HomeMy WebLinkAbout20041238 Ver 6_CAMA Application_20220622 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME:NC State Ports Authority C/O Todd Walton 2. LOCATION OF PROJECT SITE: Located along the NC Ports Authority barge berths 4 and 5 to the east(southern berth face)and within Bogue Sound. State Plane Coordinates—Longitude: 76°41'53 Latitude: 34°42'56 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— Google Aerial Photography and past site visits. Was Applicant Present—No 5. PROCESSING PROCEDURE: Application Received—5/19/2022 Application Complete- 5/19/2022 Office—Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan—Morehead City dated 2007 Land Classification from LUP—Port Mixed Use/Conservation (B) AEC(s)Involved: EW, PTA (C) Water Dependent: yes (D) Intended Use: commercial (E) Wastewater Treatment: Existing—Municipal sewer Planned -None (F) Type of Structures: Existing Buildings on high ground, road, storage tanks, piers, bulkhead, day marker, mooring buoys, pilings, barge berth areas,crane and rail areas Planned—Berth 4 and 5 improvements (bulkhead replacement,replacing and extending existing crane and train rails, potable water and stormwater drainage systems modification, south facing wall removal on transit shed 1 and construction of new wall on transit shed 1. (G) Estimated Annual Rate of Erosion: N/A Source—N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Shoreline (bulkhead) N/A N/A 4,579ft2 Inc. with fill 1,272' along shoreline (B) High Ground N/A 65,340sf N/A (D)Total Area Disturbed: 69,919ft2 (E) Primary Nursery Area: No (F)Water Classification: SC Open: No Field Investigation Report: NC State Ports Authority Page 02 8. PROJECT SUMMARY: The applicant is proposing improvements to barge berth areas 4 and 5 which would include bulkhead replacement, possible replacement and extension of crane and train rails, potable water and stormwater drainage system modifications,transit shed 1 wall removal and new wall construction. 9.Narrative Description The NC State Ports Authority is proposing improvements to barge berth areas 4 and 5 and possible high ground improvements if funding is available.This area is along the south side of the main port property located at 107/113 Arendell Street in Morehead City. The Morehead City Land Use Plan classifies this property as Port Mixed Use,with all AEC's classified Conservation. This section of the Morehead City Channel/Bogue Sound is not designated as Primary Nursery Area and is closed to the taking of shellfish. Bogue Sound within this area carries a water classification of SC. Substrate in the Morehead City Channel/Bogue Sound area is mostly sand and silt. No SAV's or shellfish beds were observed within the proposal project area. 10. Project Description: The existing major permit # 51-87 was issued a major modification on 11/14/2020 and is set to expire on 12/31/2025. The applicants are asking for a major modification to permit#51-87 for the barge berths(4 and 5) and possible high ground improvements. Per the applicant it has been recently determined that the steel sheet pile bulkhead within this area has accelerated deterioration by steel thickness loss which may cause structural stability issues in the future. The applicant also states the existing facility was constructed in the 1950's and is now close to its design life and needs to be upgraded. They are also asking to replace and extend the existing crane and rail tracks,potable water and stormwater drainage system modifications, removal of transit shed 1's south-facing wall and construction of a new replacement wall if funding is available. The bulkhead would be replaced by installing a new 1,272' long sheet pile bulkhead that would extend approximately 1.2' to 3.6' waterward of the existing bulkhead and would be constructed with a cast in place reinforced concrete pile cap. Per the applicant any existing armoring rocks at the east end of berth 4 would be moved within an existing scour hole repair location and then would be put back in place once the new sheet piles are installed. There would be a total of 2,912 sf of fill impacts that would occur within this area of Bogue Sound. The applicant also states the sheet pile was designed so it could accommodate potential future average mudline (toe)elevation of-45.15' using mean low water elevation as a reference at 00.00. The current average channel depth is approximately-39'. Due the new bulkhead location, the applicant is also proposing modifications to the cap. They would also install new soil anchors that would fix to the modified cap as well as install new bollards and fenders along the water side of the replaced bulkhead section. • If funding is available,the applicant is also proposing additional improvements (replacement and extension of crane and train rails, potable water and stormwater drainage system modifications, transit shed 1 wall removal and new wall construction)which consist of extending the crane and train rails from the east end of berth 6 onto berths 4 and 5, installing a new 8-inch ductile iron pipe water line and hose connections in vaults to replace the existing waterline and hose connections. Field Investigation Report: NC State Ports Authority Page 03 The proposed 8-inch water line would run from the west end of berth 5 to the east end of berth 4 where it would reconnect to the existing water line.They are also proposing to replace an existing storm drain as well as remove the south wall of transit shed I in order to make room for the rail extension. A new wall would be constructed farther back from the face of berth 4. The south wall of the shed,the southern portion of the roof and sidewalks,along with structural framing within the limit would be cut back from the face of berth 4 about 16'. The floor slab and concrete curbs within this area would be removed. Nonstructural brick walls would also be demolished as well as all roofing and trim and any utility lines within this area would be disconnected and removed. The new south wall would be constructed on new foundations and integrated with the remaining building structure. In order to comply with current building code some of the remaining steel framing may be strengthened as well. 11. Anticipated Impacts: The bulkhead replacement within MHC Channel/Bogue Sound would fill a total of 4,579ft2 ft2 of sand and silt bottom habitat. The high ground improvements would disturb approximately 1.5 acres but would remain within and over existing impervious surfaces. Name: Heather Styron Date: 6/17/22 Morehead City 11100 MAJOR PERMIT FEE MATRIX /,64,0, licant: NG Pa - �w r`- . Selection Development Type DCM % DWQ% (14300 1601 4351000931625 6253) (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100%($250) 0% ($0) involve the filling or excavation of any wetlands or o•en water areas: II. Public or commercial ❑ development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o•en water areas: Major Modification to a $250 ; 100% ($250) 0% ($0) CAMA Major sermit III. For development that involves the filling and/or 1111111 excavation of up to 1 acre - of wetlands and/or open water areas, determine if A, B, C, or D below a•dies: III(A). Private, non- ❑ . commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached can be a•died: I11(13) Public or commercial El development, if General $400 100% ($400) 0%($0) Water Quality Certification No. 4097 (See attached) can be a•'lied: • II1(C): If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached)could - be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or a•uatic life: 111(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be a••lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o•en water areas: _=FTNc STATEF 1,o MpY o 17, 0 V.1 ROY COOPER - `-A Governor ELIZABETH S.BISER ` n Iz„� Secretary ' *fn`Q +,,`°Ea*=" BRAXTON DAVIS NORTH CAROLINA Director Environmental Quality June 22, 2022 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Office: 252-515-5416 (Courier 11-12-09) gregq.bodnar©NCDENR.gov SUBJECT: CAMA Major Permit Application Review Applicant: NC State Ports Authority Project Location: Bogue Sound Proposed Project: Improvements to barge berth areas 4 & 5 Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by July 20, 2022. If you have any questions regarding the proposed project, contact Heather Styron 252-515-5417. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE _ DATE D E Q NorthMorehead CarolinCity Officea Department1400 of Commerce EnvironmentalAvenue Quality Moorehead I Division Ci otyf CoastalNorthCaro Managementli, na 28557 NORTH CAROLINA OepartmeM of Environmental 011ailty 252.808.2808 • NORTH CAROLINA PORTSf� May 9, 2022 Heather Styron N.C. Division of Coastal Management Morehead City Regional Office 400 Commerce Avenue Morehead City, NC 28557 Subject: Modification to the Coastal Area Management Act Major Permit 51-87 for the Proposed Port of Morehead City Berths 4 and 5 Improvements,Carteret County, NC Dear Ms.Styron: The North Carolina State Ports Authority(NCSPA) is requesting a Coastal Area Management Act (CAMA) major permit modification to modify the existing CAMA major permit 51-87 issued on 11/14/2020 and expiring on 12/31/2025 for the proposed Port of Morehead City Berths 4 and 5 Improvements project. The Berth 4 and 5 improvements project includes the replacement of an existing bulkhead at Berths 4 and 5 along the south side of the Port in Carteret County, North Carolina. Depending on available funding, improvements at Berths 4 and 5 may also include replacing and extending existing crane and train rails, potable water and stormwater drainage system modifications, removing the south-facing wall of the existing Transit Shed 1 to accommodate the new rail locations, and the construction of a new wall for the existing Transit Shed 1.This permit modification has been prepared to assume all of these improvements and related construction activities will occur. No other modifications to the CAMA major permit 51-87 are requested at this time. Please see the enclosed documents submitted as part of the CAMA major permit modification: • ppendix A: Major Development Permit Forms 1. DCM MP-1 2. DCM MP-2—Excavation and Fill 3. DCM-MP-3—Upland Development • Appendix B: Figure and Plan Sheets 1. Figure 1,Site Location Map 2. Permit Drawings—Existing and Proposed Features (General Site Plan;Sheet 1) 3. Permit Drawings---Existing and Proposed Features(Plan View; Sheets 2-6) 4. Permit Drawings—Existing and Proposed Features (Cross-Sectional View;Sheets 7-10) • Appendix C:Supplementary Information 1. Project Narrative 2.401 Certification Pre-Filing Request Email 3. Deed Information • Appendix D:Adjacent Property Owner Notification 1.Adjacent Property Owner Notification Cover Letters 2. Certified Mail—Return Receipts Requested 2202 Burnett Blvd,Wilmington, NC 28401 I 800-334-0682 I ncports.com NORTH CAROLINA PORT Sf--- • A check for$400.00 If you have any questions or need additional information,please contact me at todd.walton@ncports.com or(910)746-6460.Thank you for your assistance with this project. Kind regards, North Carolina State Ports Authority Todd C.Walton Senior Environmental Analyst 2202 Burnett 81vd,Wilmington, NC 28401 I 800-334-0682 I ncports.com N 0 RI H NC Ports Authority Phone: (910) 343-6211 Check: 196912 CAROLINA PO Box 9002 Fax: (9101 343-6272 P 0 RT�� Wilmington, NC 28402-9002 ��j Payment No.: 2003911915 NC DEPT OF ENVIRONMENTAL QUALITY Check Date: 05/10/2022 DIVISION OF COASTAL MANAGEMENT Vendor No.: 81802 400 COMMERCE AVE MOREHEAD CITY NC 28557 Page: 1 of 1 Invoice Our Tracking # PO/Contract # Gross Invoice Invoice Number Date Remarks Amount* Discount Net Amount* CAMAPERMIT2022 04/18/2022 1907297749 400.00 0.00 400.00 Check Total S400.00 DETACH FROM CHECK AND KEEP FOR YOUR RECORDS *Includes unplanned freight, if applicable T"E?f;'C CF THIS DOCUMENT HAS A COLORED BACKGROUND ON WHITE PAPER.THIS DOCUMENT CONTAINS A GENUINE WATERMARK.THIS DOCUMENT HAS A VISIBLE AND INVISIBLE FLUORESCE'!T FIBERS. NC Ports Authority531 I CAROLINA Iva „�'4 ',r1 i t f°t 1 PO Box 9002 rr < A 'i'y' �* w`,°(sbn tr . � �rck:.. 169 2 PORTS ,�-. 1 '. 1,;�.f -'91t 1K'4z,-iy , 9<� -, • ... h'F c• g -- Wllrrnrigton NC 2$402 9002 , ' �` ;�, r r ry �� ate 051101Q22 i —.f- r el "5 '"j n`aF� 'k i L{ 3T +*° ' 3� t. t 1 ! 4 r 4t '� E ��� ,°� �� �T�� ���, r � ��. ti: �- , old a�i�r O�a� Year '*+�' � �. ��, -'r+`r',3, ` ;>kx r1, ;`tx •,s &' , ,?+S )s +F I ORDER OF $ QQ 00' I B NC DEPT OF ENVIRONMENTAL QUALITY Uglim4444,+4 44,4-f4;4i4444-)4 41 FOUR Rua ir►n PERIOD env ZERO DIVISION OF COASTAL MANAGEMENT 400 COMMERCE AVE 'i ti t� t`I°»1N-,`�`' MOREHEAD CITY NC 28557 � : n''„ t ,,,I*'{ frel././rje________ t't First Citizens sank and Trust Company 4 p Y Chairman of tht�,Board ., �,�i Wilmington, NC 28401-7515 Executive Director ,' :, ; Fi. M CONT N I R TING - - 11 L9.6.9L211 1:053-10031515 0tr 1205513 Lti -- Appendix A: Major Development Permit Forms 1. DCM MP-1 2. DCM MP-2 — Excavation and Fill 3. DCM-MP-3 — Upland ❑evelopment CCM HP-1 APPLICATION for Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/Landowner Information Business Name Project Name(if applicable) North Carolina State Ports Authority. Port of Morehead City Berths 4 and 5 Improvements Applicant 1: First Name MI Last Name Brian E Clark Applicant 2: First Name MI Last Name N/A N/A N/A If additional applicants,please attach an additional page(s)with names listed. Mailing Address PO Box City State N/A 9002 Wilmington NC ZIP Country Phone No. FAX No. 28402 USA 910-746-6460 ext.N/A N/A- - Street Address(if different from above) City State ZIP 113 Arendell Street Morehead City NC 28557- Email todd.walton@ncports.com(Todd Walton is the point of contact for the Port) 2. Agent/Contractor Information Business Name N/A Agent/Contractor 1: First Name MI Last Name N/A N/A N/A Agent/Contractor 2: First Name MI Last Name N/A N/A N/A Mailing Address PO Box City State N/A N/A N/A N/A ZIP Phone No. 1 Phone No. 2 N/A N/A- - ext. N/A- - ext. FAX No. Contractor# N/A N/A Street Address(if different from above) City State ZIP N/A N/A N/A N/A- Email N/A <Form continues on back> 2 a2-8t38-2808 1-838-4taCC.AST .. www.nccoa5'talrilanageme53t.r+e: Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County(can be multiple) Street Address State Rd.# Carteret 113 Arendell Street US-70 Subdivision Name City State Zip N/A Morehead City NC 28557- Phone No. Lot No.(s) (if many,attach additional page with list) 910-746-6460 ext.N/A 639617105464000, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound and Newport River c. Is the water body identified in(b)above,natural or manmade? d. Name the closest major water body to the proposed project site. Natural ❑Manmade ❑Unknown Bogue Sound and Newport River e. Is proposed work within city limits or planning jurisdiction? . f. If applicable,list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Corporate limits of the Town of Morehead City 4. Site Description a. Total length of shoreline on the tract(ft.) b. Size of entire tract(sq.ft.) 7,954 4,604,578 c. Size of individual lot(s) d. Approximate elevation of tract above NHW(normal high water)or N/A, NWL(normal water level) (If many lot sizes,please attach additional page with a list) —5.88 ft ❑NHW or®NWL e. Vegetation on tract Terrestrial vegetation was extremely sparse and only growing opportunistically on previously disturbed;developed areas. Weeds such as Chenopodium album(white goosefoot)were growing on paved areas where enough sand has accumulated for hardy plants to root. Seaweed was growing on the existing bulkhead just below the water. f. Man-made features and uses now on tract The entire tract of the Port of Morehead City(Port) is developed and includes buildings, crane and train rail lines, asphalt and concrete areas, and bulkheads along the waterward edge of the Port. g. Identify and describe the existing land uses adjacent to the proposed project site. West of the Port there is a Shell gas station and boat storage area. North,east, and south side of the Port is the Bogue Sound/Newport River, h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Port-Maritime (PM) (Attach zoning compliance certificate,if applicable) ®Yes ❑No EINA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes No k. Has a professional archaeological assessment been done for the tract? If yes,attach a copy. ❑Yes ®No DNA If yes,by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ['Yes ®No ❑NA National Register listed or eligible property? Form continues on next page> R552-808-2808 'i-888-4t4CcAS7 wwvv.soccoastairsaanneeraeat.rtea Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (II)Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either(i)or(ii)above,has a delineation been conducted? EYes ®No (Attach documentation,if available) n. Describe existing wastewater treatment facilities. The Port has an on-site wastewater collection system that they own.This system is connected to Morehead City's municipal wastewater system and the City provides treatment. In the project area, stormwater disposal occurs through inlets with individual pipes that drain directly to the Bogue Sound/Newport River. (see 4p) o. Describe existing drinking water supply source. The Port owns all water lines on their property.Water is provided by Morehead City.The existing potable water system for Berths 4 and 5 was installed approximately 5 feet from the face of the bulkhead.Water flows through a 4-inch pipe, and there are five water vaults containing valves and hose connections serving the platform. p, Describe existing storm water management or treatment systems. The existing drainage system consists of 12-by 18-inch catch basins spaced at approximately 20 feet on center longitudinally and centered between the two existing train rails. Each catch basin is piped individually into a 4-inch pipe that extends through the existing bulkhead. Downspouts for the Transit Sheds 1 and 2 are connected to the drainage system.Where this occurs,the pipe size is increased from 4 to 6 inches. 5. Activities and Impacts a. Will the project be for commercial,public,or private use? ❑Commercial ®Public/Government ❑Private/Comm unity b. Give a brief description of purpose,use,and daily operations of the project when complete. The bulkhead at the Port Berths 4 and 5 was constructed in the 1950s and is now experiencing accelerating corrosion of the steel sheet pile. If no improvements are made to the existing bulkhead,the foundation and structural integrity of the relieving platform may become compromised;therefore, the Port is proposing to replace the existing bulkhead.The North Carolina State Ports Authority(NCSPA) is proposing to replace 1,272 feet of the existing bulkhead by installing new steel sheet piles 1.2 to 3.6 feet waterward from the existing bulkhead, placing fill between the existing and new sheet piles,and extending the concrete apron to cover the new bulkhead area. Fenders and bollards will be installed for the new bulkhead. Additionally,a temporary stand-off structure,either a steel frame with foam fenders or floating fenders, is being proposed between Berth 5 and Berths 6 and 7. Additional improvement options not directly associated with the bulkhead(Additive 1) include the extension of the crane rail and train rail from Berth 6 onto Berths 4 and 5, replacement of potable water and storm drainage infrastructure,and reconfiguration of Transit Shed 1 to remove the south face of the building and reconstruct it northward farther from the edge of the berth so that the crane can travel along Berth 5. The Port is a breakbulk and bulk facility with train service provided by Norfolk Southern,operating crane equipment,and storage facilities. The proposed improvements would allow the Port to continue to perform daily activities such as importing, exporting, storing,transporting,and shipping commodities around and out of the Port. c. Describe the proposed construction methodology,types of construction equipment to be used during construction,the number of each type of equipment and where it is to be stored. The NCSPA is proposing to replace the existing bulkheads at Berths 4 and 5 by driving new AZ26-700 steel sheet pile or approved equivalents approximately 1.2 to 3.6 feet waterward from the existing sheet pile bulkhead for a length of 1,272 feet beneath the mean low water line and existing mudline, adding fill between the existing and proposed sheet piles,expanding the Port apron by paving to the edge of the proposed bulkhead replacement and adding a new concrete pile cap, and adding structures such as fenders, bollards, and a temporary stand-off structure that are necessary for docking incoming ships(see Project Work Plan Permit Drawings Sheets 1 through 10).The construction of the proposed bulkhead replacement will require some water-based construction equipment and techniques. Barge(s)would be used in the water to operate and store equipment and materials. From the water, new soil anchors would be installed into the existing pile cap. A crane with a rock bucket or similar type of bucket would be used to temporarily move the rocks(large cobble, small boulders, and/or NC Class 2 riprap) in the armor layer within the existing scour hole repair location at the east end of Berth 4 to allow for the installation of new steel sheet piles for the proposed bulkhead replacement(see Project Work Plan Permit Drawing Sheets 1 and 6).The moved rocks would be shifted onto the existing armor layer during construction and moved back to the area in front of the bulkhead after the new sheet piles are installed. No dredging will occur during the movement of the existing rocks.The new steel sheet piles would be installed along the existing bulkhead using diesel and/or vibrating hammers.Temporary templates may be used during construction in the same footprint of the proposed sheet piles. Once the new sheet piles are installed,the fill will be placed in between the existing and new sheet piles.The fill may be added using a shoot. Temporary tie backs may be used 252-808-28O8 .. 1-888-4RCOAS-4" ., trwwwsaccoastalmanagernont.nel Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit to stabilize the newly installed sheets piles during the fill installation.The new concrete cap on the Port apron that will extend to the edge of the bulkhead replacement will be installed from a barge and/or the existing Port apron. Fenders and bollards will be installed/fastened mechanically into the new pile cap. Cathodic protection anodes will be installed by divers with torches in the water.A turbidity curtain would be used in the water to control sediment or runoff that may enter the water • column during construction. Upland development construction activities such as the extension of the crane rail and train rail from Berth 6 onto Berths 4 and 5, replacement of potable water and storm drainage infrastructure, removal of the south-facing wall of Transit Shed 1,and construction a new wall for Transit Shed 1 would take place from the Port apron. Cranes, excavators,jackhammers, bulldozers, backhoes,loaders, pavers, dump trucks,and hauling trucks may be used during the upland development construction activities. Silt fences and/or wattles will be used as perimeter controls for runoff. d. List all development activities you propose. Replacement of the existing bulkhead,which includes installing new sheet piles waterward, adding fill between the new and existing sheet piles,and adding a new concrete pile cap.Other development activities may include the extension of the crane rail and train rail from Berth 6 onto Berths 4 and 5, replacement of potable water and storm drainage infrastructure, and reconfiguration of Transit Shed 1 to remove the south face of the building and reconstruct the wall•farther from the edge of the berth so that the crane can travel along Berth 5. (see Project Narrative for more details) e. Are the proposed activities maintenance of an existing project,new work,or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? 1.5 ❑Sq.Ft or IFAcres g. Will the proposed project encroach on any public easement,public accessway or other area ❑Yes ®No DNA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Currently,stormwater from the Port drains to catch basins and then discharges to the water(Bogue Sound/Newport River) through 4-inch pipes installed in the existing bulkhead. Existing drainage pipes are proposed to be extended through the new bulkhead. in the event that Additive 1 is constructed, a new stormwater drainage system would be installed where stormwater will similarly drain to catch basins then out through the new bulkhead at Berth 4 and Berth 5.These stormwater drainage improvements resulting from Additive 1 would extend eastward to the east end of Transit Shed 1. (see Project Narrative for more details regarding Additive 1) The bulkhead replacement will occur 1.2 to 3.6 feet waterward from the existing bulkhead along Berths 4 and 5 for a distance of 1,272 feet. The installation of new sheet piles into the channel bottom and fill placed between the existing and new bulkhead will result in 2,912 square feet(0.07 acre)of permanent fill impacts. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes No DNA If yes,will this discharged water be of the same salinity as the receiving water? Dyes 0 No ®NA j. Is there any mitigation proposed? ❑Yes No DNA If yes,attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1)the following items below,if applicable,must be submitted in order for the application package to be complete. Items(a)—(t)are always applicable to any major development application, Please consult the application instruction booklet on how to properly prepare the required Items below. a. A project narrative. b. An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work,clearly indicate on maps,plats,drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. • d. A copy of the deed(with state application only)or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. 252-506-280t3 .. 1-888-41RCOAST www,nccoarstnirrliaigement.net Form DCM MP-1 (Page 5 of 5) Ma f. A list of the names and complete addresses of the adjacent waterfront(riparian)landowners and signed return rec owners have received a copy of the application and plats by certified mail. Such landowners must be advised the which to submit comments on the proposed project to the Division of Coastal Management. Name Neel Sykes,BOGUE HOLDINGS, LLC Phone No.N/A Address 1600 Razorbill Court,Morehead City,NC,28557 Name Thomas E. Matthews,Jr.,Morehead City Yacht Basin,LLC Phone No.N/A Address 208 Arendell Street,Morehead City,NC,28577 Name N/A Phone No.N/A Address N/A g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, NC State Ports Authority CAMA 51-87 11/4/2020 NC State Ports Authority NPDES NCS0001 request 6/18/21 N/A N/A h. Signed consultant or agent authorization form,if applicable. i. Wetland delineation,if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C.Environmental Policy Act(N.C.G.S. 113A 1-10),if necessary. If the proj of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Enviro 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development des( The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and fe( enter on the aforementioned lands in connection with evaluating information related to this permit a monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 141 27'PO-- Print Name gg4 £ ' G • Signature • Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts DCM MP-3 Upland Development ❑DCM MP-4'Structures Information 252-808-2808 •t-888-4t3Cc(AST .. www.Tr,ccoissa)i-aczinnvec,n Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization) Length N/A N/A N/A N/A N/A N/A N/A Width N/A N/A N/A N/A N/A N/A N/A Avg. Existing N/A N/A N/A N/A NA NA N/A Depth Final Project N/A N/A N/A N/A NA NA N/A Depth 9. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NNW or NWL in b. Type of material to be excavated. cubic yards. c. (i)Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards. (CW),submerged aquatic vegetation(SAV),shell bottom(SB), or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii)Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i)Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No DNA ❑Yes ❑No DNA (ii)If no,attach a letter granting permission from the owner. (ii)If yes,where? e. (i)Does the disposal area include any coastal wetlands/marsh f. (i)Does the disposal include any area in the water? (CW) submerged aquatic vegetation(SAV),shell bottom(SB), ❑Yes ❑No DNA or other wetlands(WL)? If any boxes are checked, provide the number of square feet affected. (ii)If yes, how much water area is affected? ❑CW ❑SAV ❑SS OWL El None (ii)Describe the purpose of disposal in these areas:1I 262-30B-2808 :: 'i-t38s -4 cOA : :: wvvvv.occoasfialmaraafemerrt.riet vevisetl: 12/26/06 G'otr;ra t3 {C'aIM (Letcnva•Non mad Fill, l axg.E9 2 3) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4—Structures) a. Type of shoreline stabilization: b. Length: 1,272 feet ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: 1.2-3.6 feet(varies depending on shape and location of existing and proposed sheet piles) c. Average distance waterward of NHW or NWL: 2.6 ft d. Maximum distance waterward of NHW or NWL: 3.6 ft e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 AZ26-700 steel sheet pile or approved equivalent,with cast-in- months? place reinforced concrete pile cap,soil anchors,and densified sand DYes DNo ®NA fill between the new and the old sheet piles. (ii)If yes,state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. • Bulkhead backfill2,912 square feet Riprap N/A Steel sheet piles and densified sand between existing and Breakwater/Sill N/A Other N/A proposed sheet piles. i. Source of fill material. Fill be will purchased from a company with a nearby facility. • 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? DYes DNo DNA b. (i)Will fill material be placed in coastal wetlands/marsh(CW), If yes, submerged aquatic vegetation(SAV),shell bottom(SB),or other wetlands(WL)? If any boxes are checked,provide the (ii)Amount of material to be placed in the water number of square feet affected. (iii)Dimensions of fill area ❑cW ❑SAV ❑SB (iv)Purpose of fill ❑WL ❑None (ii)Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used(e.g.,dragline, controlled? backhoe,or hydraulic dredge)? A crane with a rock bucket or similar type of bucket would be used . From a barge,a crane with a rock bucket or similar type bucket to temporarily move the rocks(large cobble,small boulders, would be used to move rocks around within the existing scour and/or NC Class 2 riprap)in the armor layer within the existing hole repair location at the east end of Berth 4 where new steel scour hole repair location at the east end of Berth 4 to allow for sheet piles would need to be installed.Vibrating and/or diesel the installation of new steel sheet piles for the proposed hammers would be used to drive piles,the fill between the bulkhead replacement(see Project Work Plan Permit Drawing existing and proposed sheet piles would be installed using a Sheets 1 and 6).The moved rocks would be shifted onto the shoot,temporary templates and/or tie backs may be installed existing armor layer during construction and moved back to the to straighten and stabilize the proposed sheet piles during fill area in front of the bulkhead after the new sheet piles are installation using the same equipment during the sheet pile installed.No dredging will occur during the movement of the installation.Concrete pile caps will be constructed using a existing rocks, crane from a barge or potentially in conjunction with typical A turbidity curtain would be used in the water to control sediment or land construction equipment on the existing Port apron. runoff that may enter the water column during construction. Other materials used to install the proposed bulkhead replacement • will be stored in developed upland areas and on barges during construction.Silt fences and/or wattles will be used as perimeter controls for runoff. • 252-808-2808 :: 1-B88-4RCOA8T::www,riccoastalrkaareager53ent.net evlsed: .l2l2°6/06 Foir DUI] dP-2 (f xcavaf on -andf i-ailll, gaga 3 ass 3) c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project DYes ❑No ®NA site? ❑Yes ®No DNA (ii) If yes,explain what type and how they will be implemented. (ii)If yes,explain steps that will be taken to avoid or minimize environmental impacts. f z ;u,r 20 z- Date Port of Morehead City Berths 4 and 5 Improvements Project Name Applic a pplicant Signature • • 2524l[lS-2SO8 :: 'J-8 8-stRCOAS :: vvvv iv.neconstalrsrtanacteriaeriLrie revised: l2/20106 Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings,facilities,units or structures b. Number of lots or parcels. proposed. 1 1 building modification, stormwater and potable water - systems, and train and crane rails c. Density(give the number of residential units and the units per d. Size of area to be graded,filled,or disturbed including roads, acre). ditches,etc. N/A approximately 1.5 acres • e. If the proposed project will disturb more than one acre of land,the f. List the materials(such as marl, paver stone, asphalt,or concrete) Division of Land Resources must receive an erosion and to be used for impervious surfaces. sedimentation control plan at least 30 days before land-disturbing concrete, metal rails, concrete plank roof activity begins. (I) If applicable,has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ElYes ❑No DNA (ii)If yes,list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also be covered.by impervious and/or built-upon surfaces,such as require a Stormwater Certification. pavement,building,rooftops,or to be used for vehicular driveways (I) Has a site development plan been submitted to the Division of or parking. Water Quality for review? Tract in coastal shoreline AEC is currently 100% ❑Yes ®No DNA impervious surface; all proposed improvements are to manmade structures located in upland; approximately 2,548 square feet of impervious surface would be added (ii) If yes, list the date submitted: to the tract with the additional concrete covering the bulkhead replacement. i. Give the percentage of the entire tract to be covered by impervious and/or built-upon surfaces,such as pavement,building,rooftops, or to be used for vehicular driveways or parking. The entire tract is currently 100% impervious surface; all proposed improvements are to manmade structures • located in upland;approximately 2,548 square feet of impervious surface would be added to the tract with the additional concrete covering the bulkhead replacement. j. Describe proposed method of sewage disposal. k. Have the facilities described in Item(i)received state or local N/A approval? ❑Yes No DNA If yes,attach appropriate documentation. 252-€00-28+1)tf2 :: 1-888-4LL COrAS ':: ui ww.aic.coals`alrriaiia gernerr°a.riet re•viseri: I2/26/06 Form « 7 J L!T' Gib cl (lUpOsind nevsi"'V ID,r 69'll stity Pswje 2 oil 2) I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater state(e.g., surface runoff,sanitary wastewater,industrial/ design? commercial effluent,"wash down"and residential discharges). Eyes No DNA Post-construction;surface runoff will be collected in the If yes, attach appropriate documentation. existing or new stormwater drainage system and discharged into the Bogue Sound/Newport River through the proposed bulkhead replacement. m. Describe proposed drinking water supply source(e.g.,well, n. (i) Will water be impounded? Eyes ®No DNA community,public system,etc.) (ii)If yes, how many acres? Drinking water is provided by Morehead City.The potable water system at Berths 4 and 5 will be connected to drinking water services. o. When was the lot(s)platted and recorded? p. If proposed development is a subdivision,will additional utilities be 5/5/1951 installed for this upland development? Dyes DNo ®NA Date Port of Morehead City Berths 4 and 5 Improvements Project Name Va-kir E.J Applic r1Fme pplicant Signature 2a2-808-2808 :: 7-803-4RiCOAS :: vvvnrvv.Yaccoashatr,1anaevGiraeret,reet revises]: 12/2610S Appendix B: Figure and Plan Sheets 1. Figure 1. Site Location Map 2. Permit Drawings — Existing and Proposed Features (General Site Plan; Sheet 1) 3. Permit Drawings -- Existing and Proposed Features (Plan View; Sheets 2-6) 4. Permit Drawings — Existing and Proposed Features (Cross-Sectional View; Sheets 7-10) Appendix C: Supplementary Information 1. Project Narrative 2. 401 Certification Pre-Filing Request Email 3. Deed Information Port of Morehead Berths 4 and 5 Improvements—CAMA Major Permit Modification for Permit 51-87 PROJECT NARRATIVE Existing Conditions The Port of Morehead City(Port) is a North Carolina State Ports Authority(NCSPA)facility located in Carteret County that primarily handles bulk and breakbulk cargo. Along the southern berth face are Berths 6 and 7 to the west and Berths 4 and 5 to the east. Berths 4 and 5 are currently served by a concrete apron.The concrete apron is approximately 32 feet wide at Berth 4 and approximately 40 feet wide at Berth 5 with crane and train rails, potable water and drainage systems, and a sheet pile and concrete bulkhead along the Bogue Sound/Newport River. The existing potable water system for Berths 4 and 5 is located approximately 5 feet from the face of the bulkhead. Water flows through a 4-inch pipe,and there are five water vaults containing valves and hose connections serving the platform. The existing drainage system consists of 12-by 18-inch catch basins spaced at approximately 20 feet on center longitudinally and centered between the two existing train rails. Each catch basin is piped individually into a 4-inch pipe that extends through the existing bulkhead. Downspouts for the existing sheds are connected to the drainage system.Where this occurs,the pipe size is increased from 4 to 6 inches. It has recently been determined that the deterioration of the steel sheet pile bulkhead is accelerating, as evidenced by steel thickness loss,which will lead to structural stability issues in the future if no action is taken. It appears that the existing tie-back system and timber relieving platform are still functioning as originally designed. In addition,the mudline at the face of the berth is now deeper than originally designed in the 1950s due to scouring action. The existing facility was constructed in the 1950s and is now close to its design life and needs to be upgraded to prolong its functional life into the future. Proposed Project The NCSPA proposes to modify the existing CAMA permit 51-87 to include the replacement of the steel bulkhead at Berths 4 and 5 at the Port in Carteret County, North Carolina.The bulkhead will be replaced by installing a new bulkhead consisting of sheet pile that will extend approximately 1.2 to 3.6 feet waterward from the existing sheet pile bulkhead and an integral cast-in-place reinforced concrete pile cap.The new bulkhead will replace the existing bulkhead at Berths 4 and 5 for an approximate length of 1,272 feet. Fill will be placed between the existing and proposed steel sheet piles, and the concrete apron will be extended to accommodate the new bulkhead.The proposed bulkhead replacement would result in approximately 2,912 square feet(0.07 acre) of permanent fill impacts to the Bogue Sound/Newport River. The rocks within the armor layer(large cobble, small boulders, and/or NC Class 2 riprap) at the east end of Berth 4 will be moved within the existing scour hole repair location during the installation of the new sheet piles and put back into place after the new sheet piles are installed (see MP-1 and MP-2 forms).The location of the new bulkhead has been designed so it can accommodate a Wage sheet pile size that is appropriate for a potential future average mudline (toe)elevation of-45.15 feet, using the mean low water(MLW)elevation as the reference elevation at 0.00.The current average channel depth is approximately-39 feet.The NCSPA has no current plans or funding for future dredging along the bulkhead.Any future dredging would be permitted separately. The location of the new bulkhead will require modifications of the existing pile cap. Due to the confines of the existing landside structures, new soil anchors would be installed to replace the existing tie rods to support the new bulkhead.The new soil anchors will be fixed to the existing pile cap via perforations and pipe sleeves and the resulting system be made integral with the new pile cap via epoxy resin dowels. Bollards and fenders would also be installed along the proposed bulkhead replacement but would not result in permanent fill impacts. To prevent damages to ships at the corner of Berth 5 where the proposed bulkhead replacement will extend farther waterward than Berth 6, a temporary stand-off structure, which may be in the form of a steel frame with fenders or floating fenders, would be installed at the western edge of the new bulkhead and connect to Berths 6 and 7.The addition of the temporary stand-off structure will not result in any fill impacts or additional impervious surface. Some work for the bulkhead replacement would be constructed from barge(s) (see construction methodology in the MP-1 form). Additional improvements to Berths 4 and 5 not directly associated with the bulkhead replacement(Bid Additive 1)are being proposed; however,these upland development activities would be constructed as funding is available.These include the extension of the crane rail and train rail from Berth 6 onto Berths 4 and 5, replacement of potable water and storm drainage, and reconfiguration of Transit Shed 1 by removing the south face of the building and constructing a new wall farther from the edge of the berth so that the crane can travel along Berth 5.All items have been designed and are included in this permit modification with the assumption that funding will be available (see MP-3 form). Crane and Train Rails: Additive 1 would replace and extend the rails from the east end of Berth 6 to the east end of Transit Shed 1 at Berth 4. Potable Water:Additive 1 would include a new 8-inch ductile iron pipe (DIP) water line and hose connections in vaults to replace the existing water line and hose connections in vaults.The new 8-inch water line would run from the west end of Berth 5 to the east end of Berth 4 where it would reconnect to the existing water line. Storm Drainage:Additive 1 would include a new storm drain system for replacement of the existing storm drain system serving Berths 4 and 5. Transit Shed 1:The changes to Transit Shed 1 are needed to make room for the extension of the rails. In Additive 1,the south wall of Transit Shed 1 would be removed and a new south wall farther back from the face of Berth 4 would be constructed.The south wall of the shed,the southern portion of the roof, and sidewalls, along with structural framing within the limit, would be cut back from the face of Berth 4 by about 16 feet.The floor slab and concrete curbs within this area would be removed. Brick walls (nonstructural)would be demolished and all roofing and trim would also be removed. Utility lines within the affected area will be disconnected and removed. New south wall steel framing will be designed on new foundations and integrated with the remaining building structure. Some of the remaining steel framings may be strengthened to enable the completed structural framing to be compliant with the current building code. 2IPage The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • • • Wage From:Todd W Sent: Monday,Mlton To: Perry,John April 25, 2022 10:16 AM Subject: MHC I M<John.PerrvPncdenr.gov> oerth 4-5 improvements John, I would like to submit a Pre-filing Notice for the following project: Project Name: Project Owner Berth 4/5 improvements Project Owner': NC State Ports Authority City NC 28557''s Address:mailing: PO Box 9002 Wilmington NC 28402. Project address 113 Arendell St, Morehead Project Count} Type of project: Carteret t/Approval Sought: NWP Anticipated Iry sheet pile. Tllpacts: Installation of"1272 of new sheet pile and the backfilling of^'2912ft2 between new and existing drainage lines 1e existing rock armor area will be relocated temporarily during construction. Crane rail, waterlines,and on the dock will also be repaired and replaced as necessary. Drawing are at :tached. Please let me now if any additional information is needed. Thanks, I Todd C. Way I NORTH CARCdton I Senior Enviror-INA PORTS mental Analyst 1910-746-646�k,, 800-336-240f'`7irect l Toll Free ncports.com Email to and Tr Dm this address is public record and may be disclosed to authorized third parties. i • . / g',.. . . • • AND • F,_ ii''. . •••• ,..—. ...,..,:c..''..:s....-. •.r.t. p•$.1•1,1r-fos 1-.5 -tr,r,F,I,',i,. . - DEED ,-. • ' ' - ' ( , ii '•,,,J,.-:, -3,, ,,....,1.q. u.7..f.z't t'....:., •;•."•E::•0:.• ';',..,...;7.1,,f,7:z•:".51,.'n; . . • • ,. NORTH,.C.Ar.2 0 I,1 NA .:CAIITERET.,COUNTY_. , . .. , ' ... '''' '•'''''r;3:•'''1'., ';'FL 2i a'. ':-.1"r.1',.;'.:',.:-1,--.'i-,"il,'".- . . '• ',.w. .-11.-P R.I.I:: ••1953. . 13y AND..,DETWEBY..,TICE . . ORPORAT i ON'.:.,OREATE pl.tqj D:kx tgri.tig.,..• mo13q , C.i7s..FORT ppl,ruti 1§6.1,914 t :110.141191FA . -. •-" ,•--•• . • .,•• .• • • . •-,..••••,r- [•• 1 yAlt A-At,s..,cr..?1933GANDc.ArigtlfiNtil;(911 qt111,P:T:g!'t 7.•!-OF.ITMEyif'' . " - --'-.. '''''' ---.' —' * - . T NA7,S3'.AT 11ORTs x ALI.MOR IP('r. . -2.'• rile .,E):'13,. .ppsr-ry. c .,THE F.A.Rst,p.p,Rx 6.pto 04E..N.•-5".73L"'",:'•,".`f,..-",' .;.;:•..I;V ".kl•••'",•••:"•r'" !,,-,.,-.'..`Z.271,2,r..,,e4,.,„,..., . .• .•,"•":-'":"...:.'•'':•.‘.....":"...., ".•''.. • ".".' •:.'":..-:-....'";" '•':'1 ''":-I'••••, 11'.:••..f". " -, _, . • AUTHORITY,-,-OFGHAPTERLOqf;Of,,THr v,.-F,„ .6,...r•s•FA.TE. 6Rf14ty, G5A1-g.11::ANR..or,Ef,'?!.-y,tRN uptp • -.'"- •-•.' :'••••„ • ' , • .• • - - — .. ,, • 1 ,15.E.I.14.1, ;;A".071-1E.I.PP-9110 Pir'441,.P.rAci, .Ess._J.oN;,..!..A.1/.0.of- ...9•4?.r,ANp.:f1,1,514pt,t.Ni-p-j-HET,. -.._ '" ". ' '' — ' '• " ' ;' ""- -••' • • TAT ‘IPE1 ,, 0 ,rA OF XNE.;f,.,15,(sT MRT;)-1,EF-EAN RiliF T9,1:: , •• . i . ,,,,,10T19E .4,FTM; ,Fek, 5: 171: '''' 4.;''''" ''''. %'''"" • '''', ' - : . . . . . ' AgR•ENINT:;.F.OF1,„.,ORTA.4,14,FACJirA,T,tES 15' r l'Fil.,1§,-149Y.'ir''IPF .::1-9f49..ri EPTRP"-1' ti.tO.:A. AS ' ' '"' '" ' .•' ''-•e- ''•-•'. ' '" •-.'" •'''• , . • • • 11- • • 0REHEAD 1 TY FO Cotiss 1 L'EiSE.AGAgEbIgNT- I' ,,,,,:-.--.1:',-.... .1;,'. ,•!...,7,.., L.,-,•:-4 W,.'.ts...,•—•,.., c OWNED AND.oP ERATO) BY T.HE..11 :im DN, Nt-Il0.1.1' . ' . . T 1 -.- ; .,3.9- 9 • . • . !ROY 1 0D II ti.i,P4t1T, 1 I ItE.THIN pf.'P:BY13D P9!'YPP999 ...AI1!) k1144s °E -P4-. t411:-4, •.•'• ••'''':, " ." - '''--, •'" "-•'s- '. . • OR oCi n 91,40.1 ",1Cili Tc1,,TH TJ1F.tilHEA i, ly ri • • "•' .', '--'''- • `" .. . s..L • 1"-AriEt4.1-,,,E1Y,,T.ti li..14111-kt ICLIA11.4 4)•N6f,',-."''••• • $TATA. P.PUS,A#14°F.t1AYI. lq.ACII,IVOERATIPIC,43V "* ""' ." " ''''''' .' • " ';' -"." " . , ,, ON 5.,.,E)EOUTEP-.By.:.•T.04,1:-S,A.I..p.:-.P 0 REtd . . Si-ATE PORTs AUTHORITY or.cERTAJN ,BONOS.AND., ''' '.'•," •'''' •i'• ''''• ''' '•`• ' •L'' -.'t '''''''''' ,:. • • . • ' OR •qAqPNSTI1UPT491111,.ft1440:/gElq° q9-kArW ' I1F A CE.-':PL I Pr!L FC/13:Ti5q°11,4,!•, .4:.1 cl..1, ,F. ,R,t1P17"Y:0•I 'L13•13y• , - •'•••• •' '." .. . .; . ‘• .- . ' , . .,, . • • . • .., ii,PROM 03 ec,,,•ED.R3-1-1tv. ti•tkr,,ligpti,, :., . , • Itio,, 11Ht;4!.Amp,A1....q1. RA!I,qo pio,..g94/.4y. .."•, —- '--"'"'-- -——• - i - . • .. • •.% . O.ELLA T 1 ON All p.BAT!'s FACT 1 ON OF 1 ki4TA-1., trrRoR rry 0 RADiTED 5 AND UPON THE . , . ':ftv.,411!9.1.P.57"91.1:-TrA.L'T.Irl9q,..Pni7.11:11AT. . THE 5A1D,...,130ADS..AN p....00 U..P:ONS:10Yr.Tki NART1-1 QA"R, ' • ' [ .3 .F A;.TY:; 9-,f.-...Ttlz.•••, ...01.1.P=...e:.+0,..eAt..1. T-11 ,•?1,:qT:vc:0E-i114 •••F•J:'33,,171.117..,. H0•1".7.P •Ti.Arl.,tg-t. • - . • • • . . . • .trv.119,,M 9X-111,SINDFIAPFP;Ttl.Ei4;Wt .. , p.r. 1.1E.47.RY i.CAI,,,I...g.E.-r ,g•INYPANG f-A.N.?:-.q.u:1!•.,!.. ' • " . , I, • oF THE F 1 R sT PART HAD R EcE vED..FRom, Yrs .oE R Ilt.PtRA9.4 ..1,•EIP.0;41t07r-• . . To 4 • 49); -F 1._ . ...otp:.. !,.,EA,.. S,t,.•. Ft 119R:ril f eijti)IA, . .:TAT -' , OPEFiATA.ONS,...P.R I 011..TO-i,.,D ED_ ,HDE,Ii . . . . -.s1 GNMELIT 'PORTS AUTHORJTY HAs PURCHASED.;AND .5 ECONED A- ' tr''''''' '' - '• ' -"•'4- '''". ' - -".L. . • BONDS AND CoUPoNS. EXECUTED„BY. THE..NOREHEAD.. : '' ..L :-••, 4 - -.... ' . • - • . . .• . • 'i i'lwat „S.I.,xT.Hoqs_A. 00•0 17)09 .0qi.9.:0),,, ..AR,,,,„ OR ANtouNyncy..rTARFE:...NtmoRED: y. No ' ..,. " • - . ' , I— • •-,:, •.: - .. . . . .,Ai.P../A04 inTqAg!tlx11.1 *Pli?...JW° ' THE SA i'D:NORTH cAROL 1 NA .ST..!..TE-PO RTSADTNPR!,. •- ' : -— ... • • : .-• HUNDRED ON THoUsANo .11GHT HUNDRED. ($20,17,89 -•-• —• " . :- • . ,. :,,•TA;@!.14.-:tAIII.M.r#95R7 ,1.:74,r,RAT I ir,...3 4PW.71-t . • A iap: pU.RsU„AN.T.:,T9...T14AU:r14.0F:i.kr17f,,,,Cm•NT,$,‘,1..N.ED,i V,1, : .. CW'"44.tir BY THE GENERAL ASSEMBLY. OF NORTH..GARoLi NA-0 •, ' ..• . - -- •.. , , • t1, . I . t F. w,7-,..O• B.*. Q. 6.07V-IPAAL!..9.r.A$14.: ,...r.t RST i.J? 1:tT...,,14,5.,, ,A.0 THOR!E ED,..'Amy,r_pi.REpr,r.giL„To-.3 , ,1.•;••,...:-:-; : o,.,.• t-z ,:,-F., F .,.••;•.t p,',_ .7", :,=;.".*:;•.- . .. ••:-..- :.',V.i4:'',7/,`:•": ,;:`,".",,7,-.'. ,:.'.'7,......,.. 5:',".•";-7 '.;.•1•;•'..'.:.-,-...;! , , . • - . .:., • i:': 7'i;:, .".t' ''T:'.- l'.:.!:':`10.17':1.7.;;T •• I.:"... ;'011,1r;,1.:.,:i '..1.• r.,, C...Wt *:':..r.: ...,.•'-.4,.!...: '5! -,.; :, ', i›: . • 1 . . .; . . . ' . . . . . • - • . . ,.. . • • . . . , . ' • , . 1 . . .• • . . '',)- • , . • eA in t,,n1A If! IKE b'eUIA,Ok 3WC,M0 - • - . - _ 0 V.' EGR's HA Tgligidir A ,GET00.1010H,Li449410,. .MG AN Ly MAE, ANL ALsp- TWO 'DOCKS, LOADING EqUIPMENT, •WATER TANK PHERNALIA AND EQUIPMENT USED THE MoREHEAo CITY Poitr, INC6.1 .abED THE PERIOD SUBSEQUENT TO 1 D. OnRATioi4s. IN ExoEs4 or EXPE THIS CONVEYANCE AND'TRA' HEAD CITYOORT tOimtsioN SH' :• , , BY THE MOREHEAD CITY Pok Cot TWO TRACTS OF LAND INCLUDED TO. ANY EXISTING so SUBJECT TO DEED OF EA 16 MARCH, 1948, OR RECORD IN • SUBJECT TO THE LEASE AGREEME PORT COMMISSION AND TRUMBULL ON SAID LEASES,, ,SNALL.GE TO APRIL 195i, TO HAVE AND'TO HOLD THR PROPERTY, AND ALL PRIVI-LEGE• - . PARTY OF THE SECOND PARY, HOOF FOREVER• AND THE SAID PARTY OF . , • ASSIGNS, COVENANTS WITH THE • AS :13310Y.:7110 _IN FEE .ojkLE-; TtIA.T4.1: M DO HEREBY FOREVER WARRANT 'A AGAINST tftE eLAft45 OF ALL. p IN TEST WHEREOF RESOLUTION DULY ADOPTED BY NumsEn 315, RATIFIED.11 AP, IN ITS NAME BY ITS CHAIRMA FIRED. • - ' • HHORENEAD G1'TY ?OR' cofgMlssloN . I ATTEST' ' ,'r ' GEORGE'R.. 11AL'LACE •r • •• • •BY' H,• S .GIBES (SEAL} CHA IRMAn1'• , tI I I I y NO TH-.CARCLEA, CARTER PO.I.! TY . • • f • . . ON TH15 DAY' BEFORE f4F; THE UNDERSIONED AUTHORITY, PERSONALLY CANL' GEO1,6;, _ r F 7 1 1 • 1 , -♦ �? �,S Ti IS {rj I I I 1 rI 1 x ;, •R. .I4ALLACEq -uiITH WI-oH 7•:gM'(ERSailA,E:1 ,ACQUAJNTEC,'114'iDEIN ..I5•V I I, `Y1 40 , SA.YS'.THAT-'}Ir'S. O1`.6.&-.'I.S THE CNAi:RMAN :AND'THAT`.GEORGE.;.R WAL.LACE.'.Is. 3 :;1� S LRE' .. TAttY= OF THE.HOREHEAU. C1:7Y.-FORT..C'01,1 SSION, 19>r,CO pORA'f OLf ;DESCI it3ED 1r1;;AND :l Hll l H 1=XECUYED THE FT,*(3O I NG f NSTRUI1EHT IN 1•R.ITTlNG4. THAT•HE.•KNOHs:,THE CdtA14911 SEAL or SAID CO.R•RogATIUN.f ;THAT' 'i'HR ,SEAL A• IYED. TO ITHE•t:,okE,pp)Bo,1NSTR13,M? ITT: . . . -1.A SAID.COMMON SEAL; AND TFlE N'1NE•O.F THE CORPORATION DUD$CR,1•BED THERETU•.HY Tkf SAID CHAI-HIAN, AND THAT TSW(E SAID CHA-IRM(AN AND.-SECRETARY •SUBSCRIBED'THE 7t 04111ES. . THERETO, AND THE SAID COMMON .SEA1. WKS AFFIXED, AL:I: BY ORDER THE BOARD Or'DI.T RECTORS OF SAID CORPORATION, AND THAT' THEY SKIP INSTRUMENT I5 THE ACT AND DEED . . OF SAID CORPORATION. ' WITN$SS MY HAND AND •NOTARIAL. SEAL THIS 26 DAY OF APRIL_I. 1951.• CORN. EXP. 17--22-1952 • •I-IARN. V.1RGINIA GOOWIN.. NOTARY PUBLle • NORTH CAROLINA, CARTERET BOUNTY THE FOREGOING CERT I F I CA'rE OF MARY :Y'1 RA I N IA•Gomm?? OF,CARTERET COUNTY -Ts. ADJVOGED TO BE CORRECT. LET THE. INSTRUMENT 01TH THE CERTIFICATES BE REed S•TERED.' WITNESS MY HAND THIS 571-I DAY OF MAY, 1951. . . . . A. H.._ AKE'S C1:ERK SUPERIOR COURT, • F I'LED 1 5.S-51 , 'RECpRDED ANI) V'£R 1'FI ED-: 5.7'51 4RV.IN,W. DAVIS, REGISTER OF 'GEED NORTH CAROLINA, CARTERET COUNT`( . ', INopIN W. ,DAVI-S, REGISTER OF DEEDS OF CARTERET COUNTY, NORTH CAROLINA, 06 REREBY CERTIFY THAT THE FOREGOING DEED AND BILL OF SALE FROMMOREHEAD CITY PORT COMMISSION TO. NORTH CARO.L.INA STATE PORT AUTHORITY f5 A TRUE AND EXACJ'•COPY AS TAKEN FROM AND CPMPARED..WITH THE RECORDS OF THIS OFFICE I-N BOOK .133,.PAGE 25pr WI-TiE53 MY HAND AND OFFICIAL SEAL, THIS 2ND DAY OF MAY 19?5♦ A . IRVIN, 14, :DAV1S . - R>±GISTEROF DEEDS • p Appendix D: Adjacent Property Owner Notification 1. Adjacent Property Owner Notification Cover Letters 2. Certified Mail — Return Receipts Requested NORTH CAROLINA PORTS�� Kind regards, North Carolina State Ports Authority °Zest" 4)/ Todd C. Walton Senior Environmental Analyst, North Carolina Ports Authority Enclosures: MP-1, MP-2, and MP-3 CAMA Major Development forms;Permit Drawings Sheets 1-10 CC: Heather Styron, NC Division of Coastal Management 2202 Burnett Blvd,Wilmington, NC 28401 I 800.334.06B2 I ncports.com NORTH CAROLINA PaRTS��� April 26, 2022 Thomas E. Matthews,Jr. Morehead City Yacht Basin, LLC 208 Arendell Street Morehead City, NC 28557 Certified Mail—Return Receipt Requested Subject: Modification to the Coastal Area Management Act Major Permit 51-87 for the Proposed Port of Morehead City Berths 4 and 5 Improvements,Carteret County, NC Dear Property Owner/Manager: The North Carolina State Ports Authority has completed a Coastal Area Management Act(CAMA)major permit modification request to modify the existing CAMA major permit 51-87 for the proposed Port of Morehead City Berths 4 and 5 Improvements project.The Berth 4 and 5 improvements project includes the replacement of an existing bulkhead at Berths 4 and 5 along the south side of the Port in Carteret County, North Carolina. Depending on available funding,improvements at Berths 4 and 5 may also include replacing and extending existing crane and train rails,potable water and stormwater drainage system modifications,removing the south-facing wall of the existing Transit Shed 1 to accommodate the new rail locations,and the construction of a new wall for the existing Transit Shed 1.The specifics of the proposed work are in the enclosed CAMA development forms and drawings. As the adjacent riparian property owner for your property located at 208 Arendell Street, Morehead City,28557 to the aforementioned project, I am required to notify you of the development in order to give you the opportunity to comment on the project. Please review the attached permit modification and drawings. Should you have any objections to this proposal, please send your written comments to Roy Brownlow,the NC Division of Coastal Management District Manager,400 Commerce Avenue, Morehead City, NC,28557,within 30 days of your receipt of this notice.Such comments will be considered by the Department in reaching a final decision on the modification. No comment within 30 days of your receipt of this notice will be considered as no objection. If you have any questions on this project, please call me at(910) 746-6460,or e-mail me at todd.walton@ncports.com. I •334-0682 I ncports.com 2202 Burnett Blvd,Wilmington, NC 28405 800 p or t NORTH CAROLINA PORTS Kind regards, North Carolina State Ports Authority ••off ' /- Todd C.Walton Senior Environmental Analyst, North Carolina Ports Authority Enclosures: MP-1, MP-2,and MP-3 CAMA Major Development forms; Permit Drawings Sheets 1-10 CC: Heather Styron, NC Division of Coastal Management 2202 Burnett Blvd,Wilmington, NC 28401 I 800-334•0682 ! ncports.com r. 1 Morehead CityBasin, . \, Parcel Ea,639617011427000 "' A f_ _, .2.10II,rye ' } ` s • •� , IN =� s• ,� North Carolina PortsAuth'orty __.fr .if A in.„ -i ,„F.I.,„,..4.,.-,.,-' ..- _'; Parcel No. 6396,1r7.1054640+00 74. 1 �' 4 ' Arendell lrehead 11ti k11 . - y i•' i �;.)7-:-.--- --;;:::—'--- Mr ' . 1,AI —" f r's 1.4-:111:- !f i.i ` 4 PortofM Cit, . BOGUE HOLDINGS, 1L kk. ;;,.e:.14 �`i _„ ' Parcel Ea 6388620906883000 1' ---``- A. North Carolina Ports Authority Parcel No. 639617105464000 North Carolina Ports Authority T_ ' Parcel No. 638620909711000 ' . - l'"13--- -\,:'. \ -.- -------7 , Na-aport RivFr 1 Out]Rd North Carolina forts Authority .Y ',,p Port of Morehead City Parcel Ea,639617005507000 0 t - A,,,,,st Morehead City Beaufort Legend Parcels B O G U • I 7 I Atlantic Beach 2,000 Source: ESRI Aerial Imagery via NC CGIA(2020), NC OneMap Carteret County Parcels(2021),and NCDOT Routes(2022) Feet NORTH" N Project Location: ) CAROLINA Port of Morehead City 113 Project Loll Street POR Improvements to Berths 4 & 5 Morehead City, NC 28557 WSP USA INC. North Carolina State Ports Authority N Site Location Map Carteret County 434 Fayettevile Street PO Box 9002 ,\ Suite 1500 Wilmington, NC 28402 vv -E 0 500 1,000 2,000 February 14, 2022 Raleigh, NC 27601 S Feet ,411111 _m m m....d\„ v l BASCULE ARENpELL ST \ BRIDGE o " In !_aR rrnA N REET Weld Shop ` O a z o ►Maritime / �— \ ~ J o ow _ J Bldg. 0 �/ `0 A. / ° z a 0 O p ----ii-i--i-----'....._._'___._III_III_I/II-17 ---- •.....,....V7_--7_-i..-o._....„_-..,".__......,..0.....„_.0„..._.....,-__..___._"4,_"__11_1-1_-1--1_.•1•.•_1.•1._1._,11111•1— Shippin Seamen \ O �, Receiving) ____ ________ ---_____ , I- W m I— o et- w O 0� MARTIN Z W o Elill MARIETTA Q O O J Q p O d O r a • O / wo ._ � o o� sped6 i \ ��� CT) Ce Z fz o \ �� 0_ 0 0 - i '� Z � � Transit � �� H 0I o - Shed 4 0 /IU.S.M.C. \ o - CO ❑ / uJ mea 3 8°8 %� = o 540it, o a N ,.... 0 o Warehouse 8O I u) o \-- ZWo ; Q =I ' H, 1 W oO � W W Wo Warehouse 7 I Warehouse 6 Warehouse 9 �� mN .Ikli / zW O us: O OJ0O fnO 2 I-No -p 1 ���� n Z o PROJECT AREA FACE OF EXISTING � w OCP \ I �1 �\ BULKHEAD / WATERLINE o Warehouse 10 0 0 C1 O o 1 \ o : cn a 0 _ � w ik\s„.............___. 0 0 0 0 0 0 0 0 _', o r w i20 0 0 a 0 0 .• - (� W o EXISTING TRAIN TRACKS Transit Shed 2 Transit Shed 1 0 \ °° ° o o W _ Transit Shed 3 — Boo 0 0 0 0 0 0 Goo \ ►=it , 5 0 IT E 0 LC -\ \\� — — — — — — \ — — — \ �...v.' 6 O c ��� �� \ 0 0 0 0 0 0 0 0 0 0 al ---. 0 ` o o"o iO _ _ _ _ _ _ _ _ — — __ — — — — — — — — !.. O— _\\ wmZ U . . . . . . . . . 11 ' 'XZ ..111�• FOF �m0 ••1� , CSC y 0 n ��• ��• • O Q O Q a Z -''" EXISTING =eaa Z _ M J J N 3650 3550 3450 3350 3250 31 0 3050 950 2850 2750 2650 2550 450 2350 2250 2150 2050 19 0 1850 1 750 16 0 15 0 4 0 13 0 12150 1 1 0 10 0 SCOUR HOLE a n Z 3600 3500 3400 3300 3200 3100 3000 2900 2800 2700 26 0 2500 2400 2300 2200 2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1101 x REPAIR o BERTH 7 BERTH 6 BERTH 5 BERTH 4 LOCATION Z CAMA AEC - 75' ESTURAINE FACE OF NEW BULKHEAD WATERS COASTAL SHORELINE— EXISTING '1 LiH- BULKHEAD / FENDER W/ STANDOFF NEW CRANE RAIL & TRAIN TRACKS ow J 8 U 1 CAMA AEC - 30' PUBLIC TRUST WATERLINE f �H:_ 250' 150' 50' 0 250' 500' WATERS COASTAL SHORELINE BOGUE SOUND �QCD a ' M SCALE: 1" = 250' V \ ,r \ \ \ \ °J / In I 2/ a \ z N ° WW ° z N a _ R Z 7 ° O N N ° ° 9 w r zI w w r a Lu F y O ¢x ¢ iv N \ I :Cf Y w� \ \ O / FFE:6.9 N m \ \ N '-c LLI Ce co I— < Q o \ f— — EiEr 41 N AWL d Z W O LCAMIES' \ \ Ce Q O O ESTURAINE WATERS a O Ce o N \ COASTAL SHORELINE \ NEW TRAIN TRACK ` 0 0 1_ \ \ (ADDITIVE 1) LU W Z N CAMA AEC-30' F O W Q PUBLIC TRUST NEW CRANE RAIL Ce WATERS COASTAL EXISTING PORTAL NEW TRAIN TRACKS 4iik — (ADDITIVE 1) d d z SHORELINE GANTRY CRANE RAILS (ADDITIVE 1) \ 51 I I— \ \\ NEW DRAINA_ _ _ _GE,TYP. ��_ — (ADDITIVE 1) PW—PW W _ _ _ , — — — �� In \ \ 1 oo U) co El * Ti—SO—1SC Cr.) = I— __— —, \ aW \ = m 1 law ,8W llw—aw— UJ O I \ \ PW--�- A ° I- • z I I I I f / w V V V V I— W S 83° 35' 26"W ce > O O EXISTING FACE EXISTING STEEL EXISTING FACE d Ce CONC. PILE CAP EXISTING RAILS CRANE RAIL EXTENTION SHEET TW NEW WATER ES CONC. PILE CAP 0 FENDER W/ NEW BULKHEAD STANDOFF,TYP. (ADDITIVE 1 ) SERVICE — (BERTHS 6&7) O WORK POINT O NEW FENDER, (ADDITIVE 1)TO p N: 359418.2528 p PERMANENT FILL IMPACT: 0 + E:2691281.1695 + + LENGTH= 1272±LF d- STATION 14+00.00 N r WIDTH= 1.2 FT TO 3.6 FT ce o TOTAL AREA=2912±SF 1 ° a x N W 7 + Y a o c, co IMPERVIOUS AREA ce N 0 -..S.''''"—BOGUE SOUND a co o ADDED=2548 SF a 2o°z H z Z\\\\ wm VO BERTH 6 BERTH 5 BOGUESOUND ~eg~ao r ~o0_ \\ o��� aaz N �l =Va- J_ a LEGEND ce a EXISTING NEW 0 o z o 100 TON TEE BOLLARD 2 -W. FENDER 0 STORM DRAIN INLET KEY PLAN w 0 —SO—STORM DRAIN PIPE M —PW— —SW WATER LINE w � WATER SERVICE BOX 20' 10' 0 20' 40' rRANSIrsHEoz �rRANSIT HEo —1\\I -;.nZ R !l. , �/ BULKHEAD WALL \ j 7 w r M. I I I I 0_I—1. FENDER W/STANDOFF(BERTH 6&7) ' c)i SECTION CUT LOCATION SCALE: 1" = 20 -�Bearas �l� Bearas� . . BERTH 4 -I ' Nr IL v y 7 7 7 7 7 7 7 7 I I I I I 7 I 1 IcA Z BJ N [ W K U• Z N cl ¢ U)Z• O N U _1} 0 wr r U Z O K J ucr Li, O ¢_ ' ¢ a M K U EXISTING �� 2 TRANSIT SHED 2 CC cn W Ce m I- < I— ¢ Z IQ o J CI- Z W o 7 NEW TRAIN TRACKS ce CO L.. FFE: .ss' NEW DRAINAGE,TYP. (ADDITIVE 1) ESTU AEC-75 O Q O O (ADDITIVE 1) ESTURAINE WATERS Q' d M COASTAL SHORELINE C kJ IH CAMA AEC-30' I— i_ W 1 ////// yr/Zf3X/7 / PUBLIC TRUST d W .. 2 FFE: .os WATERS COASTAL Ce Z u) / SHORELINE �Ev7'09 Z d Q / // / / / // / //Z ////////// ' /////// a P W-P 4 W P rW PW� Pw A / PW /mil Pw---________pWPw— w ) 06 �l >- I- U) - —SD M Si '. SO 7 = P PW�eu """' IIIIIIII p ~ Pw Q W �pW 8 = m tW 8W 8W— _... —8W-8W-8W-8W-8W-8W-8W—n... -BW—: 8f SW-8W-8W-8W-8W-8W-8W—e —8W 8W PW'-BW----pp,�8W l V BW—law Q 8W—, Ce O CAI- PW PW �� PW 2 1-GPM_ Z �-� .1- ✓-v-\._ �-v-v-v- W W • \✓ �✓ `✓ \_✓ \_✓ yi \✓ \✓ \✓ \✓ \_✓1\_✓ `✓ �✓ \_✓ \✓ � � � � � � � � � � � �1i � � � � � � � rv �lN.� � � � � � wI� � � � � � I� � \.v \_✓ \_✓ I 0 V V V V V V V " V V V " H W O O EXISTING STEEL 0- Ct SHEET PILES, CONC. PILE CAP � > -Ailli d MLW/MHW NEW CRANE FACE OFS 83° 35' 26"W NEW FENDER, lil EXISTING FACE NEW BULKHEAD NEW 2 RAIL TRACK EXISTING TYP. WATER - (ADDITIVE 1) SERVICE 0 0 BULKHEAD 0 PERMANENT FILL IMPACT: EXTENSION of (ADDITIVE 1) II + + + LENGTH= 1272±LF EXISTING STORM O + >- N WIDTH= 1.2 FT TO 3.6 FT DRAIN PIPE,TYP.IF T TOTAL AREA=2912±SF ADDITIVE 1 IS NOT I o CONSTRUCTED = r ¢• N IMPERVIOUS AREA i E N ADDED=2548 SF =�l a m Z a =nyl/ QOO ,—o,— I-mr M BOGUE SOUND m w o BERTH 5 0 oQo ¢a2 :mod Z J 1 1 0 e LEGEND ce a EXISTING NEW 0 z o 100 TON TEE BOLLARD 2 -W. FENDER 0 STORM DRAIN INLET KEY PLAN w `o —so—STORM DRAIN PIPE M —PM— —8W WATER LINE cWATER SERVICE BOX 20' 1�> 20' 40' TRANSIT SHED 2 TRANSITSHED —Z J�z L. \/ \/ BULKHEAD WALL 7 w r= I I 0-I- 8 I. FENDER W/STANDOFF(BERTH 6&7) }CO W SECTION CUT LOCATION SCALE: 1" = 20' ..BERTHS.I. BERTH 5� .I. BERTHA .I ' IL v Cl I I I I I I I 7 7 I I I I I I I I i � a 0 w CO / w U Z CCI N / a �Z 0 U _I> 0 wr r Lo- / U w 3a W Z O w MODIFIED o Mw a a EXISTING TRANSIT SHED 1 a 0 TRANSIT SHED 2 a (ADDITIVE 1 ) CD ix / 03 I- < — — — — — — — — — — —/ — — — — — — — — — — — ct Z LU o — a U) u_ / d Z w o / CAMAAEC-75' Y O O / ESTURAINE WATERS O Ce o / COASTAL SHORELINE > p Z � / ~ dLU LU NEW TRAIN TRACKS PART OF TRANSIT SHED 1 W = NEW DRAINAGE,TYP. (ADDITIVE 1) / (TO BE REMOVED) Z CO (ADDITIVE 1) CAMA AEC-30' / (ADDITIVE 1) d Q III / PUBLIC TRUST I `/ Ce WATERS COASTAL �4 z / � � 7 //� /m? F /� LTINE_ av) el— — - - _ — — — — / in — — — 06 1— U) SD—SD so— -SD so SD--SD--SD 0 �o as— 0 U = Q w niI T . = m —SW aw SW-1—SW sw a, —SW 8W—aw• —aw—18W SW SW 8W 8W law—aw aw SW SW aw o SW 81�1 SW 8W—aw—aw—aW SW SW— = O0 —PW PW PW 'N _{ PW— —PW PW -PW PW PW PW PW PW PW— —PW PW�PW PW PW PW PW PW O p r — z ,_r v -`.r _ ,_.t,..�_�\-. rh r- ry \.f- L L'- W w w w w w 'w w w w \r w 'w w NW' w w w' w 'w w w w Mr w w w' I"VI w w w V ' w w w w w w w w w w ,w w w w l r v wr w w w w w w w NW w w w w w 0 2 V " V V " 11 V V V V V V H W S 83° 35' 26"W ce > O O EXISTING FACE EXISTING STEEL d Ct CONC. PILE CAP SHEET PILES, d NEW FENDER, NEW CRANE EXTENSION OF NEW BULKHEAD NEW WATER MLW/MHW FACE OF 2 TYP. RAIL TRACK EXISTING STORM SERVICE EXISTING (ADDITIVE 1) DRAIN PIPE,TYP. (ADDITIVE 1) BULKHEAD I o o PERMANENT FILL IMPACT: o 0 o o LENGTH= 1272±LF o� o+ } rn CO WIDTH= 1.2 FT TO 3.6 FT N- co 1- 1 TOTAL AREA=2912±SF I ce r n ¢ N O IMPERVIOUS AREA Nz ADDED=2548 SF =\l Ow m a Spy 1 ¢00 CV BERTH 5 BERTH 4 c...c. 0mo 0 g BOGUE SOUND zC3 CV -'S.,,,..... BERTH Zaz J a LEGEND a EXISTING NEW 0 o 0 o 100 TON TEE BOLLARD 2 • FENDER 0 STORM DRAIN INLET KEY PLAN w `P SD—STORM DRAIN PIPE 0.14 Ui I —ex— —8W WATER LINE cM WATER SERVICE BOX 20' 10' 0 20' 40' TRANSIT SHED 2 �TRANSIT — Ia J I_ art, / `/ BULKHEAD WALL f 7 w r= �, , I I 0-I5" 8 I. FENDER W/STANDOFF(BERTH 6&7) ' } —1 SECTION CUT LOCATION SCALE: 1" = 20' -�BERTHfi -I- BERTHS I. BERTH 4 .I ' w v 2 co y I I I I I I I I I I I I I I I I SHEET—Permit100-30900723—Plan-101 thru 105.dwg 4/14/2022 12:26 PM Gin PART OF TRANSIT SHED 1 (TO BE REMOVED) (ADDITIVE 1) CAMA AEC - 75' ESTURAINE WATERS COASTAL SHORELINE MODIFIED TRANSIT SHED 1 (ADDITIVE 1) NEW DRAINAGE, TYP. (ADDITIVE 1) NEW TRAIN TRACKS (ADDITIVE 1) CAMA AEC - 30' PUBLIC TRUST WATERS COASTAL SHORELINE / SO— SO ----- SO- — SO M SD— 0—SO M M — SD —SO 0 M o aII 8,• • 8W 8W 81/ SW SW SW SW SW — — -1— PW DW DW OW — — — — SW + SW !W SW BW — 8W — — SW — BW BW SW II .PW -ow- -Pw II Pw nw nw nu nw ✓ \—/ \_/ \—/ \—/ \—/ \\\� / / / / \ / / \/ \✓ \\\ / / / 4./�� / / / \L / �✓\� / \I / / � / / � J �J \_\- (mil / / \-1 � � \ _/ \_/Imo_/ l \J _' \—/ \—/ \.\ _/ \ _/ \ _/ N_ _/ N_ _/ r/ �� / / \ _/ �✓ \_47 \_._/ \_._/ \_._/ \_._/ IN—/ Y �I IxIxIxIxIxV NEW WATER SERVICE --..-..r..- - AIP\A/rD4 AIP MC\N 1`? " V V V S 83° 35' 26" W EXISTING FACE EXISTING STEEL CONC. PILE CAP SHEET PILES, MLW/MHW CA!"C nr O O CO LEGEND EXISTING NEW 100 TON TEE BOLLARD FENDER STORM DRAIN INLET STORM DRAIN PIPE —PM— — 8W WATER LINE WATER SERVICE BOX rt \✓ `._/ BULKHEAD WALL I•I PERMANENT FILL IMPACT: LENGTH = 1272± LF WIDTH = 1.2 FT TO 3.6 FT TOTAL AREA = 2912± SF IMPERVIOUS AREA ADDED = 2548 SF FENDER W/ STANDOFF (BERTH 6 & 7) SECTION CUT LOCATION RAIL TRACK (ADDITIVE 1) O O 10 BOGUESOUND — BULKHEAD EXTENSION OF EXISTING STORM DRAIN PIPE, TYP. BERTH 4 20' 10' 0 NEW FENDER, TYP. O O 20' 40' SCALE: 1" = 20' EXISTING BULKHEAD KEY PLAN PROJECT LOCATION: W W N U Z Y J 0 w < ij CARTERET COUNTY APRIL 15, 2022 PROJECT WORK PLAN PERMIT DRAWINGS EXISTING AND PROPOSED FEATURES DRAWN BY: BRG SHEET 5 OF 10 PORT OF MOREHEAD CITY IMPROVEMENTS TO BERTHS 4 & 5 >- 0 O Q N adz LLJ <00 O >J_ NORTH CAROL! TRANSIT SHED 2 TRANSIT SHED 1 BELT? 4 I BERTH 5 I BERTH 4 0 SHEET—Permit100-30900723—Plan-101 thru 105.dwg 4/14/2022 12:30 PM Gin 8 yI 1 8W — O O CO MODIFIED TRANSIT SHED 1 (ADDITIVE 1) PART OF TRANSIT SHED 1 (TO BE REMOVED) (ADDITIVE 1) NEW DRAINAGE, TYP. (ADDITIVE 1) NEW TRAIN TRACKS (ADDITIVE 1) 8W-8—8W-8W-8W-8W-81 EXISTING STEEL SHEET PILES, NEW WATER I MLW/MHW SERVICE (ADDITIVE 1) LFACE OF EXISTING BULKHEAD LEGEND EXISTING NEW 100 TON TEE BOLLARD FENDER STORM DRAIN INLET — SO — STORM DRAIN PIPE PW— — 8W WATER LINE WATER SERVICE BOX rt \ _/ `,_/ BULKHEAD WALL 1•1 EXTENSION OF EXISTING STORM DRAIN PIPE, TYP. CAMA AEC - 75' ESTURAINE WATERS COASTAL SHORELINE CAMA AEC - 30' PUBLIC TRUST WATERS COASTAL SHORELINE 8W-8—BW—SW— NEW CRANE RAIL TRACK (ADDITIVE 1) NEW FENDER, O TYP. O CV PERMANENT FILL IMPACT: LENGTH = 1272± LF WIDTH = 1.2 FT TO 3.6 FT TOTAL AREA = 2912± SF BOGUE SOUND IMPERVIOUS AREA ADDED = 2548 SF FENDER W/ STANDOFF (BERTH 6 & 7) SECTION CUT LOCATION S 83° 35' 26" W NEW BULKHEAD EXISTING SCOUR HOLE REPAIR LOCATION BERTH 4 20' 10' 0 EXISTING FACE CONC. PILE CAP O O o0�v oUO ,�ooco�o��o \ EXISTING BOLLARD \ ..aalliattegoat‘11.11t / mar/ 20' 40' SCALE: 1" = 20' KEY PLAN EXISTING SCOUR HOLE REPAIR LOCATION WORK POINT 1 359571.3702 2692644.2067 STATION 0+2839 PROJECT LOCATION: CARTERET COUNTY APRIL 15, 2022 PROJECT WORK PLAN PERMIT DRAWINGS EXISTING AND PROPOSED FEATURES DRAWN BY: BRG SHEET 6 OF 10 PORT OF MOREHEAD CITY IMPROVEMENTS TO BERTHS 4 & 5 NORTH CAROL! TRANSIT SHED 2 TRANSIT SHED 1 BERTH 6 I BERTH 5 BERTH 4 Omit SHEET—Permit100-30900723—Section-301.dwg 4/12/2022 3:18 PM Griffin ANCHOR WORKPOINT ELEV. 2.54 MHW+3.10 MHHW+3.39 MLLW-0.15 MLW0.00 y 4 SHEET PILE CONSTRUCTION BASELINE NEW PILE CAP 2'-0" 4'-0%" 32'-0" CRANE RAIL 100 TON TEE BOLLARD ELEV 8.98 INVERT ELEV. 4.09 TOP OF SHEET PILE ELEV. 1.93 ARCH FENDER EXIST. MUDLINE PILE CAP — EXIST. PILE CAP ELEV. -4.52 DENSIFIED SAND FILL NEW SHEET PILE (SEE GENERAL NOTES) EXIST. SHEET PILE DESIGN ELEVATION FOR POTENTIAL FUTURE DREDGE =-45.15 DESIGN TIP ELEVATION = -71.07 PROP R1 PROP TK2 4 TRACK 2 CATCH BASIN PROP TK1 TRACK 1 LANDSIDE CRANE BEAM & PILE PROP R6 PROP TK3 SEE CIVIL DWGS. FOR 4 TRACK 3 PAVEMENT SECTION 1 EL, TYP. V BOT. OF WATERSIDE CRANE RAIL CORBEL (ADDITIVE 1) ELEV. 5.77 V V 1 r LJ 1'/4'0 TIE ROD EXIST. RELIEVING PLATFORM V EXIST. TIMBER PILE, TYP. SECTION AT BERTH 5 STA. 11+75.00 SCALE: %" = 1' ELEV. 5.27 LANDSIDE CRANE RAIL BEAM ELEV.-0.96± EXIST. TIE ROD HP12x53 PILE SOIL ANCHOR (BASE BID) EXIST. TRANSIT SHED #2 FOUNDATION EXIST. ANCHOR NOTES: 1. EXISTING FEATURES SHOWN IN THIS SECTION ARE FOR THE CONTRACTORS REFERENCE ONLY AND BASED ON AS -BUILT DRAWINGS (DATED 1969) PROVIDED BY NC PORTS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION AND DIMENSIONS INDICATED HEREIN. IF DISCREPANCIES EXIST BETWEEN THE DRAWINGS AND SITE CONDITIONS, THE CONTRACTOR SHALL INFORM THE OWNER. 2. EXISTING FEATURES SHOWN IN THIS SECTION SHALL REMAIN IN PLACE, UNLESS NOTED OTHERWISE. 3. FOR THE PURPOSE OF THE CAMA PERMIT APPLICATION, THE MEAN LOW WATER IS DEPICTED AS 0.00 AND IS THE REFERENCE FOR WATER DEPTHS AND LAND ELEVATIONS DEPICTED. 8' 6' 4' 2' 0 8' 16' SCALE: 1 /8" = 1'-0" PROJECT LOCATION: CARTERET COUNTY APRIL 15, 2022 CROSS SECTION VIEW PERMIT DRAWINGS EXISTING AND PROPOSED FEATURES DRAWN BY: BRG SHEET 7 OF 10 PORT OF MOREHEAD CITY IMPROVEMENTS TO BERTHS 4 & 5 >- 0 O N CO ▪ CNI amz < 00 Nm0 O Zaz J >J_ 0 0 0 z SHEET—Permit100-30900723—Section-302.dwg 4/12/2022 4:20 PM Griffin ANCHOR WORKPOINT ELEV. 2.54 MHW+3.10 MHHW+3.39 MLLW-0.15 MLW0.00 u EXIST. STORM WATER OUTLET ELEV. 0.56± 100 TON TEE BOLLARD DOWEL, TYP. ELEV 8.98 ARCH FENDER INVERT ELEV. 4.09 TOP OF SHEET PILE ELEV. 1.93 PILE CAP EXIST. PILE CAP ELEV. -4.52 DENSIFIED SAND FILL NEW SHEET PILE (SEE GENERAL NOTES) EXIST. SHEET PILE EXIST. MUDLINE DESIGN ELEVATION FOR POTENTIAL FUTURE DREDGE = -45.15 DESIGN TIP ELEVATION = -71.07 4 SHEET PILE __—CONSTRUCTION BASELINE 2'-0„ 32'-0" CRANE RAIL /—PROP R1 —BOT. OF WATERSIDE CRANE RAIL CORBEL ELEV. 5.77 PROP TK2 4 TRACK 2 CATCH BASIN PROP TK1 TRACK 1 � —PROP R6 SEE CIVIL DWGS. FOR PAVEMENT SECTION r ° EXIST. WATERLINE 1 r 1I J K/ W STORM DRAIN PIPE EXIST. C.I. PIPE 13/4"0 TIE ROD EXIST. TRANSIT SHED #2 FOUNDATION LANDSIDE CRANE RAIL BEAM 7—ELEV. 5.27 EXIST. RELIEVING PLATFORM EXIST. TIE ROD POTABLE WATER V V V EXISTING DRAIN PIPE TO BE CUT, FILLED W/ FLOWABLE FILL AND ABANDONED IN PLACE EXIST. TIMBER PILE, TYP. SECTION AT BERTH 5 STA. 10+00.00 SCALE: %" = 1' 4 EXIST. ANCHOR ELEV. -0.96± �—HP12x53 PILE SOIL ANCHOR (BASE BID) NOTES: 1. EXISTING FEATURES SHOWN IN THIS SECTION ARE FOR THE CONTRACTORS REFERENCE ONLY AND BASED ON AS -BUILT DRAWINGS (DATED 1969) PROVIDED BY NC PORTS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION AND DIMENSIONS INDICATED HEREIN. IF DISCREPANCIES EXIST BETWEEN THE DRAWINGS AND SITE CONDITIONS, THE CONTRACTOR SHALL INFORM THE OWNER. 2. EXISTING FEATURES SHOWN IN THIS SECTION SHALL REMAIN IN PLACE, UNLESS NOTED OTHERWISE. 3. FOR THE PURPOSE OF THE CAMA PERMIT APPLICATION, THE MEAN LOW WATER IS DEPICTED AS 0.00 AND IS THE REFERENCE FOR WATER DEPTHS AND LAND ELEVATIONS DEPICTED. 8' 6' 4' 2' 0 - ■ ■ 8' 16' SCALE: 1 /8" = 1 ' -0" PROJECT LOCATION: CARTERET COUNTY APRIL 15, 2022 CROSS SECTION VIEW PERMIT DRAWINGS EXISTING AND PROPOSED FEATURES DRAWN BY: BRG SHEET 8 OF 10 PORT OF MOREHEAD CITY IMPROVEMENTS TO BERTHS 4 & 5 >- 0 0 N CNI amz <000 0m0 O z J >J_ 0 0 0 z 0 SHEET—PermIt100-30900723—Section-303.dwg 4/12/2022 4:27 PM Griffin 100 TON TEE BOLLARD ANCHOR WORKPOINT ELEV. 2.54 MHW +3.10 MHHW+3.39 MLLW-0.15 MLW0.00 y EXIST. STORM WATER OUTLET ELEV. -0.56± DOWEL, TYP. ELEV 8.98 ARCH FENDER INVERT ELEV. 4.09 TOP OF SHEET PILE ELEV. 1.93 PILE CAP EXIST. PILE CAP ELEV. -4.52 DENSIFIED SAND FILL SHEET PILE (SEE GENERAL NOTES) EXIST. SHEET PILE EXIST. MUDLINE SHEET PILE —CONSTRUCTION BASELINE 2'-0" 32'-0" CRANE RAIL DESIGN ELEVATION FOR POTENTIAL FUTURE DREDGE = -45.15 DESIGN TIP ELEVATION = -71.07 —PROP R1 BOT. OF WATERSIDE CRANE RAIL CORBEL ELEV. 5.77 \\ EXIST. �\/4 WATERLINE V PROP TK2 4 TRACK 2 1 r EXIST. C.I. PIPE V —PROP R6 —PROP TK1 CATCH BASIN 4 TRACK 1 1 %"0 TIE ROD EXIST. DRAINAGE PIPE EXISTING DRAIN PIPE TO BE CUT, FILLED W/ FLOWABLE FILL AND ABANDONED IN PLACE V EXIST. TIMBER PILE, TYP. SECTION AT BERTH 4 STA. 3+10.00 SCALE: %" = 1' SEE CIVIL DWGS. FOR PAVEMENT SECTION LANDSIDE CRANE RAIL BEAM \—ELEV. 5.27 EXIST. RELIEVING PLATFORM EXIST. TIE ROD RELOCATED FACE OF TRANSIT SHED #1, SEE BUILDINGS DRAWINGS FOR DETAILS EXIST. ANCHOR ELEV. -0.96± HP12x53 PILE SOIL ANCHOR (BASE BID) NOTES: 1. EXISTING FEATURES SHOWN IN THIS SECTION ARE FOR THE CONTRACTORS REFERENCE ONLY AND BASED ON AS -BUILT DRAWINGS (DATED 1969) PROVIDED BY NC PORTS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION AND DIMENSIONS INDICATED HEREIN. IF DISCREPANCIES EXIST BETWEEN THE DRAWINGS AND SITE CONDITIONS, THE CONTRACTOR SHALL INFORM THE OWNER. 2. EXISTING FEATURES SHOWN IN THIS SECTION SHALL REMAIN IN PLACE, UNLESS NOTED OTHERWISE. 3. FOR THE PURPOSE OF THE CAMA PERMIT APPLICATION, THE MEAN LOW WATER IS DEPICTED AS 0.00 AND IS THE REFERENCE FOR WATER DEPTHS AND LAND ELEVATIONS DEPICTED. 8' 6' 4' 2' 0 8' 16' - ■ ■ SCALE: 1 /8" = 1'-0" PROJECT LOCATION: r ul wCO w N ce U ci)? Lu J F ❑ O wce c¢ aw 0 2 CARTERET COUNTY APRIL 15, 2022 CROSS SECTION VIEW PERMIT DRAWINGS EXISTING AND PROPOSED FEATURES DRAWN BY: BRG SHEET 9 OF 10 PORT OF MOREHEAD CITY IMPROVEMENTS TO BERTHS 4 & 5 >- 0 O N CO ▪ CNI amz < 00 Nm0 >J_ NORTH CAROL! 0 4/13/2022 3:23 PM Griffin SHEET—Permit100-30900723—Section MHW+3.10 MHHW+3.39 MLLW-0.15 MLW0.00 p 100 TON TEE BOLLARD ELEV 8.98 ARCH FENDER TOP OF SHEET PILE ELEV. 1.93 PILE CAP - EXIST. PILE CAP ELEV. -4.52 DENSIFIED SAND FILL SHEET PILE (SEE GENERAL NOTES) EXISTING ROCK ARMOR LAYER WILL BE TEMPORARILY MOVED WITHIN THE EXISTING SCOUR HOLE REPAIR LOCATION TO DRIVE IN NEW SHEET PILES. THE ROCK ARMOR MATERIAL WILL BE PUT BACK ALONG THE FACE OF THE NEW SHEET PILES TO PREVENT SCOUR. DEPTH IS APPROXIMATE (SEE NOTE 4). EXIST. DEPTH OF CHANNEL BOTTOM 4. SHEET PILE 2'-0n —CONSTRUCTION BASELINE r. o°o°o°o°o°o°o°o°0°0g06.0°0°0°0%0°0°0°0°0°0 o°o°o°o°o°o°o°o°°rs°o°o°o°o°o°o°°°°°°o°o°o°o°o°o°o 0 0 0 0 3 o 0 0 0 0 0 0 0 0 o_o o�LARGE COBBLE/SMALL BOULDERS 3o oo°000°00000 000, AND/OR NC CLASS 2RIPRAPoo°o°00000 o°o-o-o-o-o-o-o----0000000 000°000°o°o°o°0°0°0°°0°0°°°°0°0°0°0°%%%0°0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oo 0 0 0 0 0 0 0 0 0 0 0_0 00 00 00 00 0 tiy_= COURSE GRAVEL tititi t 0 0 FINISHED APRON SURFACE // //: EXIST. TIE ROD EXIST. COPING BEAM EXIST. RELIEVING PLATFORM EXIST. CONVEYOR GALLERY FOUNDATION • EXIST. SHEET PILE EXIST. H PILE —EXIST. SHEET PILE DESIGN ELEVATION FOR POTENTIAL FUTURE DREDGE =-45.15 TYPICAL SECTION - EXISTING SCOUR HOLE REPAIR LOCATION ( EAST END OF BERTH 4 ) SCALE: y" = 1' DESIGN TIP ELEVATION = -71.07 NOTES: 1. EXISTING FEATURES SHOWN IN THIS SECTION ARE FOR THE CONTRACTORS REFERENCE ONLY AND BASED ON AS -BUILT DRAWINGS (DATED 1969) PROVIDED BY NC PORTS. THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION AND DIMENSIONS INDICATED HEREIN. IF DISCREPANCIES EXIST BETWEEN THE DRAWINGS AND SITE CONDITIONS, THE CONTRACTOR SHALL INFORM THE OWNER. 2. EXISTING FEATURES SHOWN IN THIS SECTION SHALL REMAIN IN PLACE, UNLESS NOTED OTHERWISE. 3. FOR THE PURPOSE OF THE CAMA PERMIT APPLICATION, THE MEAN LOW WATER IS DEPICTED AS 0.00 AND IS THE REFERENCE FOR WATER DEPTHS AND LAND ELEVATIONS DEPICTED. 4. THE COMPLETE DETAIL FOR THE EXISTING SCOUR HOLE REPAIR LOCATION FILL SECTION AT THE CORNER OF BERTHS 3 AND 4 CAN BE SEEN IN THE REHABILITATION OF BERTHS 2, 3, 4, 7 AND 8 PLANS FROM MAY 2001. THE DEPTH OF THE ARMOR LAYER SHOWN FOR THIS CROSS SECTION WAS APPROXIMATED BASED ON THESE PLANS, ACTUALLY DEPTHS OF THE CHANNEL BOTTOM MAY VARY IN THIS LOCATION. 8' 6' 4' 2' 0 8' 16' � ■ ■ SCALE: 1 /8" = 1 '-0" PROJECT LOCATION: r wmw NCO"' Ce ci)? J F ❑ O w < w ax M � O 2 CARTERET COUNTY APRIL 15, 2022 CROSS SECTION VIEW PERMIT DRAWINGS EXISTING AND PROPOSED FEATURES PORT OF MOREHEAD CITY IMPROVEMENTS TO BERTHS 4 & 5 NORTH CAROL! or