HomeMy WebLinkAboutNCC213499_NOT Closeout Documents_20220620North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Stokes Project: Calvary Baptist Church of King River basin: Yadkin-PeeDee
Person financially responsible: Calvary Baptist Church of King Project #: STOKE-2021-016
Address: PO Box 136, King, NC 27021
1. Project Location: S. Main St., King
Pictures: No
2. Weather and soil conditions: 80's, Clear, Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Brandon Talley
Inspection report: Sent Report
9. Corrective action needed:
Title: Project Manager
Date given/sent: June 03, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney Others present:
Date of inspection: June O1, 2022 Time arriving on site: 4:00 PM Time leaving site: 4:30 PM