Loading...
HomeMy WebLinkAboutGW1-2022-05974_Well Construction - GW1_20220617 WEF.Y.CONSTRUCTION RECORD(GW-Y) For Internal Use Only: 1.Well Contractor Information: 'n-1 4f i. - (/Q K u-'� 14.WATER ZONES Well Contractor Name FROM, TO DESCRIPTION ft ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LINER(it ap likable) Barnette Well Drilling, Inc. FROM TO DIAMETER THICKNESS MATERIAL Company Name & it G---ft 6 l in. rA 1 _I*C 16.INNER CASING OR TUBING eothermal closed-loo 2.Well Construction Permit#: 2, S, FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) ft. ft. in. 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) InResidential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑hTi ation ❑Wells>100,000 GPD FROM I TO MATERIAL EMPLACEMENT METHOD&ZROUNT Non-Water Supply Well: 6 ft- 3Z f° Cement/Sand Poured ❑Monitoring ❑Recovery ft. ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barer FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. fL ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional.sheets if necessary) FROM TO DESCRIPTION(color,hardness,soil/rock e, in size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) Z ft. 3 fL d v(tJ 4.Date Well(s)Completed: C!` 0"Z�We1lID# 7( �.� ft. 5a.Well Location: /e Z ft. �a ft. 9 ft. l ft (5910 fly Q A (� Facility/Owner Name /i >JFacility ID#(if applicable) jy'a ft. en' ft. ' 6 7 -A-A C j �(\ __ _A �( 1� ft ft ft. ft. Physical Address,City,and Zip 21.REMARKS �"'+rfi`°'` rt^y n County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: JU ' 1 (ifwell field,one lat/long is sufficient) ' P 22.Certification- 6.Is(are)the well(s):T eP rm ent or ❑Temporary Signature of Certified W-ell Contractor Date By signing thisform,I hereby certifv that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ANo- 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction infonnation and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: y (ft.) For multiple wells list all depths if dierent(example-3@200'and 2@1000 Submit this GW-1 within 30 days of well Completion per the following: 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: z (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"++"° 11.Borehole diameter: 016 (in,) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method:Air Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100.000 GPD:Copy to DWR,CCPCUA 13a.Y ield(gpm) Method f test: �00-44 Permit Program,1611 MSC,Raleigh,NC 27699-1611 �/� o 13b.Disinfection type: HTH Amount: V -JIt -2- Form GW-I North Carolina Department ofEnvironmental Quality-Division of Water Resources Revised 6-6-2018