Loading...
HomeMy WebLinkAboutGW1-2022-05985_Well Construction - GW1_20220617 i WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well Contractor Information: 14_WATER ZONES I We11VCo�n~traLctorName FROM TO DESCRIPTION ft- ft. ft -Z1` NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased ells)OR LINER(if a livable) Barnette Well Drilling, Inc. FROM TO DIAMETER THICKNESS MATERIAL ft. / m. �Ot .2! Company Name d`e ft t6 /A f Ili.INNER GASING,OR;TUBING eothermal closed-loop)_ 2.Well Construction Permit#: (� Z 2 "- O G'1'cA FROM zo DIAMETER zHIClavEss MATERIAI List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) ft ft in. 3.Well Use(check well use): ft. ft. �• Water Supply Well: 17.SCREEN. FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) [']Residential Water Supply(single) ft ft in. ❑Industrial/Commercial ❑Residential Water Supply(shared) :18.GROUT ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft ft Poured ❑Monitoring ❑Recovery ft 315 ft (� Injection Well: ft. ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND(GRAVEL PACK rf a livable El Aquifer Storage and Recovery []Salinity Barrier FROM TO MATERIAL EMPLACFAN ENT METHOD ❑Aquifer Test ❑StormwaterDrainage ft. fL ❑Experimental Technology ❑Subsidence Control ft ft ❑Geothermal(Closed Loop) ❑Tracer 20 DRILLING'LOG attach additional sbeets if necessi typ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM To DESCRIPTION(co/l�or,hardness,soil/rocke, in size,eta)" 4.Date Well(s)Completed: �-2- Well ID# L 2 ft. l� ft 2 ` 1,aJ 5a.Well Location: :ft. 3�- ft k& i C/O�iF :�r�n 3 T!�/1/l 3,4—ft. ft Facciilyity/(Ow der Name �, n Facility ID#(if applicable) t0r ft. G ft. Physical Address,City,and Zip ft ft. 7- Q R-A Aff `e �i 6/ 6 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/long is sufficient) 22.Certification: C)l PR fE°•^J'dl . H - .3 6 N 6.Is(are)the well(s): LifPermanent or []TemporarySignature o Certified Well Contractor~ Dace By signing this form,I hereby certify that the wells)was(were)constructed in accordance with 7.Is this a repair to.an existing well: ❑Yes or 0 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy Ifthis is a repair fill out known well construction information and explain the nature of the of this record has been provided to the well owner. iepair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details 8.Fo'r Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-Lis needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: © (ft) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if dierent(example-3@200'and 2@100) 24a. For All Wells: Original form to.Division of Water Resources (DWR), If Static water level below top of casing: �5 (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ijwater level is above casing,use"+" ° 11.Borehole diameter: (in.) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: Air Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct.push etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR CCPCUA 13a.Yield(gpm) Method of test: %- ,/ Permit Program, 1611 MSC,Raleigh,NC 27699-1611 �d 13b.Disinfection type: HTH Amount: Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018