Loading...
HomeMy WebLinkAboutNCG140507_Application_20220623N6Giz�-osa'7 RECEIVED FOR AGENCY USONLY NCG14 0 50,1 Assigned to: • C.d 1Rjo / ARO FRO RO RRO WARO WIRO WSRO OEM I-R-Stormwater Program Division of Energy, Mineral, and Land Resources Land Quality Section National Pollutant Discharge Elimination System NCG140000 Notice of Intent This General Permit covers STORMWATER AND/OR WASTEWATER DISCHARGES associated with activities under SIC (Standard Industrial Classification) Code 3273 [Ready Mix Concrete] and like activities. You can find information on the DEMLR Stormwater Program at deq. nc.gov/SW. Directions: Print or type all entries on this application. Send the original, signed application with all required items listed in Item (8) below to: NCDEMLR Stormwater Program, 1612 MSC, Raleigh, NC 27699-1612. The submission of this application does not guarantee coverage under the General Permit. Prior to coverage under this General Permit a site inspection will be conducted. 1. Owner/Operator (to whom all permit correspondence will be mailed): Name of legal organizational entity: Legally responsible person as signed in Item (9) below: MacLeod Construction, Inc. Bob MacLeod Street address: City: State: Zip Code: 4304 Northpointe Industrial Boulevard Charlotte NC 28216 Telephone number: Email address: 704-483-3580 rmac@madeodnc.com Type of Ownership: Government ®County (]Federal OMunicipal []State Non-govemment El Business (If ownership is business, a copy of NCSOS report must be included with this application) []Individual 2. Industrial Facility (facility being permitted): Facility name: Facility environmental contact: MacLeod Construction, Inc. - Hickory Concrete Batch Plant Michael Houser Street address: City: State: Zip Code: 2880 Main Avenue SE Hickory NC 28602 Parcel Identification Number (PIN): County: 372214467983 Catawba Telephone number: Email address: mhouser@macleodnc.com 4-digit SIC code: Facility is: Date operation is to begin or began: 3273 1 El New 0 Proposed ® Existing I July 1, 2022 Latitude of entrance: Longitude of entrance: 35.726725° -81.273499' Brief description of the types of industrial activities and products manufactured at this facility: Central Mix Concrete Plant If the stormwater discharges to a municipal separate storm sewer system (MS4), name the operator of the MS4: l N/A Page 1 of 7 This facility uses: ❑ Phosphorus -containing detergents ❑ Non -Phosphorus -containing detergents ❑ Brighteners O Other Cleaning Agents ❑ Other: This facility has a closed -loop recycle system that meets design requirements in 15A NCAC 02T. 1000 and hold the f; working volume Yes — stop completion of this NOI. Contact DWR Non -Discharge Permitting Program for permitting requirements 3. Consultant (if applicable): Name of consultant: Consulting firm: Mark Cramer, P.E. The El Group, Inc. Street address: City: State: Zip code: 2101 Gateway Centre Blvd., Suite 200 Morrisville NC 27560 Telephone number: Email address: 919459-5229 mcramer@eil.com 4. Clutfall(s) (at least one outfall is required to be eligible for coverage): 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. DP-1 I Miller Branch (Bolick's Dry Branch) C ❑ This watershed has a TMDL. Discharge from this outfall is from: ® Stormwater Only ❑ Wastewater Only I] Wastewater Comingled with Stormwater 7Q10 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HQW, ORW, Tr, WS-I, WS-II, WS-III, SA, or PNA): Discharge occurs from this outfall: © Only during a rainfall event ❑ Intermittently (indicate how often) ❑ Continuously (indicate flow in CFS) Latitude of outfall: Longitude of outfall: 35.725499° -81.275789° Brief description of the industrial activities that drain to this outfall: Stormwater comingled with wastewater (vehicle and equipment cleaning, wetting stockpiles, mixing drum cleaning). Do Vehicle Maintenance Activities occur in the drainage are of this outfall? []Yes 0 No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. ❑ This watershed has a TMDL. Discharge from this outfall is from: ® Stormwater Only ® Wastewater Only © Wastewater Comingled with Stormwater 7Q10 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HOW, ORW, Tr, WS-I, WS-ll, WS-III, SA, or PNA): Discharge occurs from this outfall: 13 Only during a rainfall event ❑ Intermittently (indicate how often) ❑ Continuously (indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 2 of 7 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. ❑ This watershed has a TMDL. Discharge from this outfalI is from: E3 Stormwater Only 0 Wastewater Only 0 Wastewater Comingled with Stormwater 7Q30 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HOW, ORW, Tr, WS-I, WS-II, WS-III, SA, or PNA): Discharge occurs from this outfall: E3 Only during a rainfall event E3 Intermittently (indicate how often) [3 Continuously (indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? E3 Yes D No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. ❑ This watershed has a TMDL Discharge from this outfall is from: Stormwater Only E3 Wastewater Only ® Wastewater Comingled with Stormwater 7Q10 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HOW, ORW, Tr, WS-I, WS-II, WS-III, SA, or PNA): Discharge occurs from this outfall: 0 Only during a rainfall event ❑ Intermittently (indicate how often) ❑ Continuously (indicate flow in CFS) Latitude of outfalI: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? E3 Yes 13 No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? All outfalls must be listed and at least one outfall is required. Additional outfalls may be added in the section "Additional Outfalls" found on the last page of this N01. S. Wastewater Types of Wastewater facility will generate or discharge Vehicle & equipment cleaning (VE) O Generate O Discharge ❑ Sent to W W Treatment System Wetting of raw material stockpiles (RM) O Generate O Discharge ❑ Sent to W W Treatment System Mixing drum cleaning (MD) O Generate O Discharge ❑ Sent to WW Treatment System Facility will spray -down or actively wet aggregate piles O Yes 0 No Page 3 of 7 6. Wastewater treatment alternatives What wastewaters were considered for this alternatives review: O VE 17 RM 0 MD Are there existing sewer lines with a one mile radius: 0 Yes ❑ No If yes: ❑ The wastewater treatment plant will accept the wastewater. It is feasible to connect. Explain: ❑ The wastewater treatment plant will accept the wastewater. It is not feasible to connect. Explain: p The wastewater treatment plant will not accept the wastewater (attach a letter documenting) O Surface or subsurface disposal is technologically feasible ❑ Surface or subsurface disposal is not technologically feasible Explain: Facility design for reuse of wastewater to greatest extent feasible. O Surface or subsurface disposal system is feasible to implement ❑ Surface or subsurface disposal system is not feasible to implement Explain: Facility design for reuse of wastewater to greatest extent feasible. What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters? Explain: Facility design for reuse of wastewater to greatest extent feasible. Discharge to surface waters is the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered: 0 Yes ❑ No — contact DEMLR's Land Application Unit to determine permitting requirements If this review included all wastewater discharge types, would excluding some types make of the above non - discharge options feasible? ❑ Yes IJ No 7. Other Facility Conditions (check all that apply and explain accordingly): ❑ This facility has a DMLR Erosion & Sedimentation Control Permit. If checked, list the permit numbers for all current E&SC permits for this facility: ❑ This facility has a Division of Waste Management permit. If checked, list the permit numbers for all current DWM permits for this facility: ❑ This facility has other NPDES permits. If checked, list the permit numbers for all current NPDES permits: ❑ This facility has Non -Discharge permits (e.g. recycle permit). If checked, list the permit numbers for all current Non -Discharge permits: O This facility uses best management practices or structural stormwater control measures. If checked, briefly describe the practices/measures and show on site diagram: On -site ditches, forebays, and stormwater detention pond to contain under normal conditions. ❑ This facility has a Stormwater Pollution Prevention Plan (SWPPP). If checked, please list the date the SWPPP was implemented: SWPPP under development. SWPPP will be completed and implemented upon initiation of operation and/or when new version of NCG140000 is final. Page 4 of 7 0 This facility is subject to Phase II Post -Construction Area If checked, please list the permitting authority: Catawba County Utilities and Engineering - Approval Letter Attached ❑ This facility is located in one of the 20 Coastal Counties If checked, please indicate if the facility is adding more than 10,000 112 of built -upon area or is a CAMA Major Permit ❑ Will add more than 10,0000 ft of built -upon area ❑ Is a CMA Major Permit ❑ Yes to both ❑ No to both ❑ This facility is discharging wastewater to a stormwater BMP If checked, please indicate the permitting authority, and attach letter approval to do so: ❑ This facility has wastewater treatment facilities in the 100-year floodplain ❑ This facility stores hazardous waste in the 100-year floodplain. If checked, describe how the area is protected from flooding: ❑ This facility is a (mark all that apply) ❑ Hazardous Waste Generation Facility ❑ Hazardous Waste Treatment Facility ❑ Hazardous Waste Storage Facility ❑ Hazardous Waste Disposal Facility If checked, indicate: Kilograms of waste generated each month: Type(s) of waste: How material is stored: Where material is stored: Number of waste shipments per year: Name of transport/disposal vendor: Transport/disposal vendor EPA ID: Vendor address: ❑ This facility is located on a Brownfield or Superfund site If checked, briefly describe the site conditions 8. Required Items (Application will be returned unless all of the following items have been included): O Check for $100 made payable to NCDEQ ❑+ Copy of most recent Annual Report to the NC Secretary of State ❑+ This completed application and any supporting documentation ❑ A line drawing of the water flow through the facility. 0 Copy of county map or USGS quad sheet with the location of the facility clearly marked 0 Letter documenting that W%TP will not accept wastewater (if applicable) ❑ Approval from permitting authority to discharge wastewater to a stormwater BMP (if applicable) Page 5 of 7 f] Two (2) 24" x 36" site diagrams showing, at a minimum, existing and proposed: a) outline of drainage areas b) Stormwater/wastewater treatment structures c) Location of numbered stormwater/wastewater outfalls (corresponding to which drainage areas) d) Delineation of drainage areas to each discharge point e) Runoff conveyance structures f) Areas and acreage where materials are stored g) Impervious area acreages h) Locations(s) of streams and/or wetlands the site is draining to, and applicable buffers i) Site property lines, North Arrow, and bar scale j) If applicable, the 100-year floodplain line k) Acreage of each stormwater and wastewater topographical area 1) Each of the facilities' wastewater or stormwater source and discharge structures and each of its hazardous waste treatment, storage, or disposal facilities m) Notation of the water quality classification of the receiving water that site waters eventually discharge to n) Site location (insert) Cl A narrative description and identification of the compost manufacturing sequence at the applicant's site, the general feedstocks, the determination of where the sites final products qualities as "finished compost" as reference in the General Permit test (NCG240000) and as determined by the DWM permitting process, identification of the stormwater BMPs employed, and the general nature of the wastewater treatment system utilized to meet process wastewater discharge limits. 9. Applicant Certification: North Carolina General Statute 143-215.68 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule Implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: O I am the person responsible for the permitted industrial activity, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. El The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. O I will abide by all conditions of the NCG140000 permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. f7 I hereby request coverage under the NCGI400DO General Permit. Printed Name of Applicant: Bob MacLeod Title: President to (Signature of Appl cant) (Date Signed) Mail the entire package to: DEMLR — Stormwater Program Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 Page 6 of 7 Additional Outfalls 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. ❑ This watershed has a TMDL. Discharge from this outfall is from: 0 Stormwater Only U Wastewater Only [3 Wastewater Comingled with Stormwater 7Q10 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HQW, ORW, Tr, WS-I, WS-11, WS-III, SA, or PNA): Discharge occurs from this outfall: ® Only during a rainfall event I❑ Intermittently (indicate how often) ❑ Continuously (indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes © No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. ❑ This watershed has a TMDL. Discharge from this outfall is from: ® Stormwater Only [3 Wastewater Only ❑ Wastewater Comingled with Stormwater 7Q10 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HQW, ORW, Tr, WS-1, WS-11, WS-III, SA, or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently (indicate how often) ❑ Continuously (indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑ This water is impaired. ❑ This watershed has a TMDL. Discharge from this outfall is from: ® Stormwater Only ❑ Wastewater Only ❑ Wastewater Comingled with Stormwater 7Q10 Flow of receiving waterbody (if discharging Wastewater Only or Wastewater Comingled with Stormwater to waters classified as HQW, ORW, Tr, WS-1, WS-11, WS-III, SA, or PNA): Discharge occurs from this outfall: ® Only during a rainfall event © Intermittently (indicate how often) E3 Continuously (indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage are of this outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 7 of 7 Environmental, Health and Safety Solutions.' 0 O NOTICE OF INTENT NPDES Application for Coverage Under General Permit NCG140000 MacLeod Construction, Inc. Hickory Concrete Batch Plant 2880 Main Avenue SE Hickory, North Carolina 28602 EI Project No. ENM0220092.00 June 2022 The El Group, Inc. - 800.717.3472 • www.eil.com June 15, 2022 Stormwater Permitting Unit Program North Carolina Department of Environmental Quality (DEQ) Division of Energy, Mineral and Land Resources (DEMLR) 1612 Mail Service Center Raleigh NC 27699-1612 Re: National Pollutant Discharge Elimination System (NPDES) Application for Coverage Under General Permit NCG140000 for MacLeod Construction — Hickory Concrete Batch Plant Dear Sir or Madam: The EI Group, Inc. (EI) is submitting the enclosed application for coverage under the NPDES General Permit NCG140000 on behalf of MacLeod Construction, Inc. for a proposed new location in Hickory, North Carolina. The following application form and supporting documentation are enclosed: • DEMLR NCG140000 Notice of Intent (NOI) form; • North Carolina Secretary of State (NCSOS) report; • E-Mail from City of Hickory Indicating Nonacceptance of Wastewater; • Catawba County Utilities and Engineering Letter of Approval for Construction Erosion and Sedimentation Control Plan; • General Location Map on USGS Topo; and • Grading and Drainage Plan. Also enclosed is the check for the $100.00 fee. Please review the enclosed application and supporting documentation, and issue a Certificate of Coverage. MacLeod Construction would like to begin construction on/around July 1, 2022, and begin operation shortly thereafter. Thank you for your prompt attention to this matter. Please feel free to direct questions regarding the enclosed application to me at (919) 459-5229 or mcramerna.ei l .com. Sincerely, The EI Group, Inc. f Mark Cramer, RE Senior Engineer 2101 Gateway Centre Boulevard Suite 200 Morrisville, NC 27560 Tel: (919) 657-7500 Fax: (919) 657-7551 6 , BUSINESS CORPORATION ANNUAL REPORT IE OF BUSINESS CORPORATION: MacLeod Construction, Inc. SECRETARY OF STATE ID NUMBER: 0320411 STATE OF FORMATION: NC REPORT FOR THE FISCAL YEAR END: 12/31 /2021 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: MacLeod, RobertL 2. SIGNATURE OF THE NEW REGISTERED AGENT: E - Filed Annual Report 0320411 CA202209800391 4/8/2022 08:30 Q Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS 8 COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 4304 Northpointe Industrial Blvd Charlotte, NC 28216 Mecklenburg County SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Construction PO 320 Denver, NC 28037 2. PRINCIPAL OFFICE PHONE NUMBER: (704) 483-3580 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 5. PRINCIPAL OFFICE MAILING ADDRESS 4304 Northpointe Industrial Blvd PO Box 320 Charlotte, NC 28216 Denver, NC 28037 6. Select one of the following If applicable. (Optional see Instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: OFFICERS (Enter additional officers in Section E.) NAME: Lorne MacLeod NAME: Robert L MacLeod TITLE: Vice President TITLE: President ADDRESS: 4584 Lakeshore Rd N Denver, NC 28037 ADDRESS: 4729 Mirror Lake Rd Catawba, NC 28609 NAME: TITLE: ADDRESS: SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entLtvtibert L MacLeod 4/8/2022 RK SIGNATURE DATE Form must be signed by an officer listed under Section C of this farm. Robert L MacLeod President Print or Type Name of Officer Print or Type Title of Officer This Annual Report has been filed electronically. MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Raleigh, NC 27626-0525 Mark Cramer rom: David Cox <dcox@hickorync.gov> Sent: Monday, June 6, 2022 12:51 PM To: Mark Cramer Subject: RE: Letter/E-Mail to Support Concrete Plant NPDES Permitting for Comingled Stormwater and Process Wastewater at 2880 Main Ave SE, Hickory, NC 28602 Good afternoon, Yes, per our conversation earlier today, the City of Hickory will not accept comingled wastewater (process & stormwater) at the wastewater treatment plant even with an Industrial User Permit. It also appears that the process portion of this discharge would fall under a national categorical pretreatment standard (40 CFR 411). Thank you, David R. Cox Pretreatment Coordinator dcoxaa hickorync.aov City of Hickory (828)322-4821 www.hickorync.aov HICKORY 1 _.�,• NortM1 Life. Well Crafted. From: Mark Cramer<mcramer@eil.com> Sent: Monday, June 6, 202211:26 AM To: David Cox <dcox@hickorync.gov> Subject: Letter/E-Mail to Support Concrete Plant NPDES Permitting for Comingled Stormwater and Process Wastewater at 2880 Main Ave SE, Hickory, NC 28602 CAUTION: This email originated from outside of the organization. As we discussed by telephone earlier today, I am working with Macleod Construction, Inc. to prepare a Notice of Intent (NOI) to request coverage under the National Pollutant Discharge Elimination System (NPDES) General Permit No. NCG140000 to discharge stormwater and process wastewater for establishments primarily engaged in ready -mix concrete production. Part of the NOI requires us to evaluate alternatives, including discharge to the City of Hickory wastewater treatment plant. You indicated that the City would not accept this wastewater (e.g., vehicle and equipment cleaning, wetting of raw material stockpiles, and mixing drum cleaning) comingled with stormwater during our phone conversation. The NOI requires us to provide a letter documenting this. A written response to this email will suffice. Your assistance is greatly appreciated. Mark Cramer, P.E. - Senior Engineer The El Group, Inc. Environmental, Health and Safety Solutions. TM' Direct: 919.459.5229 Mobile: 919.623.1833 Ww .eil.c m catawba county utilities & engineering May 25, 2022 Macleod Construction, Inc. P. O. box 320 Denver, NC 28037 RE: LETTER OF APPROVAL WITH MODIFICATIONS Project Name: Macleod Construction Portable Concrete Plant Case Number: ECPR-05-2022-41115 Disturbed Area: 5 acres Submitted By: Mansour Edlin Consulting Date Received: May 23, 2022 New Submittal X Revision Dear Mr. Macleod: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The Erosion Control Permit must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Title 15 NCAC 413 .0018(a) requires that a copy of the approved erosion control plan, NCG01 permit and COC, and records of inspections made be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statue 113A- 51 through 66), this office may require revision to the plan and implementation of the revisions to insure compliance with the Act catawbacountync.gov Catawba County Government (enter 25 Government Nive I Newton NC 28658 1 828.465.8261 MAKING. LIVING. BETTER. Receiving water is Miller Branch (Bolick's Dry Branch) within the Catawba River Basin. Miller Branch is designated as Class C waters. Miller Branch is not listed in the 2020 Integrated Report 303(d) list of impaired waters. TMDLs have not been established specific to Miller Branch. There is a state-wide TMDL for mercury, which does not impact monitoring for MacLeod Construction, Inc. FIGURE NUMBER: 1 REFERENCE: USGS Topo Map, Hickory, NC Quadrangle, 2019 PROJECT NUMBER:: ENMO220092.00 SCALE: As Shown GENERAL LOCATION MAP MacLeod Construction, Inc. 2880 Main Avenue SE Hickory, NC 28602 lffw- E I