Loading...
HomeMy WebLinkAbout20211499 Ver 1_Certification of Completion_20220701ROY COOPER. Governor ELIZABETH S. BISER Secretary RIC14AM E. ROGERS, JR. NORTH CAROLINA Director Environmental Quality WR Project No.: �d 2 `f R q County: 1/4 ` K �S Applicant: Project Name: U T e.A;G-eek 9-SDA -libeu Date of Issuance of 401 Water Quality Certification: 10la G /a / Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If thisroject was designed by a Certified Professional �^ I, < e Ir ge lreto we.r , as a duly registered Professional G ^.q;etesr (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having bThorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: :� Registration No. © q 13e2 5 Date ?/l /aa North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rdoFini caaounw 828.296.4500