HomeMy WebLinkAboutDWR Pre-Filing Meeting Request Form.pdfID#* 20210864
Version* 1
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Garcy Ward
Pre -Filing Meeting Request submitted 4/26/2021
Contact Name * Steve Trovvell
Contact Email Address* sjtrowell@ncdot.gov
Project Name* SR 1122 Hydeland Canal Road Shoulder Repair and Stabilization
Project Owner* NCDOT
Project County* Hyde
Owner Address: Street Address
113 Airport drive, Suite 100
Address Line 2
aty State / Frovince / Region
Edenton North Carolina
Rbstal/Zip Code Country
27932 us
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Garcy Ward
Please give a brief project description below and include location information.
Project site is located on SR 1122, Hydeland Canal Road adjacent
the Hydeland Canal off the head of Juniper Bay in Hyde County near
swan Quarter, North Carolina. Boat traffic utilizing the NC WRC
boating access area is causing the bank to erode with the erosion
reaching the gravel travel lanes creating unsafe driving conditions.
NCDOT proposes to repair the shoulder to a minimum shoulder width
of 5' then armor the shoulder with class B riprap. Approximately 3,000
linear feet of riprap is proposed to protect the reconstructed
shoulder.
Please give a couple of dates you are available for a meeting.
4/30/2021
5/7/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 4/26/2021