Loading...
HomeMy WebLinkAboutNCG030408_Stormwater Compliance Evaluation_20220207February 7th, 2022 Steel :Specialty.Inc Attention: Ian Gibson, Operations. Manager 5907 Wilkinson Boulevard Belmont, North Carolina 28012 Subject: Stormwater Compliance Evaluation Inspection Steel Specialty Inc NPDES Certificate of Coverage — NCG030408 Gaston County, North .Carolina Dear Ian Gibson, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Wilkinson Boulevard Facility on February 3rd, 2022. Please note that in the stormwater inspection report summary we ask that you produce a stormwater pollution prevention plan with all missing sections as outlined in the report. Additionally, qualitative and analytical monitoring must be conducted per permit and records must be kept and made available for future inspections. An inspection will be conducted on April 51' 2022 to follow up on this inspection and ensure compliance. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov.. Enclosure c: Laserfiche Sincerely, Jam s Moore s>istant Regional Engineer North Carolina Deparft&t.af.Er&1r6TimehW Quality I Dtvkdon of Energy, Mheraland tad k6idi cm MooresVffit Reg%na! Office 1610 East`CenWMenue, Sufte'301 1 Moorew le. North Carolim MIS 1E 704.6631699 Comuliance Inspection Resort Permit: NCG030408 Effective: 07/01/21 Expiration: 06/30/26 Owner: Steel Specialty Inc SOC: Effective: Expiration: Facility: Steel Specialty Incorporated County: Gaston 5907 VVlkinson Blvd Region: Mooresville Belmont NC 28012 Contact Person: Rick Latz Title: Phone: 704-825-4745 Ext.31 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/03/2022 Entry Time 09:OOAM Primary Inspector: Matthew J Gigante Secondary Inspector(s): Certification: Phone: Exit Time: 10:OOAM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030408 Owner - Facility: Steel Specialty Inc Inspection Date: 02/03/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: During the inspection, no portion of the stormwater pollution prevention plan was available. Additionally, no analytical monitoring or semi-annual qualitative monitoring data was available. Ensure all portions of the stormwater pollution preventioi plan are complete, up to date, and available. Qualitative monitoring must be completed semi-annually and analytical monitoring must be completed per permit requirements. This data must be kept and made available during inspections. Page 2of3 permit: NCG030408 Owner - Facility: Steel Specialty Inc Inspection Date: 02/03/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 110 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ M ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ M ❑ ❑ # Does the Plan include a BMP summary? ❑ M ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ M ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ M ❑ ❑ Comment: The stormwater pollution prevention plan was not present during the inspection. (Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 110 ❑ ❑ Comment: No Qualitative monitoring data available. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 1111 ❑ Comment: No analytical monitoring data available. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 111:10 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ M ❑ ❑ Comment: The permit and Certificate of Coverage were not present during the inspection. Page 3 of 3