HomeMy WebLinkAboutNCC222329_ESC Approval Submitted_20220624June 28', 2021
Mr. Andrew DeSorbo
8 Pickett Ave
Spencer, NC 28159
HE: APPROVAL LETTER— EROSION CONTROL PLAN
PROJECT NAME: Kincaid Townhomes
LOCATION: Kincaid Rd
TOTAL DISTURBED ACRES: 5.0
LATITUDE: 35.637984
LONGITUDE:-80.465946
Dear Mr. DeSorbo:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with the addition of the amendments trade on June 25s, 2021 and hereby issue this Letter
of Approval and the following comments:
1. A pre -construction conference is required for this project. Contact this office at least 48
hours in advance.
2. This approval does not authorize off -site land -disturbing activity (borrow or spoil)
associated with this project.
3. This approval does not supercede nor negate the need for any applicable development
permits or approvals (ie: planning, subdivision, floodplain, DOT, etc.).
Please be advised that Section 18-52 b. of the Rowan County Soil Erosion & Sedimentation
Ordinance (RCSESO) states that a copy of the approved Erosion Control PIan be on file at the job site.
Also, you should consider this letter as giving the Notice required by G.S. 113A-61(d) & Section 18.53 a.
of that same ordinance specifying our right of periodic inspection to insure compliance with the approved
plan. This plan approval shall expire three (3) years following the date of approval if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 4H.0I29.
Letter of Approval
Mr. Andrew DeSorbo
June 2P, 2021
Page 2
Based on rules established by the North Carolina Department of Environmental Management
Land Resources (DEMLR) as of April 1, 2019, all new construction activities are required to complete
and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above mentioned project. The NOI form may be
accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas(&nedenr. og_v or Paul.clark(&ncdenr.gov. After you submit a complete and correct NOI
form, a COC will be emailed to you within three business days. A $100 fee will be charged annually.
This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Rowan County's Sedimentation Pollution Control Program is performance oriented, requiring
protection of the natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Act of 1973 (North Carolina General Statute 113A-51 thru
66), which are set forth in the local ordinance, this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form which you have provided. You are requested to file an amended form if
there is any change in the information included on the form.
Your cooperation is appreciated, and we look forward to working with you on this project.
Sincerely,
Josh Canup
Environmental Compliance Specialist
ec: Zach Gardner -PE, Salisbury 1 Stop Shop, Kevin Jones -GC