HomeMy WebLinkAboutNCG030574_Compliance Evaluation Inspection_20220207ROY COOPER
covamr
EUZABETH S. BISER
Secret"Y
BRIAN WRENN
Dir+ecnvr
NORTH CAROLINA
Envkwunenta[QuaUty
February 7, 2022
Doosan Infracore Portable Power, A Division of Clark Equipment Company
Attention: James Martin, Environmental Health and Safety Manager
1293 Glenway Drive
Statesville, North Carolina 28625
Subject: Compliance Evaluation Inspection
Doosan Infracore Portable Power
NPDES Certificate of Coverage — NCG030574
Iredell County, North Carolina
Dear Mr. Martin:
Enclosed please find a copy of the Compliance Evaluation Inspection Report
for the inspection we conducted at the Doosan Infracore Portable Power on
February 3, 2022. Please note that in the stormwater inspection report summary we
ask that you continue to maintain and follow the Stormwater Pollution Prevention
Plan (SWPPP) according to the permit.
The report should be self-explanatory; however, should you have any questions,
please do not hesitate to contact me at (704) 663-1699 or by E-mail at
james.moore@ncdenr.gov.
Enclosure
c: Laserfiche
Sincerely,
Jam s Moore
'stant Regional Engineer
jg: DO.E W__rD
OWNUUM0
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 2811S
704.663.1699
Compliance Inspection Report
Permit: NCG030574 Effective: 07/01/21 Expiration: 06/30/26 Owner: Dorian Infracore Portable Power Div of
Clark Equipment Co
SOC: Effective: Expiration: Facility: Doosan Infracore Portable Power (A Div. of Cla
County: Iredell 1293 Glenway Dr
Region: Mooresville
Statesville NC 28625
Contact Person: James A Martin Title: EH&S Manager Phone: 828-320-0768
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/03/2022 Entry Time 09:15AM
Primary Inspector: Jesse M McDonnell
Secondary Inspector(s):
Certification:
Phone:
Exit Time: 11:15AM
Phone: 704-235-2139
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: E Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
£;o Z a6ed
•sawi} asoy;;e pa;oalloo eq ueo aldwes gej6 a j! awuua;ap o;
s}uana uiej Aneay 6uunp panuasgo aie silepno a gjey; ainsu3 suiseq ay; jo Ilegno ay; wog} 6uuo}iuow {eoi}Aleue 9191dwoo
o; anui;uooa;is uo sWog owg ay;;o lle}}no ay};e sin000 6uuo;iuoW •6uuo;iuow leoij(jeue lo; pa;uawnoop uaaq sey
,mog ou, panjasgo semj!'uoi;oodsui ay; 6uunQ •9191dwoo pue;ueuno si (dddMS) ueld uoi;uanaJd uoi;nIlod aa;emwjo;S ayl
:tiewwnS uoi;oodsul
aupoa a1si jo; uosea2l U01}ERIEA3 aollElldWO� ad/U, uol;aedsul ZZOZ/£O/ZO :a;Ep uolloadsul
oo ;uawdinb3 )PBIO 10 Al(] y Jamod a1RE}Jod QX084ul uesooa :A311!oe:i - Jaumo VLOCOJON :31wJad
permit: NCG030574
inspection Date: 02/03/2022
Owner - Facility: Doosan Infracore Portable Power A Div of Clark Equipment Co
Inspection Type: Compliance Evaluation Reason for visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Yes No NA NE
■❑❑❑
■ ❑ ❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■❑❑❑
■D❑❑
■D❑❑
Comment: The Stormwater Pollution Prevention Plan (SWPPP) and associated documents are current
and complete.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑
Comment: All Qualitative monitoring has been completed per the permit.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 01100
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑
Comment: The two outfalls from the facility are the outlets of stormwater control measures (SCM).
Insufficient flow for monitoring was observed during this inspection. This is typical for storm
events. Continue to monitor at the outfall of the basin.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑
# Were all outfalls observed during the inspection? ■ ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ 110 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑
Comment: All outfalls were observed, well maintained and easily accessible.
Page 3 of 3