Loading...
HomeMy WebLinkAbout20180182 Ver 1_Yd 01- Red Barn Instrument-EPR-signature-L Culpepper_20191113ROY COOPER Govemor MICHAEL S. REGAN secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality November 12, 2019 tiP TO: Linda Culpepper Director FROM: Mac Haupt Acting Supervisor, 401 and Riparian Buffer Permitting Branch Stream and Wetland Mitigation Coordinator 0'6 SUBJECT: Division Approval of the Red Barn Mitigation Bank, Yadkin 01, Ecosystem Planning and Restoration (EPR), PLLC v The attached Mitigation Banking Instrument (MBI) is between: Ecosystem Planning and Restoration (EPR), PLLC and the U. S. Army Corps of Engineers (COE) and each of the agencies listed on the signature page. The project for this Bank is the Red Barn site in Surry County. The attached Banking Instrument is for stream and wetland credit only. I have reviewed the attached MBI and it is ready for your approval. Please sign the attached signature page and return the document to me for final execution. North Carolina Department of Environmental Quality 1 Division of Water Resources 512 North Salisbury Street 1 1617 Mali Service Center 1 Raleigh, North Carolina 27699-1617 919.707.9000 AGREEMENT TO ESTABLISH THE RED BARN MITIGATION BANK IN THE YADKIN RIVER BASIN (HUC 03040101), SURRY COUNTY, NORTH CAROLINA July 2019 USACE approval of this Instrument constitutes the regulatory approval required for the Red Barn Mitigation Bank Site to be used to provide compensatory mitigation for Department of the Army permits pursuant to 33 C.P.R. 332.8(a)(1). This Instrument is not a contract between the Sponsor or Property Owner and USACE or any other agency of the federal government. Any dispute arising under this Instrument will not give rise to any claim by the Sponsor or Property Owner for monetary damages. This provision is controlling notwithstanding any other provision or statement in the Instrument to the contrary. This Mitigation Banking Instrument (MBI) is made and entered into on this day of 2019, by Ecosystem Planning and Restoration (EPR), PLLC hereinafter Sponsor, and the U.S. Army Corps of Engineers (Corps), and each of the following agencies, upon its execution of this MBI; the Environmental Protection Agency (EPA), the U.S. Fish and Wildlife Service (FWS), the National Marine Fisheries Service (NMFS), the North Carolina Wildlife Resources Commission (NCWRC), the State Historic Preservation Office (SHPO) and the North Carolina Division of Water Resources (NCDWR). The Corps, together with the State and Federal agencies that execute this MBI, are hereinafter collectively referred to as the Interagency Review Team (IRT). WHEREAS the purpose of this agreement is to establish a mitigation bank (Bank) providing compensatory mitigation for unavoidable wetland and/or stream impacts separately authorized by Section 404 Clean Watcr Act permits and /or Section 10 of the Rivers and Harbors Act permits in appropriate circumstances; WHEREAS the agencies comprising the IRT agree that the Bank site is a suitable mitigation bank site, and that implementation of the Mitigation Plan is likely to result in net gains in wetland and/or stream functions at the Bank site, and have therefore approved the Mitigation Plan; THEREFORE, it is mutually agreed among the parties to this agreement that the following provisions are adopted and will be implemented upon signature of this MBI. Section I: General Provisions A. The Sponsor is responsible for assuring the success of the restoration, rehabilitation, creation, and enhancement activities at the Bank site, and for the overall operation and management of the Bank. The Sponsor assumes the legal responsibility for providing the compensatory mitigation once a permittee secures credits from the Sponsor and the District Engineer (DE) receives documentation that confirms the Sponsor has accepted responsibility for providing the required compensatory mitigation. B. The goals of the Bank site are to restore, rehabilitate, enhance, and create wetland and stream systems and their functions to compensate in appropriate circumstances for unavoidable wetland and stream impacts authorized by Section 404 of the Clean Water Act 1 By: IN WITNESS WHEREOF, the parties hereto have executed this Agreement entitled "Agreement To Establish The Red Barn Mitigation Bank in the Yadkin River Basin (HUC 03040101), Surry County, North Carolina": BANK SPONSOR Ecosystem Planning and Restoration, PLLC By: Date: INTERAGENCY REVIEW TEAM U.S. Army Corps of Engineers: By: Date: U.S. Environmental Protection Agency: By: Date: U.S. Fish and Wildlife Service: By: Date: N.C. Division of Water Resources: ( N.C. Wildlife Resources Commission: Date: 11 /51,1c19 By: Date: NC State Historic Preservation Office: By: Date: 10