HomeMy WebLinkAbout20021159 Ver 1_Triage Check List_20030626Triage Check List
Date: ~ ~G Project Name:
b.
DWQ#: Z,
County:
To: ^ ARO Mike Parker
^ FRO Ken Averitte
^ MRO Alan Johnson
^ RRO Steve Mitchell
From:
^ WaRO Tom Steffens
~iRO Noelle Lutheran
^ WSRO Cyndi Karoly (Central Office)
Telephone : (919) ? 33~~
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy.
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments:
V ~'~' ~5 I ' ~ 1G C,/,~ fit.
r /~