Loading...
HomeMy WebLinkAboutNC0036269_5-22 NH3 compliance schedule progress report_20220526WSACC • r - i „tar 1:'114::1A:15 + SC f2rt t t:t2. + 5045-'il21: 5 May 26, 2022 WATER & SEWER AUTHORITY OF CABARRUS COUNTY 232 Davidson Hwy, Concord, NC 28027 704.786.1783 4 704.795.1564 Fax Rocky River Regional WWTP 6400 Breezy Lane, Concord, NC 28025 704.788.4164 4 704.786.1967 Fax www.wsacc.org SUBJECT: ROCKY RIVER REGIONAL WWTP CABARRUS COUNTY, NC NPDES - NC0036269 AMMONIA -NITROGEN COMPLIANCE SCHEDULE PROGRESS REPORT Dear Mr. Scheller This is to notify NCDEQ that WSACC applied for an authorization to construct (ATC) for the RRRWWTP Expansion to 30 MGD by submitting application form, calculations, and final design documents to NCDEQ on March 3, 2022 The ATC was reviewed and approved on April 27, 2022. Submittal of ATC with final design documents meets schedule deadline number 3 as listed in the compliance schedule of paragraph A(7) of the NPDES permit NC0036269. WSACC is currently working towards the next milestone of the compliance schedule, which includes issuing a Notice to Proceed and commence construction. If you need additional information or have questions about the report, I may be reached at (704) 788-4164, ext. 114 or jamessims@wsacc.org. Sincerely, James Sims Wastewater Operations Manager JS/blc cc: Mark Fowler Thomas Hahn file