Loading...
HomeMy WebLinkAbout20220689 Ver 1_Corps Receipt of Individual WQC_20220622Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Wednesday, June 22, 2022 3:28 PM To: Homewood, Sue Subject: [External] Subject Line: SAW-2022-011046 / Hanging Rock SP Culvert Replacement / NWP 3 / Corps Receipt of Individual WQC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> Good afternoon Sue, I'm a little behind the eight ball on getting the RPOT out considering you just sent the approval; so this is simply a formality. After review of the submitted Pre -Construction Notification (PCN)/application for the above referenced project, dated May 18, 2022, and Nationwide Permit (NWP) 3 Water Quality General Certification No. 4239, dated December 18, 2020 (https://urldefense.com/v3/_https://saw- reg.usace.army.mil/NWP2021/NWP29_StateWQC.pd_;! ! HYmSToo l bBR5gwU3wiuL1S6LXjRVbwvoBGW2kIsz9 dJdc0aV7c6ac4nvSX2E1965yOX4DiH2nkpBf8gEiajUsEDyKib2zGFfOrfDQB34pGRNE7k$ ), it appears an Individual 401 Water Quality Certification (WQC) is required from the NCDWR for the proposed activities. The PCN/application received by our office provided the 9 required elements for an individual WQC and constitutes the Corps initial receipt of the WQC application. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days from the date of the complete WQC request. Unless NCDWR is granted a time review extension, the date upon which a waiver of the WQC will occur if you do not act on the certification is September 15, 2022. Best Regards, Sam Samantha Dailey U.S. Army Corps of Engineers Wilmington District, Regulatory Division, Raleigh Field Office Email: Samantha.J.Dailey@usace.army.mil Phone: (304) 617-4915 i