HomeMy WebLinkAbout20140498 Ver 1_More Info Received_20140627Cpr ENGINEERING AND SURVEYING, INC.
Land Development Consulting
June 24,2014
Attention: Karen Higgins. i
NC DWQ, WBSCP Unit rNR 512 North Salisbury Street, Raleigh, NC 27604 Re: Additional information request J U N 2 7 E U 14 For Layfayette Landing Apartments and Villas
CPT Pro ect No. 1215 -13 COG Project No. 2014 -0260 ' wA a1AUTY 3 . ,
Mrs. Higgins:
1 have addressed Sue Homewoods information request and 1 have enclosed 3 copies of the information she noted in her letter.
Please feel free to call me with any questions.
Sincerely,
CPT Engineering and Surveying, Inc.,
Robert D. Thompson, P.E.
tw D
4400 Tyning Street,
High Point, NC 27265
Phone: 336 - 812 -8800 ext. 313 Fax: 336- 812 -8780 Email: dannyt @cptengineering.com
City of Greensboro
6 J North Caroh na
Authorization Certificate
June 20, 2014
Mr. Danny Thompson, PE
CPT Engineering and Surveying, Inc.
4400Tyning Street
High Point, NC 27265
Zo14O198
D.
JUN 2 7 2014
: NR - WA Eft QUALITY
L
udl2nda t 3torrtwatar Branch
Re: Authorization Certification (Determination of No Practical Alternative) for Stream Buffer
Disturbance. Lafayette Landing Apartments and Villas
Dear Mr. Thompson:
In accordance with the State of North Carolina's Rule 15A NCAC 02B.0250- Randleman Lake
Water Supply Watershed, Protection and Maintenance of Riparian Areas, any applicant that
intends to disturb Zone 1 and Zone 2 of the stream buffer must show that there is "No Practical
Alternative" than to impact the stream buffer. The applicant submitted a "No Practical Alternative
Request" on June 20, 2014 stating that the stream buffer disturbances in Zone 1 and Zone 2 were
necessary for the construction of stream crossings to access the site, for a sanitary sewer crossing and for
the biocell outlets for the 7 stormwater controls and energy dissipaters for the site.
The City of Greensboro determined that the permanent impact of 22,544 square feet in Zone 1 and 13,980
square feet in Zone 2 of the Randleman Watersupply Watershed stream buffer were necessary for the
installation of two new access roads (Light Horse Lane, General Authors Lane), the upgrade of Ruffin
Road, a sanitary sewer connection for the site, energy dissipators and the permanently lined channels
from the exit pipes at the biocell to the receiving stream. In addition, the applicant should secure any
other required federal, state, and local certifications before the project proceeds.
Approved impacts included the following temporary and permanent disturbances:
Road Crossings
Light Horse Lane (113 LF)
General Authors Lane (124 LF)
Ruffin Road (122 LF)
Sewer Crossing (140 LF)
Biocells and Energy Disipators
Biocell 1: Zone 1 Temp. 450 SF
Biocell 2: Zone 1 Temp. 450 SF
Biocell 3: Zone 1 Temp. 450 SF
Biocell 4: Zone 1 Temp. 450 SF
Biocell 5: Zone 1 Temp. 450 SF
Biocell 6: Zone 1 Temp. 450 SF
Biocell 7: Zone 1 Temp. 450 SF
Zone 1 = 5513 SF
Zone 1 = 5380 SF
Zone 1 = 7820 SF
Zone 1 = 1341 SF
Zone 2 = 3723 SF
Zone 2 = 2682 SF
Zone 2 = 3740 SF
Zone 2 = 2175 SF
Perm. 240 SF Zone 2 Temp. 300 SF Perm. 160 SF
Perm. 270 SF Zone 2 Temp. 300 SF Perm. 180 SF
Perm. 270 SF Zone 2 Temp. 300 SF Perm. 180 SF
Perm. 270 SF Zone 2 Temp. 300 SF Perm. 180 SF
Perm. 270 SF Zone 2 Temp. 300 SF Perm. 180 SF
Perm. 300 SF Zone 2 Temp. 300 SF Perm. 200 SF
Perm. 210 SF Zone 2 Temp. 300 SF Perm. 140 SF
P.O. Box 3136 Greensboro, NC 27402 -3136 www.greensboro- nc.gov (336) 373 -CITY (2489) • TTY # 333 -6930
FES 150: Zone 1 Temp 450 SF Perm. 330 SF Zone,2 Temp. 300 SF Perm. 220 SF
FES154b:'Zone 1 Temp. 450 SF Perm. 330 SF Zone 2 Temp. 300 SF Perm. 220 SF
This' approval is valid only for the purpose and design that was described in the application. If any
modifications are made to the project a'wntten,notificahon describmg,the changes, must be submitted to
the Cityof Greensboro Water Resources Department, Engineering Division (Stormwater Engineering
Section). If the property is sold, the new.owner,must be,given a copy of the certification and approval
letter and is therebyresponsible for complying with all conditions. In addition, the applicant.should
secure,any other required federal, state, and local, certifications 'before the project proceeds.
This letter completes the review of The City - of`Greensboro, Water Resources Department,
Engineering Division (Stormwater Engineering Section) under the Determination `of No Practical
Alternative. If you have any questions, please contact Virginia Spillman at 336- 373 -3260
Sincerely,
Virginia Spillman, PE
Engineering Supervisor Stormwater
Cc: Sue Homewood, DWQ Winston Salem Regional Office
U.S. Army Corps of Engineers, Raleigh Regulatory Field Office
Mr: Danny Thompson, PE
-Z()Iqt)4 C�s
Illy. LIVII V I L'iu
KDOT
50"154A &am
TOP: 861.50
4k T 35 T
INV. IN 815.73 �5
W. OUT 57556—
INV. 10 qb
NOW
RI RAP
,OV Ib'XI IS 876
V. IN 814.91
WTCH
15 : a . - -" 73.E
ZONE I UFFER IMPACTS-- op:b A(o
TEMP 450 SF INV. IN W
ERM 330 SF INV. CIJ 3 Vw
ZONE 2
TEMP, 300 SF
PERM. J20 SF
A A
fcw DAM
.... ....... .
TC)P•ftbk)5
......... .......
IW.W .0 ...
BIER IMPACT
,ZONE
TEMP I 450 SF DM
PERM, 240 SF
ZONE 2
TEMP 300 SF
160 SF RIP
Info
PER 6, RAP IMPACT: L
(966
INV.
IN bbD57
p RAP-
ip 8 GLA55 I
1040 ZONE I
575 #174 GLASS MPAU 538q
29 Ift
LIP
N 2t7 2q4
CA ou TY
oP. -06 er 162
NC71NMR-INC-7 AND 5UP.\/EYIW.7, INC. LAYFA I E I I LAWWs APARTMEM AW
LIAINV PEVELOPHENT CION5ULTIN6 r4WHrt DRAWW46
CORPORATE LICZHBE NUMBER C-13-5 WCULVIIIIN" HPACt b' RP RAP W*"Ar-7
4400 TYMN& STREET PLAN VIEW 163-164
WvH POINT, NORT04 CAROLINA 21265 CsREE1 SBOR0, NC
PHOHE. (Mb) 012-8800 - FAX. (586) 512-9-780 P-11101
5HEET I
870
52 LF
2-i!
855
DATUM AZ9V
860. -Oo
v
ENSINEERIN6 AND SMVEYIN6, INC.
LAND DEYELOPMEHT UleA LTIN6
00RPOR2ATE LIGENSE N mom C. -1575
4400 T fWN6 STREET
HI644 POINT, NORTH CAROLIHA,,2T
PHONE f�ft1 612 -8900 FAX . i�96) 812 -8780
"W771
DBAG
DAM
WP
P RAP
REAM
LYFAYYEEM LANDMG AP�41�?1IM AND Yl IAS
W"CULVOW WrACT W RIP RAP NPACT
PROFILE 'VIEW
PGR? MILL, &X&Id CAROLINA
IhP.e0, Y.P•41
ENGINEERING AND SURVEYING, INC.
uum DeVTLOP-� CONSUL -TIN&
GORRORATE LICENSE NUMBER3C i"
4400 TYNIN5 STRUT
1-116H'POINT, NORTH CAROLINA 2T265
PHONE. (986) 8129600 PAX. (336) 812 -8'i8O
LAYFAYM LANDING APB AN,D V LLM
62' CULYOU IMPACT 16' POP RAP IMPACT
SEC7t0NAL vfEW
Csl@EEN9®0I�D, NG'
Em
molmomm
MEIN
molmommommim
Sri
mmmmmml!lllv.
Y
��
,, �utl
I����
1
�,,,,,,,�;11
�0
'
®�
-
��►��_���
►_�-
-
-• III
-0�i
_tee.--=-
A / / / /.
/ / / / / / /.'' /.I
/iii��-
�.____
N..��
mu"U
`
wommom
,
MEN
moommommom
moommommomm
moommommomm
ISEEKEEKEENE
ENGINEERING AND SURVEYING, INC.
uum DeVTLOP-� CONSUL -TIN&
GORRORATE LICENSE NUMBER3C i"
4400 TYNIN5 STRUT
1-116H'POINT, NORTH CAROLINA 2T265
PHONE. (986) 8129600 PAX. (336) 812 -8'i8O
LAYFAYM LANDING APB AN,D V LLM
62' CULYOU IMPACT 16' POP RAP IMPACT
SEC7t0NAL vfEW
Csl@EEN9®0I�D, NG'
ME
J
I
NEW 5TREAM IMPAGT: 82 L.r.
REPL ,INC '30 LF OF EXI5T(N6 PIPE` 48q
REPLAGI146 20 LF OF EXI5TIN6 RIP RAP
REPLACING 15 -LF ,OF EXI5TI% RIP' RAP',
— RELOCATE POWER POLES
I I TO 9' FROM BOC F NEE D, /
f REMOVq IF NO LCINGERt� / f
1 M
POSSEY OLD OUSE
(v �� SERV LINE I
LUCILLE A BROWN
D.B. -1766 PG. 700
TAX 7823967914
ZONED: RS-40
EXISTING USE SINGLE FAMILY
I o r r- .. OFAL STATE AO
PIPE (DEMO) 1 D / ..
- I ID
RIP, RAP:, i
OFF
�� I 0100
UT 16554-0 DA:i 4.4
I~
Derr ; -..;; ,
VV GAY TO
/ IMP GT ,182QE .. - c9 j
INV IN 853.
RIP RAP IM T Q F.
f f
RIP RAP
40.X26'x25-
1 I ci_A65.2
� f
// � I
BUFFE PA T \
\ ZONE1
TEMP 450 SF
1 ` \ PERM 270 SF
_ /ZONE 2
,� I
INEERIN6 AND 5URVEYIN6, INC,
,LAND DEVELOPMEW GONStLnN&,
GORPORA7E;UC4MW M*43M C43V
4400 TYNIM STREET
FN&H F"Mr, NORTH GNROUM 2T,2155
PH01,45 (3961812,8800 w F" (9861 812 -8980
j�
J J
i
LAY" FA LA1r lMs APARii" NTS AND YILLA�
02' au valet, nrAOr 4W wr a►r' rracr
PLAN VIEW 199 -160
Cs9�ENGBOR0, NG
r.",
\
\
T
�•(.Y�� Y wf iLY
-
. . M..... '....
\ Y S Y.Y .. ....
�\ V.r'tlIN Vi aR
n.
j�
J J
i
LAY" FA LA1r lMs APARii" NTS AND YILLA�
02' au valet, nrAOr 4W wr a►r' rracr
PLAN VIEW 199 -160
Cs9�ENGBOR0, NG
r.",
EX. ,ELEV. ,STREAM -
'IN)
DATUJI
eon.
ENGINEERING AND SURVEYING, ING.
LAND PEvm oAeNT GONSULTM
CORPORATE UGBeE NIRSER C -1575
4400 TYNH6 STREET
H16H POINT, NORTH GAROLNA 27265
PHONES MOW OD -8800 - FAX Oft) b12-8780
TEMP. COFFER/SANDBAG
DAM
OF RIP RAP IMPACT
NSTALL RIP RAP
3ELOW STREAM
3ED
;AP
LAYFAYEM LANDNS APART EMM AND VILLAG
W CW.VM MA= 4O' Or RAP IMPACT
PROFILE VIEW 1s9 -I60
,Nc
OW-40 VW-4'
lo��ll
FAmall
fmoall
W�.-
il
MRS
0
mmol
ir�il7
■
■iii
OMNI
NEI%.
ENGINEERING AND SURVEYING, ING.
LAND PEvm oAeNT GONSULTM
CORPORATE UGBeE NIRSER C -1575
4400 TYNH6 STREET
H16H POINT, NORTH GAROLNA 27265
PHONES MOW OD -8800 - FAX Oft) b12-8780
TEMP. COFFER/SANDBAG
DAM
OF RIP RAP IMPACT
NSTALL RIP RAP
3ELOW STREAM
3ED
;AP
LAYFAYEM LANDNS APART EMM AND VILLAG
W CW.VM MA= 4O' Or RAP IMPACT
PROFILE VIEW 1s9 -I60
,Nc
OW-40 VW-4'
EN&INEERINS AND SURVEYING, INC.
LAND 004 Tn45
GORPOORATE UMMENIRWBER C. -13'P5
4400 WNIN5 5TFMT
4N6H POINr,,WORTN GAROUMT 27265
F"Mes (986) 8128800 - OAX. (3961 812 -8-180
LAYFAYE - L OOWS APARYMM AM VILLM
80' CYLVW WIPA= 4V NP PAPdTIPAGT
SECTIONAL VIEW 169 =14 0
Ol�EI OI�O, ka
0.6-MV VWP -4'
NONE
mqb.,
-NNEW.M."
�
\��IIIII��
■
■1
Emom,
411111-mmEft"s
■ii��111��;��ii�_
■��Ilf�ll�
■
■
■
\i
m
MEIER
I
EN&INEERINS AND SURVEYING, INC.
LAND 004 Tn45
GORPOORATE UMMENIRWBER C. -13'P5
4400 WNIN5 5TFMT
4N6H POINr,,WORTN GAROUMT 27265
F"Mes (986) 8128800 - OAX. (3961 812 -8-180
LAYFAYE - L OOWS APARYMM AM VILLM
80' CYLVW WIPA= 4V NP PAPdTIPAGT
SECTIONAL VIEW 169 =14 0
Ol�EI OI�O, ka
0.6-MV VWP -4'
ENc51NEERIN6 AND `SIJRVEYIN6, ING. ,LAYFAYETTE LANDING APARIMENTB AND YILLA
LAWTEVELOWE gtr GOW:UL nN s rt, 6 Pw
coRPORAM LIcM way C,4" -
aer,
4400'M g* SIRMI PLAN IAEUJ 161 -162
11164 POINT, NOM CAROLINA -2120 C- dMbOBORO, kC
ROW, MM) 812 -8800 FAX, MW W-0180 P-40,
(:jf&INr=MINC7 AND WRVEYI N6, INC..
LAND'VevBX WNT GONSULT1N6
CORPORATE LIGff45E Nll WM C -1315
4400 MM STREIET
14161 POINT, NORTH CAROLINA 27265
PHA, 05b) 812 -9500 FAX. C3°J6) b12�9 IB0
SHEET 8
s
LAYFaYIErrE LAWNS APARTMENTS AND VRJ A G
runt cRAw*e
®D' 0 LvrmW'NPAGt W MP RAP:1111PACT
PROFILE VIEW 189 -160
c,RB£NSSoRo, NC
ENGINEERING AND SURVEYING, INC. L4Y AYETTE.LAOM APARMENTO ,gyp YILL�4b
LAND Devmcemea 00N%LnN& PdwuTlc ae
CORPORATE LK�E NUMBER 0-015 On' CULVtRT I'VACT 4m' NP RAP l"ACT
4400 IYWt STREET WCTIONAL VIEW I59 -YPV
H1644 PONT, NORTH CAROLINA 21265 &MENOMORO, NG
PHONEr 0336) 812 -B80O - FAX, 0336) 812 -8180 I&P.4& v.P.4'
SHEET S
' M--m-ft'mm
NONE
==Own,
mom
-ME
mom
ENGINEERING AND SURVEYING, INC. L4Y AYETTE.LAOM APARMENTO ,gyp YILL�4b
LAND Devmcemea 00N%LnN& PdwuTlc ae
CORPORATE LK�E NUMBER 0-015 On' CULVtRT I'VACT 4m' NP RAP l"ACT
4400 IYWt STREET WCTIONAL VIEW I59 -YPV
H1644 PONT, NORTH CAROLINA 21265 &MENOMORO, NG
PHONEr 0336) 812 -B80O - FAX, 0336) 812 -8180 I&P.4& v.P.4'
SHEET S
Pipe butI6Uo,W611-defindd
'Channeill
Filter
,b I a6wt
Figure G 41 Fitp(ap outlet protection (mcIh4WfivWV8.GWC0JI-
1. La is the length 6f, the �ripraiz i
apron.
Z. cl�=1.5 times the maximum
stone 'dfa'met6r but n_ ot' less
'than 6?.
3..1n a well-defined channbll ex-
tend-the-apron up t66,chanriell
banks to an =ellev5t16n, of 6`"
aboywftie maxiii-num,taiNyatbr
depth 6r-totthejop of th6.ba6k,
whi6hever is less.
.4. Nfiller'blankel or filter fabric
should be installed b6t'wee-n
the riprap,and soil fo(inda.lipm
WTALLAP W BELM TM GTIMM EM ELEVATION
ENGINEERING AM, SURVEYING, INC.
LAW VEYM.OPHWr C40INI-AULTIN&
CORPORATE UU9SE,M#2XR 04"
400
FROM MW 012,8800 — FAY, M94) 812-8180
I,SHEET 10,
LAYFAYEMIAMM APARMENTS AND VILLAS
PIN" I DIPAWNW
PW,IUP DOTALLATMM
MI
INSTALL THE PERMANENT CULVERT CR0551NG5:
The, culvert is to be installed In the dry within ,a ,2 to 3 day window of storm events.,
5edlment fencing shall be installed above and below the fill area, wrapping
the Fencing around the ends of 'the pipe. Care will be taken to keep clearing and
excavation of the stream banks ,and bed to a minimum. Stablilize ,ail dlstrubed
areas subject to flowing water with rip rap ,below the stream bed. Upon completion
of crossing, fill, compact,,ond stdillze the slopes properly. Remove any in stream
sediment control measures.
IF not able to install crossing in 'the dry:
Then they must be installed with the use of Goffer /Sand bag Dams.
The dams will be installed above and below, the culvert installations.
Pumps will be used to Install culvert In the dry and divert
stream through and away From the crossing installation. 511t fencing will
be used, parallel to the crossing to prevent down stream impacts. The
installation of culvert will' not proceed until the Flow has been diverted.
Upon .completion of, the culvert, divert flow to the permanent
culverts, install sediment fencing above the inlet "s and outlet, install outlet
protection, fill, compact and stabilize a_ ny part of the stream that is
unstable appropriately. The temporary coffer dams shall remain intact
and functioning until the all the stream work/stabllizatlons has been
completed. Ater the stream; is stabilized and flow has been diverted
then fill can be brought up and other utilities and headwalls installed.
Check and reinstall any silt fencing than needs to'be repaired on ,a
regular ,basis during construction. Mat the slopes above the top of bank
with erosion control matting as soon as permanent grade has been
estabfished if grass can not be establised. The culvert construction, in
order to, divert the Flow From temporary coffer dams to the permanent pipes should,
be completed within two weeks. Any material that need to be stockpile
near the' stream banks- v4111 be protect by silt fencing and shal l remain no more than, I
week.
If stockpile is required for longer lengths of time it shall be moved above
the temporary sediment baslns that are planned for the site and ,that will
be installed before the culvert installation. Any dewatering of the culvert
installation area will be pumped to a sediment basin/pond. Sand bag dams will
be removed within 2 days after the culvert has been stabilized.
ENGINEERING AND SURVEYING, INC.
LAND DEVELOPMENT C0N5MTING
GOR20RATE LICENSE KMER C-01
4400 TYNIN6 STRMT
,HIGH POINT, NORTH CAROLINA 27265
PHONE, (W16),812 -66000 — PAXi Mb) 812 -0160
LAYFAYETTE LANDMCs APAR?9" ENTB AND VILLAS
FEIanT VRAUN"
CULV2W1PWALLATWN
cofmN660RO, NG