Loading...
HomeMy WebLinkAbout20220613 Ver 1_More Info Requested_20220630From: Snider, Holley To: Beasley, Troy; Beecher. Gary H CIV USARMY CESAW (USA) Subject: RE: [External] RE: The Tides Apartments - Shallotte, Brunswick Co (USACE AID: SAW-2013-00111)(NCDWR Proj #20220613 v1) - Application Review Status Request Date: Thursday, June 30, 2022 4:06:00 PM Hey Troy, Per our phone conversation, please provide a justification for your determination that the isolated wetlands onsite are pocosin wetlands. This information will be necessary for the DWR to complete the review of your permit application. The application is on hold until the information has been received by our office. I thank you in advance for your time and attention to this matter. Please feel free to call or email me if you have any questions or I may be of assistance to you in any way. Sincerely, Holley Snider .•' ,><((((12> ' ' ,,..><((((°>..' Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 NORT i w1RGn ihN RMNI*rMPt CI ETMGMIMAi1 01h1i11y 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Beasley, Troy <TBeasley@withersravenel.com> Sent: Monday, June 27, 2022 12:59 PM To: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Cc: Snider, Holley <holley.snider@ncdenr.gov> Subject: [External] RE: The Tides Apartments - Shallotte, Brunswick Co (USACE AID: SAW-2013- 00111)(NCDWR Proj #20220613 v1) - Application Review Status Request CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Yes, the greenway is an asphalt greenway which will provide pedestrian access to the passive recreation area on the upland island adjacent to the Shallotte River. The asphalt greenway changes to a boardwalk over the larger section of wetland where only pedestrians and lawnmowers will need to travel on the boardwalk. The greenway trail will also provide the access for the maintenance of lower bay and outfall of SCM 1. The weight and tracks of the equipment necessary to clean out the SCM would damage a wooden boardwalk and would require a substantial bridge with the structural integrity to support an excavator and dump truck. The greenway will need to be pretty close to the same elevation as the area surrounding SCM 1, and it can't be significantly lower, or it causes issues with access to SCM 1. The topography on this site is significant and Wetland F sits in the bottom of a crenulation. So the impacts at W2 are necessary to transition greenway fill to natural grade or blend with grading for Buildings 10 & 11. Regarding impact W11, that's not a road crossing, it's a sidewalk crossing. W11 looks big, but it's just the scale of the exhibit because W11 is only 0.025 acres. The elevation of the sidewalk is based on the need to provide adequate cover for the culverts at Impact W10 and to meet ADA compliance with allowable grades for sidewalks. The extent of the grading is needed to return fill to natural grade. Let me know if you need anything else. Troy Beasley I I 219 Station Road, Suite 101 I Wilmington, NC 28405 Office: 910.256.9277 I Direct: 910.509.6512 Mobile: 910.622.0122 tbeaslev(a withersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Sent: Monday, June 27, 2022 11:31 AM To: Beasley, Troy <TBeasley@withersravenel.com> Cc: Snider, Holley <holley.snider@ncdenr.gov> Subject: RE: The Tides Apartments - Shallotte, Brunswick Co (USACE AID: SAW-2013-00111)(NCDWR Proj #20220613 v1) - Application Review Status Request Troy, Unfortunately this has happened before with projects. For one reason or another the Corps doesn't receive the package. If we never received the package, but DWR does, I don't even know when the clock starts? It can get real complicated. We'II try to knock this one out this week. I know that Myself and Holly had some concerns about the proposed "Asphalt Greenway" Is that going to be an actual wetland impact? Gary From: Beasley, Troy <TBeasleyPwithersravenel.com> Sent: Monday, June 27, 2022 11:16 AM To: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Cc: Snider, Holley <holley.snider@ncdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: The Tides Apartments - Shallotte, Brunswick Co (USACE AID: SAW-2013-00111)(NCDWR Proj #20220613 v1) - Application Review Status Request Gary, Looking back, we got the Laserfiche email confirming that the application had been submitted to the USACE. But I can't find where we received the email from WilmingtonNCREG confirming receipt of the application. I'm not sure what happened with the transmission of the application from Laserfiche to the USACE. I'm going to email you the application that was submitted on 4/28/2022 in a separate email. It's about 20 mb, so please confirm that you've received it. Once you've had a chance to review, let me know if you have any other questions and I'll address them all at once. Troy Beasley 219 Station Road, Suite 101 I Wilmington, NC 28405 Office: 910.256.9277 I Direct: 910.509.6512 Mobile: 910.622.0122 tbeaslevOwithersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.BeecherPusace.army.mil> Sent: Thursday, June 23, 2022 2:12 PM To: Beasley, Troy <TBeasleyPwithersravenel.com> Cc: Snider, Holley <holley.snider@ncdenr.gov> Subject: RE: The Tides Apartments - Shallotte, Brunswick Co (USACE AID: SAW-2013-00111)(NCDWR Proj #20220613 v1) - Application Review Status Request Troy, I talked to Holly about this project yesterday. I don't have a file or application notice for it. Did you get a receipt back from the Corps after submittal? I apologize this has happened a couple times in the past, with all the projects coming in a small fraction get lost or misplaced. Can you send me a copy of the PCN, mitigation, plans, etc. Holly was kind enough to send me some of the pages for the PCN and plans. Below are some comments based on my limited ability to review the project: - The NWP 18 maxes out at .10 of an acre of impacts - The NWP 14 maxes out at .50 of an acre of impacts I'm still going through the plans to decipher where each impact will take place and what permit action will take place. - Impact W11, why is this impact so large for a road crossing? Probably the biggest red flag that I see is the 321 LF Asphalt Greenway. Is the greenway associated with Impact W2? Or is the impact already planned for development use and the greenway just happens to be going through that area? It's going to be difficult to permit .10 acres of wetland impact for a "greenway" especially when the green way can be a raised walkway. I'll keep looking through the plans and send additional comments if warranted. Thanks for your patience, Respectfully, Gary From: Beasley, Troy <TBeasley@withersravenel.com> Sent: Wednesday, June 15, 2022 11:14 PM To: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil>; Holley Snider (holley.snider@ncdenr.gov) <holley.snider@ncdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] The Tides Apartments - Shallotte, Brunswick Co (USACE AID: SAW-2013-00111)(NCDWR Proj #20220613 v1) - Application Review Status Request Gary/Holley, We submitted the 404/401 application for this project on 4/28/2022 (see attached confirmation emails). The 401 application fee was paid on 4/29/2022, and the was put on public notice on 4/30/2022. We're at 48 days since submittal, so I wanted to check on the status of your reviews of the application and anticipated timeframes for issuance of the permits. Thanks! Troy Beasley I219 Station Road, Suite 101 I Wilmington, NC. 128405 Office: 910.256.9277 I Direct: 910.509.6512 Mobile: 910.622.0122 tbeasleyPwithersravenel.com CONFIDENTIALITY AND NONDISCLOSURE