Loading...
HomeMy WebLinkAbout20201937 Ver 2_Credit Release Task 1,2 - Dead Tree A_20220623ROY COOPER Governor ELIZABETH S. BISER Secretary RICHAM E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality June 23, 2022 Barrett Jenkins DWR ID# 2020-1937v2 Restoration Systems, LLC Edgecombe County 1101 Haynes Street, Suite 211 Raleigh, NC 27605 (via electronic mail: bienkins&restorationsystems.com) Re: Dead Tree Umbrella Nutrient Offset Banking Instrument (NOBI) Dead Tree A Bank Parcel Credit Release — Tasks I & 2 Dear Mr. Jenkins: On November 16, 2021, the Division of Water Resources (DWR) approved a Bank Parcel Development Package (BPDP) for the above -referenced site under the terms and conditions of the Restoration Systems, LLC (RS) Dead Tree Nutrient Offset Umbrella Banking Instrument (NOBI) to establish a nutrient offset bank. On June 7, 2022, DWR received a recorded conservation easement and corresponding plat for the subject site. Additionally, on June 7, 2022, DWR received documentation from RS that the Dead Tree A site had been planted and constructed in its entirety and monitoring plots had been installed. On June 21, 2022, staff with DWR along with assistance from staff with RS, inspected the site and confirmed that the subject site had been fully planted, mostly seeded, all monitoring plots had been installed, and conservation easement posts identifying the conservation easement boundary were installed. DWR staff observed bare areas around the site where seeding had not been well established. RS needs to monitor all bare areas to ensure vegetation becomes established. It was also observed that notification placards for the easement posts had not been installed. Therefore, RS will have to submit photo documentation with the As -Built Report confirming placards have been added to the posts prior to receiving a credit release for Task 3. In accordance with the NOBI, signed on November 10, 2021, the following Project Milestones have been met and the corresponding credits shall be released: Task/Milestones Credit 1) Instrument and BPDP Approved by DWR, Conservation Easement Recorded 20% & Financial Assurance Posted (not needed for this site) 2) All Riparian Earthwork, Planting and Installation of Monitoring Devices 20% Completed, easement boundaries adequately marked, and applicable permits Obtained. A site visit by DWR is required for this task TOTAL NORTH CAROLNA D North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 40% Dead Tree A Site Restoration Systems, LLC June 23, 2022 By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract and the following credits are released to sell: • 40% of the Nitrogen nutrient offset credits (0.40 x 136,543.476 lb-N = 54,617.390 lb-N) • 40% of the Phosphorus nutrient offset credits (0.40 x 8,794.455 lb-P = 3,517.782 lb-P) Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020101 of the Tar -Pamlico River Basin pursuant to 15A NCAC 02B .0703, which became effective on April 1, 2020. Please use the Credit Ledger Templates provided in the approved NOBI to track and report credit availability for the Dead Tree A Nutrient Offset Bank. Upon receiving this correspondence, please submit three (2) credit ledgers to DWR reflecting the available credits released for each mitigation type (Nitrogen Nutrient Offset, Phosphorus Nutrient Offset). Please feel free to call me at (919) 707-3637 if you have any questions regarding this correspondence. cc:File Copy (Katie Merritt) Sincerely, 'wDloocuuSiigned by: W V A43C72700BD543E... Katie Merritt 401 & Buffer Permitting Branch Page 2 of 2