Loading...
HomeMy WebLinkAboutSW8980308_Historical File_19980430State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality Mr. Tony Arato, Vice President Applied Analytical Industries, Inc. 1206 N. 23rd Street Wilmington, NC 28405 Dear Mr. Arato: 4 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 30, 1998 Subject: Permit No. SW8 980308 Applied Analytical Office Building Expansion High Density Commercial Stormwater Project New Hanover County The Wilmington Regional Office received the Stormwater Management Permit Application for Applied Analytical Office` Building Expansion on March 9, 1998, with final information on April 29, 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 980308 dated April 30, 1998, for the construction of Applied Analytical Office Building Expansion. This permit shall be effective from the date of issuance until April 30, 2008, and shall be subject to the conditions and limitations as specifiet therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerely, t ---c Cam- �•v� Qrl Rick Shiver, P.G. Acting Regional Water Quality Supervisor RSS/arl: S:1WQSISTORMWAT\PERMIT1980308.APR cc: John Tunstall, P.E. Tony Roberts, New Hanover County Inspections Beth Easley, New Hanover County Engineering David Mayes, P.E., City of Wilmington Engineering Linda Lewis Wilmington Regional Office Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equa➢ Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper State Stormwater Management Systems Permit No. SW8 980308 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules; and Regulations PERMISSION IS HEREBY GRANTED TO Applied Analytical Industries, Inc. Applied Analytical Office Building Expansion New Hanover County FOR THE construction, operation and maintenance of a detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules ") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April30, 2008 and shall be subject to the following specified conditions and limitatipns: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 411,842 square feet of impervious area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 2 State Stormwater Management Systems Permit No. SW8 980308 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Water Body Receiving Stormwater Runoff Classification of Water Body: If Class SA, chloride sampling results: Pond Depth, feet: Permanent Pool Elevation, FMSL: Total Impervious Surfaces, ftz: Total Offsite Area entering Pond, ftz: City Street Service News (&90 % Required Surface Area, ftz: Provided Surface Area, ftz: Required Storage Volume, ft3: Provided Storage Volume, ft3: Temporary Storage Elevation, FMSL: Controlling Orifice: )IVISION OF WATER QUALITY PROJECT DATA SHEET Applied Analytical Office Building Expansion 980308 New Hanover County Mr. Tony Arato, Vice President Applied Analytical Industries, Inc. 1206 N. 23rd Street Wilmington, NC 28405 March 9, 1998 Smith Creek "C Sw" n/a 6.5 11.5 411,842 161,665 80,780 80,885 20,000 25,262 33,367 38,501 12.9 2.5"$ pipe 3 State Stormwater Management Systems Permit No. SW8 9.0 08 5. All runoff from all built -upon area on the project must be directed into the permitted stormwater control system. 6. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built - upon area. 7. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision of the project area. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. In addition, the Director may determine that other revisions to the project should require a- modification to the permit. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the -time frame specified in the notice, the permittee shall submit'a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system: a. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 3. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 4. Decorative spray fountains will not be allowed in the ponds. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 4 State Stormwater Management Systems Permit No. SW8 980308 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 8. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the pernuttee if access to the stormwater facilities will be restricted by the sale of any portion of the property. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permitteegrants DENR Staff permission to enter the property for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 30th day of April, 1998. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION '17(P-� A. Preston Howard, Jr., F.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 980308 k State Stormwater Management Systems Permit No. SW8 S80 08 Applied Analytical Office Building Expansion Stormwater Permit No. SW8 980308 New Hanover County Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, ,(Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Noted deviations from approved plans and specification: ON Signature Registration Number Date SEAL 2 I STORMWATER A&K #972 30 POND MAINTENANCE REQUIREMENTS D E C E I V E Project Name: AAI Expansion - Office Building Project Number: AP D R 2 L1, 91.8 P 'imittee: Amlied Analvtical Inch-aripq A.,, Address: _1206 N. 23rd Street Wilmington. NC 28405 Phone No. 910-392-1606 I. Monthly, or after every runoff -producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DWQ personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly (Four times a year): A. Inspect the collection system (i.e., catch basins, i in P p g, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. III. Semi-annually (twice a yeas): A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The forebay depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of original design depth of _ 6m 5 feet. C. Grassed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. Repair eroded areas immediately. L 1 POND MAINTENANCE REQUIREMENTS PAGE 2 IV. Annually (Once a year): A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of the original design depth or 3', whichever is greater. Design depth is 6.5, , measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth. V . General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6" . B. Cattails are encouraged along the pond perimeter; however, they will be removed when they cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemicals for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. If previously approved components are determined to be ineffective, the component will be redesigned and/or replaced. V. Special Requirements: 1, Tony Arato, Vice -President , hereby acknowledge that I am the financially (plewe pfwt or type now crawly) responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. Signature: !iJ�� Revised VZ5/97 Date: -_5 Data for AAI EXPANSION Page 1 TYPE III 24-HOUR RAINFALL= 7.0 IN JDYTz. 'STl lW Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HydroCAD 4.523 000479 lci 1986-1996 Applied Microcomputer Systems WATERSHED ROUTING 0 0 0 OSUBCATCHMENT REACH Q PONO 1' LINK Data for AAI EXPANSION Page 2 TYPE III 24-HOUR RAINFALL= 7.0 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HYdroCAD 4.523 000479 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 AAI EXP.,AAI EXIST.,SERVICE NEWS, NEW ROAD PEAK= 50.84 CFS @ 12.29 HRS, VOLUME= 5.40 AF ACRES CN SCS TR-20 METHOD 9.46 98 IMPERVIOUS AREA TYPE III 24-HOUR 4.20 60 GREEN AREA RAINFALL= 7.0 IN 13.66 86 SPAN= 10-20 HRS, dt=.1 HRS Method Comment Tc (mini DIRECT ENTRY ENTIRE AREA 25.0 Data for AAI EXPANSION Page 4 TYPE III 24-HOUR RAINFALL= 7.0 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HdroCAD 4.523 000479 (c) 1986-1996 Applied Microcomputer Systems POND 1 POND Qin = 50.84 CFS @ 12.29 HRS, VOLUME= 5.40 AF Qout= 21.82 CFS @ 12.72 HRS, VOLUME= 4.40 AF, ATTEN= 57%, LAG= 25.9 MIN Qpri= 20.96 CFS @ 12.72 HRS, VOLUME= 4.38 AF Qsec= .86 CFS @ 12.72 HRS, VOLUME= .02 AF ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK STORAGE = 186325 CF 5.0 100 0 0 PEAK ELEVATION= 14.9 FT 11.5 25260 82420 82420 FLOOD ELEVATION= 15.5 FT 12.0 27400 13165 95585 START ELEVATION= 11.5 FT 12.9 29740 25713 121298 SPAN= 10-20 HRS, dt=.1 HRS 13.0 30000 2987 124285 Tdet= 203.8 MIN (2.47 AF) 14.8 35000 58500 182785 15.0 35600 7060 189845 15.5 37000 18150 207995 # ROUTE INVERT_ OUTLET DEVICES 1 P 11.5' 2.5' ORIFICE/GRATE Q=.6 PI r"2 SQR(2g) SQR(H-r) 2 P 12.9' 4.5' x .75' ORIFICE/GRATE Q=.6 Width 2/3 SQR(2g) (H"1.5 - [H-Height]-1.5) 3 S 14.9' 16' SHARP -CRESTED RECTANGULAR WEIR Q=C L H-1.5 C=3.27+.4 H/1 L=Length-2(.1 H) Primary Discharge �1=0rif ice/Grate 2=0r i f i ce/Grate Secondary Discharge 13=Sharp-Crested Rectangular Weir Data for AAI EXPANSION TYPE III 24-HOUR RAINFALL= 7.0 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. HvdrnCAD 4_ S?l nnn47Q r r i I QAA- i aQA Ann l ;nrl M i rvrnrnn REACH 1 Qin = 20.96 CFS @ 12.72 HRS, VOLUME= 4.38 AF Qout= 20.93 CFS @ 12.74 HRS, VOLUME= 4.38 AF, ATTEN= 0%, LAG= DEPTH END AREA DISCH (FT) (SO -FT) (CFS) 36" PIPE 0.0 -0.0 0.00 .3 .4 3.37 n= .012 .6 1.0 14.15 LENGTH= 100 FT .9 1.8 31.64 SLOPE= .05 FT/FT 2.1 5.3 135.27 2.4 6.1 157.93 2.7 6.7 172.20 2.8 6.9 173.80 2.9 7.0 172.19 3.0 7.1 161.57 Page 3 28 Apr 98 .9 MIN STOR-IND+TRANS METHOD PEAK DEPTH= .72 FT PEAK VELOCITY= 16.0 FPS TRAVEL TIME = .1 MIN SPAN= 10-20 HRS, dt=.1 HRS Data for AAI EXPANSION Page 5 TYPE III 24-HOUR RAINFALL= 9.0 IN '50YrL !�—TbPM Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HydroCAD 4.523 000479 (c) 1986-1996 Applied Microcomputer Systems WATERSHED ROUTING 0 SUBCATCHMENT REACH Q POND I I LINK Data for AAI EXPANSION Page 6 TYPE III 24-HOUR RAINFALL= 9.0 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HYdroCAD 4.523 000479 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 AAI EXP.,AAI EXIST.,SERVICE NEWS, NEW ROAD PEAK= 68.16 CFS @ 12.29 HRS, VOLUME= 7.26 AF ACRES CN SCS TR-20 METHOD 9.46 98 IMPERVIOUS AREA TYPE III 24-HOUR 4.20 60 GREEN AREA RAINFALL= 9.0 IN 13.66 86 SPAN= 10-20 HRS, dt=.1 HRS Method Comment Tc (min) DIRECT ENTRY ENTIRE AREA 25.0 Data for AAI EXPANSION Page 8 TYPE III 24-HOUR RAINFALL= 9.0 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HydroCAD 4.523 000479 (c) 1986-1996 Applied Microcomputer Systems POND I POND Qin = 68.16 CFS @ 12.29 HRS, VOLUME= 7.26 AF Qout= 43.66 CFS @ 12.57 HRS, VOLUME= 6.22 AF, ATTEN= 36%, LAG= 16.9 MIN Qpri= 23.98 CFS @ 12.57 HRS, VOLUME= 5.53 AF Qsec= 19.67 CFS @ 12.57 HRS, VOLUME= .69 AF ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD (FT) (SF) (CF) (CF) PEAK STORAGE = 204353 CF 5.0 100 0 0 PEAK ELEVATION= 15.4 FT '11.5 25260 82420 82420 FLOOD ELEVATION= 15.5 FT 12.0 27400 13165 95585 START ELEVATION= 11.5 FT 12.9 29740 25713 121298 SPAN= 10-20 HRS, dt=.1 HRS 13.0 30000 2987 124285 Tdet= 161.1 MIN (4.27 AF) 14.8 35000 58500 182785 15.0 35600 7060 189845 15.5 37000 18150 207995 # ROUTE INVERT OUTLET DEVICES 1 P 11.5' 2.5" ORIFICE/GRATE Q=.6 PI r"2 SQR(2g) SQR(H-r) 2 P 12.9' 4.5' x .75' ORIFICE/GRATE Q=.6 Width 2/3 SQR(2g) (H-1.5 - [H-Height]-1.5) 3 S 14.9' 16' SHARP -CRESTED RECTANGULAR WEIR Q=C L H-1.5 C=3.27+.4 H/1 L=Length-2(.1 H) Primary Discharge �1=Orifice/Grate 2=Orifice/Grate Secondary Discharge 13=Sharp-Crested Rectangular Weir Data for AAI EXPANSION Page 7 TYPE III 24-HOUR RAINFALL= 9.0 IN Prepared by ANDREW & KUSKE CONSULTING ENGINEERS, INC. 28 Apr 98 HydroCAD 4.523 000479 (c) 1986-1996 Applied Microcomputer Systems REACH 1 Qin = 23.98 CFS @ 12.57 HRS, VOLUME= 5.53 AF Qout= 24.02 CFS @ 12.58 HRS, VOLUME= 5.52 AF, ATTEN= 0%, LAG= .6 MIN DEPTH. END AREA DISCH (FT) (SO -FT) (CFSJ 0.0 -0.0 0.00 .3 .4 3.37 .6 1.0 14.15 .9 1.8 31.64 2.1 5.3 135.27 2.4 6.1 157.93 2.7 6.7 172.20 2.8 6.9 173.80 2.9 7.0 172.19 3.0 7.1 161.57 4-imi1Jm n= .012 LENGTH= 100 FT SLOPE= .05 FT/FT STOR-IND+TRANS METHOD PEAK DEPTH= .77 FT PEAK VELOCITY= 16.6 FPS TRAVEL TIME _ .1 MIN SPAN= 10-20 HRS, dt=.1 HRS ouuet r Project Title: AAI EXPANSION Project Engineer: JOHN TUNSTALL c:lhaestadWmclaaLstm SITEWORKS DESIGN GROUP StormCAD v1.0 00/05M 03:24:59 PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 DOT Report Pipe -Node Upstream Downstream Inlet Area (acres) Inlet CA (acres) Total CA (acres) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Slope- Energy Constructed (ftmt) -Section- Discharge Capacity (cfs) -Section- Shape Size Length (ft) Average Velocity ft/s Description P-19 1-17 0.52 0.49 0.49 22.00 18.81 0.138972 3.60 Circular 17.00 4.93 J-1 21.30 16.55 0.160000 14.25 121nch P-1 1-1 0.40 0.38 0.38 20.25 17.72 0.002943 2.77 Circular 88.00 3.17 1-2 20.00 17.58 0.005000 4.57 15 inch P-2 1-2 0.46 0.44 0.82 20.00 .17.58 0.004737 5.89 Circular 141.00 4.51 1-3 19.75 16.94 0.004823 7.29 18 inch P-3 1-3 0.39 0.37 1.19 19.75 16.94 0.004036 8.44 Circular 130.00 4.50 J-1 21.30 16.55 0.004615 15.37 24 inch P-6 J-1 N/A N/A 1.68 21.30 16.55 0.004847 11.81 Circular 119.00 5.36 1-6 20.75 16.05 0.005042 16.06 24 inch P-20 1-6 0.16 0.15 1.83 20.75 16.05 0.003911 12.76 Circular 138.00 5.05 1-9 19.00 15.67 0.004928 15.88 24 inch P-12 1-12 0.26 0.25 0.25 21.50 16.28 0.006M 1.80 Circular 74.00 2.54 1-10 19.00 15.96 0.013514 7.51 15 inch P-13 1-13 0.26 0.25 0.25 21.50 17.28 0.009774 1.80 Circular 71.00 2.66 1-11 20.00 16.75 0.014085 7.67 15 inch P-11 1-11 0.60 0.57 0.82 20.00 16.75 0.004687 5.89 Circular 193.00 4.30 1-10 19.00 15.96 0.005181 7.56 18 inch P-10 1-10 0.56 0.53 1.60 19.00 .15.96 0.003908 11.29 Circular 138.00 4.87 1-9 19.00 15.67 0.005435 16.68 24 inch P-14 1-9 0.07 0.07 3.50 19.00 15.67 0.009711 24.03 Circular 60.00 8.04 1-15 17.98 14.51 0.013333 47.36 30 inch P-15 1-15 0.16 0.15 3.65 17.98 14.81 0.006995 25.00 Circular 12.00 5.75 J-2 18.25 14.98 0.016667 86.10 361nch P-16 J-2 WA N/A 3.65 18.25 14.98 0.001974 24.98 Circular 60.00 4.71 1-18 18.00 14.96 0.005000 47.16 36 inch P-18 1-18 0.00 0.00 8.77 18.00 14.96 0.008434 48.17 Circular 83.00 8.43 Outlet I I 116.00 14.26 0.ODS434 61.25 36 inch Project Title: AAI EXPANSION Project Engineer: JOHN TUNSTALL c:%haestadlstmclaai.stm SITEWORKS DESIGN GROUP StormCAD v1.0 03/05198 03:24:10 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Paaa 1 of 1 Ip- S �17 0 ✓" �a :S,? -T-q T-►3 �- r- 14- J -Ib Project Engineer: LARRY SNEEDEN c:lhaestadlstmclaai-9723.stm SITEWORKS DESIGN GROUP StormCAD v1.0 03/04M 02:36:19 PM 6 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1 DOT Report Pipe -Node- Upstream Downstream Inlet Area (acres) Inlet CA (acres) Total CA (acres) -Ground- Upstream Downstream (ft) -HGL- Upstream Downstream (ft) -Slope- Energy Constructed (ft/ft) -Section- Discharge Capacity (cfs) -Section- Shape Size Length (ft) Average Velocity (ft/s) Description P-24 1-13 0.17 0.13 0.13 19.42 16.40 0.016042 0.92 Circular 13.00 2.68 J-10 19.70 16.26 0.019231 4.94 12 inch P-25 1-14 0.11 0.08 0.08 19.42 16.32 0.007727 0.59 Circular 18.00 2.10 J-10 19.70 16.26 0.013889 4.20 12 inch P-23 J-10 N/A N/A 0.21 19.70 16.26 0.004316 1.50 Circular 290.00 3.21 J-8 18.20 15.00 0.004310 4.24 15 inch P-22 1-12 0.20 0.15 0.15 17.98 14.97 0.001361 1.08 Circular 28.00 1.97 J-8 18.20 15.00 0.008929 6.10 15 inch P-27 1-16 0.00 0.00 3.43 19.00 15.47 0.012571 18.84 Circular 59.00 5.77 1-11 17.98 14.91 0.013559 47.76 30 inch P-21 1-11 0.20 0.15 3.58 17.98 14.91 0.002828 19.61 Circular 13.00 5.07 J-8 18.20 15.00 0.015385 50.87 30 inch P-20 J-8 N/A N/A 3.93 18.20 15.00 0.001426 21.54 Circular 61.00 4.01 J-9 17.92 14.99 0.004918 46.77 36 inch P-18 1-10 0.23 0.22 0.22 17.62 15.18 0.000602 1.59 Circular 18.00 1.31 J-6 17.85 15.17 0.039444 12.83 15 inch P-17 1-9 0.23 0.17 0.17 17.62 15.18 0.000365 1.24 Circular 14.00 1.02 J-6 17.85 15.17 0.050714 14.55 15 inch P-15 1-8 0.17 0.13 0.13 19.73 17.25 0.000201 0.92 Circular 19.00 0.75 J-5 19.97 17.24 0.017895 8.64 15 inch P-14 1-7 0.17 0.13 0.13 19.73 17.25 0.000201 0.92 Circular 12.00 0.75 J-5 19.97 17.24 0.049167 14.32 15 inch P-9 1-6 2.05 0.73 0.73 20-00 18.05 0.001970 4.63 Circular 48.00 3.06 J-4 20.80 18.04 0.015625 13.13 18 inch P-30 1-18 0.70 0.40 0.40 22.41 21.47 0.046464 2.57 Circular 49.00 4.35 1-5 21.84 19.22 0.046531 7.68 12 Inch P-7 1-5 0.14 0.10 0.51 21.84 19.22 0.005422 3.22 Circular 21.00 3.50 J-3 22.08 19.30 0.040476 13.00 15 inch P-26 1-15 1.03 0.78 0.78 20.00 19.39 0.002154 5.01 Circular 30.00 2.88 1-4 21.84 19-33 0.006667 8.58 18 inch P-6 1-4 0.14 0.10 0.89 21.84 19.33 0.002885 5.64 Circular 12.00 3.19 J-3 22.08 19.30 0.012500 11.74 18 inch P-29 1-17 1.60 1.26 1.26 24.67 23.54 0.066249 8.04 Circular 44.00 6.85 1-3 23.22 20.66 0.066364 16.64 15 inch P-3 1-3 0.21 0.15 1.41 23.22 20.66 0.021011 9.00 Circular 20.00 5.69 J-2 24.43 20.40 0.025000 16.61 18 inch P-4 1-2 0.21 0.15 0.15 23.08 20.45 0.008597 1.13 Circular 22.00 2.37 J-2 24.43 20.40 0.045455 7.60 12 inch P-1 1-1 1.04 0.79 0.79 22.50 20.93 0.010544 5.78 Circular 31.00 4.72 J-1 24.26 20.69 0.011290 11.16 18 inch P-2 J-1 N/A N/A 0.79 24.26 20.69 0.003262 5.76 Circular 129.00 3.88 J-2 24.43 20.40 0.005039 7.46 18 inch P-5 J-2 NIA NIA 2.36 24.43 20.40 0.006062 15.01 Circular 211.00 5.91 J-3 22.08 19.30 0.006398 18.09 24 inch P-8 J-3 N/A N/A 3.75 22.08 19.30 0.006895 23.47 Circular 200.00 6.53 J-4 20.80 18.04 0.007000 34.32 30 inch P-13 J-4 N/A N/A 4.48 20.80 18.04 0.006447 27.59 Circular 130.00 7.24 J-5 19.97 17.24 0.006462 32.97 30 inch P-16 J-5 N/A N/A 4.73 19.97 17.24 0.006416 28.89 Circular 330.00 7.38 J-6 17.85 15.17 0.006424 32.87 30 inch P-19 J-6 N/A N/A 5.12 17.85 15.17 0.008718 30.58 Circular ro ginee RY SNEED --- -•--•-•••• �i i-wnna 9jca1% an %3Kuur StormCAD v1.0 03105/98 03:An•0' PM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755.1666 Page 1 of 2 DOT Report Pipe -Node- Upstream Inlet Area Inlet CA Total CA -Ground- Upstream -HGL- Upstream Slope- Energy -Section- Discharge -Section- Shape Length Average Description Downstream (acres) (acres) (acres) Downstream Downstream Constructed Capacity Size (ft) Velocity (ft/s) 00 (ft) (�) WS) J-9 17.92 14.99 0.011346 43.69 30 inch P-28 1 N/A N/A 9.05 17.92 14.99 0.008701 49.38 Circular 64.00 9.38 Outlet 16.001 13.941 0.010937 69.75 36 inch Project Engineer: LARRY SNEEDEN c:%haestaMstmc%aai-9723.stm SITEWORKS DESIGN GROUP StormCAD v1.0 031D5M 03:40:22 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 2 of 2 John R. Andrew, P.E. Andrew & Kuske J.A. Kuske, P.E. CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E. 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 . Fax 910/343-9604 April 29, 1998 NCDENR/Div. of Environmental Mgmt. 127 Cardinal Drive Extension Wilmington, NC 28405-3845 P-I, Attn: Ms. Linda Lewis RE: AAI Expansion A & K Project No. 97230 Dear Ms. Lewis: DIVED :S0j gel Xj3o 3 APR 2 9 1998 In response to your letter of April 27, 1998, please find the following revised plans, calculations, and permit application for the above referenced project. Also find the following responses to your comments. 1. Plans and calculations have been revised to account for the Service News site at full build out potential (90% Impervious). 2. Permanent pool contour is dimensioned on plan. 3. Wet detention pond supplement list has been revised to show state flood pool elevation. 4. The pond is located on AAI property. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. Jo n S. Tunstall, P. E. JST/tsm Attachment cc: Mr. Phil Sharpe/Sharpe Architecture 97MO-27 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original L GENERAL INFORMATION Applicants name (specify the name of the corporation, individual, etc. who owns the project): Applied Analytical Industries, Inc. 2. Print Owner/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): Tony Arato, Vice President 3. Mailing Address for person listed in item 2 above: 1206 N. 23rd Street City: Wilmmgton State: NC Zip: 28405 Telephone Number: ( 910 ) 392-1606 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): _Applied Analytical Office Building Expansion 5. Location of Facility (street address): 1206 N. 23rd Street City: Wilmington County: New Hanover 6. Directions to facility (from nearest major intersection): From intersection of US Hwy 17 (Market St.) and 23rd St. - Head North on 23rd. St. AAI Facility approx. 0.95 miles from intersection. 7. Latitude: 340 15' 27" Longitude: 770 55' 07" of facility 8. Contact person who can answer questions about the facility: Name: Tony Arato, Vice -President Telephone Number: ( 910 ) 392-1606 IL PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number N/A and its issue date(if known) N/A Form SWU-101 January 1998 Page 1 of 4 3, Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA X Sedimentation/Erosion Control 404 Permit III. PROJECT INFORMATION: 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated by a wet detention pond designed at 90% TSS removal. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 13.66 acres 4. Project Built Upon Area: 8.6 ac/62% % 5. How many drainage basins does the project have? one 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. PntirP nrninna,- ArPn u ::...t" Smith Creek Receiving Stream Name Receiving Stream Class C-SW Drainage Basin Area 13.66 AC Existing Impervious* Area 3.02 AC Proposed Impervious* Area 8.60 AC Impervious* Area total 62% R E v' "• 50,441 F On -site Buildings, PH I II III On -site Streets Public Road 64,750 Ft On -site Parking 105,111 Ft On -site Sidewalks 6,500 Ft Other on -site Sidewalk with R/W 16,030 Ft Off -site 131,550 Ft Total: E=374 382 F - 8.60ac E_ *Impervious area is defned as the built upon area including, but not limited to, buildings, roans, pariang areas, sidewalks, gravel areas, etc. 7. How was the off site impervious area listed above derived: Existing AAI site - as -built survey, impervious areas taken off of computer; Service News site - field verification and aerial photo IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants and required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Form SWU-101 January 1998 Page 2 of 4 _33 'Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA X Sedimentation/Erosion Control 404 Permit M PROJECT tPTFORMATION: 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated by a wet detention pond designed at 90% TSS removal. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 13.66 acres 4. Project Built Upon Area: 9.46 ac/69% 5. How many drainage basins does the project have? one 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. Entire Drainage Area Receivin Stream Name Smith Creek Receiving Stream Class C-SW Drainage Basin Area 13.66 AC Existing Impervious* Area 3.88 AC Proposed Impervious* Area 9.46 AC % Impervious* Area total 69% On -site Buildings,PHI II III 50,441 F On -site Streets Public Road 64,750 F On -site Parking 105,111 F On -site Sidewalks 6,500 F Other on -site Sidewalk with R/W 16,030 F Off -site 169,012 F Total: E=411842 F - 9.46ac £_ -impervious area is aennea as the ouur upon area tnctuaing, out not atmttea to, outtatngs, roaas, parking areas, sidewalks, gravel areas, etc. 7. How was the off site impervious area listed above derived: Existing AAI site - as -built survey, impervious areas taken off of computer; Service News site - field verification and aerial photo W. ➢DIEFID RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants and required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Form SWU-101 January 1998 Page 2 of 4 A&K #97230 POND MAINTENANCE REQUIREMENTS Project Name: AAI Expansion - Office Building Project Number: 9oOlj ? p e Permittee: Applied Analytical Industries, Inc. Address: 1206 N. 23rd Street, Wilmington, NC 28405 Phone No. 910-392-1606 I. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair/replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DWQ personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly (Four times a year) : A. Inspect the collection system (i.e., catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlet pipes will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. III. Semi-annually (twice a year) : A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The forebay depth will be checked at various points. Sediment removal is required when the depth is reduced to 75 % of original design depth of 6.5 feet. C. (massed swales, including the vegetated filter if applicable, will be reseeded twice a year as necessary. Repair eroded areas immediately. POND MAINTENANCE REQUIREMENTS PAGE 2 IV u CIA Annually (Once a year): STORMWATER D E C E I V E D MAR 0 91998 D E M PROJ # A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75% of the original design depth or 3', whichever is greater. Design depth is fi :5 +, measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6" . B. Cattails are encouraged along the pond perimeter; however, they will be removed when they cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemicals for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice is designed to draw down the pond in 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond system will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. If previously approved components are determined to be ineffective, the component will be redesigned and/or replaced. Special Requirements: I, Tony Arato, Vice -President , hereby acknowledge that I am the financially W—ePrW-:ffle—cka.&, responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. Signature: Revived 2125M Date: 0-q-7r John R. Andrew, P.E. Andrew & Kuske J.A. Kuske, P.E. CONSULTING ENGINEERS, INC. J. Phillip Norris, P.E. 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604 March 9, 1998 NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Attn: Ms. Linda Lewis .CEIVED MAR 0 9 1998 BY: Re: Applied Analytical Office Expansion New Hanover County A&K Project No. 97230 Dear Ms. Lewis: Enclosed are three sets of plans for the subject project, calculations, the original Division of Water Quality stormwater management permit application and one copy and a $385.00 check for the processing fee. Also enclosed is Pond Maintenance Requirements, Form SWU-102 and a Stormwater Narrative. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, ANDREW & KUSKE CONSULTING ENGINEERS, INC. JPn . Tunstal I, P. E. JST/tsm Enclosures cc: Mr. Tony Arato/AAI 9729o-SW _- — — Andrew & Kuske CONSULTING ENGINEERS, INC. John R. Andrew, P.E. J.A. Kuske, P.E. J. Phillip Norris, P.E. 902 Market St. • Wilmington, North Carolina 28401-4733 • Telephone 910/343-9653 • Fax 910/343-9604 AAI OFFICE BUILDING EXPANSION STORMWATER NARRATIVE MARCH 6, 1998 A & K NO. 97230 AAI is planning to build a new facility'behind its current office in Wilmington, NC. The current AAI office is located on 23rd' Street between Service News Company on the North and Expo Business Park on the South. The proposed development is within the City of Wilmington limits and the land disturbance will be over an acre, therefore the development will be designed to comply with the State Stormwater requirements as well as the City of Wilmington stormwater requirements. The drainage area to the stormwater detention pond consists of the proposed AAI facility, the existing AAI site, the 36' wide public collector street within a 60 ft. right of way, and the Service News Company site along 23rd Street. The Impervious area of the Service News site was taken to be at the max build upon area (90% Impervious). The total contributing drainage area to the stormwater detention pond is 13.66 acres. The contributing impervious areas (9.46 acres) of the existing AAI facility and the new development were calculated by the computer. The Service News Co. drainage area was taken off aerial photo maps and was also field verified. Wetlands exist on the site and are delineated on the plans. The proposed development and the stormwater detention pond are outside the limits of the wetlands. Stormwater runoff will be collected by a series of drop inlets and will be conveyed to the detention pond by reinforced concrete pipe. The stormwater detention pond will be designed for 90% TSS removal and will store and release the 1st one inch volume of rainfall within a period of 2 to 5 days. The stormwater collection system and pond will also be designed in accordance with City of Wilmington Standards for a 10 year storm event and will be checked for the 50 year storm event. In efforts to improve the water quality of the effluent water, the pond outlet will discharge into the wetlands. All necessary erosion control measures are designed in conjunction with the contributing stormwater runoff and are shown on the plans. Date Design Andrew and Kuske 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Check Job Sr�r,MK44,2EZ For C�L,L'L!l�1T/oN5 Sheet rf Job No. 97230 �,��rr� �7a,eNtw��z ���CGI L�4rrmvs lev �c-1 i�clGrb14(l �TORMWATER p-E c e i v e APR 2 91998 D E PROJ.# $U36$ Date Design Andrew and Kuske Sheet 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Check Job l�Tq j E STo/zJv(W� 7-1- For �yvr'�%'/✓S�p�/ Job No. �7Z�0 3'7,3gz�,�r A��.O T � WA53ZZ r yra 37, 389 . `T3 t Tiv / Fr D Rl;-J l W1, r767 0940/9 �ro2a� E ���.rG.n7Jt�iy - dPFI- G6 Date Design o„ Andrew and Kuske [Sheet :f 202 N. Fifth Ave. CONSULTING ENGINEERS, INC, Wilmington, N.C. 28401 3 Of Check Job '%A� ���ar For A Job No. G��Gu�,aTlbNs � �72�1� f��,nm,a �s Pam_ ��G✓ �',�vu�.v�®.us ��sy WAG � __...�� /GN�1✓ �d�.....,_ .Z�.�:..�.�� 7 Z4�5Qa lXCP W jj4,h-Ze /Jv%2 IvileL 70o C -37 :? �09 , A: rr5) � 74A/'7,g Aj-3 2 7� r-r 3 Date Design Andrew and Kuske 5 f 8 4f 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Check Job STor'�i w,o T� 2 For �Ar �/pairo�vAL �/GG 644-!J CAL.C.LIGiOTiO/VS 16Z I4sl= Lo rJ = O. o, Z cm,vG 04 " 4CP STA 4:2- OO �� /Zb�v ,c� Z. - Z 24 II z-,-- C V, J&b/b WA Z-„ �G Sheet Of Job No. g-7z Date Design Andrew and Kuske Sheet 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 £> Of i Check Job For Job No. 97z3o _ _ ... . e ... _. _ ..._ ._ F� CUGLlll z .._ . if7d/l/vs l�srt�r K SL..F Z¢ /`�G/�6 & -67-X 4�t eiP G - Z �d = /. ZS x 2 Z. S C!'NkLTi/Sc� Cyr Ll/�,�TSJ �x�a=ice, A--G%5, 0 1U15; / Z• W X zo 'G X. /Zl ,,z�) IZ9a Dlid /o CO in Z z O W i a" N C/3 . LU LU z 0 --1 c U L 00 LL z 0 c0 ■..�. Z 0 LLI LLI O � C - O • . O � r i 7 • i .7 ev O � O 9 O • =a a_ -- sz > �'-2 c • g� c �E a ES w 0 � `a��� 0 0 O a• �: O W d L- V O. � O L- O tr • v A d Y d . d • gn f17 N 0 0 0 0 0 0 Qi� L2+� C G C O O C 0 = C27J ■ R ■ ■ ■ n G C.. IL d 0 o O C. , Oci z" "- 0 0 0 o a P- c CO a0 Z J ! R R ■ R R •w� IL n n a a O �. E P O P O P P z a a U.6- s a r M •- 0 Cr { N Vf N Vf N V1 V1 O -NOZ ! 1 1 I 1 I 1 I 1 1 1 1 1 1 1 I 1 1 I 1 1 1 1 t 1 I I I 1 1 1 I 1 I ! 1 I 1 I 1 1 � � 1 1 i Ir -'1- -T-- 1 1 I ! 1 er 1 1 1 r C%4 N 'S 'd 'd N I n H- 15 -?.43 Ln B s: C`7 CA U � O C C LJ Z LI U � O C: cm r < u Z• � ? L� u c L= O Z z C O U O 0 z " o x o z © z L:., U C D O cn 'a I Date Design Andrew and Kuske Sheet 3149 I98 4f 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Check Job For �J4Z- 5'pgNSioAl Job No 97.z�o Gin' o-F W14A,fIA4� ro Ay S rD,e �►U r v o r,E/z iiv�=D,��s�l n T.r�„� • Z441AI.o6457 /q/tAKjpV ID Pavo =-9/ f�.�/1�1�C`/ nJ .f 'oie oN�ioiV 5; 2 A� / 3. & AL — -2w. G-GlGAT lJ TD 60W,01 TiDNj (CXV oz�a Air 6L-:5ZV/Gr -v�H/5 - = O. 59 7or.qZ_ G = 489 /�= 2. 07ye, *, AG, 4�_ ¢9'?9, - 2i, o-5 C'A:' Date Design Andrew and Kuske Sheet 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 q Of Check Job 1270Q,`ylAMMOC- For ���' jgel,' Job No. z�qzCa�i^1'004/ q 7Z3o 6W,41-A!�F- � Pl T� Co c. � rs�euS 7�MIA.1,4at!,5 14q SWAL,E 'fD /8 ��rLG� di/h 0"c y d =evsI 17= D,Ozz � �C•a 55 ir��in/c C7/c � ?'�ow 0,r,T'f-j X Z To /f ��.�Ga��a +� /9. of ? -P/ 72W 2 F-�q5T' 4t:; Aq q62 4Z - �v/�v�l fJ�� GO,tI i_-!>-T 1� /� •l�Gfs �- /2.90 cis - 29, S Gf'S /7 V GDCiTj'= 3. B 71�7 s Date Design Andrew and Kuske Set Z� g 202 N. Fifth Ave. CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of Check Job 67VOMAI-OW- Fore— �ipC�Ll jaf Job No. eAJ-C 4 C 471',9 uh c172-5& . �A L. Lam. E5oYST dC �aN,o 75 AG. G . ` /5 49, ez Z 6419-rp, wiaL�c t�/� l �Wi4G� lreJ��T' �� �f3ivD Y /5 alAl C - ®. f'o - �r S-®� = S Ty ---1 7� 5 6AA t,,e, b/c i Permit No. � 9�O-TOs (to be provided by DWQ- State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater M nagement Plan Review• A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Applied Analytical Office Building Expansion Contact Person: Tony Arato Phone Number: ( 910 ) 392-1606 For projects with multiple basins, specify which basin this worksheet applies to Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation 5.5 ft. 11.5 ft. 14.75 ft. Permanent Pool Surface Area 25,262 sq. ft. Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA1 Diameter of Orifice 13.66 ac. 8.6 ac. 76,080 cu. ft. 35,925 cu. ft. 7,000 cu. ft. 65 % =3.65 3 in. Design TSS Removal 90 % II. REQUIRED ITEMS CHECKLIST (average elevation of the floor of the bas (elevation of the orifice) (Elevation of the discharge structure overflow (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) (combined volume of main basin and forebay) (volume detained above the permanent pool) (surface area to drainage area ratio) (85 % TSS removal required, see item k below) The following checklist outlines design requirements per the Stormwater Best Management Practices manual (NC Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Form SWU-102 January 1998 Page 1 of 2 a. The temporary pool controls runoff from the 1 inch storm event. b. The basin length to width ratio is greater than 3: 1. c. The basin side slopes above the permanent pool are no steeper than 3: 1. d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail). e. Vegetation above the permanent pool elevation is specified. f. An emergency drain is provided to empty the basin. g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). h. The temporary pool draws down is 2 to 5 days. i. A trash rack is provided for both the overflow and orifice. j. The forebay volume is approximately equal to 20% of the total basin volume. k. Sediment storage is provided in the permanent pool. 1. 30-foot vegetative filter is provided at the outlet2 (include erosive flow calculations in. Recorded drainage easement for each basin including access to nearest right-of-way. n. A site specific operation and maintenance (O&M) plan is provided. o. A vegetation management/mowing schedule is provided in the O&M plan. p. Semi-annual inspections are specified in the O&M plan. q. A debris check to be performed after every storm event is specified in the O&M plan. r. Specific clean -out benchmarks are specified in the O&M plan (elevation or depth). s. A legally responsible party is designated in the O&M plan3 (include name and title). t. If the basin is used for sediment and erosion control during construction, clean out of the. basin is specified to be performed prior to use as a wet detention basin 1When using the Division SA/DA table, the correct SA/DA ratio for permanent pool sizing should be computed based upon thy: actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. 3The legally responsible party should not be a homeowners association unless more than 50 % of the lots have been sold and a resident of the subdivision has been named the president. Form SWU-102 January 1998 Page 2 of 2 Apr 27 '98 10:58 0 K 9-3439604 State of Nor&. Caroling went of Enument and�I�at>�ral Resouxces .: ' � .. ; • Dep �?ff'ice Wayne McDevitt, Secretary dies B,.Hulit, .t. w r r ` FAX' •. o..:of; -des' Date. from. . to: u FAX: _ i,,� bo e s. C1Ydinsl -�&t�i`v��AdtelpihonnoErm(�1IgQY� F3V 13T 4639QO 1r�s 19�0) 3!o-?.IIu4 An E9ua{.Oppa tY • ., � -�+ "a� =^3=Ka �r:.:.' ...tip.. ` I I f State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Governor FAX COVER SHEET z Date: A -Z-1 - To: J onS 2 I CO: rzw 1� K us Ce- FAX #: 3¢ — CU V REMARKS: 73 �n ; 1 'v2L b-ee4 2s Wayne McDevitt, Secretary No. Of Pages: .� From: Li170(a CO: OILQ FAX#: 910-350-2004 r -o.- h-se -Fh ; s 4-SAP Ia -the- I f Qxns, 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 Telephone (910) 395-3900 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office James B. Hunt, Jr., Governor Wayne McDevitt, Secretary Division of Water Quality April 27, 1998 Mr. John Tunstall, P.E. Andrew and Kuske 902 Market Street Wilmington, NC 28401 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: ACKNOWLEDGEMENT OF RECEIPT AND REQUEST FOR ADDITIONAL INFORMATION Stormwater Project No. SW8 980308 Applied Analytical Expansion New Hanover County Dear Mr. Tunstall: The Wilmington Regional Office received a Stormwater Management Permit Application for Applied Analytical Expansion on March 9, 1998. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Have you accounted for the offsite area (Service News) at the full buildout potential, as the rules require? 2. Please dimension all sides of the figure created by the permanent pool contour. Areas and volumes cannot be verified at this time. 3. The wet detention supplement lists 14.75 as the outlet overflow. The overflow referred to is for the volume associated with the State's requirements. Please revise this to 12.75, as indicated in your calculations and plan details. 4. Locate the pond in a recorded access/drainage easement. Is the land the pond is sited on owned by AAI? The permit will contain language that requires an easement to be recorded prior to selling the land, or if access to the pond will be impeded. 127 Cardinal Dr. Eat., Wilmington, North Carolina 28405 Telephone 910-395,3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper Mr. Tunstall April 27, 1998 Stormwater Project No. SW8 980308 ---------------------------------------------- Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to May 27, 1998, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. RSS/arl: cc: Sincerely, Ms. Linda Lewis Environmental Engineer S:\WQS\STORMWAT\ADDINFO\980308.APR Linda Lewis Central Files 127 Cardinal Dr. Ext., Wilmington, North Carolina 28405 Telephone 910-395-3900 FAX 910-350-2004 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper