Loading...
HomeMy WebLinkAbout20140550 Ver 1_401 Application_20140514`14 A rFRpc 20 1 40 5 5 p $ PAID Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 o��o�np MAY 4 0 2014 Page 1 of 10 �_�` PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): 0 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Spuntech Industries Line 5 Expansion 2b. County: Person 2c. Nearest municipality / town: Roxboro 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Spuntech Industries LTD 3b. Deed Book and Page No. 516/563, 646/211, 833/196, 833/198 3c. Responsible Party (for LLC if applicable): 3d. Street address: 555 Northpark Dr 3e. City, state, zip: Roxboro, NC 27573 3f. Telephone no.: 336- 330 -9000 3g. Fax no.: 3h. Email address: o��o�np MAY 4 0 2014 Page 1 of 10 �_�` PCN Form — Version 1.4 January 2009 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d StreeLaddress 4e City, state, zip 4f T,elephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Laura Belanger 5b Business name (if applicable) Environmental Permitting Consultants Inc 5c Street address PO Box 3744 5d City, state, zip Greenville, SC 29608 5e Telephone no 864 - 271 -3040 5f Fax no 5g Email address laura @enviropermit com, Page 2 of 1`0 B Project Information and Prior Project History 1 Property Identification 1a Property Identification no (tax PIN or parcel ID) PIN 0918 -00 -53 -1735 000 1 b Site coordinates (in decimal degrees) I Latitude 36 452777 Longitude -78 947904 1c Property size 5515 acres 2 Surface Waters 2a Name of nearest body of water to proposed project Mitchell Creek 2b Water Quality Classification of nearest receiving water C 2c River basin Roanoke 3 Project Description 3a Describe the existing conditions on the,site,and the general land -use in the vicinity of the project at the time of this application The site is is an industrial facility that produces spunlace nonwoven,fabrics and textiles Currently approximately 10 7 acres impervious, including the main facility which is approximately 243,356 sq ft Areas on property to the south and east of the facility are undeveloped Areas surrounding the property are rural /undeveloped to,the, east, west and south Directly, north is a large Georgia - Pacific industrial facility, 3b List the total estimated acreage of all existing wetlands on the property 246 3c Llst,the total estimated linear feet of all existing streams (Intermittent and perennial) on the property 3,321 3d Explain the purpose of the proposed project The purpose is to expand the exsistmg facility to meet current needs 3e Describe the overall project in detail, Including the type of equipment'to be used The project will involve grading for additional parking behind the current facility and the construction of an 100,764 sq ft addition Heavy grading equipment will be utilized for the clearing and earth movement including the placement of underground utilities and bringing the site to grade 4 Jurisdictional Determinations ,4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (Includin ',all' rior phases) in the; past? ❑X Yes ❑ No ❑ Unknown Comments 4b If the, Corps made the jurisdictional determination, what,type of determination was made? []'Preliminary ❑ Final 4c If,yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Timmons Group Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation It is our understanding that the Corps has conducted a site visit on 4/15114, we are unaware if an official determination has been issued 5 Project History 5a Have permits or certifications been requested or obtained for this project (Including all prior phases)Jin the past? ❑ Yes ❑ No '❑X Unknown 5b If yes, explain In detail according to "help file" Instructions 6 Future Project Plans 6a Is this,a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑X Wetlands X❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction '2 Wetland Impacts If`there are wetland'impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland 2d Forested 2e Type, of jurisdiction Corps (404,10) or DWQ (401, other) 2f Are&of impact (acres) W1 P Fill Headwater Wetland Yes Corps 003 W2 P Fill Headwater Wetland Yes Corps 003 W3 - Choose,one Choose one Yes /No - W4 - Choose one Choose one Yes /No W5 - Choose,one Choose,one Yes /No - W6 - Choose one Choose one Yes /No 2g Total Wetland Impacts. 006 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on,the site, then complete this ,,question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of Impact 3c Stream name 3d Perennial (PER) or Intermittent (INT)? 3e Type.of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 P Fill u/t of Mitchell creek PER Corps 125 S2 - Choose one - - S3 - Choose one _ _ S4 - Choose one - S5 - Choose,one - ; - S6 - Chooseaone - 3h Total stream and tributary 125 31 Comments Page 4 of 10 PCN Form — Version 1 4 January 2009 4 Open Water Impacts If`there are proposed impacts to, lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean,, or any other open water of the U S theniindividuall ,list all open water impacts below '4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Wateebody type 4e Area of impact (acres) 01 Choose one Choose 02 - Choose one Choose 03 Choose one Choose 04 - Choose one Choose 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, the complete the,chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total-, 5g Comments 5h Is a,dam high,hazard permit,required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5I Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DW,Q) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then vou MUST fill out Section D of this form 6a Project is'inmhich protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary T 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone,2 impact (square feet B1 Yes /No B2 - Yes /No B3 - Yes /No B4 - Yes /No B5 - Yes /No B6 - Yes /No 6h Total iBuffer Impacts 61 Comments Page 5 of 10 D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed iimpacts in, designing project Site layout wassdesigned to utilize, the grading pad of the existing budding in orderto minimize impacts,to Waters of the,US The footprint of the budding expansion will �encompassgri ded back drive areasand the only new,aCreasfof proposed fill are for the parking area 1b Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques In order to minimize the impacts to Waters of the US an 8 ft high 90 ft long „retaining wall is proposed 2 Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for Impacts to Waters�of the U S or Waters ofethe State? ❑ Yes ❑X No 2b If yes, mitigation is required by (check all that,apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to In -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name�of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c- If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested_ acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a' Permittee Responsible Mitigation Plan 5a If using a permittee responsible, mitigation plan, provide,a,descnption of the,proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6 Buffer Mitigation (State Regulated,Ripanan Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ❑J No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that` requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what -type of mitigation is proposed (e g , payment -to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the pro)ect'include or is it,adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b If yes, then is a diffuse?flow plan included? If no, explain why ❑ Yes ❑X No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 30% 2b Does this projectrequire a Stormwater Management Plan? ❑ Yes No 2c If this project DOES NOT require a Stormwater Management Plan, explain Why Site is located outside of the areas in which DENR requires stormwater management (http Hportal ncdenr org /web /Ir /sw- permitting -map) and Person County does not have a specific requirement However, for grading phase, a temporary sediment trap /basin is being used to collect and release onsite stormwater runoff over a three,day period through the use of a skimmer The sediment trap /basin will remain in place until everything is stabilized Smaller areas that to do not drain to the basin are protected with BMP double row silt fences a minimum of 15 ft back 2d 1f this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? Person County and City of Roxboro 3 Certified Local Government Stormwater Review 3a In which local govern ment's' unsdiction is this project? Person County and City of Roxboro ❑ Phase II ❑ NSW 3b Which -of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4 DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 -246 ❑ Other 4b Hasetheiapproved Stormwater Management Plan,with proof of approval been ❑ Yes ❑X No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 4 January 2009 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No use of public (federal /state) land? lb If you answered "yes" to,the,aboye, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy,Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has,the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (1,5A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer'Rules (1;5A NCAC 2B 0200)? 2b Is this an after-the-fact permit application? El Yes ❑X ;No 2c If you answered "yes' to one or both of the above questions, provide an, explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project,(based'on past and reasonably anticipated,future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description This project involves the expansion of an existing facility The overall land use will not change and no new industry is proposed, therefore we do not anticipate additional develop due to this protect 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or�discharge) of wastewatengenerated, from the proposed project, or available capacity of the subject facility Sanitary sewer through existing gravity sewerline to the City of,Roxboro treatment facility Page 9 of 10 PCN Form — Version 1, 4 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur it or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? 5c If yes, indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http //wwwfws gov /raleigh /species /cntylist/person html 6 Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would'impact Essential Fish Habitat? http / /www habitat -noaa gov /protection /efh /efhmapper /index html 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur'in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ®No status (e,g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? http / /gis ncdcr gov /hpoweb/ 8 Flood Zone, Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? FEMA Flood,Map 3720090800J panel 0908 Print out enclosed 5- Z I - 14 Applicant/Agent's licant/A ent's Si pP 9 ature 9 Applicant/Agent's Printed Name Date (Agent's signature is,valid,only if an authorization letter from the,applicant is rovided` Page 10 of 10 I 0 H W W N Ir, I t , s I Q n Z r y i Q r s 0 I � � s V T) q) Ln cn D li Ln 4 i �rL i• n dr I Y. 41 �• I I I .w a v N �] y O u w 8 N U o o E F °L.I Ti- 1 "';,'` ,. ,. �:� � f��1 �., II ��,�. �� s� r I' . ��,� i,;;�; , �' .rte.; � � • _ -'` ����\ 0 z w (�() w Z l u tn c U =u 4.3 Q(L N LLJ IV / 1 f ° l W ._ j'M, . W 0 ° - w U s fj O z w iw vvv �y e c r fr i N C W Ln > Tl- CL CZ IL 4-1 / r O N V E Q N V J O m o QO d C) s w ) S W S{ N `h su b (S) N _� r w I, 0 N 0 ® I ; w Ln `v r Q -75 ���❑ , I U Q — J W t Y Y �r 7 Y � Q U s u � Ln i N D(L r P N _ r Q N P' V IL1 m —j 0 0 5 w ^ u p o o v u o vy 699 t M U 1 z� r+ u r 1' a LU oW ^� o N I I W N - I I — J W t Y Y �r 7 Y � Q U s u � Ln i N D(L r P N _ r Q N P' V IL1 m —j 0 0 5 w ^ u p o o v u o vy 699 t E o � 0 0 a 0 'Y f r Endangered Species, Threatened Species,Fedelral Species of Concern, and Candidate Species, Person, County, North Carolina Updated: 12 -27 -2012 Common Name Vertebrate: Carolina darter Pinewoods shiner Roanoke bass Invertebrate: Atlantic pigtoe QW,11I WMI-IIC111LISSCI Green floater Yellow lampmussel Vascular Plant: Prairie birdsfoot- trefoil Sweet pinesap Virginia quillwort Nonvascular Plant: Lichen: Scientific name Etheostoma collis lepidinion Lythrurus matutinus Amblophtes cavifrons Fusconaaa masons Alasmidonta heterodon Lasmigona subviridis Lampsihs cariosa Federal Record Status Status FSC Probable /potential FSC Obscure FSC Current FSC Current E Obscure FSC Current FSC Current Lotits unzfoholatus var hellera FSC Monotropsis odorata FSC Isoetes virginica FSC Current Historic Current Definitions of Federal Status Codes: E = endangered A taxon "in danger of extinction throughout all or a sigmficant portion of its range " T = threatened A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range " C = candidate ,A taxon under consideration for official listing for which there is sufficient information to support listing (Formerly "C I" candidate species ) BGPA Bald and Golden Eagle Protection Act See below FSC = federal species of concern A species under consideration for listing, for which there is insufficient information to support listing at this time. These species may or may not be listed in the future, and many of these species were formerly recognized as "C2" candidate species. T(S /A) = threatened due to similarity of appearance. A taxon that is threatened due to similarity of appearance with another listed species and is listed for its protection. Taxa listed as T(S /A) are not biologically endangered or threatened and are not subject to Section 7 consultation. See below. EXP = experimental population. A taxon listed as experimental (either essential or nonessential). Experimental, nonessential populations of endangered species (e.g., red wolf) are treated as threatened species on public land, for consultation purposes, and as species proposed for listing on private land. P = proposed. Taxa proposed for official listing as endangered or threatened will be noted as "PE" or "PT ", respectively. Bald and Golden Eagle Protection Act (BGPA): In the July 9, 2007 Federal Register( 72:37346 - 37372), the bald eagle was declared recovered, and removed (de- listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8,2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668 -668d) becomes the primary law protecting bald eagles. The Eagle Act prohibits take of bald and golden eagles and provides a statutory definition of "take" that includes "disturb ". The USFWS has developed National Bald Eagle Management Guidelines to provide guidance to land managers, landowners, and others as to how to avoid disturbing bald eagles. For mor information, visit ticl� :r�lc.lttIII Threatened due to similarity of appearance(T(S/A)): In the November 4, 1997 Federal Register (55822 - 55825), the northern population of the bog turtle (from New York south to Maryland) was listed as T (threatened), and the southern population (from Virginia south to Georgia) was listed as T(S /A) (threatened due to similarity of appearance). The T(S /A) designation bans the collection and interstate and international commercial trade of bog turtles from the southern population. The T(S /A) designation has no effect on land management activities by private landowners in North Carolina, part of the southern population of the species. In addition to its official status as T(S /A), the U.S. Fish and Wildlife Service considers the southern population of the bog turtle as a Federal species of concern due to habitat loss. Definitions of Record Status: Current - the species has been observed in the county within the last 50 years. Historic - the species was last observed in the county more than 50 years ago. Obscure - the date and/or location of observation is uncertain. Incidental/migrant - the species was observed outside of its normal range or habitat. Probable /potential - the species is considered likely to occur in this county based on the proximity of known records (in adjacent counties), the presence of potentially suitable habitat, or both. http://www.fws.gov /raleiph /species /cntylist /peison.litmI accessed 4/28/14 PROPERTY LEGAL DESCRIPTION' LOT NO. PLAN NO. PARCEL ID: .PIN 0918- 00 -53- 1735.000 STREET ADDRESS. 555 Northpark Dr., Roxboro, NC 27573 Please print Property Owner &ONT &CH I WDUSTILIE.S . 14c- Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Laura Belanger_, of Environmental Permitting Consultants, Inc._ (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and, special conditions attached. Property Owner's Address (if different than property above): Telephone We hereby certify the above information submitted in this application Is true and accurate to the best of our knowledge. 1oG° �GG Autho Date: Authorized Signature Date: