From: Chris White < Chris White @rrsi.com>
Sent: Saturday, May 03, 2014 105 PM
To: Robert Mazur, Bob Mazur
Subject: Fwd Contact email
Attachments: PCN_ buffers pdf, ATTOOOOLhtm
Authorization application for the airport is attached
Chris White
Area Manager - Virginia/Carolinas
Red River Specialties
252.493.2173 (mobile)
chris.whitegrrsi. com
Sent from my iPhone
Begin forwarded message:
From: "Smith, Danny" <danny.smith2ncdenr.gov>
Date: May 3, 2014 at 1:01:03 PM EDT
To: Chris White <Chris.Whitegrrsi.com>
Cc: "Smith, Cherri L" <cherri.smithgncdenr.gov>
Subject: RE: Contact email
The attached PCN is the buffer authorization application. (Highlighted in yellow are items
within the application that need to be filled out).
After you fill out the application send three copies of the Buffer Authorization Application to
Karen Higgins:
If sending by First Class Mail via the US Postal Service
Karen Higgins
NC DENR -DWQ - WBSCP Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
or
If sending via delivery service (UPS, FedEx, etc.)
Karen Higgins
NC DENR -DWQ - WBSCP Unit
512 N. Salisbury Street
Raleigh, NC 27604
No fee is required for this type of authorization.
Below are some links that may help as well.
hgp:Hportal.ncdenr.ora/web/wq/sLAM/ws/401/riparianbuffers
http: / /portal.ncdenr.org /web /wq /swp /ws /401 /certsandpermits /apply /forms
http://portal.ncdenr.org/web/wq/sM/ws/401/riparianbuffers/faqs# How do I apply
Below are listed some key general points that are needed for buffer authorizations that are
sometimes missed in applications:
* You can fill out this form but the owner needs to sign where indicated because the permit
will go the them. Or fill out an agent authorization form (example attached)
* Site plan with the proposed permanent impacts indicated
* Any temporary impacts beyond the permanent ones that are needed for construction. How
these will be stabilized and replanted if necessary.
* Stream indicated on the plan
* Buffers on the plan, Zone 1 - 30 feet from top of the stream bank; Zone 2 - from 30 feet to 50
feet. Paralleling the stream pattern.
* Try to keep all new impacts in Zone 2 if possible
* Amount, square footage, of impacts.
* How will the rainfall on the new impervious surface be directed or handled - For
example: The stormwater from the proposed area may flow from the proposed impervious area
as sheet flow. We want to avoid piping any run -off through the buffer and directing directly to
the stream.
* Describe the purpose and need of the impacts (explain why the buffer impacts are necessary)
* Avoidance & Minimization? Explain how the buffer impacts are limited to .... And only to
zone 2 ... etc.
If you have any questions, do not hesitate to call me or Cherri Smith. Cherri is at 919 -791-
4251. (My information is listed below.)
Thanks
Danny
Danny Smith
Regional Supervisor
Raleigh Regional Office
NCDENR- Division of Water Resources
3800 Barrett Drive
Raleigh, NC 27609
(919) 791 -4252
Danny. Smith ,ncdenr.gov
Email correspondence to and from this address may be subject to the North Carolina Public
Records Law and may be disclosed to third parties unless the content is exempt by statute or
other regulation.