HomeMy WebLinkAboutNCG030408_Stormwater Compliance Evaluation_20220207February 7th, 2022
Steel :Specialty.Inc
Attention: Ian Gibson, Operations. Manager
5907 Wilkinson Boulevard
Belmont, North Carolina 28012
Subject: Stormwater Compliance Evaluation Inspection
Steel Specialty Inc
NPDES Certificate of Coverage — NCG030408
Gaston County, North .Carolina
Dear Ian Gibson,
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection
we conducted at the Wilkinson Boulevard Facility on February 3rd, 2022. Please note that in the
stormwater inspection report summary we ask that you produce a stormwater pollution prevention
plan with all missing sections as outlined in the report. Additionally, qualitative and analytical
monitoring must be conducted per permit and records must be kept and made available for future
inspections. An inspection will be conducted on April 51' 2022 to follow up on this inspection and
ensure compliance.
The report should be self-explanatory; however, should you have any questions, please do not
hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov..
Enclosure
c: Laserfiche
Sincerely,
Jam s Moore
s>istant Regional Engineer
North Carolina Deparft&t.af.Er&1r6TimehW Quality I Dtvkdon of Energy, Mheraland tad k6idi cm
MooresVffit Reg%na! Office 1610 East`CenWMenue, Sufte'301 1 Moorew le. North Carolim MIS
1E
704.6631699
Comuliance Inspection Resort
Permit: NCG030408 Effective: 07/01/21 Expiration: 06/30/26 Owner: Steel Specialty Inc
SOC: Effective: Expiration: Facility: Steel Specialty Incorporated
County: Gaston 5907 VVlkinson Blvd
Region: Mooresville
Belmont NC 28012
Contact Person: Rick Latz Title: Phone: 704-825-4745 Ext.31
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/03/2022 Entry Time 09:OOAM
Primary Inspector: Matthew J Gigante
Secondary Inspector(s):
Certification: Phone:
Exit Time: 10:OOAM
Phone: 704-663-1699
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030408 Owner - Facility: Steel Specialty Inc
Inspection Date: 02/03/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
During the inspection, no portion of the stormwater pollution prevention plan was available. Additionally, no analytical
monitoring or semi-annual qualitative monitoring data was available. Ensure all portions of the stormwater pollution preventioi
plan are complete, up to date, and available. Qualitative monitoring must be completed semi-annually and analytical
monitoring must be completed per permit requirements. This data must be kept and made available during inspections.
Page 2of3
permit: NCG030408 Owner - Facility: Steel Specialty Inc
Inspection Date: 02/03/2022 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
110 ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ 0 ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ 0 ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ M ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ 0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ 0 ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ M ❑ ❑
# Does the Plan include a BMP summary?
❑ M ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑0 ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ 0 ❑ ❑
# Is the Plan reviewed and updated annually?
❑ M ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑ M ❑ ❑
Comment: The stormwater pollution prevention plan was not present during the inspection.
(Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 110 ❑ ❑
Comment: No Qualitative monitoring data available.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 1111 ❑
Comment: No analytical monitoring data available.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? 111:10 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ M ❑ ❑
Comment: The permit and Certificate of Coverage were not present during the inspection.
Page 3 of 3