HomeMy WebLinkAboutSite Inspection 7.5.22 NC 208Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210644
NCDOT - NC208 Widening & Guard Rail Addition
Madison
NCDOT - NC208 Widening & Guard Rail Addition
NC DOT Division 13
7/5/2022
Follow-up
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Road
maintenance/repair/improveme
ntsRegion:Asheville
Longitude:-82° 45' 11''+35° 57' 60''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on July 5, 2022. The inspection is a
follow up for a non-compliant inspection on June 29, 2022. I spoke with TK Wilson and Keith Gilpin during and after the
inspection.
Removal of sediment and gravel is complete and all areas have been stabilized. Recommend securing the coir fiber
matting with wooden stakes to prevent higher flows from displacing the matting.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210644
7/5/2022
Bryan, Roger D
Site Inspection (DOT)Follow-up
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2