Loading...
HomeMy WebLinkAbout20220891 Ver 1_Riparian Buffer Authorization Request_20220629Buffer Authorization Application Form 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form - Update 10/23/2018 Original Submittal 6/29/2022 A. Owner/Applicant Information General Information Primary Contact Email: * Who is submitting the application?* Jason Carter Please list the contact person's email for questions or payment on this project if needed. Owner Applicant other than Owner Agent Is there an agent working on this application but Yes not submitting it? • No 1. Property Owner Information: la. Name on Recorded Deed: * 1b. Responsible Party: lc. Mailing Address:* Id. Telephone: * 7045778183 Jason Thomas Carter and Traci Anne Carter (for Corporations) Street Address 100 Steamboat Drive Address Line 2 City State / Province / Region Mount Holly NC Postal / Zip Code Country 28120 United States B. Project Information and Prior Project History 1. Project Information 1a. Name of Project: * 1 e. Email Address: * jasontcarter@me.com 310 Canal Road (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No Id. Subdivision Name: Canal Road le. Nearest Municipality: Belmont, NC If. Property Size: 0.82 acres 1g. County (or Counties) where the project is located:* Gaston 1h. Property ID# Tax PIN or Parcel id 1i. Deed Information Date of Purchase Type of Book Deed Map Book# Page# 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document 310 Canal Road - Jason Carter.pdf 285.75KB PDF only 1k. How would you like to provide the Latitude and Longitude information?* • Address Lookup Manually Address Lookup Latitude* 31 Street Address 310 Canal Road Address Line 2 City State / Province / Region Belmont NC Postal / Zip Code Country 28120 United States Longitude* 81 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes O No 2. Surface Waters 2a. Name of the nearest body of water to proposed project: * Lake Wylie 2b. Water Quality Classification of nearest receiving water: Lake 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Shoreline Stabilization that will include RipRap, Land scaping cloth/fabric, and other items the permit requires. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document report.pdf 16.04KB PDF only 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document 310 Canal Road - Jason Carter.pdf 285.75KB PDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: * Shoreline Stabilization that will include RipRap, Land scaping cloth/fabric, and other items the permit requires. Excavator will be used from the shoreline, on a barge. There might be some excavator work done from the land side to make sure the shoreline matches the 3:1 ratio that the permit requires. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document report.pdf 16.04KB PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes • No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? * Yes • No 7. Future Project Plans 7a. Is this project a phased project?* C. Proposed Impacts Inventory Buffer Impacts Yes • No Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) • Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type Zone 1 Zone 2 Shoreline Wylie Permanent Allowable 0.00 0.00 Stabilization (P) Square Square Map label (e.g. Road Perm or Temp Feet Feet Crossing 1) Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 0.00 Comments: I do not know what you are asking in section lc. D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. Improving the shoreline under supervision of the correct permits for the state and county. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Excavators along the shoreline to stabilize the shoreline as well as add rip rap to control future erosion. E. Diffuse Flow Plan la. What type of SCM are you providing?* Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen lc. Diffuse Flow Documentation F. Supplementary Information Environmental Documentation Click the upload button or drag and drop files here to attach document 310 Canal Road - Jason Carter.pdf 285.75KB PDF only la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes No 2b. Is this an after -the -fact buffer authorization application? G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Additional Comments: H. Sign and Submit By digitally signing below, I certify that: Click the upload button or drag and drop files here to attach document PDF only • I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name: * Jason Carter Signature Submission Date: 04/28/2022 (Auto populated field) Initial Review Is this accepted into the review process?* • Yes No Yes • No ID#* 20220891 Version:* 1 Select Reviewer: * Doug Perez:eads\djperez Select Reviewing Office* Mooresville Regional Office - (704) 663-1699 Is this project a public transportation project?* Has payment been received?* • No Payment Needed Fee Received Need Fee - send electronic notification Amounts and percentages displayed may not total precisely due to rounding. Your bonus may be prorated on events like change in salary, target, plan, or leaves of absence, etc. 00560142_0 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: 310 Canal Road 1 b. County: Gaston 1 c. Nearest municipality: Belmont, NC 1 d. Subdivision name: North Lake Wylie (South Fork) 4C 1 e. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1 f below. ❑ Yes No 0 lf. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes No 0 2. Owner Information 2a. Name on Recorded Deed: Carter Jason Thomas Carter Traci Anne 2b. Deed Book and Page No. 4591 page 0711 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2d. Responsible Party (for Corporations): Jason Carter 2e. Street address: 100 Steamboat Drive 2f. City, state, zip: Mount Holly, NC 2g. Telephone no.: 704-577-8183 2h. Fax no.: n/a 2i. Email address: jasontcarter@me.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 3592297243 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: lc. Property size: .82 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Lake Wylie 2b. Water Quality Classification of nearest receiving water: Lake 2c. River basin: Catawba River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Shoreline of the lake of a residential property 3b. Attach an 8 1/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3e. Explain the purpose of the proposed project: Shoreline Stablization 3f. Describe the overall project in detail, including the type of equipment to be used: Shoreline Stabilization with excavator and installation of rip rap from the shoreline 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ❑ Yes // No ❑ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes 0 No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes 0 No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Buffer Impacts la. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Randleman ❑ Jordan 0 Catawba Creek ❑ Goose 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary (T) Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 0 P ❑ T Riparian zone RipRap Catawba ❑ Yes 0 No 20 B2 0 P ❑ T Brush Clearing Clearing of Brush Catawba ❑ Yes // No 50 B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts lc. Comments: Install RipRap in Riparian Zone to protect shoreline erosion D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Install RipRap will improve the shoreline lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Insure project meets all requirements of permit 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes 0 No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS proposed? ❑ Yes 0 No 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. Include a plan that fully documents how diffuse flow will be maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP ❑ Diffuse flow ❑ Other BMP Manual and attach a BMP Supplement Form. F. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? ❑ Yes 0 No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? ❑ Yes ❑ No lc. If you answered "yes" to the above, has the document been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: ❑ Yes ❑ No 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? ❑ Yes 0 No 2b. Is this an after -the -fact permit application? ❑ Yes 0 No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699 - 1617 For government transportation projects sent by delivery service (UPS, FedEx, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 OR For all other projects sent by delivery service (UPS, FedEx, etc.): Karen Higgins NCDWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 4 of 4