Loading...
HomeMy WebLinkAbout20220847 Ver 1_Shoreline Stabilization_20220627Shoreline Stabilization Application Form NORTH CAROLINA Environmental Quality 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * office@marineconstructionllc.com Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was 5/20/2022 submitted on: * Owner Information: Name: * Email: * Phone Number: Mailing Address: * Harold and Adrienne Perkins hperkins@continuumfinancial.com (281)608-8644 (xxx)xxx-xxxx Street Address 130 Hunters Hill Drive Address Line 2 City Statesville Postal / Zip Code 28677-9773 State / Province / Region NC Country US Is there an agent working on the project?* Yes No Agent/Consultant Information Name: * Charlie Washburn Company Affiliation: * Marine Construction LLC Email: * office@marineconstructionllc.com Phone Number:* Mailing Address:* (828)495-3040 (xxx)xxx-xxxx Street Address PO Box 6400 Address Line 2 City State / Province / Region Hickory North Carolina Postal / Zip Code Country 28603 USA A signed and dated copy of the Agent Authorization letter:* Perkins- Agent Authorization Form.pdf 620.56KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name: * Perkins- Granite Falls If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File Look up address Upload Map: Perkins- Directions and GIS Map.pdf 2.94MB Latitude:* 35.798000 Longitude: *-81.342000 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Perkins- Scope of Work.pdf 5.48MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) Property Picture, Survey, and Buffer.pdf 4.86MB 4. Location of the property (where work is to be conducted) Nearest Town: * Granite Falls County: * Caldwell Lake/ river/ ocean adjacent to Lake Hickory property: Subdivisions name or site address: * 6133 Plantation Pointe Dr - Plantation Pointe Lot 9 Include phase/lot number Directions to site: * Included above. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * Residential/ undeveloped Residential, undeveloped, etc. 6. Property Size 1.14 Acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): We plan to stabilize the shoreline by placing riprap along it. 8. How will the work be done?* From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 330sgft square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 330sgft square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) Scrappy vines and trees. We plan to remove 17 trees but replant 1 for 1 native hardwood trees upon completion. Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND a I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Charlie Washburn Signature: Submittal Date: 6/22/2022 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20220847 Version:* 1 Select Reviewer: * Mitchell Anderson:eads\mlanderson Select Reviewing Office: Asheville Regional Office - (828) 296-4500 Has payment been received?* ( No Payment Needed C Fee Received C• Need Fee - send electronic notification What amount is owed?* C• $240.00 C $570.00 PROPERTY LEGAL DESCRIPTION: LOT NO: 9 AUTHORIZATION FORM PLAN NO: STREET ADDRESS: 6133 Plantation Pointe Dr PARCEL ID: 0814719 Granite Falls, NC 28630 Please print: Property Owner: Harold and Adrienne Perkins Property Owner: The undersigned, registered property owners of the above noted property, do herebyauthorize Charlie Washburn , of Marine Construction LLC (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): 130 Hunters Hill Dr (Mailing) Statesville, NC 28677 (281)608-8644 Telephone: We hereby certify the above information submitted in this application is true and accurate to the bent of our know dge. Client ignature Date _-.," Z(////7.- Charlie Washburn (/2022CQ-21-22 Date .14 1117 Shiloh Church Road, Hickory, NC to 6133 Plantation Pointe Dr - Google Maps 6/14/22, 4:06 PM 1117 Shiloh Church Rd Hickory, NC 28601 1.: Head southeast toward Shiloh Church Rd 6 s (92 ft) Take Hubbard Rd and (card Dam Rd to Rocky Mt Rd in Caldwell County r3 2. Turn right onto Shiloh Church Rd 'i 3. Continue straight onto Hubbard Rd 4. Continue onto (card Dam Rd 41 5. Turn left onto Petra Mill Rd 8 min (4.3 mi) 253 ft 1.9 mi 1.4 mi 0.9 mi Continue on Rocky Mt Rd. Drive to Plantation Pointe Dr 4 min (1.5 mi) 1.1 mi 427 ft 41 6. Turn left onto Rocky Mt Rd h 7. Turn left onto Lovelady Dr r > 8. Turn right onto Plantation Pointe Dr 0 Destination will be on the right 6133 Plantation Pointe Dr Granite Falls, NC 28630 These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. 0.3 mi https://www.googl e.com/maps/dir/1117+Shiloh+Church+Road,+Hickory...851254a88da72e7:Oxeda8df3d 52f4c2ae!2m 2!1 d-81.342393!2d35.798189 Page 2 of 2 1117 Shiloh Church Road,Hickory,NC to 6133 Plantation Pointe Dr-Google Maps 6/14/22,4:05 PM r ' N,a ; , 1117 Shiloh Church Rd, Hickory, NC 28601 to 6133 Drive 5.8 miles, 11 min Plantation Pointe Dr, Granite Falls, NC 28630 }+..`NSF . .,. Y' t . g.i� Grace: hapel 0 a M. it I0V, 4;;av a E'.tt -.; to a �� .. 1�FarmersMarket® �' ✓ �' 1 ^+> � �r a �L i .ram E�, s S:� .4.f , I �°�s • ;,./ • ;.. ��;��'' f`v.���. a . ' ,�� m :. fi , , a :t Kanupp Kennels 4l. ,y % 'ter � ' a3 w '� �' t � f !t Bethlehemfi� '$,. sv„ y P . " 4Li#Kennelo* • - ., X "� Grace Chapel _ : a�, vi £ �'+ - 3 i e ., d �' I T H to Ada°. :1•=.11,14-1:31. _ i 7, sc #tz•' �, + � S� ay is @P T� :._- a ,' y. y ;.1 ;I'� kDm ac:. ,r � .k : fi �sr G1ranada Golf•Course .. r 17 s7 `. a '',.;...re ; c �a? e n 3`ri `� y ; ' ; Witten berg Access�A, '^`� � •-Players Ridge Golf+ -� ® + 7' , rfr-,,...,.., ,,‘: ,...,, 74- ' i', f; �-y e 6133 Plantation ,»du�ti D; ,,er .: `'Pointe Drive Lovelady Access Area i' r � Gunpowder Boat Ramp d '* i •tains Galley Seafood �' ;., 1f` ,, f� Market Basket " L�CC+ _ a:.p° ., - t 4�5 y ,fir { Google RNERBEND ,+ . -';s.r Imagery©2022 Alexander County,Burke County,CNES/Airbus,Landsat/Copernicus,Maxar Technologies,Orbis Inc,U.S. 2000 ft Geological Survey,USDA/FPAC/GEO,Map data©2022 t via Hubbard Rd 11 miry Fastest route now due to traffic 5.8 miles conditions Explore 6133 Plantation Pointe Dr Restaurants Hotels Gas stations Parking Lots More https:j/www.google.comjmaps/dir/1117+Shiloh+Church+Road,+Hickory..,8851254a88da72e7:0xeda8df3d52f4c2ae!2m2!1d-81,342393!2d35,798189 Page 1 of 1 -----.., \iii, ,A �Dy��pe.� \� 4rRO 4 t ''0111110- ) 140,,, z---....-- *//---------, 1, ...--- it -""".....— , s, „-- .\-N ,. 'i. f. /� ,,.. ),s, aQp P1AR0. .6' N "nr+or+ oiusE° _ 4 A _—_f This map is NOT of land survey quality and is NOT suite Ile for such use. Owner PERKINS HAROLDJ Deferred Val $ Caldwell Count PERKINS ADRIENNE R Assessed Val $180,900 y 8311 SHOREGROVE DR 1.5651 HUMBLE,TX 77346 Cale Acreage 1.1406892 0 50475 0095 0.19 ml Land Units 1(LT) I eer Acct Number 170287 Legal Desc BK 2006 PG 2158 YR 2020 ST 420.00 0 0.075 0.�5 0.3 an Parcel ID 08147 1 9 NCPIN 3705534642 Plat Ref 00019/00414 June 21,2022 Property Addr 6133 PLANTATION POINTE DR State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization ENVIRONMENT AI.auAL€ r FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments)and the application fee should be sent to: If sending via US Postal Service If sending via delivery service(UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR-401& Buffer Permitting Branch DWR-401& Buffer Permitting Branch 1617 Mail Service Center 512 N.Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Harold and Adrienne Perkins Mailing Address: 130 Hunters Hill Dr Statesville NC 28677 Telephone Number: 281-608-8644 Fax Number: N/A E-mail Address: hperkins@continuumfinancial.com 2. Agent/Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: Charlie Washburn Company Affiliation: Marine Construction LLC Mailing Address: PO Box 6400 Hickory, NC 28603 Telephone Number: 828-495-3040 Fax Number: N/A E-mail Address: office@marineconstructionllc.com B. Project Information [15A NCAC 02H .0502(a)& (b)] 1. Attach a vicinity map (i.e.street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers,and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM:SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/buffer proposed to be stabilized. (Include a scale of some sort-a yard stick,shovel handle, etc.) 4. Location of the property(where work is to be conducted) County:Caldwell Nearest Town: Granite Falls Lake/river/ocean adjacent to property: Lake Hickory Property size (acres): 1.14 Acres Subdivision name or site address(include phase/lot number): Plantation Pointe Directions to site-please include road names and numbers, landmarks, etc.: Included in packet Latitude (in decimal degrees)35.798 Longitude (decimal degrees)-81.342 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped,etc.): Residential undeveloped 6. Describe proposed work(include discussion as to how hardening of shoreline has been avoided, or why it is necessary): We plan to stabilize the shoreline by placing nprap along it. 7. Will work be conducted from land?X From water? 8. Total amount of impacts below the normal pool lake level/Normal Water Level Permanent impacts(including all excavation, backfill, rip rap, retaining walls,etc.) in square feet: 330 sqft Temporary impacts in square feet: sqft 9. Total amount of impacts above the normal pool lake level/Normal Water Level and 50 feet land-ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 330 sqft Temporary impacts(temporary clearing, construction corridor) in square feet: (Construction corridor= 1,360 sqft) 10. Please describe the vegetation above the normal pool lake level/Normal Water Level and 50 feet landward to be impacted (number of trees,for instance): Scrappy vines and trees We plan to remove 17 trees but replant 1 for 1 native hardwood trees upon completion 11. Sign ure /71 7.k 5 Z Owner/Agent's Signature* [15A NCAC 02H .0502(f)1 Date *Agent's signature is valid only if an authorization letter from the owner is provided. FORM:SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls,docks,etc. e. Location of any excavation or dredging below the Full Pond/Normal Water Level elevation Lake (At Fulf Pond/Normal Water Level) i 1 ---110 i 330 5t�4- Ue i 0f1 IiM- C rY(cAP) 0 a6 d Full Pond/ Normal Water revel misShoreline "'"/� ` / f - '. 1a- x 110 C6w61-rve i-to ,, Cerr,dor 330, 51/1-4' A.y /G NUL- /' / /� r 3'x l 10 I f�;?r4, hscw # \1 +-r4,45 TO bz A ; C-e,Made,d. IA. Z,ont 1- I 0 {`..00 14-e d. U'4 ./ ° „+„.vL °N&tMio®l....1. f Plan Vie .4 r . Nlr l`n.a.',&I 4"t'11 /r Lake (At Fa 3 Po dl twtmG34.,t 3- 1 .• Existing Dock33 h tom, . l r v-.^^ ^^ 3h,i Ott •. Y _ Apt � & toll W�td/NWL Full Pond/Normal Water Level' l�. ore me ae oh. Rf ra'--K:-Rip rap Above full po-�d�NWL 2 It 150h ..�AX ` addni�na clearing i� 'Fnece�ary Plan View FORM:SSGP 02-2017 Page 3 of 4 r�o a�'-°'�'"9 _ _ � . . _ _ - o i Tr�pa(a."O C12X \10 3x \�� `P _ �'a Can3\NC1hbn Corr �o(- KIWL 3 CC�b0 l! - plus on OLf, etuft tisS"l l (,it FLU Pore ' rile'Water .e '°a rf VIP 1544 a) 110 IlC XV ♦ lit s. 19 y l Side View 2 ft.additional clearing 3 ft below full pond water level 4 ft.above full pond water level *i{necessary I I 1 1 1 Existing bans; , 4 04 14 IV: loft bank i illilice 1 N. b height 11r d ' 1111/ �OQ Q ah 3 Side Vi Auk 1 0 qb/ ,0 FORM.SSGP 02-2017 Page 4 of 4 _ �'. 'ti ' / • : . CIA► `Fi . w ' tom' � '�� ' • .-. n Y .. ._ a.h«hew...r., ....-snxt:eka' 3^'�._ Yi#,.cs>YiYSF+r 091940,30 M.a�;. me*.0109*•m•r=r}rrlgeewlefee*Wee rr A* I r9x.,..,9r.;Wee W.Yogkrr:.FF.tei4,lf ..a}rr�±!aaWa + I .. '•oe.,rey eye.emKt x*aer gels,tee**99* .' 1�a rleA+ CYeSte OD+Yt° •Or*a**roeM+.enetx-edr±W*ee+reve �IkTJ ra+$i62Mk+!H wXrt � y�y YM 04,reo r'8+.d�Y a: :Meee hewnyyya Wn.RxreM r.4'.ver � rwuxa.r �' aYlr x+aNme1 9s 34Me. t xwa<rr rm.x w✓MW trdK#eMM 4MyairaM ra'•aw,wk.raw 01003.4999099 xhMemmem me'W.ea0 : 070010;,+� 3 N:HrlE:,W4r 47..... ruY,r;-dr&M MrMNkAYa } �'' ... ar Y4yr-'A1+N 77.0.7 _.,RYywwxO ".0.irill-rat�-"" te�'as>.W[a+J.a'.01t'A/ai "r`.o.rr+rY�.r.r+r xw.:fr F 4„0 f}'"M59f.r R. r3"ID'MhIA4o,..s a:StR P'(IX•.en wia 747KY+}r �•••..�' +lrs7xw. A,041 Foeye .4.4..4'4 re,feeeflY.ra.ri rdin- M90.990+WrR'rya.}. -pert 4!e<s.a'�•arr Alf10.109,...r 0 ? .� �'•n"""'. ru.,.�ik „'aPNr..�yr - g„ $3fx'A"�*:,ni�F B4N4A'er.,'Fat�. ¢ +a13 �.*v iY' tRRlRMISE f'.s n X ...14.' r 14� q sr.+,.sw.ars,ara• r,r...u+ .saa Y*.l+ '0a < '.3" , t(t 3 €r^'a' 13/.ulltmr603ki`fYl Ys-�Ks ::a3t*4401fli'd N[n#:i yq��. i j{ w.eO..iee ewer f•ar11.Y\Yrir or' -' - ,. • - �u i elm La bx ern+her a A:x%Jrar!.- - e 41701,474120 !61..>Y.'•-9•**00031,09 Mho w aeN' ] ....� .... "}y7$� l�yyA(irITO�M�I 1 gg rite seesa.M{3.4.rua; ._-......,5 Ct 90 M, • di7? 3V6i.7k�13i1YLf _ - *,;- ..s.r$aq a �r . i Me 09 MAX* ^ ,�f E Y t�"P 4 trill : • 44� . \ Milt .o0Y,w$rra i' i • ,Y... `tip -�„� �d! •, 'W • t i r "', Aa*"3Y 5?rid!`/Tres `Y '.i, '. +r--- • f ...440.0 ra A, t -�F- `1 nrslYrw:erwasems t "` mr mis} `' i iftate,Tw'atreiaet210.YPC :i - ''`,. ``4,, �"; *• \t ,",., 1 owe sr ilArt}RYF$r.IF.tt• S � a.....r YIL ^ '�t +mom w,...,r 0 'C. 1 melee*...lap fro -$a4 r .a.-�•iY•esltr au,rr t Y 1 4{` .,+.w•„a.w..Y.,ya fma %•"�` s.S rb�>F - r+ny "� 9r4 twa.a: • "L"°` '`f °�..a; ; "' .,r,y.. ..rw .__ t+r..*�.w„ . . p ......" rm.s _ _ r F r$•- z...I.r elerl4nne i p -.i y*,, _, .' .9r F r,k ry.e wdpwwv '°4a '3•.'�^ ; M1 .. � Yri''}Y.?A'*.. 4fa .F .wT..ar�...„..`.. ***0090009 of x'.Mer.F .?; uYF s:.� x.' �r fir .,•Y Waw,w-9Y. a - + rx v 4.4 .s ar era: ,x',teeter'r: 3.'r re.eerekt.f_.•*era OREM x.. .raiF'.L.bY9 xaxn .0404, 1,• r41'�"+9d.MlRx .A., ,r, •t'+.i ...cr rr'ro'aLr Jr«d.w.+a:+.A ix,,..:Mere eNfv eMr -_! r• erne Ls,*f`✓G 1"1 3,11 f.1�� y VKIMP'Y•4hYRYR .1110,?A'YA}ir9} rPF.yM �y f dio, 8 k . 4.w..9.fW4M...,.., 4.4••rn ,.... ark...$: -aie4 0M4114 In9 401(f4I 9**4l. 4a- 4s00 AY'"..A :17":2...5 tf.,XPoe ew. CATAWBA RIPARIAN BUFFER NOTIFICATION FORM nty:Project Name/address:/ Perkins- Granite Falls C Idwell Owner: 4b /��v eM Z� t /C%i%�> L( 2L' %, ��"` Print Signature Contractor/agent:Charlie Washburn—Marine Construction LLC l/vC ,"_,.°` Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule.Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B.0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer(within 30 ft of the full pond elevation), unless approved. Exception,those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B.0243 (6)] Beaches,impervious patios,impervious walkways,etc.are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4)and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described.The approved access corridor shall be restored. Staging,spoil,construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4), (6),(8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B.0243(5), (6)] Acknowledgement of Notification Harold & Adrienne Perkins I, ,hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plan(s)and specification(s),and other supporting materials. L //, Signature (owner): 7 ��" dry /aiiOA b//J /?o2Z Date: