Loading...
HomeMy WebLinkAbout20140641 Ver 1_Application_20140625Page 3 of 10 PCN Form – Version 1.4January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: Longitude: 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: 3e. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. 80.3636 UTtoBillBranch ClassC Yadkin Theexistinglanduseisresidential.Thelanduseinvolvessinglefamilyresidencesandashoppingmall. 0 Constructaleftturnlanetoalleviatetrafficcongestions A leftturnlanewillbeadded.Standardroadbuildingequipmentwillbeused. 36.1524 30 AnyEuliss,DEO Page 8 of 10 PCN Form – Version 1.4January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the projectinclude or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d.If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No 74 seeattached. DWR-TPU A R T MEN N A S O H D E P T O F T R A S PORT T IO N T A TEOFN RT C AR O LI N A D RAW N BYREVISED D ATE COU NTY: W .O. NU M BER: D ATE D RAW N NA D RAW N BY PLAN SCALE: NA GW G X . TSD TD RO CK IN LET PRO TECTIO N : 896.01 TY PE A .....................................................A O R A 896.02 TY PE B......................................................B O R B 896.03 TY PE C......................................................C O R C 897.01 RO CK PIPE IN LET PRO TECTIO N ......... N /A PIPE O U TLET EN ERG Y D ISSIPA TO R.. N /A D RA IN A G E TU RN O U T........................... N /A RIP-RA P LIN ED D ITCH .......................... N /A STREA M ...................................................... ERO SIO N CO NTRO L LEG END HIGH POINT/ W ATER FLOW DIRECTION TEM P. SLOPE DRAIN W / EARTH BERM SILT BASIN TYPE A SILT BASIN TYPE B TEM PORARY SILT DITCH TEM PORARY DIVERSION DITCH STORM DRAINAGE GE PIPE TEM PORARY ROCK SEDIM ENT DAM TYPE A TEM PORARY ROCK SEDIM ENT DAM TYPE B TEM PORARY ROCK SILT CHECK TYPE A TEM PORARY SILT FENCE ROCK SILT SCREEN TEM PORARY ROCK SILT CHECK TYPE B N /A 245.01 245.02 245.03 245.05 100.01B 890.05 892.01 892.02 892.04 893.01 894.01 895.10 N /A ...................................................................W ATTLE A BAFFLE IN A SEDIM ENT DAM ( 1 EVERY 10’)XXXXX LEGEND UTILITIES & STRUCTURES T EXISTING EDGE OF PAVEMENT EXISTING BACK OF CURB EXISTING EDGE OF TRAVEL WAY EXISTING CONCRETE ISLAND PROPOSED EDGE OF PAVEMENT PROPOSED BACK OF CURB PROPOSED LANE LINES ( NOTE: STRIPING WILL BE DRAWN UP BY TRAFFIC SERVICES) PROPOSED CONCRETE ISLAND POWER POLE TELEPHONE PEDESTAL GUY WIRE SIGNAL BOX CATCH BASIN & DI’S GUARDRAIL SANI. SEWER MANHOLE WATER METER WATER VALVE GAS METER GAS VALVE FENCE EXISTING RIGHT-OF-WAY LINE PROPOSED RIGHT-OF-WAY LINE EXISTING PROPERTY LINE S PROPOSED EASEMENT CONSTRUCTION PROPOSED TOE OF SLOPE SIDEWALK X X X X SANI. SEWER CLEANOUT FIRE HYDRANT UTILITY & SIGNAL POLE TREE HEDGE ROW WOOD LINE 0 0 0 PRO FILE (HO RIZO N TAL) PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 D ESIGN D ATA Prepared in the Office of: SIGNATU RE: SIGNATU RE: P.E. P.E. 2012 STAND ARD SPECIFICATIONS GRAPH IC SCALES PLAN S PRO FILE (VERTICAL) LOCATION: TYPE OF W ORK : 0 9 / 0 8 / 9 9 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 1 9 - J U N - 2 0 1 4 1 5 : 5 8 \ \ d 9 c a d 2 6 8 3 4 1 \ r d y \ C U R R E N T \ Y a d k i n v i l l e R d @ T r a n s o u R d \ D G N S \ Y A D K I N V I L L E _ R d y _ d s n . d g n n t s c o t t 375 Silas C reek P kw y., W inston Salem N C , 27127 D ISTRICT ENGINEER ENGINEER D IVISION TRAFFIC D EPARTM ENT OF TRAN SPORTATION D IV. 9 / D ISTRICT II VICIN ITY M AP BEG. PROJ. EN D PROJ. N TS N TS W B S # : 3/25/2014FORSYTH FO RSYTH CO U N TY Y A D K I N V I L L E R D @ T R A N S O U R D YADKIN VILLE RD APPROX. IN TERSECTION OF YAD K IN VILLE RD (1525) AND TRANSOU RD (3210) GRAD ING, PAVIN G, D RAINAGEPfafftown .11 . 1 0 .11 Dr. Yadkinville Rd. R d . S p ic e w o o d D r . Rd.Clinedale Ct. Stim pson Dr. Farm stead Rd. C o m m u nity C h u r c h R d. K a n e Dr. F o l k s t o n e R d . Lochurst Dr. Lochurst Ct. W aterway Dr. Pine Hill Dr. Pfaff Ln. Di xi e a n n a Ln. Aubrey Ct. M illRun Ct. Ln. .13 T r a n s o u d A l e x a n d e r F a r m s t e a d M ickle Rd. Folkstone Ct. Folkstone Rd. FH F NC 67 To Vienna L a k e P in e C t 0.14 M ILES 3 6/19/2014 GW G P O T S t a . 1 0 + 0 0 . 0 0 1 0 1 5 E X I S T I N G 1 5 0’ S T OR A G E P O T S t a . 1 8 + 0 0 15" HDPE 15" HDPE 626 628 805.85 629 817.31 630 8178.41 631 819.13 632 824.93 288 788.85 289 826.87 W ETLANDS WETLANDS TSF TSF < X < X P R O P . 1 5 0’ S T O R A G E T R A N S O U R O A D S R 3 2 10 YADKINVILLE ROAD SR 1525 3 6 " R C P 36" RCP 1522 1434 1435 3210 3217 3256 3255 3255 1518 1451 1451 1520 3220 3219 3338 1447 1525 3364 3364 3365 3366 3390 3389 4100 TCE TCE TCE N A D 8 3 N A D 8 3 YADKINVILLE ROAD & TRANSOU ROAD N 0’30’60’90’30’ R E V I S I O N S HYDRAULICSROADWAY DESIG N ENG IN EER EN GINEER R/W SHEET NO . SHEET NO .PRO JECT REFERENCE N O . 1 9 - J U N - 2 0 1 4 1 6 : 0 5 \ \ d 9 c a d 2 6 8 3 4 1 \ r d y \ C U R R E N T \ Y a d k i n v i l l e R d @ T r a n s o u R d \ D G N S \ Y A D K I N V I L L E _ R d y _ d s n . d g n n t s c o t t 8 / 1 7 / 9 9 YADKINVILLE& TRANSOU 2 1 DESIGN SPEED 50 POSTED SPEED 45 EROSION CONTROL USE BEST MANAGEMENT PRACTICES. NO EROSION CONTROL NEEDED LESS THAN 1 ACRE. DI#1 DI#2 P ULL DI TCH W I TH 36" R CP R E P LACE 1 8" R CP R E P LACE W I TH 36" R CP R E M OVE E XI STI NG P I P E S AND 39.92’ R14+0 5 -L - D 11+65-L- 28.29’ R D 38.24’ R D 1 1 +5 7 .5 0 -L - 11+50-L- 48.19’ R D 11+25-L- 48.12’ R D 11+25-L- 28.12’ R D D D 28.16’ R11+44.94-L- 48.16’ R 11+44.94-L- 11+65-L- 28.29’ R 38.24’ R11+5 7 .5 0 -L - 11+50-L- 48.19’ R 11+25-L- 48.12’ R 11+25-L- 28.12’ R 28.16’ R11+44.94-L- 48.16’ R 11+44.94-L- STR E AM STREAM WETLANDS 18 " R C P 2 4 " R C P 24" RCP 15" RCP ? ? YADKINVILLE ROAD SR 1525 SEE INSET INSET 5897-77-7121.00 DB 1936 PG 3589 William Ammons 5897-77-5070.00 DB 2107 PG 3776 C&M POPERTIES 5897-76-3989.00 DB 1704 PG 1987 Randell Pendergrass 5897-66-8689.00 DB 2448 PG 3628 Virginia Dodson 5897-77-2367.00 Grandview Inc. NTS P OT Sta. 10+00.00-S-PI Sta. 10+60.86-S- P I St a. 1 1 + 3 0. 8 2 - S - P I S t a. 11+ 8 4. 5 8- S - PI Sta. 12+41.93-S- PI Sta. 12+53.85-S- P I S t a . 1 2 + 7 8 . 4 1 - S - P O T S t a . 1 4 + 4 7 . 6 3 - S - PIN #TCE AREA(Now or Formally) OWNER NAME PDE AREA RANDELL PENDERGRASS 5897-76-3989.00 VIRGINIA DODSON 5897-66-8689.00 398 SQ. FT. 2444 SQ. FT.253 SQ. FT. 3 6 " R C P 36" RCP DURING PIPE AND DRAINAGE W ORK STREAM TO BE DEW ATERED D DEW ATERED DURING CONSTRUCTION HATCHED AREA TO BE STREAM IM PACT 30 LF OF TEM PORARY 2006 STAND ARD SPECIFICATIONS PROJECT NAM E W .O. NUM BER D RAW N BYDATE D RAW N COUNTY SR # / ROAD NAM E CH ECKED BY SCALE FORSYTH 375 SILA S C R E E K P K W Y , W IN STO N SA LE M , N C 27127 REVISED APP. BY D IST. ENG.D ATE D ATENA D ATE REVISIONS D EPARTM ENT OF TRANSPORTATIONDEPARTMENT OF TRANSPORTATION Prepared in the Office of: D EPARTM ENT OF TRANSPORTATION 3/25/14 1" = 30’ 6/19/14 APP. BY D IV. TRAFFIC ENG. 5/30/14 DRAINAGE Yadkinville Rd/Transou Rd. SR 1525 YADKINVILLE ROAD GW G NTSII 1 0 1 5 E X I S T I N G 1 5 0’ S T O R A G E 1 2 ’ 1 2 ’ 1 2 ’ STR E AM STREAM STREAM 15" HDPE 15" HDPE STR E AM W ETLA N D S WETLANDS P R O P . 1 5 0’ S T O R A G E T R A N S O U R O A D S R 3 2 10 YADKINVILLE ROAD SR 1525 3 6 " R C P 36" RCP 175.90’ D D 300.00’ TCE TCE TCE 634 782.79 635 782.44 18 " R C P 2 4 " R C P 24" RCP 15" RCP ? ? 15" RCP 12" RCP 12" RCP 15" RCP EX DI EX DI EX DI EX DI 15" RCP 15" RCP 15" H D P E ?? T U C1 D1 D1E1 E1 C1 3 :1 CL MATCH EXIST. SE TIE TO EXIST. TI E TO EXI ST. MATCH EXIST. SE TT 3:1 TI E TO EXI ST. TIE TO EXIST. 6’ UNPAVED SHOULDER SHOULDER 6’ UNPAVED C2 2: 12:1 0.08 0.08 11’-17’11’-17’ 11’-18’11’-18’ 11’-36’ TYPICAL SECTION A 11+32.25 to 17+06 -L- (Version 1.2; Released September 2011) County(ies):Forsyth Page 1 of 1 Project Type:Date: Phone:Phone: Email:Email: County(ies): CAMA County? Design/Future:Existing: Surrounding Land Use: Residental0.14 miles N/A 0.50Project Built-Upon Area (ac.) Proposed Project Existing Site Project Length (lin. Miles or feet): Buffer Rules in Effect Project Description None No None NCDWQ Surface Water Classification for Primary Receiving Water 303(d) Impairments: River Basin(s): Primary Receiving Water: Class C Other Stream Classification: City/Town: 1020 Birch Ridge Dr Address: Pfafftown 919.707.6711 Forsyth ac. General Project Narrative:Project involves improvement to intersection of SR 1525 (Yadkinville Rd) and SR 3110 (Transoud Road). Improvements include lengthening of center turn land and thru lanes as well as upgrade to some existing drainage systems. Shoulder section with grassed shoulders and swales will be used. For replacement under SR 1525 will upsize from existing 24" to 36" pipe. Wetland is located at pipe inlet so set invert at natural ground. Typical Cross Section Description: References N/A 0.60 Average Daily Traffic (veh/hr/day): ac. North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR LINEAR ROADWAY PROJECTS Galen Cail Roadway Widening General Project Information Address: 6/12/2014 Raleigh, NC 27610 Project/TIP No.: NCDOT Contact: Project No.: Contractor / Designer: gcail@ncdot.gov Yadkin-Pee Dee Three 12' lanes (one is a turning lane).Two 11' lanes, one 10' turning lane. N/A NCDWQ Stream Index No.: Supplemental: None Primary: Trib. To Bill Branch