Loading...
HomeMy WebLinkAbout20140664 Ver 1_Application_20140630(Version 1.2; Released September 2011) B-5113 County(ies):Wake Page 1 of 1 Project Type:Date: Phone:Phone: Email:Email: County(ies): CAMA County? Design/Future:Existing: Supplemental: Primary: Wake Forest Reservoir Neuse 27-23-(1.5)NCDWQ Stream Index No.: Project/TIP No.: NCDOT Contact: Project No.:B-5113 Contractor / Designer: bkyadav@ncdot.gov General Project Information Address: 5/1/2014 1020 Birch Ridge Dr Raleigh, NC 27610 Raleigh, NC 27610 North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR LINEAR ROADWAY PROJECTS Binod Yadav Bridge Replacement ac. General Project Narrative:The project consists of replacing Bridge# 157 on SR 1942 (Oak Grove Church Road) over Smith Creek. The approach work will consist of raising the existing roadway grade and providing grass shoulders and guardrails. Bridge #157 existing 1@35' span with timber deck on steel floor beams (35' total length) will be replaced with a single span @ 50', 21" cored slab, vertical abutment bridge with 2'-6" cap. Best Mgmt. Practices: -Drainage systems outlet to rip rap pads. Eliminate direct discharge from existing condition. System in NW quad outlets to proposed ditch. -Toe protection with CL B rip rap in proposed ditch. -Special cut ditch B with CL B rip rap at NW. -Grass shoulders maintained. Typical Cross Section Description: References 1662 0.48 Average Daily Traffic (veh/hr/day): ac. Other Stream Classification: Binod Yadav City/Town: 1020 Birch Ridge Dr Address: Youngsville 919-707-6758 Wake No NCDWQ Surface Water Classification for Primary Receiving Water 303(d) Impairments: River Basin(s): Primary Receiving Water: WS-II, HQW, NSW, CA Buffer Rules in Effect Project Description Surrounding Land Use: Woods0.144 Miles 5970 0.33Project Built-Upon Area (ac.) Proposed Project Existing Site Project Length (lin. Miles or feet): W E T L A N D A N D S U R F A C E W A T E R I M P A C T S P E R M I T S H E E T _ _ O F _ _ P E R M I T D R A W I N G R:\Hydraulics\PERMITS_Environmental\Drawings\W etland Permit\B-5113_Hyd_prm _wet_TSH.dgnsmquadri6/3/2014 1 6 DHVDTV ======%%MPH ADTADT% * D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S FUNC CLASS = NSRS 2007 NAD 83/ J A N U A R Y 2 0 , 2 0 1 5 L E E A N N M O O R E T O N Y H O U S E R , P . E . W A K E C O U N T Y O V E R S M I T H C R E E K G R A D I N G , D R A I N A G E , P A V I N G , A N D S T R U C T U R E 1,6625,9701075 20132033DUAL 2* TTST 1 TOT A L L E N G T H T I P P R O J E C T B - 5 1 1 3 LEN G T H S T R U C T U R E T I P P R O J E C T B - 5 1 1 3 3 502550100LOCAL = 0 . 1 4 4 M I L E S = 0 . 0 1 0 M I L E S = 0 . 1 3 4 M I L E S VICINITY MAP SHOWING LOCATION OF PROJECT B - 5 1 1 3 OFFSITE DETOUR NSRS 2007 NAD 83/ 1943 1.20.59Rd. 4 B E G I N B R I D G E E N D B R I D G E - L - - L - P O T S T A . 1 5 + 9 2 . 1 3 5025501001051020 PROJ.BEGINPROJ.END40SUB REGIONAL TIER A 1A1BUS98BUS98989898000PROFILE (HORIZONTAL) P . E . B R Z - 1 9 4 2 ( 1 ) P R O J E C T L E N G T H R I G H T O F W A Y D A T E : L E T T I N G D A T E : S T A T E S T A T E P R O J E C T R E F E R E N C E N O . S T A T E P R O J . N O . F. A . P R O J . N O . DE S C R I P T I O N N O . T O T A L S H E E T S N . C . S H E E T 1 DESIGN DATA P r e p a r e d i n t h e O f f i c e o f : S I G N A T U R E : S I G N A T U R E : D I V I S I O N O F H I G H W A Y S 2 0 1 2 S T A N D A R D S P E C I F I C A T I O N S P R O J E C T E N G I N E E R P R O J E C T D E S I G N E N G I N E E R GRAPHIC SCALESPLANSPROFILE (VERTICAL) H Y D R A U L I C S E N G I N E E R E N G I N E E R R O A D W A Y D E S I G N L O C A T I O N : T Y P E O F W O R K : 09/08/99 B - 5 1 1 3 D I V I S I O N O F H I G H W A Y S S T A T E O F N O R T H C A R O L I N A 000 See Sheet 1-A For Index of Sheets$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$ 1 0 0 0 B i r c h R i d g e D r . , R a l e i g h N C , 2 7 6 1 0 CON TRACT:TIP PROJECT:B-5113 ARTMEN N A S O H DEP T O F T R A S P OR T T IO N T ATE O F N R T C AROLINA CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE L I M I T S E S T A B L I S H E D B Y M E T H O D I I I THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES THERE IS NO CONTROL OF ACCESS ON THIS PROJECT FRANKLIN COUNTYWAKE COUNTY See Sheet 1-B For Conventional Symbols B R I D G E N O . 1 5 7 O N S R 1 9 4 2 ( O A K G R O V E C H U R C H R O A D ) TO W AKE FOREST A V E R E T T E R D . T O S R 1 9 4 5 4 2 2 5 1 . 1 . F D 1 4 2 2 5 1 . 2 . F D 1 B R Z - 1 9 4 2 ( 1 ) R O W & U T I L LEN G T H R O A D W A Y T I P P R O J E C T B - 5 1 1 3 ( O A K G R O V E C H U R C H R D . ) S R 1 9 4 2 - L - P O C S T A . 1 0 + 4 0 . 0 0 B E G I N T I P P R O J E C T B - 5 1 1 3 - L - P O C S T A . 1 0 + 3 0 . 0 0 B E G I N C O N S T R U C T I O N - L - P O T S T A . 1 8 + 0 0 . 0 0 E N D T I P P R O J E C T B - 5 1 1 3 - L - P O T S T A . 1 8 + 1 0 . 0 0 E N D C O N S T R U C T I O N - L - P O T S T A . 1 5 + 3 9 . 8 7 C203517 J A N U A R Y 2 8 , 2 0 1 4 S MIT H C R E E K 14’ G R 8’ GR of Prophesy Ch. of God11911192 1 1 2 8 1129 19011902 1951 O a k G r o v e C h u r c h R d . GilcrestFarmRd.CrossYoungForestRd.FawnCt.AppaloosaWayS.DerbyLn.Dr.1130(IN)R1062053 2064 2157 1953 1941194319421942193145114511451219331961 1 9 4 5 2054 205329203649364436453647 2 0 5 5 3648 1 9 4 2 19451941 4532 4 5 4 7 454245414540 4 5 4 7 456444035117513851385138514051395137513751445163 453351665144 KullanaOakAllen Ja c k O ld AveretteJumperFarmHornbuckle Ct.Jones Gillcrest Farm St. St. Rd.Rd. Rd.Rd.Ln.Brierroot Ct.Dr.Dr.Kirkham Ct.N.White St.JuniperAve.NorthAve.ShuffordRd.WalkRd. Mill Da m Rd. Sweetclover WhitecloverDr.RdSt MidRidgeCt Main St.Forestville Wake Forestpop. 27,499 CSX RAILROADSch.Rolesville High Wake Forest A v e. Wait WaitAve.Smiths CreekAustinCreek989898BUS98BUS98 A 1 A 1 W 2 W 1 W 3 W 4 W 5 W 6 W 7 W 8 W 9 W 1 0 W 1 1 W 1 2 W 1 3 W 1 4 SMITH CREEK GRAPHIC SCALE 0’100’200’300’100’ (N O T TO SCALE) DETAIL SHO W IN G PAVEM EN T AN D BRIDG E RELATIO N SHIP PAVED SHO ULDER SEE SHEETS S-? THRU S-? FO R STRUCTURE PLAN S SEE SHEET 5 FO R PRO FILE 10 11 1 2 13 14 15 16 17 18 19 R : \ H y d r a u l i c s \ P E R M I T S _ E n v i r o n m e n t a l \ D r a w i n g s \ W e t l a n d P e r m i t \ B - 5 1 1 3 _ H y d _ P S H _ w e t . d g n s m q u a d r i 6 / 1 1 / 2 0 1 4 FILL IN W ETLANDS SHEET __ O F __ PERM IT DRAW IN G 2 6 GRAPHIC SCALE 0’100’ W ETLAN D DEN O TES FILL INFF CLEARIN G DEN O TES M ECHAN IZED* * * * ** * ** * * FILL IN W ETLANDS ********* * * ********** ***** S S SURFACE W ATER DEN O TES IM PACTS IN *** V10= 1.5 fps Q 10= 2.5 cfs TB 2G I TB 2G I 1 5 " 1 5 " CLASS II RIP RAP SEE DETAIL 2 w/ CL B RIP RAP TO E PRO TECTIO N SEE DETAIL 1 w/ CL B RIP RAP SPECIAL CUT DITCH 15"RCP-V 15" RCP-V STRUCTURE PAY ITEM 45.00’ 30.40’ T T 60.00’ 6 0 . 0 0 ’ SM ITH CREEK No. 157 BRIDGE B 14’ G R 8’ G R 24" RCP 1 8 " R C P - E L- -EL--EL- W OODS 15" RCP OAK GROVE CHURCH ROAD SR 1942 (PAVED 18’) W OODS W OODS W OODS W OODS WOODS W OODS W OODS EIP EIP EIP EIP O A K G R O VE C H U R C H R O A D S R 1942 (P A VE D 18’) T T CENTURYLINK CENTURYLINK HYDRAULICSROADWAY DESIG N EN GIN EER EN GINEER R/W SHEET NO . SHEET NO .PRO JECT REFERENCE N O . 4B-5113 $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS N A D 8 3 / N S RS 2 0 0 7 W2 W1 W3 W4 W5 W6 W7 W8 W9W10 W11 W12 W13 W14 S M IT H C R E E K C C C C F C F C F C F F F C F F F F F F F F F F F GRAPHIC SCALE 0’100’200’300’100’ (N O T TO SCALE) DETAIL SHO W IN G PAVEM EN T AN D BRIDG E RELATIO N SHIP PAVED SHO ULDER SEE SHEETS S-? THRU S-? FO R STRUCTURE PLAN S SEE SHEET 5 FO R PRO FILE 10 11 1 2 13 14 15 16 17 18 19 R : \ H y d r a u l i c s \ P E R M I T S _ E n v i r o n m e n t a l \ D r a w i n g s \ W e t l a n d P e r m i t \ B - 5 1 1 3 _ H y d _ P S H _ w e t _ c o n . d g n s m q u a d r i 6 / 1 1 / 2 0 1 4 FILL IN W ETLANDS SHEET __ O F __ PERM IT DRAW IN G 3 6 GRAPHIC SCALE 0’100’ W ETLAN D DEN O TES FILL INFF CLEARIN G DEN O TES M ECHAN IZED* * * * ** * ** * * FILL IN W ETLANDS ********* * * ********** ***** S S SURFACE W ATER DEN O TES IM PACTS IN *** V10= 1.5 fps Q 10= 2.5 cfs TB 2G I TB 2G I 1 5 " 1 5 " CLASS II RIP RAP SEE DETAIL 2 w/ CL B RIP RAP TO E PRO TECTIO N SEE DETAIL 1 w/ CL B RIP RAP SPECIAL CUT DITCH 15"RCP-V 15" RCP-V STRUCTURE PAY ITEM 45.00’ 30.40’ 295 295 295 2 9 5 295 295 300 300 300 3 0 0 3 0 0 3 0 0 300 3 0 0 300 300 3 0 0 3 0 0 300 300 300 300 300 3 0 0 300 3 0 0 3 0 0 3003 0 0 300 300 300 300 300 300 300 3 0 0 300 300 300 300 3 0 0 300 3 0 0 3 0 0 300 300 300 300 300 3 0 0 3 0 0 3 0 0 300 300 3 0 0 3 0 0 300 300 3 0 0 300 305 305 305 305 3 0 5 305 305 305 305 3 0 5 3 0 5 3 0 5 305 305 3 0 5 305 3 0 5 3 0 5 3 0 5 3 0 5 3 0 5 3 0 5 3 0 5 3 0 5 3 0 5 305 305 3 0 5 3 0 5 305 305 305 305 3 0 5 3 0 5 3 0 5 3 0 5 305 3 10 310 3 1 0 310 310 310 3 1 0 310 310 3 1 0 310 310 3 1 0 3 1 0 310310 3 10 310 3 1 0 3 1 0 3 1 0 3 1 0 3 10 3 1 0 310 310 310 3 1 0 3 1 0 3 1 0 310 310 310 3 10 310 310 310 310 315 315 3 15 315 315 3 15 3 15 3 1 5 3 1 5 3 1 5 315 3 1 5 315 3 15 315 3 1 5 3 1 5 315 3 1 5 3 15 3 15 3 1 5 315 315 315 315 315 315 315 315 315 315 3 15 315 3 1 5 3 15 315 3 15 3 15 3 15 315 315 3 1 5 3 1 5 315 3 1 5 315 315 315 320 320 320 320 320 320 32 0 320 320 3 2 0 32 0 3 2 0 3 2 0 3 2 0 3 2 0 320 3 2 0 320 320 320 320 320 3 2 0 3 2 0 3 2 0 320 320 320 320 320 320 3 2 0 3 2 0 3 2 0 3 2 0 3 2 0 3 2 0 320 320 320 325 3 2 5 325 325 3 2 5 325 3 2 5 325 3 2 5 3 2 5 325 3 2 5 3 2 5 3 2 5 325 3 2 5 325 3 2 5 3 2 5 325 325 3 2 5 3 2 5 3 2 5 3 2 5 3 2 5325 3253 2 5 325 325 325 325 3 3 0 330 3 3 0 3 3 0 3 3 0 330 330 330 3 3 0 3 3 0 330 330 330 3 3 0 330 3 3 0 330 3 3 0 330 330 3 3 0 330 3 3 0 3 3 0 330 330 335 3 3 5 3 3 5 33 5 335 3 3 5 335 335 335 3 3 5 3 3 5 3 3 5 3 3 5 335 3 3 5335 3 3 5 3 3 5 340 340 3 4 0 3 4 0 340 3 4 0 3 4 0 3 4 0 340 340 340 340 3 4 0 3 4 0 345 345 3 4 5 345 345 3 4 5 345 3 4 5 345 3 4 5 345 350 3 5 0 350 T T 60.00’ 6 0 . 0 0 ’ SM ITH CREEK No. 157 BRIDGE B 14’ G R 8’ G R 24" RCP 1 8 " R C P - E L- -EL--EL- W OODS 15" RCP OAK GROVE CHURCH ROAD SR 1942 (PAVED 18’) W OODS W OODS W OODS W OODS WOODS W OODS W OODS EIP EIP EIP EIP O A K G R O VE C H U R C H R O A D S R 1942 (P A VE D 18’) T T CENTURYLINK CENTURYLINK HYDRAULICSROADWAY DESIG N EN GIN EER EN GINEER R/W SHEET NO . SHEET NO .PRO JECT REFERENCE N O . 4B-5113 $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS N A D 8 3 / N S RS 2 0 0 7 W2 W1 W3 W4 W5 W6 W7 W8 W9W10 W11 W12 W13 W14 S M IT H C R E E K C C C C F C F C F C F F F C F F F F F F F F F F F 13 14 15 16 17 18 R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO . $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION GRAPHIC SCALE 0’20’40’60’20’ S S SURFACE W ATER DEN O TES IM PACTS IN N A D 8 3 / N S RS 2 0 0 7 6 W ETLAN D DEN O TES FILL INFF CLEARIN G DEN O TES M ECHAN IZED* * * * ** * ** * * R : \ H y d r a u l i c s \ P E R M I T S _ E n v i r o n m e n t a l \ D r a w i n g s \ W e t l a n d P e r m i t \ B - 5 1 1 3 _ H y d _ P S H _ w e t _ B U . d g n s m q u a d r i 6 / 1 1 / 2 0 1 4 SHEET __ O F __ PERM IT DRAW IN G 4 B-5113 FILL IN W ETLAN DS ********* * * ********** ******** V10= 1.5 fps Q 10= 2.5 cfs TB 2GI TB 2GI 1 5 " 1 5 " SEE DETAIL 2 w/ CL B RIP RAP TO E PRO TECTIO N SEE DETAIL 1 w/ CL B RIP RAP SPECIAL CUT DITCH 15"RCP-V 15" RCP-V SM ITH CREEK No. 157 BRIDGE -EL- W OODS OAK GROVE CHURCH ROAD W OODS WOODS W OODS EIP EIP EIP EIP CENTURYLINK CENTURYLINK W2 W1 W3 W4 W5 W6 W7 W8 W9W10 W11 W12 W13 W14 S M IT H C R E E K C F C F F F C F F F F F F F F F F F R:\Hydraulics\PERMITS_Environm ental\Drawings\W etland Perm it\B-5113_Hyd_PSH_wet_pfl.dgnsmquadri6/3/2014 5 6 S H E E T _ _ O F _ _ P E R M I T D R A W I N G D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S 5/14/99 S H E E T N O . P R O J E C T R E F E R E N C E N O . H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R 5 B - 5 1 1 3 $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$32031030029028027026025024023022021020012+0013+00 1 4 + 0 0 1 5 + 0 0 1 6 + 0 0 1 7 + 0 0 1 8 + 0 0 11+0010+00 3 2 0 3 1 0 3 0 0 2 9 0 2 8 0 2 7 0 2 6 0 2 5 0 2 4 0 2 3 0 2 2 0 2 1 0 2 0 0 - L - S T A . 1 5 + 3 9 . 8 7 B E G I N B R I D G E - L - S T A . 1 5 + 9 2 . 1 3 E N D B R I D G E RRS SET IN 18 INCH TULIP -BL- STA. 10+38 16’ LT N= 813118 E= 2155252ELEV. = 313.05’BM 50 - L - D E S I G N D I S C H A R G E D E S I G N F R E Q U E N C Y B A S E D I S C H A R G E C F S Y R S Y R S B A S E F R E Q U E N C Y O V E R T O P P I N G E L E V A T I O N O V E R T O P P I N G F R E Q U E N C Y O V E R T O P P I N G D I S C H A R G E C F S C F S Y R S F T F T F T D E S I G N H W E L E V A T I O N B A S E H W E L E V A T I O N B R I D G E H Y D R A U L I C D A T A D A T E O F S U R V E Y W . S . E L E V A T I O N A T D A T E O F S U R V E Y F T = 9 1 0 = 2 5 = 3 0 1 . 1 = 1 3 1 0 = 1 0 0 = 3 0 2 . 3 5 = 1 4 5 0 = 1 0 0 = 3 0 2 . 8 = 8 / 2 / 2 0 1 3 = 2 9 7 . 1 PI =14+66.000 El = 299.02 (- ) 4 .7 4 2 4 % (- ) 0 .5 2 9 4 % EL= 302.15’ E L = 2 9 8 . 8 4 ’ -L- STA. 14+00.00 - L - S T A . 1 5 + 0 0 . 0 0 Begin Grade Ditch LT E n d G r a d e D i t c h L T PI = 11+70.00EL = 317.52’(+)0.1508%(-)6.2746%VC = 130’K = 20 PI = 1 4 + 1 0 . 0 0 EL = 3 0 2 . 4 6 ’ (-)6.2746% ( + ) 0 . 3 0 0 0 % VC = 2 4 2 ’ K = 3 7 P I = 1 6 + 7 8 . 0 3 E L = 3 0 3 . 2 7 ’ ( + ) 0 . 3 0 0 0 % ( + ) 4 . 3 9 2 3 % V C = 1 5 4 ’ K = 3 8 V = 30mph V = 3 0 m p h V = 3 0 m p h P r o p o s e d B r i d g e S K E W = 9 0 G . P . E L E V . = 3 0 2 . 9 3 ’ V E R T I C A L A B U T M E N T B R I D G E 1 @ 5 0 ’ ; 2 1 " C O R E D S L A B S T A . 1 5 + 6 6 - L - EL = 317.32’-L- STA. 10+40.00 BEGIN GRADE E X C A V A T I O N A B U T M E N T S E E S T R U C T U R E P L A N S C L A S S I I R I P R A P ( T Y P ) ( S U R V E Y D A T E 0 8 - 0 2 - 2 0 1 3 ) W S E = 2 9 7 . 1 ’ S E E S H E E T 4 F O R P L A N V I E W E L = 3 0 8 . 6 2 ’ - L - S T A . 1 8 + 0 0 . 0 0 E N D G R A D E RRS SET IN 18 INCH TULIP N 6820’29" W Dist 249.71’FROM BL-100 N= 813212 E= 2154488ELEV. = 312.28’BM 51 CAMA 404 Hand Existing Existing Permanent Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 -L- 15+87 LT Bank Stabilization < 0.01 < 0.01 57 24 13+30 To 17+25 Roadway Fill 0.03 0.11 TOTALS:0.00 0.03 0.00 0.00 0.11 0.00 <0.01 0.00 57 24.00 0.00 ATN Revised 3/31/05 SHEET 6 of 6 (06/03/2014) PROJECT: 42251.2FD1 (B-5113) BRIDGE #157 on N.C.D.O.T. DIVISION OF HIGHWAYS WAKE COUNTY SR 1942 (Oak Grove Church Rd) WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS over Smith Creek B U F F E R I M P A C T S P E R M I T S H E E T _ _ O F _ _ B U F F E R D R A W I N G R:\Hydraulics\PERMITS_Environmental\Drawings\Buffer Permit\B-5113_Hyd_prm _buf_TSH.dgnsmquadri6/3/2014 1 5 S I T E 1 S I T E 2 S I T E 3 DHVDTV ======%%MPH ADTADT% * D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S FUNC CLASS = NSRS 2007 NAD 83/ J A N U A R Y 2 0 , 2 0 1 5 L E E A N N M O O R E T O N Y H O U S E R , P . E . W A K E C O U N T Y O V E R S M I T H C R E E K G R A D I N G , D R A I N A G E , P A V I N G , A N D S T R U C T U R E 1,6625,9701075 20132033DUAL 2* TTST 1 TOT A L L E N G T H T I P P R O J E C T B - 5 1 1 3 LEN G T H S T R U C T U R E T I P P R O J E C T B - 5 1 1 3 3 502550100LOCAL = 0 . 1 4 4 M I L E S = 0 . 0 1 0 M I L E S = 0 . 1 3 4 M I L E S VICINITY MAP SHOWING LOCATION OF PROJECT B - 5 1 1 3 OFFSITE DETOUR NSRS 2007 NAD 83/ 1943 1.20.59Rd. 4 B E G I N B R I D G E E N D B R I D G E - L - - L - P O T S T A . 1 5 + 9 2 . 1 3 5025501001051020 PROJ.BEGINPROJ.END40SUB REGIONAL TIER A 1A1BUS98BUS98989898000PROFILE (HORIZONTAL) P . E . B R Z - 1 9 4 2 ( 1 ) P R O J E C T L E N G T H R I G H T O F W A Y D A T E : L E T T I N G D A T E : S T A T E S T A T E P R O J E C T R E F E R E N C E N O . S T A T E P R O J . N O . F. A . P R O J . N O . DE S C R I P T I O N N O . T O T A L S H E E T S N . C . S H E E T 1 DESIGN DATA P r e p a r e d i n t h e O f f i c e o f : S I G N A T U R E : S I G N A T U R E : D I V I S I O N O F H I G H W A Y S 2 0 1 2 S T A N D A R D S P E C I F I C A T I O N S P R O J E C T E N G I N E E R P R O J E C T D E S I G N E N G I N E E R GRAPHIC SCALESPLANSPROFILE (VERTICAL) H Y D R A U L I C S E N G I N E E R E N G I N E E R R O A D W A Y D E S I G N L O C A T I O N : T Y P E O F W O R K : 09/08/99 B - 5 1 1 3 D I V I S I O N O F H I G H W A Y S S T A T E O F N O R T H C A R O L I N A 000 See Sheet 1-A For Index of Sheets$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$ 1 0 0 0 B i r c h R i d g e D r . , R a l e i g h N C , 2 7 6 1 0 CON TRACT:TIP PROJECT:B-5113 ARTMEN N A S O H DEP T O F T R A S P OR T T IO N T ATE O F N R T C AROLINA CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE L I M I T S E S T A B L I S H E D B Y M E T H O D I I I THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES THERE IS NO CONTROL OF ACCESS ON THIS PROJECT FRANKLIN COUNTYWAKE COUNTY See Sheet 1-B For Conventional Symbols B R I D G E N O . 1 5 7 O N S R 1 9 4 2 ( O A K G R O V E C H U R C H R O A D ) TO W AKE FOREST A V E R E T T E R D . T O S R 1 9 4 5 4 2 2 5 1 . 1 . F D 1 4 2 2 5 1 . 2 . F D 1 B R Z - 1 9 4 2 ( 1 ) R O W & U T I L LEN G T H R O A D W A Y T I P P R O J E C T B - 5 1 1 3 ( O A K G R O V E C H U R C H R D . ) S R 1 9 4 2 - L - P O C S T A . 1 0 + 4 0 . 0 0 B E G I N T I P P R O J E C T B - 5 1 1 3 - L - P O C S T A . 1 0 + 3 0 . 0 0 B E G I N C O N S T R U C T I O N - L - P O T S T A . 1 8 + 0 0 . 0 0 E N D T I P P R O J E C T B - 5 1 1 3 - L - P O T S T A . 1 8 + 1 0 . 0 0 E N D C O N S T R U C T I O N - L - P O T S T A . 1 5 + 3 9 . 8 7 C203517 J A N U A R Y 2 8 , 2 0 1 4 S MIT H C R E E K 14’ G R 8’ GR of Prophesy Ch. of God11911192 1 1 2 8 1129 19011902 1951 O a k G r o v e C h u r c h R d . GilcrestFarmRd.CrossYoungForestRd.FawnCt.AppaloosaWayS.DerbyLn.Dr.1130(IN)R1062053 2064 2157 1953 1941194319421942193145114511451219331961 1 9 4 5 2054 205329203649364436453647 2 0 5 5 3648 1 9 4 2 19451941 4532 4 5 4 7 454245414540 4 5 4 7 456444035117513851385138514051395137513751445163 453351665144 KullanaOakAllen Ja c k O ld AveretteJumperFarmHornbuckle Ct.Jones Gillcrest Farm St. St. Rd.Rd. Rd.Rd.Ln.Brierroot Ct.Dr.Dr.Kirkham Ct.N.White St.JuniperAve.NorthAve.ShuffordRd.WalkRd. Mill Da m Rd. Sweetclover WhitecloverDr.RdSt MidRidgeCt Main St.Forestville Wake Forestpop. 27,499 CSX RAILROADSch.Rolesville High Wake Forest A v e. Wait WaitAve.Smiths CreekAustinCreek989898BUS98BUS98 A 1 A 1 W 2 W 1 W 3 W 4 W 5 W 6 W 7 W 8 W 9 W 1 0 W 1 1 W 1 2 W 1 3 W 1 4 SMITH CREEK GRAPHIC SCALE 0’100’200’300’100’ (N O T TO SCALE) DETAIL SHO W IN G PAVEM EN T AN D BRIDG E RELATIO N SHIP PAVED SHO ULDER SEE SHEETS S-? THRU S-? FO R STRUCTURE PLAN S SEE SHEET 5 FO R PRO FILE 10 11 1 2 13 14 15 16 17 18 19 ALLO W ABLE IM PACTS ZO N E 1 ALLO W ABLE IM PACTS ZO N E 2 R : \ H y d r a u l i c s \ P E R M I T S _ E n v i r o n m e n t a l \ D r a w i n g s \ B u f f e r P e r m i t \ B - 5 1 1 3 _ H y d _ P S H _ b u f . d g n s m q u a d r i 6 / 1 1 / 2 0 1 4 52 SITE 1 SITE 2 SITE 3 SHEET __ O F __ BUFFER DRAW IN GMITIGABLE IM PACTS ZO N E 1 M ITIG ABLE IM PACTS ZO N E 2 V10= 1.5 fps Q 10= 2.5 cfs V2= 1.4 fps Q 2= 1.9 cfs TB 2G I TB 2G I 1 5 " 1 5 " CLASS II RIP RAP SEE DETAIL 2 w/ CL B RIP RAP TO E PRO TECTIO N SEE DETAIL 1 w/ CL B RIP RAP SPECIAL CUT DITCH 15"RCP-V 15" RCP-V STRUCTURE PAY ITEM 45.00’ 30.40’ TYPE-IIITYPE-III TYPE-III TYPE-III T T SM ITH CREEK No. 157 BRIDGE B 14’ G R 8’ G R 24" RCP 1 8 " R C P - E L- -EL--EL- W OODS 15" RCP OAK GROVE CHURCH ROAD SR 1942 (PAVED 18’) W OODS W OODS W OODS W OODS WOODS W OODS W OODS EIP EIP EIP EIP O A K G R O VE C H U R C H R O A D S R 1942 (P A VE D 18’) T T CENTURYLINK CENTURYLINK HYDRAULICSROADWAY DESIG N EN GIN EER EN GINEER R/W SHEET NO . SHEET NO .PRO JECT REFERENCE N O . 4B-5113 $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS N A D 8 3 / N S RS 2 0 0 7 C C C C F C F C F C F F F C F F F F F F F F F F F 13 14 15 16 17 18 R E V I S I O N S HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO . SHEET NO .PROJECT REFERENCE NO . $ $ $ $ $ $ S Y S T I M E $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ D G N $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION GRAPHIC SCALE 0’20’40’60’20’ ALLO W ABLE IM PACTS ZO N E 1 ALLO W ABLE IM PACTS ZO N E 2 N A D 8 3 / N S RS 2 0 0 7 53 SITE 1 SITE 3 SITE 2 SHEET __ O F __ BUFFER DRAW IN G B-5113 M ITIG ABLE IM PACTS ZO N E 1 M ITIG ABLE IM PACTS ZO N E 2 V10= 1.5 fps Q 10= 2.5 cfs V2= 1.4 fps Q 2= 1.9 cfs TB 2GI TB 2GI 1 5 " 1 5 " SEE DETAIL 2 w/ CL B RIP RAP TO E PRO TECTIO N SEE DETAIL 1 w/ CL B RIP RAP SPECIAL CUT DITCH 15"RCP-V 15" RCP-V SM ITH CREEK No. 157 BRIDGE -EL- W OODS W OODS WOODS W OODS EIP EIP EIP CENTURYLINK CENTURYLINK W2 W1 W3 W4 W5 W6 W7 W8 W9W10 W11 W12 W13 W14 S M IT H C R E E K C F C F F F C F F F F F F F F F F F Rev. May 2006 ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) 1 Bridge 15+40 to 15+90 RT LT X 294 0 294 2 Roadway Fill 16+50 to 17+50 LT X 2041 414 2455 3 Roadway Fill 16+50 to 18+00 RT X 1725 62 1787 TOTAL:2278 1486 3764 3766 476 4242 WAKE COUNTY ALLOWABLE MITIGABLE BUFFER REPLACEMENT X 1486 SHEET 4 OF 5 PROJECT: 42251.2.FD1 (B-5113) Bridge #157 on SR 1942 (Oak Grove Church Rd) over Smith Creek 6/3/2014 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS 3470 IMPACT BUFFER IMPACTS SUMMARY TYPE SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) Road 14+90 to 15+40 & 15+90 to 16+50 RT LT 1984 ZONE 1 (ft2) ZONE 2 (ft2) 1 14+90 to 16+50 RT LT 1506 411 3 16+50 to 18+00 RT 1410 0 TOTAL:2916 411 WETLANDS IN BUFFERS SITE NO. STATION (FROM/TO) WETLANDS IN BUFFER IMPACTS SUMMARY SHEET 5 OF 5 PROJECT: 42251.2.FD1 (B-5113) Bridge #157 on SR 1942 (Oak Grove Church Rd) over Smith Creek 6/3/2014 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAKE COUNTY Rev. Jan 2009 DHV D T V = = = = = = % % M PH ADT ADT % * DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS FUN C CLASS = JAN UARY 20, 2015 JAN UARY 17, 2014 LEE AN N M O O RE TO N Y HO USER, P.E. W AK E CO U N TY OVER SM ITH CREEK GRAD ING, D RAINAGE, PAVIN G, AND STRU CTU RE 1,662 5,970 10 75 2013 2033 DUAL 2* TTST 1 TO TAL LEN G TH TIP PRO JECT B-5113 LEN G TH STRUCTURE TIP PRO JECT B-5113 3 50 25 50 100 LO CAL =0.144 M ILES =0.010 M ILES =0.134 M ILES VICIN ITY M AP SHO W IN G LO CATIO N O F PRO JECT B-5113 O FFSITE DETO UR 1943 1 .2 0 . 5 9 R d . 4 BEGIN BRID GE END BRID GE -L- -L- POT STA. 15+92.13 50 25 50 100 10 5 10 20 PROJ. BEGIN PROJ. END 40 SUB REG IO N AL TIER A 1 A 1 BUS 98 BUS 98 98 98 98 0 0 0 PRO FILE (HO RIZO N TAL) P.E. BRZ-1942(1) PROJECT LENGTH RIGH T OF W AY D ATE: LETTING D ATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 D ESIGN D ATA Prepared in the Office of: SIGNATU RE: SIGNATU RE: D IVISION OF H IGH W AYS 2012 STAND ARD SPECIFICATIONS PROJECT ENGINEER PROJECT D ESIGN ENGINEER GRAPH IC SCALES PLAN S PRO FILE (VERTICAL) H YD RAU LICS ENGINEER ENGINEER ROAD W AY D ESIGN LOCATION: TYPE OF W ORK : 0 9 / 0 8 / 9 9 B-5113DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 See Sheet 1-A For Index of Sheets 2 7 - J A N - 2 0 1 4 1 4 : 3 8 R : \ R o a d w a y \ P r o j \ b 5 1 1 3 _ r d y _ t s h . d g n $ $ $ $ U S E R N A M E $ $ $ $ 1000 B irch R idge D r., R aleigh N C , 27610 C O N T R A C T : T I P P R O J E C T : B - 5 1 1 3 A R T MEN N A S O H D E P T O F T R A S PORT T IO N T A TEOFN RT C AR O LI N A CLEARIN G O N THIS PRO JECT SHALL BE PERFO RM ED TO THE LIM ITS ESTABLISHED BY M ETHO D III THIS PRO JECT IS N O T W ITHIN AN Y M UN ICIPAL BO UN DARIES THERE IS N O CO N TRO L O F ACCESS O N THIS PRO JECT F R A N K LI N C O U N T Y W A K E C O U N T Y See Sheet 1-B For Conventional Symbols BRID GE NO. 157 ON SR 1942 (OAK GROVE CH U RCH ROAD ) T O W A K E F O R ES T AVERETTE RD . TO SR 1945 42251.1.FD1 42251.2.FD1 BRZ-1942(1)RO W & UTIL LEN G TH RO ADW AY TIP PRO JECT B-5113 (OAK GROVE CH U RCH RD .) SR 1942 -L- POC STA. 10+40.00 BEGIN TIP PROJECT B-5113 -L- POC STA. 10+30.00 BEGIN CONSTRU CTION -L- POT STA. 18+00.00 END TIP PROJECT B-5113 -L- POT STA. 18+10.00 END CONSTRU CTION -L- POT STA. 15+39.87 C 2 0 3 5 1 7 SM ITH CREEK 14’ GR 8’ G R of Prophesy Ch. of G od (IN) R106 M ain St. Forestville W ake Forest pop. 27,499 C S X R A I L R O A D Sch. Rolesville H igh W ake Forest A v e. W a it W a it A v e. Sm iths C reek Austin Creek 98 98 98 BUS 98 BUS 98 A 1 A 1 N S RS 2 0 0 7 N A D 8 3 / N S R S 2 0 0 7 N A D 8 3 / 1191 1192 1128 1129 1901 1902 1951 Oak Grove Church Rd. Gilcrest Farm R d . Cross Yo u n g F orest Rd. Faw n Ct. Appaloosa W ay S.DerbyLn.Dr. 1130 2053 2064 2157 1953 1941 1943 1942 1942 1931 4511 4511 4512 1933 1961 1945 2054 2053 2920 3649 3644 3645 3647 2055 3648 1942 1945 1941 4532 4547 4542 4541 4540 4547 4564 4403 5117 5138 5138 5138 5140 5139 5137 5137 5144 5163 4533 5166 5144 Kullana O a k A lle n Jack Ol d A v e r e t t e J u m p e r F a rm Hornbuckle Ct. Jones G illcrest Farm St. S t. R d . R d . R d . R d . Ln. Brierroot Ct. Dr. D r. Kirkham Ct. N.W hite S t. J uni per Ave. N ort h A ve. ShuffordRd. Walk R d . M ill D am Rd. S w e et cl o v er W hiteclover Dr. R d S t M idRidge Ct Existing Edge of Pavem ent Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing M etal G uardrail Existing Cable G uiderail Proposed G uardrail Equality Sym bol Pavem ent Rem oval Baseline Control Point RIGH T OF W AY: Existing Right of W ay M arker Existing Right of W ay Line h Existing Control of Access Proposed Control of Access Proposed Right of W ay Line C F Existing Easem ent Line Proposed Tem porary Construction Easem ent Proposed Tem porary Drainage Easem ent Proposed Perm anent Drainage Easem ent Proposed Perm anent Utility Easem ent H YD ROLOGY: Stream or Body of W ater Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ; z v W K Proposed Lateral, Tail, Head Ditch False Sum p Proposed Cable G uiderail M AJO R: Bridge, Tunnel or Box Culvert Bridge W ing W all, Head W all and End W all M IN O R: Head and End W all Pipe Culvert Footbridge Paved Ditch G utter U TILITIES: ROAD S AND RELATED FEATU RES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power M anhole Power Line Tower Power Transform er Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone M anhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R } T p Q l e ] / b H-Fram e Pole O O PO W ER: TELEPHO N E: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber O ptics Cable W ATER: W ater M anhole W ater M eter W ater Valve W ater Hydrant Recorded U/G W ater Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber O ptic Cable Designated U/G Fiber O ptic Cable (S.U.E.*) r | I ] G AS: G as Valve G as M eter Recorded U/G G as Line n c SAN ITARY SEW ER: Sanitary Sewer M anhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced M ain Line Designated SS Forced M ain Line (S.U.E.*) d o A/G W ater Above G round G as Line A/G Gas Above G round W ater Line Above G round Sanitary Sewer A/G Sanitary Sew er M ISCELLAN EO US: Utility Pole O F S 3 Utility Pole with Base Utility Located O bject Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW v v Drainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer M anhole m U/G Tank; W ater, G as, O il A/G Tank; W ater, G as, O il BOU ND ARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property M onum ent Existing Fence Line Proposed W oven W ire Fence Proposed Chain Link Fence Proposed Barbed W ire Fence g F 123 Existing W etland Boundary Proposed W etland Boundary Existing Endangered Anim al Boundary Existing Endangered Plant Boundary BU ILD INGS AND OTH ER CU LTU RE: Area O utline G as Pum p Vent or U/G Tank Cap Church School Dam Sign Sm all M ine W ell V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge W oods Line O rchard Vineyard RAILROAD S: Standard G auge RR Signal M ilepost Switch RR Abandoned RR Dism antled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber O ptics Cable (S.U.E.*) Designated U/G W ater Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G G as Line (S.U.E.*) U/G Test Hole (S.U.E.*) *S.U .E. = Subsurface U tility Engineering WLB EIP B ECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cem etery EXISTING STRU CTU RES: Parcel / Sequence N um ber E AATUR End of Inform ation E.O .I. Note: Not to Scale SHEET NO .PRO JECT REFERENCE NO . 1B B-5113 Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS 1 2 / 0 5 / 1 1 Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 W etland Proposed Perm anent Easem ent with Iron Pin and Cap M arker Proposed Tem porary Utility Easem ent TUE Iron Pin and Cap M arker Proposed Right of W ay Line with DUEProposed Perm anent Drainage / Utility Easem ent AUEProposed Aerial Utility Easem ent CRProposed Curb Ram p STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CO N VEN TIO N AL PLAN SHEET SYM BO LS Underground Storage Tank, Approx. Loc. G eoenvironm ental Boring UST Known Soil Contam ination: Area or Site Potential Soil Contam ination: Area or Site Concrete or G ranite R/W M arker Proposed Right of W ay Line with C A Concrete C/A M arker Proposed Control of Access Line with -L- POT STA. 18+00.00 END TIP PROJECT B-5113 -L- POT STA. 10+40.00 BEGIN TIP PROJECT B-5113 NC GRID NAD 83/NSRS 2007 103 BL-103 813121.0064 2155833.9271 339.31 OUTSIDE PROJECT LIMITS 102 BL-102 813099.1683 2155174.0996 302.12 16+04.37 16.08 LT 101 BL-101 813080.6505 2154899.4704 308.18 13+26.58 19.08 LT 100 BL-100 813119.8081 2154719.5869 315.59 11+34.50 13.76 LT ------------------------------------------------------------------------------- POINT DESC. NORTH EAST ELEVATION L STATION OFFSET BASELINE CONTROL DATA BM -51 BM -50 BL-103 BL-102 BL-101 BL-100 -L- OAK GROVE CHURCH ROAD SR 1942 SM ITH CREEK E=2156427.8000 N=813006.4300 LOCALIZED PROJECT COORDINATES NCDOT GPS STATION B5113-2 E=2157742.9708 N=812766.4009 LOCALIZED PROJECT COORDINATES NCDOT GPS STATION B5113-1 T O W A KE F O R ES T AVERETTE RD . TO SR 1945 DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCDOT FOR MONUMENT "B5113-2" WITH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF NORTHING: 813006.4300(ft) EASTING: 2156427.8000(ft) ELEVATION: 365.40(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.99994103 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "B5113-2" TO -L- STATION 10+40.00 IS N 85 14’39.8" W 1801.45’ ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 SHEET NO .PRO JECT REFEREN CE NO . 6 / 2 / 9 9 2 7 - J A N - 2 0 1 4 1 4 : 3 9 R : \ L o c a t i o n S u r v e y s \ B 5 1 1 3 _ l s _ 1 c . d g n $ $ $ $ U S E R N A M E $ $ $ $ Location and Surveys N OTE: DRAW IN G N OT TO SCALE W AK E CO U N TY LOCATION : BRID GE 157 ON SR 1942 (OAK GROVE CH U RCH ROAD ) OVER SM ITH CREEK 1CB-5113 SU RVEY CON TROL SH EET B-5113 IN DICATES GEODETIC CON TROL M ON U M EN TS U SED OR SET FOR H ORIZON TAL PROJECT CON TROL BY TH E N CDOT LOCATION AN D SU RVEYS U N IT. PROJECT CON TROL ESTABLISH ED U SIN G GLOBAL POSITION IN G SYSTEM . SEE GPS CALIBRATION SH EET FOR H ORIZON TAL AN D VERTICAL COORDIN ATE VALU ES. N OTES: 1. TH E CON TROL DATA FOR TH IS PROJECT CAN BE FOU N D ELECTRON ICALLY BY SELECTIN G N CDOT PROJECT CON TROL DATA AT: TH E FILES TO BE FOU N D ARE AS FOLLOW S: B5113_LS_CON TROL.TXT SITE CALIBRATION IN FORM ATION H AS N OT BEEN PROVIDED FOR TH IS PROJECT. IF FU RTH ER IN FORM ATION IS N EEDED, PLEASE CON TACT TH E LOCATION AN D SU RVEYS U N IT. N ETW ORK ESTABLISH ED FROM N GS ON LIN E POSITION IN G SERVICE (OPU S) H TTPS://CON N ECT.N CDOT.GOV/RESOU RCES/LOCATION /PAGES/DEFAU LT.ASPX ********************************** RRS SET IN 18 INCH TULIP N 68 20’29" W Dist 249.71 FROM BL-100 N 813212 E 2154488 51 ELEVATION = 312.28 ********************************** ********************************** RRS SET IN 18 INCH TULIP L STATION 16+84.00 28 LEFT N 813118 E 2155252 50 ELEVATION = 313.05 ********************************** BENCHMARK DATA 2’-0" ( T Y P . ) (TYP.) 4’-0"11’-0"11’-0"4’-0"8’-0" 2’-0" FDPS FDPS 6:1 2:1 T .08 .02 .02 .02 C1 .02 .08 4 :1 T E1 G RADE TO THIS LIN E9.0" 2:1 O RIG IN AL G RO UN D VARIES O RIG IN AL G RO UN D O RIG IN AL G RO UN D G RADE PO IN T TYPICAL SECTIO N N O . 1 TYPICAL SECTIO N O N BRIDG E 33’-0" 11’11’ 0.02 G RADE PT. -L- CL MC1 0.02 1 ’ - 9 " 3’-0" 11 PRESTRESSED CO N CRETE CO RED SLAB UN ITS = 33’-0" CL W ED G IN G D ETAIL O N BR ID G E M IN . 2.5" -L- W /G R 7’-0" DO NOT USE FOR CONSTRUCTIONDO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS SHEET NO .PRO JECT REFEREN CE NO . RO ADW AY DESIG N EN GINEER EN GIN EER 2 B-5113 PAVEM ENT DESIG N 6 / 2 / 9 9 2 7 - J A N - 2 0 1 4 1 4 : 4 0 R : \ R o a d w a y \ P r o j \ b 5 1 1 3 _ R d y _ t y p . d g n $ $ $ $ U S E R N A M E $ $ $ $ D1 7"3.25"3.25" -L- STA. 10+40.00 TO STA. 15+39.87 (BEG IN BRIDG E) STA. -L- 15+92.13 (EN D BRIDG E) -L- STA. 15+39.87 (BEG IN BRIDG E) TO -L- STA. 15+92.13 (EN D BRIDG E) TO STA. 18+00.00 T 4 :1 VARVAR EO P VARIABLE SLO PE O RIG IN AL G RO UN D O RIG IN AL G RO UN D 2:1 SHO ULDER BERM G UTTER DETAIL: D1 R .02 C1 -L- STA. 15+11.00 TO STA. 15+28.87 LT. (Begin Approach Slab) -L- STA. 15+11.00 TO STA. 15+28.87 RT. (Begin Approach Slab) E1 30’-10" (CLEAR RO ADW AY) 4’-5"4’-5"1’-1"1’-1" PAVEMENT SCHEDULE C1 E1 T EARTH MATERIAL. NOTE: PAVEMENT EDGE SLOPE ARE 1:1 UNLESS SHOWN OTHERWISE. W VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL) D1 PROP. APPROX. 4.0" ASPHALT CONCRETE BASE COURSE, TYPE B25.OB AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. C2 C1 D2 C2 AT AN AVERAGE RATE OF 110 LBS, PER SQ. YD. PER 1" DEPTH, TO BE PLACED PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A, D2 AT AN AVERAGE RATE OF 114 LBS, PER SQ. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2.5" IN DEPTH OR GREATER THAN 4" IN DEPTH. IN LAYERS NOT TO EXCEED 1.5" IN DEPTH. PROP. APPROX. 3.0" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. IN EACH OF 2 LAYERS. GU ARD RAIL SU M M ARY "N" = DISTAN CE FRO M EDG E O F LAN E TO FACE O F G UARDRAIL. TO TAL SHO ULDER W IDTH = DISTANCE FRO M EDGE O F TRAVEL LANE TO SHO ULDER BREAK PO INT. FLARE LENG TH = DISTANCE FRO M LAST SECTIO N O F PARALLEL G UARDRAIL TO EN D O F G UARDRAIL. W = TO TAL W IDTH O F FLARE FRO M BEGINN ING O F TAPER TO EN D O F G UARDRAIL. LENG TH SHO P CURVED DO UBLE FACED W ARRAN T PO IN T APPRO ACH END TRAILIN G END DIST. FRO M E.O .L. TO TAL SHO UL. W IDTH FLARE LEN GTH APPRO ACH TRAILIN G APPRO ACH TRAILIN G END END EN D EN D W AN CHO RS REM ARKS "N " STRAIG HT SURVEY LIN E BEG . STA.END STA.LO CATIO N XI M O D XI GRAU M -350 XIII VI M O D BICCAT-1 1 2 / 0 6 / 0 7 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA TYPE 350 ATTEN UATO R IM PACT G UARDRAIL EXISTIN G REM O VE G N G G = GATIN G IM PACT ATTENUATO R TYPE 350 N G = N O N-G ATING IM PACT ATTEN UATO R TYPE 350 CO M PUTED BY: CHECKED BY:DATE: DATE: SHEET NO .PRO JECT REFEREN CE NO . 2 7 - J A N - 2 0 1 4 1 4 : 4 1 R : \ R o a d w a y \ P r o j \ B 5 1 1 3 _ R d y _ s u m . d g n $ $ $ $ U S E R N A M E $ $ $ $ STATIO N SU M M ARY OF EARTH W ORK STATIO N EXCAV. UNCL. +% EM BANK.BO RRO W W ASTE provided by the G eotechnical Engineering Unit. These earthwork quantities are based in part on subsurface data Earthwork quantities are calculated by the Roadway Design Unit. 350 TL2 TYPE III BARRIER CO N CRETE FACED SINGLE G UARDRAIL EXISTING STO CKPILE REM O VE & -L- -L- -L- -L- RT RT LT LT 12+64.87 Subtotal TOTAL SAY Anchor Deduction Anchor Deduction Grau-350-TL2 TYPE III TOTAL ANCHORS ADDITIONAL POSTS REM OVAL OF EXISTING ASPH ALT PAVEM ENT LIN E LO CATIO N AREA LENG TH O R W IDTH YARDS SQUARESTATIONSTATION TO TAL SAY -L- -L- 10+40 15+91 LT & RT15+41 437.21 1519.96 -L- STA. 10+40.00 -L- STA. 15+41.00 -L- STA. 15+41.00 -L- STA. 18+00.00 995 248 W ASTE IN LIEU OF BORROW SUBTO TALS PRO JECT TO TALS G RAND TO TALS SAY TOTAL 16+42.13 14+89.87 16+42.13 15+92.13(BR) 15+92.13(BR) 4 4 4 4 1 1 1 1 4 4 @25=100’ @18.75=75’ 175’ 175 250 =5 1 1 1 1 13+50.00(FILL) 15+39.87(BR) 275 50 50 50 4 4 4 4 425 250 B-5113 3-A 359 43 1243 1243 402 636 205 841 841 1243 1243 402 841 841 EAD 11-18-2013 LT & RT 9717.75 3934.91 1079.75 1520 15+92.13(BR) 15+92.13(BR) 15+39.87(BR) 1250 (IN CUBIC YARDS) will be paid for at the contract lum p sum price for "G rading." Fine G rading, Clearing and G rubbing, and Rem oval of Existing Pavem ent Note: Approxim ate quantities only. Unclassified Excavation, Borrow Excavation, 15+39.87(BR) 18+00 STATIO NSTATION LIN E SURVEY LT RT TO TAL 15+15.00 15+15.00 15+28.87 15+28.87 SH OU LD ER BERM GU TTER SU M M ARY EXCAV. UNCL. 18 18 SAY 36 40 LT / RT LO C -L- -L- Slope Ditch Front Geotextile Geotextile HYDRAULICSROADWAY DESIGN EN GINEER ENG IN EER R/W SHEET N O . SHEET N O .PRO JECT REFEREN CE NO . 4B-5113 2 7 - J A N - 2 0 1 4 1 5 : 4 5 R : \ R o a d w a y \ P r o j \ b 5 1 1 3 _ r d y _ p s h _ 0 4 . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 1 7 / 9 9 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS N A D 8 3 / N S RS 2 0 0 7 T T 678.37’ 1 9 5 .3 4 ’ 3085.55’ 3 2 9 0 .3 0 ’ (T O T A L ) 5 3 2 .0 3 ’ 60.00’ 6 0 . 0 0 ’ SM ITH CREEK 299.96’ BENT 299.89’ BENT 299.85’ BENT B 14’ G R 8 ’ G R 24" RCP 1 8 " R C P R /W -E IP4.11’ ELEV. 313.05’ 16.29’ LEFT -BL- STA. 10+37.98 BM 50 ELEV. 312.28’ 249.71’ FROM BL-100 BM 51 W OODS 15" RCP OAK GROVE CHURCH ROAD SR 1942 (PAVED 18’) W OODS W OODS W OODS WOODS W OODS W OODS W OODS EIP EIP EIP EIP R/W TO EIP 0.40’ GRACE W OODLIEF DEAN FAMILY LTD PTNR DB 12899 PG 2386 GRACE W OODLIEF DEAN FAM ILY LTD PTNR DB 12899 PG 2386 W AKE FOREST RESERVOIR PROP LLC DB 10228 PG 1762 PB 1996 PG 676 W AKE FOREST RESERVOIR PROP LLC DB 10228 PG 1762 PB 1996 PG 676 CITY OF RALEIGH DB 12937 PG 774 12.79’ R/W-EIP 4.63’ 299.93’ BENT BL-100 BL-101 BL-102 O A K G R O VE C H U R C H R O A D S R 1942 (P A VE D 18’) T T CENTURYLINK CENTURYLINK 38.20’ +71.22 3 7 .9 0 ’ +7 1 .5 2 TB 2G I TB 2G ITB JB w/M H 1 5 " 1 5 " CLASS II RIP RAP SEE DETAIL 2 w/ CL B RIP RAP TO E PRO TECTIO N 2: 1 D Flatter4:1 or d ( Not to Scale) SPECIAL CUT DITCH FRO M -L- STA. 14+00 TO STA. 15+00 LT DETAIL 1 M ax. d= 1 Ft. M in. D= 1 Ft. Type of Liner= CLASS B Rip-Rap Ground Natural SEE DETAIL 1 w/ CL B RIP RAP SPECIAL CUT DITCH ( Not to Scale) TO E PRO TECTIO N d FRO M -L- STA. 17+10 TO STA. 18+00 LT, d=2Ft. Fill Slope2:1 or Flatter Fill Sl o pe 2: 1 or Fl att er DETAIL 2 d=(See Station Ranges Below) Type of Liner= B Rip-Rap Class B Rip-Rap = 52 Tons G eotextile = 95 SY 15"RCP-V 15" RCP-V Class B Rip-Rap = 35 Tons Geotextile = 105 SY 7 S.Y. 2 TO N S CL B RIP RAP 5 S.Y. 1 TO N CL B RIP RAP STRUCTURE PAY ITEM 0402 0403 0401 0405 0404 0406 -L- STA. 15+11.00 TO STA. 15+28.87(BEG IN APPRO ACH SLAB) LT -L- STA. 15+11.00 TO STA. 15+28.87(BEG IN APPRO ACH SLAB) RT SHO ULDER BERM G UTTER SEE SHEET 2 FO R DETAIL 47.00’ 54.00’ 46.00’ 40.00’ 38.00’45.00’ 34.00’ 55.00’ 25.78’ 40.00’ 29.76’ 29.99’ 45.00’ 29.63’ 29.12’ 40.00’ 40.00’ 45.00’ 30.40’ 3 2 1 1 -L- +00.00 -L- +50.00 -L- +00.00 -L- +86.66 -L- +75.00 -L- +20.00 -L- +00.00 -L- +10.00 -L- +95.00 -L- +50.00 -L- +75.00 -L- +55.00 -L- +86.66 -L- +45.00 -L- +00.00 3 40.00’ -L- +05.00 30.00’ -L- +30.00 30.00’ -L- +71.80 42.00’ 35.00’ -L- +50.00 37.00’ -L- +00.00 30.00’ -L- +30.00 35.00’ 55.00’ 47.00’ 30.00’ -L- +71.80 34.37’ -L- -L- BEGIN BRIDGE END BRIDGE 10 1 5 PI Sta 12+35.48 D L = 314.86’ T = 163.68’ R = 467.00’ 2 2 ’ - 0 " -L- POT STA. 15+39.87 -L- POT STA. 15+28.87 P S 2 ’ - 0 " P S 2 ’-0 " 2 ’ - 0 " P S 2 2 ’-0 " P S 2 ’-0 " 05 0 4 0 3 0 6 0 5 0 4 0 3 0 2 0 1 0 0 0 1 0 2 0 2 0 2 0 1 E X E X E X E X L T & R T 50’ T AP E R T YP.2 0.6 7’ 8:1 8:1 8:1 LT & RT 50’ TAPER TYP. 20.67’ 0 2 2 2 ’ - 0 " 0 2 2 2 ’ - 0 " 2 2 ’ - 0 " P S 4 ’ - 5 " P S 2 ’ - 0 " P S 2 ’ - 0 " P S 2 ’ - 0 " TYPE-IIITYPE-III TYPE-III TYPE-III (N O T TO SCALE) DETAIL SHO W IN G PAVEM EN T AN D BRIDG E RELATIO N SHIP G RAU 350 TL-2 G RAU 350 TL-2 G RAU 350 TL-2 -L - P O T S ta . 10 +0 0 .0 0 -L - P C S ta . 10 +7 1.8 0 - L - P T S t a . 1 3 + 8 6 . 6 6 - L - P O T S t a . 1 9 + 5 7 . 6 5 PAVED SHO ULDER 8: 1 06 0 6 END BRIDGE BEGIN BRIDGE -L- POT STA. 15+28.87 -L- POT STA. 15+92.13 -L- POT STA. 16+03.13 BEGIN APPROACH SLAB END APPROACH SLAB END APPROACH SLAB BEGIN APPROACH SLAB -L- POT STA. 15+39.87 -L- POT STA. 15+92.13 -L- POT STA. 16+03.13 -L- PO T STA. 10+30.00 BEG IN CO N STRUCTIO N -L- POT STA. 10+40.00 BEGIN TIP PROJECT B-5113 -L- PO T Sta. 18+10.00 -L- POT STA. 18+00.00 END TIP PROJECT B-5113 EN D CO N STRUCTIO N TL-2 G RAU 350 4 ’ - 5 " 4 ’ - 5 " R D W Y C L R 3 0 ’ - 1 0 " SEE SHEETS S-? THRU S-? FO R STRUCTURE PLAN S SEE SHEET 5 FO R PRO FILE C C C C F C F C F C F F F C F F F F F F F F F F F -L- STA. 15+39.87 BEGIN BRIDGE -L- STA. 15+92.13 END BRIDGE RRS SET IN 18 INCH TULIP -BL- STA. 10+38 16’ LT N= 813118 E= 2155252 ELEV. = 313.05’ BM 50 RRS SET IN 18 INCH TULIP N 68 20’29" W Dist 249.71’ FROM BL STATION 5+00.00 N= 813212 E= 2154488 ELEV. = 312.28’ BM 51 -L- DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 910 = 25 = 301.1 = 1310 = 100 = 302.35 = 1450 = 100 = 302.8 = 8/2/2013 = 297.1 P I = 1 4 + 6 6 . 0 0 0 E l = 2 9 9 . 0 2 ( - ) 4 .7424%(-) 0.5294% EL= 302.15’ EL= 298.84’ -L- STA. 14+00.00 -L- STA. 15+00.00 Begin Grade Ditch LT End Grade Ditch LT PI = 11+70.00 EL = 317.52’ (+)0.1508% (- )6 .2 7 4 6% VC = 130’ K = 20 PI = 14+10.00 EL = 302.46’ (- )6 .2 7 4 6% (+)0.3000% VC = 242’ K = 37 PI = 16+78.03 EL = 303.27’ (+)0.3000%(+)4.3923% VC = 154’ K = 38 V = 30mph V = 30mph V = 30mph Proposed Bridge SKEW =90 G .P. ELEV.=302.93’ VERTICAL ABUTM EN T BRIDGE 1 @ 50’; 21" CO RED SLAB STA.15+66 -L- EL = 317.32’ -L- STA. 10+40.00 BEGIN GRADE EXCAVATIO N ABUTM EN T SEE STRUCTURE PLAN S CLASS II RIPRAP (TYP) (SURVEY DATE 08-02-2013) W SE=297.1’ SEE SHEET 4 FOR PLAN VIEW EL = 308.62’ -L- STA. 18+00.00 END GRADE DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 5 / 1 4 / 9 9 SHEET NO .PRO JECT REFEREN CE NO . HYDRAULICSROADWAY DESIG N EN G INEER ENG INEER 5B-5113 2 7 - J A N - 2 0 1 4 1 4 : 4 2 R : \ R o a d w a y \ P r o j \ b 5 1 1 3 _ r d y _ p f l . d g n $ $ $ $ U S E R N A M E $ $ $ $ 320 310 300 290 280 270 260 250 240 230 220 210 200 12+00 13+00 14+00 15+00 16+00 17+00 18+0011+0010+00 320 310 300 290 280 270 260 250 240 230 220 210 200 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 2 7 - J A N - 2 0 1 4 1 4 : 4 2 R : \ R o a d w a y \ C o r r i d o r M o d e l i n g \ B 5 1 1 3 _ R d y _ X P L . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 2 3 / 9 9 PRO J. REFEREN CE N O .SHEET NO .0 315 315 320 320 310 31010+00.00 315 315 320 320 325 310 310 10+40.00 315 315 320 320 325 310 310 10+50.00 315 315 320 320 325 325 310 310 10+71.80 315 315 320 320 325 325 310 310 11+00.00 X-1B-5113 -L- 2.5 5 -L- 10+40.00 BEG IN G RADE -L- 10+30.00 BEG IN CO N STRUCTIO N Rem oval of Existing Pavem ent will be paid for at the contract lum p sum price for "G rading." Borrow, Fine G rading, Clearing and G rubbing, Breaking of Existing Pavem ent, and N ote: Approxim ate quantities only. Unclassified Excavation, Borrow Excavation, Shoulder DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS317.08 317.32 2: 1 2:14 :14:1 0.0100.040 315.11314.56 317.34 2: 1 2:14 :14:1 0.0190.049 315.41 314.49 317.37 2: 1 2:14 :1 4:1 0.0300.060 315.66 314.42 317.28 2: 1 2:14 :1 4:1 0.0440.060 315.95 314.47 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 2 7 - J A N - 2 0 1 4 1 4 : 4 3 R : \ R o a d w a y \ C o r r i d o r M o d e l i n g \ B 5 1 1 3 _ R d y _ X P L . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 2 3 / 9 9 PRO J. REFEREN CE N O .SHEET NO .0 315 315 320 320 325 325 310 310 11+50.00 315 315 320 320 325 325 310 310 12+00.00 310 310 315 315 320 320 325 325 305 30512+50.00 300 300 305 305 310 310 315 315 320 320 325 325 295 29513+00.00 X-2B-5113 -L- 2.5 5 316.65 2: 1 2:14 :1 4:1 0.060 0.060 315.77 314.05 315.29 2: 1 2:14 :1 4:1 0.060 0.060 314.12 312.40 313.34 2: 1 2:14 :1 4:1 0.060 0.060 311.28 309.56 310.75 2: 1 2: 1 4:1 0.060 0.060 306.44 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 2 7 - J A N - 2 0 1 4 1 4 : 4 3 R : \ R o a d w a y \ C o r r i d o r M o d e l i n g \ B 5 1 1 3 _ R d y _ X P L . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 2 3 / 9 9 PRO J. REFEREN CE N O .SHEET NO .0 300 300 305 305 310 310 315 315 320 320 295 29513+50.00 300 300 305 305 310 310 315 315 295 29513+86.66 300 300 305 305 310 310 315 315 295 29514+00.00 300 300 305 305 310 310 295 295 14+50.00 X-3B-5113 -L- 2.5 5 307.94 2: 1 2: 1 4:1 0.0580.058 303.82 306.05 2: 1 2: 1 4:1 0.0400.040 302.54 305.52 2: 1 2: 1 4:1 0.0340.034 302.15 304.05 2: 1 2: 1 4:1 0.0090.020 299.78 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 2 7 - J A N - 2 0 1 4 1 4 : 4 4 R : \ R o a d w a y \ C o r r i d o r M o d e l i n g \ B 5 1 1 3 _ R d y _ X P L . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 2 3 / 9 9 PRO J. REFEREN CE N O .SHEET NO .0 300 300 305 305 295 29515+00.00 300 300 305 305 295 29515+39.87 295 295 300 300 305 305 310 310 290 29015+50.00 300 300 305 305 295 29515+92.13 300 300 305 305 310 310 295 295 16+00.00 X-4B-5113 -L- 2.5 5 -L- 15+92.13 EN D BRIDG E -L- 15+39.87 BEG IN BRIDG E 303.15 2: 1 2: 1 4:1 0.0150.020 298.84 302.68 0.0200.020 295.31 0.0200.020 303.12 0.0200.020 303.25 2: 1 2:1 0.0200.020 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 2 7 - J A N - 2 0 1 4 1 4 : 4 4 R : \ R o a d w a y \ C o r r i d o r M o d e l i n g \ B 5 1 1 3 _ R d y _ X P L . d g n $ $ $ $ U S E R N A M E $ $ $ $ 8 / 2 3 / 9 9 PRO J. REFEREN CE N O .SHEET NO .0 300 300 305 305 295 295 16+50.00 300 300 305 305 295 295 17+00.00 300 300 305 305 310 310 295 295 17+50.00 305 305 310 310 315 315 300 30018+00.00 X-5B-5113 -L- 2.5 5 -L- 18+10.00 EN D CO N STRUCTIO N -L- 18+00.00 EN D G RADE 304.06 2: 1 2:1 0.0200.020 305.30 4:1 4 :1 0.0200.020 306.74 2: 12:1 0.0200.020 308.62 2: 1 2:1 0.0300.000