HomeMy WebLinkAbout20140624 Ver 1_401 Application_20140614i June 16, 2014 3040 NC Hwy 42 West; Clayton, NC 27520 P:919- 606 -1065 — F:919 -585 -5570 Ms. Amy Chapman NC DWR, Transportation Permitting Unit 1617 Mail Service Center 2 0 1 4 0 6 2 Raleigh, NC 27699 -1617 RE: Pre - Construction Notification: General Certification No. 3886 �0/ TIP B -5004 Bridge No. 87 over Brushy Fork and No. 86 over Salem Creek on Reynolds Park Road Winston- Salem, Forsyth County, North Carolina Dear Ms. Chapman; The City of Winston -Salem proposes to replace bridge No. 87 over Brushy Fork and bridge No. 86 over Salem Creek in their existing locations (TIP B- 5004). The purpose of this project is to replace two structurally deficient bridges to allow the continued safe use of Reynolds Park Road by passenger vehicles. Enclosed is an application for a Section 401 Water Quality Certification No. 3886 for Bridge No. 87. Bridge No. 87 does not require notification to the US Army Corps of Engineers under Nationwide Permit 14. Bridge No. 86 does not require pre- construction notification to either agency, as no stream or wetland impacts are anticipated. Therefore, the attached PCN form relates to Bridge 87 only. Plans for Bridge No. 86 are included with this PCN for record purposes only as B -5004 includes both bridges. For bridge No. 87, the only impacts to waters of the U.S. are 12 linear feet of permanent stream impacts due to upgrading an existing rip rap outlet and 28 linear feet of temporary stream impacts for channel stabilization. No wetland impacts are anticipated for this project. No impacts to waters of the US are anticipated for utility relocation. The preceding information, along with the enclosed project information sheet, Pre - Construction Notification, Vicinity Map, USGS Map, Jurisdictional Features Map, and wetland and stream impact drawings are being submitted for your review of this project. Ms. Amy Chapman June 16, 2014 Page 2 of 2 If you have any questions or need additional information please contact me at your earliest convenience at (919) 606 -1065 or phil.may @carolinaeco.com. Sincerely, Carolina Ecosystems, Inc. �J6 4 Philip May Senior Environmental Scientist cc: Mr. John Thomas, USACE Raleigh Regulatory Office Greg Purvis, P.E., Wetherill Engineering, Inc. CAROLINA ECOSYSTEMS9 INC. Project Information Sheet 3040 NC Hwy 42 West; Clayton, NC 27520 P:919-606-1065—F:919-585-5570 Date: 6/16/14 Project Name: TIP B -5004 Bridge No. 87 over Brushy Fork and Bridge No. 86 over Salem Creek on Reynolds Park Road Name of Property Owner /Applicant: City of Winston -Salem Consultant/Agent: Carolina Ecosystems, Inc. Related /Previous Action IDs: 200900969, City of Winston -Salem Water Line EA Site Address: N/A Subdivision Name (if applicable): N/A City: Winston - Salem, NC County: Forsyth County Lat: See Table Long: See Table USGS Quadrangle(s): Winston -Salem East River Basin(s): Yadkin 8 -Digit HUC(s): 03040101 Nearest Stream(s): Brushy Fork (Bridge 87) and Salem Creek (Bridge 86) Directions to Site: From Raleigh take 1 -40 West into Winston - Salem, take US 52 North to exit 108B Vargrave Street turn right onto Vargrave Street, take the next left onto Diggs Blvd, turn left at T intersection and remain on Diggs Blvd, turn left onto Martin Luther King Dr., then first right on Reynolds Park Road to project locations. Requested Action: ❑ Pre - application Request ❑ Jurisdictional Determination Request ❑ Final ❑ Preliminary ® Permit Application: ® Nationwide 14 ❑ General ❑ Individual o`'o� wAr�gQc. O < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: E] Section 404 Permit ❑Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ® Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ®No 2. Project Information 2a. Name of project: B -5004 Bridge No. 87 over Brushy Fork and Bridge No. 86 over Salem Creek on Reynolds Park Road 2b. County: Forsyth County 2c. Nearest municipality / town: City of Winston -Salem 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: B -5004 3. Owner Information 3a. Name(s) on Recorded Deed: City of Winston -Salem 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): Alan Temple 3d. Street address: 100 East First Street 3e. City, state, zip: Winston - Salem, NC 27102 3f. Telephone no.: 336 - 747 -6844 3g. Fax no.: 3h. Email address: alant @cityofws.org Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Phil May 5b. Business name (if applicable): Carolina Ecosystems Inc. 5c. Street address: 3040 NC Hwy 42 West 5d. City, state, zip: Clayton, NC 27520 5e. Telephone no.: (919) 606 -1065 5f. Fax no.: (919)- 585 -5570 5g. Email address: phil.may @carolinaeco.com Page 2 of 12 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Public ROW 1 b. Site coordinates (in decimal degrees): Latitude: 36.088796 Longitude: - 80.21976 (DD.DDDDDD) ( -DD DDDDDD) 1 c. Property size: 0.46 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Brushy Fork proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project site is an existing two -lane bridge and roadway. Land use in the project vicinity is primarily industrial and institutional with some forested areas along Bushy Fork and Salem Creek 3b. List the total estimated acreage of all existing wetlands on the property: 0.79 acres within the Study Area 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1260 linear feet within the Study Area 3d. Explain the purpose of the proposed project: Replace a structurally deficient bridge with a new 2 -lane bridge with improved vehicle and pedestrian safety. 3e. Describe the overall project in detail, including the type of equipment to be used: Bridge 87 will be replaced in its existing location using an off -site detour. Stormwater improvements will be constructed. The existing bridge will be removed using NCDOT Best Management Practices. Standard construction equipment such as trucks, cranes, excavators, and bulldozers will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No El Unknown project (including all prior phases) in the past? Comments: Preliminary JD requested April 2012 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Carolina Ecosystems Inc. Name (if known): Phil May and James Pflaum Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 12 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 LIP ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P FIT ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.0 2h. Comments: No wetland impacts are anticipated for this project. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? ,other) (feet) feet) S1 ❑ P ®T Bank Stabilization Brushy Fork ® PER ❑ INT ® Corps ❑ DWQ 20 28 S2 ® P ❑ T Rip Rap Outlet Brushy Fork ® PER ❑ INT ® Corps ❑ DWQ 20 12 ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 40 3i. Comments: An existing rip rap outlet pad will be upgraded and relocated. Temporary stream impacts will be limited to channel stabilization above the ordinary high water line. Page 5 of 12 PCN Form —Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 4f. Total open water impacts 0.0 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑Tar- Pamlico ❑Other- Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? El Yes 131 ❑P ❑T ❑ No El Yes B2 ❑P ❑T ❑ No El Yes B3 ❑P ❑T ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 12 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed bridge will completely span Brushy Fork. No bents will be placed in the water. An off site detour will be used to route traffic during construction to avoid additional temporary impacts. Wetlands have been completely avoided during design. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. NCDOT BMP's for bridge construction and demolition as well as erosion control measures will be strictly enforced throughout project construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested. linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 0 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 12 PCN Form —Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Project is not located within NCDWQ protected riparian buffer ❑ Yes ❑ No watershed. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 98% 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Percent impervious based on limited area of disturbance for the project. There will be an overall increase of 5% impervious surface from existing conditions. The project will be designed and constructed in compliance with NCDOT's Individual NPDES permit NCS000250. Existing stormwater management has been improved through upgrade of an existing outlet on the west side of the bridge and a pre- formed scour hole on the east side at a second outlet. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑Yes El attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No Page 9 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter) Comments: PCE does not require Clearinghouse review 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The project is a replacement of existing infrastructure; therefore, additional development is not likely to occur as a result of the project. The replacement will neither influence nearby land use or stimulate growth as no new travel lanes are proposed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated from this project Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Websitehttp : / /www.fws.gov /raleigh /species /cntylist/forsyth.html, for Forsynth County, North Carolina Natural Heritage Program GIS data updated January 2012, and onsite habitat review. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? HPOWEB Map Service http: / /gis.ncdcr.gov /hpoweb/ National Register of Historic Places http: / /www.nps.gov /nr /research/ Project does not involve new location construction, it is a repicement of existing infrastructure. S. Flood Zone Designation (Corps Requirement) Ba. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: A No Rise Certification has been approved by the NC Flood Mapping Program. 8c. What source(s) did you use to make the floodplain determination? North Carolina Floodplain Mapping Program http: / /www.ncfloodmaps.com/ Ai AA e Wipte (0/10/14 Applicant/Agent's Printed Name Date Applicant/Agent's Sig ature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version Page 12 of 12 PCN Form —Version 1.3 December 10, 2008 Version 1 j h 4�Sh Martin Luther King) •9 � D �s"'ti rs sn aJ J dal � Jsfa�ad N Z �^ N U � c o' It 0 a 4V°— Vwoa 1p d= bA � eo ,O 9 HIV i� A TP 1 j h 4�Sh Martin Luther King) •9 � D �s"'ti rs sn aJ J dal � Jsfa�ad N Z �^ N U o' It 0 a 4V°— Vwoa .F q St ca r ! gJ vi Y � �S • � - ; , �� � 1, ` �y P:\201t \11351102 85004_Winaton Selam \HUdreul:ca\ PERMITS_ Environmental \85004_Prm_tah.dan CONTRACT: TIP PROJECT.-B-5004 A O O 1IIr�y j,y� N Q 0 0 0 m O o m O O Z O FO. n n I j !yam rC) N r I ;'� v, Soo' ti A Z o o a H I �I o ty 3 °' r,W :eek 0 —I i I + m OD 0 0 °z 4 n by . waa N Z a N o s'\ m a c () b b I , lux O D < v< Un N O CA Ln II II II II II II Z I C A Q > Fn o o 0 0 1a r D 6° r o = * m m � �b s + N rn Z ` \ � oo n 3 b N � bu Ca Lyl _ • 1%f O z po It Q m 3� �o �o �' 5051 (� bCJ I n X b •` : 1 �� I� y b Z � N .� i� �, p b y Cn y o ii N tt7 w � � 1�, � F) � � O O 17 v v at = n a m II 1 y S w Yma< \ ,a _ As o bd y C y 4. o $� o E s� /1 I l iA5 PLANS PREPARED FOR °zz a a' B —���4 CITY OF WINSTON —SALEM BY. z 14 BRIDGES NO. 87 & 86 A, 559 Jones Franklin Rd Surte 164 REVISIONS W� Roleigh, N C 27606 ETHERILL Bus 919 8518077 NO. DATE DESCRIPTION BY ENGINEERING Fox 919 8518107 O a CITY OF WINSTON -SALEM License No F -0377 FORSYTH COUNTY NORTH CAROLINA m TRANSPORrAT/0N PLANNING /DESIGN - BRILIGE /STRUCTURE DESIGN TITLE SHEET CNIL.S/TE DESIGN - GIS /GPs - CONSTRUCTION OBSERVATION O D z z o o z z o Z r 2 2 m r =_ ^� � `a C D `a � D b m < m < �% Q m � � m � � m z v v z v v c� � O m m Q m m y � °° z z °° z Z y� O � � O V � O c, A � P O � o� � y x II II II II II II II 0 0 0 0 0 0 0 N O O O O � W � (Nj] N � r X 3 3 3 X 3 3 P r N N N N N N N .4111184.1 NAM tOt��GNt•••••tNNt•••• z 0 c —I cn �o m v n 1 m O_ D < i D A N W 70 O ITT H m w --I � 2 C7 Z O? Dv DT D T Z• Z• Z Z' A ? m C o W m Z mi my my OD (7 ro n ro n ro � m � m W Z m � -Di x m a D o D o D O a I° j I s m� W < m c� x c> x c� x v � v � rri mm mm m m 2 � O m D w m M. M. m ry � `� I ( to fA Z w C p m m om v � acn aA aw D vo w vm c = V p) D H O D � D 7° W mD mD m D -I + a -I 7o rn I I m a S r w w ti � °� m 1` O n D m m < O x D o� ov o v T S T 2 T 2 D N to ^ I N m a � �01 D D D r- vim 0) -4 0I I w W m T v Iv Rc m C I Z O < O tp <" m W v m m r in to D O w m �c a w A + {� FD 0 w W w s 2 O w N O m z Q H o O Z 7 x m z L O p A m• m > V % m m m O Z � A o� cc cr z O0 na = m � ° o c0� W O 'm y o G� —3 cr _ m 0 � H 2.7 m % D �3 s V7 " M p o_ � �a0 m a � � II m n _ N O D O 3 OD II v m m N �^ Z m + ; v N H � : Z Q O < � N Z m 0 ? D m m c = °° O r ` rn L.y �z � =D z� :vW c< u u ° >� r D A tJ � x V -n O -n z y 8 pp PLANS PREPARED FOR 8 B -5004 CITY OF WINSTON -SALEM BY. _ BRIDGES pL f`� r NO. p�7 O / 559 Jones Franklin Rd Suite 164 REVISIONS ~ � f m O V Raleigh, N C 27606 z o z ETHERILL Bus 919 8518077 NO. Fox 919 8518107 DATE DESCRIPTION BY"� CITY OF WINSTON -SALEM ENGINEERING License No F -0377 a FRY CO ZY O CAROLINA �1 ti ? PAVEMENT SCHEDULE TRAK�Arp PUSIMW�S161 - BRSJfid.*VAUC 1IL' f54 1 m g D ti & TYPICAL SECTIONS CWx,,0 Lr �sr�r - asAM - ��J0 OWNFAra' SEAL ? m C O W W � (7 ro n ro n ro � m � m W Z W Z W Z to n � Z a mn a wn a s m� v -mi v � v � rri mm mm m m 2 � a W a H a w ry � V1 D fA Z w C p om om o T cmil R1 vo vm vm p) D H O rn m -I z c m a m to � n D m < O C7 � C S m a � W m T v Iv - m O < O tp W v m r in m �c a w 0 W REVISIONS n I ' \/ II L tlHi ' 3/084 1`1dStl ; �2' -6" c &o 3 Hwy \ �� �, LT. & RT. 1 ��. • ► i As., STA. 10 + 64.70 11 111 , 12 rn �M 1 I II 1 I I / t1I I ` �� ,\ O ri l I i — ` Pig / —� -.'"-- ._ � j� , �.0 ! '' a t � a�1 \, ,I � � � \ \ \ \\ Fie• � \ \ \ \ \ \ \ \ \\ v I r1l —M 4-11 12, 32' LTA I y �R IM c O m rn 0 Q3 REVISIONS m/ -- In 41 h ' hilt \ \\ >i rn` my N I �, iI l I l Ili 2,12' v� I I' I l l l l l 7rP F�v�'ay \ 4 :70 vv \ _ �� \ \ \'� \ \"�• ^. \ \ ` i /;�il' `gin /// 0- ox- '4A \ / i CT p'Y ST 6 \i — Mn M M. IIIA- _ p F isfe 2` n � I i Iil�'� tb 0 N rri rr, �.% ! J/�//, 7r;�i9 - -7 i1c" m o 0 D z Z m z CD W CD r N V m� V (D 3 N .-. 3 O � � 0m `✓ o O� \n �rn} V / V r I V co N \ V rF CD m " --I CD (D 0o m CD � m n n � m II II N W n v — � � m r m � � z� �' D �n� �r CD � m CD � CD n D o�c�i cn 0 C7 m � 3 X. � C m (D � CD (Q cn D d � c C z �, m cQ n ocnz C7 m m r m� o CD z r� o O n .- 9 x p z t/� z 9 z x o d o � d x c N) c � � D C7 m � 3 X. m (D � CD (Q �, m cQ ocnz m