Loading...
HomeMy WebLinkAbout20200294 Ver 2_1 - narrative_20220621110- WithersRavenet Our People. Your Success. STORMWATER MANAGEMENT PLAN Carpenter Square Cary, NC Prepared For: Pulte Group 1225 Crescent Green Drive Cary, NC 27518 919.816.1155 Prepared By: WithersRavenel 115 MacKenan Drive Cary, NC 27511 919.469.3340 License No. C-0832 January 2020 WR No. 02180863 PRELIMINARY Wesley R. Perry, PE CFM Tadd Alexander, El Carpenter Square Stormwater Management Plan Cary, North Carolina INTRODUCTION ■■ WithersRavenel r. Our People. Your Success. The proposed site development is located within a 25.36-acre property situated between Morrisville Parkway, Louis Stephens Dr, and Carpenter Upchurch Road in Cary, North Carolina Existing Conditions Carpenter Square is a ±25.36-acre tract of land located within the Town of Cary planning jurisdiction on Morrisville Parkway. Currently zoned RMF-CU, this property features a stream and wetland draining to the southeast. Mature hardwoods and pines follow the stream creating natural buffers. There is a drainage divide at approximately halfway through the southern field, splitting the property into two existing Points of Analysis (POAs). The property boundary follows the peaks and saddles of the existing topography. The existing soil groups are Creedmore-Green and Chewacla that were assumed hydrologic soils group D when saturated. Much of the existing condition is row crops. Proposed Development The proposed development comprises of multi -family buildings, totaling 98 lots. Proposed impervious area associated with the site will increase to approximately ±32.3% of the site from ±1.9% impervious area in the existing condition (namely, scattered roads and a farm). The impacts of increased development will be mitigated with the installation of three (3) Stormwater Control Measures (SCMs). The NRCS Curve Number and Pond Sizing Calculations are based on the percent impervious associated with the Townhouse lot types. Based on architectural planning, it was assumed that ±1800 square feet of impervious would be developed on each lot. Thus, the calculation for percent impervious is as follows: % impervious on Lots = Estimated Impervious area on Townhome Lot Total proposed lot acreage Carpenter Square Stormwater Management Plan WR No. 02180863 January 2020 Carpenter Square Stormwater Management Plan Cary, North Carolina Z 98 Lots * 1800 Lot 307516.3 f tz % impervious on Lots = 57% STORMWATER MANAGEMENT REQUIREMENTS ::WithersRavenel Our People. Your Success. The development shall comply with the requirements outlined by the Town of Cary. The project straddles both the Northeast Creek catchment (Jordan Lake Watershed) and the Upper Crabtree Creek catchment (Neuse River Basin). The site must therefore meet state and local requirements relating to town wide ordinances and policies for stormwater compliance for this watershed. The following requirements apply to the subject site: Post -development peak stormwater runoff from the 1-year storm leaving the site shall be no greater than pre -development conditions. Post -development peak stormwater runoff from the 2-year, 5-year and 10-year storm leaving the site shall be equal to or less than a 10% increase from pre -development conditions. If post development calculated discharge is greater than a 10% increase then a downstream impact analysis shall be supplied. Post -development nitrogen loading rates shall not exceed 3.6 Ibs/acre/year. Nitrogen reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits; however, the total nitrogen loading rate cannot exceed 10.0 Ibs/acre/year for nonresidential or multifamily residential developments. Onsite SCMs must be used to reduce the nitrogen loading to the 10.0 Ibs/acre/year limit. All engineered SCMs shall be designed to provide a minimum of 85% TSS removal and sized to capture runoff from the first 1 inch of rainfall from the corresponding drainage area. Water quality and quantity control for the site is accomplished via two (2) wet ponds (SCM#1 & SCM#2) and one wetland (SCM#3) designed per the North Carolina Department of Environmental Quality Stormwater Design Manual's Minimum Design Criterial (MDCs). METHODOLOGY Hydrology The SCS Method, in conjunction with NOAA Atlas 14 rainfall data for the subject site's location was used to develop runoff hydrographs for the Type II, 24-hour duration, 1-year,10-year, 25-year, and 100-year storm events. The SCS method requires three basic parameters: drainage areas, curve number (CN), and time of concentration (Tc). Existing drainage areas were delineated based on topographic field survey data and Wake County aerial topographic data (LiDAR 2-ft contours). Proposed drainage areas also incorporated proposed site plan grading and storm drain networks. Curve numbers were based on soil type and land use. Soil types were delineated from the Soil Survey of Wake County, North Carolina. Land uses for existing conditions were based on survey information and 2015 aerial photography. Land uses for proposed conditions also incorporated proposed site plans. Times of concentration for pre- and post -development drainage areas were developed using the TR-55 method. This method models the flow path in segments; each segment is considered as either sheet flow, shallow concentrated flow, or channel flow. A minimum time of concentration of 5 minutes was used for the proposed piped drainage systems. Drainage area maps during existing and proposed site development are included in the Maps section of this report. A Summary of Hydrology Inputs Per Sub -Drainage Area for both existing and proposed conditions Carpenter Square WR No. 02180863 Stormwater Management Plan January 2020 Carpenter Square Stormwater Management Plan Cary, North Carolina ■■ WithersRavenel r. Our People. Your Success. is included in the Hydrology Analysi Section of this report along with a soil report generated through the USDA NRCS Wet Soil Survey, and NOAA Atlas 14 precipitation data for the subject site. Bentley System's PondPack v8i software (PondPack) was utilized to generate cumulative rainfall curves for the 1-Yr, 10-Yr, 25-Yr, and 100-year storm events using 24-hour NOAAAtlas 14 rainfall data for the subject site in conjunction with the above data to develop runoff hydrographs using the SCS unit hydrograph method. Peak flows obtained from runoff hydrographs were routed through a hydraulic model of the site. Hydraulics The hydraulic design requires the development of stage -storage and stage -discharge functions for the proposed SCMs. The rainfall/runoff hydrographs, stage -storage, and stage -discharge functions have been compiled to create a computer routing simulation model using PondPack. This PondPack model was then used to assess the peak water surface elevations in the proposed wet ponds for the design rainfall events. Computer simulated reservoir routing of the 1-year, 2-year, 5-year, 10-year, 25-year, and 100-year design storms utilized stage -storage and stage -discharge functions. A non -linear regression relation for surface area versus elevation was derived from the proposed geometry of each SCM. This relation estimates the incremental volume of the basin to the stage or elevation of the basin. Stage -discharge functions were developed to size the proposed outlet structures for the SCMs. The results of the hydraulic analysis can be found in the Hydraulic Analysis Results section of this report. The proposed culvert crossing under Road 01 was sized for the 100-year 24-hour design storm using HY-8. See supplemental culvert memo for the hydraulics analysis of this crossing and a condition of the existing culvert under Louis Stephens Dr. NITROGEN EXPORT The nitrogen export rate was calculated using Method 2 from land use and impervious area data entered into the hydrologic model. Appropriate nutrient reduction credits were applied to areas draining through the onsite wet ponds (30% TN removal) and wetland (44% TN removal). The Nutrient Control Plan worksheet summarizing the nitrogen loading rate calculations is included in the Nutrient Export Calculations section of this report. 1*61► GAIP114II&I Water Quality Based upon the routing study, the proposed stormwater management plan has sufficient measures to provide the necessary removal of nutrients and TSS as required by Town and State policies. The below nitrogen loading rate calculations have adjusted values based on existing impervious areas on site (Cary apportioning method). Detailed calculations are supplied in Nutrient Export Calculations section of this report. Nitrogen loading rates calculations for the subject site resulted in: Total TN Export (excluding existing impervious and SCM treatment): 180.21 Ibs/yr SCM #1 TN Loading Rate Reduction: 18.06 Ibs/yr SCM #2 TN Loading Rate Reduction: 25.91 Ibs/yr SCM #3 TN Loading Rate Reduction: 8.51 Ibs/yr Total Project TN Load Rate: 127.72 Ibs/yr Per the above nitrogen loading rate calculations, the proposed SCMs reduce post -development nitrogen loading rates to 5.25 Ibs/ac/yr. An additional 1204 Ibs nitrogen will be mitigated through the purchase of nutrient credits to meet the nitrogen loading rate requirements of 3.6 Ibs/ac/yr. Carpenter Square WR No. 02180863 Stormwater Management Plan January 2020 Carpenter Square ■■ WithersRavenel Stormwater Management Plan r. Our People. Your Success. Cary, North Carolina Nitrogen Buydown Calculation (with rounding) N Buydown = Loading rate standard defecit * 30 years * (site acres — existing imp. acres) _ (5.25 — 3.6) lbs * 30 yrs * (24.33 ac) = 1204 lbs N ac —yr In addition, the subject site has been designed so that runoff resulting from all impervious surfaces, as reasonably practical, is captured by the proposed SCMs. The proposed SCMs have been designed per the North Carolina Department of Environmental Quality Stormwoter Design Monuol's to meet 85% TSS removal requirements. Calculations used to size the SCMs and their associated outlet structures can be found in the SCM Sizing Calculation! section of this report. Peak Flows Post -development peak flows associated with the 1-year, 24-hour design storm will be attenuated so as not to exceed pre -development conditions. Post -development peak flows associated with the 10-year 24-hour design storm are less than 10% greater than the pre -development 10-year, 24-hour design storm. Furthermore, the proposed SCMs will be designed to safely pass the 100-year storm event while maintaining a freeboard of >1.0 feet. The following illustrates the pre and post -development peak flows for a 1-Year, 10-Year, 25-Year, and 100- Year, 24-Hour storm events as calculated using the Bentley Systems PondPack v8i software at each POA: rug► 41 Teak Flow Analysii. POA #2 Peak Flow Analysis Carpenter Square WR No. 02180863 Stormwater Management Plan January 2020 Carpenter Square Stormwater Management Plan Cary, North Carolina DESIGN SUMMARY SCM #1 - Wet Detention Pond Drainage Area = 5.26 acres Percent Impervious Area = 51% Top of Dam: 4' X 4' Riser Structure: Overflow Weir: Overflow Orifice: Temporary Pool: Normal Pool: Drawdown Orifice: Outlet Barrel: SCM #1 Performance Summary Elev. 390.0' Crest Elev. 388.5' 1.0' at Elev. 388.25' 12" (W) x 18" (H) at Elev. 385.75 12,763 CIF at Elev. 385.75' 9,021 SF at Elev. 384.5' 1.50" Diameter at Elev. 384.5' 24" RCP at Elev. 381.0' ■■ WithersRavenel r. Our People. Your Success. 1-Year, 24 Hr Water Surface 386.25 386.65 FreeboardPeak 3.75 3.35 Peak Outflow 2.15 3.84 2-Year, 24 Hr 5-Year, 24 Hr 387.23 2.77 6.26 10-Year, 24 Hr 387.65 2.35 7.86 25-Year, 24 Hr 1.81 9.49 100-Year, 24 Hr 388.78 1.22 19.03 SCM #2 - Wet Detention Pond Drainage Area = 7.84 acres Percent Impervious Area = 49% Top of Dam: 5' X 5' Riser Structure: Weir: Temporary Pool: Normal Pool: Drawdown Orifice: Outlet Barrel: SCM #2 Performance Summary Elev. 370' Crest Elev. 368.50' 3.0 LF at Elev. 366.25' 15,028 CIF at Elev. 366.25' 7,232 SF at Elev. 364.5' 1.5" Diameter at Elev. 364.5' 36" RCP at Elev. 360.0' 1-Year, 24 Hr Water Surface 367.09 FreeboardPeak 2.91 Peak Outflow 7.01 2-Year, 24 Hr 367.53 2.47 13.09 5-Year, 24 Hr 368.06 1.94 22 10-Year, 24 Hr 368.39 1.61 28.23 25-Year, 24 Hr 1 368.7 1.3 1 39.46 100-Year, 24 Hr 1 368.99 1.01 1 58.47 Carpenter Square WR No. 02180863 Stormwater Management Plan January 2020 Carpenter Square Stormwater Management Plan Cary, North Carolina SCM #3 - Constructed Wetland Drainage Area = 2.41 acres Percent Impervious Area = 44% Top of Dam: 4' X 4' Riser Structure: Overflow Weir: Temporary Pool: 1 Normal Pool: / Drawdown Orifice: / Outlet Barrel: SCM #3 Performance Summary ■■ WithersRavenel r. Our People. Your Success. Elev. 355' Crest Elev. 353.5' 2x 2.0' and 1x 1.0' Weir at Elev. 388.25' 5,314 CF at Elev. 353.25` 3,211 SF at Elev. 352.0' 1.0" Diameter at Elev. 352.0` 24" RCP at Elev. 350.5` 1-Year, 24 Hr 353.59 1.41 3.92 2-Year, 24 Hr 353.69 1.31 7.22 5-Year, 24 Hr 353.78 1.22 10.62 10-Year, 24 Hr 353.3 1.7 12.91 25-Year, 24 Hr 353.89 1.11 15.75 100-Year, 24 Hr 353.98 1.02 20.35 Carpenter Square WR No. 02180863 Stormwater Management Plan January 2020