Loading...
HomeMy WebLinkAbout20131070 Ver 1_More Info Received_20140627Strickland, Bev From: Devane, Boyd Sent: Friday, June 27, 2014 9:33 AM To: Strickland, Bev Subject: please file this email �r Illima From: davidf.ramseyCa)verizon. net [ mai Ito: davidf.ramseyCa)verizon.net] Sent: Friday, June 27, 2014 9:13 AM To: Devane, Boyd Subject: Elk Creek Avery County Fw: My mistake on previous note. Boyd: John Vilas has forward several emails from you to him regarding the aforementioned project. I am the person who needs to answer the questions and do not understand exactly what you have been reviewing. Please email directly the question you have on the plans for Elk Creek in Banner Elk, NC. David F Ramsey, Professional Engineer 434 Skinner Blvd Dunedin, F134698 or 61 The Glens Blvd Banner Elk, NC 28604 727 4094639 cell phone This E -Mail transmission (and /or the documents accompanying it) may contain information belonging to the sender which is confidential, privileged and /or exempt from disclosure under applicable law. The information is intended only for the use of the individual(s) or entity named above. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on the contents of this information is strictly prohibited. If you have received this E -Mail transmission in error, please immediately notify us by return E -Mail or telephone to arrange for return of its contents including any documents. From: John Vilas Sent: Tuesday, June 24, 2014 4:18 PM To: David F Ramsev Subject: FW: My mistake on previous note. 11l11111 will 11 John Was Program Services Manager - Environmental McGill Associates, P.A. 3764 Rominger Road I Banner Elk, NC 28604 Phone: 828.297.6946 1 Mobile: 828.964.3962 1 Fax: 828.297.1982 Email: john.vilas @mcgillengineers.com I Website: www.mcgillengineers.com From: Devane, Boyd [mailto:boyd.devane @ncdenr.gov] Sent: Tuesday, June 24, 2014 3:47 PM To: John Vilas Cc: Fox, Tim Subject: My mistake on previous note. In looking at my June 12th email, I realized that several of the comments I made were based on my viewing an older version of the "Sediment Basin Plan ". I even noted that I was viewing the September 13, 2013 version and you may have caught that. Therefore, please forgive my inaccurate memo and ignore the following comments: • On #2, 1 mentioned that I could not find the forebay. I do now see the forebays in the 2/16/14 version. • On #3, 1 mentioned the "volume provided in the filter area is 13,710 cu. ft." I think that that the 13,710 figure was from an old drawing. However, the "Water Quality Notes and Calculations" do show a volume in the pond of 11,060 cu.ft. and the drawing indicates a storage of 12,606 cu. ft. There may be some confusion because of the forebay volume but I'd appreciate you checking on that. • Please ignore #4 on the underdrain and filter fabric. I was looking at the earlier version of the drawing. • Please ignore #10. You found the slope error and corrected it. I feel much better about the submittal now that I am looking at the updated drawing. I apologize if my mistake caused you any additional work. I am, however, having some difficulty seeing the elevation lines (above the 3675.5 line) around the pond and would appreciate you sending the 2 -6 -14 drawing in a PDF version. Also, I'm not sure if this is an issue but the bottom of the drop inlet #1 of forebay #2 looks like it will be flooded at the design storm event. This may be your only option but you might check on that. (PS. Any other drawings, like the drainage area delineation, can also be submitted by PDF.) I will be out on vacation on Monday the 301h and return on July 14th. I will be in the office some tomorrow and most of the day on Thursday and Friday. If you feel like you could benefit from talking to me before I go on vacation, please give me a call. Fil