Loading...
HomeMy WebLinkAbout20191692 Ver 3_Mitigation Information_20220630From: Merritt, Katie To: Baker. Caroline D Subject: FW: [External] Raleigh Farm, White Farm, and Weaver Date: Thursday, June 30, 2022 12:46:15 PM Please file email chain below in 2019-1692 v3 From: Merritt, Katie Sent: Thursday, June 30, 2022 12:34 PM To: Barrett Jenkins<bjenkins@restorationsystems.com> Cc: Ray Holz <rholz@restorationsystems.com>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov> Subject: RE: [External] Raleigh Farm, White Farm, and Weaver Hey Barrett, After reading over the Raleigh Farm construction complete information, I am seeing that the Raleigh Farm Sites were planted in late February. That was 4 months ago and I'm suspecting that being able to observe planted stems on an As -Built site walk will be nearly impossible. None -the -less, I'm going to work on logistics for a site visit, but if planted stems cannot be confirmed onsite at the density required in the mitigation plan, Restoration Systems will be required to perform site -wide transects (at least equal to the number of the plots) and provide documentation (content to be determined) to DWR for review prior to issuance of a credit release. I am just giving you a heads up of what to expect if DWR staff are unable to verify with certainty, that the Planting Plan was implemented according to the approved Plan. Other parts of the Restoration Plan should still be able to be observed onsite (easement marking, plot installation, disking, ripping, removal of haul roads, fescue treatment, etc). Thanks, Katie From: Barrett Jenkins<bienkinsCo�restorationsystems.com> Sent: Thursday, June 30, 2022 9:15 AM To: Merritt, Katie <katie.merrittPncdenr.gov> Cc: Ray Holz <rholzC@restorationsystems.com> Subject: [External] Raleigh Farm, White Farm, and Weaver CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Katie, Three things: 1. 1 uploaded the attached corrected White Farm post construction memo to laserfiche this morning. The CE document and Survey are already uploaded. We changed Conservation Easement Area 1 to match the 8.11 acres show on the final survey as discussed in the field yesterday. 2. 1 also uploaded the Raleigh post construction memos, attached to laserfiche the end of last week, I think they are now posted. 3. Can you see if you can get us the Weaver Credit release ASAP as we are losing credit sales. Thanks, Barrett