NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
June 16, 2014
GHM Group, LLC
Attn: Lorraine Mohler
7670 Raeford Road
Fayetteville, NC 28304
John E. Skvarla, III
Secretary
DWR # 14 -0500
Cumberland County
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
West Hampton — Phase II
Dear Ms. Mohler:
You have our approval for the impacts listed below for the purpose described in your application dated
May 19, 2014, received by the Division of Water Resources (Division) May 19, 2014. These impacts are
covered by the attached Water Quality General Certification Number 3890 and the conditions listed
below. This certification is associated with the use of Nationwide Permit Number 29 once it is issued to
you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or
local permits before proceeding with your project, including those required by (but not limited to)
Sediment and Erosion Control, Non- Discharge, and Water Supply Watershed regulations.
This approval requires you to follow the conditions listed in the enclosed certification(s) or general
permit and the following additional conditions:
1. The following impacts'are hereby approved provided that all of the other specific and general
conditions of the Certification, General Permit and /or Buffer Rules are met. No other impacts
are approved, including incidental impacts.
Type of Impact
Amount Approved (units)
Permanent
Amount Approved (units)
Temporary
404/401 Wetlands
0.18 (acres).
0.122 (acres)
Perennial Stream
105 (linear feet)
44 (linear feet)
2. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If you
Fayetteville Regional Office
225 Green Street, Suite 714, Fayetteville, North Carolina 28301 -5095
Main Phone: 910 -433 -3300 1 Internet: http: / /www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer — Made in part by Recycled Paper
GHM Group, LLC
DWR# 14 -0500
401 APPROVAL
Page 2 of 4
change your project, you must notify the Division and you may be required to submit a new
application package with the appropriate fee. If the property is sold, the new owner must be
given a copy of this approval letter and General Certification (s) /Permit /Authorization and is
responsible for complying with all conditions.
3. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre - Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
4. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation; operation, and maintenance of the sediment and erosion control
- measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor -owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
5. No Sediment & Erosion Control Measures in Wetlands or Waters
Sediment and erosion control measures should not be placed in wetlands or waters without
prior approval by the Division. If placement of sediment and erosion control devices in wetlands
and waters is unavoidable, design and placement of temporary erosion control measures shall
not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or
banks, adjacent to or upstream and downstream of the above structures. All sediment and
erosion control devices shall be removed and the natural grade restored within two (2) months
GHM Group, LLC
DWR# 14 -0500
401 APPROVAL
Page 3 of 4
of the date that the Division of Land Resources or locally delegated program has released the
project.
6. The SMP approved by the Stormwater Permitting Unit on April 24, 2014 (SW6140302) under the
state stormwater program meets the requirements of the 401 Certification Program:
7. Certificate of Completion
Upon completion of all work approved within the'401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to'return the attached
certificate of completion to the DWR WEBSCAPE Unit at: 1650 Mail Service Center, Raleigh,
North Carolina 27699 -1650.
This approval and its conditions are final and binding unless contested. This Certification can be
contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an
administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form
may be obtained from the OAH at http: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919)
431 -3000 for information.
Within thirty (30) calendar days of receipt of this notice, a petition must be filed with the OAH. A
petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is
received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm,
excluding official state holidays).
The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the
petition along with any applicable OAH filing fee is received by the OAH within five (5) business days
following the faxed transmission.
Mailing address for the OAH:
If sending by First Class Mail
via the US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
If sending via delivery service
(e.g. UPS, FedEx):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609 -6285
One (1) copy of the petition must also be served to DENR:
Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699 -1601
Please send one (1) copy of the petition to DWR:
If sending by First Class Mail
via the US Postal Service:
Karen Higgins
NC DENR -DWR — Webscape Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
If sending via delivery service
(e.g. UPS, FedEx):
Karen Higgins
NC DENR -DWR— Webscape Unit
512 N. Salisbury Street
Raleigh, NC 27604
GHM Group, LLC
DWR# 14 -0500
401 APPROVAL
Page 4 of 4
This letter completes the review of the Division under section 401 of the Clean Water Act. Please
contact Chad Turlington at (910) 433 -3320 or chad.turlington @ncdenr.gov if you have any questions or
concerns.
Sincerely,
Belinda S. Henson
Regional Supervisor
Division of Water Resources
Enclosures: GC 3890
Certificate of Completion
cc: Debbie Shirley — Soil & Environmental Consultants, PA (8412 Falls of Neuse Road, Ste. 104,
Raleigh, NC 27615)
Tyler Crumbley - USACE Wilmington Regulatory Field Office (via email)
DWR FRO 401 files
Karen Higgins - DWR Webscape Unit
1
A 0, A
ACDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
John E. Skvarla, III
Secretary
DWR Project No.: County:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office —
Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699 -1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary
to send certificates from all of these.
Applicant's Certification
I, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
Agent's Certification
Date:
I, . hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
1, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe
(periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the construction
was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date
Registration No.
. Fayetteville Regional Office
225 Green Street, Suite 714, Fayetteville, North Carolina 28301 -5095
Main Phone: 910 -433 -3300 1 Internet: http: / /www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer — Made in part by Recycled Paper
Water Quality Certification No. 3890
Water Quality Certification Number 3890 is issued in conformity with the requirements of Section
401, Public Laws 92 -500 and 95 -2,17 of the United States, and: subject to the North Carolina
Division of Water Quality (DWQ) Regulations in 15A NCAC 02H .0500 and 15A NCAC 02B .0200
for the discharge of fill material to waters and adjacent we areas or to wetland areas that are
not a part of the, surface tributary system to interstate waters or navigable waters of the'United
States as described in 33 CFR 330 Appendix A' (B) (18, 29, 39, 41, 42, 44, and 46) of the Corps
of Erfgineers.regulations and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC
026 .0200. ,
The State of North Carolina certifies that the specified category of activity will not violate
applicable. portions -of Sections 301, 302, 303, 306 and 307 of -the Public Laws 92 -500 and 95 -217
if conducted in accordance with the conditions hereinafter set forth.
Activities meeting any one (1) of the following thresholds or circumstances require written
approval for a 401 Water Quality Certification from the'Division of Water Quality (the
"Division "):
a. Any impacts to streams involving excavation or dredging; or
b. Total stream impacts within the project, boundaries, equal to or greater than 15.0 linear feet
of stream, including temporary and /or permanent impacts; or
c. Any stream relocation; -or
d. Any,impact associated with a high density,project (as defined in "Item (A)(iv) of the 401
Stormwater Requirements) that is not subject to either a state stormwater program (such
as, but -not limited to, Coastal Counties, HQW, ORW or state - implemented Phase II
..y_NPDES) or a certified community's stormwater program; or
e'.'"" or permanent impacts equal to or greater than one- tenth (1 /10) acre of wetlands
or-open waters; or
f. Any impacts to wetlands adjacent to waters designated as: ORW, SA, WS -I, WS- II,'or
Trout, or wetlands contiguous to waters designated -as a North Carolina or National Wild
and.Scenic River; or
g. Any impacts to coastal wetlands [15A NCAC 07H .0205)], or Unique Wetlands (UWL) [15A
NCAC 02H.0506]; or
h. Any impact associated with a Notice of Violation or an enforcement - action for violation(s) of
DWQ Wetland Rules (f 5A NCAC 02H.0 500), Isolated Wetland Rules (15A,NCAC 02H
1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC
02B .0200); or..
i. Any impacts to streams and /or buffers in the Neuse, Tar - Pamlico, or Catawba River Basins
or:in the 'Randleman, Jordan or Goose Creek Watersheds (or any other basin or watershed
with Riparian Area Protection Rules [Buffer Rules], in effect at the time of application)
unless the activities are listed as "EXEMPT" from these rules ora Buffer Authorization
Certificate is issued through N.C. Division of Coastal Management (DCM) delegation for
"ALLOWABLE" activities.
In accordance with North Carolina General Statute 143- 215.3D(e), written approval for a 401
Water Quality General Certification must include the appropriate fee. If a project also requires a
CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the
two fees.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
Activities included in this General Certification that do not-meet one of the thresholds
listed above do not require written approval from the Division as lone as they comply with
the Conditions of Certification listed below. If any of these Conditions cannot be met, then
written approval from the Division is required.
Conditions of Certification:
1. No Impacts Beyond those Authorized in the Written Approval or Beyond the Threshold of Use
of this Certification
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of -the impacts depicted in the Pre - Construction Notification, as
authorized in the written approval from the Division or beyond the thresholds established for
use of this Certification without written authorization, including incidental impacts. All
construction activities, - including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices shall be performed so that no
violations of state water quality standards, statutes, or rules occur. Approved plans and
specifications for this project are incorporated by reference and are enforceable parts of this
permit.
2. Standard Erosion and Sediment Control Practices
Erosion an_d sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices and if applicable, comply with the specific conditions and
requirements of the NPDES Construction Stormwater Permit issued to the site:
a. Design, installation, operation_ , -and maintenance of the sediment and erosion control
measures must be -such that they equal or exceed the requirements specified in the most
recent version of the North Carolina Sediment and Erosion. Control Manual. The devices
shall be maintained on all construction sites, borrow sites,_ and waste pile (spoil) projects,
including contractor -owned or leased borrow pits associated with -the project.
- - -..b. --- ,For - borrow_ pit_ sites,_. the ,erosion_and.sediment,control .measiares.must be designed, -_,.__ _ .
installed, operated, and maintained in accordance with the most recent version of the
North - Carolina- Surface- Mining Manual.
c. Reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act and the
Mining Act of 1971.
d. Sufficient materials required for stabilization' and /or repair of erosion control measures
and stormwater routing and treatment shall be on site at all times.
e. If the project occurs in waters or- watersheds classified as Primary Nursery Areas (PNAs),
SA, WS -I, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the
sedimentation and erosion control designs must comply with the, requirements set forth
in -15A NCAC 04B .0.124, Design Standards in Sensitive Watersheds.
Water Quality Certification No. 3890 2
Water Quality Certification No. 3390
3, No Sediment and Erasion Control Measures in Wetlands or Waters
Sediment and erosion control measures shall not -be placed in wetlands or waters.
Exceptions to this condition require application subrinittal to and written approval by-the
Division. If placement of sediment and erosion controt'devices in wetlands and waters is
unavoidable, then design, and placement of temporary;erosiori control measures shall not,be
conducted in a manner that may result in dis- equilibrium,of wetlands; stream beds, or banks,
adjacent to.or upstream and downstream of'the above structures. All sediment and erosion
control devices shall be removed and the natural grade restored within two (2) months of the
date that the Division of Land Resources (DLR) or locally delegated program has released
the specific area within the project.
4. Construction Stormwater Permit NCG010000
An NPDES Construction Stormwater Permit is required for construction projects that disturb
one (1) or more acres of. land. This Permit ;allows stormwater to be discharged during land
disturbing construction activities as stipulated in the conditions of the permit. If your project
is covered by this permit, full compliance with permit - conditions including the erosion &
sedimentation,control.plan, inspections and maintenance, selfmonitbring,i record keeping
and reporting requirements is required. A copy of the general permit (NCG010000),
inspection log sheets, and other information may be found at
htti�/fportal ncdenr org /web /wq /wsfsuingdessw#tab =w .
The North Carolina Department of Transportation (NCDOT) shall be required to be in full
compliance with the, conditions related to construction activities within the most recent version
,of their individual NPDES (NCSb00250) stormwater permit.
5. Construction Moratoriums and Coordination
If activities must occur during,periods of high biological activity (i.e. sea turtle nesting, fish
spawning, or bird nesting), then biological monitoring may be required at the request of other
state or federal agencies and coordinated with these activities.
- -- _.. -A(I- moratoriums on,construction,,activities established;by the NC „Wildlife Resources._.__
Commission (WRC), US,Fish and Wildlife Service (USFWS), NC Division of,Marine Fisheries
(QMF), or National Marine, Fisheries Service (NMFS).to lessen impacts on trout, anadromous
fish, larval /post - larval- fishes and crustaceans, or other aquatic:species of concern shall be
implemented. - Exceptions to this condition requireVritten approval by the resource agency
responsible for the given moratorium.
Work within the twenty -five (25) designated trout counties or ideritified state or federal
endangered or- threatened species habitat shall be coordinated with the appropriate WRC,
USFWS, NMFS, and /or DMF personnel.
6. Work in the Dry
All work in or adjacent to stream waters shall be conducted so that the flowing stream does
not come in contact with the disturbed area. Approved best management practices from the
most current version of the NC Sediment and Erosion Control Manual, or the NC DOT
Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams,
and other diversion structures shall be used to minimize excavation. in .flowing water.
Exceptions to this condition require application submittal to and written approval by the
Division.
Water Quality Certification No. 3890 3
Water Quality Certification No. 3890
7. Riparian Area Protection (Buffer) Rules
Activities located in the protected riparian areas (whether jurisdictional wetlands or not),
within the Neuse, Tar - Pamlico: or Catawba River Basins or in the Randleman, Jordan, or
Goose Creek Watersheds (or any other basin or,41atershed with buffer rules) shall be limited
to "uses" identified within and constructed in accordance with 15A NCAC 02B .0233, :0259,
.0243; .0250, .0267 and , -0605, and shall be located, designed, constructed, and maintained
to have minimal disturbance to protect water quality to the maximum extent practicable
through the use of best management practices. All buffer rule requirements, including diffuse
flow requirements, must be met.
8. If concrete is used during the construction, then all necessary measures shall be taken to
prevent direct contact, between uncured or curing concrete and waters of the state. Water
that, inadvertently contacts uncured concrete shall not be discharged to waters of the state
due to the potential for elevated pH and possible aquatic life/ fish kills.
9. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed
across the bridge and pre- treated through site - appropriate means (grassed swales, pre-
formed -scour holes, vegetated buffers, -etc.) before entering the stream. Please refer to the
most current version of Stormwater Best Management Practices. Exceptions to this condition
require written approval by the Division.
10. Compensatory Mitigation
In accordance with 15A NCAC 02H.0506 (h), compensatory. mitigation may be required for
losses of equal to or greater than 150 linear feet of'streams (intermittent and perennial)
and /or equal to or,greater than one (1) acre of wetlands. For linear public transportation
projects, impacts equal to or exceeding 150 linear feet per stream shall require mitigation.
Buffer mitigation maybe required for any project with Buffer Rules in effect at the time of
application for activities classified_ as "Allowable with Mitigation" or "Prohibited" within the
Table of Uses.
- - -- - - - -- -- - - - -A. deter mination- of_buffer.,- wetland,. and_ stream- mitigation requirements _.shall,.be,,made,for -_any._
General Water Quality Certification for this Nationwide and /or Regional General Permit.
Design and monitoring protocols shall - follow the US�Army Corps of Engineers Wilmington
District Stream Mitigation Guidelines (April 2003) or, its subsequent updates. Compensatory
mitigation plans shall be submitted .t6 the Division`for "written approval as required in those
protocols. The mitigation plan must be implemented and /or constructed before any impacts
occur on site. Alternatively; the Division will accept payment into an in -lieu fee program or a
mitigation bank. In these,cases, proof of payment shall be provided to the Division before
any impacts occur on site.
Water Quality Certification No. 3890 4
Water Quality Certification No. 3890
11. Relocated stream designs should include the same dimensions, patterns, and profiles as the
existing channel (or a stable reference reach if the existing channel is unstable), to the
maximum extent practical. The new channel should be, constructed in the dry and water shall
not be turned into the new channel until the banks are stabilized. Vegetation used for bank
stabilization shall be limited to native woody species, and 'should include establishment of a
30 -foot wide wooded and an adjacent 20 -foot wide, vegetated buffer on both sides of the
relocated channel to the maximum extent practical. A transitional phase incorporating
appropriate erosion control matting materials and seedling establishment is allowable,
however matting that incorporates plastic mesh and /or plastic twine shall not be used in
wetlands, riparian buffers or floodplains as recommended by 'the North Carolina Sediment
and Erosion Control Manual. Rip -rap, A- Jacks, concrete, gabions or other hard structures
may be allowed if it is necessary, to maintain the physical integrity of the stream; however, the
applicant must provide written justification and any calculations used to determine the extent
of rip -rap coverage. Please note that if the stream relocation `is conducted as a stream
restoration as defined in the US Army Corps of Engineers Wilmington District, April 2003
Stream Mitigation Guidelines (or its subsequent updates), the restored length may be used
as compensatory mitigation for the impacts resulting from the relocation.
12. Stormwater Management Plan Requirements
All applications shall address stormwater management throughout the entire project area per
the 401 Stormwater Requirements, referenced-herein as "Attachment A" at the end of this
Certification
13. Placement of Culverts and Other Structures in Waters and Wetlands
Culverts required for this project shall be designed and installed in,such a manner that the
original stream profiles are not altered and allow for aquatic life movement during low flows.
Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal
profile) must be maintained above and below locations of each culvert.
Placement of culverts and other structures, in waters and streams must be below the
elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
_ _,and- 241percentof thecu.lyeft..diameter for culverts having a diameter less than or equal to 48
inches, to allow low flow passage of water and aquatic life.
When topographic constraints indicate culvert slopes of greater than 5 %, culvert burial is not
required, provided that all alternative options for flattening the slope have been investigated
and aquatic life movement/ connectivity has been "provided when possible (rock ladders,
crossvanes, etc). Notification to the Division including supporting documentation to include a
location map of the culvert, culvert profile drawings, and slope calculations shall be provided
to the 'Division.60 days prior to the installation of the culvert.
When bedrock is, present in culvert locations, culvert burial, is not,required provided that there
is sufficient documentation of the presence of.bedrock. Notification to the Division including
supporting documentation such as, but not limited'to, a location map of the culvert,
geotechnical reports, photographs, etc shall be provided to the Division a minimum of 60
days prior to the installation of'the culvert. If bedrock is discovered during construction, then
the division, shall be notified by phone or email within 24 hours of discovery.
If other site - specific topographic..constraints preclude the ability to bury the culverts as
described,_ above and /or it can be demonstrated that burying the culvert would result in
destabilization of the channel, then exceptions to this condition require application submittal
to, and written approval by, the Division of Water Quality, regardless of the t6.41 impacts to
streams or wetlands from the project.
Water Quality Certification No. 3890
Water Quality Certification Flo. 3890
Installation of culverts in wetlands must ensure continuity of water movement and be
designed to adequately accommodate high water or flood conditions. Additionally, when --
roadways, causeways, or other fill projects are constructed across FEMA- designated
floodways or wetlands, openings such as culverts or bridges must be provided to maintain
the natural hydrology of the system as well as prevent constriction of the floodway that may
result in destabilization of streams or wetlands.
The establishment of native, woody vegetation, and other soft stream bank stabilization
techniques must be used where practicable instead of riprap -or other bank hardening
methods.
14. All temporary fill and culverts shall be removed and the impacted area returned -to natural
conditions within 60 days of the determination that the temporary impact is no longer
necessary. The impacted areas shall be restored to original- grade, including each stream's
original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile,
and the various sites shall be stabilized with natural "woody vegetation (except for the
approved maintenance areas) and restored to prevent erosion.
15. All temporary pipes/ culverts/ riprap pads etc, shall be installed in all streams as outlined in
the most recent edition of the North Carolina Sediment and Erosion Control Planning and
Design Manual or the North Carolina Surface Mining Manual so as not to restrict stream flow
or cause dis- equilibrium during use of this General Certification.
16. Any riprap required for proper culvert placement, stream stabilization, or restoration of
temporarily disturbed areas shall be restricted to the area,directly impacted by the approved
construction activity. All rip -rap shall buried and /or "keyed in" such -that the original stream
elevation and -streambank contours are restored and maintained. Placement of rip -rap or
other approved materials shall not result in de- stabilization'of -the stream bed or banks
upstream or downstream of the area.
17. Any rip-rap, used -for stream stabilization shall be of a size- a_ nd density so as not to be able to
be carried off by wave, current action, or stream flows'and consist of clean rock or masonry
material free of debris or toxic pollutants. Rip -rap shall not be,installed in the streambed
_ except .in.specific_areas,required for velocity control and to ensure structural integrity of bank
stabilization measures.
18. A one- time - application of fertilizer to re- establish vegetation is- allowed in disturbed areas
including riparian buffers, but is restricted to no closer than 10 feet -from top of bank of
streams. Any fertilizer application must comply with all other Federal, State and Local
regulations.
19. If this Water Quality Certification is used to access building sites, then all lots owned by the
applicant must be buildable without additional impacts to streams or wetlands. The applicant
is required to provide evidence that the lots are buildable without requiring additional impacts
to wetlands, waters, or buffers if required to do so in writing by the Division. For road
construction purposes, this Certification shall only be utilized from natural high ground to
natural high ground.
20. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional
wetlands, waters, and protective buffers within the project boundaries in order to assure
compliance for future wetland,, water, and buffer impact. These mechanisms shall be Out in
place at the'time of recording of the property orof individual lots, whichever is appropriate. A
sample'deed_ notification can be' downloaded from the 401/Wetlands Unit web site at
httd'/ /portal ncd6ftr.org/web/wq/swp/ws/401/certsand6ormits/apply/forms-. The text of the
sample deed notification may be modified as appropriate to suit to a specific project.
Documentation of deed notifications shall be provided to the Division -upon request.
Water Quality Certification No. 3890 6
Water Quality Certification No. 8890
21. If an environmental document is required under the National or State Environmental Policy
Act (NEPA or SEPA), then this General Certification is not valid until a Finding of•No
Significant Impact (FONSI) or Record of Decision (ROD). is issued by the State
Clearinghouse.
22. In the twenty (20) coastal counties, the appropriate DWQ' Regional Office must be contacted
to determine if Coastal Stormwater Regulations will be required.
23. This General Certification does not relieve the applicant of the responsibility to obtain all other
required Federal, State, or Local approvals.
24. The applicantlpermittee and their authorized agents shall conduct all activities in a manner
consistent with State water quality standards (including any requirements resulting from
compliance with §303(d) of the. Clean Water Act), and any other appropriate requirements of
State and Federal Law. If the Division determines that such standards or laws are not being
met, including failure to sustain a designated or achieved use, or that State or Federal law is
being violated, or that further conditions are necessary to assure compliance, then the
Division may reevaluate and modify.this General Water Quality Certification.
25. When written authorization is required for use of this certification, upon completion of all
permitted impacts included within the approval and any subsequent modifications, the
applicant shall be required to return the certificate of completion attached to the approval.
One copy of the certificate shall be sent to the DWQ Central Office in-Raleigh at 1650 Mail
Service Center, Raleigh, NC, 27699 -1650. .
26. Additional site - specific conditions, including monitoring:and /or.modeling requirements, may
be added to the written approval letter for projects- proposed-under this Water Quality
Certification in order to ensure compliance with all applicable waterquality and effluent
standards.
27. This certification grants permission to the director, an authorized representative of the
Director, or DENR staff, upon the presentation of proper credentials, to enter the property
during normal business hours.
This General Certification shall expire on the same day as the expiration date of the
corresponding Nationwide and /or Regional General Permit. The conditions in effect on the date
of issuance of Certification for a specific project shall remain in effect-for the life of the project,
regardless of the expiration date of this Certification.
Non- com."pliance with or violation of the conditions herein set forth by a specific project may result
in revocation of this General Certification for the project and may also result in criminal and /or civil
penalties.
The Director of the North Carolina Division of Water Quality may require submission of a formal
application for Individual Certification for any project -in this category, of activity if it is determined
that the project is likely to have a significant adverse effect upon water quality, including state or
federally listed endangered or threatened aquatic species, or degrade the waters so that existing
uses of the wetland or downstream waters are precluded.
Water Quality Certification No. 3890
Water Quality Certification No. 3890
Public hearings may be held for specific applications or group of applications prior to a
Certification decision if deemed in the public's best interest by the Director of the North Carolina,
Division of Water Quality.
Effective date: March 19, 2012
DIVISION OF WATER QUALITY
By
Charles Wakild, P. E.
Director
History Note: Water Quality Certification (WQC) Number 3890 issued March 19, 2012 replaces
WQC Number 3821 issued April 6, 2010, WQC Number 3631 issued March 19,2007; WQC 3402
issued March, 2003; WQC Number 3362, issued March 18, 2002; WQC 3287, issued June 1,
2000; WQCs 3,106 and 3108 issued-February 11, 1997. This Water Quality, Certification is
rescinded when the Corps of Engineers reauthorizes any of.the corresponding Nationwide or
Regional General Permits andlor whemdeemed appropriate by the Director of the Division of
Water Quality.
Water Quality Certification No. 3890 8
Water Quality Certification Igo. 3890
Attachment A: 401 Stormwater Requirements
The requirements listed below shall be implemented in order to comply with Condition 12 of this
General Certification. For the North Carolina Department of Transportation, compliance with
NCDOT's Individual NPDES permit NCS000250 shall serve to satisfy the 401 and Isolated
Wetland Stormwater Requirements.'
A. Design, and Implementation Requirements. All projects, regardless of project area,
amount of built -upon area or amount of jurisdictional impact, shall meet the following
stormwater design requirements:
i. Non - Erosive Discharge to Streams and 'Wetlands. Stormwater conveyances that
discharge to streams and wetlands must discharge at a non - erosive velocity prior to
-entering the stream or wetland during the peak flow from, the ten -year storm.
Vegetated Setbacks. A 30 -foot wide vegetated setback must be maintained adjacent to
streams, rivers and tidal waters in areas that are not subject to a state Riparian Area
Protection'Rule or other more - stringent vegetated setback requirements. The width of
the setback,shall be measured horizontally from the normal, pool elevation of impounded
structures; the" top-of-bank of streams and rivers, and the;mean high waterline of tidal
waters, perpendicular to shoreline. Vegetated setback and filters required by state rules
or local governments may be met concurrently with this requirement and may contain
coastal, isolated or 404 jurisdictional wetlands. Non jurisdictional portions of the
vegetated setback maybe cleared and graded, but must be planted with and maintained
in grass or other vegetative or plant material.3
iii. Construction and Operation. The stormwater management plan must be constructed
and operational before any permanent building or other structure is occupied or utilized at
the site. The stormwater management plan, including drainage- patterns, must be
maintained in perpetuity.4
iv. Coordination with Other Stormwater,Programs. Projects that are subject to another
`Division of Water,Quality (DWQ) stormwater,program,,including (but riot, limited to) the -20
Coastal Counties, HOW, O'RW'or`state= implem -ented Phase"ll NPDES; or -a Certified` -
Community's stormwater management, program,, must be- constructed and maintained in
compliance -with, the approved stormwater management,plah.5
v. Stormwater Design Requirements for Projects Not Covered Under Item (iv).
Projects, thatare not subject to another DWQ stormwater program or a Certified
Community's stormwater program -shall meet all of the, following requirements:
a. : Low Density. A site is low density if all the following requirements are met:
The development has a built upon area of twenty -four percent (24 %) or less,
considering both current and future development. When determining the amount
of built upon area, coastal wetlands shall be included; however, porids, lakes -and
,rivers as,specified in North Carolina's Schedule of Classifications shall be
excluded. If a portion of project has a density greater than 24 %, the higher -
density area must be located in an upland area and away from surface waters _
and drainageways to the maximum extent practicable.s
2. All stormwater.runoff from the built upon areas is transported primarily via
vegetated conveyances designed in accordance with the most recent version of
the NC DWQ Stormwater Best Management Practices Manual. Alternative
designs may be approved if the applicant can show that the design provides
Water Quality Certification No, 3890 9
Water Quality Certification No. 3890
equal or better water quality protection than the practices specified in the manual.
The project must not include a stormwater collection system (such as piped
conveyances) as defined in 15A NCAC 02B .0202(60).'
b. High Density. Projects that do not meet the Low Density requirements shall meet
the following requirements;
1. Stormwater runoff from the entire site must be treated by structural stormwater
controls (BMPs) that are designed to remove eighty -five percent (85 %) of the
average annual amount of Total Suspended Solids (TSS). Stormwater runoff
that drains directly to Nutrient Sensitive Waters (NSW) must also be treated to
remove thirty percent (30 %) of Total Nitrogen (TN) and Total Phosphorus (TP).e
2. All BMPs must be designed in accordance with the version of the NC DWQ
Stormwater Best Management Practices Manual that is in place on the date of
stormwater management plan submittal. Alternative designs may be approved if
the applicant can show that the design provides equal or better water quality
Protection than the practices specified in-the manual.9
3. DWQ may add specific stormwater management requirements on a case -by-
case-basis in order to ensure that a- proposed activity will not violate water quality
standards.t0
4. DWQ may approve Low Impact Developments:(L iDs) that meet the guidance set
forth in the Low Impact Development: A Goidebook for North Carolina."
5. Proposed new development undertaken by a local government solely as a public_
road project.shall follow the requirements of the NC DOT BMP Toolbox rather
than Items (1) -(4) above. 12
B. Submittal Requirements. The submittal requirements listed below apply only to projects
that require written authorization as indicated in the applicable General Certification as well
as projects -that require an Isolated Wetlands Permit. -Any required documentation shall
be sent -to the UVetlands, Buffers and Stormwater Compliance and Permitting Unit at
1650 Mail Seivice =Center,' "Raleigh; NC 276991650.`
i. Projects that are Subject to Another DWO Stormwater Program: If the project is
subject to another DWQ stormwater program, such as the 20 Coastal Counties, HQW,
ORW or state- implemented Phase II NPDES, then.the- applicant shall submit a copy of
the stormwater approval letter before any impacts occur on site. 13
ii. Projects that-are Subject to a Certified Community's Stormwater Program. If-the
project is subject to a certified local government's stormwater program, then the applicant
shall submit one set of approved stormwater management plan details and calculations
with documentation of the local government's approval before any impacts occur on site.5
iii. Projects Not Covered Under Items (i) or (ii). If the project is not subject to another
DWQ Stormwater Program or a Certified Community's stormwater program, then it shall
be reviewed and approved by the DWQ through the Water.Quality Certification
authorization process.
a. Low Density. For low density projects, the applicant shall submit two copies of the
DWQ-Low Density Supplement Form with all required items. 13
Water Quality Certification No. 3890 10
Water Quality Certification No. 3890
b. High Density. For high density projects, the applicant shall submit two copies of a
DWQ BMP Supplement Form and all required items at the specified scales for each = -
BMP that is proposed.13
iv. Phasing. Stormwater management plans may be phased on a case -by -case basis, With
the submittal of a final stormwater management plan per Items (i) -(iii) above required for
the current phase and a conceptual stormwater management plan for the future phase(s).
The stormwater, management plan for each future phase must be approved by the
appropriate entity before construction of that phase is commenced. The approved
stormwater management plan for each future phase must be constructed and operational
before n permanent building or other structure associated with that phase is
occupied. 4
v. Stormwater Management Plan Modifications. The stormwater management plan may
not be modified without prior written authorization from the entity that approved the plan.
If the project is within a Certified Community, then the applicant shall submit one set of
approved stormwater management plan details and calculations with documentation of
the local government's approval for record - keeping, purposes. If the project is subject to
DWQ review, then the applicant shall submit two copies.of the appropriate Supplement
Forms per Item (iii) above for any BMPs that have been modified for DWQ's review and
approval.15
1 The stormwater requirement for 401 applications is codified in 15A NCAC 02H .0506(b )(5) and
(G)(5),
2 Non erosive discharge rates are required in SL 2008 - 211 §2(b),(1'). The 10 -year design storm
standard is codified in 15A NCAC 02H .1008(f)(2) and .1008(g)(1).
3 .30 -foot vegetated setbacks are required in SL,2006- 246 §9(d), SL 2008- 211 §2(b), 15A NCAC
02H .1006(2)(c) and .1007(1)(a).
. 4- Construction. and- maintenance.of.the.stormwater plan is,necessary to satisfy 15A NCAC 02H _
.0506(b)(5).
5 Conveys application procedure to streamline the permitting process and reduce, any unnecessary
duplication in the review of stormwater management plans.
6 Low density built upon area thresholds are set in SL 2006 - 246 §9(c) and SL 2008- 211 §2(b).
The requirement for low density development to use vegetated conveyances is codified in SL
2006= 246 §9(c), SL 2008- 211 §2(b), 15A NCAC 02H .1006(2)(b) and .1007(1)(a). The Stormwater
BMP Manual is also referenced in 15A NCAC 02B .0265(3)(a) and .0277(4)(e).
6 85% TSS removal is required in SL 2006 = 246 59(d), SL 2008 - 211 §2(b), 15A NCAC 02H
.1006(2)(c), 15A NCAC 02H .1007(1)(a). The 30% TN and TP removal requirements for NSW
waters are set forth in 15A NCAC 0213 .0232, 15A NCAC 02B .0257(a)(1), 15A NCAC 02B
.0265(3)(a) and 15A NCAC 02B.0277(4).
9 The Stormwater BMP Manual is also referenced in 15A NCAC 02B .0265(3)(a) and .0277(4)(e).
10 The requirement for DWQ to ensure that water quality standards are protected before issuing a
401 certification is codified in 15A NCAC 02H .0506.
11 The Llb Toolbox is also referenced in 15A NCAC 02B .0277(4)(g),
12 The term "public road project" is defined in15A NCAC 02B .0265(3)(a).
13 Conveys application procedure to-streamline the permitting process.
14 Phased development is addressed as a "common plan of development" in 15A NCAC 02H
.1003(3).
15 Procedures for modifying stormwater plans are set forth in 15A NCAC 02H .1011.
Water Quality Certification No. 3890 11