Loading...
HomeMy WebLinkAbout20021159 Ver 1_Triage Check List_20030626Triage Check List Date: ~ ~G Project Name: b. DWQ#: Z, County: To: ^ ARO Mike Parker ^ FRO Ken Averitte ^ MRO Alan Johnson ^ RRO Steve Mitchell From: ^ WaRO Tom Steffens ~iRO Noelle Lutheran ^ WSRO Cyndi Karoly (Central Office) Telephone : (919) ? 33~~ The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ^ Stream length impacted ^ Stream determination ^ Wetland determination and distance to blue-line surface waters on USFW topo maps ^ Minimization/avoidance issues ^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ^ Pond fill ^ Mitigation Ratios ^ Ditching ^ Are the stream and or wetland mitigation sites available and viable? ^ Check drawings for accuracy. ^ Is the application consistent with pre-application meetings? ^ Cumulative impact concern Comments: V ~'~' ~5 I ' ~ 1G C,/,~ fit. r /~