Loading...
HomeMy WebLinkAboutSW5220101_Supplement-EZ Form_20220623SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Hardee's - Main Street 2 Project Area ac 2.07 3 Coastal Wetland Area ac 4 Surface Water Area ac 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 1 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 1 Dry Pond 23 StormFilter Silva Cell Bayfilter Filterra 24 25 26 FORMS LOADED DESIGNER CERTIFICATION 27 IName and Title: 29 IStreet address: 30 ICitv, State, Zip: Davidl- Smith. PE 2905 Meridian Parkwa Durham, NC, 27713 1 32 JEmail: I dsmith@mcadamsco.com I Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 06/21 /22 Signature of Designer Date