Loading...
HomeMy WebLinkAboutSW5220101_Stormwater Report_2022062361 d STORMWATER IMPACT ANALYSIS HARDEE'S - T / BOD-2020110321 / APRIL 2022 J MCADAMS HARDEE'S - MAIN STREET BUNN, NORTH CAROLINA STORMWATER IMPACTANALYSIS SITE PLAN DRAWINGS STORMWATER PERMIT#: SW5220101 PROJECT NUMBER: BOD-2020110321 DESIGNED BY: R.WATSON, PE K.GARCIA, PE DAVID L. SMITH, PE DATE: DECEMBER 2021 REVISED DATE: J U N E, 2022 'J MCADAMS 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 NC Llc. # C-0293 't-14 w11111��#t r 2 rzsAL S r = 20744 4 /2 t /r- J MCADAMS NARRATIVE > BOD- 2021110321 HARDEE'S - MAIN STREET Storm woter Impact Analysis SITE HISTORY & PROJECT DESCRIPTION The proposed development currently known as Hardee's — Main Street is located on Main Street east of its intersection with Warren Avenue in Bunn, North Carolina. The site includes two parcels (PIN 2820146316 and 2820147256) totaling approximately 2.07 acres in size. The site is located in the jurisdiction of City of Bunn and is designated as Commercial zoning. The proposed development on PIN 2820146316 (1.41 acres) includes a quick service restaurant with drive thru, surface parking and other necessary supporting infrastructure. The proposed development of the parcel will include subdividing the existing parcel to create a residual parcel for future development (PIN2820147256, 0.66 acres). It is assumed that the property's proposed use is permitted in the City of Bunn zoning ordinance as commercial. As a proposed high -density project, the proposed stormwater solution will be designed for the current proposed development and the future development. The proposed development is located within the Tar -Pamlico River watershed with the entirety of the site's stormwater runoff ultimately draining into Crooked Creek. The proposed development shall be subject to the stormwater management requirements set forth by the NC DEQ Stormwater Requirements. Per NCDEQ regulations, stormwater management on site shall address two primary issues: (1) peak discharge rates and (2) water quality management. This report contains calculations detailing the expected stormwater impacts as a result of the proposed development. Please refer to the appropriate section of this report for additional information. CALCULATION METHODOLOGY • Rainfall data for the Bunn, NC region is derived from NOAA Atlas 14. This data describes a depth -duration - frequency (DDF) table describing rainfall depth versus time for varying return periods in the Bunn, NC area. These rainfall depths are input into the meteorological model within PondPack for peak flow rate calculations. Please reference the rainfall data section within this report for additional information. • Using maps from the NRCS Web Soil Survey, the on -site soils were determined to be from hydrologic soil groups HSG 'C' and V. Since the method chosen to compute both pre- and post -development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Service Curve Number (SCS CN). • Within the site boundary, an approximate proportion of each soil group was determined using NRCS Soil Survey Maps. Once an approximate proportion was determined, a composite SCS CN was computed for each cover condition. • The on -site topography used in the analysis is from field survey performed by McAdams. The off -site topography used in the analysis is from available GIS information. • Land cover conditions for the pre -development were taken from survey prepared by McAdams and aerial imagery to determine baseline conditions. Land cover conditions for the post -development conditions are based on the proposed layout and an approximate 82.7% impervious allocation for future development on PIN 2820147256 (23,779 sf of allocated impervious). Please refer to the pre- and post- development drainage area maps for additional information. • The time of concentration was calculated using SCS TR-55 (Segmental Approach, 1986). The Tc flow path can be divided into multiple segments where applicable: overland flow, concentrated flow, and channel flow. The travel time was then computed for each segment, from which the overall time of concentration was determined by taking the sum of each segmental time. creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 J MCADAMS NARRATIVE > BOD- 2021110321 • The post -development time of concentration to the proposed stormwater control measure is assumed to be 5 minutes. This provides a conservative estimate of facility size for design purposes. • Pond Pack Version V8i, by Bentley Systems, Inc., was used for the routing calculations for the proposed stormwater control measures for the 1-, 10-, 25-, and 100-year storm events. • For 100-year storm routing calculations, approximately 6 inches of freeboard was provided between the peak elevation during the 100-year storm event and the top of the dam of the stormwater wetland facility. • Nutrient export calculations were computed using NCDEQ's Total Nitrogen and Total Phosphorus Loading Calculation Worksheet for the Piedmont of the Tar -Pamlico River Basin. This method uses known footprint areas of wooded, open, pond, and impervious surfaces. Note, the TN and TP removal rates for a stormwater wetland were revised in this tool to reflect the current NCDEQ SCM removal rates (2018 North Carolina Stormwater Control Measure Credit Document). DISCUSSION OF RESULTS Peak Runoff Control Requirements The proposed Hardee's — Main Street project all drains to point of analysis #1 and the proposed project and future project will result in an increase in peak flow rates at POA #1. To mitigate impacts from the proposed development compared to the predevelopment conditions at POA #1, the proposed stormwater wetland was modeled such that the post -development peak flow rate is reduced below the pre -development rate in the 1-year storm event. Pollutant and Nutrient Control Requirements The 2.07-ac nutrient boundary for the proposed site includes both the proposed and future developments. The future development includes the allocated future impervious area for PIN 2820147256. The proposed 2.07-ac site is treated for water quality via a stormwater wetland. The stormwater wetland captures runoff from the developed areas of the site and is designed to provide 44% Total Nitrogen removal and 40% Total Phosphorus removal. The stormwater wetland has been designed to ensure the nitrogen load rates for the nutrient boundary is less than 10 Ibs/ac/yr. A buydown payment will be required to reach the target nitrogen loading rate of 4 Ibs/ac/year. The Total Phosphorous export limit is 0.8 Ibs/ac/yr. The stormwater wetland provides enough treatment that a buydown for phosphorous is not required for the site. Please refer to the appropriate section of this report for additional information. CONCLUSION If the development on this tract is built as proposed within this report, then the requirements set forth in the NCDEQ regulations will be met without additional stormwater management facilities. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: 1. The proposed site impervious surface exceeds the amount accounted for in this report. 2. The post -development watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. creating experiences through experience 2 of 2 1 I SUMMARY OF RESULTS 2 1 MISCELLANEOUS SITE INFORMATION 3 PRE -DEVELOPMENT HYDROLOGIC (CALCULATIONS 4 POST -DEVELOPMENT HYDROLOGIC CALCULATIONS 5 STORMWATER CONTROL MEASURE W (DESIGN CALCULATIONS 61 NUTRIENT LOADING CALCULATIONS SUMMARY OF RESULTS Hardee's BOD-2020110321 HARDEES SUMMARY OF RESULTS K. GARCIA, PE 2021110321 4/8/2022 RELEASE RATE MANAGEMENT RESULTS POINT OF ANALYSIS #1 Return Period Pre-Dev [cfs] Post-Dev [cfs] % Increase [%] 1-Year 2.32 1.68 -28% POINT OF ANALYSIS #2 Return Period Pre-Dev [cfs] Post-Dev [cfs] % Increase [%] 1-Year 0.55 0.20 -64% HARDEES SUMMARY OF RESULTS K. GARCIA, PE 2021110321 4/8/2022 URE SUMMARY Design Drainage Area = 1.76 ac Design Impervious Area = 1.42 ac % Impervious = 80.7% Top of Dam = 274.50 ft NWSE = 272.00 ft Temporary Pool Ponding Depth = 10.38 in WQv Ponding Elevation = 272.87 ft WQv Orifice Diameter = 1.00 in WQv Orifice Invert Elevation = 272.00 ft Riser Size = 4' x 4' Riser Crest = 273.50 ft Number of Weirs = 1 Weir Length = 1.00 ft Weir Elevation = 273.25 ft Barrel Diameter= 18 in # of Barrels = 1 Upstream Invert = 271.50 ft Downstream Invert = 271.00 ft Length = 28 ft Slope = 0.0179 ft/ft STORMWATER CONTROL MEASURE ROUTING RESULTS Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 1-Year 7.05 1.58 273.57 0.93 10-Year 11.04 9.06 273.83 0.67 25-Year 12.45 10.06 273.88 0.62 100-Year 14.68 10.76 273.97 0.53 MISCELLANEOUS SITE INFORMATION Hardee's BOD-2020110321 e A N HARDEE'S SITE AERIAL MAP 0 50 100 200 PROJECT #: BOD-2021110321 Feet MCADAMS 1 inch= 100 feet BUNN, NORTH CAROLINA ram/ �• r. ; � � =-�� r ,, f � - -� `�� Ste, •. • •.: 8 M � � �_r �. _ a i�- - r n . , • - Oka Bunn r P* •�� SITE • �, . Ap j� Amllp V = • # NOAp- izz — 41,-do- 416- C�_ _) �• ' ` . State . ...Corr Uortal irtSt A. WT !Getlreenume a 2 water C •�/ J : �9 Tanker /4 C ''✓� 0 ✓ i C�opy'r,1g,ht�©j2013�JN' ational Geographic Society, i-cubed Il•�1.r•fwi�� _ _� t /1 � . h � �/ � L/ �17 N HARD E E'S " USGS TOPO MAP J 0 625 1,250 2,500 PROJECT #: BOD-2021110321 Feet I inch= 1,250 feet BUNN, NORTH CAROLINA WADAMs Hydrologic Soil Group —Franklin County, North Carolina (PL) 747810 747830 747850 747870 747890 747910 747930 747950 35o 5730" N N O LL� r M r O r N N 35o 5725' N 747810 747830 747850 747870 747890 747910 747930 in Map Scale: 1:1,000 if printed on A landscape (11" x 8.5') sheet. Meters N 0 10 20 40 60 Feet 0 45 90 180 270 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 747970 747990 747950 747970 747990 i ru E 748010 35o 5730" N o_ N O ug r N r N O r N N 35o 5725' N 748010 m v 11 /16/2021 Pagel of 4 Hydrologic Soil Group —Franklin County, North Carolina (PL) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Franklin County, North Carolina Survey Area Data: Version 24, Sep 1, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 22, 2018—Oct 25, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. usoA Natural Resources Web Soil Survey 11/16/2021 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Franklin County, North Carolina PL Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI HeB Helena sandy loam, 2 to 6 percent slopes D 1.5 70.9% VaB Vance sandy loam, 2 to 6 percent slopes C 0.6 29.1 % Totals for Area of Interest 2.1 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition USDA Natural Resources Web Soil Survey 11/16/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Franklin County, North Carolina PL Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 11/16/2021 IM Conservation Service National Cooperative Soil Survey Page 4 of 4 TAR-PAMLICO RIVER BASIN Name of Stream Subbasin Stream Index Number Map Number Class Cherry Run TAR06 28-103-17 E30SE5 C;Sw,NSW Chicod Creek TAR05 28-101 F30NW3 C;NSW Chocowinity Bay TAR07 29-6-(1) E30SE8 SC;NSW Chocowinity Bay TAR07 29-6-(5) E30SE9 SB;NSW Chocowinity Creek TAR07 29-6-2-1-(8) E30SE8 SC;NSW Chocowinity Creek and Connecting Canals TAR07 29-6-2-1-(1) F30NE5 C;Sw,NSW Church Creek TAR07 29-34-40-9 F32NE5 SA;HQW,NSW Cindy Edwards Branch TAR07 29-6-2-1-3 F30NE2 C;Sw,NSW Clark Creek TAR07 29-34-34-5-3 E32SW9 SC;NSW Clark Creek TAR07 29-35-6-4 F32SE6 SA;HQW,NSW Clark Creek TAR08 29-73-6 E35SE1 SA;HQW Clark Mill Creek TAR07 29-34-11-(1) E33SW4 C;Sw,NSW Clark Mill Creek TAR07 29-34-11-(2) E33SW1 SC;NSW Cliftons Pond TAR01 28-30-1 D25NE1 C;NSW Cockrel Creek TAR08 29-77 G35NE5 SA;HQW Coker Creek TAR02 28-33-1.5 D26NW6 C;NSW Cokey Swamp TAR03 28-83-3 D27NE8 C;NSW Collie Swamp TAR06 28-103-4 D30SW5 C;Sw,NSW Compass Creek TAR02 28-72 C27SE8 C;NSW Conetoe Creek TAR03 28-87-(0.5) D29NW6 C;NSW Conetoe Creek TAR03 28-87-(2) D29SW7 WS-IV;NSW Conetoe Creek TAR05 28-87-(2) D29SW7 WS-IV;NSW Convoy Gut TAR07 29-33-10-2 F32SE4 SA;HQW,NSW Coole Creek TAR01 28-24 C25SE1 WS-IV;NSW Coon Creek TAR01 28-11-5 B24SE5 C;NSW Corkenson Creek TAR07 29-34-25 E33SW7 SC;NSW Corn Creek TAR03 28-83-2.5 D28SW4 C;NSW Cow Creek TAR07 29-35-6-3-3 F32SE6 SA;HQW,NSW Cow Gallus Creek TAR07 29-33-1-3 F32SE7 SA;HQW,NSW Cow Gut TAR07 29-34-7 E32SE3 SC;NSW Cow Haul Swamp TAR04 28-79-30-3 C28SE6 C;Sw,NSW Cow Swamp TAR05 28-101-5 E29SE9 C;NSW Cowlick Branch TAR02 28-71 D27NE6 C;NSW Cowpen Branch TAR02 28-38 D27SW2 WS-IV;NSW,CA Cowpen Creek TAR08 29-49-2 F33NE7 SA;ORW Cox Creek TAR07 29-34-46-5 F32NE6 SA;HQW,NSW Crab Cove (Crabb Cove) TAR08 29-50 F33SE2 SA;ORW Crabtree Bay TAR07 29-34-13 E33SW4 SC;NSW Crabtree Creek TAR02 28-78-1-13-1 C26NW7 B;NSW:+ Cradle Gut TAR07 29-19-10 F31NE2 SC;NSW Crawford Creek TAR07 29-6-2 E30SE8 SC;NSW Crawford Mill Run TAR07 29-21-4-(1) F31NE7 C;NSW Crawford Mill Run TAR07 29-21-4-(2) F31NE7 SC;NSW Crisp Creek TAR03 28-87-1 D29NE8 C;NSW Cromwell Canal and Connecting Canals TAR03 28-82 D28SE3 C;NSW Crooked Creek TAR01 28-30 C25SW9 C;NSW Crooked Creek TAR07 29-34-27 E32SE9 SC;NSW Crooked Creek TAR07 29-34-50 F32NE9 SA;HQW,NSW Crooked Run TAR01 28-2 B23SE3 WS-IV;NSW Crooked Swamp TAR04 28-79-24 C27NW8 C;NSW Cross Swamp TAR05 28-101-5-1 F30NW1 C;NSW Cub Creek TAR01 28-3 B23SE8 WS-IV;NSW Cuckolds Creek (Chuckolds Creek) TAR07 29-34-34-3 E32SW6 SC;NSW Cuff Tarkiln Creek TAR07 29-33-2-16 F32SW9 SA;HQW,NSW Page 4 of 17 2016/03/03 9:26:41 11/11/21, 12:07 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Bunn, North Carolina, USA* � 'in° Latitude: 35.9571*, Longitude:-78.2512° Elevation: 272.66 ft** *source: ESRI Maps w,�w ^ y� -source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000� 0.403 0.463 0.521 0.594 0.663 0.722 0.775 0.822 0.875 0.928 5-min (0.367-0.442) (0.424-0.506) (0.476-0.569) (0.542-0.649) (0.602-0.724) (0.653-0.789) (0.696-0.845) (0.735-0.899) (0.776-0.959) (0.815-1.02) 0.643 0.740 0.835 0.950 1.06 1.15 1.23 1.30 1.38 1.46 10-min (0.587-0.706) (0.678-0.810) (0.763-0.912) (0.867-1.04) 11 (0.960-1.15) 1 1 (1.17-1.43) (1.23-1.52) (1.28-1.60) 0.804 0.931 1.06 1.20 1.34 1.46 1.56 1.65 1.74 1.84 15-min (0.734-0.883) (0.852-1.02) (0.965-1.15) (1.10-1.31) 1 1 (1.32-1.59) 11 (1.40-1.70) 11 (1.47-1.80) 1 l(l.61-2.01)1 1.10 1.29 1.50 1.74 1.98 2.19 2.38 2.56 2.77 2.97 30-min (1.01-1.21) (1.18-1.41) (1.37-1.64) (1.59-1.90) (1.80-2.17) (1.98-2.40) 11 (2.14-2.60) 11 (2.29-2.80) 1 1(2.61-3.26)1 1.37 1.61 1.92 2.27 2.64 2.97 3.28 3.59 3.98 4.34 60-min (1.25-1.51) (1.48-1.76) (1.76-2.10) (2.07-2.48) (2.40-2.88) (2.69-3.25) (2.95-3.58) (3.21-3.93) (3.53-4.36) (3.81-4.76) 1.61 1.89 2.28 2.73 3.23 3.71 4.16 4.64 5.26 5.85 2-hr (1.46-1.78) (1.72-2.08) (2.07-2.51) (2.47-2.99) (2.91-3.54) (3.33-4.06) (3.71-4.55) (4.10-5.07) (4.61-5.75) (5.08-6.42) 1.71 2.01 2.43 2.93 3.50 4.05 4.59 5.17 5.94 6.69 3-hr (1.55-1.90) (1.83-2.23) (2.21-2.69) (2.65-3.23) (3.15-3.85) (3.62-4.46) (4.07-5.05) 1 (5.17-6.53) (5.75-7.38) 2.04 7 2.41 7 2.92 7 3.52 4.22 4.91 6.59 6.32 7.31 8.28 6-hr (1.86-2.27) (2.20-2.67) (2.65-3.22) (3.19-3.88) (3.81-4.64) (4.40-5.39) (4.96-6.13) (5.55-6.92) 1 1(7.08-9.09)1 2.41 2.84 3.46 4.19 5.06 5.93 6.79 7.74 9.03 10.3 12-hr (2.20-2.66) (2.61-3.13) (3.16-3.80) (3.81-4.60) (4.58-5.54) (5.32-6.47) (6.03-7.40) (6.79-8.42) (7.80-9.84) (8.77-11.3) 2.84 3.44 4.36 5.11 6.18 7.06 8.01 9.03 10.5 11.7 24-hr (2.65-3.06) (3.20-3.71) (4.05-4.70) (4.74-5.50) (5.70-6.65) (6.48-7.61) (7.30-8.64) (8.17-9.75) 11 (9.39-11.4) (10.4-12.7) 3.30 3.98 5.01 5.84 7.02 7.99 9.02 10.1 11.7 13.0 2{iay (3.08-3.55) (3.71-4.28) (4.66-5.38) (5.43-6.28) (6.49-7.55) (7.35-8.59) (8.24-9.71) (9.18-10.9) 1 1 (11.5-14.2) 3.50 4.21 5.27 6.13 7.34 8.34 9.38 10.5 12.1 13.4 3{iay (3.27-3.75) 11 (3.94-4.52) 11 (4.92-5.65) 11 (5.71-6.57) 1 1 (7.68-8.94) 11 (8.60-10.1) 11 (9.55-11.3) 1 1(12.0-14.6)1 3.70 4.45 5.54 6.43 7.67 8.68 9.75 10.9 12.5 13.8 4{iay (3.46-3.96) 11 (4.16-4.76) 11 (5.18-5.93) 11 (5.99-6.87) 1 (8.02-9.29) 11 (8.96-10.5) 11 (9.93-11.7) 1 1(12.4-14.9)1 4.31 5.15 6.34 7.30 8.64 9.73 10.9 12.1 13.7 15.1 7{iay (4.03-4.60) 11 (4.83-5.50) 11 (5.94-6.77) 11 (6.82-7.80) 11 (8.04-9.23) 1 1 (10.0-11.6) 1 1(13.6-16.3)] 4.91 5.85 7.10 8.10 9.48 10.6 11.7 12.9 14.6 15.9 10-day (4.61-5.23) (5.50-6.23) (6.67-7.56) (7.59-8.62) (8.85-10.1) (9.85-11.3) 1 (11.9-13.8) 11 (13.3-15.6) (14.4-17.1) 6.60 7.81 9.32 10.5 12.2 13.5 14.9 16.3 18.2 19.7 20-day (6.22-7.00) (7.37-8.29) (8.79-9.90) (9.92-11.2) (11.4-12.9) (12.6-14.4) (13.9-15.8) 11 (15.1-17.3) 11 (16.7-19.5) (18.0-21.2) 8.19 9.66 11.4 12.7 14.5 15.8 17.2 18.6 20.5 22.0 30-day (7.75-8.66) (9.15-10.2) (10.7-12.0) (12.0-13.4) (13.6-15.3) (14.9-16.8) 1 (17.4-19.8) 11 (19.0-21.9) (20.3-23.5) 10.4 12.2 14.1 15.6 17.6 19.1 20.6 22.2 24.2 25.7 45-day (9.90-11.0) (11.6-12.9) (13.4-14.9) 11 (14.8-16.5) 1 1 (19.4-21.8) (20.8-23.4) (22.5-25.6) (23.9-27.3) 12.5 14.6 16.7 18.3 20.5 22.1 23.6 25.2 27.2 28.7 60-day (11.9-13.1) IL (13.9-15.3) JL (15.9-17.5) JL (17.4-19.2) JL (19.4-21.5) j (22.3-24.9) (23.7-26.6) (25.5-28.8) (26.9-30.5) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9571 &Ion=-78.2512&data=depth&units=english&series=pds 1 /4 11/11/21, 12:07 PM Precipitation Frequency Data Server Pas -based depth -duration -frequency (DDF) curves Latitude: 35.9571', Longitude:-78.2512' Mill 25 c t 20 4- a di U 15 49 a 10 CL a i t t Jr t L N N r{4 N rq rq rq N rq O N Alb N rV A q O O O Ln O ,1 r-I rn ro � N rn v Ln Duration 30 25 c s 20 a m a 15 A, 49 a 10 CL a y ------------- ......................... — -- ------ ----------- ................. ........ ...... 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, VoIume 2, Version 3 Created (GMT): Thu Nov 11 17:06:59 2021 Back to Top Maps & aerials Small scale terrain Average recurrence mlerva I {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — 6-min — 2-day — 10-min — 3-day 15-min — d-dmy — 30-min — 7-day — 6 Wain — 10-day — 2fir — 20-day — 3-fir — 30-day — 8fir — 45-day — 12-hr — 60-day - 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htmI?Iat=35.9571 &Ion=-78.2512&data=depth&units=engIish&series=pds 2/4 11/11/21, 12:07 PM Precipitation Frequency Data Server Lar a scale terrain g Roanoke • Norfolk �m 0 • • Durham Greensboro qp�.� Rocky Mount � Ralelc�h ' C A R O L I N A � Greenville F�t•Fttr�il� ���ll f Ott2 100km 6 mi Large scale map 1\ i-Salem Green {boro Jacksonville s Durham �— Rocky Mount Rslei� N ort h :Greenville Carolina Ate Fayetteville 100km Jacksonville Large scale aerial Norfolk https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9571 & Ion =-78.2512&data=depth&units=english&series=pds 3/4 11/11/21, 12:07 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9571 & Ion =-78.2512&data=depth&units=english&series=pds 4/4 PRE -DEVELOPMENT Hardee's BOD-2020110321 HARDEE'S PRE -DEVELOPMENT HYDROLOGY BOD-2021110321 Summory of Results K.GARCIA, PE 11/16/2021 Sub -basin ID Impervious + OpenM +� Wooded Pond Total Impervious Open Wooded Pond Total [acres] w SCS CN Tc [min] 1 0.16 1.21 0.26 0.00 1.63 0.00 0.00 0.00 0.00 0.00 1.63 1 80 12.81 2 0.03 0.28 0.13 0.00 0.44 0.00 0.00 0.00 0.00 0.00 0.44 78 13.30 Totak 0.19 1.49 039 0.00 2.07 0.00 0.00 0.00 0.00 0.00 2.07 HARDEE'S PRE -DEVELOPMENT HYDROLOGY K.GARCIA, PE BOD-2021110321 Subbosin 1 11/16/2021 I. SCS CURVE NUMBERS Soils from WebSoilSurvey are only inclusive of indirectly connected areas Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG 'A' = 0.0% HSG'B'= 0.0% HSG 'C' = 28.8% HSG'D'= 71.2% Cover Condition SCS CN Comments Impervious 98 Open 78 Assume good condition Wooded 75 Assume good condition II. PRE -DEVELOPMENT A. Onsite Impervious Breakdown Contributing Area Area [sfJ Area ac Roadwa Area 0 0.00 Driveway/ Parking Lot 4,170 0.10 Roof 2,645 0.06 Sidewalk / Patio 152 0.00 Other 0 0.00 Totals 6,967 0.16 B. Watershed Land Use Breakdown Contributing Area SCS CN Area [sfl Area [acresl Comments Onsite impervious 98 6,967 0.16 Onsite open 78 52,702 1.21 Assume good condition Onsite wooded 75 11,261 0.26 Assume good condition Onsite pond 100 0 0.00 Offsite impervious 98 0 0.00 Offsite open 78 0 0.00 Assume good condition Offsite wooded 75 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area = 1.63 acres 70,930 sf Composite SCS CN = 80 °% Impervious = 9.8% HARDEE'S PRE -DEVELOPMENT HYDROLOGY K.GARCIA, PE BOD-2021110321 Subbosin 1 11/16/2021 III. TIME OF CONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 216 ft Top Elev = 282.00 ft Top Elev = 279.00 ft BotElev = 279.00 ft BotElev = 270.50 ft Height = 3 ft Height = 9 ft Slope = 0.0300 ft/ft Slope = 0.0394 ft/ft Manning's n = 0.24 dense grasses Paved ? = No P (2-year/24-hour)= 3.44 inches (Bunn, NC) Velocity= 3.20 ft/sec Segment Time = 11.69 minutes Segment Time = 1.12 minutes Time of Concentration = 12.81 minutes SCS Lag Time = 7.69 minutes (SCS Lag = 0.6* Tc) Time Increment = 2.23 minutes (= 0.29*SCS Lag) HARDEE'S PRE -DEVELOPMENT HYDROLOGY K.GARCIA, PE BOD-2021110321 Subbosin 2 11/16/2021 I. SCS CURVE NUMBERS Soils from WebSoilSurvey are only inclusive of indirectly connected areas Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG 'A' = 0.0% HSG'B'= 0.0% HSG 'C' = 30.1% HSG'D'= 69.9% Cover Condition SCS CN Comments Impervious 98 Open 78 Assume good condition Wooded 75 Assume good condition II. PRE -DEVELOPMENT A. Onsite Impervious Breakdown Contributing Area Area [sfJ Area ac Roadwa Area 0 0.00 Driveway/ Parking Lot 248 0.01 Roof 776 0.02 Sidewalk / Patio 152 0.00 Other 0 0.00 Totals 1,176 0.03 B. Watershed Land Use Breakdown Contributing Area SCS CN Area [sfl Area [acresl Comments Onsite impervious 98 1,176 0.03 Onsite open 78 12,138 0.28 Assume good condition Onsite wooded 75 5,871 0.13 Assume good condition Onsite pond 100 0 0.00 Offsite impervious 98 0 0.00 Offsite open 78 0 0.00 Assume good condition Offsite wooded 75 0 0.00 Assume good condition Offsite pond 100 0 0.00 TotaIIC area = 0.44 acres 19,185 sf Composite SCS CN = 78 °% Impervious = 6.1% HARDEE'S PRE -DEVELOPMENT HYDROLOGY K.GARCIA, PE BOD-2021110321 Subbosin 2 11/16/2021 III. TIME OF CONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 ft Length = 117 ft Top Elev = 282.50 ft Top Elev = 280.00 ft BotElev = 280.00 ft BotElev = 276.75 ft Height = 2.5 ft Height = 3 ft Slope = 0.0250 ft/ft Slope = 0.0278 ft/ft Manning's n = 0.24 dense grasses Paved ? = No P (2-year/24-hour)= 3.44 inches (Bunn, NC) Velocity= 2.69 ft/sec Segment Time = 12.57 minutes Segment Time = 0.73 minutes Time of Concentration = 13.30 minutes SCS Lag Time = 7.98 minutes (SCS Lag = 0.6* Tc) Time Increment = 2.31 minutes (= 0.29*SCS Lag) TI MCADAM,%s FlexTable: Catchment Table (BOD 2021110321.ppc) Current Time: 0.00 min Label Area SCS CN Time of Notes (ftz) Concentration (min) SUB-1 70,930 80 12.81 PRE SUB-2 19,185 78 13.30 PRE HAR DE E'S K.GARCIA BOD 2021110321.ppc 11/29/2021 TI MCADAM,%s Scenario: Pre - Development o HAR DE E'S K.GARCIA BOD 2021110321.ppc 11/16/2021 TI M c A DA MS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) SUB-1 Pre- 1 Year 1 0.153 727.00 2.32 SUB-2 Pre- 1 Year 1 0.037 727.00 0.55 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) POA-1 Pre- 1 Year 1 0.153 727.00 2.32 POA-2 Pre- 1 Year 1 0.037 727.00 0.55 HAR DE E'S K.GARCIA BOD 2021110321.ppc 11/29/2021 'J McADAms The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT BODDIE-NOELL ENTERPRISES, INC. P.O. BOC 1908 ROCKY MOUNT, NC 27802 PHONE: 252. 937. 2800 �=E W W J Q W W _ z am_ az � z z�= aom J M W LLI W o?S 0 - O N a REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. 2020110321 FILENAME 2020110321-PRE CHECKED BY KEG DRAWN BY KEG SCALE 1"=2Y DATE 11.22. 2021 SHEET PRE -DEVELOPMENT DRAINAGE AREA MAP PRE POST -DEVELOPMENT Hardee's BOD-2020110321 HARDEES POST -DEVELOPMENT HYDROLOGY David L Smith, PE 2021110321 Summary of Results 6/21/2022 HYDROLOGY INPUT SUMMARY Onsite Area [acres] Offsite Area [acres] Total Area Sub -basin ID SCS CN Tc [min] Impervious p open p Wooded Pond Total Impervious p Open p Wooded Pond Total [acres] 1 Bypass 0.03 0.19 0.00 0.00 0.22 0.00 0.00 0.00 0.00 0.00 0.22 81 5.00 1 to SCM A 1.38 0.27 0.00 0.08 1.74 0.00 0.00 0.00 0.00 0.00 1.74 1 95 5.00 2 0.00 0.11 0.00 0.00 0.11 0.00 0.00 0.00 0.00 0.00 0.11 79 5.00 Totals = 1.41 0.57 0.00 0.08 2.07 0.00 0.00 0.00 0.00 0.00 2.07 Piedmont of the Tar -Pamlico BMP Stormwater Nutrient Load Calculation Tool Inputs Land Use Area (sf) Area (ac) Roadway Area 0 0.00 Driveway / Parking 32,324 0.74 Roof Area 3,099 0.07 Sidewalk / Patio 2,285 0.05 Future Impervious* 23,782 0.55 Open 24,950 0.57 Wooded 0 0.00 Pond 3,675 Total 90,115 0.08 2.07 *Allocated future impervious for PIN 2820147256 development included for proposed site's nutrient accounting TI MCADAM,%s FlexTable: Catchment Table (BOD 2021110321.ppc) Current Time: 0.00 min Label Area SCS CN Time of Notes (ftz) Concentration (min) SUB 1 BYP 8,642 78 5.00 POST SUB 1 TO SCM A 76,793 95 5.00 POST SUB 2 4,680 79 5.00 POST HAR DE E'S K.GARCIA BOD 2021110321.ppc 11/29/2021 TI MCADAM,%s Scenario: Post - Development POA HAR DE E'S K.GARCIA BOD 2021110321.ppc 11/29/2021 TJ M c A DA MS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) SUB 1 BYP Post- 1 Year 1 0.017 722.00 0.35 SUB 1 TO SCM A Post- 1 Year 1 0.337 721.00 7.05 SUB 2 Post- 1 Year 1 0.010 722.00 0.20 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) POA-1 Post- 1 Year 1 0.214 731.00 1.68 POA-2 Post- 1 Year 1 0.010 722.00 0.20 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) SCM A (IN) Post- 1 Year 1 0.337 721.00 7.05 (N/A) (N/A) SCM A Post- 1 Year 1 0.197 732.00 1.58 273.57 0.177 (OUT) HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 00 \ 4 s\ 010 \ \ \\ \ \NN \ po / ��` vv S� \0 1 v �`� lb" X LD � as \ \ \ \ \ \\p 1 / —°J OG \ \ \ \ \ \ \oo \ �o \ \ OG \ \ \Oe, \ \ �� \ \\OG v \ v 0e, v v 00ou A \ V f 9 OU \ \ \ SUB 1 BYPASS / 1 /� 1 PROPOSED DEVELOPMENT \ I / PIN 2820146316 \ ss v AREA = 1.41 AC / \ PROPOSED IMPERVIOUS AREA 0 87 AC 41 / ♦ / \ \\p\� \ \ NN NI 01 SUB 1TOSCMA ` \ ' AREA = 1.74 A 41 \\� \Ad FUTURE DEVELOPMENT PIN 2820147256 , SCM A `, / AREA = 0.66 AC as �\ \\ \\ STORMWATER WETLAND \\ : FUTURE IMPERVIOUS AREA = 0.55 AC* as ` \ \ / \\ \ \ \ \\ \ •/ \ o ou i tea" \\\ PROPERTY LINE AREA = 2.07 AC Point Northing Easting 1 2221420.49 804317.81 2 2221574.80 804147.74 3 2221643.91 804217.00 4 2221704.68 804151.08 5 2221855.53 804301.42 6 2221794.74 804368.18 7 2221642.85 804535.81 ;N*06�\ c. \\ LEGEND \ \ PERMIT BOUNDARY \ ` AREA =2.07AC. \� \\ \ \\ \\ \\ �...'�. \ POA 2 PROPOSED IMPERVIOUS \ \ AREA = 0.87 AC. \ \ \ \ J�, \ \ �\ ALLOCATED FUTURE IMPERVIOUS* — —2�f- � \ \ \ \ \ � \\ SUB2 \ \ \ / � AREA =0.55AC. \ \ \ \ \ \ \\ � � /� \\\ \ AREA = 0.11 AC DRAINAGE AREA \ �� \ \ \ \ ` --4 \ *NOTE: FUTURE IMPERVIOUS ON THIS SHEET IS ASSUMED 2 \ ^ \\ AND DISPLAYED FOR ILLUSTRATION, DEVELOPMENT LAYOUT \ \ NN SUBJECT TO CHANGE fie, ��— \ GRAPHIC SCALE 0 10 20 40 N1 inch = 20 ft. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION 'J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com BODDIE-NOELL ENTERPRISES, INC. P.O. BOX 1908 ROCKY MOUNT, NC 27802 Contact PHONE: 252. 937. 2800 IMM W W LLI � W z � N J ~ ZO. —z� Qoaz � z V z � M W LLI z 06 000 V N a REVISIONS NO. DATE 1 2 3 4 5 6 PLAN INFORMATION PROJECT NO. 2021110321 FILENAME 2020110321-POST CHECKED BY RW DRAWN BY KEG SCALE 1"=20' DATE 04.11.2022 SHEET POST DEVELOPMENT DRAINAGE AREA &BUILT UPON AREA MAP C9eO5 STORMWATER CONTROL MEASURE DESIGN CALCULATIONS Hardee's BOD-2020110321 HARDEES STORMWATER CONTROL MEASURE K. GARCIA, PE 2021110321 SSFxn Above NP 3/24/2022 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 272.00 0.00 3,429 273.00 1.00 5,438 4434 4434 4434 1.00 273.25 1.25 5,740 5589 1397 5831 1.25 274.00 2.00 6,665 6203 4652 10483 1.99 274.50 2.50 7,300 6983 3491 13974 2.51 Storage vs. Stage 16000 14000 y = 4420.6x1 2519 12000 R2 = 0.9999 U 10000 R 8000 L ° 6000 U) 4000 2000 0 0.00 0.50 1.00 1.50 2.00 2.50 3.00 Stage (feet) Ks = 4421 b = 1.252 HARDEES STORMWATER CONTROL MEASURE 2021110321 SSFxn Below NP Per NCDEQ "Stormwater Design Manual" Minimum Design Criteria K. GARCIA, PE 3/24/2022 ZonjeK Depth at Normal Pool (inches) Depth at Temp Pool (inches) Portion of Wetland Surface Area Deep Pool - Forebay 9 to 40 21 to 55 10 - 15% Deep Pool - Non Forebay 9 to 40 21 to 55 5 - 15% Shallow Water 0 to 9 15 to 21 35 - 45% Shallow Land - to - 0 to 15 30 - 45% Permanent Pool Elevation = 272.00 Temporary Pool Elevation = 273.25 Wetland Surface Area at Temporary Pool = 5,740 Zone Elevation (ft) Measured Area (sf) Portion of Wetland Surface Area Deep Pool - Forebay 271.25 to 268.67 631 11.0% Deep Pool - Non Forebay 271.25 to 268.67 291 5.1% Shallow Water 272.00 to 271.25 2,507 43.7% Shallow Land 273.25 to 272.00 2,311 40.3% HARDEES STORMWATER CONTROL MEASURE K. GARCIA, PE 2021110321 WQV Calculation - MD 3/24/2022 R QUALITY VOLUME WQ v = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A= area in acres P = rainfall (in inches) Input data: Total area, A = 1.76 acres Impervious area = 1.42 acres Percent impervious cover, I = 80.7 % Rainfall, P = 1.00 inches Calculated values: Rv= 0.78 WQv= 0.11 acre-ft = 4967 cf. SURFACE AREA CALCULATION Per NCDEQ "Stormwater Design Manual" Wetland MDC 3. Surface Area WQv= 4967 cf. Max. ponding depth = 15 inches Min. surface area (at temp. pool) = 3973 sf. Surface area provided at temp. pool = 5740 sf. Approximate ponding depth = 0.87 feet = 10.38 inches Calculated values: Depth of WQv in Basin = 0.87 ft 10.38 inches Elevation = 272.87 ft HARDEES STORMWATER CONTROL MEASURE 2021110321 WQV Drawdown Calculation CE DESIGN a_ D orifice = 1 inch # orifices = 1 Ks = 4421 b = 1.252 Cd orifice = 0.60 Normal Pool Elevation = 272.00 feet Volume @ Normal Pool = 0 cf Orifice Invert = 272.00 feet WSEL @ 1" Runoff Volume = 272.87 feet WSEL (feet) Vol. Stored (cf) Orifice Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 272.87 3688 0.024 272.80 3323 0.023 0.023 365 15669 272.73 2966 0.022 0.022 357 16049 272.66 2618 0.021 0.021 349 16481 272.59 2278 0.019 0.020 339 16977 272.52 1949 0.018 0.019 329 17560 272.45 1630 0.017 0.017 319 18258 272.38 1324 0.015 0.016 307 19122 272.31 1031 0.014 0.014 293 20237 272.24 754 0.012 0.013 277 21774 272.17 497 0.010 0.011 258 24142 Drawdown Time = 2.16 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.275 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.005 sf Q = 0.0138 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 3.10 days K. GARCIA, PE 3/24/2022 HARDEES STORMWATER CONTROL MEASURE 2021110321 Temp Pool Drawdown Calculation CE DESIGN D orifice = 1 inch # orifices = 1 Ks = 4421 b = 1.252 Cd orifice = 0.60 Normal Pool Elevation = 272.00 feet Volume @ Normal Pool = 0 cf Orifice Invert = 272.00 feet Temp Pool Elevation Volume = 273.25 feet WSEL (feet) Vol. Stored (cf) Orifice Flow (cfs) Avg. Flow (cfs) Incr. Vol. (cf) Incr. Time (sec) 273.25 5845 0.029 273.14 5223 0.028 0.028 623 22107 273.03 4614 0.026 0.027 608 22671 272.93 4022 0.025 0.025 592 23317 272.82 3447 0.023 0.024 575 24066 272.71 2890 0.021 0.022 556 24955 272.60 2355 0.020 0.021 536 26038 272.50 1843 0.018 0.019 512 27407 272.39 1358 0.015 0.017 485 29236 272.28 906 0.013 0.014 452 31909 272.17 497 0.010 0.011 410 36555 Drawdown Time = 3.10 days By comparison, if calculated by the average head over the orifice (assuming average head is one-third the total depth), the result would be: Average driving head on orifice = 0.403 feet Orifice composite loss coefficient = 0.600 Cross -sectional area of siphon = 0.005 sf Q = 0.0167 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 4.06 days K. GARCIA, PE 3/24/2022 TI Mc ADA M,%s Subsection: Elevation -Area Volume Curve Label: SCM A Scenario: Post- 1 Year Return Event: 1 years Storm Event: 1 year Elevation Planimeter Area Al+A2+sqr Volume Volume (Total) (ft) (ftz) (ftz) (Al*A2) (ac-ft) (ac-ft) (ftz) 272.00 0.0 3,429 0 0.000 0.000 273.00 0.0 5,438 13,185 0.101 0.101 273.25 0.0 5,740 16,765 0.032 0.133 274.00 0.0 6,665 18,590 0.107 0.240 274.50 0.0 7,300 20,940 0.080 0.320 HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ McADAMS Subsection: Outlet Input Data Label: SCM A Scenario: Post- 1 Year Requested Pond Water Surface Elevations Minimum (Headwater) 272.00 ft Increment (Headwater) 0.10 ft Maximum (Headwater) 274.50 ft Outlet Connectivity Structure Type Outlet ID Direction Outfall E1 E2 (ft) (ft) Rectangular Weir Weir - 1 Forward Culvert 273.25 274.50 Inlet Box Riser Forward Culvert 273.50 274.50 Orifice -Circular WQ Orifice Forward Culvert 272.00 274.50 Culvert -Circular Culvert Forward TW 271.50 274.50 Tailwater Settings Tailwater (N/A) (N/A) Return Event: 1 years Storm Event: 1 year HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ N1cADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post- 1 Year Structure ID: Riser Structure Type: Inlet Box Number of Openings 1 Elevation 273.50 ft Orifice Area 16.0 ftz Orifice Coefficient 1 Weir Length 15.00 ft Weir Coefficient 3.00 (ft^0.5)/s K Reverse 1 Manning's n 0 Kev, Charged Riser 0 Weir Submergence False Orifice H to crest False HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 T]McADAMS Subsection: Outlet Input Data Label: SCM A Scenario: Post- 1 Year Structure ID: Culvert Structure Type: Culvert -Circular Number of Barrels 1 Diameter 18.0 in Length 28.00 ft Length (Computed Barrel) 28.00 ft Slope (Computed) 0.018 ft/ft Outlet Control Data Manning's n 0.013 Ke 1 Kb 0 Kr 1 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0098 M 2.0000 C 0.0398 Y 0.6700 T1 ratio (HW/D) 1 T2 ratio (HW/D) 1 Slope Correction Factor -1 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... T1 Elevation 273.23 ft T1 Flow 7.58 ft3/s T2 Elevation 273.45 ft T2 Flow 8.66 ft3/s Return Event: 1 years Storm Event: 1 year HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ N1cADAMS Subsection: Outlet Input Data Return Event: 1 years Label: SCM A Storm Event: 1 year Scenario: Post- 1 Year Structure ID: WQ Orifice Structure Type: Orifice -Circular Number of Openings 1 Elevation 272.00 ft Orifice Diameter 1.0 in Orifice Coefficient 1 Structure ID: Weir- 1 Structure Type: Rectangular Weir Number of Openings 1 Elevation 273.25 ft Weir Length 1.00 ft Weir Coefficient 3.00 (ft^0.5)/s Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 ft (Maximum) Headwater Tolerance 0.01 ft (Minimum) Headwater Tolerance 0.50 ft (Maximum) Flow Tolerance (Minimum) 0.001 ft3/s Flow Tolerance (Maximum) 10.000 ft3/s HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TI McADAMS Subsection: Composite Rating Curve Label: SCM A Scenario: Post- 1 Year Composite Outflow Summary Return Event: 1 years Storm Event: 1 year Water Surface Flow Tailwater Elevation Convergence Error Contributing Structures Elevation (ft3/s) (ft) (ft) (ft) 272.00 0.00 (N/A) 0.00 (no Q: Weir - 1,Riser,WQ Orifice,Culvert) 272.10 0.01 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.20 0.01 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.30 0.01 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.40 0.02 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.50 0.02 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.60 0.02 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.70 0.02 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.80 0.02 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 272.90 0.02 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 273.00 0.03 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 273.10 0.03 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 273.20 0.03 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 273.25 0.03 (N/A) 0.00 WQ Orifice,Culvert (no Q: Weir - 1,Riser) 273.30 0.06 (N/A) 0.00 Weir - 1,WQ Orifice,Culvert (no Q: Riser) 273.40 0.20 (N/A) 0.00 Weir - 1,WQ Orifice,Culvert (no Q: Riser) 273.50 0.39 (N/A) 0.00 Weir - 1,WQ Orifice,Culvert (no Q: Riser) 273.60 2.03 (N/A) 0.00 Weir - 1,Riser,WQ Orifice,Culvert 273.70 4.87 (N/A) 0.00 Weir - 1,Riser,WQ Orifice,Culvert 273.80 8.40 (N/A) 0.00 Weir - 1,Riser,WQ Orifice,Culvert 273.90 10.51 (N/A) 0.00 Riser,Culvert (no Q: Weir - 1,WQ Orifice) 274.00 10.88 (N/A) 0.00 Weir - 1,Riser,Culvert (no Q: WQ Orifice) 274.10 11.24 (N/A) 0.00 Riser,Culvert (no Q: Weir - 1,WQ Orifice) 274.20 11.58 (N/A) 0.00 Riser,Culvert (no Q: Weir - 1,WQ Orifice) 274.30 11.91 (N/A) 0.00 Riser,Culvert (no Q: Weir - 1,WQ Orifice) HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TI McADAMS Subsection: Composite Rating Curve Label: SCM A Scenario: Post- 1 Year Composite Outflow Summary Water Surface Flow Elevation (ft3/s) (ft) Tailwater Elevation Convergence Error (ft) (ft) Return Event: 1 years Storm Event: 1 year Contributing Structures 274.40 12.24 (N/A) 0.00 Riser,Culvert (no Q: Weir - 1,WQ Orifice) 274.50 12.55 (N/A) 0.00 Riser,Culvert (no Q: Weir - 1,WQ Orifice) HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ Mc ADA WS Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Scenario: Post- 1 Year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 272.00 ft Initial) Volume (Initial) 0.000 ac-ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow (Peak In) 7.05 ft3/s Time to Peak (Flow, In) 721.00 min Flow (Peak Outlet) 1.58 ft3/s Time to Peak (Flow, Outlet) 732.00 min Elevation (Water Surface, 273.57 ft Peak) Volume (Peak) 0.177 ac-ft Mass Balance (ac-ft) Volume (Initial) 0.000 ac-ft Volume (Total Inflow) 0.337 ac-ft Volume (Total Infiltration) 0.000 ac-ft Volume (Total Outlet 0.197 ac-ft Outflow) Volume (Retained) 0.139 ac-ft Volume (Unrouted) 0.000 ac-ft Error (Mass Balance) 0.0 % Return Event: 1 years Storm Event: 1 year HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ Mc ADA WS Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Scenario: Post- 10 Year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 272.00 ft Initial) Volume (Initial) 0.000 ac-ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow (Peak In) 11.04 ft3/s Time to Peak (Flow, In) 721.00 min Flow (Peak Outlet) 9.06 ft3/s Time to Peak (Flow, Outlet) 724.00 min Elevation (Water Surface, 273.83 ft Peak) Volume (Peak) 0.214 ac-ft Mass Balance (ac-ft) Volume (Initial) 0.000 ac-ft Volume (Total Inflow) 0.665 ac-ft Volume (Total Infiltration) 0.000 ac-ft Volume (Total Outlet 0.518 ac-ft Outflow) Volume (Retained) 0.147 ac-ft Volume (Unrouted) 0.000 ac-ft Error (Mass Balance) 0.0 % Return Event: 10 years Storm Event: 10 year HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ Mc ADA WS Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Scenario: Post- 25 Year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 272.00 ft Initial) Volume (Initial) 0.000 ac-ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow (Peak In) 12.45 ft3/s Time to Peak (Flow, In) 721.00 min Flow (Peak Outlet) 10.06 ft3/s Time to Peak (Flow, Outlet) 724.00 min Elevation (Water Surface, 273.88 ft Peak) Volume (Peak) 0.221 ac-ft Mass Balance (ac-ft) Volume (Initial) 0.000 ac-ft Volume (Total Inflow) 0.820 ac-ft Volume (Total Infiltration) 0.000 ac-ft Volume (Total Outlet 0.671 ac-ft Outflow) Volume (Retained) 0.149 ac-ft Volume (Unrouted) 0.000 ac-ft Error (Mass Balance) 0.0 % Return Event: 25 years Storm Event: 25 year HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 TJ Mc ADA WS Subsection: Level Pool Pond Routing Summary Label: SCM A (IN) Scenario: Post- 100 Year Infiltration Infiltration Method No Infiltration (Computed) Initial Conditions Elevation (Water Surface, 272.00 ft Initial) Volume (Initial) 0.000 ac-ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 1.00 min Inflow/Outflow Hydrograph Summary Flow (Peak In) 14.68 ft3/s Time to Peak (Flow, In) 721.00 min Flow (Peak Outlet) 10.76 ft3/s Time to Peak (Flow, Outlet) 724.00 min Elevation (Water Surface, 273.97 ft Peak) Volume (Peak) 0.235 ac-ft Mass Balance (ac-ft) Volume (Initial) 0.000 ac-ft Volume (Total Inflow) 1.088 ac-ft Volume (Total Infiltration) 0.000 ac-ft Volume (Total Outlet 0.937 ac-ft Outflow) Volume (Retained) 0.151 ac-ft Volume (Unrouted) 0.000 ac-ft Error (Mass Balance) 0.0 % Return Event: 100 years Storm Event: 100 year HAR DE E'S K.GARCIA BOD 2021110321.ppc 3/24/2022 HARDEES STORMWATER CONTROL MEASURE K. GARCIA, PE 2021110321 Anti -Flotation Block Calculations 3/24/2022 ON CALCULATION ■ Input Data ==> Safety Factor: Safety factor to use = Concrete: Concrete unit weight = Riser: Inside height of Riser = Inside length of riser = Inside width of riser = Wall thickness of riser = Base thickness of riser = Base length of riser = Base width of riser = Openings: Total Orifice Area = OD of barrel exiting manhole = Size of drain pipe (if present) _ Trash Rack: Bottom Length = Bottom Width = Height = Trash Rack water displacement = Concrete Present in Riser Structure ==> Total amount of concrete: Base of Riser = Riser Walls = Adjust for openings: Opening for Orifices = Openings for Weirs = Opening for barrel = Opening for drain pipe = Total Concrete present, adjusted for openings = Weight of concrete present = 1.15 (recommend 1.15 or higher) 142.0 PCF Note: NC Products lists unit wt. of manhole concrete at 142 PCF. 2.00 feet 4.00 feet 4.00 feet 6.00 inches 6.00 inches 5.00 feet 5.00 feet 0.349 SF 23.00 inches 6.0 inches 7.00 feet 5.50 feet 2.00 feet 38.50 CF 12.50 CF 18.00 CF 0.17 CF 0.13 CF 1.44 CF 0.10 CF 28.910 CF 4,105 Ibs HARDEES STORMWATER CONTROL MEASURE K. GARCIA, PE 2021110321 Anti -Flotation Block Calculations 3/24/2022 Amount of water displaced by Riser structure ==> Displacement by concrete = 28.91 CF Displacement by open air in riser = 32.00 CF Displacement by trash rack = 38.50 CF Total water displaced by riser/barrel structure = 99.41 CF Weight of water displaced = 6,203 Ibs Calculate size of base for riser assembly ==> Length = 8.00 feet Width = 8.00 feet Thickness = 12 inches Concrete Present = 64.00 CF Total Water Displaced = 150.91 CF Total Concrete Present = 92.91 CF Total Water Displaced = 9,417 Ibs Total Concrete Present = 13,193 Ibs Actual safety factor = 1.40 OK Base length = 8.00 feet Base width = 8.00 feet Base Thickness = 12.00 inches CY of concrete total in base = 2.37 CY Concrete unit weight in added base >= 142.0 PCF HARDEES STORMWATER CONTROL MEASURE K. GARCIA, PE 2021110321 Anti -Flotation Block Calculations 3/24/2022 11. CALCULATION FOR RISER ANTI -FLOTATION STEEL Input Data ==> Anti -Floatation Block Length = 8.0 feet Anti -Floatation Block Width = 8.0 feet Anti -Floatation Block Thickness = 12 inches Asteei to AconCfete Ratio = 0.0020 (recommend 0.0018 or higher) Cross -Section Calculations==> Cross -Section Area* = 8.00 SF Minimum Steel Area Required = 0.016 SF 2.30 SI *Note: Assumes a "square"x-sec (Land W same) Rebar Calculations ==> Bar Size 4 5 6 7 8 Diameter (inches) 0.500 0.625 0.750 0.875 1.000 X-Sec Area (SI) 0.196 0.307 0.442 0.601 0.785 Minimum Number of Bars 12 8 6 4 3 Project Project No. Outlet ID Flow, Q10_yr Slope, S Pipe Diameter, Do Pipe Diameter, Do Number of pipes Pipe separation Manning's n DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Hardees Date 3/24/2022 2021110321 Designer KEG SCM A 9.1 cfs 1.79 % 18 inches 1.5 feet 1 0 feet 0.013 Fieure 8.06.b.1 25 20 one Zone 7 V 15 wNI 10 on 5 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 2 Outlet pipe diameter 18 in. Length = 9.0 ft. Outlet flowrate 9.1 cfs Width = 4.5 ft. Outlet velocity 8.5 ft/sec Stone diameter = 6 in. Material = Class B Thickness = 22 in. Zone Material Diameter I Thickness Length I Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 3 Class B Class 1 6 13 22 22 6 x D(o) 8 x D(o) 3 x D(o) 3 x D(o) 4 5 Class 1 Class 11 13 23 22 27 8 x D(o) 10 x D(o) 3 x D(o) 3 x D(o) 6 Class 11 23 27 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full -flow velocity SCM - Rip Rap Outlet Protection Design3/24/2022 DESIGN OF RIPRAP OUTLET PROTECTION WORKSHEET Project Hardees Project No. 2021110321 Outlet ID System Discharge at SCM Flow, Q10_yr 9.2 cfs Slope, S 1.22 % Pipe Diameter, Do 24 inches Pipe Diameter, Do 2.0 feet Number of pipes 1 Pipe separation 0 feet Manning's n 0.013 Fh!ure 8.06.b.1 25 Date 6/21/2022 Designer KEG 20 &one o V 15 w 10 ,7 • on 5 0 0 1 2 3 4 5 6 7 8 9 10 Pipe diameter (ft) Zone from graph above = 2 Outlet pipe diameter 24 in. Length = 12.0 ft. Outlet flowrate 9.2 cfs Width = 6.0 ft. Outlet velocity 7.5 ft/sec Stone diameter = 6 in. Material = Class B Thickness = 22 in. Zone Material Diameter Thickness Length Width 1 Class A 3 9 4 x D(o) 3 x D(o) 2 Class B 6 22 6 x D(o) 3 x D(o) 3 Class 1 13 22 8 x D(o) 3 x D(o) 4 Class 1 13 22 8 x D(o) 3 x D(o) 5 Class 11 23 27 10 x D(o) 3 x D(o) 6 Class 11 23 27 10 x D(o) 3 x D(o) 7 Special study required 1. Calculations based on NY DOT method - Pages 8.06.05 through 8.06.06 in NC Erosion Control Manual 2. Outlet velocity based on full -flow velocity SCM IN- Rip Rap Outlet Protection Design.xlsm6/21/2022 NUTRIENT LOADING CALCULATIONS Hardee's BOD-2020110321 Tar -Pamlico StormwaterRule 15A NCAC 28 .0258 Last Modified 6/21/2022 Piedmont of the Tar -Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project Name: Hardee's Date: 121312021-Rev 0612012022 By: Kelli Garcia, PE -David L Smith, PE Checked By: Directions (same for pre -development and post -development tables): > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > Unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. Pre -development: (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Area S.M. Formula Average EMC Column Average EMC Column acres 0.46 + 8.3I of TN m /L 2 3 4 of TP m L 2 3 6 Transportation impervious 0.11 1.21 2.60 0.34 0.19 0.02 Roof impervious 0.08 1.21 1.95 0.19 0.11 0.01 Managed pervious (lawn/landscaped) 1.49 1.21 1.42 2.56 0.28 0.50 Managed pervious (cropland) 1.21 4.23 0.00 1.23 0.00 Managed pervious (pasture) 1.21 2.04 0.00 0.62 0.00 Wooded pervious 0.39 1.21 0.94 0.45 0.14 0.07 Fraction Impervious (I) = 0.09 TN Loading 3.53 TP Loading 0.61 (lb/yr) = (lb/yr) = Total Area of Development = 2.07 TN Exp. Coeff. 1.71 TP Exp. Coeff. 0.29 (lb/ac/yr) _ (lb/ac/yr) _ Post -development: (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Area S.M. Formula Average EMC Column Average EMC Column acres 0.46 + 8.3I of TN m /L 2 3 4 of TP m L 2 3 6 Transportation impervious 1.18 6.13 2.60 18.75 0.19 1.37 Roof impervious 0.24 6.13 1.95 2.81 0.11 0.16 Managed pervious 0.66 6.13 1.42 5.72 0.28 1.13 Wooded pervious 0.00 6.13 0.95 0.00 0.14 0.00 Fraction Impervious (I) = 0.68 TN Loading 27.28 TP Loading 2.66 (lb/yr) _ I (lb/yr) _ Total Area of Development = 2.07 TN Exp. Coeff. 13.19 TP Exp. Coeff. 1 28 (lb/ac/yr) _ (lb/ac/yr) _ Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post -development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next worksheet calculates post -development TN and TP loadings after BMPs are installed. Tar -Pamlico Stormwater Rule 15A NCAC 28 .0258 Last Modified 5/23/03 Piedmont of the Tar -Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties BMP Removal Calculation Worksheet (Automated) Project Name: Hardee's Date: 121312021-Rev 0612012022 By: KeZU Garciay PE -David L Smith, PE Checked By: Directions_ > It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post -development IN and TP export coefficients you calculated above to the rule requirements of 4.0 lb/ac/yr IN and 0.4 lb/ac/yr TP, select BMP(s) from the list for treating the catchment runoff. Enter the chosen BMP(s) nutrient removal rates in the green blanks. If more than one BMP is to be used in series, the combined removal rates will be calculated automatically in the blue blanks. > Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre-BMP worksheet tables, and also to the site plans, for consistency. All of these values need to be the same TN TP Design Standard BMP Wet Detention Pond 25 40 NC BMP Manual Nutrient Stormwater Wetland 40 35 NC BMP Manual Removal Sand Filter 35 45 NC BMP Manual Rates Bioretention 35 45 NC BMP Manual Grass Swale 20 20 NC BMP Manual Vegetated Filter Strip w/ 20 35 NC BMP Manual Level Spreader Dry Detention 10 10 NC BMP Manual Catchment 1: Total acreage of catchment 1 =Igac First BMP's TN removal rate% First BMP's TP removal rateSecond BMP's TN removal rate =% Second BMP's TP removal rate = % Third BMP's TN removal rate =% Third BMP's TP removal rate = % TOTAL IN REMOVAL RATE = 44 % TOTAL TP REMOVAL RATE = 40 % (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC Column Average EMC Column Acrea e 0.46 + 8.3 of TN m /L 2 3 4 of TP m L 2 3 Transportation impervious 1.15 7.07 2.60 21.08 0.19 1.54 Roof impervious 0.24 7.07 1.95 3.24 0.11 0.18 Managed pervious 0.27 7.07 1.42 2.72 0.28 0.54 Wooded pervious 0.00 7.07 0.94 0.00 0.14 0.00 Area taken up by BMP 0.08 7.07 1.95 1.16 0.11 0.07 Fraction Impervious (I) = 0.80 Pre BMP TN 28.20 Pre BMP TP 2.32 Load (lb/yr) = Load (lb/yr) = Total Area of Development = 1.74 Pre-BMP TN 16.24 Pre-BMP TP 1.34 Export (m/ac/yr) = Export (lb/ac/yr) = Post-BMP TN 15.79 Post-BMP TP 1.39 Load (lb/yr) = Load (lb/yr) = Post-BMP TN 9.09 Post-BMP TP 0.80 Export (@/ac/yr) Export (@/ac/yr) = Tar -Pamlico Stormwater Rule 15A NCAC 28.0258 Last Modified 5/23/03 Catchment 2: Total acreage of catchment 2 = First BMP's TN removal rate =Mac % First BMP's TP removal rate = % Second BMP's TN removal rate =% Second BMP's TP removal rate = % Third BMP's TN removal rate =% Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 0 % TOTAL TP REMOVAL RATE = 0 % (1) (2) (3) (4) ( (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC Column Average EMC Column Acreage 0.46 + 8.3 of TN m /L 2 3 4 of TP m /L 2 * 3 * 6 Transportation imper«ous Pr 0.03 1.21 2.60 0.09 0.19 0.01 Roof impervious 0.00 1.21 1.95 0.00 0.11 0.00 Managed pervious 0.30 1.21 1.42 0.52 0.28 0.10 Wooded pervious 0.00 1.21 0.94 0.00 0.14 0.00 Area taken up by BMP 0.00 1.21 1.95 0.00 0.11 0.00 Fraction Impervious (I) = 0.09 Pre BMP TN 0.61 Pre -BMW TP 0.11 Load (lb/yr) = Load (lb/yr) _ Total Area of Development = 0.33 Pre-BMP TN Export 1.84 Pre-BMP TP Export 0.33 (m/adyr) _ (lbladyr) Post-BMP TN Post-BMP TP 0.61 0.11 Load (lb/yr) = Load (Ib/yr) = Post -BAIT TN 1.84 Post-BMP TP 0.33 Export (Ib/adyr) Export (Ib/adyr) = Catchment 3: Total acreage of catchment 3 = First BMP's TN removal rate =Mac % First BMP's TP removal rate = % Second BMP's TN removal rate =% Second BMP's TP removal rate = % Third BMP's TN removal rate =% Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 0 % TOTAL TP REMOVAL RATE = 0 % (1) (2) (3) (4) ( (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC Column Average EMC Column Acrea a 0.46 + 8.3 of TN m /L 2 3 4 of TP m /L 2 3 Transportation impervious 2.60 0.19 Roof impervious 1.95 0.11 Managed pervious 1.42 0.28 Wooded pervious 0.94 0.14 Area taken up by BI%IP 1.95 0.11 Fraction Impervious (1) = Pre-BMP TN Pre-BMP TP Load (lb/yr) = Load (lb/yr) _ Total Area of Development = Pre-BMP TN Export Pre-BMP TP Export (Ib/adyr) _ (lb/adyr) Post-BMP TN Post-BMP TP Load (lb/yr) = Load (lb/yr) _ Post-BMP TN Post-BMP TP Export (@/ac/yr) = Export (@/adyr) _ Tar -Pamlico Storm water Rule 15A NCAC 28 .0258 Last Modified 5/23/03 Weighted Average of Nutrient Loadings from the Catchments: Catchment Post-BMP Post-BMP Acreage TN Loading TP Loading (lb/ac/yr) (lb/ac/yr) Catchment 1 1.74 9.09 0.80 Catchment 2 0.33 1.84 0.33 Catchment 3 0.00 0.00 0.00 TOTAL FOR DEVELOPMENT 2.07 7.93 0.73 Note: The nutrient loading goals are 4.0 lb/ac/yr for TN and 0.4 lb/ac/yr for TP. If the post -development nutrient loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMPs and/or modifications in development plans are required. Nitrogen Compute Estimated Offset Pay Total Nitrogen Analysis Area = 2.07 acres Max. TN -Export w/o Offset Payment = 4.00 Ibs/ac/yr Computed TN -Export After Treatment = 7.93 Ibs/ac/yr Total TN -Export Requiring Offset Payment = 3.93 Ibs/ac/yr # of Years requiring offset = 30 yrs Total TN -Export Requiring Offset Payment = 243.9 Ibs ute EsAfted Offset Total Phosphorous Analysis Area = 2.07 acres Max. TP-Export w/o Offset Payment = 0.80 Ibs/ac/yr Computed TP-Export After Treatment = 0.73 Ibs/ac/yr Total TP-Export Requiring Offset Payment = -0.07 Ibs/ac/yr # of Years requiring offset = 30 yrs Total TP-Export Requiring Offset Payment= -4.5 Ibs