Loading...
HomeMy WebLinkAbout20120965 Ver 2_More Info Received_20140626Homewood, Sue From: Ken Bridle <kbridle @ pied montland org> Sent: Friday, June 27, 2014 4 45 PM To: Bailey, David E SAW, Mark Taylor, Kevin Redding Cc: Homewood, Sue, Kevin Redding Subject: RE [EXTERNAL] RE Autumn Creek Crossing Relocation, Summerfield Farm, Piedmont Land Conservancy (UNCLASSIFIED) Attachments: PCN Summerfield Farm 03June2014 kab revised 27Jun2014kab pdf Hello David and Mark I have attached the revised PCN with the change in the stream impact length corrected to 70 feet. If you can Just swap out the page you need, that should cover the PCN revision issue Ken Kenneth A. Bridle, Ph D. Piedmont Land Conservancy P O Box 4025, Greensboro, NC 27404 -4025 Stewardship Director PLC Office 336 - 691 -0088 Home office 336 - 591 -5882 - - - -- Original Message---- - From Bailey, David E SAW [mailto David E Bailey2 @usace army mil] Sent Friday, June 27, 2014 3 31 PM To Mark Taylor, Kevin Redding Cc Ken Bridle, 'Homewood, Sue' Subject RE: [EXTERNAL] RE Autumn Creek Crossing Relocation, Summerfield Farm, Piedmont Land Conservancy (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE Thanks for the information and quick return, Mark I'll look for the updated PCN /plans in the mail -Dave Bailey David E Bailey Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone (919) 554 -4884, Ext 30 1 Fax (919) 562 -0421 Email David E.Bailey2 @usace army mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http //regulatory usacesurvey com/ - - - -- Original Message---- - From Mark Taylor [mailto mark @ecologic -nc com] Sent Friday, June 27, 2014 10 31 AM To- Bailey, David E SAW, 'Kevin Redding' Cc 'Ken Bridle', 'Homewood, Sue' Subject [EXTERNAL] RE Autumn Creek Crossing Relocation, Summerfield Farm, Piedmont Land Conservancy (UNCLASSIFIED) Good morning Dave, On behalf of PLC, I offer the following response- 1) 70 If of impact is correct as you described Please let Kevin know if a revised PCN is necessary 2) The design inverts do not allow for the 1 foot of burial (our oversight), so we will modify the plans accordingly (lower the inverts 1') and get them to Kevin to resubmit Expect to see the resubmittal next week (most likely) Thanks for catching these discrepancies Best regards, Mark Mark Taylor, PE, MSCE President and Principal Consultant Ecologic Associates, PC P O Box 41288 Greensboro NC 27404 (336) 382 -9362 Cell - - - -- Original Message---- - From Bailey, David E SAW [mailto David E.Bailey2 @usace.army mil] Sent Tuesday, June 24, 2014 4 04 PM To Kevin Redding Cc- Ken Bridle, Homewood, Sue, Mark Taylor Subject RE Autumn Creek Crossing Relocation, Summerfield Farm, Piedmont Land Conservancy (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE Kevin, 2 C. Proposed Impacts Inventory 1. Impacts Summary 1a Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts: 2h Comments There are no wetlands at the point of this stream crossing 3. Stream Impacts If there are perennial or Intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites Impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or Intermittent (I NT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 P Culvert UT to Haw River PER Corps 5 70 S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 31 Comments This is to install one large culvert, see attached plans prepared by Ecologic Associates, P A Page 4 of 10 PCN Form — Version 1 4 January 2009