Loading...
HomeMy WebLinkAbout20140636 Ver 1_401 Application_2014061420140830 o�oFWATF9OG Office Use Only � � 0 FIA M Corps action ID no o t DWQ project no • Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a Type(s) of approval sought from the Corps ®Section 404 Permit ❑Section 10 Permit 1 b Specify Nationwide Permit (NW P) number 41 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ® 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ® Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ❑ No 2. Project Information 2a Name of project Nano Plant Storm Water New Hanover D 2b County 2c Nearest municipality / town Wilmington LJ -- 2d Subdivision name JUN 2e NCDOT only, T I P or state project no 0 NR . 3. Owner Information r Branch 3a Name(s) on Recorded Deed 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) Jim R Flechtner, PE, CFPUA 3d Street address 235 Government Center Dr 3e City, state, zip Wilmington, NC 28403 3f Telephone no 910 - 332 -6542 3g Fax no 910- 799 -6066 3h Email address Jim flechtner @cfpua org Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5. Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City, state, zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) R03600- 003 - 187 -000 1 b Site coordinates (in decimal degrees) Latitude 34 171510 Longitude 77 491448 (DD DDDDDD) ( -DD DDDDDD) 1 c Property size acres 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Smith Creek proposed project 2b Water Quality Classification of nearest receiving water C, Sw 2c River basin map is available at Cape Fear http / /h2o enr state nc us /admen /maps/ 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Land is used for transport of stormwater through ditches off of the property into a tributary that leads into the headworks of Smith Creek Linear drainage at a Public Works Facility 3b List the total estimated acreage of all existing wetlands on the property 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 3d Explain the purpose of the proposed project The project is being performed to clear out a storm water drain that helps alleviate storm water build up located behind an adjacent neighborhood and to assist with the flow of the runoff into a tributary that leads into the head works of Smith Creek No additional development will occur as a result of this project 3e Describe the overall project in detail, including the type of equipment to be used Removal of a 700' stretch of willow branches, silt and other growth currently within the ditch bank on CFPUA property by a small bucket excavator There will also be the removal of 4'— 6' of silt inside of the concrete flare on Groundwater Way We are planning to do some mowing along the bank of the canals located on our property All foliage, silt and debris that is removed will be placed on high ground There will be no re- grading of the storm water canal or any other land disturbing activities other than those described 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Page 3 of 11 PCN Form —Version 1 3 December 10, 2008 Version 5. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions Original development of the property to place Water Plant, Operations and Environmental Management facilities 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ PET Flow restoration UT1 to Smith Creek ❑ PER ® INT ® Corps ® DWQ 15 700 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 700 31 Comments Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivi ually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 0. Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ❑ Neuse ❑Tar- Pamlico ❑Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ❑P ❑T El Yes ❑ No El Yes B2 ❑P ❑T ❑ No El Yes B3 ❑P ❑T ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project All foliage, silt and debris that is removed will be placed on high ground There will be no re- grading of the storm water canal or any other land disturbing activities other than those described b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments Page 7 of 11 / PCN Form — Version 1 3 December 10, 2008 Version 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected npanan buffer that requires buffer mitigation? If yes, you will have to fill out this entire form — Please contact the State for more information ❑ Yes ❑ No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 8 of 11 �I E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules 1 b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why There is no development of the area Performing maintenance of the storm water drain 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 / PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes E-1 No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility No waste water will be generated from this maintenance project Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife Website 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA EFH Website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Website 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? NC Floodmaps JA s -R - V- LEC-t*TaE?-- ,114 -- Applicant/Agent's Printed Name Date U Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 GRAPHIC SCALE 50 0 50 100 SCAM: 1 inch = 50 & A I ar IPA t It ! ee i i°(• �l k: r PROJECT ' AREA -fes f t �{ ,,'"f ';.r VICINITY MAP NOT TO SCALE JUN 1 9 2014 k rraD NOTICE REQUIRED ALL EXISTING UNDERGROUND UTILITIES SHALL BE PHYSICALLY LOCATED BY CONTRACTOR PRIOR TO THE BEGINNING OF ANY CONSTRUCTION IN THE VICINITY OF SAID UTILITIES. NORTH CAROLINA LAW REQUIRES A TWO WORKING DAYS NOTICE BE GIVEN TO THE U11UTY OWNERS BEFORE YOUR DIGGING BEGINS. ONCE ALL UNDERGROUND FACILITIES HAVE BEEN MARKED, YOU MAY BEGIN YOUR EXCAVATION ACTIVITIES. CONTACT "CAROLINA ONE CALL" AT 811 EMERGENCY DIAL 911 POLICE - FIRE - RESCUE