HomeMy WebLinkAboutNCC222217_ESC Approval Submitted_20220623ROY COOPER
Govemor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Cole Riddle, LLC
Attn: Mr. Kent Cole
10 Murphy Edwards Hollar Rd.
Mars Hill, NC 28754
NORTH CAROLINA
Environmental Quality
May 31, 2022
LETTER OF APPROVAL
RE: Project Name: MORLIN ACRES DRIVE SUBDIVSION
Acres Approved: 5.0
Project ID: MADIS-2022-003
County: Madison
City: Mars Hill
Address: Morlin Acres Dr.
River Basin: French Broad
Stream Classification: Unnamed Tributary to Panhandle Branch - Class C
Submitted By: Brooks Engineering Associates - Mr. Wyatt Edsel, P.E.
Date Received by LQS: April 4, 2022
Date Revision Received by LQS: May 20, 2022
Plan Type: Residential
Dear Mr. Cole,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval. This plan
approval shall expire three (3) years following the date of approval, if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email, You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eN01 form to Paul Clark at
REQ�� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
No rH cnAa ru
o�n�,Emmd uwm� /� 828.296.4500
Letter of Approval
Attn: Mr. Kent Cole
Date: May 31, 2022
Page 2 of 3
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in to future, the new
responsible party is required to apply for his/her own COC.
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Fred Walker, P.E.
Express Engineer
Division of Energy, Mineral, and Land Resources
Letter of Approval
Attn: Mr. Kent Cole
Date: May 31, 2022
Page 3 of 3
ec: Mr. Wyatt Edsel, P.E. (wedse]@brooksea.com)
Mr. Bryan Shamblin- NCDEQ LQS (bvran.shamblinOncdenngov)
CC Regional Office file