Loading...
HomeMy WebLinkAbout20140612 Ver 1_Permit Drawings_2014061718TREE GV WM CONCRETE ASPHALT T DHV D T V = = = = = = ADT ADT INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER LOCATION: TYPE OF WORK: 0 C O N T R A C T : T I P P R O J E C T : SEE SHEET 1-B FOR CONVENTIONAL PLAN SHEET SYMBOLS SEE SHEET 1-A FOR INDEX OF SHEETS WAKE COUNTY FROM GLENCOE DRIVE TO NORTH MAIN STREET / US 1A STADIUM DRIVE (SR 1930) GRADING, DRAINAGE, PAVING, SIGNING, AND UTILITIES U - 5 5 1 5 U-5515 55056.1.1 STPDA-0527(14)P.E. VICINITY MAP 40 80 80402040 40 20 510 10 20 TBD TBD J. JASON PACE, P.E ROADWAY DESIGN ENGINEER TOWN OF WAKE FOREST BY: PLANS PREPARED FOR THE TOTAL LENGTH TIP PROJECT U-5515 LENGTH ROADWAY TIP PROJECT U-5515 ARTERIAL URBANFUNC CLASS = 2014 2040 MPH40 N/A N/A N/A 7000 VPD 9100 VPD = 1.100 MILES = 1.100 MILES Raleigh, North Carolina 27636 Post Office Box 33068 PE NO. F-0102 PROJECT END Wake Forest Downtown W ait Ave R d hamDur T hom pson M ill R d Stadium DrPurnell Rd 1 PROJECT BEGIN N W in g ate S t U N TY CO U N TY FR A N K LI N W A K E C O R ichland Creek C reek Horse Creek Sanford Kea mey Rd Harris Rd W a l l R d 1 C SX R a ilro a d iJunerp Ave % % %1A %1A C a p ita l B lv d Jenks Rd N M ain St S M a in S t 98( 98( Sm ith C r e e k C A PITAL BLVD (U S 1) G LEN C O E D R -Y2 - O LD STA DI U M D R - Y1- W H IS TLIN G S W A N D R - Y3 - R IC H LAN D C R E E K McD O WELL D R -Y4 - McDOWELL DR-Y5- JU D SO N D R -Y 6 - N W I N G A T E S T - Y 8 - N C O LLE G E S T SEMINARY THEOLOGICAL BAPTIST SOUTHEASTERN WAKE FOREST TO DOWNTOWN T O R ALE IGH T O F R AN K LIN T ON -L- Sta. 24+30.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT U-5515 -L- Sta. 82+15.00 END CONSTRUCTION END TIP PROJECT U-5515 98 7 6 5 4 ( U S 1 A ) N M A I N S T COURSE GOLF PASCAL HIGH SCHOOL WAKE FOREST F R O N T S T SHOPPING CENTER WAKE FOREST CROSSING APARTMENTS NORTH FOREST SEMINARY THEOLOGICAL BAPTIST SOUTHEASTERN N A D 8 3/ N A 2 0 11 NORTH AVE -L- ( SR 1930) STA DI U M D R - L- ( SR 1930) STA DI U M D R - L- JENK INS RD Stewart, Inc. GEOTECHNICAL INVESTIGATIONS BY: Stewart, Inc. and Spatial Data Consultants, Inc. SURVEYS PROVIDED BY: C 2014 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t s h .d g n R O C K S P R I N G S R D - Y 7 - ( S R 1 9 5 4 ) N W I N G A T E S T - Y 8 - H I S T O R IC D IS T R I C T HISTORIC DISTRICT H IS T O R IC D IS T R IC T HIS T O R IC D IS T R IC T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT WAKE FOREST DOWNTOWN APPROVED BY THE TOWN OF WAKE FOREST. OF WAKE FOREST AND SHALL BE SO INSTALLED UNLESS A CHANGE IS TOWN STANDARDS. THESE FACILITES HAVE BEEN APPROVED BY THE TOWN RAMPS ARE TO BE CONSTRUCTED ON ALL STREETS AS SPECIFIED BY ALL PUBLIC FACILITIES, INCLUDING UTILITIES, SIDEWALKS, AND HANDICAP STANDARDS AND/OR CONDITIONS. REGARD TO COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL RESPONSIBILITY OF THE OWNER AND ENGINEER OF RECORD WITH FOR THE TOWN OF WAKE FOREST IN NO WAY LIMITS THE EXECUTION OF THIS CONSTRUCTION PLAT BY THE REVIEW ENGINEER OWNER HEREBY CERTIFIES AND AGRESS TO TAKE SUCH ACTION AS MAY BE REQUIRED BY THE TOWN OF WAKE FOREST TO CORRECT ANY ERRORS, OMISSIONS, OR NON-COMPLIANCE WITH TOWN STANDARDS AND/OR CONDITIONS DESCRIBED IN THE CONSTRUCTION PLAT, INCLUDING RE-SUBMISSION OR RE-EXECUTION OF THIS CONSTRUCTION PLAT WITH THE APPROPRIATE CORRECTIONS AND/OR REVISIONS. OWNER DATE CONSTRUCTION BY THE TOWN OF WAKE FOREST. THESE PLANS HAVE BEEN APPROVED FOR FIRE PREVENTION CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT DATE DATE DATE DATE DATE DATE DATE DATE DATE ENGINEERING DEPARTMENT PUBLIC WORKS DEPARTMENT EROSION & SEDIMENT CONTROL CONSTRUCTION INSPECTOR ACCESSIBILITY PLANNING DEPARTMENT DATEPARKS AND RECREATION - MAINTENANCE PARKS AND RECREATION - URBAN FORESTRY REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t s h .d g n 6 / 16 / 2 0 14 NOT TO SCALE Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is STANDARD DRAWINGS LIST OF ROADWAY GENERAL NOTES INDEX OF SHEETS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 INDEX OF SHEETS SHEET NO.DESCRIPTION TITLE SHEET1 CONVENTIONAL SYMBOLS1-B 3 PLAN SHEETS PROFILE SHEETS CROSS SECTIONS TRAFFIC MANAGEMENT PLANS 4 THRU 9 1-A 10 THRU 16 X-0 TO X-27 PS-1 THRU PS-6 RETAINING WALL ENVELOPES PAVEMENT MARKING AND SIGNING PLANS 1-A GENERAL NOTES LIST OF ROADWAY STANDARD DRAWINGS 200.02 225.02 GUIDE FOR GRADING SUBGRADE - SECONDARY AND LOCAL DESCRIPTIONSTD NO. METHOD OF CLEARING - METHOD II 225.04 METHOD OF OBTAINING SUPERELEVATION - TWO LANE PAVEMENT 560.01 654.01 METHOD OF SHOULDER CONSTRUCTION - HIGH SIDE OF SUPERELEVATION CURVE - METHOD II CONC BASE PAD FOR DRAINAGE STRUCTURES PAVEMENT REPAIRS DRIVEWAY PIPE CONSTRUCTION310.10 815.03 PIPE UNDERDRAIN AND BLIND DRAIN 840.00 840.03 840.01 840.15 840.16 DROP INLET FRAME AND GRATES - FOR USE WITH STD DWGS 840.14 AND 840.15 840.66 DRAINAGE STRUCTURE STEPS 846.01 848.01 848.04 STREET TURNOUT 852.01 GUARDRAIL PLACEMENT BRICK CATCH BASIN - 12" THRU 54" PIPE BRICK DROP INLET - 12" THRU 30" PIPE 840.27 840.54 BRICK MEDIAN DROP INLET TYPE ’B’ - 12" THRU 36" PIPE MANHOLE FRAME AND COVER CONCRETE CURB, GUTTER AND CURB AND GUTTER CONCRETE SIDEWALK CONCRETE ISLANDS 848.02 840.32 840.02 CONCRETE CATCH BASIN - 12" THRU 54" PIPE FRAME, GRATES AND HOOD - FOR USE ON STANDARD CATCH BASIN 840.14 CONCRETE DROP INLET - 12" THRU 30" PIPE 840.18 CONCRETE MEDIAN DROP INLET TYPE ’B’ - 12" THRU 36" PIPE 840.31 CONCRETE JUNCTION BOX - 12" THRU 66" PIPE BRICK JUNCTION BOX - 12" THRU 66" PIPE CHAIN LINK FENCE -4’, 5’ AND 6’ HIGH FENCE FRAMES AND NARROW SLOT SAG GRATES DRIVEWAY TURNOUT - RADIUS TYPE GUARDRAIL INSTALLATION 840.34 TRAFFIC BEARING JUNCTION BOX - FOR USE WITH PIPES 42" AND UNDER 862.01 876.02 GUIDE FOR RIP RAP AT PIPE OUTLETS 862.02 866.01 MOUNTING OF TYPE ’D’, ’E’ AND ’F’ SIGNS ON ’U’ CHANNEL POSTS ORIENTATION OF GROUND MOUNTED SIGNS 876.04 DRAINAGE DITCHES WITH CLASS ’B’ RIP RAP 904.50 904.10 876.01 RIP RAP IN CHANNELS 310.02 PARALLEL PIPE END SECTION 300.01 840.25 ANCHORAGE FOR FRAMES - BRICK/CONCRETE/PRECAST CONCRETE 848.05 METHOD OF PIPE INSTALLATION CURB RAMP 840.35 TRAFFIC BEARING GRADED DROP INLET 840.45 PRECAST DRAINAGE STRUCTURE 840.46 TRAFFIC BEARING PRECAST DRAINAGE STRUCTURE 840.71 CONCRETE AND BRICK PIPE PLUGS 840.72 PIPE COLLAR HEREBY ARE CONSIDERED A PART OF THESE PLANS: RALEIGH, N.C., DATED JANUARY 2012 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN BRANCH-N.C. DEPARTMENT OF TRANSPORTATION THE FOLLOWING ROADWAY STANDARDS AND ANY OTHER APPLICABLE STANDARDS WITHIN THE 2 TO 2-A 2-B TO 2-D 2-E TO 2-F 2-G THRU 2-K CONSTRUCTION DETAILS TYPICAL SECTIONS UO-1 THRU UO-6 UTILITIES BY OTHERS SHEETS EC-1A THRU EC-19 EROSION CONTROL PLANS AND DETAILS UC-1 THRU UC-8 *OMITTED FROM THIS SUBMITTAL 3-A * DRAINAGE SUMMARY SHEETS ROUNDABOUT GEOMETRY AND CURB PROFILE SHEETS INDEX OF SHEETS, GENERAL NOTES, AND STANDARD DRAWINGS L-100 THRU L-200 STD NO 848.05 AND AS SHOWN IN THE PROJECT SPECIAL DETAILS. THE CONSTRUCTION OF ALL WHEELCHAIR RAMPS SHALL BE IN ACCORDANCE WITH CURB RAMPS ARE SHOWN ON THE PLANS AT APPROXIMATE LOCATIONS. CURB RAMPS: EXCEPT AS SHOWN ON THE PLANS. ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS, CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT - JANEEN GOODWIN - (919) 996-4564 PUBLIC SERVICE COMPANY OF NORTH CAROLINA - NAKIMA BOGAN - (919) 367-2720 CENTURY LINK - DARREL CLEMANS - (9190 554-5270 TIME WARNER CABLE - JOE FAHEY - (919) 632-3688 WAKE FOREST POWER - MIKE BARTON - (919) 435-9571 UTILITY OWNERS ON THIS PROJECT ARE: UTILITIES: LOCATION OF THE SHORING. OR "TEMPORARY SHORING-BARRIER SUPPORTED" DEPENDING UPON THE PLANS WILL BE PAID FOR AT THE CONTRACT PRICE FOR "TEMPORARY SHORING" SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC NOT SHOWN ON THE TEMPORARY SHORING: CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL. CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING GUARDRAIL: 848.04 USING THE RADII NOTED ON PLANS. STREET RETURNS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD. NO. STREET TURNOUT: PROVIDE A SMOOTH TRANSITION TO EXISTING. THE CONTRACTOR SHALL RECONSTRUCT DRIVEWAYS IN SUCH A MANNER AS TO OF 5’ BEHIND THE PROPOSED SIDEWALK. ALL GRAVEL DRIVEWAYS SHALL BE CONSTRUCTED WITH CONCRETE FOR A MINIMUM THE ENGINEER. LOCATIONS OF DRIVES WILL BE AS SHOWN ON THE PLANS OR AS DIRECTED BY WITH DETAILS IN PLANS USING 3’ RADII OR RADII AS SHOWN ON THE PLANS. DRIVEWAYS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD NO 848.02 AND DRIVEWAYS: LOCATIONS DIRECTED BY THE ENGINEER. UNDERDRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD. NO. 815.03 AT UNDERDRAINS: PARTICULAR ITEMS INVOLVED. PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE SIDE ROADS: ELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD NO 560.01. ASPHALT AND EARTH SHOULDER CONSTRUCTION ON THE HIGH SIDE OF SUPER SHOULDER CONSTRUCTION: UNLESS OTHERWISE NOTED ON THE PLANS. IN WIDENING AREAS CONTRACTOR IS TO MATCH EXISTING ROADWAY SLOPE SHOWN ON THE TYPICAL SECTIONS. THE PLANS. SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS STD. NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH SUPERELEVATION: BY METHOD II AS SHOWN IN STD NO 200.02. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED CLEARING: ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. MAY BE ADJUSTED AT THEIR BEGINNING AND ENDING AS DIRECTED BY THE SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED GRADE LINE: REVISED: 07/30/12 EFFECTIVE: 01-17-12 2012 SPECIFICATIONS LANDSCAPE PLANS AND DETAILS TCP-1 THRU TCP-18 840.24 * GUARDRAIL AND PAVEMENT REMOVAL SUMMARY SHEET UTILITY CONSTRUCTION PLANS REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t s h .d g n 6 / 16 / 2 0 14 CONVENTIONAL SYMBOLS NOT TO SCALE Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is A R T ME N N A S O H D E P T O F TRA SPORT T I O N T A TEOF N RT C ARO LI N A PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Baseline Control Point RIGHT OF WAY: Existing Right of Way Marker Existing Right of Way Line h Existing Control of Access Proposed Control of Access Proposed Right of Way Line C F Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ; z v W K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R } T p Q l e ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) r | I ] GAS: Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW v v Drainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber Optics Cable (S.U.E.*) Designated U/G Water Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G Gas Line (S.U.E.*) U/G Test Hole (S.U.E.*) *S.U.E. = Subsurface Utility Engineering WLB EIP B ECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Note: Not to Scale Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland Proposed Permanent Easement with Iron Pin and Cap Marker Proposed Temporary Utility Easement TUE Iron Pin and Cap Marker Proposed Right of Way Line with Proposed Permanent Drainage / Utility Easement AUEProposed Aerial Utility Easement Proposed Curb Ramp STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring UST Known Soil Contamination: Area or Site Potential Soil Contamination: Area or Site Concrete or Granite R/W Marker Proposed Right of Way Line with C A Concrete C/A Marker Proposed Control of Access Line with DUE CR 1-B 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is STADIUM DRIVE - COMPLETE STREETS U-5515 NOT TO SCALETYPICAL SECTIONS L 2’ GROUND EXISTING 0.02 2:1 2: 1 C 2’ GROUND EXISTING 2: 1 2:1 5’ 0.02 5.5’ 31.5’ 4.5’ 5.5’14’14’ -L- STADIUM DRIVE (SR 1930) 0.5’ MUP 10’ 2 TYPICAL SECTION NO. 1 PAVEMENT SCHEDULE AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS. AN AVERAGE RATE OF 168 LBS. PER SQ. YD. EARTH MATERIAL PROPOSED 4" AGGREGATE BASE COURSE S T E1 GRADE TO THIS LINE 1:1C1 W T E1 GRADE TO THIS LINE POINT GRADE R1 U 6"6" 1:1 2:1 2: 1 0.020.02 2’ GROUND EXISTING 6.5’2’5.5’ 0.02 TYPICAL SECTION NO. 1A TYPICAL SECTION NO. 1B L 2’ C 2’ 0.02 5.5’5.5’14’14’ -L- STADIUM DRIVE (SR 1930) S T E1 GRADE TO THIS LINE 1:1C1 W E1 GRADE TO THIS LINE POINT GRADE R1 U 6"6" TYPICAL SECTION NO. 2 1.5’ 2: 1 2:1 GROUND EXISTING 31.5’31.5’ SEE NOTE 1 & 2 SEE NOTE 1 & 2 0.5’ 10’ 8.0’ 0.02 ST 1.5’ 2:1 2: 1 8.0’ 10’ 1:1 0.5’ GROUND EXISTING R1 THAT ALLOWS THE MINIMUM SURFACE COURSE DEPTH. 4. MILL EXISTING ASPHALT PAVEMENT TO A DEPTH NOTED. 3. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE MINIMUM FULL DEPTH PAVEMENT. 2. SAWCUT EXISTING PAVEMENT TO PROVIDE 1’ 1. SEE PLANS FOR EXISTING PAVEMENT LOCATIONS. NOTES: 0.02 2’6.5’ TYPICAL SECTION NO. 1C C3C3 C3 C3 D1D1 D1 D1 VARIES 33.5’ - 37.5’ VARIES 0.5’ 0’ - 4’ VARIES 12’ - 16’ R1 3’ W/ GRAIL 1.5’ GROUND EXISTING T S S S -L- STA 58+95.00 TO STA 61+25.00 RT -L- STA 69+10.00 TO STA 74+35.26 11"11" 11"11" C2 J2 EXIST EXIST EXIST EXIST 3’ (SEE DETAIL ON SHEET 2-B) TOE WALL WITH ROCK VENEER CAST-IN PLACE CONCRETE T R1 W U E1 R2 J1 E2 R3 S PROPOSED 2’-6" CONCRETE CURB AND GUTTER PROPOSED 1’-6" CONCRETE CURB PROPOSED 4" CONCRETE SIDEWALK EXISTING PAVEMENT (CONCRETE AND/OR ASPHALT) VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL ON SHEET 2-A) J2 PROPOSED 6" AGGREGATE BASE COURSE PROPOSED 8" X 18" CONCRETE HEADER CURB IN LAYERS NOT LESS THAN 3" OR GREATER THAN 5" IN DEPTH. AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER 1" DEPTH, TO BE PLACED PROPOSED VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT PROPOSED APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5B, AT I19.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE. TYPE LAYERS NOT LESS THAN 2" OR GREATER THAN 4" IN DEPTH. AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED IN PROPOSED VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B, C1 C3 C4 D1 D2 C2 A1 AN AVERAGE RATE OF 456 LBS. PER SQ YARD. PROPOSED APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT GROUND EXISTING PROPOSED APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5B, AT LC -L- STADIUM DRIVE (SR 1930) TYPICAL SECTION NO. 2A -L- STA 70+30.00 TO STA 74+20.00 12 " 3 " 3 " 1’-6" PVC SCHEDULE 40 WITH A MINIMUM COVER OF 1’ BELOW BASE ** ANY UNDERDRAIN PASSING UNDER ROADWAY WILL NEED TO BE NOTE: COORDINATE UNDERDRAIN LOCATION WITH LANDSCAPE DESIGN T TT R2 R2 E1 E1 SEE SHEET 2-F FOR DETAIL UNDERDRAIN FINE AGGREGATE. THE OUTSIDE OF THE BE WRAPPED AROUND FILTER FABRIC SHOULD BY UNDERDRAIN FINE ABC DRAIN SURROUNDED 6" PERFORATED PVC -L- STA 53+29.50 TO STA 60+60.00 LT 2:1 -L- STA 53+24.26 (END BRIDGE) TO STA 69+00.00 -L- STA 24+30.00 TO STA 51+93.15 (BEGIN BRIDGE) 6"6" -L- STA 53+30.00 TO STA 69+10.00 RT 3’ W/ GRAIL 14’ W/ GRAIL 10’ 3.5’3.5’ 5’5’ 4 " -L- STA 75+05.29 TO STA 76+32.00 (PAVEMENT WITHOUT DOWELS) PROPOSED 8" PORCELAIN CEMENT CONCRETE PAVEMENT LAYERS NOT GREATER THAN 2" IN DEPTH. AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED IN PROPOSED VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN 2’-9"2’-9" 8 " 3 0 " 4.5’ W/ GRAIL 6"6" 2’ PRIME COAT AT THE RATE OF 0.35 GAL PER SQ YDK K PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE COURSE TYPE SF9.5A, AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. IN TWO LAYERS. 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 2" MINIMUM CL WEDGING DETAIL D1 3" MINIMUM C1 D2 EXISTING PAVEMENT D2 10’ CONSTRUCTION BEGIN OR END SURFACE COURSE MILLED NOTCH TO KEY-IN DETAIL SHOWING TIE-INS AT PROJECT TERMINI C4 U E2 C1 C E N T E R O F R O U N D A B O U T CIRCULATING WIDTH 20’18’17’ TRUCK APRON 55’ R 11" R3 A1 R1 GRADE TO THIS LINE E1W 0.02 0.02 C3 J1 TYPICAL SECTION NO. 5 TYPICAL SECTION NO. 3 2-A LC GROUND EXISTING GROUND EXISTING 10’10’ 0 " M I L L IN G 3 " M I L L IN G EXISTING PAVEMENT EXISTING CURB MILLING ADJACENT TO EXISTING CURB D1 -L- NORTH AVENUE COURSE 1"SURFACE 6.5’ P A R K I N G R2 -L- STA 76+32.00 TO STA 82+15.00 T 1:1D1 JOINTS " EXPANSION C1 U 2:1 2: 1 GROUND EXISTING S T 1 :1 6" 2’6’1.5’ 12"12" L 2’ C 2’ 0.02 T E1 GRADE TO THIS LINE 1:1C1 W E1 GRADE TO THIS LINE R1 U 6"6" TYPICAL SECTION NO. 4 2: 1 2:1 GROUND EXISTING SEE NOTE 1 & 2 0.5’ 0.02 T 2:1 2: 11:1 0.5’ GROUND EXISTING R1 C3 C3 D1 D1 11"11" EXIST EXIST VARIES A VARIES A VARIESVARIES -Y4- MCDOWELL DRIVE -Y3- WHISTLING SWAN DRIVE -Y2- GLENCOE DRIVE -Y1- OLD STADIUM DRIVE A -Y1- -Y2- -Y3- -Y4- -Y5- -Y7- -Y8- -Y6- LINE 7’ -Y8- N WINGATE STREET -Y7- ROCK SPRINGS ROAD -Y6- JUDSON DRIVE -Y5- MCDOWELL DRIVE 13.5’ 10.5’ 11’ 11’ 13’ SIDEWALK RETAIN 0.020.02 C3 E1 6"6" TYPICAL SECTIONS AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS. AN AVERAGE RATE OF 168 LBS. PER SQ. YD. EARTH MATERIAL PROPOSED 4" AGGREGATE BASE COURSE T R1 W U E1 R2 J1 E2 R3 S PROPOSED 2’-6" CONCRETE CURB AND GUTTER PROPOSED 1’-6" CONCRETE CURB PROPOSED 4" CONCRETE SIDEWALK EXISTING PAVEMENT (CONCRETE AND/OR ASPHALT) VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL ON SHEET 2-A) J2 PROPOSED 6" AGGREGATE BASE COURSE PROPOSED 8" X 18" CONCRETE HEADER CURB IN LAYERS NOT LESS THAN 3" OR GREATER THAN 5" IN DEPTH. AN AVERAGE RATE OF 114 LBS. PER SQ. YARD PER 1" DEPTH, TO BE PLACED PROPOSED VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT LAYERS NOT LESS THAN 1" OR GREATER THAN 2" IN DEPTH. AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED IN PROPOSED VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN PROPOSED APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5B, AT I19.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE. TYPE LAYERS NOT LESS THAN 2" OR GREATER THAN 4" IN DEPTH. AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED IN PROPOSED VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.0B, C1 C3 C4 D1 D2 C2 AN AVERAGE RATE OF 456 LBS. PER SQ YARD. PROPOSED APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B, AT PAVEMENT SCHEDULE A1 THAT ALLOWS THE MINIMUM SURFACE COURSE DEPTH. 4. MILL EXISTING ASPHALT PAVEMENT TO A DEPTH NOTED. 3. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE MINIMUM FULL DEPTH PAVEMENT. 2. SAWCUT EXISTING PAVEMENT TO PROVIDE 1’ 1. SEE PLANS FOR EXISTING PAVEMENT LOCATIONS. NOTES: -Y4- STA 10+78.00 TO STA 11+13.43 -Y3- STA 11+27.00 TO STA 11+69.50 -Y2- STA 10+38.00 TO STA 11+62.00 -Y1- STA 10+74.00 TO STA 11+18.96 -Y8- 14+98.76 (END ROUNDABOUT) TO STA 15+77.00 -Y8- STA 13+20.00 TO STA 14+28.75 (BEGIN ROUNDABOUT) -Y7- STA 10+80.00 TO STA 11+24.43 -Y6- STA 10+00.00 TO STA 10+84.00 -Y5- STA 10+19.27 TO STA 10+55.00 15’ 13’ * * * SEE PLANS FOR SPECIFIC DIMENSIONS 17.5’ -RBT- STADIUM DRIVE AND N. WINGATE STREET ROUNDABOUT PLANS) (SEE LANDSCAPE LANDSCAPED ISLAND POINT GRADE 11" R1 R1 T T SPLITTER ISLAND DETAIL 1’ R 1’ R C R O S S WA L K 1’ R 3’ R 55’ R 2’ 5’ MEDIAN 6" 6" 4’ 1.5’ (SEE PLANS) CURB TYPE 6’ ISLAND SPLITTER 2.5’2.5’ PROPOSED APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5B, AT AND ASPHALT PAVEMENT REMOVE EXISTING CONC (PAVEMENT WITHOUT DOWELS) PROPOSED 8" PORCELAIN CEMENT CONCRETE PAVEMENT WITH TOPSOIL SUBGRADE AND REPLACE EXISTING PAVEMENT AND CONTRACTOR TO REMOVE PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE COURSE TYPE SF9.5A, AT NOTE: BEGIN CONCRETE PAVEMENT REMOVAL STA 76+32.00 TO STA 82+15.00 -L- STA 74+00 +/- NOT TO SCALE AN AVERAGE RATE OF 110 LBS. PER SQ. YD. IN TWO LAYERS. 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 10’ TRANSITION GUTTER CURB & 2’-6" CURB TRANSITION DETAIL 0.02 2’ 0.02 2’ T GRADE TO THIS LINE T 2:1 2: 1 GROUND EXISTING GROUND EXISTING FOR WIDTH SEE PLANS DRIVEWAY DETAIL A 6" ABC 2 :1 2:1 SEE NOTES 30" VALLEY CURB TIE TO EXISTING 2’-6" CURB & GUTTER 2-G CURB CUT WHEELCHAIR RAMP (TOWN) DETAIL SHOWING TYPICAL MULTI-USE PATH (PLAN VIEW) "CURB RAMPS (MUP)." FOR AT THE CONTRACT UNIT PRICE PER EACH CONCRETE CURB CUT WHEELCHAIR RAMPS WILL BE PAID CURB AND RAMP TRANSITION TAPER FOR SCORED CONTRACTION JOINT EXPANSION JOINT ASPHALT PATH MULTI-USE RAMP WHEELCHAIR CONC. CONCRETETRANSITION 3’ CURB 8’ DROP CURB TRANSITION 3’ CURB CONCRETE EXPANSION JOINT #848.05 (WHEELCHAIR RAMP) APPLY. ALL REQUIREMENTS OF NCDOT STANDARD DRAWING CONSTRUCTION DETAILS NOT TO SCALE DRIVEWAY DETAIL B SEE PLANS 8’ (CROSS PIPE) STORM DRAIN (ABOVE FLOW LINE) CORED HOLE TO STORM SEWER 6" UNDER DRAIN EXTENSION GROUT GROUT STORM SEWER EXTENSION TO 6" UNDER DRAIN STRUCTURE TIE-IN CROSS PIPE TIE-IN MEDIAN UNDERDRAIN DETAIL E X I S T T R E E SIDEWALK 4" CONC BACKFILL DO NOT COMPACT SOIL WITH #57 STONE (DEPTH VARIES) SURROUND/PROTECT ROOTS TO AVOID DAMAGE TO EXIST ROOTS PLACE WASHED STONE CAREFULLY * * PVC SCHEDULE 40 WITH A MINIMUM COVER OF 1’ BELOW BASE ** ANY UNDERDRAIN PASSING UNDER ROADWAY WILL NEED TO BE NOTE: COORDINATE UNDERDRAIN LOCATION WITH LANDSCAPE DESIGN USED AT WHISTLING SWAN DRIVE -Y3- DRIVEWAY CONCRETE WIDTH DRIVEWAY EXIST 6" CONCRETE DRIVEWAY 10’ ASPHALT MUP 4" CONC SIDEWALK OR WIDTH (SEE PLANS) PROPOSED DRIVEWAY 10’ ASPHALT MUP 4" CONC SIDEWALK OR TO CURB AND GUTTER TIE PROPOSED WHEELCHAIR RAMP UNLESS OTHERWISE SPECIFIED BY TOWN IN CONJUNCTION WITH THE MULTI-USE PATH *NOTE: TRUNCATED DOMES ARE TO BE YELLOW BASE COURSE TO 8". 4. FOR DRIVEWAYS STEEPER THAN 7% INCREASE AGGREGATE BASE COURSE REINFORCED WITH WOVEN WIRE MESH ON 6" AGGREGATE 3. FOR CONCRETE DRIVEWAYS, USE 6" JOINTED CONCRETE 2. FOR GRAVEL DRIVEWAYS, USE 6" AGGREGATE BASE COURSE AGGREGATE BASE COURSE 1. FOR EXISTING ASPHALT DRIVEWAYS, USE 2" SF9.5A ON 6" NOTES: 6’ LENGTH PRECASE CONCRETE WHEEL STOP WHEEL STOP 1/2" BELOW SURFACE OF #5 10" LONG REBAR DRIVEN TO DO NOT CRACK CONCRETE DRILL (2) 3/4" DIAMETER HOLES LOCATION VARIES PER CONCRETE WHEEL STOP 2 " C L E AR MIN . 8 " MIN . 1/2"OFFSET, TYP. ANGLED NOSING #4 BARS @ 12" O.C. # 4 BARS @ 12" (TYP.) #4 BARS @ 12" O.C. @ 12" O.C. (TYP.) # 4 BARS (2) #4 BARS CONTINUOUS # 4 CORNER BARS IN NOSING (TYP.) 1/4" TREAD PITCH (TYP.) 1. ALL CONCRETE TO BE 4,000 PSI @28 DAYS. NOTES: CONCRETE CHEEK WALL, SEE DETAIL 1/4" WASH BROOM FINISH TREAD EXPANSION JOINT @ STAIR BOTTOM OF STAIR EL. (SEE PLAN) EL. (SEE PLAN) TOP OF STAIR GROUT SECURLEY WITH AND FASTEN POST DRILL CHEEK WALL RAILING POST-CORE GROUT POST SECURLEY WITH CHEEK WALL AND FASTEN RAILING POST-CORE DRILL EXPANSION JOINT, TYP. AT NOSING 4 TROWLED GROOVES NOSING 1/2" R 12" TREAD (TYP) CONCRETE TRAIL 3" 6" RISER 1’-2" 1’-2" 2’-0" (MIN.) 6" 6 "M IN . 6 8 ’-7 3 / 4 T H CONCRETE STAIRS 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 2-H CONSTRUCTION DETAILS NOT TO SCALE 10’-0" 8’-0" SURFACE" "CROSSWALK DETECTABLE AREA INCIDENTAL TO CONCRETE WITHIN WALKING (SEE PLANS) CONCRETE ISLAND (KEYED IN) ISLAND NOSES 5" MONOLITHIC CONSTRUCT ALL CONCRETE ON SIDES 5:1 SLOPE CURB RAMP PAID FOR AS L and ing 3 S id ew a lk 3 1 212 TRANSITION TO STREET. PORTION OF RAMP OR EXCEED 2% ON ANY CROSS SLOPE NOT TO S IDEWALK GRASS STR IP RAMP W IDTH 4 ’ M IN LAND ING 1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE NOTE: USE SMALL FLARES ONLY WHEN A CURB TYPE DIRECTLY CONFLICTS WITH APPROACHING VEHICULAR TURNING 12" MIN WIDTH 24" TYP WIDTH 8"W X 6"D TYP. 5’ MAX. MOVEMENTS. PAY LIMITS FOR CURB RAMP TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING 22 1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING PAY LIMITS FOR CURB RAMP PAY LIMITS FOR CURB RAMP (MEDIANS 20’)< PAY LIMITS FOR CURB RAMP PAY LIMITS FOR CURB RAMP1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING 1 LANDING RAMP / FLARE 4" 6" 1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING PAY LIMITS FOR CURB RAMP LANDING RAMP / FLARE 4" 6" LANDING RAMP / FLARE 4" 6" LANDING RAMP / FLARE 4" 6" LANDING RAMP / FLARE 4" 6" 1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING CROSSING (NO VERGE) DETAIL CR-2: DIRECTIONAL CROSSING (WITH VERGE) DETAIL CR-1: DIRECTIONAL DETAIL CR-5: PARALLEL CROSSING AT INTERSECTION (NO VERGE) DETAIL CR-6: SHARED LANDING (WITH VERGE) DETAIL CR-4: MID-BLOCK CROSSING POND WITHIN LANDING) (USE ONLY WHERE WATER WILL NOT LANDING RAMP / FLARE 4" 6" 1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING PAY LIMITS FOR CURB RAMP (NO VERGE) DETAIL CR-3: MID-BLOCK CROSSING CROSSWALK DETECTABLE SURFACE PEDESTRIAN REFUGE DETAIL TURNING MANEUVERS. SLOPE TO DRAIN TO CURB. SLOPE OF 2.00% WHERE PEDESTRIANS PERFORM WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL CURB RAMPS REQUIRE A (4’-0") MINIMUM LANDING 1 6" 4"SIDE RAMPS LANDING & CURB RAMPS PAY LIMITS FOR CURB RAMP 1 2 3 CROSS SLOPE: 2.00% 8.33% (12:1) MAX RAMP SLOPE AT INTERSECTION (WITH VERGE) DETAIL CR-7: CURB RAMPS SIDEWALK JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION 2’-6" CURB AND GUTTER 12" MIN. 24" TYP. 8"W X 6"D AND GUTTER 2’-6" CURB 5’ MAX. SURFACE WARNING DETECTABLE 4’ MIN. LANDING WIDTH 6" x 12" CONCRETE CURB 2’-6" CURB & GUTTER 3 1 2 3 1 2 NON-WALK SURFACE SURFACE (TYP) DETECTABLE WARNING 2 JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION 3 1 3 3 10% 10% 10%10% 4’ MIN LANDING CURB & GUTTER DEPRESSED 2’-6" SURFACE (TYP) DETECTABLE WARNING 4’ MIN RAMP WIDTH BY FLARE SLOPE) CURB REVEAL DETERMINED (HEIGHT VARIES CURB & GUTTER DEPRESSED 2’-6" SIDEWALK AREA 1 1 JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION 4’ MIN. W IDTHRAMP SURFACE (TYP) DETECTABLE WARNING SIDEWALK CURB & GUTTER DEPRESSED 2’-6" 6" W X 12"D CONCRETE CURB 2 3 CONCRETE DEPTH JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION SURFACE NON-W ALK CONCRETE DEPTH CONCRETE DEPTH CONCRETE DEPTH CONCRETE DEPTH SIDEWALK JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION SURFACE DETECTABLE WARNING 4’ MIN LANDING WIDTH 6" x 12" CONCRETE CURB 2’-6" CURB AND GUTTER 2 NON-WALK SURFACE 1 1 2 2 1 3 1 2 SIDEWALK CONCRETE DEPTH JOINT (TYP) 1/2" EXPANSION JOINT (TYP) 1/2" EXPANSION SIDEWALK SIDEWALK 2 1 3 2 11 8" TYP 10%10% 4’ MIN. RAMP WIDTH SURFACE (TYP) DETECTABLE WARNING CURB & GUTTER DEPRESSED 2’-6" BY FLARE SLOPE) CURB REVEAL DETERMINED (HEIGHT VARIES CURB & GUTTER DEPRESSED 2’-6" SURFACENON-W ALKS URF AC E NO N- W AL K 12" MIN. 24" TYP. CONCRETE DEPTH 6"W X 12"D CONCRETE CURB 6"W X 12"D CONCRETE CURB 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PROJECT: SHEET NUMBER:JOB NUMBER: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 BUS STOP DETAIL WITH SHELTER BUS STOP DETAIL WITHOUT SHELTER -L- STA 27+30.00 (RT) -L- STA 36+35.00 (RT) -L- STA 50+00.00 (RT) -L- STA 67+70.00 (RT) 2-I NOT TO SCALE 20’ CONSTRUCTION DETAILS 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 2-J CONSTRUCTION DETAILS 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ t y p .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 2-K CONSTRUCTION DETAILS CEMETERY v v v v 15"R C P 8 14PT 6 6 6 8 6 6 6 6 6 6 6 6 6 6PT 14 12 12 12 12 10 8 8PT 16PT 12PT 12PT 6PT 8PT 8PT 6 66 6 6PT 6PT 8PT10QA 10QA 10JV 12JV 6JV 14PT 8JV 8JV 8JV8JV 8JV 10JV 10JV 10JV 10JV8JV 8JV 11JV 11JV 11JV 11JV 12 14PT 10QA 12QA 12QA 12QA 12QA 11JV 11JV 11JV 11JV 6 6 8 8 8 14 12 12 12 8 8IO 6JV 14QA 10QA 14LI 6 6 6 16PT 6 8 12PT 10PT 12PT 8 8 12 8 10 8 10 8 16PT 8PT 10108PT 14PT 8PT15PT 15PT 12PT 12PT 8PT 6 6 8 10PT 10PT 10PT 10 6PT 6PT 12PT 8PT 8PT 8PT 8PT 8PT 12PT 12PT 6 6 6 6 8PT 14PT 8 8 8 8 8 8 20PT8 8 8 12 6 6 12PT 8PT 8PT 12PT 16PT 8 18QA 16QA 12QA22QA 20QA 20QA 14QA 14QA20QA 12PT 12PT 6 10 12PT OUT=336.12’ IN=336.17’ RIM=345.77’ SSMH 8"PVC 8 "P V C 8"DIP OUT=342.69’ IN=346.89’ RIM=352.89’ SSMH 15"RCP INV =335.09’ INV=335.37’ 15"RCP INV=341.54’ 15"RCP INV=360.74’ 15"RCP INV=357.83’ 3 0" R C P INV=352.18’ FES 18"RCP INV=337.22’ INV=333.16’ INV=364.03’ FES 15"CMP PO ST W ITN E SS T T T 2 S BK APTS 1 S F D 1 S BK D 1 S BK D 2 S F APTS 1 S F D 2 S F D 2 S F D 2 S F D 2 S F D INV=359.93’ INV=350.20’ FES 8 "P V C 80-02 INV=370.75’ TOC=377.00’ CB-1 CB-1 90-02 91-06 91-04 91-03 CB-2 CB-8 INV=362.44’ TOC=369.29’ CB-2 UNKNOWN # LP LP LP 91-01 EXISTING STORMDRAIN INFORMATION G R A V E L W O O D CONCRETE ASPHALT ASPHALT ASPHALT CHAIN ROPE WOOD WOOD CT W O O D W O O D WOOD/VINYL C ON C R E T E GUY POLE GUY POLE PIN 1841057290 DB 12900, PG 728 BM 1986, PG 1869 PIN 1841055049 DB 15080, PG 1310 BM 1991, PG 30 PIN 1841056044 DB 15080, PG 1313 BM 1991, PG 30 PIN 1841051332 DB 1244, PG 333 P I N 1 8 4 1 0 5 9 1 1 1 D B 8 5 3 7 , P G 1 9 9 8 B M 1 9 9 9 , P G 2 5 PIN 1841059111 DB 8445, PG 1028 BM 1999, PG 25 PIN 1841058427 DB 10749, PG 1871 BM 2003, PG 941 PIN 1841056333 DB 12501, PG 2296 BM 2003 PG 941 PIN 1841055452 DB 13546, PG 417 BM 1986 PG 1624 PIN 1841052792 DB 4098, PG 892 BM 1986 PG 1624 PIN 1831957846 DB 1244, PG 333 P IN 18 4 10 5 4 9 3 1 D B 3 5 6 0 , P G 13 B M 19 8 6 P G 16 2 4 P I N 1 8 4 1 0 5 9 1 1 1 D B 8 5 3 7 , P G 1 9 9 8 B M 1 9 9 9 , P G 2 5 PIN 1841054478 DB 4602, PG 946 BM 1986 PG 1624 PIN 184105461 DB 14556, PG 116 BM 1986 PG 1624 PIN 1841047736 DB 14297, PG 1312 50.17’ S5256’33"E N 33 28’4"W8.00’ N/F GEORGE R. WOOTEN JR. N/F MACKIE FAMILY, LLC N/F MACKIE FAMILY, LLC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N / F M E O L D Y H A R R I S N/F MEOLDY HARRIS N/F MARLOWE & MOYE, LLC N/F ANDY. D. GILLELAND N/F CHRISTOPHER J. & LISA R. SIEMERS N/F STAFFORDSHIRE HOA, INC. N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N / F S T A F F O R D S H IR E H O A , IN C . N/F CARSON E. & CONNIE ANN CHAVIS N/F JORDAN M. & WENDY STEARNS SEBTS CEMETARY STADIUM DRIVE TOWN HOMES N/F NORTH FOREST APARTMENT, LLC STAFFORDSHIRE 1 2 4 5 6 7 8 9 10 11 12 3 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p s h _ 4 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 STADIUM DRIVE - COMPLETE STREETS U-5515 1 2 CONSTRUCTION NOTES SIDEWALK TIE PROPOSED SIDEWALK TO EXISTING TO EXISTING CURB & GUTTER TIE PROPOSED 2’-6" CURB & GUTTER 3 4 RAMP (SEE SHEET 2-F) CONSTRUCT MULTI-USE PATH CURB (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-1 5 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-2 6 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-3 7 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-4 8 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-5 UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) NOTE: RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT SEE SHEET FOR -L- PROFILE 9 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-6 SEE DETAIL SHEET 2-A MILL AND RESURFACE LIMITS 10 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-7 11 (SHEET 2-G) SEE PEDESTRIAN REFUGE DETAILS RETAIN REMOVE CB REMOVE 15" RCP REMOVE REMOVE CB CB CB CB CB 18"RCP-IV 403 404 400 402 401 15" RCP - III 405 RETAIN 15" RCP-IV 15" RCP-IV 15" RCP-IV 18" RCP-IV ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 2: 1 Max. d=1 Ft. Min. D=1 Ft. Type of Liner= PSRM Ground Natural 2:1 Slope Fill FROM STA. 30+00 TO STA. 32+00 RT DETAIL 1 FROM STA. 32+00 TO STA. 34+00 RT ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2: 1 D Min. D=1 Ft. DETAIL 2 Ground Natural Slope Fill2:1 SPECIAL LATERAL ’V’ DITCH EST 115 SY PSRM SEE DETAIL 2 SEE DETAIL 2 SPECIAL LATERAL ’V’ DITCH CB RETAIN 2GI 4 ROADWAY PLAN SHEET DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY NCGS FOR MONUMENT "FOREST" WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF NORTHING: 816316.78(ft) EASTING: 2139555.67(ft) ELEVATION: (ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.999946374 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "FOREST" TO -L- STATION 24+00.00 IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 S 39 16’ 52" E 822.38’ 10 N A D 83/N A 2011 ) 5 T E E H S E E S ( 5 2 + 4 3 A T S - L - E N I L H C T A M 16SEE SHEET FOR -Y2- PROFILE -Y1- POT Sta. 10+00.00 PI Sta 24+23.58 L = 684.43’ T = 392.31’ R = 560.00’ PI Sta 30+65.90 L = 210.40’ T = 105.59’ R = 1,000.00’ -Y2- POT Sta. 10+00.00 -L- PT Sta. 27+15.70 -Y2- POT Sta. 10+38.00 BEGIN CONSTRUCTION OLD STADIUM DR -Y1- G LEN C O E D R - Y2 - -L- PC Sta. 29+60.31 -L- PT Sta. 31+70.71 = 109 53’ 33" -Y2- POT Sta. 11+62.00 -L- POC Sta. 25+88.45 = = 88 17’ 12" -Y2- POT Sta. 11+07.22 -Y1- POT Sta. 11+47.00 = -L- 24’ DR 14’ DR 16’ DR 16’ DR 16’ DR 16’ DR16’ DR 2’-6" C&G 2’-6" C&G 2’-6" C&G 2’-6" C&G 11’ 14’ 14’ 19.5’ 19.5’ 19.5’ 19.5’ 14’ 14’ 11’ 45’ R 40’ R 2 2 ’ R 20’ R 20’ R 2’ R 2’ R 1 2 1 2 4 1 R=100’ 11 3 1 4 REMOVE EXIST SIDEWALK 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK BACK OF CURB 4’ FROM PROPOSED PROPOSED 10’ MUP 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK 2 5 + 0 0 3 0 + 0 0 R E T AIN C U R B 4’ FROM PROPOSED BACK OF CURB BEGIN PROPOSED 5’ CONC SIDEWALK 10:1 SIDEWALK TAPER RETAIN C&G 12’ 12’ 12’16.5’ 19.5’ STADIUM DR (SR 1930) -L- STADIUM DR (SR 1930)-L- -Y1- POT Sta. 10+74.00 BEGIN CONSTRUCTION 2’ PS8:1 -L- Sta. 25+17.00 BEGIN 2’-6" C&G R=100’ FENCE RETAIN -L- Sta. 26+30.00 BEGIN PROPOSED 10’ MUP SE = EXIST SE = EXIST 4’ R 4’ RE X I S T E X I S T E X I S T E X I S T MUP TO MATCH PROP GRADE REMOVE AND REPLACE TO STA 26+72.00 -L- STA 26+42.00 MONOLITHIC ISLAND INSTALL 5" CONCRETE CR CR CR CR 13.5’13.5’ 10 .5 ’ 10 .5 ’ 10 CONC CONC CONC CONC CONC POLE RETAIN LIGHT (SEE DETAIL SHEET 2-I) 3000 PSI CONC BUS PAD WITH BENCH 25’ GRAVEL R=100’R=100’ BACK OF CURB ON PROPOSED PROPOSED 10’ MUP BACK OF CURB 4’ FROM PROPOSED PROPOSED 10’ MUP MONOLITHIC ISLAND ISLAND AND INSTALL 5" CONCRETE REMOVE EXISTING CONCRETE 2 0’ 17.2 4’ 8:1 20’ R 2’-6" C&G 20’ R -L- STA 24+56.00 BEGIN 2’-6" C&G -L- Sta. 24+30.00 BEGIN CONSTRUCTION BEGIN TIP PROJECT U-5515 -Y1- STA 10+82.00 END 2’-6" C&G SEE SHEET 2-X FOR DETAIL PROPOSED DECORATIVE WALL SEE LANDSCAPE PLANS PROPOSED GATEWAY FEATURE F F F F F F F C C F F F C C C C F F F F F F F F F C C F F F F F v v S 18 "RC P 15"RCP 15"RCP 15"RCP18"RCP INV=299.01’ FES 24"RCP 18"R C P 8PT 8PT 8PT 16PT 16PT 16LI 6PT 24 2412 10 10 10 10 10 10 14PT 14PT 14PT 14PT 14PT 16MG 16MG 11JV11JV 11JV 11JV 11JV 11JV 8PT 16PT 14 14PT 10 10 16PT 8PT 10PT 8PT 16PT 8PT 8PT 12PT 12PT 14PT 12PT 12PT 6PT 16PT 12PT 10PT 8PT 12PT 10PT 8PT 8PT 8PT 8PT 10PT 10PT 10PT 10PT 12PT 6PT 6PT 6PT 10PT6PT 6PT 10PT10PT 26PT 12 12 16LI 16LI 16LI 16LI 8 6 6 6 10 10 30QA 20QA 14LI 10 14 10 14 10 24PT 24 16LI16LI 4 " P V C 8"D IP 8"DIP OUT=308.38’ IN=308.43’ RIM=316.53’ SSMH 8"DIP 4 " P V C 8"DIP 1 5 " R C P 6 "P V C OUT=309.99’ IN(SW)=310.24’ IN(NW)=310.04’ RIM=322.64’ SSMH 6"P V C 24"RCP 18 "R C P 15 "R C P 12 "R C P 15"RCP 15"RCP INV=335.09’INV=333.38’ 8 "D IP T T T T 2 S BR APTS 2 S BR APTS 1 S F D2 S BK APTS 1 S F D 1 S F D 2 S F D 2 S F D 2 S F APTS 2 S F APTS 2 S F APTS 1 S F D STADIUM DRIVE W H IS T IN G S W A N D R IV E 8 "P V C T 91-02 01-04 01-03 02-07 02-05 02-03 02-02 13-11 OUT=333.37’ IN=333.47’ TOC=337.32’ CB 3 OUT=331.73’ IN=332.03’ TOC=336.83’ CB-6 OUT=340.58’ RIM=344.48’ CB-8 CB-3 CB-5 CB-6CB-7 OUT=326.85’ IN=328.50’ TOC=333.20’ CB-5 OUT=332.46’ TOC=336.96’ CB-7 OUT=332.81’ IN=332.96’ RIM=335.86’ DI-4 DI-4 OUT=302.98’ IN(NW)=303.73’ IN(SW)=304.93’ TOC=309.53’ CB-11 OUT=312.76’ RIM=320.56’ CB-12 OUT=310.58’ IN=311.18’ TOC=317.88’ CB-9 CB-9 CB-12 CB-11 OUT=286.54’ IN=286.80’ TOC=292.55’ CB-14 CB-13 CB-16 CB-15 CB-14 OUT=294.07’ IN(NW)=295.47’ IN(SE)=294.12’ TOC=301.22’ CB-13 INV=288.82’ TOC=292.47’ CB-15 INV=NOT ACCESSABLE TOC=301.20’ CB-16 CB-10 OUT=318.93’ IN=320.88’ RIM=328.58’ CB-10 OUT=291.55’ IN=291.65’ RIM=302.65’ JB-20 LP 02-03 13-10 OUT=328.93’ IN(NW)=328.98’ IN(SW)=329.33’ RIM=336.68’ SSMH OUT=314.68’ IN(SE)=314.91’ IN(NE)=315.41’ RIM=324.26’ SSMH OUT=301.44’ IN=301.49’ RIM=309.84’ SSMH OUT=293.30’ IN=294.30’ RIM=301.50’ SSMH OUT=285.57’ IN=286.67’ RIM=295.22’ SSMH EXISTING STORMDRAIN INFORMATION OUT=330.50’ IN=330.61’ TOP=332.67’ WOOD/VINYL VINYL FENCE C H A IN L I N K F E N C E C O N C R E T E W O O D 1 5 "R C P 24"R C P 15 "R C P24"RCP U/G JB 18"RCP DI DI CB 15 "R C P 10" C MP 15 "R C P APPROX 148’ OF 15" RCP TOP OF PIPE EXPOSED PIN 1841047736 DB 14297, PG 1312 PIN 1841047736 DB 14297, PG 1312 PIN 1841140723 DB 12902, PG 2738 PIN 184144323 DB 15124, PG 1656 BM 2008, PG 315 PIN 1841145217 DB 12241, PG 682 PIN 1841241584 DB 7416, PG 381 BM 2001, PG 1111 PIN 1841159424 DB 9959, PG 765 PIN 1841141899 DB 4215, PG 94 PIN 1841152010 DB 12772, PG 1619 BM 1999, PG 25 PIN 1841140937 DB 15448, PG 2603 BM 1999, PG 25 PIN 1841150081 DB 12071, PG 2259 PIN 1841059076 DB 12851, PG 2604 BM 1999, PG 25 P IN 18 4 114 7 3 9 5 D B 2 8 9 4 , P G 3 6 8 P IN 18 4 10 5 9 111 D B 8 5 3 7 , P G 19 9 8 B M 19 9 9 , P G 2 5 15 6 . 2 0 ’ N 3 5 3 8 ’ 14 " E 123.53’ N5246’34"W 3 5 . 8 8 ’ N 3 7 13 ’ 2 5 " E 3 5 . 8 8 ’ N 3 7 13 ’ 2 5 " E 19 3 . 3 7 ’ N 2 9 2 8 ’ 14 " E 96.79’ S5246’35"E 99.84’ S5247’56"E 99.89’ S5246’24"E 2 0 3 . 8 4 ’ S 2 1 6 ’ 3 2 " W 2 0 3 . 9 1’ N 2 1 4 ’ 5 8 " E 86.29’ S5234’57"E 49.41’ S5157’0"E 49.76’ S5124’1"E 49.00’ S5026’29"E 49.17’ S4848’46"E 48.54’ S4727’54"E 49.27’ S4543’9"E 48 .89’ S4353’51"E 49 .08 ’ S42 27 ’21"E 49 .0 6 ’ S413 ’5 "E 7 3 .5 3 ’ S 3 9 5 0 ’2 9 "E 2 6 4 .4 1’ N 5 0 16 ’2 9 "E 2 5 9 . 13 ’ S 4 3 2 5 ’5 6 "W 19 8 .8 1 ’ N 3 9 3 0 ’2 "W 55 .46 ’ N42 42 ’10"W 50 .58 ’ N4334’1"W 50.93’ N4519’51"W 50.83’ N46 57’9"W 101.09’ N4845’39"W 99.20’ N5144’34"W 2 2 3. 2 5 ’ S 1 6 3 4 ’ 3 " W 112.26’ N5240’50"W S4325’56"W 10.11’11.53’ S 1 9 3 ’ 2 5 " W 3 3 1. 0 3 ’ ( T O T A L ) 15 7 . 11’ S 3 5 4 2 ’ 18 " W N5220’55"W 104.69’ 6.16’ 6.09’ S 3 8 5 2 ’5 9 "E 14 3 . 8 6 ’ N 5 0 16 ’3 4 "E 2 3 0 .11’ 2 2 5 .7 3 ’ 3.99’ 6 2 . 6 1’ N 3 8 5 ’18 "W C26 C27 C28 S5349’24"E 95.57’ 67.03’ S5244’10"E EXIST R/W EXIST R/W E X IS T R /W E X IS T R /W N/F NORTH FOREST APARTMENT, LLC N/F NORTH FOREST APARTMENT, LLC N/F GEORGE J. AUSTIN N/F DAVID & ELLEN I. YOUNG N/F ERIC & KERI RUSH N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F CITADEL PINE FOREST MEMORIAL GARDENS, LLC N/F DWAYNE D. ROSS N/F JAMES M. & CHRISTINA R. LYERLY JR. N/F WILLIAM M. & JILL G. MABE N/F NICOLE M. CEBULA N/F GEORGE J. AUSTIN M E O L D Y H A R R IS N / F P H Y L L IS K A Y P L E A S A N T SN / F M E O L D Y H A R R IS SWANS COVE NORTH FOREST APARTMENTS PINE FOREST MEMORIAL GARDENS 10 1312 14 15 17 10 18 19 20 21 22 16 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p s h _ 5 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 STADIUM DRIVE - COMPLETE STREETS U-5515 1 2 CONSTRUCTION NOTES SIDEWALK TIE PROPOSED SIDEWALK TO EXISTING TO EXISTING CURB & GUTTER TIE PROPOSED 2’-6" CURB & GUTTER 3 4 RAMP (SEE SHEET 2-F) CONSTRUCT MULTI-USE PATH CURB (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-1 5 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-2 6 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-3 7 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-4 8 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-5 9 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-6 10 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-7 11 (SHEET 2-G) SEE PEDESTRIAN REFUGE DETAILS RETAIN CB 18" RCPRETAIN 15" RCPRETAIN ADJUST CB RETAIN 15" RCP R E TA IN 24" RCP RETAIN R E T A INR E T A IN RETAIN 18" RCP R E T A IN R E T A I N 24" RCP RETAIN CB CB CB CB CB CB CB CB CB TO JB W/ MH CONVERT CB RETAIN 24" RCP ADJUST CBADJUST CB ADJUST CB 15" RCP-III 501 503 505 517 502 504 507 509 510 511 512 513 514 515 516 518 519 520 508 500 REMOVE 24" RCP REPLACE CB REMOVE AND TIE TO EXISTING SYSTEM ADJUST CB CONTRACTOR TO VERIFY INVERTS TBJB w/MH COVER 520 18" RCP-IV 15" RCP-IV 15" RCP - IV 15" RCP - IV 15" RCP-IV 15" RCP - IV 15" RCP-IV 15" RCP - III 15" RCP-III 15" RCP - III 18" RCP-III RCP-IV 18" JB W/ MANHOLE CONVERT CB TO FROM STA. 43+65 TO STA. 44+50 RT ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2: 1 D Min. D=1 Ft. DETAIL 2 Ground Natural Slope Fill2:1 CB ADJUST RETAIN 24" RCP CONVERT TO TBJB w/MH TBJB w/ MH COVER PIPE SECTION CONTRACTOR TO REPLACE 2GI CONSTRUCTION CARE TO AVOID TREE ROOTS DURING SPECIAL CONTRACTOR TO TAKE ROADWAY PLAN SHEET 5 11 N A D 83/N A 2011 ) 4 T E E H S E E S ( 5 2 + 4 3 A T S - L - E N I L H C T A M ) 6 T E E H S E E S( 0 5 + 5 4 A T S -L - ENIL HC TAM UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) NOTE: RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT SEE SHEET FOR -L- PROFILE SEE DETAIL SHEET 2-A MILL AND RESURFACE LIMITS 12 MEANDER MUP OR SIDEWALK AROUND POLE -Y3- PC Sta. 10+00.00 -Y3- PT Sta. 10+91.66 PI Sta 10+46.35 L = 91.66’ T = 46.35’ R = 250.00’ PI Sta 41+53.72 L = 544.09’ T = 273.58’ R = 2,100.00’ -L- PC Sta. 38+80.14 -L- PT Sta. 44+24.23 -Y3- POT Sta. 11+27.00 BEGIN CONSTRUCTION = 90 00’ 00" -Y3- POT Sta. 11+89.00 -L- POT Sta. 36+99.50 = - Y 3 - R D N A W S G N I L T S I H W -L--3Y- 16’ DR 16’ DR 16’ DR 16’ DR 16 ’ DR 16 ’ DR 16 ’ D R 2’-6" C&G 2’-6" C&G 2 ’ -6" C&G 2 ’-6 " C & G 19.5’ 19.5’14’ 14’ 11’ 14 ’ 14 ’ 11’ 19. 5 ’ 1 9. 5 ’ 35’ R 35’ R 35’ R 35’ R 3 5’ R 35’ R 25’ R 15 ’ R 15 ’ R 16’ DR 1 1 121 2 R=50’ 1 33 10 4 5 5 4 3 3 PROPOSED BACK OF CURB PROPOSED 10’ MUP ON 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK BACK OF CURB 4’ FROM PROPOSED PROPOSED 10’ MUP TREE RETAIN 3 5 + 0 0 4 0 + 0 0 4 5 + 0 0 1 2 R = 2 5 ’ R = 2 5 ’ R = 5 0 ’ SIDEWALK REMOVE EXISTING 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK TREE RETAIN R=50’ R=50’ 4 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK R=50’ STADIUM DR (SR 1930) -L- SE = EXIST SE = EXIST SIDEWALK REMOVE EXIST CONCRETE BAND KEY-IN AT EXIST MILL NOTCH TO AND WALL LANDSCAPING RETAIN SIDEWALK REMOVE EXIST E X I S T E X I S T E X IS T E XIS T POLE EXIST RETAIN CRCR CR CR CR CR 11’11’ CONC CONC C O N C FENCE RETAIN VINYL COVE SIGN RETAIN SWANS 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK 50’ R 50’ R VINYL FENCE IN PLACE REMOVE AND RESET 3 CR 2’-6" C&G GRAVEL GRAVEL ASPHALT 3 0’ R -L- STA 36+18.00 -L- STA 35+63.00 TO BACK OF MUP FROM VINYL FENCE ALONG REMOVE AND RESET BRICK WALL RETAIN 2-I) (SEE DETAIL SHEET AND RETAINING WALL PAD WITH BENCH 3000 PSI CONC BUS EXPANSION JOINT TO EXISTING TIE DRIVEWAY R=50’ R=50’ R=50’ RETAIN POLE 12 PROPOSED BACK OF CURB PROPOSED 10’ MUP 13.5’ FROM PROPOSED BACK OF CURB PROPOSED 10’ MUP 13.5’ FROM F F F F F F F F F F F F F F F F F F F C F F F F F F C C C CC CCCF F C v RIP RAP RIP RAP INV=286.40’ FES 10 10 12 30QA 14PT 12PT 8PT 18 1 0 24 10 13 13 8 8 20PT 8 10 12 12 18PT 12 12 16 16 8 8 12 12 18 14 12 12 20QA 8 10 36 24 21PT 18 32QA 8 16PT 14 32 16 24 12LS 6LS 12LS12LS 12 12 8LS 8LS 66 10 10 101010 68 14 8 10106 6 66 8 12 12 10 8 12PT12PT 6 1 0 12PT 17PT 10PT 8 8PT 8PT 12 8" DI P 8"DIP OUT=270.95’ IN(NW)=271.00’ IN(SW)=271.35’ RIM=278.70’ SSMH 8"DIP 18"RCP INV=270.28’ 18"RCP36"RCP 36"RCP SS 36"RCP 36"RCP 3 6 "R C P 8"DIP 8"DIP INV=272.89’ STADIUM DRIVE MC D O WE L L DR IV E M C D O W E L L D R IV E 10 5 1 0 6 INV=257.55’ FES OUT=261.15’ IN=261.79’ RIM=271.90’ SSMH INV=270.34’ FES 13-08 13-07 13-02 23-02 24-02 24-03 34-10 CL INV=276.98’ TOC=281.53’ CB-17 CB-17 OUT=270.29’ IN=270.38’ TOC=376.50’ CB-23 CB-23 OUT=258.42’ IN=(NW)=266.22’ IN(SE)=268.57’ TOC=272.22’ CB-24 OUT=268.58’ IN=268.68’ TOC=272.13’ CB-25 OUT=268.61’ TOC=272.14’ CB-26 CB-26CB-25CB-24DI-18 OUT=275.70’ RIM=280.05’ DI-18 ACCESSABLE INV=NOT RIM=277.55’ DI-19 JB-21 JB-22 OUT=273.61’ IN=273.91’ RIM=279.61’ 21JB- OUT=272.18’ IN=273.08’ RIM=278.43’ 22JB- RIP RAP 13-03 LP UNKNOWN # UNKNOWN # UNKNOWN # OUT=285.76’ IN=285.83’ RIM=291.48’ SSMH 8" C L AY 8 "D IP OUT=264.32’ IN=264.39’ RIM=273.07’ SSMH OUT=257.03’ IN=257.19’ RIM=268.98’ SSMH EXISTING STORMDRAIN INFORMATION OUT=251.23’ IN=254.23’ RIM=274.23’ SSMH OUT=252.58’ IN(N)=252.87’ IN(NW)=255.17’ RIM=272.82’ SSMH 8 "C L A Y OUT=257.00’ IN=257.29’ RIM=264.19’ SSMH 8"DIP 1 8 " DI P 18"DIP 15"RCP CONCRETE CONCRETE 1 8 " DI P 2 4 " DI P 2@48" RCP 4 2 " R C P v v ROCK STEP POOL EXISTING 18"RCP 18" R C P DI-19 PIN 1841049087 DB 1244, PG 333 PIN 1841332919 DB 13625, PG1724 BM 2010, PG 820 PIN 1841229786 DB 1244, PG 333 BM 2008, PG 889-890 CONSERVATION EASEMENT BM 2006, PG 1282 PIN 1841241584 DB 7416, PG 381 BM 1998, PG 2028 PIN 1841147395 DB 2894, PG 368 PIN 1841148294 DB 05-E, PG 240 PIN 1841145217 DB 12241, PG 682 430.93’ N7032’34"W 55.00’ N3838’5"W 316.25’ N4313’49"W 3 9 . 0 5 ’ N 4 1 3 0 ’ 15 " E 9 4 . 8 7 ’ S 3 8 3 ’ 2 8 " W 83.72’ S4740’10"E 16.25’ N340’18"W 334.21’ N3755’43"W 2 5 9 . 5 5 ’ N 4 3 2 5 ’ 5 6 " E 19.81’ N5117’40"W 59.47’ N5729’10"W 50.07’ N5953’10"W 17.29’ N6618’10"W 133.49’ N6618’10"W 80.68’ S640’35"E 3 0. 6 6 ’ N 3 0 2 2 ’ 1 1" E N3825’20"E 12.47’ N5143’0"E 12.44’ S3817’0"E 44.13’ S4325’56"W 10.11’ N3753’45"W 152.99’126.45’ N3753’45"W 226.35’ N383’28"E 34.65’ 6.65’ S5539’36"E 107.80’ S6748’8"E C 2 9 C42 C30 C32 C31 EXIST R/W EXIST R/W EXIST R/W EXIST R/W EXIST R/W EXIST R/W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F WAKE COUNTY BOARD OF EDUCATION N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F PHYLLIS KAY PLEASANTS N/F KIMBERLY C. & WILLIAM W. VERNAL PASCAL GOLF COURSE FLETCHER VILLAGE N/F ERIC & KERI RUSH 22 21 23 24 25 26 27 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p s h _ 6 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 STADIUM DRIVE - COMPLETE STREETS U-5515 1 2 CONSTRUCTION NOTES SIDEWALK TIE PROPOSED SIDEWALK TO EXISTING TO EXISTING CURB & GUTTER TIE PROPOSED 2’-6" CURB & GUTTER 3 4 RAMP (SEE SHEET 2-F) CONSTRUCT MULTI-USE PATH CURB (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-1 5 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-2 6 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-3 7 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-4 8 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-5 9 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-6 10 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-7 11 (SHEET 2-G) SEE PEDESTRIAN REFUGE DETAILS ROADWAY PLAN SHEET 6 N A D 83/ N A 2011 )7 T E E H S E E S( 0 5 + 6 5 A T S -L - E N IL H C T A M ) 5 T E E H S E E S ( 0 5 + 5 4 A T S - L - E N I L H C T A M SEE DETAIL SHEET 2-A MILL AND RESURFACE LIMITS UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) NOTE: RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT 12SEE SHEET FOR -L- PROFILE MEANDER MUP OR SIDEWALK AROUND POLE12 -Y5- PT Sta. 11+83.56 -Y5- POT Sta. 12+40.00 -Y5- PC Sta. 10+59.39 -Y5- POT Sta. 10+55.00 END CONSTRUCTION = 90 00’ 00" -Y5- POT Sta. 10+00.00 -L- POC Sta. 48+31.22 = -Y4- POT Sta. 10+00.00 = 90 00’ 00" -Y4- POT Sta. 11+33.00 -L- POT Sta. 48+17.68 = M c D O W E LL D R - Y 4 - PI Sta 11+37.91 L = 124.18’ T = 78.53’ R = 80.00’ -Y4- POT Sta. 10+78.00 BEGIN CONSTRUCTION RD LLEWODcM -5Y- -L--5Y- -L- PT Sta. 51+62.15 2’-6" C&G 2’-6" C&G 2’-6" C&G 2’-6" C&G 2’-6" C&G 14’19.5’ 14’ 11’ 19.5’ 19.5’ 19.5’ 14’ 11’ 14’ 35’ R 35’ R 25’ R RI C H L A N D C R E E K 20’ DR 2’-6" C&G 50’ TAPER 4’ R 4’ R -L- PC Sta. 48+21.14 -L- PC Sta. 53+31.80 PI Sta 49+91.69 L = 341.02’ T = 170.55’ R = 6,000.00’ PI Sta 55+08.53 L = 345.12’ T = 176.73’ R = 650.00’ 11’ 11’10’ TAPER 20’ 10’11’ TAPER 20’ 15’ R 15’ R 1 1 11 10’ R 10’ R 4 4 3 4 3 3 5 5 25’ R SIDEWALK REMOVE EXISTING PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK ON 10:1 10:1 10:1 BACK OF CURB PROPOSEDON PROPOSED 10’ MUP 5 0 + 0 0 5 5 + 0 0 CONC SIDEWALK RETAIN EXIST 5’ + 5 8 + 7 8 + 4 0 + 6 0 -L- Sta. 51+93.15 BEGIN EXIST BRIDGE MILL NOTCH TO KEY-IN -L- Sta. 53+24.26 END EXIST BRIDGE MILL NOTCH TO KEY-IN RICHLAND CREEK R=50’ R=50’ 2 2 4’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK R=50’ R=50’ WITH GUARDRAIL ON PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK PROPOSED BACK OF CURB PROPOSED 10’ MUP ON AT-1 30.5’ 19.5’ 11’ 14’ 14’ 14’ 11’ 14’ 11’ STADIUM DR (SR 1930) -L- STADIUM DR (SR 1930) -L- SE = EXISTSE = EXIST SE = 0.020 0 30 20 1 0 0 0 10 2 + 2 4 + 5 2 + 15 + 6 5 TYPE III TYPE IIIE X I S T E X I S T 1 1 CROSSING CREEK GREENWAY FUTURE RICHLAND CROSSING CREEK GREENWAY FUTURE RICHLAND TO STA 51+35.00 -L STA 50+85.00 MONOLITHIC ISLAND INSTALL 5" CONCRETE E X I S T 0 4 + 8 0 E X I S T 0 2 + 2 9 . 7 4 CR CR CR CR CR CR 11 7 7 0 2 E X I S T + 0 0 0 2 E X I S T STOP 120’ BUS 17.5’17.5’ 10:1 (SEE DETAIL SHEET 2-I) WITH SHELTER 3000 PSI CONC BUS PAD TYPE III ANCHOR UNIT REMOVE AND RESET RETAIN GATE TYPE III ANCHOR UNIT REMOVE AND RESET GRAU-350 GRAIL AND GRAU-350 REMOVE AND RESET UNITANCHOR RESET CAT-1 REMOVE AND CAT-1 GRAIL AND GRAU-350 TL-2 REMOVE AND RESET TL-2 GRAU-350 III TYPE R=50’R=50’ POLE EXIST RETAIN R=50’ TO -L- Sta. 57+53.25 FROM -L- Sta. 54+22 EXIST GUARDRAIL REMOVE AND RESET CR ACCESS SEWER EASEMENT DRIVEWAY FOR INSTALL CONC 2 12 ON BRIDGE EXISTING 42" RAILINGS SEE STRUCTURE PLANS SIDEWALK ALONG BRIDGE INSTALL 5’ RAISED RETAIN CI RETAIN CB R E T A IN RETAIN 36" RCP RETAIN CI CB CB ADJUST CB ADJUST CB CB CB CB CB CB 15" RCP-III 12" RCP-III TO JB W/ MH CONVERT CB CB CB RETAIN JB W/ MH RETAIN 15" RCP - III JB 18" RCP-III 24" RCP -III JB W/ MH 15" RCP - III 30" RCP - III 604 607 601 603 606 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 626 627 600 ADJUST CB RETAIN EXISTING TREES CLEAN OUT OUTLET BY HAND REMOVE W/ MH CONVERT DI TO JB RETAIN 36" RCP RETAIN RETAIN DUAL 48" RCP RETAIN RETAIN 18" RCP - III INV. OUT 273.93 12" RCP - III INV. OUT 272.93 SPLITTER BOX 30" RCP-IV 15" RCP - IV 18" RCP-IV 18" RCP-IV 12" RCP - III 18" RCP-IV 15" RCP-IV 18" RCP-IV 15" RCP - III RETAIN 602 (SEE DETAIL SHEET 2-J) 2,200 SQUARE FEET) FOREBAY (APPROX. BIORETENTION AREA (SEE DETAIL SHEET 2-J) LOW RETAINING WALL SHEET 2-J) STEP STORMWATER OUTLET. (SEE DETAIL AREA TO OUTLET TO EXISTING ROCK CONTRACTOR TO INSTALL BIORETENTION PLACE 6 SY GEOTEXTILE CLASS B RIP RAP PLACE 3 TONS (STREAM BANK WORK ANTICIPATED) POSITIVE DRAINAGE NEW PIPE OUTLET AND PROMOTE OUTFALL DITCH TO ACCOMMODATE CONTRACTOR TO CLEAN OUT EXIST GEOTEXTILE PLACE 36 SY CLASS I RIP RAP PLACE 16 TONS BASIN SEDIMENT BASIN SEDIMENT 44 SY FF RIP RAP CLASS 1 AND II 20 TONS STREAM BANK ONLY PLACE 12 SY FF AND II RIP RAP 5 TONS CLASS I SEE DETAIL 3 AFTER BASIN IS REMOVED RE-ESTABLISH CHANNEL CONTRACTOR TO 3:13: 1 D ( Not to Scale) STANDARD BASE DITCH B d STA. 49+07 RT DETAIL 3 B= 3 Ft. Max. d= 1 Ft. Min. D= 1.5 Ft. *When B is < 6.0’ Type of Liner= PSRM Ground Natural Ground Natural REMOVE DI PLUG, FILL & ABANDON F F F F F F F F F F F F F FFFF C C C C F F F F F F C C F F F F F F v v RIP RAP RIP RAP 15 "R C P 26 28PT 30PT 24QA 18QA 18QA 16QA 24QA 48QA 42QA 8 6 48QA 16LI 16LI 16LI 16LI 16LI 16LI9 16LI 16LI 16LI 16LI 9 8 8"DIP 6"DIP 8"DIP 6 " C L A Y 8"DIP 8"D I P INV=291.50’ 18"RCP INV=292.77’ 1 S BK D1 S BK D1 S BK D1 S BK D 1 S BK D STADIUM DRIVE OUT=327.43’ INV=327.49’ RIM=336.08’ SSMH OUT=307.81’ IN=307.91’ RIM=312.91’ SSMH 34-02 35-03 35-02 36-05 36-04 OUT=319.72’ TOC=322.87’ CB-27 CB-27 CB-28 OUT=337.25’ TOC=342.02’ CB-29 CB-29 36-03 LP 46-07 INV=318.84’FES OUT=306.72’ IN(SE)=306.74’ IN(E)=306.80’ RIM=310.95’ SSMH OUT=324.00’ IN(SE)=325.91’ IN(E)=324.05’ RIM=330.00’ SSMH EXISTING STORMDRAIN INFORMATION OUT=289.27’ IN=289.32’ RIM=294.82’ SSMH OUT=340.94’ IN=341.05’ RIM=346.45’ SSMH OUT=308.01’ IN=308.37’ RIM=315.67’ SSMH OUT=303.45’ IN(NE)=303.64 IN(SE)=304.03’ RIM=309.22’ SSMH 8"CLAY OUT=313.55’ IN=314.15’ RIM=319.44’ SSMH OUT=319.77’ IN(S)=320.75’ IN(E)=320.02’ RIM=326.97’ SSMH 6 " C L A Y OUT=339.45’ IN=339.89’ RIM=345.49’ SSMH 15"RCP OUT=336.63’ IN=337.18’ TOC=341.92’ CB 15" R CP CONCRETE CONCRETE BY TOW TV CAMERA LINE WAS DETECTED UNDERGROUND JB? 18 " R C P OUT=327.20’ IN=327.57’ RIM=333.30’ CONCRETE CB-28 COVERING STR DUE TO SIDEWALK NOT ACCESSABLE INVERTS ARE FLOWLINE ELV.=318.57 CURB CUT CONCRETE CONCRETE 15"RCP 8"CLAY CONCRETE CONCRETE 8"CLAY 8" 12"DIP 12"DIP 12" 8 " CONCRETE ABOUT 22’ UP THE PIPE. THROUGH THE STORM PIPE THERE IS A UTILITY LINE BORED PIN 1841332919 DB 13625, PG1724 BM 2010, PG 820 PIN 1841229786 DB 1244, PG 333 BM2008, PG889-890 133.49’ N6618’10"W 294.85’ N6749’17"W 555.82’ N6749’17"W 63.90’ S664’42"E 93.92’ S6748’8"E 45.69’ S685’37"E S2154’23"W 3.84’N2211’54"E 2.81’ S2355’18"W 2.53’ N680’12"W 25.98’ S6748’8"E 221.41’409.93’ S685’37"E 154.31’ S6128’10"E 13.78’ C33 C34 C37 EXIST R/W EXIST R/W EXIST R/W EXIST R/W N/F WAKE COUNTY BOARD OF EDUCATION N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC WAKE FOREST HIGH SCHOOL RICE CIRCLE DUPLEX APARTMENTS 27 26 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p s h _ 7 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 STADIUM DRIVE - COMPLETE STREETS U-5515 1 2 CONSTRUCTION NOTES SIDEWALK TIE PROPOSED SIDEWALK TO EXISTING TO EXISTING CURB & GUTTER TIE PROPOSED 2’-6" CURB & GUTTER 3 4 RAMP (SEE SHEET 2-F) CONSTRUCT MULTI-USE PATH CURB (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-1 5 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-2 6 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-3 7 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-4 8 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-5 UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) NOTE: RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT SEE SHEET FOR -L- PROFILE 9 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-6 SEE DETAIL SHEET 2-A MILL AND RESURFACE LIMITS 10 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-7 11 (SHEET 2-G) SEE PEDESTRIAN REFUGE DETAILS RETAIN 15" RCP REMOVE RETAIN CB RETAIN 18" RCP CB CB CB CB CB CB CB CB 18" RCP-III RCP-III 15" CB RETAIN RETAIN 705 706 710 711 700 701 702 703 704 707 708 709 712 RETAIN PROPOSED SYSTEM INTO TIE EXISTING 18" RCP-IV 18" RCP-IV 15" RCP-IV 18" RCP-IV 18" RCP-IV RCP-III 15" CB RETAIN 18" RCP-IV 18" RCP - IV HOOD & FRAME AND REPLACE ADJUST CB TOP O O 7 ROADWAY PLAN SHEET 13 N A D 8 3/ N A 2 0 1 1 ) 6 T E E H S E E S ( 0 5 + 6 5 A T S - L - E N I L H C T A M ) 8 T E E H S E E S( 0 5 + 7 6 A T S -L - E NIL H C T AM 18’ 24’ 24’ 18’ 322.3’ 32.5’ RT +55.07 321.3’ 32.5’ RT +37.07 321.9’ 28.5’ RT +58.07 323.0’ 28.5’ RT +83.07 325.4’ 48.42’ RT +83.07 324.0’ 89.50’ RT +37.07 324.8’ 90.38’ RT +55.70 325.0’ 98.12’ RT +57.45 326.4’ 98.12’ RT +82.20 326.6’ 35.5’ RT +41.69 327.4’ 35.5’ RT +59.69 328.4’ 28.5’ RT +87.69 328.6’ 33.65’ RT +87.69327.3’ 28.5’ RT +62.69 327.0’ 92.50’ RT +41.69 327.4’ 93.38’ RT +60.31 327.5’ 101.12’ RT +62.07 329.3’ 101.12’ RT +86.81 PARKING LOT / STADIUM DRIVE -L- RELATIONSHIP PARKING LOT / STADIUM DRIVE -L- RELATIONSHIP ALL ELEVATIONS ARE SHOWN FROM BACK OF CURB* SEE SHEET FOR -Y6- PROFILE16 -L- PC Sta. 57+92.87 -L- PT Sta. 60+36.52 -L- PT Sta. 56+76.92 PI Sta 10+97.23 L = 65.77’ T = 33.00’ R = 325.76’ PI Sta 10+34.23 L = 64.23’ T = 34.23’ R = 75.00’ -L- PC Sta. 65+32.48 -Y6- POC Sta. 10+84.00 END CONSTRUCTION -Y6- PRC Sta. 10+64.23 -L--6Y- RD NOSDUJ -6Y--Y6- PC Sta. 10+00.00 -L- POC Sta. 65+33.65 = 24’ DR 24’ DR 2’-6" C&G 2’-6" C&G 2’-6" C&G RETAIN C&G 2’-6" C&G 14’ 11’ 14’ 11’ 14’ 30.5’ 19.5’ 18 ’ R PI Sta 59+14.74 L = 243.64’ T = 121.86’ R = 3,730.00’ PI Sta 66+56.74 L = 248.12’ T = 124.26’ R = 1,800.00’ RETA IN EX IST S IDEWALK 1 1 1 2 2 6 0 + 0 0 6 5 + 0 0 -Y6- PT Sta. 11+30.00 2’-6" C&G 50’ R 2 2 2 ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK R=50’ R=50’ ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK ON PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK 55 54 RETAIN C&G 2’ C&G 2’ C&G STADIUM DR (SR 1930) -L- SE = EXIST SE = EXIST SE = EXIST SE = EXIST ( E X IS T ) 0 50 4 0 3 0 2 SIDEWALK RETAIN EXIST + 9 4 + 6 6 0 2 0 1 0 0 0 1 0 2 + 7 0 . 2 5 + 4 2 . 2 5 14’ 11’ 14’19.5’ -L- Sta. 62+50.00 END 2’-6" C&G ( T YP ) 0 2 ( T YP ) 0 2 ( T YP ) 0 2 CR CRCR CR 24’ 18’ 24’ 18’ 9’9’ ( T YP ) E X IS T (T YP ) E X IS T SEE INSET THIS SHEET 6 TOTAL SPACES PARKING LOT PROPOSED ASPHALT SEE INSET THIS SHEET 6 TOTAL SPACES PARKING LOT PROPOSED ASPHALT 1’ R 1’ R 5’ R 5’ R 5’ R 1’ R 1’ R 5’ R SIDEWALK CONC STEPS AND REMOVE EXIST DOOR STEPS TIE SIDEWALK TO 53.99’ RT +07.43 48.74’ RT +14.75 RETAIN TREE RETAIN TREE RETAIN TREES (TYP) AND GRADE TO DRAIN REMOVE CONC BLOCKS SHEET 2-A EXISTING CURB DETAIL SEE MILLING TO ADJACENT GRAU-350 CONC SIDEWALK CONSTRUCT 4’ CONC SIDEWALK CONSTRUCT 4’ SEE SHEET 2-G FOR DETAIL SIDEWALK CONSTRUCTON TREE ROOT SYSTEM DURING RETAIN TREE & PROTECT -L- Sta. 61+72 RESET GRAU-350 REMOVE AND SEE DETAIL SHEET 2-G CONCRETE STEPS REBUILD EXIST REMOVE AND SEE DETAIL SHEET 2-G SIDEWALK CONSTRUCTION TREE ROOT SYSTEM DURING RETAIN TREE & PROTECT WHEEL STOPS INSTALL CONCRETE SHEET 2-G SEE DETAIL CONC SIDEWALK CONSTRUCT 4’ RETAIN POLE 10:1 8.5’ FROM PROPOSED BACK OF CURB PROPOSED 5’ CONC SIDEWALK DO NOT DISTURB RESIDENCE TIE SIDEWALK TO DOOR STEPS WALL ENVELOPE SEE SHEET 2-C FOR -L- Sta. 61+25.00 -L- Sta. 58+95.00 TO EDGE OF PROP SIDEWALK CONCRETE TOE WALL ALONG CONSTRUCT CAST IN PLACE REMOVE EXIST CMU WALL; DISTURB RESIDENCE DOOR STEPS DO NOT TIE SIDEWALK TO F F F F F F F C C C C F C C C C C C F F WM S GRAVEL R I P R A P 15" R CP 15" R CP S 18" RC P 12’RCP 8 8 6 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 42QA 6 6 6 6 6 6 24PT 42QA 16LI 16LI 16LI 16LI 16LI 16LI 8 8 8 6 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 8 10 14QA ST ST ST ST S OUT=365.20’ IN(S)=365.51’ IN(SERVICE-SE)=367.03’ IN(SE)=365.24’ RIM=373.28’ SSMH 8"CLAY 8 " C L A Y 6 "C L A Y 6"C LA Y 6"CLAY INV N/A RIM=370.23’ BOLTED SHUT SSMH IS SSMH RIM=383.31’ IN(N)=361.61’ IN(E)=360.81’ OUT=360.75’ 8"CLAY 8"CLAY SSMH RIM=365.30’ IN=358.84’ OUT=358.76’ 8"CLAY 8 "C L A Y 24"RCP 2 4 "R C P S S 18 "R C P 24"CPP CULVERT2.33’ X 2.50’ BRICK 18"CMP 18 "R C P 12"RCP 2 4 "R C P 15 "R C P 12"RCP 18 "C P P OUT=392.99’ IN=393.03’ RIM=394.72’ SSMH OUT=377.83’ IN=379.43’ RIM=385.93’ SSMH 121414 16 10 10 8 10 8 8 21JV 18JV 18MG 33 14JV 8"CLAY 24"CPP 2 4 "C L A Y INV=380.36’ T T 3 S BR 1 S BR STONE WALL S T O N E W A L L S T O N E W A L L STEPS 2 S BR SCHOOL 3 S BR SCHOOL 1 S BR D 1 S BR D R O C K S P R IN G R O A D N W IN G A T E S T R E E T STADIUM DRIVE STEAM OUT=391.67’ IN=391.07’ RIM=394.77’ SSMH 16LI 37-05 47-08 46-05 46-06 48-11 48-09 48-02 48-07 37-06 48-03 48-05 48-13 48-14 CB-30 CB-31 CB-32 INV=351.02’ TOC=355.37’ CB-30 OUT=354.30’ IN=354.36’ TOC=356.98’ CB-31 OUT=354.38’ TOC=358.48’ CB-32 OUT=381.85’ IN=382.00’ TOC=386.10’ CB-34 CB-34 OUT=384.06’ IN=384.14’ TOC=389.46’ CB-35 CB-35 OUT=386.95’ RIM=390.70’ CB-36 CB-36 CB-47 CB-46 OUT=353.28’ IN=353.38’ RIM=355.63’ JB-33 OUT=366.08’ RIM=370.52’ YDI-37 YDI-37 OUT=365.62’ IN=365.67’ RIM=369.94’ YDI-38 YDI-38 OUT=365.20’ IN(SE)=365.45’ IN(E)=365.50’ IN(NE)=365.46’ RIM=369.35’ YDI-39 YDI-39 OUT=366.19’ IN(24")=366.35’ IN(18")=366.44’ RIM=369.81’ YDI-40 OUT=367.38’ IN=367.39’ RIM=370.64’ YDI-41 YDI-40 YDI-41 OUT=367.72’ IN=367.79’ RIM=370.19’ YDI-42 YDI-42 INV=373.37’ RIM=383.39’ YDI-43 YDI-43 JB-44 OUT=376.42’ IN=377.27’ RIM=383.27’ JB-45 JB-45 OUT=377.86’ IN(W)=378.07’ IN(E)=378.57’ IN(NE)=378.07’ RIM=382.59’ JB-44 JB-33 36-02 UNKNOWN # LP LP LP LP 57-02 LP LP LP LP EXISTING STORMDRAIN INFORMATION 15 "R C P 42"RCP OUT=357.86’ IN=357.91’ RIM=362.16’ DI 30"RCP 30"RCP OUT=362.49’ IN=363.94’ TOP=366.54’ CONC. BOX OUT(30)= IN(18)= IN(42)= TOP=366.40’ CONC. BOX 8"D IP CONCRETE OUT=362.76’ IN=362.96’ TOC=373.31’ CB 2 4 " R C P 18 "R C P OUT=367.82’’ TOC=371.82’ CB OUT=366.75’ IN=367.55’ TOC=371.55’ CB 18"RCP 8"DIP OUT=364.20’ IN=364.35’ TOC=369.00’ CB OUT=353.03’ IN=353.09’ RIM=369.77; SSMH U/G JB POSSIBLE BRICK B RI C K C O N C R E T E CONCRETE CONCRETE CONCRETE BRICK BRIC K 6 "C L A Y 6"PVC INV=390.65’ BRICK 18’CMP BRICK INV=378.59’ TOC=382.79’ CB-46 INV=378.67’ TOC=382.87’ CB-47 47-10 6" 12"DIP 8 2 " 8" BRICK 8" 12" 15"RCP RETROFITED TO A CDI USED TO BE A DI, NOW 18 " C M P BECAUSE PIPE IS PLUGED OFF. CAN NOT GET TV ACCESS THIS PIPE APPEARS TO BE CAPPED ABOUT 22’ UP THE PIPE. THROUGH THE STORM PIPE THERE IS A UTILITY LINE BORED Underground Power Approx. Location of 8" (ABANDONED) PIN 1841229786 DB 1244, PG 333 PIN 1841423401 DB 3404, PG115 PIN 1841423401 DB 3404, PG115 PIN 1841424812 DB 1388, PG432 PIN 184142963 DB 1244, PG333 2 7 . 8 6 ’ S 2 6 4 8 ’ 2 3 " W 6 5 0 . 17 ’ S 2 6 4 8 ’ 2 3 " W 6 7 8 . 4 5 ’ N 2 6 4 8 ’ 2 3 " E 4 10 . 8 6 ’ N 2 8 17 ’ 3 7 " E 4 0 9 . 5 6 ’ N 2 8 17 ’ 3 7 "E 14 7 . 5 0 ’ S 2 5 1’ 5 " W 14 7 . 4 0 ’ N 2 7 11’ 5 " E 81.40’ N6248’55"W 3 9 7 . 4 0 ’ S 2 8 3 9 ’ 14 " W 277.49’ S8012’41"E 71.34’ S7828’49"E N6248’49"W N6248’49"W 20.56’ N8017’27"W 277.53’ N6248’49"W 199.78’75.82’80.20’ S595’25"E 108.15’ S 2 7 4 2 ’ 4 3 " W 3 8 2 . 0 8 ’ S638’31"E 6.11’ 356.56’ (TOTAL) N 2 7 4 2 ’ 4 3 " E 4 14 . 4 5 ’ ( T O T A L ) 5 0 . 2 7 ’ 136.70’ (NO DEED FOUND) GIS RECORDS THIS LINE PER C35 C36 C38 C39 C40 C 4 1 C42 29.30’ N5831’28"W EXIST R/W EXIST R/W E X IS T R / W E X IS T R / W EXIST R/W EXIST R/W EXIST R/W E X IS T R / W E X IS T R / W E X IS T R / W E X IS T R / W E X IS T R / W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY H IS T O R IC D IS T R IC T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT 27 28 29 30 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p s h _ 8 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 STADIUM DRIVE - COMPLETE STREETS U-5515 1 2 CONSTRUCTION NOTES SIDEWALK TIE PROPOSED SIDEWALK TO EXISTING TO EXISTING CURB & GUTTER TIE PROPOSED 2’-6" CURB & GUTTER 3 4 RAMP (SEE SHEET 2-F) CONSTRUCT MULTI-USE PATH CURB (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-1 5 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-2 6 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-3 7 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-4 8 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-5 UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) NOTE: RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT SEE SHEET FOR -L- PROFILE 9 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-6 SEE DETAIL SHEET 2-A MILL AND RESURFACE LIMITS 10 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-7 11 (SHEET 2-G) SEE PEDESTRIAN REFUGE DETAILS RETAIN 24" RCP RETAIN CB CB CB CB CB CB CB CB CB CB CB TIE TO EXISTING RETAIN RETAIN PLUG, FILL & ABANDON RETAIN 24" RCP - III RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN DRAIN AS NEEDED REINSTALL 6" PVC ROOF RETAIN 809 800 801 802 803 805 806 807 808 810 811 812 813 814 817 818 819 820 821 804 RETAIN RETAIN REMOVE 24" RCP - III 18" RCP-III 18" RCP-IV 15" RCP-IV 822 15" RCP - III 18" RCP-IV 15" RCP-IV RCP-IV 24" 24" RCP-IV 24" RCP-IV 18" RCP - IV 18" RCP - IV 18" RCP - IV RETAIN JB w/MH COVER RETAIN RETAIN RETAIN ADJUST CB ADJUST CB REMOVE CB REMOVE PIPE TO PROPOSED CB FROM STA. 69+25 TO STA. 71+00 RT ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2: 1 D Min. D=1 Ft. DETAIL 2 Ground Natural Slope Fill2:1 SEE DETAIL 2 SPECIAL LATERAL ’V’ DITCH DI RETAIN 15" RCP REMOVEHOOD & FRAME AND REPLACE ADJUST CB TOP CB REMOVE REMOVE JB 2GI O 8 ROADWAY PLAN SHEET 14 N A D 8 3/ N A 2 0 1 1 ) 7 T E E H S E E S ( 0 5 + 7 6 A T S - L - E N I L H C T A M ) 9 T E E H S E E S ( 0 5 + 8 7 A T S - L - E N I L H C T A M SEE SHEET FOR -Y8- PROFILE16 -L- PT Sta. 70+03.61 -L- PC Sta. 72+49.43 -L- PC Sta. 68+12.23 -L- PT Sta. 67+80.60 -Y7- POT Sta. 10+00.00 NORTH AVE -L- PI Sta 14+27.61 L = 43.70’ T = 21.86’ R = 533.00’ PI Sta 14+72.15 L = 45.40’ T = 22.71’ R = 533.00’ -Y8- PC Sta. 14+05.74 -Y8- PT Sta. 14+94.84 -Y8- PRC Sta. 14+49.44 -Y7- POT Sta. 11+46.00 -L- POC Sta. 68+40.11 = N W IN G A T E S T - Y 8 - -L--8Y- N C O LLE G E S T 2’-6" C&G 2’-6" C&G 2’-6" C&G 2’-6" C&G 14’ 14’ 11’ 19.5’ 19.5’ 35’ R 1 PI Sta 69+08.96 L = 191.38’ T = 96.73’ R = 533.00’ 1 2 30’ R 2 1 1 1 1 1 10:1 7 0 + 0 0 2 2 6 ON PROPOSED BACK OF CURB PROPOSED 8’ CONC SIDEWALK 59 -Y8- POT Sta. 15+77.00 END CONSTRUCTION -Y8- POT Sta. 13+20.00 BEGIN CONSTRUCTION -Y7- POT Sta. 10+80.00 BEGIN CONSTRUCTION ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK RETAIN POLE 2 2 ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK ON PROPOSED BACK OF CURB PROPOSED 6’ CONC SIDEWALK BACK OF PROPOSED 6’ SIDEWALK PROPOSED GUARDRAIL ALONG 17’18’20’ 55’ 8 6 6 6 8 8 6 6 2’-6" C&G 2’- 6" C & G 1’-6" C&G (TYP) 2’-6" C&G (TYP) STADIUM DR (SR 1930)-L- SE = EXIST SE = EXIST SE = EXIST 8:1 DRIVEWAY APRON RETAIN CONC RETAIN EXIST SIDEWALK AT-1 AT-1 -Y8- POC Sta. 14+63.76 -L- POT Sta. 74+70.27 = T = 63.98’ L = 126.56’ PI Sta 74+07.69PI Sta 72+96.63 L = 94.28’ T = 47.20’ R = 800.00’R = 350.00’ -L- PCC Sta. 73+43.71 SE = EXIST LANDSCAPED MEDIAN ( T YP ) 0 2 ( T Y P ) 0 2 ( T Y P ) 0 2 N W IN G A T E S T ( S R 1 9 5 4 ) - Y 8 - CR CR CR CR CR CR CR CR CR CR CR -Y8- STA 13+35.20 TIE TO EXIST GUARDRAIL -Y8- STA 13+38.00 TIE TO EXIST GUARDRAIL 13’13’ 15’15’ 13’13’ 11 11 + 0 0 E X I S T 0 2 ( T YP ) E X IS T R O C K S P R I N G R D - Y 7 - SEMINARY SIGN BAPTIST THEOLOGICAL RETAIN SOUTHEASTERN (TYP) TREES RETAIN (TYP) TREES RETAIN2 AND 2-G SEE DETAIL SHEETS UNDERDRAIN INSTALL MEDIAN 2’-6" C&G 2’-6" C&G 2 ’ - 6 " C & G 2 ’ - 6 " C & G 1’-6" C&G 1’-6" C&G MONOLITHIC ISLAND INSTALL 5" CONCRETE MONOLITHIC ISLAND INSTALL 5" CONCRETE MONOLITHIC ISLAND INSTALL 5" CONCRETE SPLITTER ISLAND LANDSCAPED SPLITTER ISLAND LANDSCAPED (SEE DETAIL SHEET 2-I) RETAINING WALL PAD WITH BENCH AND 3000 PSI CONC BUS -L- STA 76+32.00 PAVEMENT REMOVAL BEGIN CONCRETE SEE DETAIL SHEETS 2 AND 2-G INSTALL MEDIAN UNDERDRAIN SEE DETAIL SHEETS 2 AND 2-G INSTALL MEDIAN UNDERDRAIN RETAIN POLE CR 4 OPERATIONS (TYP) PART OF GRUBBING GRID STUMP AS AS MUCH AS POSSIBLE RETAIN HEDGE ROW ON PROPOSED BACK OF CURB PROPOSED 8’ CONC SIDEWALK STEPS INTO EXIST TIE SIDEWALK -L- PT Sta. 76+34.37 PI Sta 75+27.03 L = 113.31’ T = 56.75’ R = 800.00’ PI Sta 76+09.07 L = 50.78’ T = 25.48’ R = 250.00’ SE = EXIST -L- PRC Sta. 75+83.59 10’ 10’ CR EXISTING TIE TO APRON (TYP) VEHICULAR CONCRETE STAIRWAYREMOVE CONCRETE CR SEE SHEET 2-D FOR WALL ENVELOPE PROPOSED RETAINING WALL 9 2 CR 6 5’R8:1 CC C C C F F F F F F F F F F F F F F F F F C C 18TREE GV 15 "R C P 12 50QA 1 S F D OUT=390.17’’ IN(SW)=390.58’ IN(SE)=390.22’ RIM=395.43’ SSMH 15 " R C P INV=392.72’ TOC=396.12’ CB-48 OUT=390.69’ IN=390.70’ TOC=395.99’ CB-49 CB-48 CB-49 LP UNKNOWN #UNKNOWN # C/L INV=399.21’ RIM=403.46’ SSMH OUT=379.08’ IN(SW)=379.38’ IN(SE)=379.41’ IN(NE)=379.31’ RIM=389.56’ SSMH EXISTING STORMDRAIN INFORMATION OUT=395.81’ IN=395.87’ RIM=403.08’ SSMH13 141416 53QA T T BRICK CONCRETE 4AR 4AR 20 T 10IO 10IO 4AR I R O N F E N C E STONESTONE WALL (TYP) IRON FENCE BRICK WALL CONCRETE CONCRETE ASPHALT MAGNOLIALARGE DRIPLINETREET CONCRETE 8" 8" T PIN 1841423401 DB 3404, PG115 3 9 7 . 4 0 ’ S 2 8 3 9 ’ 14 " W E X IS T R / W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY H IS T O R IC D IS T R IC T H I S T O R I C D I S T R I C T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT WAKE FOREST DOWNTOWN 29 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p s h _ 9 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 011311030Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 STADIUM DRIVE - COMPLETE STREETS U-5515 1 2 CONSTRUCTION NOTES SIDEWALK TIE PROPOSED SIDEWALK TO EXISTING TO EXISTING CURB & GUTTER TIE PROPOSED 2’-6" CURB & GUTTER 3 4 RAMP (SEE SHEET 2-F) CONSTRUCT MULTI-USE PATH CURB (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-1 5 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-2 6 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-3 7 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-4 8 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-5 UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) NOTE: RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT SEE SHEET FOR -L- PROFILE 9 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-6 SEE DETAIL SHEET 2-A MILL AND RESURFACE LIMITS 10 (SEE SHEET 2-G) CONSTRUCT CURB RAMP PER DETAIL CR-7 11 (SHEET 2-G) SEE PEDESTRIAN REFUGE DETAILS RETAIN TOP AS NECESSARY FIELD ADJUST CB CONTRACTOR TO TOP AS NECESSARY FIELD ADJUST CB CONTRACTOR TO 9 ROADWAY PLAN SHEET N A D 8 3/ N A 2 0 1 1 ) 8 T E E H S E E S ( 0 5 + 8 7 A T S - L - E N I L H C T A M 15 N C O LLE G E S T F R O N T S T C S X T R A I L R O A D NORTH AVE -L- ( U S 1 A ) N O R T H M A IN S T RETAIN EXIST SIDEWALK -L- PC Sta. 81+56.35 -L- PRC Sta. 82+61.24 -L- POT Sta. 84+23.00 -L- PT Sta. 83+66.13 T = 52.46’ R = 2,000.00’ PI Sta 83+13.70 D L = 104.89’ T = 52.46’ PI Sta 82+08.81 D L = 104.89’ R = 2,000.00’ 20’ 10’ 10’ + 5 7 10’ 10’ WALL AS SEPARATE PROJECT TO REMOVE AND REBUILD TOWN OF WAKE FOREST 2 R=100’ 75’ TAPER R=100’ 2’-6" C&G 2’-6" C&G 1 1 10’R15’R 1 1 -L- POT Sta. 82+32.00 END CONSTRUCTION END TIP PROJECT U-5515 (INCIDENTAL TO GRADING) NEW CURB AND GUTTER UP AS NEEDED TO INSTALL TREE STUMP TO BE GROUND 12CR 6’ CONCRETE SIDEWALK 2 5’R CR 2 2 6 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p f l _ 1.d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: HORIZ VERTPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 0 PE NO. F-0102 P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PREPARED IN THE OFFICE OF: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 4020 2 4 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PROPOSED GRADE EXISTING GROUND PI = 25+17.00 EL = 376.38’ VC = 170’ K = 63 PI = 29+10.00 EL = 361.64’ VC = 200’ K = 183 PI = 33+54.00 EL = 340.14’ VC = 300’ K = 187 G LE N C O E D R ELEV = 373.69’ -Y2- STA 11+62.00 -L- STA 25+88.45 = (-)1.0575% (- ) 3. 7506% (-) 4. 8 4 2 3 % DS > 40 MPH DS > 40 MPH DS > 40 MPH ELEV = 377.30’ -L- STA 24+30.00 BEGIN GRADE E l = 3 4 3 .17 E l = 3 4 1.2 2 E I = 3 3 7 .8 6 P I = 3 4 + 0 0 .0 0 P I = 3 2 + 0 0 .0 0 P I = 3 2 + 5 0 .0 0 (-) 2 .2 4% (- ) 3. 90% (-) 7.65 % P I = 3 0 + 0 0 .0 0 E I = 3 5 8 .4 6 ROADWAY PROFILE 330 24 25 26 27 28 29 30 31 32 33 34 330 338 346 354 362 370 378 386 10 334 342 350 358 366 374 382 338 346 354 362 370 378 386 334 342 350 358 366 374 382 FOR -L- PLAN SEE SHEET 4 STADIUM DRIVE (SR 1930) -L- 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p f l _ 2 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: HORIZ VERTPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 0 PE NO. F-0102 P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PREPARED IN THE OFFICE OF: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 4020 2 4 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PI = 39+70.00 EL = 320.19’ VC = 180’ K = 77 PI = 43+19.00 EL = 300.81’ VC = 80’ K = 68 W H IS T LI N G S W A N D R ELEV = 328.95’ -Y3- STA 11+89.00 -L- STA 36+99.50 = ( - ) 3. 2 3 86% (-) 5. 5 5 3 0 % PROPOSED GRADE EXISTING GROUND DS > 40 MPH DS > 40 MPH (-) 4. 3 7 6 9 % E l = 2 9 6 .0 1 P I = 4 4 + 0 0 .0 0 (- ) 4. 2 3 % (- ) 4. 00% E I = 2 9 4 .0 1 E I = 2 9 7 .4 9 P I = 4 4 + 5 0 .0 0 P I = 4 3 + 6 5 .0 0 ROADWAY PROFILE 36 37 38 39 40 41 42 43 44 45 282 290 298 306 314 322 330 338 11 3534 334 326 318 310 302 294 286 342 282 290 298 306 314 322 330 338 334 326 318 310 302 294 286 342 FOR -L- PLAN SEE SHEET 5 STADIUM DRIVE (SR 1930) -L- 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p f l _ 3 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: HORIZ VERTPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 0 PE NO. F-0102 P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PREPARED IN THE OFFICE OF: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 4020 2 4 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PI = 49+08.00 EL = 275.03’ PI = 51+58.00 EL = 272.55’ VC = 70’ K = 35 PI = 54+75.00 EL = 279.28’ VC = 200’ K = 53 PI = 49+08.00 EL = 275.03’ VC = 240’ K = 71 M c D O W E LL D R M c D O W E LL D R ELEV = 279.05’ -Y4- STA 11+33.00 -L- STA 48+17.68 = ELEV = 278.53’ -Y5- STA 10+00.00 -L- STA 48+31.22 = (-) 4. 3 76 9 % (-)0.9920% (+)1.0078% (+)2.7456% (+)6.4985% PROPOSED GRADE EXISTING GROUND DS > 40 MPH DS = 25 MPH DS = 35 MPH RICHLAND CREEK EXISTING BRIDGE TIE TO EXISTING BRIDGE MILL NOTCH TO KEY-IN ELEV = 272.90’ -L- STA 51+93.15 END GRADE TIE TO EXISTING BRIDGE MILL NOTCH TO KEY-IN ELEV = 275.14’ -L- STA 53+24.26 BEGIN GRADE ROADWAY PROFILE 250 258 266 274 282 290 298 306 250 47 48 49 50 51 52 53 54 55 5646 302 294 286 278 270 262 254 258 266 274 282 290 298 306 302 294 286 278 270 262 254 57 12 FOR -L- PLAN SEE SHEET 6 STADIUM DRIVE (SR 1930) -L- 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p f l _ 4 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: HORIZ VERTPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 0 PE NO. F-0102 P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PREPARED IN THE OFFICE OF: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 4020 2 4 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is PI = 58+00.00 EL = 300.40’ VC = 230’ K = 416 PI = 61+22.00 EL = 319.55’ VC = 180’ K = 217 J U D S O N D R ELEV = 340.61’ -Y6- STA 10+00.00 -L- STA 65+33.65 = (+)5.9472% (+)5.1150% PROPOSED GRADE EXISTING GROUND DS > 40 MPH DS > 40 MPH DS > 40 MPH (+)6.4985% 3 3 8 .8 8 3 3 8 .8 8 PI = 66+96.00 EL = 348.91’ VC = 120’ K = 418 (+)5.1150 % ROADWAY PROFILE 58 59 60 61 62 63 64 65 66 67 68 290 298 306 314 322 330 338 346 354 362 57 294 302 310 318 326 334 342 350 358 298 306 314 322 330 338 346 354 362 302 310 318 326 334 342 350 358 294 290 13 FOR -L- PLAN SEE SHEET 7 STADIUM DRIVE (SR 1930) -L- 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p f l _ 5 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: HORIZ VERTPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 0 PE NO. F-0102 P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PREPARED IN THE OFFICE OF: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 4020 2 4 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is R O C K S P R I N G S D R ELEV = 355.89’ -Y7- STA 11+46.00 -L- STA 68+40.11 = PROPOSED GRADE EXISTING GROUND DS > 40 MPH N W I N G A T E S TDS > 40 MPH ELEV = 387.23’ -RBT- STA 11+46.30 -L- STA 74+35.26 = BEGIN ROUNDABOUT END GRADE E l = 3 6 0 .9 8 E l = 3 6 7 .10 E I = 3 7 1.17 (+) 8.14% (+) 6.12% (+) 4.00% P I = 6 9 + 2 5 .0 0 P I = 6 9 + 5 0 .0 0 P I = 7 0 + 5 0 .0 0 P I = 7 1+ 0 0 .0 0 E I = 3 5 9 .9 8 PI = 69+10.00 EL = 359.24’ VC = 180’ K = 108 PI = 72+60.00 EL = 381.97’ VC = 220’ K = 63 PI = 74+35.26 EL = 387.23’ (+)3.0000% PI = 75+05.28 EL = 390.07’ PI = 75+25.28 EL = 389.67’ (-)2.0000%(+)0.3000% PI = 75+98.00 EL = 389.89’ VC = 90’ K = 55 (+)6.4942 % (+)4.8281 % ELEV = 390.07’ -RBT- STA 10+29.56 -L- STA 75+05.28 = END GRADE BEGIN ROUNDABOUT -L- 76+32.00 PAVEMENT REMOVAL BEGIN CONCRETE ROADWAY PROFILE 346 354 362 370 378 386 394 402 354 362 370 378 386 394 402 67 68 69 70 71 72 73 74 75 76 77 78 350 358 366 374 382 390 398398 390 382 374 366 358 350 342 346 342 14 FOR -L- PLAN SEE SHEET 8 STADIUM DRIVE (SR 1930) -L- 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ p f l _ 6 .d g n PROJECT: SHEET NUMBER:JOB NUMBER: REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: HORIZ VERTPRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 0 PE NO. F-0102 P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PREPARED IN THE OFFICE OF: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 4020 2 4 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is (+)1.9400% ELEV = 402.19’ -L- STA 82+32.00 PAVEMENT REMOVAL END CONCRETE END GRADE ROADWAY PROFILE 378 386 394 402 78 79 80 81 82 83 84 398 390 382 374 15 FOR -L- PLAN SEE SHEET 9 406 410 378 386 394 402 398 390 382 374 406 410 NORTH AVENUE -L- 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ u 5 5 15 _ y l i n e s _ p f l .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is HORIZ VERT 0 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 20 40 402 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 PI = 11+06.00 EL = 373.73’ (+)5.2984% VC = 70’ K = 16 ELEV = 370.12’ -Y2- STA 10+38.00 BEGIN GRADE (-)1.54664% ELEV = 374.01’ -L- STA 25+95.26 (19.50’ LT) -Y2- STA 11+41.31 = END GRADE (+)0.8000% ELEV = 373.69’ -L- STA 25+88.45 -Y2- STA 11+62.00 = K = 4 VC = 20’ VC = 30’ K = 6 ELEV = 341.51’ -Y6- STA 10+84.00 END GRADE ELEV = 340.61’ -L- STA 65+33.65 -Y6- STA 10+00.00 = (-)2 . 6 3 8 3% PI = 10+30.00 EL = 340.13’ (+)0.3600% PI = 10+55.00 EL = 341.43’ (+)0.3000% (+)5.1935% ELEV = 340.09’ -L- 65+31.18 -Y6- STA 10+19.71 = BEGIN GRADE ELEV = 383.89’ -Y8- STA 13+20.00 BEGIN GRADE ELEV = 390.29’ -Y8- STA 15+77.00 END GRADE K = 16 VC = 50’ ELEV = 387.75’ -RBT- STA 11+95.46 -Y8- STA 14+28.75 = BEGIN ROUNDABOUT END GRADE PI = 13+50.00 EL = 384.39’ (+)1.6400% PI = 14+08.74 EL = 387.15’ (+)4.7000% (+)3.0000% PI = 15+18.77 EL = 389.64’ (-)1.0000%(+)1.1100% ELEV = 389.87’ -RBT- 10+86.99 -Y8- STA 14+98.76 = BEGIN GRADE END ROUNDABOUT ROADWAY PROFILE 402 394 378 386 11 12 13 14 15 16 17 18 19 360 368 376 1110 10 11 346 330 338 360 368 376 346 330 338 402 394 378 386 NORTH WINGATE STREET -Y8- GLENCOE DRIVE -Y2- JUDSON DRIVE -Y6- FOR -Y8- PLAN SEE SHEET 8 FOR -Y2- PLAN SEE SHEET 4 FOR -Y6- PLAN SEE SHEET 7 372 364 398 390 382 372 364 342 334 342 334 382 390 398 16 12 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C - 1A - t s h .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 C AP ITA L BLVD (U S 1) G LEN C O E D R -Y2 - O LD STA DI U M D R - Y1- W H IS TLIN G S W A N D R - Y3 - R I C H L A N D C R E E K McD O W ELL D R -Y4 - McDOWELL DR-Y5-JU D SO N D R -Y 6 - N W I N G A T E S T - Y 8 - N C O LLE G E S T SEMINARY THEOLOGICAL BAPTIST SOUTHEASTERN WAKE FOREST TO DOWNTOWN T O R ALE IGH T O F R AN K LIN T ON EC-6/EC-12 EC-4/EC-10 E C- 3/ E C- 9 EC-2 /EC-8 E C - 1/ E C - 7 ( U S 1 A ) N M A I N S T COURSE GOLF PASCAL HIGH SCHOOL WAKE FOREST F R O N T S T SHOPPING CENTER WAKE FOREST CROSSING APARTMENTS NORTH FOREST N W I N G A T E S T - Y 8 - SEMINARY THEOLOGICAL BAPTIST SOUTHEASTERN N A D 8 3/ N A 2 0 11 NORTH AVE -L- ( SR 1930) STA DI U M D R - L- ( SR 1930) STA DI U M D R - L- JENK INS RD R O C K S P R I N G R D - Y 7 - DENUDED AREA MAP EC-1A 0 EC-5/EC-11 NARRATIVE PROJECT DENUDED AREAS DISTURBED AREAS U-5515 STADIUM DRIVE - COMPLETE STREETS IMPERVIOUS AND PERVIOUS SURFACES IN DIRECTION OF FLOW 250 500 PROPOSED PERVIOUS SURFACE = 3.40 AC PROPOSED IMPERVIOUS SURFACE = 2.77 AC Total Disturbed Area (shaded) = 6.17 acres (CeB2, EnC2, WmB, ApC2, CeC2). The soil types throughout the project limits are mostly sandy loams Soils project appear to be stable and do not show signs of significant erosion soils. system outlets that are to be retained. The fill slopes and drainage ditches around the introduced. Pre-construction runoff equals Post-construction runoff for all existing systems to Richland Creek at the existing bridge, thus no new drainage patterns will be drainage from the project site makes its way through a series of ditches and storm drain primarily residential and institutional where theres existing development. Majority of the moderate slopes. Land use along the roadway is partially undeveloped and The site is generally rolling and contains some drainage ways that are bordered by Site Description to N. Wingate Street there will be 6-foot sidewalks on both sides of the road. the north side from Glencoe Dr to Richland Creek. From the bridge at Richland Creek A 10-foot multi-use path with be constructed on the south side and a 5-foot sidewalk on typical section will construct a consistent three-lane roadway with curb and gutter. Wake Forest, NC. The project extends approximately 1.1 miles. The proposed The U-5515 Stadium Drive - Complete Streets Project is located in Wake County, 3.40 acres will be vegetatively stabilized with grass and permanent plantings. disturbed during the construction of this project. Also, approximately from Glencoe Drive to N. Main Street. Approximately 6.17 acres will be The Town of Wake Forest proposes to upgrade Stadium Drive to a "complete street" Project Description CEMETERY v v v v 15"R C P 14PT 6 6 6 8 6 6 6 6 6 6 6 6 6 6PT 14 12 12 12 12 10 8 8PT 16PT 12PT 12PT 6PT 8PT 8PT 6 66 6 6PT 6PT 8PT10QA 10QA 10JV 12JV 6JV 14PT 8JV 8JV 8JV8JV 8JV 10JV 10JV 10JV 10JV8JV 8JV 11JV 11JV 11JV 11JV 12 14PT 10QA 12QA 12QA 12QA 12QA 11JV 11JV 11JV 11JV 6 6 8 8 8 14 12 12 12 8 8IO 6JV 14QA 10QA 14LI 6 6 6 16PT 6 8 12PT 10PT 12PT 8 8 12 8 10 8 10 8 16PT 8PT 10108PT 14PT 8PT15PT 15PT 12PT 12PT 8PT 6 6 8 10PT 10PT 10PT 10 6PT 6PT 12PT 8PT 8PT 8PT 8PT 8PT 12PT 12PT 6 6 6 6 8PT 14PT 8 8 8 8 8 8 20PT8 8 8 12 6 6 12PT 8PT 8PT 12PT 16PT 8 18QA 16QA 12QA22QA 20QA 20QA 14QA 14QA20QA 12PT 12PT 6 10 12PT 15"RCP INV =335.09’ INV=335.37’ 15"RCP INV=341.54’ 15"RCP INV=360.74’ 15"RCP INV=357.83’ 3 0" R C P INV=352.18’ FES 18"RCP INV=337.22’ INV=333.16’ INV=364.03’ FES 15"CMP PO ST W ITN E SS T T T 2 S BK APTS 1 S F D 1 S BK D 1 S BK D 2 S F APTS 1 S F D 2 S F D 2 S F D 2 S F D 2 S F D INV=359.93’ INV=350.20’ FES 80-02 INV=370.75’ TOC=377.00’ CB-1 CB-1 90-02 91-06 91-04 91-03 CB-2 CB-8 INV=362.44’ TOC=369.29’ CB-2 UNKNOWN # LP LP LP 91-01 EXISTING STORMDRAIN INFORMATION G R A V E L W O O D CONCRETE ASPHALT ASPHALT ASPHALT CHAIN ROPE WOOD WOOD CT W O O D W O O D WOOD/VINYL C ON C R E T E GUY POLE GUY POLE 50.17’ S5256’33"E N 33 28’4"W8.00’ N/F GEORGE R. WOOTEN JR. N/F MACKIE FAMILY, LLC N/F MACKIE FAMILY, LLC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N / F M E O L D Y H A R R I S N/F MEOLDY HARRIS N/F MARLOWE & MOYE, LLC N/F ANDY. D. GILLELAND N/F CHRISTOPHER J. & LISA R. SIEMERS N/F STAFFORDSHIRE HOA, INC. N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N / F S T A F F O R D S H IR E H O A , IN C . N/F CARSON E. & CONNIE ANN CHAVIS N/F JORDAN M. & WENDY STEARNS SEBTS CEMETARY STADIUM DRIVE TOWN HOMES N/F NORTH FOREST APARTMENT, LLC STAFFORDSHIRE 340 340 3 4 0 345 3 4 5 345 345 3 5 0 350 3 5 0 3 5 5 355 355 355 3 5 5 360 360 3 6 0 360 360 360 360 365 365 3 6 5 365 365 365 365 3 6 5 370 3 7 0 370 370 370 370 370 370370370 370 370 3 7 0 375 375 375 375 3 7 5 3 7 5 375 375375 375 3 7 5 375 375 375 3 8 0 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 1- C & G .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 TPF TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF STADIUM DR (SR 1930) -L- STADIUM DR (SR 1930)-L- OLD STADIUM DR -Y1- G LEN C O E D R - Y2 - STAGING AREA STOCKPILE/ STAGING AREA STOCKPILE/ 2 ft. weir height Silt Check Type A Temporary Rock CONCRETE TRUCK CLEANOUT TEMPORARY CONSTRUCTION ACCESS/ AND GRUBBING OPERATIONS NEEDED DURING CLEARING INSTALL CHECK DAMS AS AND GRUBBING OPERATIONS NEEDED DURING CLEARING INSTALL CHECK DAMS AS AND GRUBBING OPERATIONS NEEDED DURING CLEARING INSTALL CHECK DAMS AS SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY FENCE (TYP) INSTALL TREE PROTECTION CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP N A D 83/N A 2011 CLEARING AND GRUBBING PHASE EROSION CONTROL SHEET EC-1 SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME TIMEFRAME EXCEPTIONS NPDES GENERAL STORMWATER PERMIT PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES SLOPES STEEPER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS 14 DAYS 7 DAYS 7 DAYS 7 DAYS IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. NONE NONE NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY EC-7 FOR THE CONSTRUCTION PHASE. GRUBBING PHASE OF THE PROJECT. SEE SHEET THIS SHEET REPRESENTS THE CLEARING AND ) 2 - C E T E E H S E E S ( 5 2 + 4 3 A T S - L - E N I L H C T A M CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 2 5 + 0 0 3 0 + 0 0 F F F F F F F C C F F F C C C C F F F F F F F F F C C F F F F F v v S 18 "RC P 15"RCP 15"RCP 15"RCP18"RCP INV=299.01’ FES 24"RCP 18"R C P 8PT 8PT 8PT 16PT 16PT 16LI 6PT 24 2412 10 10 10 10 10 10 14PT 14PT 14PT 14PT 14PT 16MG 16MG 11JV11JV 11JV 11JV 11JV 11JV 8PT 16PT 14 14PT 10 10 16PT 8PT 10PT 8PT 16PT 8PT 8PT 12PT 12PT 14PT 12PT 12PT 6PT 16PT 12PT 10PT 8PT 12PT 10PT 8PT 8PT 8PT 8PT 10PT 10PT 10PT 10PT 12PT 6PT 6PT 6PT 10PT6PT 6PT 10PT10PT 26PT 12 12 16LI 16LI 16LI 16LI 8 6 6 6 10 10 30QA 20QA 14LI 10 14 10 14 10 24PT 24 16LI16LI 4 " P V C 8"D IP 8"DIP OUT=308.38’ IN=308.43’ RIM=316.53’ SSMH 8"DIP 4 " P V C 8"DIP 1 5 " R C P 6 "P V C OUT=309.99’ IN(SW)=310.24’ IN(NW)=310.04’ RIM=322.64’ SSMH 6"P V C 24"RCP 18 "R C P 15 "R C P 12 "R C P 15"RCP 15"RCP INV=335.09’INV=333.38’ 8 "D IP T T T T 2 S BR APTS 2 S BR APTS 1 S F D2 S BK APTS 1 S F D 1 S F D 2 S F D 2 S F D 2 S F APTS 2 S F APTS 2 S F APTS 1 S F D STADIUM DRIVE W H IS T IN G S W A N D R IV E 8 "P V C T 91-02 01-04 01-03 02-07 02-05 02-03 02-02 13-11 OUT=333.37’ IN=333.47’ TOC=337.32’ CB 3 OUT=331.73’ IN=332.03’ TOC=336.83’ CB-6 OUT=340.58’ RIM=344.48’ CB-8 CB-3 CB-5 CB-6CB-7 OUT=326.85’ IN=328.50’ TOC=333.20’ CB-5 OUT=332.46’ TOC=336.96’ CB-7 OUT=332.81’ IN=332.96’ RIM=335.86’ DI-4 DI-4 OUT=302.98’ IN(NW)=303.73’ IN(SW)=304.93’ TOC=309.53’ CB-11 OUT=312.76’ RIM=320.56’ CB-12 OUT=310.58’ IN=311.18’ TOC=317.88’ CB-9 CB-9 CB-12 CB-11 OUT=286.54’ IN=286.80’ TOC=292.55’ CB-14 CB-13 CB-16 CB-15 CB-14 OUT=294.07’ IN(NW)=295.47’ IN(SE)=294.12’ TOC=301.22’ CB-13 INV=288.82’ TOC=292.47’ CB-15 INV=NOT ACCESSABLE TOC=301.20’ CB-16 CB-10 OUT=318.93’ IN=320.88’ RIM=328.58’ CB-10 OUT=291.55’ IN=291.65’ RIM=302.65’ JB-20 LP 02-03 13-10 OUT=328.93’ IN(NW)=328.98’ IN(SW)=329.33’ RIM=336.68’ SSMH OUT=314.68’ IN(SE)=314.91’ IN(NE)=315.41’ RIM=324.26’ SSMH OUT=301.44’ IN=301.49’ RIM=309.84’ SSMH OUT=293.30’ IN=294.30’ RIM=301.50’ SSMH OUT=285.57’ IN=286.67’ RIM=295.22’ SSMH EXISTING STORMDRAIN INFORMATION OUT=330.50’ IN=330.61’ TOP=332.67’ WOOD/VINYL VINYL FENCE C H A IN L I N K F E N C E C O N C R E T E W O O D 1 5 "R C P 24"R C P 15 "R C P24"RCP U/G JB 18"RCP DI DI CB 15 "R C P 10" C MP 15 "R C P APPROX 148’ OF 15" RCP TOP OF PIPE EXPOSED 15 6 . 2 0 ’ N 3 5 3 8 ’ 14 " E 123.53’ N5246’34"W 3 5 . 8 8 ’ N 3 7 13 ’ 2 5 " E 3 5 . 8 8 ’ N 3 7 13 ’ 2 5 " E 19 3 . 3 7 ’ N 2 9 2 8 ’ 14 " E 96.79’ S5246’35"E 99.84’ S5247’56"E 99.89’ S5246’24"E 2 0 3 . 8 4 ’ S 2 1 6 ’ 3 2 " W 2 0 3 . 9 1’ N 2 1 4 ’ 5 8 " E 86.29’ S5234’57"E 49.41’ S5157’0"E 49.76’ S5124’1"E 49.00’ S5026’29"E 49.17’ S4848’46"E 48.54’ S4727’54"E 49.27’ S4543’9"E 48 .89’ S4353’51"E 49 .08 ’ S42 27 ’21"E 49 .0 6 ’ S413 ’5 "E 7 3 .5 3 ’ S 3 9 5 0 ’2 9 "E 2 6 4 .4 1’ N 5 0 16 ’2 9 "E 2 5 9 . 13 ’ S 4 3 2 5 ’5 6 "W 19 8 .8 1 ’ N 3 9 3 0 ’2 "W 55 .46 ’ N42 42 ’10"W 50 .58 ’ N4334’1"W 50.93’ N4519’51"W 50.83’ N46 57’9"W 101.09’ N4845’39"W 99.20’ N5144’34"W 2 2 3. 2 5 ’ S 1 6 3 4 ’ 3 " W 112.26’ N5240’50"W S4325’56"W 10.11’11.53’ S 1 9 3 ’ 2 5 " W 3 3 1. 0 3 ’ ( T O T A L ) 15 7 . 11’ S 3 5 4 2 ’ 18 " W N5220’55"W 104.69’ 6.16’ 6.09’ S 3 8 5 2 ’5 9 "E 14 3 . 8 6 ’ N 5 0 16 ’3 4 "E 2 3 0 .11’ 2 2 5 .7 3 ’ 3.99’ 6 2 . 6 1’ N 3 8 5 ’18 "W C26 C27 C28 S5349’24"E 95.57’ 67.03’ S5244’10"E EXIST R/W EXIST R/W E X IS T R /W E X IS T R /W N/F NORTH FOREST APARTMENT, LLC N/F NORTH FOREST APARTMENT, LLC N/F GEORGE J. AUSTIN N/F DAVID & ELLEN I. YOUNG N/F ERIC & KERI RUSH N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F CITADEL PINE FOREST MEMORIAL GARDENS, LLC N/F DWAYNE D. ROSS N/F JAMES M. & CHRISTINA R. LYERLY JR. N/F WILLIAM M. & JILL G. MABE N/F NICOLE M. CEBULA N/F GEORGE J. AUSTIN M E O L D Y H A R R IS N / F P H Y L L IS K A Y P L E A S A N T SN / F M E O L D Y H A R R IS SWANS COVE NORTH FOREST APARTMENTS PINE FOREST MEMORIAL GARDENS 2 9 5 295 2 9 5 295 2 9 5 3 0 0 3 0 0 300 3 0 0 3 0 5 3 0 5 310 3 10 315 3 15 315 3 2 0 3 2 0 320 3 2 0 3 2 0 3 2 5 325 3 2 5 325 3 2 5 330 330 3 3 0 3 3 0 335 335 335 340 3 4 0 340 340 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 2 - C & G .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF - Y 3 - R D N A W S G N I L T S I H W STADIUM DR (SR 1930) -L- T P F U N D E R D IS T R IB U T IO N L IN E S . C O N T R A C T O R T O U S E C A U T IO N F E N C E A S S H OW N O N P LA N S . IN S T A L L T R E E P R O T E C T IO N AND GRUBBING OPERATIONS NEEDED DURING CLEARING INSTALL CHECK DAMS AS SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY FENCE (TYP) INSTALL TREE PROTECTION CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP 2.0 ft. weir height Silt Check Type A Temporary Rock N A D 83/N A 2011 DO NOT CUT TREE TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN C F LEGEND TPFTREE PROTECTION CHECK, TYPE B TEMPORARY ROCK SILT TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE WATTLE EC-2 CLEARING AND GRUBBING PHASE EROSION CONTROL PLAN SHEET )1 - C E T E E H S E E S ( 5 2 + 4 3 A T S - L - E N I L H C T A M ) 3 -C E T E E H S E E S( 0 5 + 5 4 A T S -L - ENIL H C TAM "SILT SOCK"/FILTER SACK INLET PROTECTION EC-8 FOR THE CONSTRUCTION PHASE. GRUBBING PHASE OF THE PROJECT. SEE SHEET THIS SHEET REPRESENTS THE CLEARING AND CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 3 5 + 0 0 4 0 + 0 0 4 5 + 0 0 F F F F F F F F F F F F F F F F F F F C F F F F F F C C C CC CCCF F C v RIP RAP RIP RAP INV=286.40’ FES 10 10 12 30QA 14PT 12PT 8PT 18 1 0 24 10 13 13 8 8 20PT 8 10 12 12 18PT 12 12 16 16 8 8 12 12 18 14 12 12 20QA 8 10 36 24 21PT 18 32QA 8 16PT 14 32 16 24 12LS 6LS 12LS12LS 12 12 8LS 8LS 66 10 10 101010 68 14 8 10106 6 66 8 12 12 10 8 12PT12PT 6 1 0 12PT 17PT 10PT 8 8PT 8PT 12 OUT=270.95’ IN(NW)=271.00’ IN(SW)=271.35’ RIM=278.70’ SSMH 8"DIP 18"RCP INV=270.28’ 18"RCP36"RCP 36"RCP SS 36"RCP 36"RCP 3 6 "R C P 8"DIP INV=272.89’ STADIUM DRIVE MC D O WE L L DR IV E M C D O W E L L D R IV E INV=257.55’ FES INV=270.34’ FES 13-08 13-07 13-02 23-02 24-02 24-03 34-10 CL INV=276.98’ TOC=281.53’ CB-17 CB-17 OUT=270.29’ IN=270.38’ TOC=376.50’ CB-23 CB-23 OUT=258.42’ IN=(NW)=266.22’ IN(SE)=268.57’ TOC=272.22’ CB-24 OUT=268.58’ IN=268.68’ TOC=272.13’ CB-25 OUT=268.61’ TOC=272.14’ CB-26 CB-26CB-25CB-24DI-18 OUT=275.70’ RIM=280.05’ DI-18 ACCESSABLE INV=NOT RIM=277.55’ DI-19 JB-21 JB-22 OUT=273.61’ IN=273.91’ RIM=279.61’ 21JB- OUT=272.18’ IN=273.08’ RIM=278.43’ 22JB- RIP RAP 13-03 LP UNKNOWN # UNKNOWN # UNKNOWN # 8 "D IP EXISTING STORMDRAIN INFORMATION 15"RCP CONCRETE CONCRETE 2@48" RCP 4 2 " R C P v v ROCK STEP POOL EXISTING 18"RCP 18" R C P DI-19 N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC WAKE COUNTY BOARD OF EDUCATION N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F PHYLLIS KAY PLEASANTS N/F KIMBERLY C. & WILLIAM W. VERNAL PASCAL GOLF COURSE FLETCHER VILLAGE N/F ERIC & KERI RUSH 260 260 2 6 0 2 6 0 260 260 2 6 0 2 6 0 260 260265 2 6 5 265 26 5 265 265 265 265 2 6 5 265 265 2 7 0 2 7 0 2 7 0 270 270 2 7 0 270 270 270 270 2 7 0 2 7 0 270 270 275 275 275 275 275 275 275 275 2 7 5 2 7 5 280 280 2 8 0 2 8 0 280 280 2 8 0 2 8 0 280 285 285 285 285 285 2 8 5 2 8 5 2 8 5 290 290 290 2 9 0 290 290 295 2 9 5 295 3 0 0 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 3 - C & G .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 TPF TPF TPF TPF TPF TPF T PF T P FTPF TPF TPF TPF TPF TPF STADIUM DR (SR 1930) -L- M c D O W E LL D R - Y 4 - RD LLEWODcM -5Y- STADIUM DR (SR 1930) -L- RI C H L A N D C R E E K RICHLAND CREEK STAGING AREA STOCKPILE/ TPF TPF TPF TPF TPF TPF TPF TPF TPF 3.5 ft. weir height Silt Check Type A Temporary Rock UNDER DISTRIBUTION LINES. CONTRACTOR TO USE CAUTION FENCE AS SHOWN ON PLANS. INSTALL TREE PROTECTION CONCRETE TRUCK CLEANOUT TEMPORARY CONSTRUCTION ACCESS/ FLOW ALONG SILT FENCE (TYP) SILT FENCE AS NEEDED TO DIFFUSE INSTALL J-HOOK AND REINFORCED PIPE INLET PROTECTION RETAIN AND MAINTAIN EXISTING FLOW ALONG SILT FENCE (TYP) SILT FENCE AS NEEDED TO DIFFUSE INSTALL J-HOOK AND REINFORCED CLEARING AND GRUBBING PHASE EDGE OF PAVEMENT DURING INSTALL SILT FENCE ALONG EXIST AND GRUBBING OPERATIONS NEEDED DURING CLEARING INSTALL CHECK DAMS AS FENCE (TYP) INSTALL TREE PROTECTION SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP 1.0 ft. weir height Silt Check Type A Temporary Rock POSITIVE DRAINAGE TO BASIN CLEAN OUT PIPE OUTLET TO ENSURE ID 6.1 8 ft. weir Orifice Diameter with 1.75 inch 2.0 inch Skimmer 102’ x 35’ x 3’ ID 6.2 8 ft. weir Orifice Diameter with 2 inch 2 inch Skimmer 82’ x 60’ x 3’ LIMITS OF DISTURBANCE, TYP THE END OF EACH WORK DAY. GROUND COVER SHALL BE PROVIDED AT A MINIMUM OF 3 CONSECUTIVE DAYS. DRY WEATHER IS FORECASTED FOR THIS AREA SHALL BE PERFORMED WHEN INSTALLATION IS COMPLETED. WORK IN KEEP DITCH STABILIZED UNTIL PIPE AS PIPE SEGMENTS ARE INSTALLED TO GRUBBING. RIP RAP SHALL BE REMOVED DURING CLEARING AND RETAIN RIP RAP IN CHANNEL CLEARED ACCESS ROAD ALONG EXISTING ENTRANCE INSTALL CONSTRUCTION N A D 83/ N A 2011 CLEARING AND GRUBBING PHASE EROSION CONTROL PLAN SHEET EC-3 ) 2 - C E T E E H S E E S ( 0 5 + 5 4 A T S - L - E N I L H C T A M )4 -C E T E E H S E E S( 0 5 + 6 5 A T S -L - E N IL H C T A M 5 5 + 0 0 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE EC-9 FOR THE CONSTRUCTION PHASE. GRUBBING PHASE OF THE PROJECT. SEE SHEET THIS SHEET REPRESENTS THE CLEARING AND "SILT SOCK"/ FILTER SACK INLET PROTECTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 5 0 + 0 0 F F F F F F F F F F F F F FFFF C C C C F F F F F F C C F F F F F F v v RIP RAP RIP RAP 15 "R C P 26 28PT 30PT 24QA 18QA 18QA 16QA 24QA 48QA 42QA 8 6 48QA 16LI 16LI 16LI 16LI 16LI 16LI9 16LI 16LI 16LI 16LI 9 8 INV=291.50’ 18"RCP INV=292.77’ 1 S BK D1 S BK D1 S BK D1 S BK D 1 S BK D STADIUM DRIVE 34-02 35-03 35-02 36-05 36-04 OUT=319.72’ TOC=322.87’ CB-27 CB-27 CB-28 OUT=337.25’ TOC=342.02’ CB-29 CB-29 36-03 LP 46-07 INV=318.84’FES EXISTING STORMDRAIN INFORMATION 15"RCP OUT=336.63’ IN=337.18’ TOC=341.92’ CB 15" R CP CONCRETE CONCRETE BY TOW TV CAMERA LINE WAS DETECTED UNDERGROUND JB? 18 " R C P OUT=327.20’ IN=327.57’ RIM=333.30’ CONCRETE CB-28 COVERING STR DUE TO SIDEWALK NOT ACCESSABLE INVERTS ARE FLOWLINE ELV.=318.57 CURB CUT CONCRETE CONCRETE 15"RCP CONCRETE CONCRETE 8" 12"DIP 12"DIP 12" 8 " CONCRETE ABOUT 22’ UP THE PIPE. THROUGH THE STORM PIPE THERE IS A UTILITY LINE BORED 133.49’ N6618’10"W 294.85’ N6749’17"W 555.82’ N6749’17"W 63.90’ S664’42"E 93.92’ S6748’8"E 45.69’ S685’37"E S2154’23"W 3.84’N2211’54"E 2.81’ S2355’18"W 2.53’ N680’12"W 25.98’ S6748’8"E 221.41’409.93’ S685’37"E 154.31’ S6128’10"E 13.78’ C33 C34 C37 EXIST R/W EXIST R/W EXIST R/W EXIST R/W N/F WAKE COUNTY BOARD OF EDUCATION N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC WAKE FOREST HIGH SCHOOL RICE CIRCLE DUPLEX APARTMENTS 270 270 270 270 275 275 275 2 7 5 280 280 280 2 8 5 285 285 285 2 9 0 290 290 290 295 295 295 2 9 5 2 9 5 2 9 5 300300 300 300 305 305 305 305 310 3 1 0 310 310 315 315 315 315 315 315 315 315 320 320 320 320 320 325 325 325 325 3 3 0 330 330 330 335 3 3 5 340 340 3 4 0 345 3 4 5 345 3 5 0 350 350 355 360 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 4 - C & G .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF T P F TPF TPF T P F TPF TPF TPF T P F TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF TPF TPF TPF TPF TPF TPF TPF STADIUM DR (SR 1930) -L-RD NOSDUJ -6Y- RIP RAP CHANNEL RETAIN EXISTING AND GR UB BI NG OP E RATI ONS NE E DE D DURI NG CL E ARI NG I NS T AL L CHE CK DAM S AS AND GRUBBING OPERATIONS NEEDED DURING CLEARING INSTALL CHECK DAMS AS SILT FENCE (TYP) INSTALL TEMPORARY FENCE (TYP) INSTALL TREE PROTECTION FENCE (TYP) INSTALL TREE PROTECTION FLOW ALONG SILT FENCE (TYP) SILT FENCE AS NEEDED TO DIFFUSE INSTALL J-HOOK AND REINFORCED 3.5 ft. weir height Silt Check Type A Temporary Rock CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT TPF TPF LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF 13 N A D 8 3/ N A 2 0 1 1 PARKING LOT / STADIUM DRIVE -L- RELATIONSHIP CLEARING AND GRUBBING PHASE EROSION CONTROL PLAN SHEET EC-4 ) 3 - C E T E E H S E E S ( 0 5 + 6 5 A T S - L - E N I L H C T A M ) 5 - C E T E E H S E E S( 0 5 + 7 6 A T S -L - E NIL H C T AM EC-10 FOR THE CONSTRUCTION PHASE. GRUBBING PHASE OF THE PROJECT. SEE SHEET THIS SHEET REPRESENTS THE CLEARING AND CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 6 0 + 0 0 6 5 + 0 0 F F F F F F F C C C C F C C C C C C F F WM S GRAVEL R I P R A P 15" R CP 15" R CP S 18" RC P 12’RCP 8 8 6 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 42QA 6 6 6 6 6 6 24PT 42QA 16LI 16LI 16LI 16LI 16LI 16LI 8 8 8 6 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 8 10 14QA ST ST ST ST S8"CLAY 8 " C L A Y 6 "C L A Y 6"C LA Y 6"CLAY INV N/A RIM=370.23’ BOLTED SHUT SSMH IS SSMH RIM=383.31’ IN(N)=361.61’ IN(E)=360.81’ OUT=360.75’ 8"CLAY 8"CLAY SSMH RIM=365.30’ IN=358.84’ OUT=358.76’ 8"CLAY 8 "C L A Y 24"RCP 2 4 "R C P S S 18 "R C P 24"CPP CULVERT2.33’ X 2.50’ BRICK 18"CMP 18 "R C P 12"RCP 2 4 "R C P 15 "R C P 12"RCP 18 "C P P OUT=392.99’ IN=393.03’ RIM=394.72’ SSMH 121414 16 10 10 8 10 8 8 21JV 18JV 18MG 33 14JV 8"CLAY 24"CPP 2 4 "C L A Y INV=380.36’ T T 1 S BR STONE WALL S T O N E W A L L S T O N E W A L L STEPS 2 S BR SCHOOL 3 S BR SCHOOL 1 S BR D 1 S BR D R O C K S P R IN G R O A D N W IN G A T E S T R E E T STADIUM DRIVE STEAM 16LI 37-05 47-08 46-05 46-06 48-11 48-09 48-02 48-07 37-06 48-03 48-05 48-13 48-14 CB-30 CB-31 CB-32 INV=351.02’ TOC=355.37’ CB-30 OUT=354.30’ IN=354.36’ TOC=356.98’ CB-31 OUT=354.38’ TOC=358.48’ CB-32 OUT=381.85’ IN=382.00’ TOC=386.10’ CB-34 CB-34 OUT=384.06’ IN=384.14’ TOC=389.46’ CB-35 CB-35 OUT=386.95’ RIM=390.70’ CB-36 CB-36 CB-47 CB-46 OUT=353.28’ IN=353.38’ RIM=355.63’ JB-33 OUT=366.08’ RIM=370.52’ YDI-37 YDI-37 OUT=365.62’ IN=365.67’ RIM=369.94’ YDI-38 YDI-38 OUT=365.20’ IN(SE)=365.45’ IN(E)=365.50’ IN(NE)=365.46’ RIM=369.35’ YDI-39 YDI-39 OUT=366.19’ IN(24")=366.35’ IN(18")=366.44’ RIM=369.81’ YDI-40 OUT=367.38’ IN=367.39’ RIM=370.64’ YDI-41 YDI-40 YDI-41 OUT=367.72’ IN=367.79’ RIM=370.19’ YDI-42 YDI-42 INV=373.37’ RIM=383.39’ YDI-43 YDI-43 JB-44 OUT=376.42’ IN=377.27’ RIM=383.27’ JB-45 JB-45 OUT=377.86’ IN(W)=378.07’ IN(E)=378.57’ IN(NE)=378.07’ RIM=382.59’ JB-44 JB-33 36-02 UNKNOWN # LP LP LP 57-02 LP LP LP LP EXISTING STORMDRAIN INFORMATION 15 "R C P 42"RCP OUT=357.86’ IN=357.91’ RIM=362.16’ DI 30"RCP 30"RCP OUT=362.49’ IN=363.94’ TOP=366.54’ CONC. BOX OUT(30)= IN(18)= IN(42)= TOP=366.40’ CONC. BOX CONCRETE OUT=362.76’ IN=362.96’ TOC=373.31’ CB 2 4 " R C P 18 "R C P OUT=367.82’’ TOC=371.82’ CB OUT=366.75’ IN=367.55’ TOC=371.55’ CB 18"RCP OUT=364.20’ IN=364.35’ TOC=369.00’ CB U/G JB POSSIBLE BRICK B RI C K C O N C R E T E CONCRETE CONCRETE CONCRETE BRICK BRIC K 6 "C L A Y 6"PVC INV=390.65’ BRICK 18’CMP BRICK INV=378.59’ TOC=382.79’ CB-46 INV=378.67’ TOC=382.87’ CB-47 47-10 6" 12"DIP 8 2 " 8" BRICK 8" 12" 15"RCP RETROFITED TO A CDI USED TO BE A DI, NOW 18 " C M P BECAUSE PIPE IS PLUGED OFF. CAN NOT GET TV ACCESS THIS PIPE APPEARS TO BE CAPPED ABOUT 22’ UP THE PIPE. THROUGH THE STORM PIPE THERE IS A UTILITY LINE BORED Underground Power Approx. Location of 8" (ABANDONED) 2 7 . 8 6 ’ S 2 6 4 8 ’ 2 3 " W 6 5 0 . 17 ’ S 2 6 4 8 ’ 2 3 " W 6 7 8 . 4 5 ’ N 2 6 4 8 ’ 2 3 " E 4 10 . 8 6 ’ N 2 8 17 ’ 3 7 " E 4 0 9 . 5 6 ’ N 2 8 17 ’ 3 7 "E 14 7 . 5 0 ’ S 2 5 1’ 5 " W 14 7 . 4 0 ’ N 2 7 11’ 5 " E 81.40’ N6248’55"W 3 9 7 . 4 0 ’ S 2 8 3 9 ’ 14 " W 277.49’ S8012’41"E 71.34’ S7828’49"E N6248’49"W N6248’49"W 20.56’ N8017’27"W 277.53’ N6248’49"W 199.78’75.82’80.20’ S595’25"E 108.15’ S 2 7 4 2 ’ 4 3 " W 3 8 2 . 0 8 ’ S638’31"E 6.11’ 356.56’ (TOTAL) N 2 7 4 2 ’ 4 3 " E 4 14 . 4 5 ’ ( T O T A L ) 5 0 . 2 7 ’ 136.70’ (NO DEED FOUND) GIS RECORDS THIS LINE PER C35 C36 C38 C39 C40 C 4 1 C42 29.30’ N5831’28"W EXIST R/W EXIST R/W E X IS T R / W E X IS T R / W EXIST R/W EXIST R/W EXIST R/W E X IS T R / W E X IS T R / W E X IS T R / W E X IS T R / W E X IS T R / W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC H IS T O R IC D IS T R IC T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT 350 3 5 5 3 5 5 355 360 3 6 0 360 360 365 365 365 365 365 365 3 6 5 365 3 6 5 3 6 5 3 7 0 3 7 0 370 370 370 3 7 0 3 7 0 370 370 370 37 0 370 3 7 5 3 7 5 375 375 375 3 7 5 3 7 5 375 3 7 5 375 380 3 8 0 3 8 0 380 380 3 8 0 3 8 0 380 3 8 0 3 8 0 3 8 5 3 8 5 385 3 8 5 385 385 3 8 5 3 8 5 385 3 8 5 390 390 3 9 0 390 3 9 0 3 9 0 3 9 0 3 9 0 390 395 395 395 395 3 9 5 395 3 9 5 4 0 0 4 0 0 400 400 400 400 400 4 0 5 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 5 - C & G .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 T PF T P F TPF TPF TPF TPF TPF TPF R O C K S P R I N G R D - Y 7 - STADIUM DR (SR 1930)-L- N W IN G A T E S T ( S R 1 9 5 4 ) - Y 8 - NORTH AVE -L- N W IN G A T E S T - Y 8 - N C O LLE G E S T FENCE (TYP) INSTALL TREE PROTECTION FENCE (TYP) INSTALL TREE PROTECTION SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP TPF TPF TPF TPF TPF TPF 14 N A D 8 3/ N A 2 0 1 1 CLEARING AND GRUBBING PHASE EROSION CONTROL PLAN SHEET EC-5 ) 4 - C E T E E H S E E S ( 0 5 + 7 6 A T S - L - E NI L H C T A M ) 6 - C E T E E H S E E S ( 0 5 + 8 7 A T S - L - E N I L H C T A M EC-11 FOR THE CONSTRUCTION PHASE. GRUBBING PHASE OF THE PROJECT. SEE SHEET THIS SHEET REPRESENTS THE CLEARING AND CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 7 0 + 0 0 CC C C C F F F F F F F F F F F F F F F F F C C 18TREE GV 15 "R C P 12 50QA 1 S F D N C O L L E G E S T R E E T 15 " R C P INV=392.72’ TOC=396.12’ CB-48 OUT=390.69’ IN=390.70’ TOC=395.99’ CB-49 CB-48 CB-49 LP UNKNOWN #UNKNOWN # EXISTING STORMDRAIN INFORMATION 13 141416 53QA T T BRICK CONCRETE 4AR 4AR 20 T 10IO 10IO 4AR I R O N F E N C E STONESTONE WALL (TYP) IRON FENCE BRICK WALL CONCRETE CONCRETE ASPHALT MAGNOLIALARGE DRIPLINETREET CONCRETE 8" 8" T 3 9 7 . 4 0 ’ S 2 8 3 9 ’ 14 " W E X IS T R / W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY H IS T O R IC D IS T R IC T H I S T O R I C D I S T R I C T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT WAKE FOREST DOWNTOWN 395 395 395 395 4 0 0 400 400 4 0 0 405 405405405405 405 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 6 - C & G .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 NORTH AVE -L- N C O LLE G E S T ( U S 1 A ) N O R T H M A IN S T TPF N A D 8 3/ N A 2 0 1 1 CLEARING AND GRUBBING PHASE EROSION CONTROL PLAN SHEET EC-6 ) 5 - C E T E E H S E E S ( 0 5 + 8 7 A T S - L - E N I L H C T A M EC-12 FOR THE CONSTRUCTION PHASE. GRUBBING PHASE OF THE PROJECT. SEE SHEET THIS SHEET REPRESENTS THE CLEARING AND CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. CEMETERY v v v v 15"R C P 14PT 6 6 6 8 6 6 6 6 6 6 6 6 6 6PT 14 12 12 12 12 10 8 8PT 16PT 12PT 12PT 6PT 8PT 8PT 6 66 6 6PT 6PT 8PT10QA 10QA 10JV 12JV 6JV 14PT 8JV 8JV 8JV8JV 8JV 10JV 10JV 10JV 10JV8JV 8JV 11JV 11JV 11JV 11JV 12 14PT 10QA 12QA 12QA 12QA 12QA 11JV 11JV 11JV 11JV 6 6 8 8 8 14 12 12 12 8 8IO 6JV 14QA 10QA 14LI 6 6 6 16PT 6 8 12PT 10PT 12PT 8 8 12 8 10 8 10 8 16PT 8PT 10108PT 14PT 8PT15PT 15PT 12PT 12PT 8PT 6 6 8 10PT 10PT 10PT 10 6PT 6PT 12PT 8PT 8PT 8PT 8PT 8PT 12PT 12PT 6 6 6 6 8PT 14PT 8 8 8 8 8 8 20PT8 8 8 12 6 6 12PT 8PT 8PT 12PT 16PT 8 18QA 16QA 12QA22QA 20QA 20QA 14QA 14QA20QA 12PT 12PT 6 10 12PT OUT=336.12’ IN=336.17’ RIM=345.77’ SSMH 8"PVC 8 "P V C 8"DIP OUT=342.69’ IN=346.89’ RIM=352.89’ SSMH 15"RCP INV =335.09’ INV=335.37’ 15"RCP INV=341.54’ 15"RCP INV=360.74’ 15"RCP INV=357.83’ 3 0" R C P INV=352.18’ FES 18"RCP INV=337.22’ INV=333.16’ INV=364.03’ FES 15"CMP PO ST W ITN E SS T T T 2 S BK APTS 1 S F D 1 S BK D 1 S BK D 2 S F APTS 1 S F D 2 S F D 2 S F D 2 S F D 2 S F D INV=359.93’ INV=350.20’ FES 8 "P V C 80-02 INV=370.75’ TOC=377.00’ CB-1 CB-1 90-02 91-06 91-04 91-03 CB-2 CB-8 INV=362.44’ TOC=369.29’ CB-2 UNKNOWN # LP LP LP 91-01 EXISTING STORMDRAIN INFORMATION G R A V E L W O O D CONCRETE ASPHALT ASPHALT ASPHALT CHAIN ROPE WOOD WOOD CT W O O D W O O D WOOD/VINYL C ON C R E T E GUY POLE GUY POLE 50.17’ S5256’33"E N 33 28’4"W8.00’ N/F GEORGE R. WOOTEN JR. N/F MACKIE FAMILY, LLC N/F MACKIE FAMILY, LLC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N / F M E O L D Y H A R R I S N/F MEOLDY HARRIS N/F MARLOWE & MOYE, LLC N/F ANDY. D. GILLELAND N/F CHRISTOPHER J. & LISA R. SIEMERS N/F STAFFORDSHIRE HOA, INC. N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N / F S T A F F O R D S H IR E H O A , IN C . N/F CARSON E. & CONNIE ANN CHAVIS N/F JORDAN M. & WENDY STEARNS SEBTS CEMETARY STADIUM DRIVE TOWN HOMES N/F NORTH FOREST APARTMENT, LLC STAFFORDSHIRE 340 340 3 4 0 345 3 4 5 345 345 3 5 0 350 3 5 0 3 5 5 355 355 355 3 5 5 360 360 3 6 0 360 360 360 360 365 365 3 6 5 365 365 365 365 3 6 5 370 3 7 0 370 370 370 370 370 370370370 370 370 3 7 0 375 375 375 375 3 7 5 3 7 5 375 375375 375 3 7 5 375 375 375 3 8 0 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 7 .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 ( Not to Scale) SPECIAL LATERAL ’V’ DITCH D d 2: 1 Max. d=1 Ft. Min. D=1 Ft. Type of Liner= PSRM Ground Natural 2:1 Slope Fill FROM STA. 30+00 TO STA. 32+00 RT DETAIL 1 FROM STA. 32+00 TO STA. 34+00 RT ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2: 1 D Min. D=1 Ft. DETAIL 2 Ground Natural Slope Fill2:1 TPF TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF STADIUM DR (SR 1930) -L- STADIUM DR (SR 1930)-L- OLD STADIUM DR -Y1- G LEN C O E D R - Y2 - STAGING AREA STOCKPILE/ STAGING AREA STOCKPILE/ 2 ft. weir height Silt Check Type A Temporary Rock CONCRETE TRUCK CLEANOUT TEMPORARY CONSTRUCTION ACCESS/ SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY FENCE (TYP) INSTALL TREE PROTECTION CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP FINAL DITCH (TYP) INSTALL WATTLES IN FINAL DITCH (TYP)IN INSTALL CHECK DAMS STA 30+00 TO 32+00 RT TO STABILIZE AFTER DITCH GRADING INSTALL PSRM IMMEDIATELY STA 32+00 TO 34+00 STRAW WITH NET INSTALL TEMPORARY LINER: N A D 83/N A 2011 EC-7 SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME TIMEFRAME EXCEPTIONS NPDES GENERAL STORMWATER PERMIT PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES SLOPES STEEPER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS 14 DAYS 7 DAYS 7 DAYS 7 DAYS IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. NONE NONE NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY CONSTRUCTION PHASE EROSION CONTROL SHEET ) 8 - C E T E E H S E E S ( 5 2 + 4 3 A T S - L - E N I L H C T A M THE CLEARING AND GRUBBING PHASE. PHASE OF THE PROJECT. SEE SHEET EC-1 FOR THIS SHEET REPRESENTS THE CONSTRUCTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 2 5 + 0 0 3 0 + 0 0 F F F F F F F C C F F F C C C C F F F F F F F F F C C F F F F F 3 4 0 340345 345 350355 360 3 6 5 370 370370 3 7 5 v v S 18 "RC P 15"RCP 15"RCP 15"RCP18"RCP INV=299.01’ FES 24"RCP 18"R C P 8PT 8PT 8PT 16PT 16PT 16LI 6PT 24 2412 10 10 10 10 10 10 14PT 14PT 14PT 14PT 14PT 16MG 16MG 11JV11JV 11JV 11JV 11JV 11JV 8PT 16PT 14 14PT 10 10 16PT 8PT 10PT 8PT 16PT 8PT 8PT 12PT 12PT 14PT 12PT 12PT 6PT 16PT 12PT 10PT 8PT 12PT 10PT 8PT 8PT 8PT 8PT 10PT 10PT 10PT 10PT 12PT 6PT 6PT 6PT 10PT6PT 6PT 10PT10PT 26PT 12 12 16LI 16LI 16LI 16LI 8 6 6 6 10 10 30QA 20QA 14LI 10 14 10 14 10 24PT 24 16LI16LI 8"D IP 8"DIP OUT=308.38’ IN=308.43’ RIM=316.53’ SSMH 8"DIP 4 " P V C 8"DIP 1 5 " R C P 24"RCP 18 "R C P 15 "R C P 12 "R C P 15"RCP 15"RCP INV=335.09’INV=333.38’ 8 "D IP T T T T 2 S BR APTS 2 S BR APTS 1 S F D2 S BK APTS 1 S F D 1 S F D 2 S F D 2 S F D 2 S F APTS 2 S F APTS 2 S F APTS 1 S F D STADIUM DRIVE W H IS T IN G S W A N D R IV E 8 "P V C T 91-02 01-04 01-03 02-07 02-05 02-03 02-02 13-11 OUT=333.37’ IN=333.47’ TOC=337.32’ CB 3 OUT=331.73’ IN=332.03’ TOC=336.83’ CB-6 OUT=340.58’ RIM=344.48’ CB-8 CB-3 CB-5 CB-6CB-7 OUT=326.85’ IN=328.50’ TOC=333.20’ CB-5 OUT=332.46’ TOC=336.96’ CB-7 OUT=332.81’ IN=332.96’ RIM=335.86’ DI-4 DI-4 OUT=302.98’ IN(NW)=303.73’ IN(SW)=304.93’ TOC=309.53’ CB-11 OUT=312.76’ RIM=320.56’ CB-12 OUT=310.58’ IN=311.18’ TOC=317.88’ CB-9 CB-9 CB-12 CB-11 OUT=286.54’ IN=286.80’ TOC=292.55’ CB-14 CB-13 CB-16 CB-15 CB-14 OUT=294.07’ IN(NW)=295.47’ IN(SE)=294.12’ TOC=301.22’ CB-13 INV=288.82’ TOC=292.47’ CB-15 INV=NOT ACCESSABLE TOC=301.20’ CB-16 CB-10 OUT=318.93’ IN=320.88’ RIM=328.58’ CB-10 OUT=291.55’ IN=291.65’ RIM=302.65’ JB-20 LP 02-03 13-10 EXISTING STORMDRAIN INFORMATION OUT=330.50’ IN=330.61’ TOP=332.67’ WOOD/VINYL VINYL FENCE C H A IN L I N K F E N C E C O N C R E T E W O O D 1 5 "R C P 24"R C P 15 "R C P24"RCP U/G JB 18"RCP DI DI CB 15 "R C P 10" C MP 15 "R C P APPROX 148’ OF 15" RCP TOP OF PIPE EXPOSED 15 6 . 2 0 ’ N 3 5 3 8 ’ 14 " E 123.53’ N5246’34"W 3 5 . 8 8 ’ N 3 7 13 ’ 2 5 " E 3 5 . 8 8 ’ N 3 7 13 ’ 2 5 " E 19 3 . 3 7 ’ N 2 9 2 8 ’ 14 " E 96.79’ S5246’35"E 99.84’ S5247’56"E 99.89’ S5246’24"E 2 0 3 . 8 4 ’ S 2 1 6 ’ 3 2 " W 2 0 3 . 9 1’ N 2 1 4 ’ 5 8 " E 86.29’ S5234’57"E 49.41’ S5157’0"E 49.76’ S5124’1"E 49.00’ S5026’29"E 49.17’ S4848’46"E 48.54’ S4727’54"E 49.27’ S4543’9"E 48 .89’ S4353’51"E 49 .08 ’ S42 27 ’21"E 49 .0 6 ’ S413 ’5 "E 7 3 .5 3 ’ S 3 9 5 0 ’2 9 "E 2 6 4 .4 1’ N 5 0 16 ’2 9 "E 2 5 9 . 13 ’ S 4 3 2 5 ’5 6 "W 19 8 .8 1 ’ N 3 9 3 0 ’2 "W 55 .46 ’ N42 42 ’10"W 50 .58 ’ N4334’1"W 50.93’ N4519’51"W 50.83’ N46 57’9"W 101.09’ N4845’39"W 99.20’ N5144’34"W 2 2 3. 2 5 ’ S 1 6 3 4 ’ 3 " W 112.26’ N5240’50"W S4325’56"W 10.11’11.53’ S 1 9 3 ’ 2 5 " W 3 3 1. 0 3 ’ ( T O T A L ) 15 7 . 11’ S 3 5 4 2 ’ 18 " W N5220’55"W 104.69’ 6.16’ 6.09’ S 3 8 5 2 ’5 9 "E 14 3 . 8 6 ’ N 5 0 16 ’3 4 "E 2 3 0 .11’ 2 2 5 .7 3 ’ 3.99’ 6 2 . 6 1’ N 3 8 5 ’18 "W C26 C27 C28 S5349’24"E 95.57’ 67.03’ S5244’10"E EXIST R/W EXIST R/W E X IS T R /W E X IS T R /W N/F NORTH FOREST APARTMENT, LLC N/F NORTH FOREST APARTMENT, LLC N/F GEORGE J. AUSTIN N/F DAVID & ELLEN I. YOUNG N/F ERIC & KERI RUSH N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F CITADEL PINE FOREST MEMORIAL GARDENS, LLC N/F DWAYNE D. ROSS N/F JAMES M. & CHRISTINA R. LYERLY JR. N/F WILLIAM M. & JILL G. MABE N/F NICOLE M. CEBULA N/F GEORGE J. AUSTIN M E O L D Y H A R R IS N / F P H Y L L IS K A Y P L E A S A N T SN / F M E O L D Y H A R R IS SWANS COVE NORTH FOREST APARTMENTS PINE FOREST MEMORIAL GARDENS 2 9 5 295 2 9 5 295 2 9 5 3 0 0 3 0 0 300 3 0 0 3 0 5 3 0 5 310 3 10 315 3 15 315 3 2 0 3 2 0 320 3 2 0 3 2 0 3 2 5 325 3 2 5 325 3 2 5 330 330 3 3 0 3 3 0 335 335 335 340 3 4 0 340 340 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 8 .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 FROM STA. 43+65 TO STA. 44+50 RT ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2: 1 D Min. D=1 Ft. DETAIL 2 Ground Natural Slope Fill2:1 TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF - Y 3 - R D N A W S G N I L T S I H W STADIUM DR (SR 1930) -L- T P F U N D E R D IS T R IB U T IO N L IN E S . C O N T R A C T O R T O U S E C A U T IO N F E N C E A S S H OW N O N P LA N S . IN S T A L L T R E E P R O T E C T IO N SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY FENCE (TYP) INSTALL TREE PROTECTION CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP 2.0 ft. weir height Silt Check Type A Temporary Rock STA 43+65 TO STA 44+50 RT STRAW WITH NET INSTALL TEMPORARY LINER: 2 9 5 300 3 0 5 310 3 15 3 2 0 3 2 5 325 330 330 335 335 N A D 83/N A 2011 DO NOT CUT TREE TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN C F LEGEND TPFTREE PROTECTION CHECK, TYPE B TEMPORARY ROCK SILT TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE WATTLE EC-8 ) 7 - C E T E E H S E E S ( 5 2 + 4 3 A T S - L - E N I L H C T A M ) 9 - C E T E E H S E E S( 0 5 + 5 4 A T S -L - E NIL HC TAM CONSTRUCTION PHASE EROSION CONTROL PLAN SHEET "SILT SOCK"/ FILTER SACK INLET PROTECTION THE CLEARING AND GRUBBING PHASE. PHASE OF THE PROJECT. SEE SHEET EC-2 FOR THIS SHEET REPRESENTS THE CONSTRUCTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 3 5 + 0 0 4 0 + 0 0 4 5 + 0 0 F F F F F F F F F F F F F F F F F F F C F F F F F F C C C CC CCCF F C v RIP RAP RIP RAP INV=286.40’ FES 8"DIP 18"RCP INV=270.28’ 18"RCP36"RCP 36"RCP SS 36"RCP 36"RCP 3 6 "R C P INV=272.89’ STADIUM DRIVE MC D O WE L L DR IV E M C D O W E L L D R IV E INV=257.55’ FES INV=270.34’ FES 13-08 13-07 13-02 23-02 24-02 24-03 34-10 CL INV=276.98’ TOC=281.53’ CB-17 CB-17 OUT=270.29’ IN=270.38’ TOC=376.50’ CB-23 CB-23 OUT=258.42’ IN=(NW)=266.22’ IN(SE)=268.57’ TOC=272.22’ CB-24 OUT=268.58’ IN=268.68’ TOC=272.13’ CB-25 OUT=268.61’ TOC=272.14’ CB-26 CB-26CB-25CB-24DI-18 OUT=275.70’ RIM=280.05’ DI-18 ACCESSABLE INV=NOT RIM=277.55’ DI-19 JB-21 JB-22 OUT=273.61’ IN=273.91’ RIM=279.61’ 21JB- OUT=272.18’ IN=273.08’ RIM=278.43’ 22JB- RIP RAP 13-03 LP UNKNOWN # UNKNOWN # UNKNOWN # EXISTING STORMDRAIN INFORMATION 15"RCP CONCRETE CONCRETE 2@48" RCP 4 2 " R C P v v ROCK STEP POOL EXISTING 18"RCP 18" R C P DI-19 N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC WAKE COUNTY BOARD OF EDUCATION N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F PHYLLIS KAY PLEASANTS N/F KIMBERLY C. & WILLIAM W. VERNAL PASCAL GOLF COURSE FLETCHER VILLAGE N/F ERIC & KERI RUSH 260 260 2 6 0 2 6 0 260 260 2 6 0 2 6 0 260 260265 2 6 5 265 26 5 265 265 265 265 2 6 5 265 265 2 7 0 2 7 0 2 7 0 270 270 2 7 0 270 270 270 270 2 7 0 2 7 0 270 270 275 275 275 275 275 275 275 275 2 7 5 2 7 5 280 280 2 8 0 2 8 0 280 280 2 8 0 2 8 0 280 285 285 285 285 285 2 8 5 2 8 5 2 8 5 290 290 290 2 9 0 290 290 295 2 9 5 295 3 0 0 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 9 .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 TPF TPF TPF TPF TPF TPF T PF T P FTPF TPF TPF TPF TPF TPF STADIUM DR (SR 1930) -L- M c D O W E LL D R - Y 4 - RD LLEWODcM -5Y- STADIUM DR (SR 1930) -L- RI C H L A N D C R E E K RICHLAND CREEK STAGING AREA STOCKPILE/ TPF TPF TPF TPF TPF TPF TPF TPF TPF 3.5 ft. weir height Silt Check Type A Temporary Rock UNDER DISTRIBUTION LINES. CONTRACTOR TO USE CAUTION FENCE AS SHOWN ON PLANS. INSTALL TREE PROTECTION CONCRETE TRUCK CLEANOUT TEMPORARY CONSTRUCTION ACCESS/ FLOW ALONG SILT FENCE (TYP) SILT FENCE AS NEEDED TO DIFFUSE INSTALL J-HOOK AND REINFORCED PIPE INLET PROTECTION RETAIN AND MAINTAIN EXISTING FLOW ALONG SILT FENCE (TYP) SILT FENCE AS NEEDED TO DIFFUSE INSTALL J-HOOK AND REINFORCED FENCE (TYP) INSTALL TREE PROTECTION SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP THE PROPOSED BASIN THE STORM SYSTEM TO TO DIRECT ALL RUNOFF IN GRADING IS COMPLETED PLUG 18" RCP UNTIL FINAL INSTALL 18" FLEXIBLE PIPE BIORENTENTION AREA BASIN AND REPLACE WITH - AFTER SITE IS STABILIZED REMOVE - CONSTRUCT BEFORE C&G PHASE BASIN SEQUENCE: 1.0 ft. weir height Silt Check Type A Temporary Rock PIPE AND INSTALL 12" RCP STABILIZED REMOVE 18" FLEXIBLE AREA IS CONSTRUCTED AND GRADING AND AFTER BIORETENTION UPON COMPLETION OF FINAL POSITIVE DRAINAGE TO BASIN CLEAN OUT PIPE OUTLET TO ENSURE STA. 53+18 TO STA 53+40 LT ON SLOPE AS WORK ALLOWS. PLACE MATTING FOR EROSION CONTROL ID 6.1 8 ft. weir Orifice Diameter with 1.75 inch 2.0 inch Skimmer 102’ x 35’ x 3’ ID 6.2 8 ft. weir Orifice Diameter with 2 inch 2 inch Skimmer 82’ x 60’ x 3’ LIMITS OF DISTURBANCE, TYP THE END OF EACH WORK DAY. GROUND COVER SHALL BE PROVIDED AT A MINIMUM OF 3 CONSECUTIVE DAYS. DRY WEATHER IS FORECASTED FOR THIS AREA SHALL BE PERFORMED WHEN CONSTRUCTION IN THIS AREA. WORK IN TO NOTIFY TOWN ENGINEER PRIOR STABILIZE. PER DETAIL 3. INSTALL PSRM TO BASIN AND RESTORE BANKS OF SWALE - AFTER SITE IS STABILIZED REMOVE - CONSTRUCT BEFORE C&G PHASE BASIN SEQUENCE: THE END OF EACH WORK DAY. GROUND COVER SHALL BE PROVIDED AT A MINIMUM OF 3 CONSECUTIVE DAYS. DRY WEATHER IS FORECASTED FOR THIS AREA SHALL BE PERFORMED WHEN CONSTRUCTION IN THIS AREA. WORK IN NOTIFY TOWN ENGINEER PRIOR TO EACH WORK DAY. SHALL BE PROVIDED AT THE END OF CONSECUTIVE DAYS. GROUND COVER FORECASTED FOR A MINIMUM OF 3 BE PERFORMED WHEN DRY WEATHER IS IS COMPLETE. WORK IN THIS AREA SHALL STABILIZED UNTIL PIPE INSTALLATION ARE INSTALLED TO KEEP CHANNEL SHALL BE REMOVED AS PIPE SEGMENTS EXISTING RIP RAP IN CHANNEL CLEARED ACCESS ROAD ALONG EXISTING ENTRANCE INSTALL CONSTRUCTION 270 270275 275 275 2 8 0 2 8 0 285 2 8 5 290 2 9 0 295 N A D 83/ N A 2011 EC-9 ) 8 - C E T E E H S E E S ( 0 5 + 5 4 A T S - L - E N I L H C T A M 5 5 + 0 0 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE THE CLEARING AND GRUBBING PHASE. PHASE OF THE PROJECT. SEE SHEET EC-3 FOR THIS SHEET REPRESENTS THE CONSTRUCTION CONSTRUCTION PHASE EROSION CONTROL PLAN SHEET )01 -C E T E E H S E E S( 0 5 + 6 5 A T S -L - E N IL H C T A M "SILT SOCK"/ FILTER SACK INLET PROTECTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 5 0 + 0 0 3:13: 1 D ( Not to Scale) STANDARD BASE DITCH B d STA. 49+07 RT DETAIL 3 B= 3 Ft. Max. d= 1 Ft. Min. D= 1.5 Ft. *When B is < 6.0’ Type of Liner= PSRM Ground Natural Ground Natural F F F F F F F F F F F F F FFFF C C C C F F F F F F C C F F F F F F v v RIP RAP RIP RAP 15 "R C P 26 28PT 30PT 24QA 18QA 18QA 16QA 24QA 48QA 42QA 8 6 48QA 16LI 16LI 16LI 16LI 16LI 16LI9 16LI 16LI 16LI 16LI 9 8 INV=291.50’ 18"RCP INV=292.77’ 1 S BK D1 S BK D1 S BK D1 S BK D 1 S BK D STADIUM DRIVE 34-02 35-03 35-02 36-05 36-04 OUT=319.72’ TOC=322.87’ CB-27 CB-27 CB-28 OUT=337.25’ TOC=342.02’ CB-29 CB-29 36-03 LP 46-07 INV=318.84’FES EXISTING STORMDRAIN INFORMATION 15"RCP OUT=336.63’ IN=337.18’ TOC=341.92’ CB 15" R CP CONCRETE CONCRETE BY TOW TV CAMERA LINE WAS DETECTED UNDERGROUND JB? 18 " R C P OUT=327.20’ IN=327.57’ RIM=333.30’ CONCRETE CB-28 COVERING STR DUE TO SIDEWALK NOT ACCESSABLE INVERTS ARE FLOWLINE ELV.=318.57 CURB CUT CONCRETE CONCRETE 15"RCP CONCRETE CONCRETE 8" 12"DIP 12"DIP 12" 8 " CONCRETE ABOUT 22’ UP THE PIPE. THROUGH THE STORM PIPE THERE IS A UTILITY LINE BORED 133.49’ N6618’10"W 294.85’ N6749’17"W 555.82’ N6749’17"W 63.90’ S664’42"E 93.92’ S6748’8"E 45.69’ S685’37"E S2154’23"W 3.84’N2211’54"E 2.81’ S2355’18"W 2.53’ N680’12"W 25.98’ S6748’8"E 221.41’409.93’ S685’37"E 154.31’ S6128’10"E 13.78’ C33 C34 C37 EXIST R/W EXIST R/W EXIST R/W EXIST R/W N/F WAKE COUNTY BOARD OF EDUCATION N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC WAKE FOREST HIGH SCHOOL RICE CIRCLE DUPLEX APARTMENTS 270 270 270 270 275 275 275 2 7 5 280 280 280 2 8 5 285 285 285 2 9 0 290 290 290 295 295 295 2 9 5 2 9 5 2 9 5 300300 300 300 305 305 305 305 310 3 1 0 310 310 315 315 315 315 315 315 315 315 320 320 320 320 320 325 325 325 325 3 3 0 330 330 330 335 3 3 5 340 340 3 4 0 345 3 4 5 345 3 5 0 350 350 355 360 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 10 .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 O O TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF T P F TPF TPF T P F TPF TPF TPF T P F TPF TPF TPF TPF TPF TPF TPF T P F TPF TPF TPF TPF TPF TPF TPF TPF TPF STADIUM DR (SR 1930) -L-RD NOSDUJ -6Y- RIP RAP CHANNEL RETAIN EXISTING SILT FENCE (TYP) INSTALL TEMPORARY FENCE (TYP) INSTALL TREE PROTECTION FENCE (TYP) INSTALL TREE PROTECTION FLOW ALONG SILT FENCE (TYP) SILT FENCE AS NEEDED TO DIFFUSE INSTALL J-HOOK AND REINFORCED CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT TPF TPF LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF TPF 2 9 5 295 3 0 0 300 305 305 3 10 3 15 320 325 3 3 0 3 3 5 3 4 0 345 350 13 N A D 8 3/ N A 2 0 1 1 PARKING LOT / STADIUM DRIVE -L- RELATIONSHIP ) 9 - C E T E E H S E E S ( 0 5 + 6 5 A T S - L - E N I L H C T A M CONSTRUCTION PHASE EROSION CONTROL PLAN SHEET EC-10 )11 - C E T E E H S E E S( 0 5 + 7 6 A T S -L - E NIL H C T AM THE CLEARING AND GRUBBING PHASE. PHASE OF THE PROJECT. SEE SHEET EC-4 FOR THIS SHEET REPRESENTS THE CONSTRUCTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 6 0 + 0 0 6 5 + 0 0 F F F F F F F C C C C F C C C C C C F F WM S GRAVEL R I P R A P 15" R CP 15" R CP S 18" RC P 12’RCP 8 8 6 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 42QA 6 6 6 6 6 6 24PT 42QA 16LI 16LI 16LI 16LI 16LI 16LI 8 8 8 6 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 16LI 8 10 14QA ST ST ST ST S8"CLAY 8 " C L A Y 6 "C L A Y 6"C LA Y 6"CLAY 24"RCP 2 4 "R C P S S 18 "R C P 24"CPP CULVERT2.33’ X 2.50’ BRICK 18"CMP 18 "R C P 12"RCP 2 4 "R C P 15 "R C P 12"RCP 18 "C P P OUT=392.99’ IN=393.03’ RIM=394.72’ SSMH 121414 16 10 10 8 10 8 8 21JV 18JV 18MG 33 14JV 8"CLAY 24"CPP 2 4 "C L A Y INV=380.36’ T T 1 S BR STONE WALL S T O N E W A L L S T O N E W A L L STEPS 2 S BR SCHOOL 3 S BR SCHOOL 1 S BR D 1 S BR D R O C K S P R IN G R O A D N W IN G A T E S T R E E T STADIUM DRIVE STEAM 16LI 37-05 47-08 46-05 46-06 48-11 48-09 48-02 48-07 37-06 48-03 48-05 48-13 48-14 CB-30 CB-31 CB-32 INV=351.02’ TOC=355.37’ CB-30 OUT=354.30’ IN=354.36’ TOC=356.98’ CB-31 OUT=354.38’ TOC=358.48’ CB-32 OUT=381.85’ IN=382.00’ TOC=386.10’ CB-34 CB-34 OUT=384.06’ IN=384.14’ TOC=389.46’ CB-35 CB-35 OUT=386.95’ RIM=390.70’ CB-36 CB-36 CB-47 CB-46 OUT=353.28’ IN=353.38’ RIM=355.63’ JB-33 OUT=366.08’ RIM=370.52’ YDI-37 YDI-37 OUT=365.62’ IN=365.67’ RIM=369.94’ YDI-38 YDI-38 OUT=365.20’ IN(SE)=365.45’ IN(E)=365.50’ IN(NE)=365.46’ RIM=369.35’ YDI-39 YDI-39 OUT=366.19’ IN(24")=366.35’ IN(18")=366.44’ RIM=369.81’ YDI-40 OUT=367.38’ IN=367.39’ RIM=370.64’ YDI-41 YDI-40 YDI-41 OUT=367.72’ IN=367.79’ RIM=370.19’ YDI-42 YDI-42 INV=373.37’ RIM=383.39’ YDI-43 YDI-43 JB-44 OUT=376.42’ IN=377.27’ RIM=383.27’ JB-45 JB-45 OUT=377.86’ IN(W)=378.07’ IN(E)=378.57’ IN(NE)=378.07’ RIM=382.59’ JB-44 JB-33 36-02 UNKNOWN # LP LP LP 57-02 LP LP LP LP EXISTING STORMDRAIN INFORMATION 15 "R C P 42"RCP OUT=357.86’ IN=357.91’ RIM=362.16’ DI 30"RCP 30"RCP OUT=362.49’ IN=363.94’ TOP=366.54’ CONC. BOX OUT(30)= IN(18)= IN(42)= TOP=366.40’ CONC. BOX CONCRETE OUT=362.76’ IN=362.96’ TOC=373.31’ CB 2 4 " R C P 18 "R C P OUT=367.82’’ TOC=371.82’ CB OUT=366.75’ IN=367.55’ TOC=371.55’ CB 18"RCP OUT=364.20’ IN=364.35’ TOC=369.00’ CB U/G JB POSSIBLE BRICK B RI C K C O N C R E T E CONCRETE CONCRETE CONCRETE BRICK BRIC K 6 "C L A Y 6"PVC INV=390.65’ BRICK 18’CMP BRICK INV=378.59’ TOC=382.79’ CB-46 INV=378.67’ TOC=382.87’ CB-47 47-10 6" 12"DIP 8 2 " 8" BRICK 8" 12" 15"RCP RETROFITED TO A CDI USED TO BE A DI, NOW 18 " C M P BECAUSE PIPE IS PLUGED OFF. CAN NOT GET TV ACCESS THIS PIPE APPEARS TO BE CAPPED ABOUT 22’ UP THE PIPE. THROUGH THE STORM PIPE THERE IS A UTILITY LINE BORED Underground Power Approx. Location of 8" (ABANDONED) 2 7 . 8 6 ’ S 2 6 4 8 ’ 2 3 " W 6 5 0 . 17 ’ S 2 6 4 8 ’ 2 3 " W 6 7 8 . 4 5 ’ N 2 6 4 8 ’ 2 3 " E 4 10 . 8 6 ’ N 2 8 17 ’ 3 7 " E 4 0 9 . 5 6 ’ N 2 8 17 ’ 3 7 "E 14 7 . 5 0 ’ S 2 5 1’ 5 " W 14 7 . 4 0 ’ N 2 7 11’ 5 " E 81.40’ N6248’55"W 3 9 7 . 4 0 ’ S 2 8 3 9 ’ 14 " W 277.49’ S8012’41"E 71.34’ S7828’49"E N6248’49"W N6248’49"W 20.56’ N8017’27"W 277.53’ N6248’49"W 199.78’75.82’80.20’ S595’25"E 108.15’ S 2 7 4 2 ’ 4 3 " W 3 8 2 . 0 8 ’ S638’31"E 6.11’ 356.56’ (TOTAL) N 2 7 4 2 ’ 4 3 " E 4 14 . 4 5 ’ ( T O T A L ) 5 0 . 2 7 ’ 136.70’ (NO DEED FOUND) GIS RECORDS THIS LINE PER C35 C36 C38 C39 C40 C 4 1 C42 29.30’ N5831’28"W EXIST R/W EXIST R/W E X IS T R / W E X IS T R / W EXIST R/W EXIST R/W EXIST R/W E X IS T R / W E X IS T R / W E X IS T R / W E X IS T R / W E X IS T R / W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC H IS T O R IC D IS T R IC T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT 350 3 5 5 3 5 5 355 360 3 6 0 360 360 365 365 365 365 365 365 3 6 5 365 3 6 5 3 6 5 3 7 0 3 7 0 370 370 370 3 7 0 3 7 0 370 370 370 37 0 370 3 7 5 3 7 5 375 375 375 3 7 5 3 7 5 375 3 7 5 375 380 3 8 0 3 8 0 380 380 3 8 0 3 8 0 380 3 8 0 3 8 0 3 8 5 3 8 5 385 3 8 5 385 385 3 8 5 3 8 5 385 3 8 5 390 390 3 9 0 390 3 9 0 3 9 0 3 9 0 3 9 0 390 395 395 395 395 3 9 5 395 3 9 5 4 0 0 4 0 0 400 400 400 400 400 4 0 5 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 11.d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 FROM STA. 69+25 TO STA. 71+00 RT ( Not to Scale) SPECIAL LATERAL ’V’ DITCH 2: 1 D Min. D=1 Ft. DETAIL 2 Ground Natural Slope Fill2:1 O T PF T P F TPF TPF TPF TPF TPF TPF R O C K S P R I N G R D - Y 7 - STADIUM DR (SR 1930)-L- N W IN G A T E S T ( S R 1 9 5 4 ) - Y 8 - NORTH AVE -L- N W IN G A T E S T - Y 8 - N C O LLE G E S T FENCE (TYP) INSTALL TREE PROTECTION FENCE (TYP) INSTALL TREE PROTECTION SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY SILT FENCE (TYP) INSTALL TEMPORARY CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT CONTROL FENCE (TYP) INSTALL SPECIAL SEDIMENT LIMITS OF DISTURBANCE, TYP LIMITS OF DISTURBANCE, TYP TPF TPF TPF TPF TPF TPF FINAL DITCH (TYP)IN INSTALL CHECK DAMS STA 69+25 TO 71+00 RT STRAW WITH NET INSTALL TEMPORARY LINER: 355 360 3 6 5 370 3 7 0 375 3 7 5 3 7 5 380 3 8 0 3 8 0 3 8 5 385 3 9 0 390 3 9 0 390 390 390 390 390 395 14 N A D 8 3/ N A 2 0 1 1 EC-11 ) 01 - C E T E E H S E E S ( 0 5 + 7 6 A T S - L - E N I L H C T A M ) 21 - C E T E E H S E E S ( 0 5 + 8 7 A T S - L - E N I L H C T A M CONSTRUCTION PHASE EROSION CONTROL PLAN SHEET THE CLEARING AND GRUBBING PHASE. PHASE OF THE PROJECT. SEE SHEET EC-5 FOR THIS SHEET REPRESENTS THE CONSTRUCTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. 7 0 + 0 0 CC C C C F F F F F F F F F F F F F F F F F C C 18TREE GV 15 "R C P 12 50QA 1 S F D N C O L L E G E S T R E E T 15 " R C P INV=392.72’ TOC=396.12’ CB-48 OUT=390.69’ IN=390.70’ TOC=395.99’ CB-49 CB-48 CB-49 LP UNKNOWN #UNKNOWN # EXISTING STORMDRAIN INFORMATION 13 141416 53QA T T BRICK CONCRETE 4AR 4AR 20 T 10IO 10IO 4AR I R O N F E N C E STONESTONE WALL (TYP) IRON FENCE BRICK WALL CONCRETE CONCRETE ASPHALT MAGNOLIALARGE DRIPLINETREET CONCRETE 8" 8" T 3 9 7 . 4 0 ’ S 2 8 3 9 ’ 14 " W E X IS T R / W N/F SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY, INC SOUTHEASTERN BAPTIST THEOLOGICAL SEMINARY H IS T O R IC D IS T R IC T H I S T O R I C D I S T R I C T HISTORIC DISTRICT WAKE FOREST DOWNTOWN HISTORIC DISTRICT WAKE FOREST DOWNTOWN 395 395 395 395 4 0 0 400 400 4 0 0 405 405405405405 405 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ 12 .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION 0 Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is 4020 CHECK, TYPE B TEMPORARY ROCK SILT TPF TRAP, TYPE C ROCK INLET SEDIMENT CHECK, TYPE A TEMPORARY ROCK SILT (LABELED ON PLANS) LIMITS OF DISTURBANCE LEGEND C F TEMPORARY SILT FENCE FENCE SPECIAL SEDIMENT CONTROL CONSTRUCTION ENTRANCE TEMPORARY GRAVEL CONSTRUCTION LIMIT WITH BAFFLES SKIMMER BASIN TREE PROTECTION DO NOT CUT TREE WATTLE "SILT SOCK"/FILTER SACK INLET PROTECTION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 NORTH AVE -L- N C O LLE G E S T ( U S 1 A ) N O R T H M A IN S T TPF 4 0 0 N A D 8 3/ N A 2 0 1 1 EC-12 CONSTRUCTION PHASE EROSION CONTROL PLAN SHEET )11 - C E T E E H S E E S ( 0 5 + 8 7 A T S - L - E N I L H C T A M THE CLEARING AND GRUBBING PHASE. PHASE OF THE PROJECT. SEE SHEET EC-6 FOR THIS SHEET REPRESENTS THE CONSTRUCTION CROSS SECTIONS AND MATTING SUMMARY SHEET. NPDES GENERAL STORMWATER PERMIT. REFER TO ON ALL SLOPES WITHIN 7 DAYS OR AS REQUIRED BY CONTRACTOR SHALL PROVIDE SOIL STABILIZATION NOTE: SLOPES ON THIS PROJECT ARE PRIMARILY 2:1. T = 52.46’ R = 2,000.00’ PI Sta 83+13.70 D L = 104.89’ T = 52.46’ PI Sta 82+08.81 D L = 104.89’ R = 2,000.00’ 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 Shoulders, Side Ditches, Slopes (3:1) Date Type Planting Rate Jun. 15-Aug. 15 (Nov. 1-Mar. 1) combinations are possible. those which do well under local conditions: other seeding rate vegetation of denuded areas. The above vegetation rates are for additional information concerning other alternatives for Consult Conservation Engineer or Soil Conservation Service or Add Weeping Lovegrass or Add Hulled Common Bermudagrass Tall Fescue *** & Browntop Millet *** or Sorghum-Sudan Hybrids *** (unhulled-unscarified) & Tall Fescue Add Abruzzi Rye Sericea Lespedeza may be shaded out. grow over 12 inches in height before mowing, otherwise, fescue desired permanent vegetation. Do not allow temporary cover to *** Temporary - Reseed according to optimum season for SEEDING SCHEDULE Date Type Aug. 15-Nov. 1 Nov. 1-Mar. 1 Mar. 1-Apr. 15 Mar. 1-Jun. 1 (Mar. 1-Jun. 30) (Mar. 1-Apr. 15) (Mar. 1-Jun. 30) Jun. 1-Sep. 1 Sep. 1-Mar. 1 Tall Fescue Tall Fescue Tall Fescue Tall Fescue Slopes (3;1 to 2:1) & Abruzzi Rye Hulled Common Bermudagrass & Browntop Millet *** or Sorghum-Sudan Hybrids *** Sericea Lespedeza (scarified) and Add Tall Fescue 25 lbs./acre 25 lbs./acre 12 lbs./acre 35 lbs./acre 30 lbs./acre 50 lbs./acre 5 lbs./acre 8 lbs./acre 35 lbs./acre 30 lbs./acre 70 lbs./acre Apr. 15-Jun. 15 1) 2) 4) 5) 6) 7) seeded and planted to a depth of six inches. After rough grading is completed, till soil in areas to be disturbed areas to be vegetated. Apply agricultural lime, fertilizer, and superphosphate to Seeding permanent grass. November 15. February 15 through May 15 or August 15 through 3.0 lbs. KY-31 tall fescue/1000 sq. ft. (130 lbs./acre) during -OR- sq. ft. during November 15 through February 15. 3.0 lbs. KY-31 tall fescue and 2.0 lbs. annual ryegrass/1000 of 3 inches. Mulch around shubbery and trees with pine straw to depth Temporary cover -OR- 1.0 lbs. brown top millet/1000 sq. ft. May through August 25. 1.0 lbs. annual ryegrass/1000 sq. ft. August 25 through April. Date surface is uniform and free of large dirt clods. Disk nutrients into soil to a depth of six inches until 1) 2) 3) 4) 5) 6) 7) SEEDING SPECIFICATIONSSEEDING SPECIFICATIONS MAINTENANCE PLAN fine gravel or sand may be needed to protect the filter cloth. Where large stones are used or machine placement is difficult, a 4-inch layer of If extensive damage is suspected, remove and replace the entire sheet. of filter material with a minimum overlap of 12 inches around the damaged area. If damage occurs remove the riprap and repair the sheet by adding another layer next section as required. Take care not to damage the cloth when placing riprap. ground and where necessary, bury the lower end of the cloth or overlap with the the overlap. Bury the upstream end of the cloth a minimum of 12 inches below Overlap the edges by at least 12 inches, and space anchor pins every 3 ft along Synthetic filter fabric - Place the cloth filter directly on the prepared foundation. layers with minimal mixing. specified depth. Where more than one layer of filter material is used, spread the foundation is prepared. For gravel, spread filter stone in a uniform layer to the Sand and gravel filter blanket - Place the filter blanket immediately after the ground inside dimensions and grade of the riprap meet design specifications. sufficiently to allow placement of the riprap in a manner such that the finished will be at the elevation of the surrounding area. Channels should be excavated material. Cut the subgrade sufficiently deep that the finished grade of the riprap depressions with riprap. Remove brush, trees, stumps and other objectional to a density approximating that of the surrounding undisturbed material or overfill lines and grades shown on the plans. Compact any fill required in the subgrade Subgrade Preparation - Prepare the subgrade for riprap and filter to the required CONSTRUCTION SPECIFICATIONS flow. Control of weed and brush growth may be needed in some locations. vigorous condition to protect the area from erosion and scour during out-of-bank immediately. Maintain all vegetation adjacent to the channel in a healthy, look for indications of piping, scour holes, or bank failures. Make repairs where concentrated flow enters. Carefully check stability at road crossings and promptly. Give special attention to the outlet and inlet sections and other points Inspect channels at regular intervals as well as after major rains, and make repairs MAINTENANCE riprap should be apparent. of the riprap should blend with the surrounding area. No overfall or protrusion of stone sizes to produce a relatively smooth, uniform surface. The finished grade stones. Hand placing may be necessary to achieve the proper distribution of The finished slope should be free of pockets of small stone or clusters of large the stones. stone sizes. Take care not to dislodge the underlying base or filter when placing riprap by dumping through chutes or other methods that cause segregation of final placement. Place riprap to its full thickness in one operation. Do not place be obtained by selective loading at the quarry and controlled dumping during a minimum of voids. The desired disbribution of stones throughout the mass may of the filter. Place riprap so that if forms a dense, well-graded mass of stone with Stone Placement - Placement of riprap should follow immediately after placement LAND GRADING (6.02) TOPSOILING (6.04) VEGETATIVE PLAN (NCDENR 6.11) withstand anticipated velocities during the establishment period. Protect the channel with mulch or a temporary liner sufficient to depend upon the severity of the conditions and selection of species. 4. The procedure used to establish grass in the channel will surface water may enter the channel freely. 3. Remove and properly dispose of all excess soil so that preparations and sod buildup. the channel perimeter to allow for bulking during seedbed dimensions shown on the plans plus a 0.2-ft overcut around 2. Excavate the channel and shape it to neat lines and material from the foundation area and dispose of properly. 1. Remove all trees, brush, stumps, and other objectionable CONSTRUCTION SPECIFICATIONS erosion protection for the channel. healthy, vigorous condition at all times, since it is the primary to maintain the designed carrying capacity. Keep the grass in a piping or scour holes. Remove all significant sediment accumulations outlet and all road crossings for bank stability and evidence of make repairs. It is particularly important to check the channel channel; check it after every heavy rainfall event. Immediately every rainfall. After grass is established, periodically check the During the establishment period, check grass-lined channels after MAINTENANCE 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre 250 lbs./acre at a rate of 450 gallons emulsion per acre of straw. of all drainage swales, tack mulch with asphalt emulsion surface equals or exceeds a 3:1 slope, and in the inverts sunlight to seedlings. On areas where the ground of ground surface should be visible to avoid blocking sq. ft. (2 tons/acre). Spread uniformly. Approximately Mulch seeded area with small grain straw at 90 lbs/1000 RIP RAP (6.15)GRASS-LINED CHANNELS (6.30)CONSTRUCTION SEQUENCE EC-13 DETAILS EROSION CONTROL 40 lbs. 50% superphosphate/1000 sq. ft. (1750 lbs/acre) 35 lbs. 10-10-10 fertilizer/1000 sq. ft. (1500 lbs/acre) test 90 lbs. limestone/1000 sq. ft. (2 tons/acre) or based on soils retain sediment. Sediment barriers - Use sediment fences or other barriers where necessary to latest NPDES rules. All stockpile areas used shall be stabilized with silt fence and seeded per the topsoil is stockpiled in small piles located near areas where they will be used. traffic routes. On large sites, respreading is easier and more economical when Select stockpile location to avoid slopes and natural drainageways, avoiding STOCKPILING basins, diversions, and other controls into place before stripping. generally varies along a gradient from hilltop to toe of the slope. Put sediment soil cores at several locations within each area to be stripped. Topsoil depth but depth varies depending on the site. Determine depth of stripping by taking roadbuilding, or compaction by equipment. A 4 to 6-inch stripping depth is common, Strip topsoil only from those areas that will be disturbed by excavation, filling, STRIPPING identified by their extremely light weight when dry. Organic soils such as mucks and peats do not make good topsoil. They can be if it meets the other criteria listed above. desirable; however, material excavated from deeper layers may be worth storing Generally, the upper part of the soil, which is richest in organic matter, is most thickness affect the ease of excavation and spreading of topsoil. Soil factors such as rock fragments, slope, depth to water table, and layer The depth of material meeting the above qualifications should be at least 2 inches. Sodium - sodium adsorption ratio should be less than 12. Soluble salts - should be less than 500 ppm. it is less than 6.0. Acidity - pH should be greater than 3.6 before liming, and liming is required if greater than 1.5% by weight. Organic matter content - (sometimes referred to as "humic matter") should be soils such as peat or muck as topsoil. loam, clay loam, and loamy sand are fair. Do not use heavy clay and organic Texture - loam, sandy loam, and silt loam are best; sandy clay loam, silty clay handling. Quality topsoil has the following characteristics: Determine whether the quality and quantity of available topsoil justifies selective MATERIALS CONSTRUCTION SPECIFICATIONS to avoid excessive mixing of topsoil into the subsoil. After topsoil application, follow procedure for seedbed preparation, taking care between topsoil and subsoil. after spreading topsoil. A disk may be used to promote bonding at the interface On slopes and areas that will not be mowed, the surface may be left rough high-maintenance turf is to be established. germination. Light packing with a roller is recommended where but avoid excessive compaction, as it increases runoff and inhibits seed Compact the topsoil enough to ensure good contact with the underlying soil, water pockets. topsoiling or other operations to prevent the formation of depressions or wet or frozen. Correct any irregularities in the surface that result from Do not spread topsoil while it is frozen or muddy or when subgrade is SPREADING TOPSOIL the soil to a depth of at least 6 inches before spreading topsoil. the topsoil and subsoil. If no amendments have been incorporated, loosen by disking or scarifying to a depth of at least 4 inches, to ensure bonding of Roughening - Immediately prior to spreading the topsoil. loosen the subgrade Incorporate lime to a depth of at least 2 inches by disking. recommended by soil tests or specified for the seeding mixture to be used. soil is composed of heavy clays, incorporate agricultural limestone in amounts Liming of subsoil - Where the pH of the existing subsoil is 6.0 or less, or the approved plan and do not alter them by adding topsoil. Grading - Maintain grades on the areas to be topsoiled according to the such as diversions, berms, dikes, waterways, and sediment basins. Before spreading topsoil, establish erosion and sedimentation control practices SITE PREPARATION growth. must be stabilized with permanent vegetation to control erosion and weed Permanent vegetation - If stockpiles will not be used within 12 months they the latest NPDES rules. Temporary seeding - Protect topsoil stockpiles by temporarily seeding per 6. The Town of Wake Forest contact is Holly Miller, P.E. (919) 435-9443 completion of construction or development. all disturbed areas within 7 to 14 days or sooner following requirements. Permanent ground cover is to be provided for dated August 2011 for more information on ground stabilization of any phase of grading. Refer to the latest NPDES Rules or other areas within 7 to 14 days or sooner of completion 5. The Contractor shall provide ground cover on exposed slopes cover. vegetative plan to maintain a vigorous, dense vegetative mulch all seeded areas according to specifications in the 4. The Contractor shall fertilize, reseed as necessary, and to maintain a barrier. fence. Silt fence will be repaired as necessary fence when it becomes 0.5 feet deep at the 3. The Contractor shall remove sediment from behind silt sediment pools no longer drains properly. filled. Gravel will be cleaned or replaced when the devices when storage capacity has been approximately 50% 2. The Contractor shall remove sediment from erosion control inch of rainfall and once a week. by the Contractor must be made and logged after every half on site. The rain gauge must be kept onsite and inspections general stormwater permit, a rain gauge must be installed National Pollutant Discharge Elimination System (NPDES) Contractor to maintain all practices as designed. Also per week. Any needed repairs will be made immediately by the runoff producing rainfall but in no case less than once every control practices for stability and operation following every 1. The Contractor shall check all erosion and sediment is an essential part of an effective erosion and sedimentation control plan. maintenance of small eroded areas before they become significant gullies washouts or breaks occur, repair them immediately. Prompt remove all sediment from diversion and other water-disposal practices. If sedimentation control practices, especially after heavy rainfalls. Promptly Periodically check all graded areas and the supporting erosion and MAINTENANCE stabilization of these areas in the plan. make sure they are adequately protected from erosion. Include final 12. Show topsoil stockpiles, borrow areas, and spoil areas on the plans, and Timeframes. completed on each area in the grading plan per NPDES Soil Stabilization 11. Permanently stabilize all graded areas immediately after final grading is with approved methods. 10. Handle seeps or springs encountered during construction in accordance during all phases of development. 9. Keep diversions and other water conveyance measures free of sediment slippage. 8. Do not place fill on a frozen foundation, due to possible subsidence and materials into fill slopes. 7. Do not incorporate frozen material or soft or highly compressible related problems. the layers as required to reduce erosion, slippage, settlement, or other 6. Place all fill in layers not to exceed 9 inches in thickness, and compact building debris, and other materials inappropriate for constructing stable fills. 5. Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, other objectionable material that would affect the planned stability of the fill. 4. Clear and grub areas to be filled to remove trees, vegetation, roots, or placing topsoil. 3. Scarify areas to be topsoiled to a minimum depth of 2 inches before it for use in finishing the grading of all critical areas. 2. Remove good topsoil from areas to be graded and filled, and preserve construction schedule. measures in accordance with the approved sedimentation control plan and 1. Construct and maintain all erosion and sedimentation control practices and CONSTRUCTION SPECIFICATIONS see Sheet EC-18 for seed mix and plantings. NOTE: For Wetland, Buffer, and Reforestation areas, the Mining Act. through the Sedimentation Pollution Control Act as a one-use borrow site or through they shall be considered separate land-disturbing activities and must be permitted either activity and any related borrow or waste activity are not conducted by the same person, or is a landfill regulated by the Division of Waste Management. If the land-disturbing activity unless the borrow or waste activity is regulated under the Mining Act of 1971, activity, the related borrow or waste activity shall constitute part of the land-disturbing If the same person conducts the land-disturbing activity & any related borrow or waste Office at 919-707-9200. If you have questions, please contact the Land Quality Section at a DENR Regional the Land Quality web site, http://portal.ncdenr.org/web/lr/erosion The Combined Self-Monitoring form is available as a PDF and Word document from easier to comply with self-inspection requirements. Permit for Construction Activities, NCG 010000. The combined form should make it Resources is responsible for administering both the SPCA and the NPDES Stormwater NCG 010000. Beginning August 1, 2013, the Division of Energy, Mineral, and Land Pollution Control Act and the NPDES Stormwater Permit for Construction Activities, available. The new form was developed to satisfy the requirements of the Sedimentation Inspection Reports and NPDES Self-Monitoring Reports, a combined form is now To simplify documentation of Self-inspections took effect October 1, 2010. control plan is being followed. Rules detailing the documentation of these phase of the project to make sure that the approved erosion and sedimentation persons responsible for land-disturbing activities inspect a project after each The Sedimentation Pollution Control Act was amended in 2006 to require that Notification of Land Resources Sediment and Erosion Control Self-Inspection Program: maintain management control. construction activities are needed, amend the sequence schedule in advance to and until permanent vegetation on the project is established. When changes in during the demolition or clearing and grubbing phases as well as throughout the life of and sediment control measures must be installed, maintained and adjusted as needed Follow the construction sequence throughout project development. Adequate erosion MAINTENANCE removed. Contractor must receive permission by project inspector before any measures are maintenance and vegetative plan. removed, restored as existing, and permanently vegetated as described in the and material area stockpile areas, and all other erosion control devices shall be 11. AFTER SITE IS STABILIZED, construction entrances, and construction staging 10. Site includes approximately 3.40 acres of permanent vegetation area. 9. Estimated time before final stabilization is 12 months. after rainfall events. Needed repairs will be made immediately. 8. All erosion and sediment control practices will be inspected weekly and devices maintained. shall have temporary vegetative ground cover established and erosion control ceases for more than the above mentioned length of time, all disturbed areas areas and slopes shall be stabilized within 14 days. If work on the project 3:1, and high quality (HQW) zones should be stabilized within 7 days. All other requirements. In summary, perimeter dikes, swales, ditches, slopes steeper than Rules dated August 2011 for more information on ground stabilization or sooner of completion of any phase of grading. Refer to the latest NPDES specifications to maintain a vigorous, dense, vegetative cover within 7 to 14 days 7. All graded areas will be seeded, fertilized and mulched according to NCDOT and mulch. 6. Finish grading of slopes, topsoil critical areas and permanently vegetate, seed 5. Complete final grading for roadway. as necessary, place silt fence around culverts as needed. stabilize 2:1 slopes as indicated. Modify silt fence placement around project and outlets place reinforced silt fence as shown. Place additional erosion control matting and 4. In accordance with the erosion control plans, grade roadway, install crosspipes, and erosion control devices. protection fence, construction entrance, construct basins, and all other 3. Prior to any land disturbing (including demolition) activities, install silt/tree 2. Flag the work limits for protection. and invite NCDEMLR LQS contact number is (919) 707-9200. 1. Hold preconstruction conference at least one week prior to starting construction CONSTRUCTION SPECIFICATIONS 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 DETAILS EROSION CONTROL EC-14 ABOVE TOP OF BOX TO A HEIGHT OF 12"-18" MIN. #57 WASHED STONE PLACED 3’ 2’ 16" 2’ #57 STONE 2 1 METAL POST 2’ CONSTRUCTION SPECIFICATIONS 1. As synthetic fabric, use a previous sheet of nylon, polyester, or ethylene yarn - extra strength (50 lb/1 inch minimum) - that contains ultraviolet ray inhibitors and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pool. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For stakes, use 5-foot steel posts. 4. Space stakes evenly around the perimeter of the inlet a maximum of 4 ft apart, and securely drive them into the ground, approximately 24 inches deep. 5. Place a 2 foot flap of wire mesh under the gravel for anchoring. 6. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stake. 7. The top of the frame and fabric must be well below the ground elevation downslope from the drop inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary dike on the down slope side of the structure to prevent bypass flow. Material from within the sediment pool may be used for diking. MAINTENANCE Inspect the fabric barrier after each rain and make repairs as needed. next rain. Take care not to damage or undercut the fabric during sediment removal. CLOTH " HARDWARE SIDE VIEW FRONT VIEW HARDWARE CLOTH WIRE FENCE STEEL FENCE POST GRADE THE TRENCH AND SILT FENCE FABRIC 6 INCHES INTO BURY WIRE FENCE, HARDWARE CLOTH, :NOTE GRADE 18" FABRIC SILT FENCE WIRE FENCEMAXIMUM 2 FEET APART STEEL FENCE POST SET # 57 WASHED STONE FILTER OF 1 INCH DIAMETER PLAN VIEW # 57 WASHED STONE FILTER OF 1 INCH DIAMETER STEEL FENCE POST ON WIRE FENCE SILT FENCE FABRIC ON WIRE FENCE HARDWARE CLOTH HARDWARE CLOTH HARDWARE CLOTH BY 12 INCHES SILT FENCE FABRIC TO OVERLAP :NOTE FLOW DIRECTION F L O W F L O W F L O W INCHES 12 OVERLAP INCHES 12 OVERLAP 6" LINE WIRES MINIMUM 10 GAUGE SIDE VIEW FRONT VIEW STANDARD TEMPORARY SILT FENCE DIRECTED BY ENGINEER ANCHOR SKIRT AS OVER SKIRT 6" MINIMUM COVER GRADE FILL SLOPE SILT FENCE FABRIC WOVEN WIRE FABRIC STEEL POST 3 2 " M IN . W ID T H AREAS OF CONCENTRATED FLOW. DOES NOT EXCEED 1/4 ACRE AND NEVER IN USE SILT FENCE ONLY WHEN DRAINAGE AREA :NOTE VARIABLE AS DIRECTED BY THE ENGINEER WIRE FROM TOP INSTALLED TO SECOND SILT FENCE FABRIC INTERMEDIATE WIRES GAUGE 2 1MINIMUM 12 GRADE 8’-0" MAXIMUM 3 ’ - 0 " 2 ’ - 0 " 2 6 " * * * USE REINFORCED SILT FENCE OUTLET DETAIL FOR REPAIR OF SILT FENCE FAILURES HARDWARE CLOTH AND GRAVEL INLET PROTECTION DETAIL (6.51) AS A REPAIR OF SILT FENCE FAILURES. ACRE AND THERE IS A LOW AREA. USE DRAINAGE AREA DOES NOT EXCEED 1/4 1.USE SILT FENCE OUTLETS ONLY WHEN :NOTE TON "SEDIMENT CONTROL STONE." FOR AT THE CONTRACT UNIT PRICE PER 2. #57 WASHED STONE SHALL BE PAID SILT FENCE OUTLET SPECIAL SEDIMENT CONTROL FENCE/ NOTE: USE TREE PROTECTION COMBINATION IN WOODS AND STREAM AREAS NOTED ON PLANS (TYP) 5’ STEEL POST FRONT VIEW SIDE VIEW 2 ’- 0 " 3 ’- 0 " 2 6 "FILL SLOPE GRADE WOVEN WIRE FABRIC 40" WARNING SIGN DETAIL DO NOT ENTER TREE PROTECTION AREA3 " 4 " 3 " 4 " 4 " 18" WARNING SIGN VARIABLE AS DIRECTED BY THE ENGINEER 8’ MAX. GRADEWIRE FROM TOP INSTALLED TO SECOND SILT FENCE FABRIC WIRES INTERMEDIATE MIN. 12-1/2 GA. LINE WIRES MIN. 10 GA. TREE PROTECTION AREA DO NOT ENTER NOTES: SILT FENCE GEOTEXTILE FABRIC * CREDIT OF EXISTING TREES (UDO SECTION 7.2.7.E.) (UDO ARTICLE 9.1. TREE CONSERVATION) AND FOR FOR PROTECTION OF TREE CONSERVATION AREAS THIS TREE PROTECTION FENCE DETAIL IS REQUIRED 1.WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 2.LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50’ ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200’ IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. 4. 5. 6. 7. 8. 9. 10. MIN 4" PLANNING CONSIDERATIONS & DESIGN CRITERIA. (HOWEVER FLOW SHALL NOT RUN PARALELL WITH THE TOE OF THE FENCE). SEE N.C. STATE DENR PRACTICE STANDARDS & SPECIFICATIONS SEDIMENT FENCE SET FOR CONDITIONS WHERE PRACTICE APPLIES; MIN 6" WIRE TIES PLASTIC OR DO NOT DISTURB TREE CONSERVATION AREAS LIFE OF FENCING: 6-9 MONTHS MAINTENANCE: CLEAN OUT AT 50% CAPACITY ZONA DE PROTECCION DE ARBOLES NO ENTRE SIGNS TO BE IN ENGLISH AND SPANISH. SIGNS SHALL BE PLACED AT 50’ MAXIMUM INTERVALS. ADDITIONAL SIGNS MAY BE REQUIRED BY THE TOWNE OR NCDEMLR BASED ON ACTUAL FIELD CONDITIONS. SIGNS SHALL BE INCIDENTAL TO THE FENCE. 11. 12. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. 13. CONSERVATION AREA FENCE DETAIL STANDARD TEMPORARY SILT TREE "Sediment Control Stone." 8. #57 washed stone shall be paid for at the contract unit price per ton Remove sediment from the pool area as necessary to provide adequate storage volume for the POSTS 2’-0" IN GROUND STANDARDIZED METAL IN "L" SHAPE AS SHOWN EXTENDS 2 FEET ON GROUND GALVANIZED HARDWARE WIRE ENTRANCE WHERE FEASIBLE AS CONDITIONS ALLOW. CONTRACTOR SHALL USE 100’ MINIMUM CONSTRUCTION 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 DETAILS EROSION CONTROL NATURAL GROUND NATURAL GROUND FLOW 2’(MAX.) CROSS SECTION CROSS SECTION TRAPEZOIDAL DITCH VEE DITCH EDGE OF PAVEMENT ISOMETRIC VIEW PAVEMENT SHLD. SLOPE BACK SLOPEDITCH STAKE 2’ UPSLOPE MATTING STAKE 2’ DOWNSLOPE STAKE 2’ UPSLOPE MATTING STAKE 2’ DOWNSLOPE TOP VIEW 6’(MIN.) 18"(MIN.) EXCELSIOR WATTLE STAKE UPSLOPE STAKE DOWNSLOPE MATTING MATTING See Inset B INSET B STAPLES VAR. 2’(MIN.) 2 IN. See Inset A INSET A STAKES WATTLE DETAIL STANDARD SPECIFICATIONS. INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON FORMED INTO A U SHAPE NOT LESS THAN 18" IN LENGTH. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT CROSS SECTION. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL USE MINIMUM 18 IN. DIAMETER EXCELSIOR WATTLE. NOTES: EC-15 2:1 SLOPE 2: 1 S LOP E at center 24" max Fabric Filter Fabric Filter min 1.5’ A A min 9" Section A-A A B L A and B are of equal elevation L = The distance such that points NOTE: Check dams to be installed as indicated on plan or if grade is steeper per plan detail. CONSTRUCTION SPECIFICATIONS 1. Place stone to the lines and dimensions shown in the plan on a filter fabric foundation. 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts the channel banks. 3. Extend stone at least 1.5 ft beyond the ditch banks to keep overflow water from cutting around the ends of the check dam. 4. Set spacing between dams to assure that the elevation at the top of the lower dam is the same as the toe elevation of the upper dam. 5. Protect the channel downstream from the lowest check dam, considering that water will flow over and around the dam. 6. Make sure that the channel reach above the most upstream dam is stable. 7. Ensure that channel appurtenances, such as culvert entrances below check dams, are not subject to damage or blockage from displaced stones. MAINTENANCE Inspect check dams and channels for damage after each runoff event. Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct all damage immediately. If significant erosion occurs between dams, install a protective riprap liner in that portion of the channel. Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation, allow the channel to drain through the stone check dam, and prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. CONTROL, #57 STONE STONE FOR EROSION 1.5’ 4’ to 6’ 8. #57 washed stone shall be paid for at the contract unit price per ton "Sediment Control Stone." CONTROL, CLASS B STONE FOR EROSION TEMPORARY ROCK SILT CHECK, TYPE B 20 100 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 DETAILS EROSION CONTROL J-HOOK DETAIL TOP WITH WIRE. ADJACENTLY AND BIND AT PLACE POSTS (STAKES) SHEET FLOW SHEET FLOW J-HOOK J-HOOK SILT FENCE J-HOOK PLACEMENT FABRIC CONTINUOUS FENCE (AS NEEDED) 40-80’ SPACING PREVENT ACCUMULATION AND UNDERMINING OF SILT FENCE. TO DIRECT RUN-OFF TO SILT FENCE OUTLETS AND NOTE: USE SILT FENCE J-HOOK PLACEMENT AS NEEDED METAL STAKE EC-16 GUTTER PIPE GEOTEXTILE BAG BLOCK (TYP) RUBBER 2"X2"X3/4" SACK INSTALLED FILTER PROFILE VIEW OF PERMITTIVITY FLOW RATE APPARENT OPENING SIZE UV RESISTANCE TRAPEZOID TEAR MULLEN BURST PUNCTURE GRAB TENSILE ELONGATION GRAB TENSILE STRENGTH PROPERTIES TEST METHOD UNITS PERMITTIVITY FLOW RATE APPARENT OPENING SIZE UV RESISTANCE TRAPEZOID TEAR MULLEN BURST PUNCTURE GRAB TENSILE ELONGATION GRAB TENSILE STRENGTH PROPERTIES TEST METHOD UNITS LOW TO MODERATE FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE MODERATE TO HIGH FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE RESTRAINT EXPANSION ROPE COLORED NYLON 1/4" BRIGHTLY ELEVATION VIEW RESTRAINT NYLON ROPE EXPANSION 1/4" BRIGHTLY COLORED (SEE DETAIL) PROTECTION FILTER SACK INLET non-degradable materials. with ultraviolet stabilizers or a seamless, high-density polyethylene of seamless, high-density polyethylene photodegradable materials treated leaf mulch under this specification. Utilize an outer netting that consists netting material. Do not use straw, straw fiber, straw bales, pine needles or fibers or hardwood mulch or a mix of these materials enclosed by a flexible Composed of compacted geotextiles, curled excelsior wood, natural coconut Produced by a Manufacturer experienced in sediment tube manufacturing. Use inlet tubes that exhibit the following properties: Materials Inlet Tubes ISOMETRIC VIEW (IF NEEDED) OR SILT FENCE SEDIMENT TUBE DEBRIS FROM ENTERING INLETS DURING CONSTRUCTION. NOTE: USE INLET TUBES AS NEEDED TO PREVENT SILT AND (OPTIONAL) OVERFLOW HOLES LOCATION. COLLECTION SEDIMENT SACK AT A TO EMPTY FILTER REBAR FOR A HANDLE 1" REBAR. USE LOOPS SIZED FOR FOR HANDLES. INLET USING REBAR FILTER BAG FROM 1" REBAR. LIFT LOOPS SIZED FOR ASTM D-4491 ASTM D-4491 ASTM D-4751 ASTM D-4355 ASTM D-4533 ASTM D-3786 ASTM D-4833 ASTM D-4632 ASTM D-4632 0.55 SEC -1 40 GAL/MIN/SQ FT 40 US SIEVE 80 % 120 LBS 800 PSI 120 LBS 20 % 300 LBS ASTM D-4491 ASTM D-4491 ASTM D-4751 ASTM D-4355 ASTM D-4533 ASTM D-3786 ASTM D-4833 ASTM D-4632 ASTM D-4632 1.5 SEC -1 200 GAL/MIN/SQ FT 20 US SIEVE 90 % 45 LBS 420 PSI 135 LBS 20 % 265 LBS SURFACE. OR UNDER SURROUNDING SECURE LIFTING LOOPS TO INLET GRATE INLET BOX. MATCH THE INSIDE LENGTH OF THE GRATED THE LENGTH, "L", OF THE FILTER SACK WILL 7. BE BETWEEN 18 INCHES AND 36 INCHES. THE DEPTH, "D", OF THE FILTER SACK WILL 6. INLET BOX. MATCH THE INSIDE WIDTH OF THE GRATED THE WIDTH, "W", OF THE FILTER SACK WILL 5. INSPECT PER REGULATORY REQUIREMENTS.4. CONCERN. PURCHASED WHEN OIL SPILLS ARE A AN OIL ADSORBENT PAD OR PILLOW CAN BE 3. SPECIFICATIONS TABLE. EXCEEDS REQUIREMENTS IN THE POLYPROPYLENE FABRIC THAT MEETS OR GEOTEXTILE WILL BE A WOVEN 2. SEEN. EXPANSION RESTRAINT CAN NO LONGER BE EMPTY FILTER SACK WHEN BRIGHTLY COLORED 1. Inspector or Manufacturer’s Representative at the contractor’s expense. Replace inlet tubes damaged during installation as directed by the Inlet tubes may be temporarily moved during construction as needed. Inspection and Maintenance: underlying surface and the inlet tube. Install inlet tubes lying flat on the ground, with no gaps between the :Installation NOT TO SCALE INLET TUBES "SILT SOCK"FILTER SACK INLET PROTECTION NOT TO SCALE TUBE SEDIMENT WEIGHTED 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 DETAILS EROSION CONTROL EC-17 STORM DRAIN UNDER CONSTRUCTION PLYWOOD INLET PROTECTION FOR STORM DRAIN UNDER CONSTRUCTION STONE FILTER INLET PROTECTION FOR Upstream End of Storm Drain 3/4" Exterior Plywood Across Pipe Inlet Washed Stone Filter Steel Fence Post Storm Drain Upstream End of Diameter 1/3 Pipe Upstream End of Storm Drain 3/4" Exterior Plywood Across Pipe Inlet Washed Stone Filter Steel Fence Post Storm Drain Upstream End of Diameter 1/3 Pipe PLYWOOD INLET PROTECTION WILL BE CONSIDERED INCIDENTAL TO THE CONTRACT UNIT PRICE PER LINEAR FOOT OF PIPE CULVERT INSTALLATION. STONE FILTER INLET PROTECTION WILL BE CONSIDERED INCIDENTAL TO THE CONTRACT Trench Bury Bottom of Plywood Trench Bury Bottom of Plywood UNIT PRICE PER LINEAR FOOT OF PIPE CULVERT INSTALLATION. Hardware Cloth Overflow Diameter 1/3 Pipe Hardware Cloth Overflow Diameter 1/3 Pipe 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 EC-18 DETAILS EROSION CONTROL S K I M M E R B A S I N W I T H B A F F LE S D E T A I L R E I N F O R C E ME N T B A R # 1 0 S T E E L 1 2 " 1 " 2 4 " 4 " 1 " S T A P L E 1 " ( n o m i n a l ) D I A ME T E R B E N D 4 " WO O D E N S T A K E 2 " x 2 " ( n o m i n a l ) 1 2 - 2 4 " 1 - 2 " 1 - 2 " A N C H O R O P T I O N S C O I R F I B E R MA T N O T E S N O T T O S C A L E 1 / 4 L 1 / 2 L E A R T H D I K E M A T E R I A L U N C L A S S I F I E D E A R T H D D W W D 3 / 4 L D D D D D D S T E E L P O S T S D D C O I R F I B E R M A T C O I R F I B E R M A T L = 3 W D D D D M E T A L P O S T O R W O O D S T A K E M I N . R O P E P E R M A N E N T D I T C H T E M P O R A R Y O R D M I N . D D M A T E R I A L U N C L A S S I F I E D E A R T H M I N . M I N . D D D 2:1 (MIN .) 1.5:1 (MIN.) 1. 5: 1 ( M I N.) 3:1 (MAX.) S T E E L P O S T S ( Q U A N T I T Y V A R . ) S K I M M E R ( S I Z E V A R . ) 1 . 5 : 1 ( M I N . ) S T O N E P A D P I P E ( 1 2 I N . ) P L A S T I C S L O P E D R A I N 1 ’ 1 . 5 ’ 4 ’ ( M A X . ) 4 ’ 1 ’ 9 ’ ( M I N . ) 6 ’ ( M I N . ) 2 ’ ( M I N . ) 1 ’ ( M I N . ) 4 ’ ( M I N . ) ( M I N . ) 6 I N . 3 ’ 2 ’ 4 ’ 1 ’ ( M I N . ) 1 ’ ( M I N . ) 1 ’ ).NIM( ’6 4 I N . ( M I N . ) ( M I N . ) O V E R L A P 1 8 I N . C L A S S B S T O N E P A D ( 4 ’ x 4 ’ x 1 ’ M I N . ) D ( S E E R O A D W A Y S T D . D W G . N O . 1 6 4 0 . 0 1 ) C O I R F I B E R B A F F L E W I T H M I N I M U M W I D T H O F 6 I N . P L A C E S E A L A N T A R O U N D B A R R E L P I P E G E O T E X T I L E S O I L S T A B I L I Z A T I O N G E O T E X T I L E S O I L S T A B I L I Z A T I O N G E O T E X T I L E S O I L S T A B I L I Z A T I O N V A R I A B L E N A T U R A L G R O U N D P R I M A R Y S P I L L W A Y 6 . S O I L S T A B I L I Z A T I O N G E O T E X T I L E F O R P R I MA R Y S P I L L WA Y S H A L L B E O N E C O N T I N U O U S P I E C E O F MA T E R I A L O R O V E R L A P P E D 1 8 I N . ( MI N . ) . 5 . P L A S T I C S L O P E D R A I N P I P E A T I N L E T O F B A S I N MA Y B E R E P L A C E D B Y F I L T R A T I O N G E O T E X T I L E O R T A R P A S D I R E C T E D . 4 . D E T E R MI N E P R I MA R Y S P I L L WA Y WE I R L E N G T H ( F T . ) U S I N G Q / 0 . 4 , WH E R E Q I S F L O W R A T E ( C F S ) I N T O B A S I N . 3 . F O R B A S I N D E P T H O F 3 F T . , T H E MI N I MU M B A S I N WI D T H S H A L L B E 9 F T . 2 . L I MI T E A R T H D I K E H E I G H T T O 5 F T . 1 . S E E D A N D P L A C E MA T T I N G F O R E R O S I O N C O N T R O L O N I N T E R I O R A N D E X T E R I O R S I D E S L O P E S . 6 / 16 / 2 0 14 K : \ R A L _ R o a d w a y \ 0 113 110 3 0 - U - 5 5 15 \ P l a n \ P l a n S h e e t s \ E r o s i o n C o n t r o l \ u 5 5 15 _ E C _ d t l s .d g n REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY: Copyright Kimley-Horn and Associates, Inc., 2014 shall be without liability to Kimley-Horn and Associates, Inc. reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. intended only for the specific purpose and client for which it was prepared. Reuse of and improper This document, together with the concepts and designs presented herein, as an instrument of service, is NOT TO SCALE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR RW ACQUISITION PE NO. F-0102 PREPARED IN THE OFFICE OF: P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068 PHONE: (919) 677-2000 FAX: (919) 677-2050 PROJECT: SHEET NUMBER:JOB NUMBER: 011311030 STADIUM DRIVE - COMPLETE STREETS U-5515 SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME TIMEFRAME EXCEPTIONSSITE DESCRIPTION NPDES GENERAL STORMWATER PERMIT IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. NONE NONEPERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES SLOPES STEEPER THAN 3:1 SLOPES 3:1 OR FLATTER ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS 14 DAYS 7 DAYS 7 DAYS 7 DAYS SOIL STABILIZATION SUMMARY SHEET SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY) MATTING FOR EROSION CONTROL -L-27+00 29+00 LTec-1 DETAILS EROSION CONTROL EC-19 180 ec-2 -L- ec-2 -L- SUBTOTAL TOTAL SAY 200 2,250 MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER 31+30 33+30 RT 150 35+10 LT35+60 60 ec-2 -L-35+10 36+25 RT 38+00 39+30 LT-L-ec-2 39+50 41+50 RT-L-ec-2 41+50 42+50 LT 60-L-ec-2 45+50 47+00 RT-L-ec-3 50+00 51+93 RT-L-ec-3 53+30 54+30 RT-L-ec-3 56+00 59+00 RT-L- 57+50 61+00 LT-L-ec-4 130 130 130 100 300 200 ec-3/4 400 240 2,450 2,700 ec-3 -L-53+18 53+40 LT 170