Loading...
HomeMy WebLinkAbout20070184 Ver 1_Staff Report_20070412Staff Report Project Num: 20070184 Version: 1 Name: Carolina Lakes Block T (old x-ref: 95-0337 c/n locate file) County: Harnett Location: Little Bridge Branch CPF Spout Springs Latitude: +35°16'38" SW Plan Location: Owner: Blackmon, Bruce Contact Person: Blackmon, Bruce Inspection Date: 04/12/2007 Reason for Inspection: Routine On-Site Representative(s): Primary Inspector: Kenneth L Averitte Secondary Inspector(s): Title: Entry Time: 12:30 PM Status: Received Project Type: Residential Subdivision Region: Fayetteville Longitude: -79°02'37" Phone: 704-845-2100 Exit Time: 03:00 PM Inspection Type: Staff Report Phone: 910-433-3300 Ext.703 Question Areas: Site Visit Inspection Summary: Some of the roadways were installed several years ago. Redesign believed to be warranted on some crossings, esp. G and F. Future lot fills could be significant and should be addressed. Page: 1 Project Num: 20070184 Owner: Blackmon, Bruce Inspection Date: 04/12/2007 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Yes No NA NE Do impacts described in the application differ those seen in the field? ^ ~ fl ^ If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ^ ~ ^ ^ If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? ~ ^ ^ ^ If yes, please describe and quantify: inevitable lot fill Were the impacts in place prior to the application for the 401 Certification? ^ ~ ^ ^ Additional conditions recommended for the Certification: address stormwater as needed; deed restrictions, etc. Recommended project modifications: WL crossing "F" is in one of the higher value wetland areas on the site. Is this a modification request to an existing Certification? ^ ~ ^ ^ Are there additional stromwater conditions that should be required due to the following classifications: ~ ^ ^ ^ # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? ~ ^ ^ ^ # If yes, what phase is this? Are there prior impacts from prior phases? ~ ^ ^ ^ If yes, what are the cumulative imacts for this project? Possible secondary impacts noted: Comment: Page: 2