HomeMy WebLinkAbout20070184 Ver 1_Staff Report_20070412Staff Report
Project Num: 20070184 Version: 1
Name: Carolina Lakes Block T (old x-ref: 95-0337 c/n
locate file)
County: Harnett
Location: Little Bridge Branch CPF Spout Springs
Latitude: +35°16'38"
SW Plan Location:
Owner: Blackmon, Bruce
Contact Person: Blackmon, Bruce
Inspection Date: 04/12/2007
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Kenneth L Averitte
Secondary Inspector(s):
Title:
Entry Time: 12:30 PM
Status: Received
Project Type: Residential Subdivision
Region: Fayetteville
Longitude: -79°02'37"
Phone: 704-845-2100
Exit Time: 03:00 PM
Inspection Type: Staff Report
Phone: 910-433-3300 Ext.703
Question Areas:
Site Visit
Inspection Summary:
Some of the roadways were installed several years ago. Redesign believed to be warranted on some crossings, esp. G and F. Future
lot fills could be significant and should be addressed.
Page: 1
Project Num: 20070184 Owner: Blackmon, Bruce
Inspection Date: 04/12/2007 Inspection Type: Staff Report Reason for Visit: Routine
Site Visit Yes No NA NE
Do impacts described in the application differ those seen in the field? ^ ~ fl ^
If yes, please describe differences:
Are the Intermittent/Perennial calls different in the application? ^ ~ ^ ^
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application? ~ ^ ^ ^
If yes, please describe and quantify: inevitable lot fill
Were the impacts in place prior to the application for the 401 Certification? ^ ~ ^ ^
Additional conditions recommended for the Certification: address stormwater as needed; deed restrictions, etc.
Recommended project modifications: WL crossing "F" is in one of the higher value wetland areas on the site.
Is this a modification request to an existing Certification? ^ ~ ^ ^
Are there additional stromwater conditions that should be required due to the following classifications: ~ ^ ^ ^
# 303(d)list, Class WS, NSW, ORW, HQW
Describe:
Is this a subdivision or otherwise part of a larger project? ~ ^ ^ ^
# If yes, what phase is this?
Are there prior impacts from prior phases? ~ ^ ^ ^
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment:
Page: 2