HomeMy WebLinkAboutSW3220402_Stormwater Narrative_20220627VILLAGE AT GRANITE QUARRY - PHASE 2 BMP STORMWATER DESIGN NARRATIVE DPR No. 17031 Rev 2-18-2021, 5-7-2021, 2-04-2022, 3-15-2022 The enclosed package shows the results of the stormwater BMP design calculations for Phase 2 of Village at Granite community. The development is in Granite Quarry, Rowan County, North Carolina, at 3040 Faith Road. The net site area is approximately +/-108 acres and the existing conditions consist of covered buildings with pavement, open space and woods. This phase of the project's proposed development will be a 132 lot single-family residential homes. This phase has two (2) proposed stormwater BMP facilities for the site, a wet pond and a sand filter. All were designed per the latest NCDENR Stormwater design manual. Topographic maps and field observations were used to delineate the watershed basins and hydraulic path feeding into the study conveyance system. With this information, hydraulic lengths, time of concentrations (TOC), and basin slopes were determined for the pre -developed conditions. TOC of 5 minutes was used for all post -developed conditions. The total impervious areas of the development were calculated. The composite curve numbers (CN) were calculated based on the hydrologic soil types and groups from the U.S. Department of Agriculture, SCS method for the pre -developed and post -developed conditions. Surface areas for the wet pond was sized to handle the first inch of rainfall based on total impervious area of the watershed using the Schueler simple method and both basins were sized to provide for channel protection using the 1-year, 24-hr storm. Modeling results indicate that 2-year and 10-year (24-hr storm events, using SCS Method) release peak flow rates for the post - development detention routed conditions are less than that of pre -developed conditions. Precast concrete outlet structures are designed with 6" thick top slabs. The weir heights vary to allow the 100-year storm to pass below the bottom of the top slab. This insures that these outlets function as weirs and do not transition into orifices. Refer to the detailed maps, calculations, results, and details as shown in this package and in the civil engineering subdivision plans. C:IDPR Dropboxl ProjectsWctivel20l7ll7O31 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031- PH2-BMP Narrative.doc Page 1 of 2 Table 1: DRAINAGE AREAS: Basin No. Drainage Area Pre -Developed (+/- Ac.) Drainage Area Post -Developed (+/- Ac.) Phase 2 BMP #7 5.5 22.71 Phase 2 BMP #8 3.0 6.3 Phase 2 Temp BMP #9 2.5 ----- Phase 2 Temp BMP #10 5.0 ----- Phase 2 Temp. BMP #11 7.0 ----- Phase 2 Temp BMP #12 4.5 ----- Phase 2 Undetained Areas* 8.5 5.5 Total 36.0 34.51 TABLE 2: PRE -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) 25 - Year (cfs) 50-Year (cfs) 100-Year (cfs) Phase 2 BMP #7 0.279 0.920 4.164 6.821 9.137 11.64 Phase 2 BMP #8 1.303 2.219 5.116 7.047 8.646 10.32 Phase 2 Temp BMP #9 0.938 1.599 3.709 5.118 6.282 7.496 Phase 2 Temp BMP #10 0.135 0.503 2.725 4.646 6.391 8.289 Phase 2 Temp. BMP #11 3.283 5.963 14.58 20.52 25.50 30.71 Phase 2 Temp BMP #12 1.076 2.050 5.468 7.831 9.811 11.89 Phase 2 Undetained Areas* 3.189 6.917 19.34 27.95 35.18 42.80 Total 7.036 14.31 40.44 59.40 75.57 92.87 TABLE 3: POST -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) 25 - Year (cfs) 50 - Year (cfs) 100 - Year (cfs) Phase 2 BMP #7 41.73 58.01 105.41 134.88 158.40 182.32 Phase 2 BMP #8 12.19 16.78 30.12 38.33 44.87 51.51 Phase 2 Undetained Areas* 1.147 3.133 10.50 15.73 20.18 24.90 Total 54.95 77.92 145.32 188.27 222.83 258.21 TABLE 4: ROUTED -DEVELOPED DISCHARGES: 1- Year (cfs) 2 - Year (cfs) 10 - Year (cfs) 25 - Year (cfs) 50 - Year (cfs) 100 - Year (cfs) Phase 2 BMP #7 0.000 0.000 2.357 3.927 10.85 25.47 Phase 2 BMP #8 0.121 0.281 1.744 8.056 20.04 31.52 Phase 2 Undetained Areas* 1.147 3.133 10.50 15.73 20.18 24.90 Total 1.195 3.233 10.67 17.28 35.07 59.72 TABLE 5: ROUTED -DEVELOPED DISCHARGES EVELATION: 1 - Year 2 - Year 10 - Year 1 25 - Year 1 50 - Year 1 100 -Year Phase 2 BMP #7 724.45' 725.42' 726.39' 727.09' 727.44' 727.74' Phase 2 BMP #8 733.00' 734.15' 734.95' 735.38' 735.68' 735.91' FEMA Elevation BMP #7 724.50' 724.50' 724.50' 725.00' 725.50' 726.00' FEMA Elevation BMP #8 726.30' 726.30' 726.30' 726.80' 727.30' 727.80' *Undetained areas include areas that are disturbed during construction but covered with grass in the final condition. C:IDPR Dropboxl ProjectsWctivel20l7ll7031 Village at Granite (Partial)IPhase 21CALCSIBMPIPhase 2117031- PH2-BMP Narrative.doc Page 2 of 2