HomeMy WebLinkAboutNCC222342_NOI Application_20220628Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 6/23/2022 5:24:09 PM (NCG01 NOI Submission)
Approve by Broussard, Brooklyn C 6/24/2022 9:04:13 AM (Review - NOI 95006 LBT: Schedules I & II - Partial Parallel
Taxiways - Runways 23 & 5)
• The task was assigned to Broussard, Brooklyn C by round robin distribution 6/23/2022 5:24 PM
• The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 28, 2022 5:00 PM
6/23/2022 5:24 PM
by Workflow 6/24/2022 9:04:26 AM (Workflow Start Event)
Submit by Georgoulias, Bethany A 6/28/2022 12:04:11 PM (Payment Verification for NCC222342)
* W. Stephen Bright
• Georgoulias, Bethany A assigned the task to Georgoulias, Bethany A 6/28/2022 7:49 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 5, 2022 5:00 PM
6/24/2022 9:04 AM
�a
NORTH CAROLINA,
Enri--tn! C2-1;ly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting No
an NOI that was • Yes
rejected before?
Previous Rejected 94769
NOI No.
Prior Reviewer Name Brooklyn Broussard
la. Project Name* LBT: Schedules I & II - Partial Parallel Taxiways - Runways 23 & 5
1 b. Specific Lot
This field may be used to list specifc lot numbers.
Numbers
N/A
1 c. Parcel ID
List all PINs associated with this project.
Number(s) (PIN)
938123207700
2. County*
Robeson
3. Highway or Street 163 Airport Boulevard
Address* Street name only is acceptable if no address number assigned yet
4. City or Township* Lumberton
5. State* NC
6. Zip Code* 28358
7. Latitude* Enter the latitude in decimal degrees
34.6100
8. Longitude* Enter the longitude in decimal degrees (MUST be negative)
-79.0590
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 06/22/2022
Estimated Construction Project Start Date
10. Date to End* 03/08/2023
Estimated Construction Project End Date
11. SIC (Primary)* Commercial (1542)
Standard Industrial Classification for Development
12. Acres to be 29.00
disturbed* (including off -site borrow and waste areas)
13. Total site area 567.00
(acres) *
14. Post -construction 72.00
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-ROBES-2022-LBT. Schedules I & II - Partial Parallel Taxiways -
Runways 23 & 5
Assigned automatically (not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a. Receiving Cotton Mill Branch
Waterbody * Name of waterbody into which stormwater runoff will discharge
15b. Waterbody Index 14-14
No. * NC Waterbody Index Number
Stormwater No
discharges will flow Yes
to additional waters*
15c. Additional Jacob Swamp (Jacob Branch)
Receiving Waterbody Waterbody name
15d. Waterbody Index 14-17
No. NC Waterbody Index Number
15e. Additional Waterbody name
Receiving Waterbody
15f. Waterbody Index NC Waterbody Index Number
No.
16a. Is this project Yes
subject to the NC No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Permittee Information - Legally Responsible Entity and Individual
........................................................................................................................................................................
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as
a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
1. Permittee* Legally Responsible Entity
City of Lumberton
If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name.
Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the
registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership (FRO) Form.
2. First Name* Gary
If Corporation, enter Registered Agent First Name
3. Last Name* Lewis
If Corporation, enter Registered Agent Last Name
3b. Title Airport Manager
4. Permitee E-mail glewis@ci.lumberton.nc.us
Address*
5. Permittee 910-739-6480
Telephone No.*
6. Permittee Mailing Street Address
Address* 163 Airport Boulevard
Address Line 2
City State / Province / Region
Lumberton NC
Postal / Zip Code Country
28358 us
Check box if the Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address *
163 Airport Boulevard
Address Line 2
City
State / Province / Region
Lumberton
NC
Postal / Zip Code
Country
28358
us
8. Type of
Ownership is only individual if an individual is named in B.1. above.
Ownership*
Government - Municipal
C. Site Contact Information
Part C.
Project Site Contact Information
.................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Gary
Contact - First
Name*
2. Primary Site Lewis
Contact - Last Name*
3. Title Airport Manager
4. Site Contact E-mail glewis@ci.lumberton.nc.us
Address*
5. Site Contact 910-739-6480
Telephone No.*
6. Organization Name City of Lumberton
7. Site Contact Street Address
Mailing Address* 163 Airport Boulevard
Address Line 2
City
Lumberton
Postal / Zip Code
28358
8. Consultant Name (optional)
JD Lannou
First and Last name
9. Consultant E-mail jlannou@tbiilm.com
This person will be copied on all correspondence.
10. Consultant 910-763-5350
Telephone No.
11. Billing E-mail (For Annual Fee correspondence)
glewis@ci.lumberton.nc.us
Default is legally responsible person e-mail
12. Billing Telephone (For Annual Fee correspondence)
910-739-6480
Default is legally responsible person telephone
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Plan Approval Information
1. Date E&SC Plan 07/09/2021
Approved *
2. E&SC Plan Project ROBES-2021-021
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4. State DEQ Office* Fayetteville (FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan LBT Runway 5 & 23 Partial Parallel
Approval letter or Taxiways —Approved Erosion Control Permit_0709 411.93KB
Grading Permit
21.pdf
Must be PDF format
6. Signed FRO Financial Responsibility/Ownership Form
FRO_Signed.pdf 936.54KB
Must be PDF format
7. Site Location Map Must be PDF format (limit 20 MB)
1. USGS Location Exhibit-1.pdf 1.73MB
Please do not upload entire set of E&SC plans.
8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application. Include additional waterbodies if necessary.
The signed NOI Cert. Form and check will be mailed in to NCDEQ
office once approved.
9. NOI Certification NOI Cert_Signed.pdf 356.4KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613 (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project, for satisfying
the requirements of this permit, and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is, to the best of my knowledge and belief, true,
accurate, and complete based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person' (signing on behalf of Legally Responsible Person
named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee.
*An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Gary Lewis
Title Airport Manager
Organization Legally Responsible Entity
City of Lumberton
Date * 06/23/2022
F. Tracking and COC Info
NOI Tracking No. 95006
NC Reference No. NCG01-2022-2342
Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SP (passed
from workflow if eNOI approved)
Certificate of NCC222342
Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SIP (formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC222342-2022
Invoice Due Date 7/24/2022
Initial Fee $ 100.00
Invoice Status OPEN