Loading...
HomeMy WebLinkAboutNCG030642_Compliance Evaluation_20210809ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director u+�4 { NORTH CAROLINA EnvtrommW Quaftty August 9, 2021 GKN Driveline Newton LLC Attention: Zachary Woods, EHS Manager 1848 GKN Way Newton, North Carolina 28658 Subject: Compliance Evaluation Inspection GKN Driveline Newton LLC NPDES Certificate of Coverage — NCG030642 Catawba County, North Carolina Dear Mr. Woods, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the GKN Driveline Newton facility on August 5, 2021. Please note that in the stormwater inspection report summary we ask that you submit an updated Stormwater Pollution Prevention Plan by November 10, 2021. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, 7 ;ssistPantRegional s Engineer North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office j 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704-663-1699 Compliance Inspection Resort Permit: NCG030642 Effective: 07/01/21 Expiration: 06/30/26 Owner: Gkn Driveline Newton LLC SOC: Effective: Expiration: Facility: GKN Driveline Newton LLC County: Catawba 1848 Gkn Way Region: Mooresville Newton NC 28658 Contact Person: Zachary Woods Title: EHS Manager Phone: 828-855-4360 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/05/2021 Entry Time 10:15AM Primary Inspector: srinivasa r kamarajugadda Secondary Inspector(s): Certification: Phone: Exit Time: V:'5AM Phone: 919-807-6045 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG030642 Owner - Facility: Gkn Driveline Newton LLC Inspection Date: 08/05/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility and outfalls appear well operated and maintained. The Stormwater Pollution Prevention Plan (SPPP) was developed in 2000 and a new SPPP must be submitted to the Mooresville regional office by November 10, 2021. Page 2 of 3 Opp Permit: NCG030642 Owner - Facility: Gkn Driveline Newton LLC inspection Date: 08/05/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? N ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ■ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ E ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SPPP) was developed in 2000 with all of the permit requirements but has not been maintained. A new SPPP is beincl developed and should be submitted to the Mooresville regional office by November 10. 2021. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Qualitative monitoring reports were not produced at this inspection. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Laboratory sheets were produced without the results. PH is measured on -site with a handheld meter. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 110 N ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: Two outlets discharge from the employee parking lots and the other outlets discharge to the railroad line below the facility. The facility and outfalls appearwell operated and maintained. Minimal outside storage and uncovered dumpsters were observed at this inspection. Page 3 of 3