Office Use Only: Form Version March OS
USACE Action ID No. DWQ No. ~ 7 ~ 5 ~ 4
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(sj Requested:
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ^ ~(p.(-~v,1 ~,,~~ ~ y j
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NGEEP, complete section VIII,
and check here: ^
S. If your project is located in any of North Carolina's twenty coastal counties {listed on page
4}, and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
Owner/Applicant Information t
Name: J''~:nn~/~,r~e QAp~-is-~ ~1'i~r~~t PU~+e-r /~' ~D
Telephone Number:
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Page5of12
Mailing Address: ~ / ~ ~ I 7"r~/o ~ c?'o~~l-~4~Q,~,r. p ,~d, - V
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include ~ scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other. facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
baundaries outlined. Plan drawings, or other maps maybe included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers foil-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of
2. T.I.P. Pxojeet Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN): ~ ~ ~ ~ 2
4. Location ,/
County: Gr4~~-o,n NearestTawn: ~C~SS'~;n~C~~ Ci1'~'
Subdivision name (include phase/lot number):. T
Directions to site (include road numbers/names, landmarks, etc.): ~~ r~.d ~u,n~y5; q
L~o~=~s~- ~I~~~c(~ 1631 1'Tnv,C.a,~ ~a~ t i!~, des' ,r-
~~0~1
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossin of a distinct waterbody.)
Decimal Degrees (6 digits minimum}: ,, 5 ~ ~ ®~ 5 ~ ] "IN - 8 ~.3 035 83 °W
6. Property size (acres): ~~ `~-f<,-4~ ~i ~ ~~ n r-
7. Name of nearest receiving body of water: ~,~ ~~~~
8. River Basin:_ C q~-A W ~~
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http:/Ih2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general la~n~6d use in the vicinity of the project
at the time of this application: ~ fl~5 y we!' w•e,~-~e.~ ~'~~-m f~~ c~
I ~ II 1 j{ T / ] /
i'1~,'n~. I C4 ~A n.~7 CLy1C ~{hAeta, [~ (~~1'[nC-l~nc' L A tom'.
Page 6 of 12
10. Describe the overall project in det il, including the type of equipment to be used:~rnc.~J ~--
~' 2ofl' a~ ~~ ~ ~rA-~ n ; e, to Co~e.f' c. 1~; f ~ ~ r4.7t-
Gt ~, A-N9Y'DUn~ ~y41/Il be b:.c; I¢- ih PIaC~.. ~cu~n{-~,~~ loR~a,~r '~-~r„~~
~~s
11. Explain the purpose of the proposed work: ~~~ e~ ~ ' rvw.~ ~5 ~N S~'
1_ _ ,, ~..~_ ,~~.. _ nl.u,.,~ ire, _ C _ ~!['.'~ c ~ 1~.~ u.r-G~ _
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision} in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable}. If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's {or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads}. Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the
Page ? of 12
~'~ 2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
se aratel list im acts due to both structure and floodin .
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
lOq-year
Floodplain
( es/no Distance to
Nearest
Stream
linear feet Area of
Impact
(acres)
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: N A _
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fzll or culverts, daze
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching(straightening, etC. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact
Number
indicate on ma
Stream Name
Type of Impact
Perenmal or
Intermittent? Average
Stream Width
Before Ln act Impact
Length
linear feet Area of
Impact
acres
C.u~ vL( S ~/1l^e,l~.YFCn ~ 7.fJQ Lear
• $'
Total Stream Impact (by length and acreage}
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
„+~~, Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
y`4( fill, excavation, dred~in~, flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
indicate on ma)
Name of Waterbody
(if applicable)
Type of Impact Type of Waterbady
(lake, pond, estuary, sound, bay,
ocean, etc. Area of
Impact
acres
Total Open Water Impact (acres)
Page $ of 12
6. List the cumulative impact to all Waters of the U.S. resultint; from the uraiect:
Stream Im act (acres : 2~0 !
Wetland Im act (acres):
en Water Im act acres
Total Im act to Waters of the U.S. (acres)
Total. Stream Im act (lineaz feet): 2cx~ ~
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ~No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet), Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated an any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ~] stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.}:
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.}:
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were pat feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacfts. Ia ~o~' k ~q wl~n~ (e-- Flo
vrti~-~P.~ ~~oifJJ c`~,.1~ 'FAS~i' C~melt~- Qi~x.Sr'1 CfiT' Pte- Pr,~~ S~rs ~-G~,'1~ /~c"9
VIII. Mitigation
DWQ • In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality far projects involving greater than ar equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 9 of 12
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January l5, 2Q02, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strm Tidy e.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not Limited to: site location (attach dixections
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism. (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(R 19) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. Far
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres);
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
1. Does the project involve. an expenditure of public (federaUstate/lacal} funds or the use of
public (federal/state) land? Yes ^ No
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or Nargh Carolina Environmental Policy Act (NEFA/SEPA)?
Nate: If you are not sure whether '',a NEFA/SEPA document is required, call the SETA
coordinator at (919} 733-5083 to review current thresholds for environmental documentation.
Yes ^ No ^
3. If yes, has the document review been. finalized by the State Clearinghouse? If so, please
attach a copy of the NEFA or SEFA ffnal approval letter. Yes ^ No []
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associatjed with the project. The applicant must also provide
justification for these impacts in Section II above. All proposed impacts must be listed herein,
and must be cleazly identifiable on the a companying site plan, All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
~ 1, Will the project innpact protected rt orlon buffers identified within 15A NCAC 2B .0233
(Meuse), 1 SA NCAC 28.0259 (Tar-~amlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
28 .0250 (Randleman Rules and ''~,Vater Supply Buffer Requirements), or other (please
identify )? 'Yes ^ No ^
2. If "yes", identify the square feet and' acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers. _- _ _ __--
Zone* I r., ~~pa~tQ*` I Multiplier I Required
3 (2 for Catawba)
1.5
~~ total ~ I I J
* Zone 1 extends out 30 feet perpendiculalr from the top of the near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund), Please .attach all appropriate information as identified
within I SA NCAC 2B .0242 or .0244, or .0260.
Page 11 of i 2
XI. Stormwater (required by DWQ)
Describe impervious acreage; (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exce ds 20°f°, please provide calculations
demonstrating total proposed impervious level. /~ ~'
~~
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewat r generated from the proposed project, or available capaci . of the subject facility.
,_
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (ISA NCAC ZH .OS00) or any Buffer Rules?
Iles ^ No [~
Is this an after-the-fact permit application? Yes ^ No ,~
XIV. Cumulative impacts (required by DWQ)
Will this project (based on past and reasonably anticipated :future impacts) result in ad 'tional
development, which could impact nearby downstream water quality? Yes ^ No
if yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:_~_~-,___
XV. Other Circumstances (Optional):
It is the applicant's responsibility to subunit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules far lakes, dates associated with Endangered and
I hrea~ned Species, accessibility problems, or other issues outside of the applicant's control).
31 ~
Ap',,~li~nt/Agent's Signature Date `~
(Agent's signature is valid only if an authorisation letter from the applicant is provided.)
Fage 12 of 12