Loading...
HomeMy WebLinkAboutB-4484 Maple Cypress Bridge Clearing in BZ Carpenter,Kristi From:Harrell, Stanley L Sent:Wednesday, June 23, 2021 10:50 AM To:Johnson, Jay B; Ward, Garcy; Steffens, Tom; Lane, Stephen; Blankenship, Andrew; Davis, Justin K Cc:Bullard, Aaron; Nunez, Andrea C; jweldin@gfnet.com Subject:B-4484 Maple Cypress Bridge Clearing in BZ Attachments:20210623_081505.jpg; 20210623_081525.jpg; 20210623_075639.jpg; BZ Impacts.pdf Good Morning, It was discovered yesterday afternoon that the clearing contractor had begun clearing and grubbing an area of the buffer zone that was not permitted for allowable impacts. They were stopped and informed clearing was not allowed between the two rows of safety fence (one of which was torn down in the process). I have attached a PDF of the buffer drawings to show the area impacted in red, as well a few photos. The contractor will be reinstalling the safety fence that was torn down, as well as the erosion control devices needed in this area today. I’m not sure if the area between the two bridges was overlooked in the permitting process, but clearing will be needed in this area, due to the proximity of the trees to the proposed bridge. Let me know how we need to proceed. Thanks, Stanley Harrell Engineering Specialist I Division 2 – District 3 Construction Department of Transportation 252-527-0053 Office 252-527-7920 Fax slharrell1@ncdot.gov 1629 Hwy 258 South Kinston, NC 28504 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1