HomeMy WebLinkAboutSW3220402_Supplement-EZ Form_20220627SUPPLEMENT-EZ COVER PAGE
LOAD SUPPLEMENT FORMS
(PROJECT INFORMATION
Name
Area (ac)
Wetland Area
Water Area (z
at Granite Quarry - Phase 2
58.27 ac (Phase 2)
0 ac
2.50 ac
5 1 Is this project High or Low Density? High
6 1 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)
30 ft
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
Yes
10
lis streambank stabilization proposed on this project?
Yes
NUMBER AN SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
1
17
Rainwater Harvesting (RWH)
18
Green Roof
19
Level Spreader -Filter Strip (LS-FS)
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
Dry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
1 Filterra
LOAD SUPPLEMENT FORMS
SIGNER CERTIFICATION
27
Name and Title:
Hy V. Nguyen, PE
28
Organization:
DPR Associates, Inc
29
Street address:
420 Hawthorne Lane
30
City, State, Zip:
Charlotte, NC 28204
31
1 Phone number(s):
704.332.1204
32
Email:
hnguyen@dprassociates.net
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
G A
�,sSo°
SEAL
030523
., y°•o�INE�o �
V11rNmU��\\\\`��
Seal
f �
Signature of Designer
02-19-2021
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
3
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
3
4
Type of SCM
Total Phase 2
Wet Pond 7
Sand Filter 8
Bypass
5
Total drainage area (sq ft)
2,435,439
989,247
274,428
1,171,764
6
Onsite drainage area (sq ft)
2,429,341
989,247
268,330
1,171,764
7
Offsite drainage area (sq ft)
6,098
0
6,098
0
8
Total BUA in project (sq ft)
599,481
455,597
113,634
30,250
9
New BUA on subdivided lots (subject to
permitting) (sq ft)
370,920
303,890
67,030
0
10
New BUA not on subdivided lots (subject to
permitting) (so
228,561
151,707
46,604
30,250
11
Offsite BUA (sq ft)
0
0
0
0
12
Breakdown of new BUA not on subdivided lots:
-----
-----
-----
-----
Parking (sq ft)
1,597
0
0
1,597
Sidewalk (sq ft)
55,718
36,550
11,600
7,568
Roof (sq ft)
0
0
0
0
Roadway (sq ft)
154,150
100,545
32,520
21,085
Future (sq ft)
0
0
0
0
Other, please specify in the comment box
below (sq ft)
17,096
14,612
2,484
0
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
0
0
0
0
14
New infiltrating permeable pavement not on
Isubdivided lots (sq ft)
0
0
0
0
15
Existing BUA that will remain (not subject to
permitting) (sq ft)
0
0
0
0
16
Existing BUA that is already permitted (sq ft)
0
0
0
0
17
Existing BUA that will be removed (sq ft)
0
0
0
0
18
Percent BUA
23.6%
46.05%
41.41 %
2.58%
19
Design storm (inches)
1.0 in
1.0 in
1.0 in
20
Design volume of SCM (cu ft)
40,121 cf
7,250 cf
21
Calculation method for design volume
Simple Method
Simple Method
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
BMP 7 2,840 sf (Proposed Turn Around) + 11,772 sf (driveway within ROW)
BMP 8 2,484 sf (driveway within ROW)
WET POND
area number
MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
713.50
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
714.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
721.00
23
Elevation of the permanent pool (fmsl)
721.50
24
Elevation of the top of the vegetated shelf (fmsl)
722.00
25
Elevation of the temporary pool (fmsl)
723.04
26
Surface area of the main permanent pool (square feet)
16,653
27
Volume of the main permanent pool (cubic feet)
93,113
28
Average depth of the main pool (feet)
7.50 ft
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
311
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
32,748
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
66 in
35
Design volume of SCM (cu ft)
40,121
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
4 in
381
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3.83
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of forebay at entrance (inches)
74 in
441
Depth of forebay at exit (inches)
66 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
No
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
sweet flag
541
Hasa plantinq plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about the
wet pond(s):
SAND FILTER
MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Y-es
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
151
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM desi ned b an NC licensed rofessional?
Yes
SAND FILTER
MDC FROM 02H .1056
18
SHWT elevation (fmsl)
718.81
19
Type of sand filter (open or closed)
Open
20
If closed, will the filter will be pre -cast or pour -in -place?
21
If closed, top of grate elevation (fmsl)
22
Is this sand filter designed to attenuate peak flows?
Yes
I Sediment Chamber
23
Volume that can be retained in the sediment chamber (cubic feet)
7,250
24
Will there be a permanent pool in the sediment chamber?
No
25
Bottom of the sediment chamber fmsl
731.00
26
Area of the sediment chamber (square feet
8,228
27
Physical depth of the sediment chamber inches
24 in
28
Ponding depth in the sediment chamber, above any permanent pool
inches
16 in
29
Elevation of top of weir between chambers (fmsl)
734
ISand Chamber
30 Volume that can be retained in the sand chamber (cubic feet)
31 Bottom of the sand chamber fmsl
32 Area of the sand chamber(square feet
40,810
731.00
1000 sf
33
Physical de th of the sand chamber inches
24 in
34
Ponding depth in the sand chamber, above the sand surface
inches
24 in
351
Elevation of the bypass device (fmsl)
36
Type of bypass device
37
Mechanism for distributing flow over the sand surface
38
Sand specification for sand chamber
ASTM C-33
Medium
39
Depth above underdrain pipe (inches)
40
Will the media be maintained to drain at least two inches per hour at
the sand surface?
Yes
41
Is at least one clean -out pipe provided at the low point of each
underdrain line?
Yes
42
Will clean -out pipes be capped?
Yes
ADDITIONAL INFORMATION
43
Please use this space to provide any additional information about the
sand filter(s):