Loading...
HomeMy WebLinkAbout20080868 Ver 2_As-Built Phase 2 P and U Lands_20140616100 80888V -�'- AS -BUILT REPORT FOR P AND U LANDS RESTORATION SITE PHASE 2 RICHLAND TOWNSHIP BEAUFORT COUNTY, NORTH CAROLINA Prepared for PCS Phosphate Company, Inc Prepared by 0 CZR Incorporated Wilmington, NC tG14 Jonathan T Ricketts, Inc I VLW.- Palm Beach Gardens, FL VQAA June 2014 AS -BUILT REPORT FOR P AND U LANDS RESTORATION SITE PHASE 2 RICHLAND TOWNSHIP BEAUFORT COUNTY, NORTH CAROLINA Prepared for: PCS Phosphate Company, Inc. Prepared by: CZR Incorporated Wilmington, NC Jonathan T. Ricketts, Inc. Palm Beach Gardens, FL June 2014 AS -BUILT REPORT FOR P AND U LANDS RESTORATION SITE PHASE 2 RICHLAND TOWNSHIP BEAUFORT COUNTY, NORTH CAROLINA Prepared for: PCS Phosphate Company, Inc. Prepared by: CZR Incorporated Wilmington, NC Jonathan T. Ricketts, Inc. Palm Beach Gardens, FL June 2014 TABLE OF CONTENTS 1.00 INTRODUCTION .................................................................... ............................... 11a 2.00 AS -BUILT TOPOGRAPHY ..................................................... ............................... 21a 2.10 Contour Restoration and Implementation .............................. .............................2M Figure 4 2.20 As -Built Methods and Equipment .......................................... .............................20 Monitoring Locations P and U Lands Phase 2 3.0M PLANTING ............................................................................. ............................... W 4.00 HYDROLOGY ........................................................................ ............................... 41a 5.00 POST - PERMIT DESIGN OR CONSTRUCTION REFINEMENTS ........................4M 5.1M Justification ............................................................................ .............................41a 5.20 Description ............................................................................. .............................41a 6.00 POST - CONSTRUCTION MONITORING ............................... ............................... 5M 6.1E Vegetation ............................................................................ ............................... 51a 6.2.0 Hydrology ............................................................................... .............................5M 6.30 Fixed -point photo stations ...................................................... .............................51a LITERATURE CITED .......................................................................... ..............................7 Cover Photo: Looking ESE from Benfewell Road; trees in far distance are along Peele Road; trees to left are along the north boundary of project. (8.21.13) LIST OF TABLES Table 1 Planted species by percent for each zone LIST OF FIGURES Figure 1 Vicinity Map P and U Lands Phase 2 Figure 2A P and U Lands Phase 2 Existing LiDAR Hypsometric Tint Figure 2B P and U Lands Phase 2 As -Built LiDAR Hypsometric Tint Figure 3 Planting Plan P and U Lands Phase 2 Figure 4 Areas Treated with Herbicide P and U Lands Phase 2 Figure 5 Monitoring Locations P and U Lands Phase 2 Figure 6 Soils P and U Lands Phase 2 APPENDICES A Final As -Built Plans and Drawings B Permits, Certifications, and Nursery Certificates C Selected Site Photographs NOTE: Copy of entire report and As -Built plans are also included on accompanying CD. P and U Lands Mitigation Site Phase 2 ii PCS Phosphate Company, Inc. As -Built Report June 2014 1.0 INTRODUCTION The +/- 3,667 -acre P and U Lands restoration site is part of the PCS Phosphate Company Inc.'s (PCS) compensatory mitigation to offset unavoidable impacts to wetlands and waters authorized under United States Army Corps of Engineers ( USACE) Action ID: 2001 -10096 and North Carolina Division of Water Quality (DWQ) Water Quality Certification (WQC) #2008 -0868 version 2.0 (agency authorizations are included in Appendix A). As described in the mitigation plan prepared for the pre- construction notification (PCN) to the USACE (CZR 2012), the project was to be constructed in three phases as shown on Figure 1. This as -built report concerns completion of the reestablishment and rehabilitation activities for the 796 acres of Phase 2. The purpose of activities at the P and U Lands Phase 2 is to successfully reestablish approximately: 40 wetland acres of headwater forest 562 wetland acres of non - riverine swamp forest, 135 wetland acres of hardwood flat forest, and 6 acres of open water in plugged ditches (interior field and along roads). The remaining 52 acres are comprised of existing roads, perimeter berm and ditch, roadside plugs, and parking lots. Approximately 9,062 linear feet of jurisdictional waters in roadside ditches (along Royal Road and the north side of Small Road) were plugged in order to increase the hydroperiods within the adjacent planted areas. Jonathan T. Ricketts, Inc. of Palm Beach Gardens, FL was the restoration design engineer who worked in conjunction with PCS and CZR Incorporated (CZR), environmental consultants of Wilmington, NC (design team). Restoration activities began onsite on July 29, 2011, with the first application for an erosion and sediment control permit from the NC Division of Land Resources (DLR). Phase 2 was constructed with a total of five DLR permits for land clearing which were subsequently modified for the construction of the interior ditch plugs and perimeter berms and ditches. Earthwork was performed by Sawyer's Land Developing, Inc. of Belhaven, NC and supervised by the design team. The P and U Lands provided a new challenge for restoration since the P and U Lands were in silviculture use. All the previous wetland sites restored by PCS were primarily used for agriculture and contained regularly spaced ditches and crowned fields to accelerate removal of runoff. To complete the restoration on the previous sites, the ditches were plugged or filled and the fields leveled. The vegetation present on the previous restoration sites was less than a year in age. While the P and U Lands also contained ditches, the bedding common to silviculture along with post - harvest woody debris from various aged stands of vegetation presented unique obstacles. After timber removal, large amounts of stumps and slash remained on the site. Since the soils were organic and susceptible to fire, the woody debris could not be burned. Several methods were utilized to prevent or discourage the slash and stumps from resprouting. These methods were modified several times during the Phase 1 work and are described in the Phase 1 As -built Report (CZR 2013). P and U Lands Mitigation Site Phase 2 1 PCS Phosphate Company, Inc. As -Built Report June 2014 2.0 AS -BUILT TOPOGRAPHY 2.1 Contour Restoration and Implementation. The Compensatory Mitigation Plan for the P Lands and U Lands Restoration Site (CZR 2012) contains details on the removal of pine plantation vegetation and bedding, filling of ditches, and reestablishment of topography close to historic elevations. Most of the Phase 2 topography is basically flat and elevations range from 7.5 feet to 13 feet with 74 percent of the site between 8.5 to 10.5 feet. The area of Phase 2 historically drained to the north northwest into unnamed tributaries to South Creek or Gum Swamp Run. During the time of silviculture operations, a series of ditches diverted the drainage to the west northwest. Since the restoration required the removal of the ditch drainage, the potential for hydrologic trespass was great. The restoration accommodated this issue by collecting all the surface water flows near the north property line of Phase 2 and directing them westward. This was accomplished by constructing a bypass canal along the north property line. Water that historically flowed to the north northwest was then directed into the bypass canal through three weirs located adjacent to the canal. This design allowed for the restoration of the natural flows to the north northwest but prevented the northward flowing water from trespassing on the adjacent agricultural lands to the north. 2.2 As -Built Methods and Equipment. The as -built topographic survey was produced as a joint effort by Matrix East Surveyors, LLC from Kinston, NC and Tuck Mapping Solutions, Inc. from Big Stone Gap, Virginia. Matrix East provided the ten ground control points that established the horizontal and vertical control for the survey. On 21 April 2013, Tuck Mapping Solutions performed aerial mapping using a Bell 407 helicopter flying 1,500 feet above the site. Forward air speed was 60 knots during the LiDAR (Light Detection and Ranging) and photo acquisition. Point density during acquisition was 30 -35 points per square meter resulting in approximately 129 million points collected. The resultant combined imagery and 0.5 -foot LiDAR contour data represents the ground condition as of the date of the flight. The aerial photography was taken using an Applanix DSS322 22 megapixel camera integrated with a 410 IMU (inertial measure unit) coupled with a Riegl Q560 LiDAR scanner. The photography and LiDAR were controlled /georeferenced to nine ground control points established by Matrix East. The photo georeferencing was completed and checked using Applanix POSPac v5.3 CAL QC and Inpho v5.2 software. The airborne GPS baselines were also processed using POSPac v5.3 software. The project datums are North Carolina grid system horizontal (2007) and NAVD88 vertical. The topographic mapping was compiled from LiDAR using TerraScan and TerraModel 00, applications utilized in MicroStation v8. The compiled map included a digital terrain model (DTM) from which the 0.5 -foot contour topography was generated. The mapping was checked /edited on MicroStation v8 and AutoCADD Civil 3D and delivered in AutoCADD digital format. The mapping meets US National Map Accuracy Standards in relation to the surveyed control, i.e., at least 90 percent of map measured ground features in non - obscured areas are accurate to within 1.67 feet (1/30 map scale) horizontally and 0.25 foot (one half contour interval) vertically. The existing (pre- restoration) LiDAR topography is depicted on Figure 2A and the post restoration LiDAR topography with monitoring well locations is depicted on Figure P and U Lands Mitigation Site Phase 2 2 PCS Phosphate Company, Inc. As -Built Report June 2014 2B. The entire Phase 2 As -Built plans and drawings are included in Appendix A and on a CD which accompanies this report. 3.0 PLANTING A planting plan with three zones was developed to reflect the site's wetland status (Figure 3). This plan was based on the hydric wetland soils present, the return of the historic hydrology resulting from the site construction and the readily available wetland trees and shrubs that are appropriate for the site's soil and hydrology. Two of those three zones were also planted within Phase 1 and include non - riverine swamp forest and hardwood flat. To control nuisance and or competing hardwood vegetation after planting, herbicide applications (aquatic and non - aquatic formulations) were applied by helicopter in May and September 2012 prior to the 2013 spring planting (Figure 4). The May application was to target just the roadside ditch north of Small Road and it was treated with 6 quarts /acre of Rodeo plus 16 oz. /acres of Arsenal AC with 1.4% LI -700. This mixture was applied at 10 gallons per acre. The September application was for control of the nuisance and competing vegetation throughout the rest of the phase. This treatment consisted of Rodeo applied at 4 quarts /acre, Sulfomet Extra (equivalent to Oust) applied at 2 ounces /acre, Roundup Pro at 4 quarts /acre and LI 700 applied at 3.2 ounces /acre. American Forest Management, Inc. of Charlotte, NC specified the treatments and supervised their application. Pine Belt Inc. and Couch Helicopter Service, Inc. of Arkansas were the applicators. Fifteen (15) native wetland hardwood tree species and five species of small trees were chosen for planting based largely on soil type of the site and expected hydrology. In addition to trees, eight wetland shrub species were incorporated into the plan to provide a more diverse assemblage. One nursery from North Carolina and one nursery from South Carolina supplied the species. The certifications are included in Appendix B. Conservation Services, Inc. out of Verona, VA planted the site from February 12 -23, 2013, after restoration earthwork was completed. Approximately 738 total acres were planted with 388,390 stems, consisting primarily of bare root seedlings and some tubelings. All but 175 acres were planted on 9 x 9 spacing (538 stems /acre), the remainder was planted at 10 x 10 spacing (436 stems /acre). Due to the footprint of the debris piles, the stems which would have been planted in that footprint were planted in higher concentrations in some of the surrounding areas, so exact spacing of stems varies across the site. Shrub stems were also predominantly bare root seedlings with the exception of some tubelings. Shrub stems made up 5 percent or less of the total stems within each zone. The complete list of species planted and the planting mix of species by planting zone are identified in Table 1. As was done in Phase 1, the Atlantic white cedar stems were planted in small clusters across Zone 3. Prior to planting the other species in the zone, the planter would select the areas perceived to be higher in elevation for planting these small clusters. The perimeter canal was in its final construction phase during planting. As it became apparent that water was likely to be held in the northwest corner of Zone 2 until construction was completed on the perimeter, the species more tolerant of standing water were substituted (green ash, swamp black gum, water tupelo, and bald cypress) in P and U Lands Mitigation Site Phase 2 3 PCS Phosphate Company, Inc. As -Built Report June 2014 this area for those less tolerant (ironwood, water hickory, and sugarberry) to help reduce potential mortality. 4.0 HYDROLOGY To document surface storage and hydroperiods, 47 Leveltroll water level monitoring wells were installed across the planted area (approximately 1 well /15 acres) (Figure 5). The wells installed over the soil polygons of Phase 2 are shown in Figure 6. Bear exclosures constructed of barbed wire wrapped around metal fence posts were built around all wells to prevent destruction of the wells by black bears. The nearby Bay City Farm mitigation site rain gauge will be used for P Lands site rainfall. Rainfall data will be used in conjunction with data from nearby automated weather stations (e.g., NRCS WETS data from NOAA's site at Aurora) to determine normal rainfall during the monitoring period. 5.0 POST - PERMIT DESIGN OR CONSTRUCTION REFINEMENTS 5.1 Justification. Refinements were made to the proposed construction when field conditions were different than reported in the design phase and these refinements would result in the proposed wetland trees, vegetation and hydrology to be more representative of these items seen in the adjacent undisturbed areas or the values proposed in design. Careful observation during construction and regular communication between the design team and contractor allowed these discrepancies to be recognized and timely action by the design team resulted in a project that would function closer to its historic condition. 5.2 Description. Descriptions of the refinements are as follows: Differences in average ground elevation - The LiDAR data was collected prior to the removal of the existing timber and, in some areas, heavy vegetation. This heavy vegetative cover and tree canopy prevented the design team from accurately measuring the average existing ground surface in some areas. Careful inspection during the construction revealed a small discrepancy in the LiDAR data and the actual ground surface in the vicinity of the discharge weir adjacent to Benfewell Road, located near station 125 +40 on the north property line alignment (Section G -G). The actual average ground surface was approximately 6 inches lower near the vicinity of the discharge weir. The elevation of the discharge weir was lowered 6 inches from the original design elevation to allow ponded water near the weir to be no greater than the 3 -6 inches in depth that is typical throughout the rest of the site. The second proposed weir near station 48 +60 (Section F -F) on the north property line alignment was also checked and lowered 6 inches. Finally, a third weir was added near station 41 +00. All of these refinements were implemented to keep the ponded water depth near the low points adjacent to the discharges to be consistent with the ponded water depths throughout the restored site. Encroachments from Adjacent Property Owners - To accommodate encroachment of ditches constructed by adjacent property owners, the perimeter berm P and U Lands Mitigation Site Phase 2 4 PCS Phosphate Company, Inc. As -Built Report June 2014 and ditch cross - sections were required to be modified. The modifications due to the encroachments would insure that neither the drainage rights of the adjacent property owner would be impacted nor would the function of the proposed wetland restoration be compromised. The perimeter bypass canal located along the east, north and west property lines were reconfigured to be smaller in width and deeper in depth at the locations where adjacent drainage ditches encroached upon the project. This decrease in the bypass canal width potentially added 1.47 acres of restored wetlands in the perimeter areas. These modifications are noted on the as -built plans. Delays in Construction - The Phase 2 area had a large volume of timber present at the start of construction. Some of the areas contained timber that was less than 10 years in age and these young, small trees had very little value to the commercial timber operators. To prepare the site for restoration, all of the areas had to be cut. The older trees were hauled from the site for use as finished timber. Several methods were attempted to process the smaller trees before a successful method was obtained. The smaller trees were cut, stacked, chipped in the fields and then the wood chips were loaded into trucks for use at a local power plant. The additional time required for the completion of work by multiple contractors and limited access to the site consisting of a single 15 -20' wide road reduced the acreage that could be restored during the time allotted. It was decided that the detailed work involving the Gum Swamp Run stream valley should be postponed for completion during Phase 3. Plug Completion — The majority of the plugs adjacent to Small Road and Royal Road were not fully constructed prior to planting. This deliberate change in the construction sequence allowed the site's average water elevation to be lower during the first 6 to 9 months. This prevented the bare root seedlings planted in the lower areas from being totally submerged during their first year. It is anticipated that the seedlings will have grown to a height in year two that the normal standing water levels will not increase tree mortality. 6.0 POST - CONSTRUCTION MONITORING 6.1 Vegetation. Planted vegetation monitoring plots were established at 47 monitoring wells (plots represent 2 percent of the restoration area) (Figure 5). Plots were established after planting and all trees and shrubs within the plot were marked with a stake. A few months after planting (after stems had grown leaves to allow for better identification) planted stems within vegetation plots were tagged and identified to species if possible. Each year prior to leaf fall in autumn, planted stems within vegetation plots will be sampled for survival, beginning in 2013. In the fifth year, the tree plots will be sampled for all woody volunteer stems, which will be recorded separately from planted trees. 6.2. Hydrology. Electronic wells at the site, as well as a rain gauge, will be downloaded once a month and the data (water level readings taken every 1.5 hours) evaluated to document wetland hydroperiods. 6.3 Fixed -point photo stations. Photographs will be taken periodically throughout the monitoring year to visually document hydrologic conditions, stability, vegetation growth, and the evolution of the restoration site. Seven permanent photo point locations were established at six of the 10 corners of Phase 2 (Figure 4). Several P and U Lands Mitigation Site Phase 2 5 PCS Phosphate Company, Inc. As -Built Report June 2014 photographs will be taken at each station to capture a panoramic view of the site. Photographs at the fixed -point stations will be taken at each autumn sampling and representative photos will be selected for inclusion in the annual report. Representative photos of site conditions, earthwork, planting, and others of interest are included in Supporting Document C of this report. P and U Lands Mitigation Site Phase 2 6 PCS Phosphate Company, Inc. As -Built Report June 2014 LITERATURE CITED CZR, Incorporated. 2012. Compensatory Mitigation Plan for P and U Lands Restoration Site, Richland Township, Beaufort County, NC in PCN for P and U Lands Restoration Site, submitted January 2012. CZR Incorporated. 2013. As -Built Report for the P and U Lands Restoration Site Phase 1. P and U Lands Mitigation Site Phase 2 7 PCS Phosphate Company, Inc. As -Built Report June 2014 Table 1. Planted species in Phase 2 by percent for each zone. Total acres and percents have been rounded; total may exceed 100. Trees Atlantic white cedar Chamaecyparis thyoides Zone 2 Zone 3 Zone 5 Bald cypress Non - riverine 10 10 Headwater forest swamp forest Hardwood flat 1 Species Latin name 40 ac 562 ac 135 ac Trees Atlantic white cedar Chamaecyparis thyoides <1 10 Bald cypress Taxodium distichum 10 10 Pond cypress Taxodium ascendens 10 2 4 Green ash Fraxinus pennsylvanica 15 3 1 Ironwood Carpinus caroliniana 5 3 5 Laurel oak Q. laurifolia <1 14 15 Overcup oak Q. lyrata 1 12 15 River birch Betula nigra 5 1 Sugarberry Celtis laevigata 7 Swamp chestnut oak Q. michauxii 14 14 Swamp tupelo Nyssa biflora 12 8 15 Sycamore Platanus occidentalis 12 Water hickory Carya aquatica 5 5 Water tupelo N. aquatica 5 9 10 Willow oak Q. phellos 10 10 Small trees Red chokeberry Aronia arbutifolia <1 Red bay Persea borbonia 2 Sweet pepperbush Clethra alnifolia 1 2 4 Titi Cyrilla racemiflora 2 3 1 Sweetbay Magnolia virginiana 2 3 4 Shrubs Buttonbush Cephalanthus occidentalis 1 Fetterbush Lyonia lucida 1 High bush blueberry Vaccinium corymbosum 1 1 Possumhaw Viburnum nudum 1 <1 1 Silky dogwood Corpus amomum <1 1 1 Spicebush Lindera benzoin <1 <1 Virginia sweetspire Itea virginica 1 1 Winterberry Ilex verticillata 1 Summary Total stems by zone 17,601 302,544 58,829 P and U Lands Mitigation Site Phase 2 T -1 PCS Phosphate Company, Inc. As -Built Report June 2014 - AURORA SOUTH CREEK �fl - CORRIDOR SOUTH CREEK P LA CORRIDOR _ U LANDS BAY CITTjWRM off ASE1 a+ P LANDS P LANDS � 35' 14' 15.04" .. LONG: 76.46'19.20" w r. PL CASEY TRACT / H SE PHASE I NOS PARKER FARM ! ,� PARKER FAR SECTION~ PARKER FARM SECTION J- I • LEGEND P and U LANDS BOUNDARY SOUTH CREEK CORRIDOR AND 0 5,000 109000 PARKER FARM BOUNDARY SCALE IN FEET NORTH CAROLINA VICINITY MAP P LANDS PHASE 2 SITE LOCATION P and U LANDS PCS PHOSPHATE COMPANY, INC. SOURCE: SCALE: AS SHOWN APPROVED BY: DRAWN BY: BFG /TLJ PORTIONS OF THE BOUNDARY PROVIDED BY: ROBERT M. CHILES, NEW BERN, NORTH CAROLINA, JOB #2009096, DATED: 11/19/2009 DATE: 08/21/13 FILE•ANNUAL RPTS/PH2/ AND 02/02/2010 AND BEAUFORT COUNTY GIS DATA WEBSITE P LANDS VIC PH WWW.CO.BEAUFORT.NC.US, BEAUFORT COUNTY PARCEL DATA SHAPEFILES, NAD 1983 FEET. CP #1745.59.32.2 4709 COLLEGE ACRES DRIVE USGS TOPOGRAPHIC MAP IMAGES, NC STATEPLANE, Z R SUITE 2 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION INCORPORATED WILMINGTON, NORTH CAROLINA 28403 FIGURE 1 NAD83, FEET, 1:24000- SCALE, WEBSITE: WWW.NCDOT.ORG ENVIRONMENTTA CONSULTANTS FAX 910/ 392 -9139 Project Boundary Planting Area ` t J �i2 1 J1t41+i<c � i hr� a��t� a+ tlf ne Royal Road Elevations Table Number Minimum Elevation Maximum Elevation Color 1 0.000 7.500 ■ 2 7.510 8.000 ffift 3 8.010 8.500 4 8.510 9.000 5 9.010 9.500 6 9.510 10.000 7 10.010 10.500 8 10.510 11.000 9 11.010 11.500 10 11.510 13.000 11 13.010 16.000 12 16.010 25.000 �\ LEGEND PHASE 2 PLANTING AREA — a — PROJECT BOUNDARY OPEN WATER ROADS PI - PHASE 1 Bay City Road PHASE 3 (S.R.1002) Small Road Small Road is Project Boundary FIGURE 2A REV. No. DATE DESCRIPTION 0 600' 1200• 1800• SCALE IN FEET Z3: U Z �c) r) r(D Z "� o Z gZ o `L U ry LU H N 0 N � C U c Q J J �o �Z �L co = (n Sx �0 w PROJ. NO.: 1002 DRAVm BY: RC DATE: 01116/14 SHEET: FIG.2A Project Boundary Planting Area 106 10 3 1 i 5 Royal Road 7 \ J n c _ 914 � 92 �_: 00 �. � � \ Project Boundary X91 -,g0 2._ { hBay City Road (S.R.1002) Fit- ®g3 PHASE 2 74® `' g \-o ®72 76 7 0 67 0 69® ® 75® 77 780 y .p 370 7.3 980 �Il Small Road 65 �63 61 66® 64® °62 ® ��j! PHASE 1 Small Road PHASE 3 Project Boundary FIGURE 2B Number Minimum Elevation Maximum Elevation Color 1 0.000 7.500 ■ 2 7.510 8.000 3 8.010 8.500 ■ 4 8.510 9.000 5 9.010 9.500 6 9.510 10.000 7 10.010 10.500 8 10.510 11.000 ■ 9 11.010 11.500 ! 10 11.510 13.000 11 13.010 16.000 12 16.010 25.000 LEGEND — - — — PHASE 2 PLANTING AREA — PROJECT BOUNDARY OPEN WATER o ROADS o PERIMETER BERM AND PARKING AREAS Z 3: m z WELL LOCATION `" P Z) U Z0 0 0 gO o w � z 0 z 0 N (n ~ N � z w N Co J a fr- =a CU 0 x � a0 0 600' 1200' 1800' SCALE IN FEET PROJ. NO.: 1002 DRAWN BY: RC DATE: 01/16/14 SHEET: FIG.2B LEGEND - PHASE 2 (796.43 ACRES) - -- -- P & U LANDS BOUNDARY ® ROADS V/// BERMS AND PARKING AREAS 0 OPENWATER OR PLUGGED /FILLED DITCH PHASE 2 - AREAS TO BE PLANTED: 0 ZONE 2 HEADWATER FOREST (40.37 ACRES) 0 ZONE 3 NON - RIVERINE SWAMP FOREST (562.35 ACRES) 0 ZONE 5 HARDWOOD FLAT 1 (134.93 ACRES) D PHASE 2 '< PHASE 3 O D U) O O N BENFEWELL ROAD 9.40oc 13.28ac 17.64ac 20.1 Doc 10.51 ac 18.89ac 7.3 \---2.1-I.c ROYAL ROAD ROYAL ROAD _ 1.75ac 5.53ac P LAN D A 2 7 ac 9.29ac �^ 0.1500 6.07ac \ \ \ 9.54ac 40.43ac 34.92ac \ ^ 12.43ac 36.77ae 43.52ac 43.53ac 43.32ac 1 1.O5ac 17.72ac \ 19.180c \ 10.61 cc 20.39ac \ 9.17oc \ 21.97ac \ \ 24.67ac 13.43ac 15.04ac 10.32ac 13.32ac 21 29ac 8.06ac SMALL ROAD \ 9.87ac 13.42ac 110- LANDS 15.66ac 8.10ac 7.26ac 11.03ac SMALL ROAD2.11aa 29.51 oc 'pO �O 15.61ac 7.47ac 0.56ac PHASE 2 PHASE 1 LE END P AND U LANDS (3,666.92 ACRES) (TOTAL ACREAGE INCLUDES 12.52 ACRES OF RIGHT -OF -WAY ALONG STATE ROADS NOT PLANTED.) PLANTING PLAN P LANDS PHASE 2 REVISED 11/01/12 q 0 1,000 2,00o PCS PHOSPHATE COMPANY, INC. No. CITY BAY SCALE IN FEET SCALE: AS SHOWN APPROVED BY: DRAWN BY: TLJ /BFG DATE: 06/12/14 FILE: P-,LANDS- PLANT_ SOURCE: PORTIONS OF THE BOUNDARY PROVIDED BY: ROBERT M. CHILES,i{� �� ��ff CP #1745.59.32.2 NEW BERN, NORTH CAROLINA, JOB #2009096, DATED: 11/19/2009 AND 02/02/2010 AND BEAUFORT COUNTY GIS DATA WEBSITE O 4709 COLLEGE ACRES DRIVE Z R SUITE 2 WWW.CO.BEAUFORT.NC.US, BEAUFORT COUNTY PARCEL DATA SHAPEFILES, WILMINGTON, NORTH CAROLINA 28403 INCORPORATED TEL 910/392 -9253 FIGURE 3 NAD 1983 FEET. _ ENVIRONMENTAL CONSULTANTS FAX 910/392 -9139 Man 24 (E) 6s rsmM�= 05 Ir I I ih r{ Il it Tl II R n u 4K bI I I n u Il fr" II II }1 I' Ir I Il •r Ir 11 Il it tt u 54 II II LOYAL ROAD tl •4 �1 B E N F E ELL_RQA42```; ROYAL ROAD r;rr $,POO lbw Glkl6 SMALL ROAD C3 SMALL -R WAD 1 -' w• P LANDS 1+4 AN D 1 10 h ,? K- mciff2miq P AND U LANDS BOUNDARY 0 AREAS TREATED WITH APPROVED MIXTURE FOR TERRESTRIAL APPLICATION x 03 AREAS TREATED WITH APPROVED MIXTURE FOR AQUATIC APPLICATION AREAS TREATED FOR NUISANCE SPECIES AND COMPETING VEGETATION P AND U LANDS PHASE 2 I � 3� -.�: - -=�'- �' -�- � — ,uk- -�- ""` � ° —' �_ � �'"._ — �... `�fi �� �- � Lam- .,:�._ _, •r, _ ���� -- � � __ fir- ,' -�- �•- _ ...;� PCS PHOSPHATE COMPANY, INC. SOURCE: PORTIONS OF THE BOUNDARY PROVIDED BY' ROBERT M. CHILIES. SCALE: AS SHOWN �_�~ ''}= �- �fy _'..JL`- ,� _.U!r .+}T�. �... ''mow �.�r °��.�?ii! _�` 'W.'_ } �-•R�r - 3LL.-. -'I✓ _114.. _ .yLi.. �,•R�G} \ ' _��ik' =.W,�. _'6` � ��•p�rt _ _+.,}� Awl- P— LAND S,— HERBCCIDE- FILE: PH D APE W^.CO.BEAUFORT.NC,US, BEAUFORT COUNTY PARCEL DATA SHFILES, --k— CP #1745.59.32.2 NAD 1983 FEET. 0 1,300 2,600 USCS TOPOGRAPHIC MAP IMAGES, INC STATEPLANE, 4709 COLLEGE ACRES DRIVE NORTH CAROLINA DEPARTMENT DF TRANSPORTATION NAD83, FEET. 1:24000- SCALE, WEBSITL WWW.NCDDT.ORO SCALE IN FEET SUITE 2 INCdR PORATEO WILIAINGTON, NORTH LC910 /391 -9153 FIGURE 4 BAY.. .. EMVIRUWEMTAL CO.WLT"n FAX 910/392 -9139 1 -' w• P LANDS 1+4 AN D 1 10 h ,? K- mciff2miq P AND U LANDS BOUNDARY 0 AREAS TREATED WITH APPROVED MIXTURE FOR TERRESTRIAL APPLICATION x 03 AREAS TREATED WITH APPROVED MIXTURE FOR AQUATIC APPLICATION AREAS TREATED FOR NUISANCE SPECIES AND COMPETING VEGETATION P AND U LANDS PHASE 2 PCS PHOSPHATE COMPANY, INC. SOURCE: PORTIONS OF THE BOUNDARY PROVIDED BY' ROBERT M. CHILIES. SCALE: AS SHOWN APPROVED BY: DRAWN BY: TLJ /BFG NEW BERN, NORTH CAROLINA, JOB ,#2009095, DATED: 11/19/2009 AND 02/02/2010 AND BEAUFORT COUNTY CIS DATA WEBSITE DATE: 05/06/14 P— LAND S,— HERBCCIDE- FILE: PH D APE W^.CO.BEAUFORT.NC,US, BEAUFORT COUNTY PARCEL DATA SHFILES, CP #1745.59.32.2 NAD 1983 FEET. 0 1,300 2,600 USCS TOPOGRAPHIC MAP IMAGES, INC STATEPLANE, 4709 COLLEGE ACRES DRIVE NORTH CAROLINA DEPARTMENT DF TRANSPORTATION NAD83, FEET. 1:24000- SCALE, WEBSITL WWW.NCDDT.ORO SCALE IN FEET SUITE 2 INCdR PORATEO WILIAINGTON, NORTH LC910 /391 -9153 FIGURE 4 EMVIRUWEMTAL CO.WLT"n FAX 910/392 -9139 94 95 � 67 68 m ROYAL ROAD V8 9 92 ' \�\ \91 90 \_ �I 69�_ 65 n 64/ 66 SMALL ROAD 0 0 U) 0 0 N BAY CITY No. 4 BENFEWELL ROAD 109 107 108 03 °1 10 10 /I, �„ 102 �!�""� ROYAL ROA ®96 1097 ®99 ® 1001 087 P LAND C� � ' 85o 083 86 84 74**** i ®76 70 �7� 73 75 ; 1 � 7 � SMALL ROAD r LANDS LEGEND P LANDS PLANTING AREA OPEN WATER OR PLUGGED /FILLED DITCH - ROADS ® PERIMETER BERM AND PARKING AREAS TREE SAMPLING PLOT • WELL LOCATION AND TREE MONITORING PLOT (WELLS TO MONITOR LATERAL DRAINAGE EFFECT MAY NOT HAVE A TREE PLOT. LOCATIONS ARE APPROXIMATE.) AREAS PLANTED IN PHASE 2: 0 ZONE 2 HEADWATER FOREST \\2 ZONE 3 NON- RIVERINE SWAMP FOREST ZONE 5 HARDWOOD FLAT 1 90 1L 81� 80 PHASE 2 PHASE 1 MONITORING LOCATIONS P AND U LANDS PHASE 2 PCS PHOSPHATE COMPANY, INC. SCALE: AS SHOWN APPROVED BY: DRAWN BY: TLJ /BFG AllUAL HZ/- 5-1 DATE: 03/12/14 FILE: PHASE 2 /P_LANDS_WELL_ SOURCE: 0 1 .200 2,400��ff PORTIONS OF THE BOUNDARY PROVIDED BY: ROBERT M. CHILES, CP #1745.59.32.2 NEW BERN, NORTH CAROLINA, JOB #2009096, DATED: 11/19/2009 1 1 0 4709 COLLEGE ACRES DRIVE AND 02/02/2010 AND BEAUFORT COUNTY GIS DATA WEBSITE L SUITE 2 WWW.CO.BEAUFORT.NC.US, BEAU FORT COUNTY PARCEL DATA SHAPEFILES, • ` WILMINGTON, NORTH CAROLINA 28403 NAD 1983 FEET. SCALE IN FEET INCORPORATED TEL 910/392 -9253 FIGURE 5 ENVIRONMENTAL CONSULTANTS FAX 910/392 -9139 OD v n -c 0 v 0 C/) TJ 0 PHASE 2 0 PHASES 'Z! 95 To Ap 68 LEGEND P AND U LANDS PH2 (796.43 ACRES) • WELL LOCATION AND TREE MONITORING PLOT (WELLS TO MONITOR LATERAL DRAINAGE EFFECT BENFEWELL ROAD MAY NOT HAVE A TREE PLOT. LOCATIONS ARE APPROXIMATE.) Pt 1 106 107 08 109 Pt 105 103 102 101 104 ROYAL ROAD 96 97 99 ROYAL ROAD 98 100 87 Pt 2 g 1 90 93 Wd 69 71 70 Pt 65,Z Da4 63 62 66 SMALL ROAD BAY CITY N0. 4 61 SOILS SYMBOL SOIL NAME Ap ARAPAHOE (MINERAL) (12.70 ACRES) Do DARE (ORGANIC) (0.07 ACRES) Po PONZER (ORGANIC) (488.55 ACRES) Pt PORTSMOUTH (MINERAL) (74.04 ACRES) To TOMOTLEY (MINERAL) (1.87 ACRES) Wd WASDA (ORGANIC) (219.21 ACRES) 0 HYDRIC SOILS NOTE: ��p ONLY HYDRIC SOILS ARE DESIGNATED MINERAL ��I A OR ORGANIC. 88 85 '083 82 F 8 4 �o 86 Po v 74 76 g 72 73 75 78:.,�' 77 80 81 SMALL ROAD P SOILS P AND U LANDS PHASE 2 SOURCE: PCS PHOSPHATE COMPANY, INC. PORTIONS OF THE BOUNDARY PROVIDED BY: ROBERT M. CHILES, NEW BERN, NORTH CAROLINA, JOB #2009096, DATED: 11/19/2009 AND 02/02/2010 AND BEAUFORT COUNTY GIS DATA WEBSITE SCALE: AS SHOWN APPROVED BY: DRAWN BY: TLJ /BFG WWW.CO.BEAUFORT.NC.US, BEAUFORT COUNTY PARCEL DATA SHAPEFILES, NAD 1983 FEET. DATE: 05/06/14 FILE: PABANDS_SOILS_PH2_ 2012 AERIALS DOWNLOAD FROM FROM NC ONE MAP 0 1 ,200 2,400 WEBSITE: http: / /data.nconemop CP #1745.59.32.2 7 4709 COLLEGE ACRES DRIVE SOIL SURVEY OF BEAUFORT COUNTY, NORTH CAROLINA, US DEPARTMENT L SUITE 2 WILMINGTON, NORTH CAROLINA 28403 OF AGRICULTURE NATURAL RESOURCES CONVERSATION SERVICE, SCALE IN FEET INCORPORATED TEL 910/392 -9253 FIGURE 6 ISSUED: SEPTEMBER 1995 umrsoNNERTK CONSULTANTS FAX 910/392 -9139 r' SOILS P AND U LANDS PHASE 2 SOURCE: PCS PHOSPHATE COMPANY, INC. PORTIONS OF THE BOUNDARY PROVIDED BY: ROBERT M. CHILES, NEW BERN, NORTH CAROLINA, JOB #2009096, DATED: 11/19/2009 AND 02/02/2010 AND BEAUFORT COUNTY GIS DATA WEBSITE SCALE: AS SHOWN APPROVED BY: DRAWN BY: TLJ /BFG WWW.CO.BEAUFORT.NC.US, BEAUFORT COUNTY PARCEL DATA SHAPEFILES, NAD 1983 FEET. DATE: 05/06/14 FILE: PABANDS_SOILS_PH2_ 2012 AERIALS DOWNLOAD FROM FROM NC ONE MAP 0 1 ,200 2,400 WEBSITE: http: / /data.nconemop CP #1745.59.32.2 7 4709 COLLEGE ACRES DRIVE SOIL SURVEY OF BEAUFORT COUNTY, NORTH CAROLINA, US DEPARTMENT L SUITE 2 WILMINGTON, NORTH CAROLINA 28403 OF AGRICULTURE NATURAL RESOURCES CONVERSATION SERVICE, SCALE IN FEET INCORPORATED TEL 910/392 -9253 FIGURE 6 ISSUED: SEPTEMBER 1995 umrsoNNERTK CONSULTANTS FAX 910/392 -9139 APPENDIX A FINAL AS -BUILT PLANS AND DRAWINGS (also on accompanying CD) WETLAND RESTORATION PLANS FOR V PotashCor rviyu-mareCUA, "P" and "U" LANDS -PHASE II AS -BUILT PLANS IN BEAUFORT COUNTY, NORTH CAROLINA LOCATION SKETCH 0 not to scale AS -B U I LTS NOTE: PLANS MAY BE PRINTED IN DIFFERENT PAGE SIZES - ALWAYS CONFIRM SCALE USING SCALE BAR. REV -N0. DATE DESCRIPTION VICINITY MAP natty scale 0 INDEX OF DRAWINGS C1.1 C COVER SHEET C1.2 C CONVENTIONAL PLAN SHEET SYMBOLS C1.3 G GENERAL NOTES & SYMBOLS t MASTER SITE PLAN C2.2 S A , TYPICAL SECTIONS C4'1 - GRADING SUMMARY BY PLANTING ZONE - G GRADING PLAN Project Location 04:65 - C4.108 G GRADING PLAN _j ±r P'ERIMET'ER CROSS SECTIONS (NOT INCLUDED) 66.511 - - - 4 ( a S GEGTIE048 - GMAI lz R ( (RIOT INCLUDED) PHASEw (NOT INCLUDED) C7.1 P PARKING LOT DETAILS REV -N0. DATE DESCRIPTION VICINITY MAP natty scale 0 INDEX OF DRAWINGS C1.1 C COVER SHEET C1.2 C CONVENTIONAL PLAN SHEET SYMBOLS C1.3 G GENERAL NOTES & SYMBOLS C2.1 M MASTER SITE PLAN C2.2 S STATIONING PLAN C3.3 T TYPICAL SECTIONS C4'1 - GRADING SUMMARY BY PLANTING ZONE - G GRADING PLAN 04:65 - C4.108 G GRADING PLAN C5.1 - C5.14 P P'ERIMET'ER CROSS SECTIONS (NOT INCLUDED) 66.511 - - - 4 ( E6.3 -- S S GEGTIE048 - GMAI lz R ( (RIOT INCLUDED) (NOT INCLUDED) C7.1 P PARKING LOT DETAILS 01/16/14 SEAL n- q 3450 Nodhlake Boulevard • SuA& 102 •" P0. BaaM Gardens, FloWu 33403 �ys 7 4709 COLLEGE DR., STE 2 TR Ph— (581 ) 6.700 ve,_Y; Z WILMINGTON, N.C. 26403 Tdl - Free: (8 7 71 630 -677 7 YYY Jonathan T. Ricketts, ler. F . (58FI82�i2770 ' INCORPORATED TEL 910.392.9253 " """n""" E%VIR�VENTR CONSULTAN FAX 910.392.9139 FL Campo o1 Aulhod &Ian: 8773 0617 RICK NC Cerm6cnte o1 Aulloeh7.e!'�a: C•2761 JONATHAN T. RICKETTS NC P.E. No. 26154 g Nate: Not to Scale *S.U.E. = Subsurface Utility Engineering STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS V.OlECT FEFERENCE W0. SHM I .. FN W awi p r z° a�a Q �a s F K Imo_ C O z � J zo 7a0 ,(a o ED z C ¢_J C LL q w m � LU Z L J J Q Z J _Q POf Z 0 Z LLJ �L Z x O r (] PRBJ. NO.: 1002 MAUVR sr: RC GATE: 01/16/14 SHEET: �} C1 .L WATER: BOUNDARIES AND PROPERTY: RAILROADS: Water Manhole .............. ............................... Water Q � State Line .... Standard Gauge .., . > Meter ...................... ..................... . -- --- - - - - -- -- - - --- - - - --- -- -..... County Line RR Signal Milepost ................ ....... ,..,....,., MILEPOST �5 Water Valve ,. - - - -. - .-- . - - - -- ..----- ......... .... Switch a EXISTING STRUCTURES: Water Hydrant ................ ...... .................... ....� Township Line ........... — •� — . . _ ............ ............................... ......I City Line ...... RR Abandoned .......................... ... ....... T MAJOR: Recorded UIG Water Line ............................ RR Dismantled - -- - - Bridge, Tunnel or Box Culvert ................ g ....... cw+c Designated UIG Water Line S.U.E.' 9 � ) .......... --- - ■ - - -- Reservation Line ........... .... ................... ...... �. � . �. � ............................ . °. .......° RIGHT OF WAY: Bridge Wing Wall, Head Wall and End Wall - � �� *^Y � Above Ground Water Line ............................ My MW Property Line ................ ................... . .........°.. Pr Existing Iron Pin .............. ............................... o Baseline Contra[ Point_.. ........... .............. MINOR: Property Corner .............. ............................... + Existing Right of Way Marker . ....................... ., Head and End Wall ........ ............................... oowc Hw TV: Pipe Culvert ................... ............................... TV Satellite Dish .............. ............................... � Property Monument ........ ............................... o Existing Right of Way Line .......................... - Footbridge � � TV Pedestal Parcel 1 Sequence Number ............................ sa Proposed Right of Way Line .... .,...... � ...................... ............................... ............,......,. .......,......,................ Existing Fence Line ........................ . ........... . x� x- Proposed Right of Way Line with Drainage Box; Catch Basin, DI or JB ............ ❑CB TV Tower ............................ Iron Pin and Cap Marker _ .... Paved Ditch Gutter... ...... ............................... - - - -- UIG TV Cable Hand Hole_ .................. Q Proposed Woven Wire Fence ........................ Proposed Right of Way Line with P 9 Y Storm Sewer Manhole � Recorded UIG TV Cable .................. TM Proposed Chain Link Fence ........................... ® Concrete or Granite Marker ........ .............. :............... Storm Sewer...... ...., s Designated UIG TV Cable (S U.E. ") ---- *-- - -- Proposed Barbed Wire Fence ........................ 9 Existing Control of Access ........................... Recorded UIG Fiber Optic Gable ................... rye. Existing Wetland Boundary_ ......................... Proposed Control of Access .......°.................... @ UTILITIES: Designated UIG Fiber Optic Cable (S.0 E. " ) - Proposed Wetland Boundary .. .. ° ............... wee Existing Easement Line.._. ............... .. ........ ... - -E -- POWER: Existing Endangered Animal Boundary_ ... .... - -EAB - Proposed Temporary Construction Easement ...... E ■ GAS: Existing Power Pole ........ Existing Endangered Plant Boundary ............. — —CPO — - Proposed Temporary Drainage Easement .,.... TDE Proposed Power Pole..... . ........................ Gas Valve ........................... BUILDINGS AND OTHER CULTURE: Proposed Permanent Drainage Easement -. °. ., Rat: Existing Joint Use Pole . ............................... Gas Meter .................. ............................... Gas Pump Vent or UJG Tank Cap ................... 0 Proposed Permanent Drainage I Utility Easement DUE Proposed Joint Use Pole ............................ Recorded UIG Gas Line . ............................... G Sign "° °' .............. ' 0 Proposed Permanent Utility Easement ............ PUE .............................. ° ° °' Power Manhole . 0 Designated UJG Gas Line S.U.E." - - - - --- - - - Well ....... ............................... ........................... ❑ Proposed Temporary Utility Easement ............ —TUE— Power Line Tower ® Above Ground Gas Line .Ir W. Small Mine 5t Proposed Permanent Easement with + ............................ °....... F . ............................... ............................... .................. Iron Pin and Cap Marker ............................. Power Transformer ...... ............................... Foundation ..................... ............................... �— ROADS AND RELATED FEATURES: UIG Power Cable Hand Hole ...................... SANITARY SEWER: Area Outline ..................... ............................... I — — — } Existing Edge of Pavement .............................. - - - -- H -Frame Pole.. ...... ........ ...... ..................... Sanitary Sewer Manhole .. ............................... Cemetery ......................... ............................... � t I Existing Curb ............ .................. ....... ............ .. - - - -- Recorded UIG Power Line ...... .................... a Sanitary Sewer Cleanout . ............................... Building ............................ ............................... Proposed Slope Stakes Cut ....,....................... - - - 2___ Designated UIG Power Line (S.U.E.') ......... - - - -P- - - - UIG Sanitary Sewer Line . ..........................°.°.° School .............................. ............................... Proposed Slope Stakes Fill ............................. -- - L___ Above Ground Sanitary Sewer ....................... ./9 � IW, Church ................ ............................... Proposed Wheel Chair Ram c TELEPHONE: Recorded SS Forced Main Line ..................... Dam ....,°.....,° .................... ............................... Existing Metal Guardrail ., ,. ... ....... ............... ..,.. - Existing Telephone Pale ...... ... ...... ..,....,... f Designated SS Forced Main Line (S.U.E') .... HYDROLOGY. Proposed Guardrail .......... ............................... T ' T r Proposed Telephone Pole ............................. �r Stream or Body of Water... ............................ Existing Cable Guiderail ,. ........... ....... ... ....... .... Telephone Manhole ........ ............................... C7 MISCELLANEOUS: Hydro, Pool or Reservoir ............................... I-- - - - -, Proposed Cable Guiderail ............................... n n n n Telephone Booth ............ ............................... 0 Utility Pole ......................... ............................... Jurisdictional Stream ...... ............................... J Equality Symbol ........................................... Qj Telephone Pedestal ........ ,.. ....... Q Utility Pole with Base .......... ........................ Q Buffer Zone 1 .................... ................ ............ — BZ Pavement Removal °......... ............................... Telephone Cell Tower .... ............................... A Utility Located Object .°...... ............................... �n Buffer Zone 2 .................. ............................... Bz 2 VEGETATION: UIG Telephone Cable Hand Hole ................. Q Utility Traffic Signal Box .... ............................... Q Flow Arrow ...°......° .......... ............................... Single Tree ......................... ............................... € Recorded UIG Telephone Cable ................... Utility Unknown UIG Line ... ............................... Disappearing Stream ..... ............................... y-- — Single Shrub ....................... ............................... Designated UIG Telephone Cable (S.U.E. ") - - - - *- - - - UfG Tank; Water, Gas, Oil ............................... 0 Spring ............................ ............................... Hedge ........................... ............................... ..... Recorded UIG Telephone Conduit ................ AIG Tank; Water, Gas, Oil ............................... 0 Wetland ° ........................ ............................... Woods Line ........................ ............................... Designated UlG Telephone Conduit (S.U.E.') - - - -rt- - - - UIG Test Hole (S.U. E. ") ......................... .......... � Proposed Lateral, Tail, Head Ditch .............. Orchard ..,..........,................ ............................... Q f3 Q 4 Recorded UIG Fiber Optics Cable ........,........ ro Abandoned According to Utility Records ..,...... AATUR False Sump...... .... ............... ........ __ ....... Vineyard .......°..................... ............................... v.,. a Designated UIG Fiber Optics Cable (S.U.E. ") -- - - *ro- -- End of Information , ........ ... ............. ........... ....... E.0.1. AS -BU ILTS FN W awi p r z° a�a Q �a s F K Imo_ C O z � J zo 7a0 ,(a o ED z C ¢_J C LL q w m � LU Z L J J Q Z J _Q POf Z 0 Z LLJ �L Z x O r (] PRBJ. NO.: 1002 MAUVR sr: RC GATE: 01/16/14 SHEET: �} C1 .L 1. SITE INFORMATION IS BASED ON SURVEY WORK DONE BY MATRIX EAST, PLLC DATED OCTOBER 1, 2010 WITH THE VERTICAL DATA (TOPOGRAPHY) PROVIDED BY TUCK MAPPING SOLUTIONS USING AIRBORNE LIDAR (DATA WAS COLLECTED ON MAY 14, 2010 AND MARCH 10, 2012). VERTICAL COORDINATES ARE BASED ON NAVD 1968. AS -BUILT Li DAR COLLECTED APRIL 21,2013 USERS OF THESE PLANS ARE CAUTIONED THAT THE VERTICAL INFORMATION SHOWN ON THESE PLANS IS LIMITED TO THE ACCURACY OF THE LIDAR METHODOLOGY EMPLOYED AND SPECIFICALLY THAT LOWEST ELEVATIONS INSIDE DITCHES OR OTHER AREAS OF STANDING WATER MAY NOT REPRESENT THE BOTTOM OF THE DITCHES (OR LOW -LYING AREAS) BUT INSTEAD REFER TO THE WATER SURFACE ELEVATION ON THE DATE OF THE LIDAR WORK. ADDITIONALLY, THE TOPOGRAPHY WORK WAS COMPLETED PRIOR TO THE REMOVAL OF THE PINE PLANTATION THAT EXISTED ON MANY AREAS OF THE SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY FIELD CONDITIONS SUCH AS ELEVATIONS, DEPTHS, ETC AND REPORT TO THE ENGINEER ANY SIGNIFICANT CHANGES IN THE EXISTING GRADES SHOWN ON THESE PLANS PRIOR TO INITIATING WORK IN THAT AREA OF THE PROJECT. THE ENGINEER SHALL MAKE CHANGES TO THE EXISTING DESIGN, AS NECESSARY, AND PROVIDE THE CONTRACTOR WITH ANY UPDATED PLANS AS NECESSARY. 3. CONTRACTOR'S FIRST ORDER OF WORK IS TO PLACE ALL EROSION CONTROL DEVICES (SEE EROSION CONTROL PLAN). 4. CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE TO ALL REQUIREMENTS OF REGULATORY AGENCIES. 5. CONTRACTOR SHALL BE REQUIRED TO MAKE MINOR GRADING CHANGES TO THE PROPOSED PERIMETER CONSTRUCTION AT THE REQUEST OF JONATHAN T. RICKETTS, INC. 6. AT THE COMPLETION OF CONSTRUCTION, CONTRACTOR TO REMOVE ANY SAND IN EXISTING DRAINAGE STRUCTURES AND PIPES LOCATED THROUGHOUT THE PROJECT. 7. ALL CLEARING DEBRIS WILL BE LEFT IN PLACE IN OPEN FIELDS. MAXIMUM DIAMETER OF PILES SHALL BE 50', MAXIMUM HEIGHT SHALL BE 16. 8. FOLLOWING DITCH FILLING FOR THOSE DITCHES SHOWN TO BE FILLED, COMPACTION WILL CONSIST OF 3 PASSES WITH A D-4 DOZER OR EQUIVALENT, LEAVING 12" OF LOOSE COMPACTION OF THE TOP OF THE FILL. PROPOSED GRADES SHOWN FOR THESE AREAS SHALL REFER TO THE TOP OF THE UNCOMPACTED FILL. 9. FOLLOWING COMPLETION OF FILL FOR EMBANKMENT, BERM ROADWAY SUBGRADE, SPILLWAYS, AND PARKING SPACES, TESTING WILL BE REQUIRED FOR DENSITY SPECIFIED ON TYPICAL SECTIONS. 10. IF REQUIRED, DE- WATERING WILL BE ACCOMPLISHED IN ACCORDANCE WITH A PLAN PREPARED AND SUBMITTED TO THE ENGINEER AT LEAST ONE WEEK PRIOR TO COMMENCEMENT ACTIVITIES. 11. FOLLOWING WIND STORM EVENTS THE CONTRACTOR SHALL RETURN ROADWAYS TO USABLE CONDITION WITHIN 48 HOURS OF THE END OF THE STORM EVENT. 12. STAKE OUT OF ALIGNMENT AND GRADE FOR CONSTRUCTION WILL BE PROVIDED BY ENGINEER'S SURVEYOR. ALL RE- STAKING OF CONTROL POINTS WILL BE AT THE CONTRACTOR'S EXPENSE. 13. MAINTENANCE OF TRAFFIC ON ALL ADJACENT PUBLIC ROADS WILL CONFORM TO THE REQUIREMENTS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 14. PLACEMENT OF TEMPORARY SILT FENCES, DITCH BLOCKS, AND CHECK DAMS WILL BE INSTALLED BASED ON PERMIT DRAWINGS APPROVED BY NORTH CAROLINA DENR OR THE U. S. ARMY CORPS OF ENGINEERS. ALL PERMITS MUST BE POSTED ON THE JOB SITE FOR REVIEW BY THE APPROPRIATE INSPECTION PERSONNEL. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE ENCLOSURE WHICH PROVIDES FOR THE PROTECTION OF THE POSTED PERMITS AND NOTICES AND WILL BE RESPOSIBLE FOR ALL WEEKLY MONITORING. 15. THE CONTRACTOR WILL PREPARE A SEQUENCE OF WORK PLAN FOR REVIEW AND APPROVAL BY THE ENGINEER ONE WEEK PRIOR TO COMMENCEMENT OF EACH PHASE OF PROJECT. 16. THE CONTRACTOR WILL BE RESPONSIBLE FOR COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN WHICH WILL INCLUDE, BUT NOT BE LIMITED TO, PLANS FOR AVOIDANCE OF FUEL AND HYDRAULIC OIL SPILLS ON THE SITE. IT ALL DISTURBED AREAS SHALL BE RESTORED IN STRICT ACCORDANCE WITH REQUIREMENTS OF THE EROSION AND SEDIMENT CONTROL (ESC) PERMITS. 18. AT THE BEGINNING OF WORK OF EACH ESC PERMIT THE CONTRACTOR SHALL PERFORM A SOIL ANALYSIS FOR EACH SOIL TYPE WITH A MINIMUM OF 2 SAMPLES: A PERIMETER BERM SOIL SAMPLE, AND A FIELD SAMPLE. THE ANALYSIS CAN BE PERFORMED BY NCDA & CS AGRONOMIC DIVISION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A STABILIZED (VEGETATED) SITE PER THE REQUIREMENTS OF EACH ESC PERMIT. CONTRACTOR, AS PART OF HIS UNIT PRICE SHALL PROVIDE REWORK OF ANY AREA THAT DOES NOT SUPPORT VEGETATION IN DENSITIES AND TIME FRAMES SPECIFIED IN THE ESC PERMIT. 19. PROPOSED GRADES SHALL BE CONSTRUCTED TO WITHIN PLUS OR MINUS 0.10' ON OPEN AREAS AND BERMS AND 0.05' ON SPILLWAYS. 20. AREAS WHICH HAVE RECEIVED HEAVY EQUIPMENT TRAVEL SHALL BE LOOSENED BY PLOWING OR "RIPPING" AS DIRECTED BY THE ENGINEER. 21. ALL WORK PERFORMED WITHIN ROADWAYS, INCLUDING INTERNAL ROADS, SHALL BE IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES" FROM THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. AS- BUILTS LEGEND PROPOSED SPILLWAY (PYRAMAT TURF REINFORCEMENT) PROPOSED DITCH CROSSING (# 57 STONE) PROPOSED RIP RAP ( 5" - 12" CLASS B ) _ PROPOSED TOP OF BERM PROPOSED 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PROPOSED DITCH FILL �. PROPOSED FLOW ARROW PROPOSED SLOPE ARROW PROPOSED =Ed MAJOR PLUG (LENGTH =100') -PROPOSED MINOR PLUG (LENGTH = 50') PROPOSED PIPE AND RIPRAP EXISTING SURVEY SPOT ° ELEVATION O 'ba EXISTING LIDAR ELEVATION X12.50 PROPOSED SPOT ELEVATION NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. N vwi p r z° oxa a a v'sm 8 �E �a�LL�z �H �C 111111 �—. 0 z a D O ¢© O LL U) J Q m Q1 } 0 U) M i 06 IL U) sn w 0 Z ? 0 yC LL W z W �0 PROJ. NO.: 1002 D AwN sr RC DATE: 01/1 6114 SHEET: C1.3 rR'ClVS!•D 05' BERM AND BY -PASS DITCH PROJECT BOUNDARY C, ?F!"e Ebr20'SERMAND Gwo, BY=PASS DITCH F �Ga nFq Iti .+► m 9 REAM VAVEY -t, I I LOS ENERG�STREAM T MSW PRUN PRCR791•Q 75' BERM AND BY-PASS DITCH PROJECT BOUNDARY 1 ♦ 80' BERM AND BY -PASS DITCH G m LREOY(IENERGY TR EEAMEO t "Tsply VI ^ Q I �— T SWAMP AT _LEWAYSIFF AUf 7 f T JfTl 1 Epsi urr T l 11 T (2) 30'xi5 l PA ING AREA 1 5 (TYgOF 2 - PH4SE r) " 1 t QISCFy15RGE `VVI`A SSPIlI.WAY 1 PVAS�E t _-AF EXISTING- '80' BER%AIND DIT l3 r PROP EO BER E %PANS SAYAITY r ALIGNMENT 1 START STA.O'+00.00 5C DIS HARCE F VIA 5 1LL-AY l x 5 r U a m oI�eHARC> =� s x t"Rl7RC8CR 4S' BERM AND BY -PASS DITCH 1jI Y+ j �H+E Id +E CROSiNG 111 ■ L�� �� '� � PARKIII Af[II EXISTING DISCHARGE FROM PARKER FARM TO BE RELOCATED PROJECT BOUNDARY P.REFG3[R 50' BERM 6� �AND DITCH (FVTVREI PARKER FARM fin, � ti at �e ,PR6PBBE9 T0' BERM AND pp BY -PASS DITCH .P a EXISTING OFFSITE I' LATERAL DITCHES � / 80' BERM AND 1 T - _- _.— PR9PbBE9 50' BERM AND B'Y•PASS DITCH AS- BUILTS PHASE II ARGE FROM PARKER TO REMAIN LEGEND PHASE II PHASE III (FUTURE) PERIMETER BERM & DITCH PROJECT" _ _ _ RESTORED HEADWATER VALLEY PL PROPERTY BOUNDARY TYPICAL SECTION "X" PR6POSED ARKING AREA - -- EXISTING 09 BERM — _- - -_- - - - -_ - AND DITCH WITH PR9P9EWEI - - - - — - -- -- _ BERM EXPANSION (FHTUREt ___ —_ __ °__ __v_ =__ _ VIA SPI - - - - -- --= = - - - °--- BAY CITY FARM _ --- -- ---- ==--=- _ _ _ ____ _ ____ - --------- _- _____ _ _ __ _�� °�• __ P �I _ _ _ _ _ _ __ _ _ -' _ 13AYCITY 3 ALKC Nh +.EN7 - - _ - -- - -__ PROJECT- B - ALRY_ � __ START STA u11U.1111 l �^ --- _ -- _ APL _ --_ r- _-- _ _ _ _ __ __ ____ ___ ____ - ___ r- - - y _ _ _ - i �.- __ _____ ____ __ _ ___ _ _ err_ -- �- - -: -- 1 -�- l ----- ..� _ -$ ----------- _ COUNV LINE poxD _- _ - F------ -- _-- REAM VAVEY -t, I I LOS ENERG�STREAM T MSW PRUN PRCR791•Q 75' BERM AND BY-PASS DITCH PROJECT BOUNDARY 1 ♦ 80' BERM AND BY -PASS DITCH G m LREOY(IENERGY TR EEAMEO t "Tsply VI ^ Q I �— T SWAMP AT _LEWAYSIFF AUf 7 f T JfTl 1 Epsi urr T l 11 T (2) 30'xi5 l PA ING AREA 1 5 (TYgOF 2 - PH4SE r) " 1 t QISCFy15RGE `VVI`A SSPIlI.WAY 1 PVAS�E t _-AF EXISTING- '80' BER%AIND DIT l3 r PROP EO BER E %PANS SAYAITY r ALIGNMENT 1 START STA.O'+00.00 5C DIS HARCE F VIA 5 1LL-AY l x 5 r U a m oI�eHARC> =� s x t"Rl7RC8CR 4S' BERM AND BY -PASS DITCH 1jI Y+ j �H+E Id +E CROSiNG 111 ■ L�� �� '� � PARKIII Af[II EXISTING DISCHARGE FROM PARKER FARM TO BE RELOCATED PROJECT BOUNDARY P.REFG3[R 50' BERM 6� �AND DITCH (FVTVREI PARKER FARM fin, � ti at �e ,PR6PBBE9 T0' BERM AND pp BY -PASS DITCH .P a EXISTING OFFSITE I' LATERAL DITCHES � / 80' BERM AND 1 T - _- _.— PR9PbBE9 50' BERM AND B'Y•PASS DITCH AS- BUILTS PHASE II ARGE FROM PARKER TO REMAIN 0 YO(lo 2000 3000 SCALE IN FEET N W N p ~ p a C ca x � O u 5 v'sw 8� �E LL �a�LL�z 4i Imo_ C r1 Lf3 `r a Z r�to v U Q© v 0) Z cn J CL LU J � 0 LL /H/�� 2 H 7 G O _ rn PRa- NCI.: 1002 DRAWN BY: RIC DATE: 01116/14 SHEET: -//-ff��`` 1 Ci• LEGEND PHASE II PHASE III (FUTURE) PERIMETER BERM & DITCH EXISTING ROAD — — — — — — — RESTORED HEADWATER VALLEY PL PROPERTY BOUNDARY TYPICAL SECTION "X" PR6POSED ARKING AREA 0 YO(lo 2000 3000 SCALE IN FEET N W N p ~ p a C ca x � O u 5 v'sw 8� �E LL �a�LL�z 4i Imo_ C r1 Lf3 `r a Z r�to v U Q© v 0) Z cn J CL LU J � 0 LL /H/�� 2 H 7 G O _ rn PRa- NCI.: 1002 DRAWN BY: RIC DATE: 01116/14 SHEET: -//-ff��`` 1 Ci• J1 C C i NORTH PROPERTY LINE ALIGNMENT PEELE ROAD ALIGNMENT END STA. 155.38.7$ END STA. 6647.97 PR®Pp9ED 75' BERM AND BY-PASS DITCH SEN�EWELL ROAD PROJECT BOUNDARY { + .. ;;•x PRBPO@E9-45' BERM AND BY-PASS DITCH .. +... . _. _.......: : :, :... "F ..v. SHT 89 ::.::::::r :.........:::..... , ::: ;:9i :::::::::::...... SH k PROJECT BDUwDARY :............... :.i : ''" : Ct T R4 .:......; :::. .::....:.:...... ..:::........... :.:. _.... :.:.... :.:... :. Fy V/. V/J _CSC / 'Qp PRiW9EF 12P'BERII AND BY DITCH v� 1 SH`T 64 �1 NORTH PROPERTY LINE ALIGNMENT i 1 START STA. 0.00 -00 4 1 STREAM VALLEY OUTFALL r y �7 E]CISTING DISCHARGE FROM SMALL ROAD ALIGNMENT H 'T 5L a 11 PARKER FARM TO BE RELOCATED START STA. 0+00.00 I RESTORED MODERATE TO SHT 1}4 STREAM ALIGNMENT LOW ENERGY STREAM START STA. 0.00.00 Il SHT 43 _ INTERVALLEY CONNECTOR I T 41 HT�111�— y 1 � SHT 39 ` PRCrCxC 50' BERM SHT 33 _ AND DITCH {FUTURE) EXISTING S0' BERM SHT AND DITCH WITH PR9P®8'E'O LOW ENERGY STREAM SHT 3l BERM EXPANSION (FUTURE) � O GUM SWAMP RUN — ~ �� .s•� � SHT 35 SHT 36 BAYCITY 4 ALIGNMENT A BAYCITY 4 ALIGNMENT P +o•� + (f�' 57 START ST 0 +00.00 GUM SWAMP RUN END STA. 52 +97: { HEADWATER VALLEY PRBPOOE&DISCHARGE EAST UT1 VIA SPILLWAY (FUTURE) BAY CITY FARM PHA SE I PARKER FARM AS- BUILTS \,ROJECT BOUNDARY -REV. No. DATE DESCRIPTION. N W � v � a aka C a N v7m &E dip¢ 9 2.JiP a SHT 88 SMALL ROAD ALIGNMENT .�'... ` END STA. 134 +55.t3 p$ PHASE II a to 0 � U PEELS ROAD ALIGNMENT J START STA. 0.00 -00 � Cfl DISCHARGE FROM PARKER FARM TO REMAIN 4 i 1 l 0 600• 1200' " 1900' SCALE IN FEET Z M nJn LL LL c U) co J 0 z �0 Z �¢ 4 LL ca a °- 0 cn PROD. NC.: 1QD2 DRAWN BY: RIC DATE: 01/16174 SHEET: C .2 LEGEND PHASE II PERIMETER BERM & DITCH EXISTING ROAD PL PROPERTY BOUNDARY x x L—f TYPICAL SECTION W on fROP66EBPARKINGAREA .. +... . _. _.......: : :, :... "F ..v. SHT 89 ::.::::::r :.........:::..... , ::: ;:9i :::::::::::...... SH k PROJECT BDUwDARY :............... :.i : ''" : Ct T R4 .:......; :::. .::....:.:...... ..:::........... :.:. _.... :.:.... :.:... :. Fy V/. V/J _CSC / 'Qp PRiW9EF 12P'BERII AND BY DITCH v� 1 SH`T 64 �1 NORTH PROPERTY LINE ALIGNMENT i 1 START STA. 0.00 -00 4 1 STREAM VALLEY OUTFALL r y �7 E]CISTING DISCHARGE FROM SMALL ROAD ALIGNMENT H 'T 5L a 11 PARKER FARM TO BE RELOCATED START STA. 0+00.00 I RESTORED MODERATE TO SHT 1}4 STREAM ALIGNMENT LOW ENERGY STREAM START STA. 0.00.00 Il SHT 43 _ INTERVALLEY CONNECTOR I T 41 HT�111�— y 1 � SHT 39 ` PRCrCxC 50' BERM SHT 33 _ AND DITCH {FUTURE) EXISTING S0' BERM SHT AND DITCH WITH PR9P®8'E'O LOW ENERGY STREAM SHT 3l BERM EXPANSION (FUTURE) � O GUM SWAMP RUN — ~ �� .s•� � SHT 35 SHT 36 BAYCITY 4 ALIGNMENT A BAYCITY 4 ALIGNMENT P +o•� + (f�' 57 START ST 0 +00.00 GUM SWAMP RUN END STA. 52 +97: { HEADWATER VALLEY PRBPOOE&DISCHARGE EAST UT1 VIA SPILLWAY (FUTURE) BAY CITY FARM PHA SE I PARKER FARM AS- BUILTS \,ROJECT BOUNDARY -REV. No. DATE DESCRIPTION. N W � v � a aka C a N v7m &E dip¢ 9 2.JiP a SHT 88 SMALL ROAD ALIGNMENT .�'... ` END STA. 134 +55.t3 p$ PHASE II a to 0 � U PEELS ROAD ALIGNMENT J START STA. 0.00 -00 � Cfl DISCHARGE FROM PARKER FARM TO REMAIN 4 i 1 l 0 600• 1200' " 1900' SCALE IN FEET Z M nJn LL LL c U) co J 0 z �0 Z �¢ 4 LL ca a °- 0 cn PROD. NC.: 1QD2 DRAWN BY: RIC DATE: 01/16174 SHEET: C .2 i PROPERTY LINE SOUTH CREEK I P LANDS CORRIDOR SITE 65' TYPICAL 70T AT PARKING AREA - -� - - -� SMALL RD. _ f I MATCH EXISTING GRADE 1 12D'TYPICAL 153' AT PARKING AREA ELEV. 2.0 J CUT TYPICAL SECTION 'E —E 25' 1 Z -16' Z -6' t a• 2' � I2 1 Small Rd (Adjacent to S-R. 1002 and South Creek Corridor Site) (W MIN.- 8' MAX.) (FUTURE) PROPERTY LINE * THIS DIMENSION WAS INCREASED AN ADDITIONAL 10'- 18' DUE TO AN ENCROACHMENT ON THE PROPERTY LINE- SEE PLAN SHEETS AND CROSS- SECTIONS FOR ACTUAL DIMENSIONS MULTIPLE ADJACENT I P LANDS PROPERTY OWNER 85a I I 31' 14' 20' 20' 5'79' 3a• - 4&' I 4•-8• 14, 12• 4• I ' I-- 72' -16' 74' 72' -76' 2 2 MATCH EXISTING GRADE / Ji (SLOPE VARIES -4.1 MAX -) ELEV. 2.0 —/ CUT (6' MIN- S" MAX-) J TYPICAL SECTION F —F Royal Rd (South Creek Corridor Site to Benfewell Rd) PROPERTY LINE 7 (DEPTH VARIES 1' TO 2':t) KEY WAY {CONIT) PROPERTY LINE (SAND & MINERAL SOI TOP OF BERM ELEV. VARIES ELEV- 9 -0 TO 90 -0 (SEE CROSS SECTIONS) {1 MATCH EXISTING GRADE 1 STABILIZATION FABRIC BETWEEN L BERMIKEYWRY AND EXISTING GROUND ( MIN. ELEV. = 8.5 TOP OF ROAD ELEV - VARIES (SEE CROSS SECTIONS) ` TOP OF BERM ELEV - VARIES ELEV- 10 -5 TO 12.0 (SEE CROSS SECTIONS) MATCH EXISTING GRADE STABILIZATION FABRIC BETWEEN BERMIKEYWAY AND EXISTING GROUND {US FABRIC US 200, OR APPROVED EQUAL) FILL KEY WAY (CONT) (SAND 8 MINERAL SOIL) WEYERHAEUSER I TRACT PLANDS - 1116,' 4' 8 0' VS FABRIC US 200, OR APPROVED EQUAL) 26'14'20'20' FILL MIN. ELEV. = 8.5 TOP OF ROAD ELEV - VARIES (SEE CROSS SECTIONS) ` TOP OF BERM ELEV - VARIES ELEV- 10 -5 TO 12.0 (SEE CROSS SECTIONS) MATCH EXISTING GRADE STABILIZATION FABRIC BETWEEN BERMIKEYWAY AND EXISTING GROUND {US FABRIC US 200, OR APPROVED EQUAL) FILL KEY WAY (CONT) (SAND 8 MINERAL SOIL) WEYERHAEUSER I TRACT PLANDS - 1116,' 4' 8 0' 4 26'14'20'20' I 28' 1D' I75' 19' 20' GRADE 2 LOCATION 2 7 I V 4 SHOWN a' 34' - 46' 23'- 2T MIN. ELEV. = 8.5 ON PLAN 4'-g 12' - 16` 14' 12'- 16' 4' -8' I-4' 12' �-{ 4' TOP OF ROAD ELEV. VARIES 2 I SHEETS 4 2 2 (SEE CROSS SECTIONS) - - - - - -- ++ r $ J FILL 1L NrmMAX 1 2't .. 9' OWNER SUPPLIED BASE WI STABILIZATION FABRIC MATCH EXISTING GRADE EXISTING 9" DITCH (6' MIN- 8' MAX -) ELEV, 2.0 TYPICAL SECTION G —G Benfewell Rd (N -S from Royal Rd) GENERAL NOTES 1- ALL DITCH SIDE SLOPES IN CROSS - SECTIONS (2:1 AREAS) SHALL BE REINFORCED WITH NORTH AMERICAN GREEN C125 BIN RECP AND SEEDED WITH APPROVED SEED MIX, 2, BERM SIDE SLOPES MAY BE SEEDED AND MULCHED (WITH TACKIFIER.), INSTEAD OF THE SEED AND RECP. ADJACENT PROPERTY OWNERS P LANDS 4' 1116,' ■mot I 28' 1D' I75' 19' 20' Z GRADE LOCATION 7 4 SHOWN 6' 34' - 42' 3, 7, 23'- 2T SHEETS SHEETS 4' 4'-a' 12' -16' 1D' 12' -16° I I 12' 4' 2 4 CUT 7I_ . 2 I - ., .. ,. v a" FILL 1 �_�1 z± 2 MAX. 2 MAX. 8" OWNER SUPPLIED BASE WI STA69U7-ATION FABRIC (6' MIN. S' MAX.) MATCH EXISTING GRADE ELEV. 2.0 EXISTING 8- DITCH TYPICAL SECTION H —H Benfewell Rd (E -W from Royal Rd) PEELE RD. ASSUMED RIGHT -OF -WAY LINE -- �— P LANDS � 45' 2D' I 20' I TOP OF BERM ELEV. VARIES 12' z' ELEV. 10.0 TO 91.0 (SEE CROSS SECTIONS) 1 MATCH EXISTING GRADES / STABILIZATION FABRIC BETWEEN BERMIKEYWAY AND EXISTING GROUND (US FABRIC US 200, OR APPROVED EQUAL) FILL KEY WAY (CONT) (SAND &MINERAL SOIL) TOP OF BERM ELEV - VARIES ELEV. 10.0 TO 10 -5 ISEE CROSS SECTIONS) MATCH EXISTING GRADE STABILIZATION FABRIC BETWEEN BERMIKEYWAYAND EXISTING GROUND (US FABRIC US 200. OR APPROVED EQUAL) �— FILL KEYWAY (CON'T) A� —B U I LTS {SAND &MINERAL SOIL] 2'± �7 TOP OF BERM ELEV. VARIES ELEV. 10.0 TO 11.0 (SEE CROSS SECTIONS) {+, MATCGH EXISTING GRADE LSTABILIZATION FABRIC BETWEEN BERMIKEYWAY AND EXISTING GROUND (US FABRIC US 200. OR APPROVED EQUAL) L FILL KEY WAY (CCN'T) (SAND & MINERAL SOIL) PROPERTY LINE —� PEELE RD. I PEELE RD. 30' I 25' a a n 21 - 92' 16' $' APPROX. CENTERLINE MATCH EXISTING GRADE OF PEELE RD. - -- GUT (6' MIN. T MAX -) J "— ELEV. 4.0 TYPICAL SECTION 1 -1 Peele Rd (Benfewell Rd to Parker Farm) REV. No. DATE DESMPTIOH 3 6/29112 REVISED SECTIONS G -G & H -H FN W p rya z� 0 x,�.Snnd,9® Z,a���LLi O O tS <� O LL 7 w m rwr� VJ CL f6 Z ua O 0 J W �o J IL _V O 2 �° RRCM. No -: 1002 DRAWN 8Y: RC DATE: 01116114 SHEET: C3.3 Y PL Project Boundary Zane 5 ` Zane 3 7 f PERCENTAGE OF PLANTING ZONES AND PHASE II AREAS BY ELEVATION ELEVATION INTERVALS PLANTING ZONE Total - Phase II, Minumum 2 maximum 3 5 Zones 23 & 5 Color = Zone Phase 11 Zone Phase 11 Phase 11 Elevation Elevation Zone Phase 11 % % %D % % % %° 0.000 7.500 0.3°% 0.0% 0.0°% 0.0% 0.0°% 0.0% 0.0% 7.500 8.000 54.9% 3.0% 0.6°% 0.4% 0.0°% 0.0% 3.4% 8.000 8.500 35.7°% 9.000 7.5% 9.500 04% 2.0% 0.4% 0.0% 2.9% $.4 °f0 24.3% 22% 6.4010 18.5°% 0.1% 0-1% 02% 0.00% i 010% 0.0 °% 4.2% 6.8% 18.6°% 8.540 9.000 9.500 10.000 0.1% 10.500 0.1% 11.000 0.1% 0.0% 0.0% 0.0% 26.1% 27.4% 8.4% 19.9% 20.8°% 6.4% 42% 39.7°x6 43.2% 0.8% 7.3% 7,9% 20.7°% 28.1% 14.3% 10.000 10.500 11.000 11.500 0.1% 0.0% 0.5°% 0.4% 9.6% 1.$% 2.2% 11.500 13.000 0.20/0 0.0% 0.5% 0.4% 1.9% 0.3% 0.7% 13.000 16.000 0.30% 0.0% 0.5% DA% 0.5 %0 0.1% 0.5°% 16.000 26.000 0.3°% 0.0% 0.5°% J 0.4% 0.4°% 0.1% 0.4% Subtotals = 100.0% 5.5°% 100.0°% ' 76.2% 1100.0%1 18.3% I 100.0% Zone 5 Project Boundary , Benfewell Road PL FF ZfJf}e 2 Zone 3 ummmmmp M1✓ �- r- Royal Road Zone 3 i :pa1 �o , LLr!� PL PL Project Boundary AS- BUILTS G ®0 S® Project Boundary 0 SOii 1280• 1 Bop SCALE IN FEET N r 7H a 0 a;a a7 O A Po k �q x '[a oP � d •� H � a a z W in Z r� z p 7 D ° Nn 0 2 Q ~ J � Q v Z D L LU Q r m Z J a N m co `r a � {fy J w Q {t3 4 0 a_ 0 RwD.J. No: 1002 DRAWN BY: RC DATE: 01116/14 SHEET: C4.1 - -. -4" - -- - - - -- - - Q 3.}�K - _ 9.42± a I c�J kl X9.593 - 1 r r r n S TA. 14 0 r t i 241 L 60" HDPE 10 +00.00 (E-E ) 2 +00.00 SHEET C9 -1 ) CON STCT00 -) SEE EXISTING z ° f p° TOP OF BANK ° 873t ROADSIDE DITC P 9.21 t J II n [} "{ D��}r H LUG / r )I�}S' 0 (FUTURE} r� LEGEND F'Re P95EB SPILLWAY w (PYRAMAT TURF z = i2. 1 REINFORCEMENT) c z o a PR@PASEB DITCH CROSSING z (# 57 STONE) F!$t PRePE8EBRIP RAP =i { 5" - 12" CLASS B ) _ POS€E) TOP OF BERM M1 y z• ' � v ° a � G+ cv ' ��e ° 4 o p 1 �,/ / � ' ; / r r , ' I � a q o a 1 a p C I q q 7 4 -�� p V fr / P ROP®SEB8' ROCK PA D O fl 0 a L (LARGE SIZE MINE REJECTS) �tj ✓ / `ti' L/ o V "'m, j / r p C0 U �' TioPvaEE) DUTCH FILL 'D PIPE CROSSING DETAIL 9.57t e1 Q 0 ' v (SEE SHEET C9.1) / rl . - fR8PA5EB FLOW ARROW / / } ! I� v f l� ° ° a ✓ r T r 4 100" 4 9.113 i j � ^ / ROADSIDE DITCH PLUG 8.78t ' PR6R65EEi SLOPE ARROW . h. � I r / uuu ___ o ° ,� 'flat ❑ a G" ,4 Y /r / $ '� ti ° � �° /g�")/ o p W v � � �4'� � s Q o � yr , a o � �R�sE� s p r it j v p U �a o �y a eJ 1 q r r r` MAJOR PLUG a 4 f ✓ /, Io/�] a (��]v r{} �a 9 -73t k(r r' $.25# (LENGTH -100') 'Ic� f? f3 O Ud D Q 9 e o n° n / {p L q e n p\ d l/ .9 P 9 1l r PRE)P'6SEB MINOR PLUG r p II FILL EXISTIlIG.I)ITCH i LY \ (LENGTH =50 ) 8.713 TO MATCH EXISTING 9275 j a b tiGRADES ON EACH S{� fR6PFSEBPIP E AND o OF 50' GRADIN o o a �� D 4 {FUTURE] ♦ Q RIPRAP f O S a i (V EXISTING DITCH -TO MATCH EXISTING t7 a 4� 1 d is V u q 40 1 y�.70�t /r i rr f/ r . t � lr r r F{ 9dJ .7 3± 'd � PRE-CONSTRUCTION PILL C aSURVEY SPOT ELEVATION GRADES ON EACH SIDE ' f LS OF 50GRADING LIMIT / LO PRE- CONSTRUCTION LIQAR (FUTURE) 8.37± A 1 9 ELEVATION 8.49t Q m p d � 0 l a 0 0 PRE- CONSTRUCTION SPOT o 12.50 EL €NATION O r G 12.40 AS - BUILT SPOT GRADES r {j m if Q ❑(y ° O 9.$33 9.77 ± O (� A °c D (?i NOTE; Q� q ( // f fl a 4 0 a d a o a poll O e ° {I THIS LEGEND SUPERCEDES LEGEND UN 9 '`. '8 -63t r ^ r ° v Q D p C' v ,. C1.2 WHEN CONFLICTING. 8.771 fl s o o D 50' EARTHWORK LIMITS W (Fo o o o o o ()o o 50' EARTHWORK LIMITS r U Q L P d (FUTURE) p Q 85 9.2 9 -18 a + , / a Jam[ 0 1fTi �1 8 48t l r' r �d 8.60± A '% (1 ' S o o SV� R Aft (SEE STREAM PLANS) p G C 9.35± R SHEET 51,5 / ° q � 8.283 r (Y;, C M a � a < 10� q 11 >� STREAM ALIGNMENT M J rr Sr�A�p o n SHF E4 Zry`(ry Q { 1 .l 9.6 r Mp I KEY MAP r Q I Ru r r l, 9.751 R RU S7S Wsj'- G tptssl , jQ5. 19- SA S gLq'VSJ'.�UtiT p a so 100 150 l SCALE IN FEET IN'E - See Sheet 04.41 ;r Minimum Elevation Minimum Elevation Maximum Elevation Color 8.500 9 -000 13.000 10.500 11 -ODD 16100 8.500 10 -OW . J rr Sr�A�p o n SHF E4 Zry`(ry Q { 1 .l 9.6 r Mp I KEY MAP r Q I Ru r r l, 9.751 R RU S7S Wsj'- G tptssl , jQ5. 19- SA S gLq'VSJ'.�UtiT p a so 100 150 l SCALE IN FEET IN'E - See Sheet 04.41 ;r AS -B U I LTS L e� s 2 E€�LL i F IC r � M o p Q w M N f6 � J J CL Q x Z LL O V PZ rta: 1002 DRAWN gv- RC DATE. 01116114 SHEET: 04.53 Minimum Elevation Minimum Elevation Maximum Elevubw Color 10100 70 -500 13.000 10.500 11 -ODD 16100 11.000 11 -500 ■ AS -B U I LTS L e� s 2 E€�LL i F IC r � M o p Q w M N f6 � J J CL Q x Z LL O V PZ rta: 1002 DRAWN gv- RC DATE. 01116114 SHEET: 04.53 Minimum Elevation Maximum Elevation Color 11.500 93.000 13.000 16 -000 ■ 16100 25.900 AS -B U I LTS L e� s 2 E€�LL i F IC r � M o p Q w M N f6 � J J CL Q x Z LL O V PZ rta: 1002 DRAWN gv- RC DATE. 01116114 SHEET: 04.53 C1 PLUG EL = 11.01 6 9 m a °i 1 97# �� -` 8.42#._ n CONSTRUCT ROADSIDE DITCH PLUG /•/ r /I a �� ".041 ��] ,. + ���v�^ - ✓� �7 1� - g9 33 0 0 [FUTURE] r�yy- v ,I / SMALL ROAD -/ 0pc> > ALIGNMENT �� 0 a- 5 J i h t "i v o .}0 v /• 1 CONSTRUCT 100' A. ROi 6SIDE DITCH PLUG 1 G ^� Q 9.971 // / [FUTURE] �M rl y �. �. / 14.261 q i> n O o O 0 O 0� [� O CF 09 0 v \1 P r. ✓ / `� Cr a 111111 19 .i a ` CJ mI a cb y a ;. 9.74± 4� y 4 q Ij 0a -0p O ��y� U � Q �-' �L7 Qp� ❑p V � z/ ❑�4, I"�,. V /, /�,`% 6p �// /� // Ja oP p a o 4 9 P "� a 9771.. f/ I� 6 DJ a y �q r try'' U�1 j Cy 1{� FI f]41S GDI7 / ri f' // LL1 i j 4 s l!7 v / } 9 s o n. a C19 ° a � 10.02± / / .771 �' 6 � � 4 any ° 9 � � a o � �' -',TO MATCH EXTST� ' Og /[ /� ° �� ® U& 9 f?� 6 �"' GRADE SONEACHIDE n r1 p ` � �Oy F 50' G., R1 ADIN G LIMIT F+ (FUITUR C, L EXISTING DITCH p TO MATCH EXISTING 9312± - , / ., GRADES ON EACH SIDE / / , '� (;,} � pO � " V L V ° o�° c� ° OF 50' GRADING LIMIT // � r � n � � � ° 0 �, I (FUTURE] ' ✓? n UUU p g j�! $� 9.231 / f'ri 9i4 21 ° �n�a f3 O ,I' C' ` Cyr, A .° oO o 4> O 9. n• •� / IVJ•. zj 1I (( �i / 0 4 D a C`n D U',�I g a 4} ` W //� /7 g Q6 �O © a D F O I ITS ✓ it 9.76 +_ IQ p / F i P U O O [� ° O O p Q r S j 50 � EARTHWORK LIMITS. // fl a �° d [FUTURE] 4�77 ' � �� M"•}'`jjJ a 1] � J l� �/ / �� �+' � a V_ � ` � a ° � ° �. �?4 l� � !f �D ,y °C` ✓f 4a a 9.87+ / // / 9,05f }. 9• O0 Q Oro 0. . q 4r / � / 0' © 1 / VV / 1a.2a ±, f / o ,: � 9 i 7 �R�R AcvU a 9.870 t $ �° �? quo d o o ' ��. � � �. .� � MA - e e 4 f p m �4 �►�. o cr l\ i� /•n 14 f f Y ° i _ �u ti nt `7 I a Minimum Elevation Maximum Elevation Color 8 0.0D0 7.500 ■ 7.500 8.000 ' -- 8.000 6.500 t AS -B U I LTS 10.481 XI Q LEGEND PRe PB5EB SPILLWAY Minimum Elevation Maximum Elevation Color 8.500 9.a0a ' 9.000 9 -500 ■ 9.500 10 -OW . AS -B U I LTS 10.481 XI Q LEGEND PRe PB5EB SPILLWAY Minimum Elevation Maximum Elevation Color 1x.000 10.500 ' 10.500 17.000 . 71.00D 17.500 ■ AS -B U I LTS 10.481 XI Q LEGEND PRe PB5EB SPILLWAY Minimum Elevation Maximum Elevation Color 11.500 13.DD0 ' 13.000 18.080 . 18.000 25.D00 KEY MAP AS -B U I LTS 10.481 XI Q LEGEND PRe PB5EB SPILLWAY N w (PYRAMAT TURF w z REINFORCEMENT) w orz ' ui o m PReP95EBDITCH CROSSING z (# 57 STONE) 7 PRePE8EB RIP RAP ( 5" - 12" CLASS B ) �l. 4 l _ POS€t3 TOP OF BERM PROP SEB 8" ROCK PAD (LARGE SIZE MINE REJECTS) ) DITCH FILL PRC AE BFLOW ARROW PRePBSEB SLOPE ARROW PRBPGSEB MOW MAJOR PLUG (LENGTH =100') PRBPBSEB MINOR PLUG (LENGTH = 50') PR6Pe8EB PIPE AND RIPRAP +�5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION ,,N PRE CONSTRUCTION LIDAR O ELEVATION 312.5® PRE - CONSTRUCTION SPOT ELEVATION 12.40 AS -BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. ' �TR[AR7 ALIGNM[NT - - - - PROJECT BOUNDARY :14 rs DENOTES THIS SHEET ra 1a - PHASE v 0 ro rr ' 7 _ PHASE 3 KEY MAP SCALE IN FEET is e� a� m rya'` E� -a 5a��wi a e r, IN z o^r a D U ¢© Q W M (f) L � J cq LL t� 0 2 r PRa- 1002 mAUw18r RC -TE: 01116/14 SHEET: C4.54 s � D f T- 100' /ROADSIDE DITCH PLUG SHNSTRSE3 100' - -,PLUG EL 11 51- i ROADSIDE DITCH PLUG �� — — t }--­,5_ - LEGEND ► H F'R6PBSEB SPILLWAY w (PYRAMAT TURF REINFORCEMENT) w orz 4 , o ° So ° PRePBSEB DITCH CROSSING (# 57 STONE) G; PRBP88E9 RIP RAP R DSJL { 5" - 12" CLASS B ] `- _TOP OF BERM /'D PROPOSEB 87 ROCK PAD ( LARGE SIZE MINE REJECTS) , s� /r /! / -PR6PASff3 -DITCH FILL [ ° op � Q r i/ � / f f 6/ ! / i • ,d - 0 ��— � $6£f3y• n_ h — RFLOW ARROW 10-204- UCT 1@ fRBP9SE9 SLOP E ARROW •k -_ 40#- � o 0 ?9 i3t— 0 (� 0 7# *1042±_ I? � t 0v CONSTR a a BROADSIDE DITCH PLLj ?0.7# G .544- MAJOR (LENGTH 100- 0 ' FUTURE) d CONSTRUCT 100' ] ROADSIDE DITCH PLUG )o I. i /f 'c� 4 p� Q 9 !/ / .(FUTURE) <J v a p T4.97± / a a r r� PRE)P6SEB MINOR PLUG ° yr //; 6 (LENGTH =50 ") yD ° °y ^ �ry t° F q anal �`R / i i tie �s FILL XIS,TIN° G DITCH //` + � ° C° RepeSEB PIPE AND 4 ° A 10% MATCH EXISTING U o eD � - ffGii� y CJ P 4 � � Up � a �` 11.441 i / RIPRAP 4 1111 }} HADES ON EACH SIDE j) v �/X / �}� D l� 0 G7a ✓ j v� f ` 10.21* 4 O 9 fir' f �PRE-CONSTRUCTION GRAQING LIMIT SURVEY SPOT ELEVATION ( D 1 o `S y ` 45 i # a a � p r ING DITCH { y4 PRE - CONSTRUCTION LIDAR D ° .1 FILL EXIST 1 ® ELEVATION P CH EXISTING ° ES ON EACH SIDS ° PRE - CONSTRUCTION SPOT ' OF 50 GRADING LIMIT ✓ 1 ° � X1250 V 6 t o q� n Minimum Efe"lion Maximum FlevBbon Color 0 -ow 7,500 ■ 7..500 9.000 ■ B.DOd 8.500 ■ J i CS Q� ELEVATION ❑ 4 Lr7 _ { (FUTURE) 10.79t' i /! ' { / y G a a n ❑ Ol q �7y i 12.fl0 AS - BUILT SPgT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON J C1 �I1 � it ✓° / o o DO !i flog p 0 a yD0 Gd a� ( {iSU f^� /? yflg� ` C1.2 WHEN CONFLICTING- 0 n y2l Oj q Q° D J ° C� b ' / ° 1 ✓ 0 ��(yj q 6 C o // e Q 7 I 0 �D � p d % V ry � `6J e a o v 0i.r / v /,I °E7tFi(FUTUURE]IIMITS / A 11 C� na yyL> (�Y (� \f aL3 4 ��Q Cpi� q p7 C3 OS r //f 1�J.61# G/ Y >• l/ f'/ ,r)`V -Jp n 4 �. 10.::84+ ' //� * o a q ° ° v [I �/� 0' EAF THWO IC' LIMBS r q 6 a (}j} j ° 1 fF4lTU ♦ 1 . /% p� Clo1D c ° L�( O�%3 pL/Ci �9 4�U i�. �/t n // / ❑ n Q D 4 p 0 1.78 1 / 14393 o 6 iD . O ,' / / // " o p n 10.575 f i/ /fir,: 10 �6 r fff]jj 0�I C o D} V c-0 }} 'h Ob 40 / / I ! 4'h rS I 5 it PHASE t a J P � � 0� q q � � / �� J /.., i � 7 PNASE3 �j � � J`•] y� a� � I � `a. 0.641' / X; KEY MAP LID o{I oQ 0 0`l`ll}Cid p aQ 4 r. y // ✓ /� „� a so 100 150 p� I� m° N FEET SCALE -&Tc IN �j S �S s� I Minimum Elevation Maximum Elevation Color 8.500 9.00Q ■ 9.000 9 -5DQ ■ 8.500 10.000 ■ J i CS Q� ELEVATION ❑ 4 Lr7 _ { (FUTURE) 10.79t' i /! ' { / y G a a n ❑ Ol q �7y i 12.fl0 AS - BUILT SPgT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON J C1 �I1 � it ✓° / o o DO !i flog p 0 a yD0 Gd a� ( {iSU f^� /? yflg� ` C1.2 WHEN CONFLICTING- 0 n y2l Oj q Q° D J ° C� b ' / ° 1 ✓ 0 ��(yj q 6 C o // e Q 7 I 0 �D � p d % V ry � `6J e a o v 0i.r / v /,I °E7tFi(FUTUURE]IIMITS / A 11 C� na yyL> (�Y (� \f aL3 4 ��Q Cpi� q p7 C3 OS r //f 1�J.61# G/ Y >• l/ f'/ ,r)`V -Jp n 4 �. 10.::84+ ' //� * o a q ° ° v [I �/� 0' EAF THWO IC' LIMBS r q 6 a (}j} j ° 1 fF4lTU ♦ 1 . /% p� Clo1D c ° L�( O�%3 pL/Ci �9 4�U i�. �/t n // / ❑ n Q D 4 p 0 1.78 1 / 14393 o 6 iD . O ,' / / // " o p n 10.575 f i/ /fir,: 10 �6 r fff]jj 0�I C o D} V c-0 }} 'h Ob 40 / / I ! 4'h rS I 5 it PHASE t a J P � � 0� q q � � / �� J /.., i � 7 PNASE3 �j � � J`•] y� a� � I � `a. 0.641' / X; KEY MAP LID o{I oQ 0 0`l`ll}Cid p aQ 4 r. y // ✓ /� „� a so 100 150 p� I� m° N FEET SCALE -&Tc IN �j S �S s� I is e� ti� m HAS Mimi 2AEA ale 5; E ; - a a� A t� G I� f R C � � J 4I z O M a z O U O LL {u 0) M IL cn Z to J LL O � O x H x_ P-- -: 1002 DAWN BY: RC DATE: 01/16114 SHEET: X4.55 Minimum Elavatiarl Maximum Elevation Cider 10.000 10.500 ■ 10.500 11.DDD ■ 71.000 17.5i/0 ■ is e� ti� m HAS Mimi 2AEA ale 5; E ; - a a� A t� G I� f R C � � J 4I z O M a z O U O LL {u 0) M IL cn Z to J LL O � O x H x_ P-- -: 1002 DAWN BY: RC DATE: 01/16114 SHEET: X4.55 Minimum Elevation Maximum Elevation Color F1.500 93.000 ■ f3.OdD 98.086 ■ SB.OW 25.000 is e� ti� m HAS Mimi 2AEA ale 5; E ; - a a� A t� G I� f R C � � J 4I z O M a z O U O LL {u 0) M IL cn Z to J LL O � O x H x_ P-- -: 1002 DAWN BY: RC DATE: 01/16114 SHEET: X4.55 (j LEGEND FR8P85EB SPILLWAY (PYRAMAT TURF I r v ❑ a I 7 REINFORCEMENT) ` o PReP85EB DITCH CROSSING {# 57 STONE} 1 p k 4y o� ° LU PReP88EBRIP RAP R $[d I L ©hU I' d_ Q.h Dc 2)h 5" 12" CLASS B) 91— 4 oh • — -v �Y n Gil ' 0 _ STOP OF BERM i' ` ^ ROPeSEB F' ROCK PAD r '' P OS i� D ° l� (LARGE SIZE MINE REJECTS { A SMALL ROAD 4M v ( ) ALIGNME �s li EXISTING ROAPSID o � ' c 1 tl I o $ ` ��y y EL - 1= {V s � '� �- [ T0:52Q tv ` _ J . � �_ p _ q l., �i Q c.f ' c'S 1 a §— .F-9•3 - r , h-- ` - _ - - - —_. _ -- _ - -._ ` _J . -- . `�` r - 1Q 0 :473- Y r r i r/ r _ r -- -- � - - - r f . = 1 - 3'$m t r /r ' J'' , ( ✓ ! 1 � r " ,J 0 ! 4 L o r r- - "DITCH FILL {g O T1 $ ld PLUG Ei c m I FLOW ARROW A fR8P95E#3 SLOPE ARROW C O PREIPGSEB cc OADSIDE 044--oZ. &4 6 c (LENGTH = 10 0 ') R ©� % DITCH ° U) MAJOR PLUG .g7tTING R ! "r t� © 1 6 'O x11.60+ J fR8P85E8 MINOR PLUG E 12.8# v 1258 (LENGTH = 59) i � CONSTRUCT 100 111.fl83 ' ' 0 � = ase XP043� p 0 O d r 12.07s � x `r ✓ / r U f V y) q a q 5 fRepeS EB PIPE AND D 0 a ROADSIDE DITCH PLUG L RIPRAP o y ah o ��� � d Qv PRE - CONSTRUCTION p 0 Jet b o t _ C)• V rV �kfV j a o p O �1 1� �° q } p �, o / / ' � r/ rr r i' r r P A• L� D �Cvl � ° ac o� V 1� 1haQ . 0 SURVEY SP OT ELEVATION 51 LEY nY 11.331 10 0 ? PRE- CONSTRUCTION LIDAR 10.58± i c P ELEVATION Q p 9, FILL PRE- CONSTRUCTION SPOT J TO MATCH EXISTING Q 1 i o' y X12.5® GRADES ON EACH SIDE ELEVATION ry ( CJ VC b OF 50' GRADING LIMIT �i fr TO MATCH EXISTING r> r/ r 0� b Q °� D o ° , r s,• 12.00 AS -BUILT SPOT GRADES (FUTURE) -yam/ r� GRADES ON EACH SfOE r r' rr �' ph o < ® � F OF 50' GRADING LIMIT r� r EXISTING DITCH QhO NOTE: Q hot a it 'J r r FUTURE r r 11.04 E o J1 �J h o Q O ho1U'41# , rr � 10.71± ( } r ^r p v o o� o i LLt THIS LEGEND SUPERCEDES LEGEND ON U7 C1.2 WHEN CONFLICTING. r y 11.50# r . �� v pA C� C, 50' EARTHWORK LIMITS v 0 �• d/? FUTURE r t i a3 ,x` ax h� 11.33± b a e tiff, se ,ro ,o„ 0 Q d t Ly o f�j t r a a n h� r' r n ho° as sc ei a �Cy G @Q a p fl a 0 „ti6 0:7# r1 ref 11 -131 0 [} l 7 11,281 o (j ARTHWORR LIMITS f ! r Q r> / rr / Jo q ] ° a (FUTURE} r r ro hhti P r� i7 a T he{cT�Frr 10.791 1S TIN dIT H sm[na [,Gu a[eT 4. O V 6 ,,./�� Cl .yn.� / ! D p 4 C /. ,, '� //��,,1 • `_'ti -� tl `ri 0 4 1 (� Q a O _ {J d ti > �i } '.. �r J r,�l 9 /� A < ;A r r / . O 6 j 0 4) - . V - 1j' i/ 11 �° VV % J >� `E 11.58f ° 1 a ® ,�J� 4 �r — — PROJECT80UND4RY D ° h TD,59t. r r (l n t� Q T i Q' 1j ,ri 0 G° a 39 DENO TES THIS SNr F: o r// r 14.75# V 4 r L -0 i 4 "ry o 0 6 S 0 °v "s Q9 f�l- p p v `� c a _ tf �5 CJ C] 11 /r 6 fS O 10 11 PHASE 1 (� d °s [ `—, V a si ° p .I r ..1 U o r r„ /•, ^� PHASE3 a (f J I 3. 10.97± I . 9 a o U Q o �i r M1,• r ® rj o r h t KEY MAP r�I CONSTRUCT 50' a y fl •,�• Q �,' 10,861 r I �l QPIELD DITCH PLUG ' f �l UTURE} -r ! �' P a so soo so SCALE IN FEET 9 Me Sheet'.44, 1 - a Minimum Elevation Maximum Elevation Color $ 0-ow 7.500 ■ 7.500 8.000 -- 8.000 6.500 t AS -B U I LTS yN a H prz c> w Q � a is e� m EF_d v� r 1-11 L � z C o p ¢© Q w M N (1) � J J CL Q9 _� Q V Z LL �0 PRa-N�.: 1002 ORAYYN 8r: RC -TE: 01116/14 SHEET: q 4.56 Minimum Elevation Maximum Elevation Color 8.500 a.00O 9.000 9 -500 ■ 8.500 10-OW . AS -B U I LTS yN a H prz c> w Q � a is e� m EF_d v� r 1-11 L � z C o p ¢© Q w M N (1) � J J CL Q9 _� Q V Z LL �0 PRa-N�.: 1002 ORAYYN 8r: RC -TE: 01116/14 SHEET: q 4.56 Minimum Elevation Maximum Elevation Culnr 10.000 ao.snO 10.500 17.000 ■ 71.000 17.500 ■ AS -B U I LTS yN a H prz c> w Q � a is e� m EF_d v� r 1-11 L � z C o p ¢© Q w M N (1) � J J CL Q9 _� Q V Z LL �0 PRa-N�.: 1002 ORAYYN 8r: RC -TE: 01116/14 SHEET: q 4.56 Minimum Elevation Maximum Elevation Color 11.500 9:,-- 13.000 18.000 ■ 18.000 25.000 AS -B U I LTS yN a H prz c> w Q � a is e� m EF_d v� r 1-11 L � z C o p ¢© Q w M N (1) � J J CL Q9 _� Q V Z LL �0 PRa-N�.: 1002 ORAYYN 8r: RC -TE: 01116/14 SHEET: q 4.56 CAN I IIY * l ! I r7--\, n 1!101 a Cl /'z Q�� 1 I {./`�J,p � p Q o• r� �.... Q o 0 C 3 C L`��� a a '(?,EXISTING DITCH TOP 0 D n `= EXISTING DITCH i $6j Ji oC- 0, of o I iP 0 _ . ++ Y cLc � /h EXIS�td G cl) � � ' NORTF ( PROPER J - oo < a - ' '11LIG LU + (Y N 4' + o. I 0 .9@ P OF BANK 7.50 Q' s A� a° I � \_EXISTN46 GRARE 41 �T s r I n `q0 A r _ U a i i BBER� b a 0 O e U 0a - NORTH PROPERTY LINE f.1z PIPE CROSSING DETAIL } y `~J , .- ALIGNMENT (SEE SHEET C9.1) TF i % STA, 15 +50 c7.6 L/ LL �2- 18^ HDPE 0`� (SEE SHEETC91j kIALL RD o //I � •per 2 V ` i1 J 1 0 r r � f•: AS —B U I LTS . LEGEND ew PR+9PE)SEB SPILLWAY k (PYRAMAT TURF of REINFORCEMENT) W c z a 1 m p i a �r # ReP85EB DITCH CROSSING i (# 57 STONE) oq w PRBPE8EB RIP RAP (5" - 12" CLASS B) _ PROPOSEB TOP OF BERM PROP1 SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRISPOSEE) DITCH FILL i ..�P86EBFLOW ARROW 0~ PReP95E$ SLOP EARROW �R -Pe5E_ MAJOR PLUG =Ed (LENGTH = '100') -PR9P85E8 MINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP t�5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION �? PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPDT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. GTREAM ALIGNMENT Minimum Elevation Minimum Elevation Maximum Elevation CWor 8.500 9.00 43.00 8.000 9.500 E 8.500 1tl.00 . AS —B U I LTS . LEGEND ew PR+9PE)SEB SPILLWAY k (PYRAMAT TURF of REINFORCEMENT) W c z a 1 m p i a �r # ReP85EB DITCH CROSSING i (# 57 STONE) oq w PRBPE8EB RIP RAP (5" - 12" CLASS B) _ PROPOSEB TOP OF BERM PROP1 SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRISPOSEE) DITCH FILL i ..�P86EBFLOW ARROW 0~ PReP95E$ SLOP EARROW �R -Pe5E_ MAJOR PLUG =Ed (LENGTH = '100') -PR9P85E8 MINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP t�5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION �? PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPDT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. GTREAM ALIGNMENT Minimum Elevation Minimum Elevation Maximum Elevation tutor sn.tltltl atl.5oo 43.00 70.550 17.500 18.00 71.00 17.500 ■ AS —B U I LTS . LEGEND ew PR+9PE)SEB SPILLWAY k (PYRAMAT TURF of REINFORCEMENT) W c z a 1 m p i a �r # ReP85EB DITCH CROSSING i (# 57 STONE) oq w PRBPE8EB RIP RAP (5" - 12" CLASS B) _ PROPOSEB TOP OF BERM PROP1 SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRISPOSEE) DITCH FILL i ..�P86EBFLOW ARROW 0~ PReP95E$ SLOP EARROW �R -Pe5E_ MAJOR PLUG =Ed (LENGTH = '100') -PR9P85E8 MINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP t�5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION �? PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPDT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. GTREAM ALIGNMENT Minimum Elevation Maximum Elevation CWor 41.50 13.00 ai7 43.00 16 -000 ■ 18.00 25.00 AS —B U I LTS . LEGEND ew PR+9PE)SEB SPILLWAY k (PYRAMAT TURF of REINFORCEMENT) W c z a 1 m p i a �r # ReP85EB DITCH CROSSING i (# 57 STONE) oq w PRBPE8EB RIP RAP (5" - 12" CLASS B) _ PROPOSEB TOP OF BERM PROP1 SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRISPOSEE) DITCH FILL i ..�P86EBFLOW ARROW 0~ PReP95E$ SLOP EARROW �R -Pe5E_ MAJOR PLUG =Ed (LENGTH = '100') -PR9P85E8 MINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP t�5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION �? PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPDT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. GTREAM ALIGNMENT PROJE'OT SOfIMDARY ai7 O DENOTES THIS SHEET . PHASE 7 KEY MAP 0 50 r°0 r5p SCALE IN FEET ao �� a a6 49 W e � AE -q l ai€�wi z u. �L r � M M1 � M m z a M O d z ¢0 0 Lill m f1] a Z i Q � J J CL n 0 V y a: Z 7C3 7 4 � V PROJ, NO.: 1002 tRAWNBY RC DATE: 01M6114 16114 SHEET Cd C� T.6V t s t i i See ' a CA � f IL 0 0 FSERkfC�r � I - I FIELD BITCH PLUG ¢� QI' L_ _ •�•- �S EXISTING DITCH (PARTIALLY FILLED) ~ c g q, ty CJ \� J •. P ! r d� 1 ppI I Minimum Elevation I Maximum Elevation I Color 0Aa0 7.564 ■ 7.500 8.040 ■ 8.600 6.500 ■ I r. LEGEND j; ~ �RBPE)SEB SPILLWAY w F (PYRAMAT TURF REINFORCEMENT) r i I:, o •, a ' j� f'R91'BSE$OETCH CROSSING z 57 STONE) C4.70 0 ,A f � PRBP65EB RIP RAP ll 1 t - r t r —. ; r I ,,err -*r a t i " -- - -- t 5' 12" CLASS 8 ] is —�hr. µ t ' _ I PRBPBSEi}TOP OF BERM �;-, \'o b ! P b 0 PRBPB5EB 8" ROCK PAD ( LARGE SIZE MINE REIECTS ] a s i �� ! fRBP65EEDITCH FILL PREWEISEB FLOW ARROW b` °� a# b` °6 ®`a� b` °� PRE)P85EB SLOPE ARROW tS, , I F PRBPGSEB MAJOR PLUG (LENGTH = 100') r G t PR9P6S€MINORPLUG °h p (LENGTH = 50') G♦ ' IAI, Cis f 0 I I IV( m P%PeGEE PIPE AND IF RIPRAP P _r _ • $5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION V ` PRE- CONSTRUCTION LIDAR 'Y NCI ea ELEVATION P e 't X125I1 PRE - CONSTRUCTION SPOT •• 0 ELEVATION P P t (12.60 AS - BUILT SPOT GRADES Q a NOTE: ¢ Z P P EXISTING DITCH c ! O) O Y p (PARTIALLY 1 1LLEQj, _ THIS LEGEND SUPERCEDES LEGEND ON Q IV a \fly C1.2 WHEN CONFLICTING. ++ 0 *., w P J 1 p FS. m � — u Minimum Elevation Minimum Elevation Maximum Elevation Color 8.500 9.804 13.000 9.000 8.904 ■ 8.500 10-OW . I r. LEGEND j; ~ �RBPE)SEB SPILLWAY w F (PYRAMAT TURF REINFORCEMENT) r i I:, o •, a ' j� f'R91'BSE$OETCH CROSSING z 57 STONE) C4.70 0 ,A f � PRBP65EB RIP RAP ll 1 t - r t r —. ; r I ,,err -*r a t i " -- - -- t 5' 12" CLASS 8 ] is —�hr. µ t ' _ I PRBPBSEi}TOP OF BERM �;-, \'o b ! P b 0 PRBPB5EB 8" ROCK PAD ( LARGE SIZE MINE REIECTS ] a s i �� ! fRBP65EEDITCH FILL PREWEISEB FLOW ARROW b` °� a# b` °6 ®`a� b` °� PRE)P85EB SLOPE ARROW tS, , I F PRBPGSEB MAJOR PLUG (LENGTH = 100') r G t PR9P6S€MINORPLUG °h p (LENGTH = 50') G♦ ' IAI, Cis f 0 I I IV( m P%PeGEE PIPE AND IF RIPRAP P _r _ • $5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION V ` PRE- CONSTRUCTION LIDAR 'Y NCI ea ELEVATION P e 't X125I1 PRE - CONSTRUCTION SPOT •• 0 ELEVATION P P t (12.60 AS - BUILT SPOT GRADES Q a NOTE: ¢ Z P P EXISTING DITCH c ! O) O Y p (PARTIALLY 1 1LLEQj, _ THIS LEGEND SUPERCEDES LEGEND ON Q IV a \fly C1.2 WHEN CONFLICTING. ++ 0 *., w P J 1 p FS. m � — u Minimum Elevation Minimum Elevation Maximum Elevation Color 1010a 10 -SD0 13.000 10.900 11 -000 18.000 11.000 11.5110 ■ I r. LEGEND j; ~ �RBPE)SEB SPILLWAY w F (PYRAMAT TURF REINFORCEMENT) r i I:, o •, a ' j� f'R91'BSE$OETCH CROSSING z 57 STONE) C4.70 0 ,A f � PRBP65EB RIP RAP ll 1 t - r t r —. ; r I ,,err -*r a t i " -- - -- t 5' 12" CLASS 8 ] is —�hr. µ t ' _ I PRBPBSEi}TOP OF BERM �;-, \'o b ! P b 0 PRBPB5EB 8" ROCK PAD ( LARGE SIZE MINE REIECTS ] a s i �� ! fRBP65EEDITCH FILL PREWEISEB FLOW ARROW b` °� a# b` °6 ®`a� b` °� PRE)P85EB SLOPE ARROW tS, , I F PRBPGSEB MAJOR PLUG (LENGTH = 100') r G t PR9P6S€MINORPLUG °h p (LENGTH = 50') G♦ ' IAI, Cis f 0 I I IV( m P%PeGEE PIPE AND IF RIPRAP P _r _ • $5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION V ` PRE- CONSTRUCTION LIDAR 'Y NCI ea ELEVATION P e 't X125I1 PRE - CONSTRUCTION SPOT •• 0 ELEVATION P P t (12.60 AS - BUILT SPOT GRADES Q a NOTE: ¢ Z P P EXISTING DITCH c ! O) O Y p (PARTIALLY 1 1LLEQj, _ THIS LEGEND SUPERCEDES LEGEND ON Q IV a \fly C1.2 WHEN CONFLICTING. ++ 0 *., w P J 1 p FS. m AS- GUILTS 14 - -,. q)o t� \ L Fj sTa[AU xL. iGr:r,�[Nr ? 28 � — u Minimum Elevation Maximum Elevation Color 11.500 13.000 1D, 13.000 18.000 ■ 18.000 25.000 AS- GUILTS 14 - -,. q)o t� \ L Fj sTa[AU xL. iGr:r,�[Nr ? 28 � — u PROJECT BCLlNOARY 21 14. O !DENOTES THIS SHEET 14 PHASE1 1D, s 6 _. PHASE3 KEY MAP 0 50 146 150 SCALE IN FEET CL Z � Q � J J Q. Z LL O x O0 V PRDJ. NO.: 1002 BRAWN BY, RC DATE 01116114 SHEET' 04.66 * A4, w r �s - Ir r i 1� X11 I Oma 7I A, 17 0 II, PI I' I o I� P� P PIS ►� Minimum Elevation I Maximum Elevation 3 Minimum Elevation 0-wo 7.500 r 7.500 8.000 8.000 8.500 i! 18.000 FIELD DITCH PLUG 4 k tiu r .P IIP I • fi �4I _ PR6P95E9 Minimum Elevation Minimum Elevation Maximum Elevation Color 8.500 7,7 I, 9.000 11.000 18.000 8.500 11.500 ■ FIELD DITCH PLUG 4 k tiu r .P IIP I • fi �4I _ PR6P95E9 Minimum Elevation Minimum Elevation Maximum Elevation Color 10100 10 -SD0 I, 10.500 11.000 18.000 11.000 11.500 ■ FIELD DITCH PLUG 4 k tiu r .P IIP I • fi �4I r 1 ' a .a �• II A5- BUILTS j •- t LEGEND _ PR6P95E9 Minimum Elevation Maximum Elevation Color 11.500 93.000 lU7 13.000 18.000 ■ 18.000 25.000 PRE)P65EF) r 1 ' a .a �• II A5- BUILTS j •- t LEGEND _ PR6P95E9 + f'RE)POSEB SPILLWAY w DPRBP9SEB (PYRAMAT TURF ( LARGE SIZE REINFORCEMENT) prz r / PR6P65EEDITCH FILL C) a PRE)P65EF) SLOPE ARROW PRePBSEB DITCH CROSSING z (LENGTH = 100') (# 57 STONE) MINOR PLUG r PR6P95EE) RIP RAP ( S" - 12" CLASS B ) _ PR6P95E9 TOP OF BERM DPRBP9SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) r / PR6P65EEDITCH FILL PkeFIBSEB FLOW ARROW PRE)P65EF) SLOPE ARROW PRBPGSEB MAJOR PLUG (LENGTH = 100') - PR6P65EB MINOR PLUG (LENGTH = 50') P%P9SSEEfPIPE AND Kk RIPRAP {b PRE - CONSTRUCTION SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT z ELEVATION 12.40 AS - BUILT SPOT GRADES Q NOTE: ¢ z L) J 0 THIS LEGEND SUPERCEDES LEGEND ON 4 LL C1.2 WHEN CONFLICTING. w ED n� Vl r L � J __J LL KEY MAP (6 O Q x H - 0 LJ u7 0 so 100 150 SCALE IN FEET PRDJ. ryo.: 1002 MAWN BV- RC DATE: 01116114 SHEET'. 04.67 "� � �, � � i 1 I • ��� 1 ga , ._ ; J* f'LEGEND ' p N • ► 1 � ent �+ _ RE)POSEB SPILLWAY y I % xv. (PYRAMAT TURF 6 REINFORCEMENT) FIELp DITL "H PLUG :i hs ■ �� �� r a $P95EE) DITCH CROSSING a i �F ++ q (# 57 STONE) 0 '� J l► 4 t PRGP65EE) RIP RAP .. 1 �R` lot \:__ "►' �¢ _ r { 5,. _ 12° CLASS B 4 ' " 2 ' + , !. '' 4`. , R 1 ahQ' f WALL ROAD CIO PRBP95E9 TOP OF BERM �4. } ►♦ w t\°ti Gh ALIGNMENT FZTING ROADSIDE Owl �� < < �� 1 �., ' Sv I a DITC _ �E ROCK PAD a I � "� ' � � �' � � ` 0 (LARGE SIZE MINE REJECTS) AF A ' a f. �' f j PLUG EL - 11 52 /R6P65EEDITCH FILL a� PLUG EL = 11.22 / 44 - y ► L E 4e6n`° -� �` - _,�• . FLOW ARROW • t CH PLUG ©� 11 �� ' ��'� PRE)P8SEBSLOPEARROW • f r a PLUG EL = 10 93 - a h to 4� 1 s - I - 9 r 4 I � I -I � 1 �I �0 a MAJOR PLUG Q o 4 EXISTING ROAD (LENGTH = 100') DITCH ► r . ' i ; r Ahoy ''� K' ` d f. 1 1 i P�j� o } � �> " PR6PE)SEB MINOR PLUG (LENGTH = 50') A a , h. Q c }j 1b 4 f 2OP PIPE AND RIPRAP p C7 I' .p?� �, IJ G [� �0 y d� a h PRE - CONSTRUCTION 11 SURVEY SPOT ELEVATION 0 P J ` I► - �! 40 ❑ � r', - V a�n PRE - CONSTRUCTION LIDAR p � �o � �� � � � try � ELEVATION .40 - Q i J ►' I A6 6 1 0. 12 56 PRE - CONSTRUCTION SPOT M pF } {� 4 l j Z} /V q s f 1 0 e a tic ELEVATION Q ► j . Ip p {� � L' qVJ a o 11.00 AS - BUILT SPOT GRADES Un Q o r�o • K I i i. i'� t3 4 r� 0 1 O i art i lllffl v 1 rs v`o p r NQl E. ¢ o � a ►' i I n 4 THIS LEGEND SUPERCEDES LEGEND ON O LL C1.2 WHEN CONFLICTING . r� r� y *�- � SMALL ROAD I I I `ALIGNMENT 0 1 t �!I Ile }r l 9a iJ ` �► ^� +p p I EXISTING ROADSIDE DITCH J. tio• �I� I I I � U c v ,� � �� o p � � i Z. {61413510 ���� I �0 a © 7' ,a [S p Ct� CL Z C Q � J J t1. Z -D < — �I (4 0 LL r DITCH I I j a r a s �, KEY MAP CL5 O Q ♦. f 4 4 0 1v P ��1p LY �o� C! 19 A p d l , {rte a i I aI a I(G 0° ,; M1 ° 50 tou , su a �.V ,- SCALE IN FEET Q' n 1 V ° 10 t n PRO.i. NO.: 1002 E Minimum Elevation Maximum Elevation Cokw Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevstion Color 0.000 7.500 ■ 8.500 9:000 10.000 10.500 11.500 13.0130 r 7.500 8.000 ■ 9.000 9 -500 . 10.500 11.000 13.000 18.000 ■ Y $.1100 8.500 �'� 9.500 10.0013 . 11.000 11.51/0 ■ 16wo 25.000 AS- GUILTS twAw" By RO WE 011'16/14 SHEET 04.68 0h E j 4P f 0116 1 �I �0 a MAJOR PLUG Q o 4 EXISTING ROAD (LENGTH = 100') DITCH ► r . ' i ; r Ahoy ''� K' ` d f. 1 1 i P�j� o } � �> " PR6PE)SEB MINOR PLUG (LENGTH = 50') A a , h. Q c }j 1b 4 f 2OP PIPE AND RIPRAP p C7 I' .p?� �, IJ G [� �0 y d� a h PRE - CONSTRUCTION 11 SURVEY SPOT ELEVATION 0 P J ` I► - �! 40 ❑ � r', - V a�n PRE - CONSTRUCTION LIDAR p � �o � �� � � � try � ELEVATION .40 - Q i J ►' I A6 6 1 0. 12 56 PRE - CONSTRUCTION SPOT M pF } {� 4 l j Z} /V q s f 1 0 e a tic ELEVATION Q ► j . Ip p {� � L' qVJ a o 11.00 AS - BUILT SPOT GRADES Un Q o r�o • K I i i. i'� t3 4 r� 0 1 O i art i lllffl v 1 rs v`o p r NQl E. ¢ o � a ►' i I n 4 THIS LEGEND SUPERCEDES LEGEND ON O LL C1.2 WHEN CONFLICTING . r� r� y *�- � SMALL ROAD I I I `ALIGNMENT 0 1 t �!I Ile }r l 9a iJ ` �► ^� +p p I EXISTING ROADSIDE DITCH J. tio• �I� I I I � U c v ,� � �� o p � � i Z. {61413510 ���� I �0 a © 7' ,a [S p Ct� CL Z C Q � J J t1. Z -D < — �I (4 0 LL r DITCH I I j a r a s �, KEY MAP CL5 O Q ♦. f 4 4 0 1v P ��1p LY �o� C! 19 A p d l , {rte a i I aI a I(G 0° ,; M1 ° 50 tou , su a �.V ,- SCALE IN FEET Q' n 1 V ° 10 t n PRO.i. NO.: 1002 E Minimum Elevation Maximum Elevation Cokw Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevstion Color 0.000 7.500 ■ 8.500 9:000 10.000 10.500 11.500 13.0130 r 7.500 8.000 ■ 9.000 9 -500 . 10.500 11.000 13.000 18.000 ■ Y $.1100 8.500 �'� 9.500 10.0013 . 11.000 11.51/0 ■ 16wo 25.000 AS- GUILTS twAw" By RO WE 011'16/14 SHEET 04.68 C] Q-� o CI d R TH . J N °`— —`r - o 1 � L/• cv C c 7 J N c _ G NORTH PROPERTY L14E �� ALIGNMRNT EXISTING DITCH IL PHA T ns EXISTING DITCH —� 3 EXISTING DITCH LINE`. ti ,+ \•$" Qf Q1a j, 136. `� 2.00 "- Y�. � �• ! � � !�� ,iW _ � � " ° sw" , V� ` � o o 4 • 7` s 0 Q U. NN - N • 0 a 0 g �_PlRePe6E tpITCH \..)BERM �q l ;243' -. °wo l� E1r Q % tip ' C2, *1 0 ■ %.,E AS - auILT @A7 Minimum Elevation Maximum Elevation Cdor Minimum Elevation Maximum Elevation Cdor 10.000 10 -500 11.500 13 -0130 lU7 10.500 17 -000 13.000 16 -000 ■ 11.000 11 -500 ■ l6wo 25.000 WIF LEGEND fREIPOSEB SPILLWAY k g 0 (PYRAMAT TURF REINFORCEMENT) o z • � P 10. j fRePEI DITCH CROSSING a i + (# 57 STONE) PREIPOSEE) RIP RAP Iw O 11 - Q '1 r ■ ;v � 54' 1 FIELD DITj L V, All r 1 (STING DITCH -- ARTIALLY FILLED) r AS- GUILTS . (S" - 12" CLASS B) Minimum Elevation Maximum Elevation Color 8.500 9:000 PR6P9SEB 8" ROCK PAD 9.000 9 -500 ff 9.500 10 -000 . ■ %.,E AS - auILT @A7 Minimum Elevation Maximum Elevation Cdor Minimum Elevation Maximum Elevation Cdor 10.000 10 -500 11.500 13 -0130 lU7 10.500 17 -000 13.000 16 -000 ■ 11.000 11 -500 ■ l6wo 25.000 WIF LEGEND fREIPOSEB SPILLWAY k g 0 (PYRAMAT TURF REINFORCEMENT) o z • � P 10. j fRePEI DITCH CROSSING a i + (# 57 STONE) PREIPOSEE) RIP RAP Iw O 11 - Q '1 r ■ ;v � 54' 1 FIELD DITj L V, All r 1 (STING DITCH -- ARTIALLY FILLED) r AS- GUILTS Ja (LENGTH = 50') w PROP PIPE AND RIPRAP PRE - CONSTRUCTION R� SURVEY SPOT ELEVATION 0 PRE - CONSTRUCTION LIDAR ELEVATION X1250 50 PRE - CONSTRUCTION SPOT M Y ELEVATION — � Q � °.12.00 -� AS - BUILT SPOT GRADES Q �1 C N{]TE: ¢ z F �O r THIS LEGEND SUPERCEDES LEGEND ON O LL C1.2 WHEN CONFLICTING. x � m :.,. � i D UMAW, — _. X I % I- n }1 is 13 1' C6 U7 'C Z C Q � J __j LL KEY MAP CL5 O Q x — 0 LJ u7 o sa Iou Isu SCALE IN FEET PRG1. NO.: 1002 twAWN BY RC N. Na, PATE DESCRIPTION DATE: 01116/74 SHEET'. X4.69 _ I . (S" - 12" CLASS B) PR61P95ED TOP OF BERM PR6P9SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PR6P65EEDITCH FILL ` 7 • ._ . - f'kePE)SEB FLOW ARROW PRE)P65EB SLOPE ARROW 'r PRBPGSEB MAJOR PLUG (LENGTH = 100') i , PRBPOS€E) MINOR PLUG Ja (LENGTH = 50') w PROP PIPE AND RIPRAP PRE - CONSTRUCTION R� SURVEY SPOT ELEVATION 0 PRE - CONSTRUCTION LIDAR ELEVATION X1250 50 PRE - CONSTRUCTION SPOT M Y ELEVATION — � Q � °.12.00 -� AS - BUILT SPOT GRADES Q �1 C N{]TE: ¢ z F �O r THIS LEGEND SUPERCEDES LEGEND ON O LL C1.2 WHEN CONFLICTING. x � m :.,. � i D UMAW, — _. X I % I- n }1 is 13 1' C6 U7 'C Z C Q � J __j LL KEY MAP CL5 O Q x — 0 LJ u7 o sa Iou Isu SCALE IN FEET PRG1. NO.: 1002 twAWN BY RC N. Na, PATE DESCRIPTION DATE: 01116/74 SHEET'. X4.69 _ I r 0 i 3 V I - MA, Cii`hj,NE` -- ­See p .$0 I. 'lot 0 1' y y s ` EXISTING DITCH r 1 + ,F. (PARTIALLY FILLED 161%,e ,'+ ` 0 cr s _ I g• ,q� -' �° � �© ..' cad' y y � 4-EXISTING DITCH (PARTIALLY FILLED) 010 If lyy yy Ilk ! 0 0 t � r 1 40" o SQ, D DITCH PLUG -� • ] +. o II II D o 4 s 1 {k w Minimum ElavaSon _ Maximum Elevation Cdar 0, 9.000 c s oo� 9-wo SBA00 8.500 10.1100 . Ir r 0 i 3 V I - MA, Cii`hj,NE` -- ­See p .$0 I. 'lot 0 1' y y s ` EXISTING DITCH r 1 + ,F. (PARTIALLY FILLED 161%,e ,'+ ` 0 cr s _ I g• ,q� -' �° � �© ..' cad' y y � 4-EXISTING DITCH (PARTIALLY FILLED) 010 If lyy yy Ilk ! 0 0 t � r 1 40" o SQ, D DITCH PLUG -� • ] +. o II II D o 4 s 1 {k AS- GUILTS �< LEGEND PRE)POSEB SPILLWAY w (PYRAMAT TURF w REINFORGEMENT) prz a w DPRePOSE•E+DITCH CROSSING z (# 57 STONE) f'RGP65€E)RIP RAP 5 - 12" CLASS B ] PR6P65E9 TOP OF BERM PRBP95EE}$" ROCK PAD w ( LARGE SIZE MINE REJECTS) / PR6P65EEDITCH FILL - . _== FLOW ARROW I— PREW19SEF) SLOPE ARROW MAJOR PLUG ,,,[=A , ­—, (LENGTH = 100') —PR6POSEB MINOR PLUG (LENGTH = 50') PROP96EE1 PIPE AND fj RIPRAP &h PRE - CONSTRUCTION SURVEY SPOT ELEVATION q ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. ...... ..... C3W4I. MUUMUU ®®noulwa A �r �4 KEY MAP 0 so 100 s5o SCALE IN FEET �gPlE�ai 5a��wi a �k oc �L `1(0 Q __ r` U Q x Q m t� � rJryn � V LL 0 x I— [L ° Ld Y) PZ 1002 DRAWN BY- RC DATE. 01116114 SHEET � 9-% Minimum ElavaSon Minimum Elevation Maximum Elevation Cdar 8.500 9.000 13.000 s oo� 9-wo SBA00 8.500 10.1100 . AS- GUILTS �< LEGEND PRE)POSEB SPILLWAY w (PYRAMAT TURF w REINFORGEMENT) prz a w DPRePOSE•E+DITCH CROSSING z (# 57 STONE) f'RGP65€E)RIP RAP 5 - 12" CLASS B ] PR6P65E9 TOP OF BERM PRBP95EE}$" ROCK PAD w ( LARGE SIZE MINE REJECTS) / PR6P65EEDITCH FILL - . _== FLOW ARROW I— PREW19SEF) SLOPE ARROW MAJOR PLUG ,,,[=A , ­—, (LENGTH = 100') —PR6POSEB MINOR PLUG (LENGTH = 50') PROP96EE1 PIPE AND fj RIPRAP &h PRE - CONSTRUCTION SURVEY SPOT ELEVATION q ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. ...... ..... C3W4I. MUUMUU ®®noulwa A �r �4 KEY MAP 0 so 100 s5o SCALE IN FEET �gPlE�ai 5a��wi a �k oc �L `1(0 Q __ r` U Q x Q m t� � rJryn � V LL 0 x I— [L ° Ld Y) PZ 1002 DRAWN BY- RC DATE. 01116114 SHEET � 9-% Minimum ElavaSon Minimum El§v§dion Maximum Elavatirxl Color 101M 70.500 13.000 10.500 11.DD0 SBA00 11.000 11.500 ■ AS- GUILTS �< LEGEND PRE)POSEB SPILLWAY w (PYRAMAT TURF w REINFORGEMENT) prz a w DPRePOSE•E+DITCH CROSSING z (# 57 STONE) f'RGP65€E)RIP RAP 5 - 12" CLASS B ] PR6P65E9 TOP OF BERM PRBP95EE}$" ROCK PAD w ( LARGE SIZE MINE REJECTS) / PR6P65EEDITCH FILL - . _== FLOW ARROW I— PREW19SEF) SLOPE ARROW MAJOR PLUG ,,,[=A , ­—, (LENGTH = 100') —PR6POSEB MINOR PLUG (LENGTH = 50') PROP96EE1 PIPE AND fj RIPRAP &h PRE - CONSTRUCTION SURVEY SPOT ELEVATION q ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. ...... ..... C3W4I. MUUMUU ®®noulwa A �r �4 KEY MAP 0 so 100 s5o SCALE IN FEET �gPlE�ai 5a��wi a �k oc �L `1(0 Q __ r` U Q x Q m t� � rJryn � V LL 0 x I— [L ° Ld Y) PZ 1002 DRAWN BY- RC DATE. 01116114 SHEET � 9-% Minimum ElavaSon Maximum Elevation Odor 11.5010 93.000 13.000 18.000 ■ SBA00 25.000 AS- GUILTS �< LEGEND PRE)POSEB SPILLWAY w (PYRAMAT TURF w REINFORGEMENT) prz a w DPRePOSE•E+DITCH CROSSING z (# 57 STONE) f'RGP65€E)RIP RAP 5 - 12" CLASS B ] PR6P65E9 TOP OF BERM PRBP95EE}$" ROCK PAD w ( LARGE SIZE MINE REJECTS) / PR6P65EEDITCH FILL - . _== FLOW ARROW I— PREW19SEF) SLOPE ARROW MAJOR PLUG ,,,[=A , ­—, (LENGTH = 100') —PR6POSEB MINOR PLUG (LENGTH = 50') PROP96EE1 PIPE AND fj RIPRAP &h PRE - CONSTRUCTION SURVEY SPOT ELEVATION q ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. ...... ..... C3W4I. MUUMUU ®®noulwa A �r �4 KEY MAP 0 so 100 s5o SCALE IN FEET �gPlE�ai 5a��wi a �k oc �L `1(0 Q __ r` U Q x Q m t� � rJryn � V LL 0 x I— [L ° Ld Y) PZ 1002 DRAWN BY- RC DATE. 01116114 SHEET � 9-% y ' r� AD .,0 A" R J / s `V. 4 1 tl .7 r �� °~ �1 ° 4p w.C` 14 - +EXISTII DIT a Minimum Elevation Maximum Elevation f:olor 8 0-00 7.500 ■ 1 -500 8.000 ■ -- 8.000 8.500 . allf4w 4w V 777 olor Minimum Elevation Color 13.000 . 11.000 11.504 ■ .t AS- GUILTS t ° LEGEND �4 H f'R9P6'.iE$5PlLLWAY w � (PYRAMAT TURF I REINFORGEMENT) c z tz _ C) w Q fReP9SffFD3TCH CROSSING a z (# 57 STONE) PRGP65EE) RIP RAP ___J ( 5" - 12" CLASS B ) r 4 Minimum Elevation Minimum Elevation Maximum Elevation Color 1O.= 10.5DD 13.000 10.500 11.000 18.000 11.000 11.504 ■ AS- GUILTS t ° LEGEND �4 H f'R9P6'.iE$5PlLLWAY w � (PYRAMAT TURF I REINFORGEMENT) c z tz _ C) w Q fReP9SffFD3TCH CROSSING a z (# 57 STONE) PRGP65EE) RIP RAP ___J ( 5" - 12" CLASS B ) r 4 Minimum Elevation Maximum Eleveton Color 11.500 93.000 13.000 18.000 ■ 18.000 25.000 4 4 I AS- GUILTS t ° LEGEND �4 H f'R9P6'.iE$5PlLLWAY w � (PYRAMAT TURF I REINFORGEMENT) c z tz _ C) w Q fReP9SffFD3TCH CROSSING a z (# 57 STONE) PRGP65EE) RIP RAP ___J ( 5" - 12" CLASS B ) r 4 0 1 y "_01 o MAJJO PL G (LENGTH _ 100') EXISTING DITCH 11r =• (PARTIALLY FILLED) I I PR8P6S€B MINOR PLUG ` (LENGTH = 50') +29P9r :.Ee PIPEANp RIPRAP 0b PRE - CONSTRUCTION 1 lI SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR ' G D� ELEVATION Z z Z ♦ Bwa d �� 4 4 X12 511 PRE - CONSTRUCTION SPOT a ` i a ELEVATION AS -BUILT SPOT GRADES Q V ~ f' NOTE: ¢ Z F 4 �° ©t ps THIS LEGEND SUPERCEDES LEGEND ON LL «� 00— 'I C1.2 WHEN CONFLICTING. Uj ii 5o' !� a41 r 4� if , ll c� CL u� z � Q � J _J ' CLL KEY MAP (6 O �ry� IVA I� LJ o so 700 750 ��__IYy1 r �I ^ ry 11 1-1 I �f, �� � SCALE IN FEET ` av ���� - j•;�_:�: _ PRCU.KO.: 1002 DRAWN BV- RC DATE: 01116114 SHEET: C4.7 1 L OEM irPR6PBSE9 TOP OF BERM �• �' 4 4 I ` 1 4, PRBPeSEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) $DITCH FILL R P88E.)ELOW ARROW y IIL J� PRE)P8SEF) SLOPE ARROW 0 1 y "_01 o MAJJO PL G (LENGTH _ 100') EXISTING DITCH 11r =• (PARTIALLY FILLED) I I PR8P6S€B MINOR PLUG ` (LENGTH = 50') +29P9r :.Ee PIPEANp RIPRAP 0b PRE - CONSTRUCTION 1 lI SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR ' G D� ELEVATION Z z Z ♦ Bwa d �� 4 4 X12 511 PRE - CONSTRUCTION SPOT a ` i a ELEVATION AS -BUILT SPOT GRADES Q V ~ f' NOTE: ¢ Z F 4 �° ©t ps THIS LEGEND SUPERCEDES LEGEND ON LL «� 00— 'I C1.2 WHEN CONFLICTING. Uj ii 5o' !� a41 r 4� if , ll c� CL u� z � Q � J _J ' CLL KEY MAP (6 O �ry� IVA I� LJ o so 700 750 ��__IYy1 r �I ^ ry 11 1-1 I �f, �� � SCALE IN FEET ` av ���� - j•;�_:�: _ PRCU.KO.: 1002 DRAWN BV- RC DATE: 01116114 SHEET: C4.7 1 L OEM �. a 0jUNE 82 ' 4 1' -- ` +►„ 4C- 4T lEXISTING ol DI {'PARTIALLY F ' �Ilk s Or ip ►i + ; pA �q> r �,. y�y° i0 jilt p$ — ►_ 1 Ao"� ' � 1. J r ^ ♦ .may } i ~► `° — f IL a , 0 i i I h"a Ke 11 I, C , n �li: f I 1! ) ) r _ t 0 Aj do 'SHASE II • r • f SMALL ROAD EXISTING ROADSIDE A , it "S • \ r » , j � * ` ALIGNMENT DITCH OP low `ZP _ l-- se_ -__ r �y i `► ` 4 _— f--1 65*Q9 PLUG EL 11.22 -- -- _ f4 — -- OL 4 a, . ROA�IDEDCPLUG EXISTING RdADSD°E PLUG EL 0.93 / a DITCH � � � � I I �Ir � �� r •y � � � c I ° J1ipllr 5� Gd ° PHASE C � as Li 'I a ► �t � � r 'k `� � � I � a .y .tr "S t �1 � !� � SIB I ��. �o. � #i�j. a�.. I I tip', �) , ° 5' i�'' ia. •, � �Q � i�' Ci6 4' - „ p p ] p�b I' � �p � A? LEGEND h PREPOSEB SPILLWAY k (PYRAMAT TURF SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR REINFORCEMENT) w c z ELEVATION jB PRE)POSEB DITCH CROSSING a i t# 57 STONE) a RIP RAP L .._.. (5" - 12" CLASS B) PR6P65E9 TOP OF BERM DPR6P6SEB 8" ROCK PAD (LARGE SIZE MINE REJECTS) r / PR6P65EEDITCH FILL keP6SEEIFLOW ARROW PRBPGSEB MAJOR PLUG (LENGTH = 100') PR'6POSEB MINOR PLUG C! (LENGTH = 50 ") 1`1-96SP PIPE AND RIPRAP faximum Elevation h PRE - CONSTRUCTION L ■ SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR 8.000 ■ ELEVATION �u X1250 PRE - CONSTRUCTION SPOT 25.000 ELEVATION 12.00 * AS - BUILT SPOT GRADES NOTE: faximum Elevation Color Minimum Elevation Maximum Elevation Color 7.500 ■ 8.600 9.UOU 8.000 ■ 9.000 9 -500 6.5L10 �' 9.500 10-OW . Minimum Elevation Maximum Elevation Color 10.000 10.5/10 10.500 ,1.O0D 11.000 11.504 ■ AS— GUILTS Minimum Elevation Maximum Elevation Color 11.500 13.000 ONO M 13.000 18.000 ■ 16A00 25.000 AS— GUILTS KEY MAP 0 50 100 lsu SCALE IN FEET MIA, z zE� _a N p� �I1.LLH W r�i2 �7 s M ffi fv � M } U <� ¢0 � 0 x m CL Z C Q � J __j Z LL Q �o Q x [L O Ld Y) PRDJ.NO.: 002 fMAWN BY RC EmTE: 01116/14 SHEET'. 04.72 VAN is ONO M VOLVO][ a f KEY MAP 0 50 100 lsu SCALE IN FEET MIA, z zE� _a N p� �I1.LLH W r�i2 �7 s M ffi fv � M } U <� ¢0 � 0 x m CL Z C Q � J __j Z LL Q �o Q x [L O Ld Y) PRDJ.NO.: 002 fMAWN BY RC EmTE: 01116/14 SHEET'. 04.72 vw A It It S ` , ll ok iA tf gI I fik are �, I O ds gyp. _ o EXISTING RdADsIDE a �R ` DI U� �t _ � VTCH ERNE RtiE� 100' - / f 1b q. ROADSIDE DITCH PLUG fa Ile CY �.© o 0 r o PHASE fl -, �o EXISTING ROADSIDE LEGEND t ' 193 19i i� PRGPOSEB SPILLWAY N w (PYRAMAT TURF Color REINFORCEMENT) C, H jB w p a PRePBSEB DITCH CROSSING z (# 57 STONE) 10.DDD PR6P95EE) RIP RAP ( 5" - 12" CLASS B ) �� =FLOW ARROW PRE)PBSEF) SLOPE ARROW MAJOR PLUG (LENGTH = 100') P���Q� , i NELLa 9X I ire ' 7~ s PRBP95E9-TOP OF BERM l � �$" ROCK PAD (LARGE SIZE MINE REJECTS } P -- - J PLUG EL 11 22: c P _ EL= 11.fi4 PLUG EL = "0 1 � PLUG EL - 10 94 1 ,i'° -- e� - -- - 3 r - pp _� —�_— --4.— — - — - - - --- v - -- - -r'- - - - -- _ �-r_ -� -___ �_ _ c,_---- STA7CLT __ ~__- -_- - -. _:�_� O ` C 7. '.PLUG ESL. !°LUG EL = 12.35 p �/ o _ _a� ' Ur PLUGEL =11.19 - -_ - - - -- y ROADSIDE DITCH PLUG -`I n — ` �� I/ r�0' EARTHWORK LfNfITS o} EXISTING RUA6 / LS i PHhF$FRflP 107 ca ISTIN ADSIDE r _ o - a n v 1 � ¢ DITCH #'rT 10fl' I' v 4 D ROADSIDE DITCH PLUG ° . rr / �} ° o J cy F 50' EARTHWORK LIMITS �� '1. ¢ Y� r X qq a Q a Q 'L '7 '1 ° ", r`-• r r 'i+ 1� 'h 4 a k D 4 /. / ,� L1 O �+., J G - -0 1_ 1041 rr ce�r 0 Q O O v O U� °00, 0 O a 1f1.38 / �� / 9.75 IS �� � Q 3 � fl L �° . Dp 10.43 1, 4 s <] qo a 1 I q EXTINGDftCHT Jrry °Q��/ . v 4 {� ©fin EXISTING DITCH TF}° ' /' ir%' 4b 4• ° 4 a o a n u 9 ifr LU6 TNOf HENflJ a - © q 4 jrr D / % r o Ica .0 @� � 9 0,71 Rim 0 a,e or �{r,,, /��1 °• O IIYE -o C•r` -eF� PA�II`1J' U -r9.31 JIY:' (..q ],a-p Q Cl e a r_i - f; 0 n a f" n. 10.38 t ' 193 19i i� Minimum Elevation Maximum Elevation Color 8.500 9.000 9.000 9 -500 ■ 9.500 10.DDD R6P65E0 -DITCH FILL -- - J PLUG EL 11 22: c P _ EL= 11.fi4 PLUG EL = "0 1 � PLUG EL - 10 94 1 ,i'° -- e� - -- - 3 r - pp _� —�_— --4.— — - — - - - --- v - -- - -r'- - - - -- _ �-r_ -� -___ �_ _ c,_---- STA7CLT __ ~__- -_- - -. _:�_� O ` C 7. '.PLUG ESL. !°LUG EL = 12.35 p �/ o _ _a� ' Ur PLUGEL =11.19 - -_ - - - -- y ROADSIDE DITCH PLUG -`I n — ` �� I/ r�0' EARTHWORK LfNfITS o} EXISTING RUA6 / LS i PHhF$FRflP 107 ca ISTIN ADSIDE r _ o - a n v 1 � ¢ DITCH #'rT 10fl' I' v 4 D ROADSIDE DITCH PLUG ° . rr / �} ° o J cy F 50' EARTHWORK LIMITS �� '1. ¢ Y� r X qq a Q a Q 'L '7 '1 ° ", r`-• r r 'i+ 1� 'h 4 a k D 4 /. / ,� L1 O �+., J G - -0 1_ 1041 rr ce�r 0 Q O O v O U� °00, 0 O a 1f1.38 / �� / 9.75 IS �� � Q 3 � fl L �° . Dp 10.43 1, 4 s <] qo a 1 I q EXTINGDftCHT Jrry °Q��/ . v 4 {� ©fin EXISTING DITCH TF}° ' /' ir%' 4b 4• ° 4 a o a n u 9 ifr LU6 TNOf HENflJ a - © q 4 jrr D / % r o Ica .0 @� � 9 0,71 Rim 0 a,e or �{r,,, /��1 °• O IIYE -o C•r` -eF� PA�II`1J' U -r9.31 JIY:' (..q ],a-p Q Cl e a r_i - f; 0 n a f" n. 10.38 AS- GUILTS —PR0P65EB MINOR PLUG (LENGTH = 50') P%PESSEEfPIPE AND RIPRAP PRE - CONSTRUCTION SURVEY SPOT ELEVATION ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION C72.0D AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. t ' 193 19i i� Minimum Elevation Maximum Elevation Color 8.500 9.000 9.000 9 -500 ■ 9.500 10.DDD . AS- GUILTS —PR0P65EB MINOR PLUG (LENGTH = 50') P%PESSEEfPIPE AND RIPRAP PRE - CONSTRUCTION SURVEY SPOT ELEVATION ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION C72.0D AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. t ' 193 19i i� Minimum Elevation Maximum Elevation Calm 10.000 10.500 10.500 i 1.DD0 ■ 11.000 11.504 ■ AS- GUILTS —PR0P65EB MINOR PLUG (LENGTH = 50') P%PESSEEfPIPE AND RIPRAP PRE - CONSTRUCTION SURVEY SPOT ELEVATION ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION C72.0D AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. t ' 193 19i i� Minimum Elevation Maximum Elevation Color F1.500 13.DD0 f3.ODD 9B.D136 ■ SB.000 25.DD0 AS- GUILTS —PR0P65EB MINOR PLUG (LENGTH = 50') P%PESSEEfPIPE AND RIPRAP PRE - CONSTRUCTION SURVEY SPOT ELEVATION ' PRE - CONSTRUCTION LIDAR ELEVATION X125D PRE - CONSTRUCTION SPOT ELEVATION C72.0D AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. KEY MAP 0 50 100 150 SCALE IN FEET z ' Q U Zo ¢o � LL 0 m [6 "C Z � J ___) � Z o x r CL O �J _(f) PRa -N�.: 1002 MAWN By RC IMT €: 01115114 SHEET: 04.731 t ' 193 19i i� P gp tp0 so- _ CIO S� 23 B1 IM E& 8F ,96 w as +� jE I 37 at ;'Tn[AM µiGNRk[NT — PROJECT 8CN1MC7ARY • 1E 39 E] DENOT ES THIS SN €€ T i 15� PHASE 9 to If 8 r 8 PHASE 3 3 KEY MAP 0 50 100 150 SCALE IN FEET z ' Q U Zo ¢o � LL 0 m [6 "C Z � J ___) � Z o x r CL O �J _(f) PRa -N�.: 1002 MAWN By RC IMT €: 01115114 SHEET: 04.731 v II u EXISTING DITCH a tm A,� 1 f oiPA Y FILLEo }Q� }F ��m.' -_ I _'0 � ?' { L :PA IRul%HLLYD €IECH 3 � r � » � � ,{5�, r � t I yr• �r" ' ti r .�i^ �,.� $.. j J 11 I � � G]1 t�4 • + fff 4 Ij MALL ROAD t> t ALIGNMENT'1 7 Qom, p EXISTING ROAObE _ R� G 3N5 R# ,100' ,�: 0 ROADS RICH PLUG Il DITCH ROADSIDE DITCH PLUG _ - — ` - T n r - PLUG EL = 10 79 s > E -. kl PLUG EL 1732_ "j� 1 = - - -- - PLUG EL =10.58 LUG EL 10.77 '! L - -�- - - -- - - - - - -- -° .�. -- ��- --- _--- ax�5o -- - -�� - -- -rev - --- -- aaso° - -- ---- �ar-- °----- �s+au� - -- - - �2.ob -- - �s.•oa - -° 1 -_ - -- a-- - - -�.-s = ----�t - - - -- - - -SLA I� 1 11.81 _ PLLIfE-= 11:09- -r _ _ 1 . tie 1ff -59 gqi --------- _ . _ - , _ r C1 [ il nI 1 Y/i rye,./ r' 50' EART I °J ° Y 1 = ;/ r �p EXISTING ROADSIDE r V J 1.11[ / I/ 1 0 o DITCH 9THde 100' n (0� 1 ROADSIDE DITCH PLUT ROADSIDE DITCH PLUG 9 '!7 'n D �� t �• of j k459 `n .... Ii1 12 109 Q 0 Q Q � Qq O El IXIT!'1G DITCH FE:�- r }rig �ay{Vfr �o p q EXISTING DITCH "FE'r ,� / j Q e 0 ° �0 V/ /, !y 0 ti ° O e -- I/ / p o r f �/ rD _ n,• // �fl L1 ° 0 ° 7 q o . (PLUGGED AT NORTH END ) n, // rY✓� PLUGGED AT NORTH END) Y /, tenn: p //4T Le' « pi L�l54 /r.rR/ e c P M10 p i Elwin 10.47© Q 4 '6 Minimum Elevation I Maximum Elevation I Color 0 -000 0.500 ■ 7.500 8.000 &ODD 6.500 ■ AS- GUILTS LEGEND PRGPOSEB SPILLWAY Minimum Elevation Maximum Elevation Color 8.500 9 -000 9.000 9 -900 ■ 8.500 10 -OW . AS- GUILTS LEGEND PRGPOSEB SPILLWAY Minimum Elevation Maximum Elevation Color 10.000 10 -500 10.900 11 -DDO . 11.000 11 -5w ■ AS- GUILTS LEGEND PRGPOSEB SPILLWAY Minimum Elevation Maximum Elevation Color F1.500 93.000 f3.000 98 -006 . SB.000 25.000 ■ AS- GUILTS LEGEND PRGPOSEB SPILLWAY N w (PYRAMAT TURF REINFORCEMENT) Orz H 9p w O o. PRePBSEB DITCH CROSSING z (# 57 STONE) PR6PESEE) RIP RAP ( 5" - 12" CLASS B ] PRISPBSE9 TOP OF BERM DPRE)P9SEB 8" ROCK PAD (LARGE SIZE MINE REJECTS) r r R6P65EEDITCH FILL +...- PkeFiBSEB FLOW ARROW PRE)PBSEEiSLOPE ARROW PRBPGSEB MAJOR PLUG (LENGTH = 100') PR0P65EB MINOR PLUG {LENGTH = 50'} B PIPE AND RIPRAP $h P RE -CONSTRUCTION SURVEY SPOT ELEVATION eh PRE - CONSTRUCTION LIDAR ELEVATION X1250 PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS -BUILT SPOT GRADES NOTE: UREAIA AUGNMENT - PRa1ECT WUAiMRY nEneDT €S 7r•n5 SN €€ r- - PHASE 1 PHASE 3 0 5o 100 150 SCALE IN FEET is e� 1� m zE�a N 9X �7 V J Z� U Z ' Q U ¢O � 4 m Ri Z J < o LL o < N IL o PRa -� 1002 MAWN By. RC anTE: 0111$114 SHEET: 04.74 s i i may ROADSIDE SMALL;; , AL113NME PLUG EL = 10.0 r - - - - {)-_ -- - - - _ { PLUG EL = 11.l ��o R A 1. L A I a a n �'L c OSSINP� ETAIL HEET C9.1) STA.97 +20 2 - 1$" CALP (SEE SIET C9.1 ) r ISTING DITCH f % (PARTIALLY PILLED) rY tiA L 0 _• _d� � VL II p J � � ,�: I 9' r-EXISTING ROADSIDE BByyC� 1p4• � 1Vi b P phi O 9 0 R �l 3& 1 011., DITCH ROADSIDE DITCH PLUG Mf -- - - - - - JGEL � , P Ip. PLUG EL - 10.45 P =10.54 - .. � q y - -- - - - - -° 190 +9p - -- UG EL 1129 7. _ PLUG EL 11.08 EXISTING ROADSIDE DITCH -, y vim° I f D �i. � L1 ROADSIDE QS( APL J' 10.70 r Cy p a 3.$7 I E � c �� � �' �,0rrrry r 4 apo7y� Ll ab c C O Ci Q L /rf fjr �- o � J ti. EXISTING DITCH Tf'r i r� r r!' i 4 (I b p STING QITCH F@ r y r`! i� 4 a 6 a .6 's R 1C I ITS `0 } /I Q Q o p p f a 1 < so ' d i ED AT NORTH E n� ) bRTH END) (rLUGGEAT .. ° ice, r 10.07 10.iNiel 6 d 72 it - SheD ( Phl€) 11 C, A Minimum Elevation I Maximum Elevation Color 0.000 7.500 ■ 7.500 8.000 PRBPBSEB DITCH CROSSING 8.600 8.500 ■ A5- BUILTS LEGEND I PRBP9SE#3SLOPFARROW F'RBPBSEBSPILLWAY (PYRAMAT TURF Minimum Elevation Maximum Elevation Color 8.500 9.a06 PRBPBSEB DITCH CROSSING 8.000 9.500 ■ 9.500 10.1100 ■ A5- BUILTS LEGEND I PRBP9SE#3SLOPFARROW F'RBPBSEBSPILLWAY (PYRAMAT TURF Minimum Elevation Maximum Elevation Calm 10.000 10.500 PRBPBSEB DITCH CROSSING 10.500 11.DD0 . 11.000 11.500 ■ A5- BUILTS LEGEND I PRBP9SE#3SLOPFARROW F'RBPBSEBSPILLWAY (PYRAMAT TURF Minimum Elevation Maximum Elevation Color 11.500 93.000 PRBPBSEB DITCH CROSSING t100o 98.006 . 16.000 25.000 ■ A5- BUILTS LEGEND I PRBP9SE#3SLOPFARROW F'RBPBSEBSPILLWAY (PYRAMAT TURF w REINFORCEMENT) Orz (LENGTH =100') H C) o. PRBPBSEB DITCH CROSSING z (# 57 STONE) PRBPBSEE PIPE AND RIP RAP J (5" - 12" CLASS B) _ STOP OF BERM DPROPOSEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) rr / FRBPASff3 DITCH FILL -- ..E•FLOW ARROW I PRBP9SE#3SLOPFARROW =Ed PRBP95EB MAJOR PLUG (LENGTH =100') —PR9PBSEBMINOR = PLUG SD') (LENGTH PRBPBSEE PIPE AND RIPRAP $y PRE- CONSTRUCTION SURVEY SPOT ELEVATION �? P RE -CONSTRUCTION LIDAR a ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING, 0111117A 1 ALIGNMENT - PROJECrBOUNDARY y` E] DENOTES ThrS SNELIr - PHASE 7 PHASE 3 KEY MAP 0 SO t00 ,sii SCALE FEET is e� � f= Yi 2 m Y LL u��v 9X V L IM a 'ro O r` () Z ¢o a 4 LL m 0.. Z C � J < o ® Z a Qx r 0 PRa-r�: 1002 MAwN By. RC DATE: 01/16114 SHEET: 04.75 f I 7 �I c 'r 1% .` s} r bL1 Nfz �d;4 S 'e r; r l _ 1 I K � 40 y IX t 04 1 OP A i f I I malf LRQP - l'Le1 1 I rje 1NG DITCH ALLY FILLED) 0� l �'Vow • Q� r, OKI `c a CD PIPE CRQSING f (SEE SHEET C9.1) ! SMALLROAi] 40 F ALIGNMENT dii �t _ 1 EXISTING RO, FADE `° 4t � DITCH HASE II ROADSIDE DITCH PLUG ROADSIDE DITCH y (SEE SHEET C9.1 1 - ° - -- -L - -- - - - - - - - - - PLUG EL _. EL 11 08 ` _ - PLUG EL - I PLUG EL - -10.31 - - -- -- _ �- - - - -- ° tea'- - - - - -- W - '- - - - - - "�-- �- °--"—' wry• _ - - ,�� _ �°-- ��- �.�_I._ at1 —r�- - -= Ltd- 1—=--- - -#--- SMALL RD - -- - —., __ - -- PLUG EL - -��r� - -- PLUG EL 10.96 11.14 9.54 -• ffl, 50" EARTHWOR# LIMI f�' EXISTING RO IDE `� DITCH 0 [}6 �d / / / d C ` 1 fj o a a 4 v TCV`cT 100 9 3 Q' 6 Q i44��5]]] (1 C ROADSIDE DITCH PLUG j j� IIr 4[� Q Ly EXISTING DITCHT- ANB Y0999 81 lips oa O•�- f t� r/'��- (PLUGGEQ AT NORTH END) LEGEND fRGPOSEB SPILLWAY w !] 1 (PYRAMAT TURF rR ri REINFORCEMENT)" fn3w 1 PRePBSEB DITCH CROSSING �x}x z ,f .� (# 57 STONE) � 1 f RR6P6.5EF3•RIP RAP W C. f __j ( 5" - 12'• CLASS B ) PR6PBSE9 TOP OF BERM 1 / r 00_01 4 H log t • p • � r i � t v PLUG EL= 11.58 8--7-6 -t fft6P85E€�$" ROCK PAD (LARGE SIZE MINE REJECTS) RR6P65E�DITCH FILL / N. . -.. -- �� =FLOW ARROW � F) SLOPE ARROW MAJOR PLUG (LENGTH = 100') PR0P65E6MINOR PLUG (LENGTH = SD') PR9P9SEE PIPE AND RIPRAP �5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION eh PRE - CONSTRUCTION LIDAR ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. � 1 r :100' / Y rf 'EA RTIWORK LIMITS ROADSIDE DIT, &Fi PLUG ° yy /I 0 J 0 b� a 4d ° a 11 11538 � e ° a 1 1051 ° e J` EXISTING DITCH Tee .00 a NB ".,9613 el, (PLUGGED AT NORTH END) /' > �r � p A °'� j� �,,; 7 h AT,, U N E AS- GUILTS IIIII�® r•7 ,, r TR[A11511C11111W — P70JECr 80UNDART Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color 8.500 9.900 10.000 10.500 (1.500 13.000 N 9.000 8 ■ 10.500 11.000 , f3.000 16.000 . 0.000 7.500 ■ 1 8.000 f -500 r -500 8.500 10-OW . 11.000 11.500 ■ 16.000 25.000 ■ Y $.000 6.500 `' LEGEND fRGPOSEB SPILLWAY w !] 1 (PYRAMAT TURF rR ri REINFORCEMENT)" fn3w 1 PRePBSEB DITCH CROSSING �x}x z ,f .� (# 57 STONE) � 1 f RR6P6.5EF3•RIP RAP W C. f __j ( 5" - 12'• CLASS B ) PR6PBSE9 TOP OF BERM 1 / r 00_01 4 H log t • p • � r i � t v PLUG EL= 11.58 8--7-6 -t fft6P85E€�$" ROCK PAD (LARGE SIZE MINE REJECTS) RR6P65E�DITCH FILL / N. . -.. -- �� =FLOW ARROW � F) SLOPE ARROW MAJOR PLUG (LENGTH = 100') PR0P65E6MINOR PLUG (LENGTH = SD') PR9P9SEE PIPE AND RIPRAP �5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION eh PRE - CONSTRUCTION LIDAR ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. � 1 r :100' / Y rf 'EA RTIWORK LIMITS ROADSIDE DIT, &Fi PLUG ° yy /I 0 J 0 b� a 4d ° a 11 11538 � e ° a 1 1051 ° e J` EXISTING DITCH Tee .00 a NB ".,9613 el, (PLUGGED AT NORTH END) /' > �r � p A °'� j� �,,; 7 h AT,, U N E AS- GUILTS IIIII�® r•7 ,, r TR[A11511C11111W — P70JECr 80UNDART E] DEMOTES THIS SN €€ T' - PHASE I PHASE 3 KEY MAP 0 50 100 150 SCALE IN FEET is e� zE�a N 9X I �7 M J Z� U z ' Q U ¢O � 0 m [6 (Z Z K V i O Z LL x r O V PROD- Ni).: 1002 ONAWN OY: RC. GATE: 01/16114 SHEET: 04.75 d ip 0 irk •�O "A • 4 �. t ' _ ' � ` y• ,' �� I I r S r � 1 � ` • ?I h I � - - r- t i A i C.i.l ` ,. �'-•' t ,o .1e'' 1�'3 �{ I' EXISTING DITCH ( #ARTIALLY FILLED) c 4 �' a • Cis + �p EXISTING' ITCH • b' 1 / (PARTIALLY FILLED) I Ifio, 0 MEW kj� IV �. r O I O• ` 0 0 f E I 519 �I r 61 G SMALL ROA `7z ALIGNMENT' ``P1. G ROADSIDE 1 ROADSIDE DITCH PLUG ;lf Minimum EI§vatw Maximum Elevation Color 0.000 ------ - - - - -- - - - - -- - �- - - -- 1 - PLUG EL = 10 79 h PLUG EL 1La66J -� ��- �` - - - - -�� _------ _- 'PLUG 14 PLUG EL 10.22 ; EL 2L - -- — ----------------- - - - - -- -4 12 — — — - - � 2 — � � 0(—r .rte � � 1- 2m- L� —1294M i = ♦- z� =L T — ___I —=i ® - - - - - - -- Cx.- - t.__-- G�- - -. - -_ g ACL RD — — — - - -.- °c _.. --- — — �° -_ --� `_"jam _ .0 -�c - -- -0 - PLUG EL = — -- 10.62 PLUG EL = 11.21 _ - - _ PLUG EL =11.87 PLUG EL = 10 92 � 1- 1,97 ___ ___ %� -_ ��� �- - ��' -�� - -- a - _ - -- - _ f •- -4r - / i f 7 fn Vic., Z* K1 / ✓ ✓ ✓ a v o P C7 O � � � `mot; � f / ' o g .LEXISTING ROADSIDE {� l> DITCH �, � y(}0' / /' / 50' EARTHWORK LIMITS p 1 7 100'I i f I✓ J c Q (i ° ROADSIDE DITCH PLUG �T c a ROADSIDE DITCH PLUG ;r. / f / r^\� f ✓ � Q Ile �L P xn7 b o �.O L ' 0 / O !C0 �1 0 QO ; i 0k LARTHWOR�CKrL LIMI;T` S ( ! ✓/ / / j / f EXISTING DITCH -�_ �' � � /✓' cp° LS (PLUGGED j��AT NORTH END) y i � � � 0 0 #L -feet 4 62 I�j o p� ' b � p a 6 d t• L 1� 1 11.12 / r 11.10 �'� ' f ✓ vy �� EXISTING DITCH (PLUGGED AT NORTH END) 46 / vf^ / /ff'Q Q G/n b �( D a 1: ham. I / / ,�� . I e Q •.i'Y[Y" VV e , b "87 �.D r yS�F\''' ,ff. % %% MATCH LINE - fee ��6t Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum EI§vatw Maximum Elevation Color 0.000 7 "500 ■ 8.600 9.000 10.000 10.500 7.500 8.000 M 9.000 9 -500 ■ 10.500 11.000 , $.000 6.500 `' 9.500 10.000 . 11.000 11.500 ■ � O Q ■ ■ B U I LT S LEGEND >~ PRBPBSF#3 FIR6PBSEB SPILLWAY (PYRAMAT TURF Minimum Elevation Maximum Elevation Cvlar 11.500 13.000 PR@PASEB DITCH CROSSING 13.000 16.000 . 16.000 25.000 ■ � O Q ■ ■ B U I LT S LEGEND >~ PRBPBSF#3 FIR6PBSEB SPILLWAY (PYRAMAT TURF w REINFORCEMENT) Orz (LENGTH =100') H 4 w PR@PASEB DITCH CROSSING z (# 57 STONE) fRBPeSEE PIPE AND PRBP88E9 RIP RAP ( 5" - 12" CLASS B ) _ PROPOSEE?TOP OF BERM DPROPOSEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRE)PASEE3 DITCH FILL -- PliepeGEEI FLOW ARROW >~ PRBPBSF#3 SLOPE ARROW =Ed PRBPBSEB MAJOR PLUG (LENGTH =100') —PRBPBSEBMINOR = PLUG SO') (LENGTH fRBPeSEE PIPE AND RIPRAP �5 PRE- CONSTRUCTION SURVEY SPOT ELEVATION ®h P RE -CONSTRUCTION LIDAR ELEVATION X1750 PRE - CONSTRUCTION SPOT ELEVATION 12.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING, STREAM ALIGNMMT — PRDJECF BOUNDARY E] ormorcs THIS SNEF 1-1 - PHASE 9 PHASE 3 KEY MAP 0 50 100 150 SCALE FEET is e� 1� m w °E� ms fI o l 1�. J D Z D O O tU fA N Z J 0 [,� LL ❑ LL 2 °- 0 c� PROD. rte.: 1002 mAwN 61' RC IMTE: 01/16114 SHEET: 4. 7 7 t C i T \ Q LMAT1CK LINE 7 See S,, +dt C4-8&- =M - mp` ON, EOEw 12.8 n p* °�j� D a 4 �C% NJ TOP-761' QAAK Z_ a% p6 �0 tf p or1�I �° D s Lbb cam° e TOP C7F, 4C �sx XIS T � a o VA � �` <) � c> � GRA.p(g. cr c n DITCHy'� ! �� `\�' � rya t✓ O � n tS ` �? - _ � o i V %. "I Ar AL i of SMALL ROAD ALIGNMENT ! r ! It J_ . ROADSIDE & AIIIIIIIIIII. Z DI11&W_\ y o vp - F ----- --- r- 31�c - - - - -- -- 132:dit - - - - - 1331A'�--- �--- �34•�rb..._ ----- 1a5�mn ----• - - - - - - -— - - - - (PLUG EL 10.14 PLUG El 7- -rte- - - - - - kW!3TJNG ROADSIDE £RLfeF 100' ROADSIDE DITCH PLUG 0 "EARTHWORK LIMITS a oy e *�Q IL N� ib — VA "TT- I %yet AS Minimum Ereaalion I Maximum Elevalon I Color 0-00 7.500 ■ 7.500 B0nv PRePBSEB DITCH CROSSING 8.000 8.500 t EXISTING GRADE 12 4 PRep&3EB BERM k '00 F J `80' s �© KING LOT EL = 10.53 GNMENT P fl LEGEND r F'RBPBSEBSPILLWAY (PYRAMAT TURF Minimum Elevation Maximum Elevation Color 8.500 9.000 PRePBSEB DITCH CROSSING 9.000 9.500 , 9.500 10-ODD ■ EXISTING GRADE 12 4 PRep&3EB BERM k '00 F J `80' s �© KING LOT EL = 10.53 GNMENT P fl LEGEND r F'RBPBSEBSPILLWAY (PYRAMAT TURF Minimum Elevation Maximum Elavatiorl Color 101= 10 -SDD PRePBSEB DITCH CROSSING 10.500 11.000 , 11.000 11.5D0 ■ EXISTING GRADE 12 4 PRep&3EB BERM k '00 F J `80' s �© KING LOT EL = 10.53 GNMENT P fl LEGEND r F'RBPBSEBSPILLWAY (PYRAMAT TURF w REINFORCEMENT) Orz 11.500 H 1a w PRePBSEB DITCH CROSSING z (# 57 STONE) a PRE - CONSTRUCTION LIDAR 0 ELEVATION PR8P88E8 RIP RAP ( 5” - 12'• CLASS B ) _ STOP OF BERM DPROP8SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) FR@PASEEI DITCH FILL ..E•FLOW ARROW I PR8PBSE#3 SLOPE ARROW PRBPeGEEI E=d MAJOR PLUG (LENGTH =100') is / f PRE)PBSEBMINOR PLUG fy �� b (LENGTH = 50') SOMDARY PROPeSEE PIPE AND Maximum Elevation RIPRAP 11.500 PRE- CONSTRUCTION PHASE SURVEY SPOT ELEVATION LISTING DITCH a PRE - CONSTRUCTION LIDAR 0 ELEVATION 18.900 25.000 ■ 012 50 PRE - CONSTRUCTION SPOT ELEVATION A 1--j 12.Q0 * AS -BUILT SPOT GRADES e �� MOTE: OF 12 01 THIS LEGEND SUPERCEDES LEGEND ON OFF: 2A1 C1_2 WHEN CONFLICTING, 48" HD E PIPE ,"< _ a' V. EL .92 T C9 -2) �r --'- KING LOT 3 \ -- ARKINGLOTEL =71: —L- L =11.81 Z- =1040 'HDPEPIPE Qa g� C,[ t LpPPROX EOP SMALL RD j 12i2 Bs¢ CROSSING [3ET�It / F i - EXISTING DITCH =f s� r, , (SE a^HEET C9.1), f f� r SPLUGGED AT NORTH END} J o s (PEE S � .1y` Q LICE - „r�a r f`_ { . ti ( PHASEI ) AS- GUILTS y a ;fix 0 �Y t� rSTREAMALIGNAfENT —PROJECT SOMDARY Minimum Elevation Maximum Elevation Color 11.500 13.DD0 PHASE 13.000 18 -000 . 18.900 25.000 ■ AS- GUILTS y a ;fix 0 �Y t� rSTREAMALIGNAfENT —PROJECT SOMDARY E] DENOTES THIS SHEET - PHASE 1 PHASE KEY MAP 0 50 100 150 "Millillillillilli NINE SCALE IN FEET a'e m m H Eg �L L J D cn O v z 0 tLQml U7 co IL �Z � Q c OE Z �0 Q m� I— [L ° C7 PRDJ. NO.: 1a02 MAWN BY- RC DATE 01116114 SHEET' Lq 4. ?8 MATCH LINE - See She � o 0 0 0 0 0 0 0 c nlTrH �Oh EXISTING DIF gy � ary i C lhy i 3 hioff i 1 EXISTING 3g +0R. :e)PeSEB BERM lb A LEGEND w Minimum Elevation k ek u(PYRAMAT TURF 9:000 a 0 9.000 REINFORCEMENT) ■ W c z 10 -000 . _ <- t ' r THIS LEGEND SUPERCEDES LEGEND ON N R� O 'IT W r .. ® V UF • 1`c i1�1 Q 3 hioff i 1 EXISTING 3g +0R. :e)PeSEB BERM lb A LEGEND fRePE)SEB SPILLWAY Minimum Elevation k i;Wor u(PYRAMAT TURF 9:000 s 9.000 REINFORCEMENT) ■ W c z 10 -000 . _ <- t ' r THIS LEGEND SUPERCEDES LEGEND ON N R� O � • I C1.2 WHEN CONFLICTING . ReP85EB DITCH CROSSING a i (# 57 STONE) e BERM SHIFTED 104 EAST DUE TO PReP88EBRIP RAP ENCROACHMENT ON WEST PROPERTY LINE { 5" - 12" CLASS B ) h44iF} POSER TOP OF BERM EXISTING GRADE � , ry � TTiar19rScrr8" ROCK PAD F= ( LARGE SIZE MINE REJECTS) 12.73 } O 0 0 LL UL �f / 1 DITCH FILL o °' s "" .._. .-� -_ RFLOW ARROW N f'R9P95E$ SLOPE ARROW PRBPGSEB MAJOR PLUG .50 �•' ' �� (LENGTH = 100') ('2 18; 1 -8-87"'- 8 87' PR9P65E8 MINOR PLUG 1, BEAN (�: (LENGTH = 50') 6 � fRSPeSEB PIPE AND 12_.541 y a . } � �� RIPRAP LL � LL Ta $5 PRE- CONSTRUCTIDN 0 7 o tr SURVEY SPOT ELEVATION o $h PRE - CONSTRUCTION LIDAR k� M s ELEVATION U • 0q9 X12 5Q PRE - CONSTRUCTION SPOT cn w f ' ELEVATION �l a z - 0,- I I 4 50' 1 FIEL DITCH PLUG O GRADE ° 0 0 O BERM SHIFTED 10± EAST DUE TO CHMENT ON WEST PROPERTY LINT= c 0 d 0 AIL Minimum _ AS - BUILT DA7 Minimum Elevation ` Maximum Elevation I Cdor 10.000 1 10 -500 10.500 11 -000 T1.000 71 -500 ■ Minimum Elevation Maximum Elevation i;Wor 8.500 9:000 s 9.000 9 -SM ■ 9.500 10 -000 . AS - BUILT DA7 Minimum Elevation ` Maximum Elevation I Cdor 10.000 1 10 -500 10.500 11 -000 T1.000 71 -500 ■ AS -B U I LTS C12.oa -E�- AS - BUILT SPOT GRADES Minimum Elevation Maximum Elevation Cdor 71.500 93.000 s tlaocl 16 -000 ■ 16.000 25.000 ■ AS -B U I LTS C12.oa -E�- AS - BUILT SPOT GRADES L) I­ NOTE: ¢ Z _ <- t ' r THIS LEGEND SUPERCEDES LEGEND ON �a O � • I C1.2 WHEN CONFLICTING . W � • 1`c i1�1 m EXISTING DIT$1 AF T•11S 1A no- VO{ 71 n 711 _ - - aa ° L F STREAM ALIGNMFN1 TE 7 Z8, --- -aizar crsouvrwar 4 co J ,g fA ❑ DENOtES THIS SHEET J CL 1S 15 PHASE 7 19 I 1 0.v t r'] d P PHASES 0 V Q LL KEY MAP (10 Q O 0 50 too T% SCALE IN FEET PROJ, NO.: 1002 twAWN BY RC DATE: 01/16114 SHEET: � C4 j . f 9 _ \ Min MIT 10k � 44, 4 r x a lw -�-k DITCH—/ AR FILLED) � r Iti II Ic NO . I _I Q J Aj TABfl!4 lair h Qi' h° S° \ l 4 �- �0. 0, 0 L t A I � � ° ♦ X50' - �.: FIELD DITCH PLUG 1 A¢ G9 HG:50, I 1 y Ir HELD DITC4.LUG a LEGEND PRE)POSEB SPILLWAY w (PYRAMAT TURF Color REiNFORGEMENT) " w orz 43.000 m w p m PRePOSEE1DITCH CROSSING a z he (# 57 STONE) 10 -OW PRGP65EE#RIP RAP ( S" - 12" CLASS B ) PR6P65EE) TOP OF BERM DPR6POSEEI I" ROCK PAD ( LARGE SIZE MINE REJECTS) r / PR6P65EE) DITCH FILL r r e� keP6SEB FLOW ARROW s PR9P6SEF) SLOPE ARROW �A PRBPGSEB MAJOR PLUG ' ► (LENGTH = 100') PR6PE)SEB MINOR PLUG (LENGTH= 59) PROPeSED PIPE AND RIPRAP r PRE - CONSTRUCTION SURVEY SPOT ELEVATION • �' PRE - CONSTRUCTION LIDAR ELEVATION 2 !I 125Q PRE- CONSTRUCTION SPOT 9 �` ELEVATION 1 12.fl0 * AS -BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. j �M. 'w EXISTING DITCH ~ ~ ! 1 J s ` (PARTIALLY FILLED) , , .. r Alit Y Or 1 hrr C �C) f A 0, ^y ISM 'S Ap, A& Y ' q r Y - - 0 � o c WWI © a e -# �_ o o kW,' EXISTING DITCH rA 4 { S (PARTIALLY FILLED] Nit MAT t "10 SS waft- AS- GUILTS Minimum Elevation Minimum Elevation Maximum Elevation Color 8.500 9-OW 43.000 9.000 9 -900 16.000 8.500 10 -OW . AS- GUILTS Minimum Elevation Minimum Elevation Maximum Elevation Color 14.000 90 -5D0 43.000 10.540 11 -DW 16.000 71.00 11 -540 ■ AS- GUILTS Minimum Elevation Maximum Elevation Color (1.500 93.000 91 95 1,.% 97 43.000 18 -000 ■ 16.000 25.000 73 AS- GUILTS KEY MAP 0 50 100 150 SCALE IN FEET Is e 5ai€�wi a u k �L tdj ~ M } CD Z Q U ¢o Jj 0 x ED � Q � J _J LL (f3 O x CL O PZ rta: 1002 DRAWN BY RC DATE: 01/16/14 SHEET'. 04.80 i 14$ 10}, 4p5 tW I 91 95 1,.% 97 - t 82 83 8i 8i 87 .M a 701 71 12 73 _ ;'TKAra AL. VALC1J7 � 8, l � 23 --— PROJECT BCiJNOARY - p--17 it 11 DENOTES O DENOTES THIS SHEET _ f3 1S- P{A W 7 I g 1EIr. �- Sy -- T... PHAiSE3 riysY3��I KEY MAP 0 50 100 150 SCALE IN FEET Is e 5ai€�wi a u k �L tdj ~ M } CD Z Q U ¢o Jj 0 x ED � Q � J _J LL (f3 O x CL O PZ rta: 1002 DRAWN BY RC DATE: 01/16/14 SHEET'. 04.80 LINE - 1 i0e Sheet 04.91 -= Wt� � ���' .,' - A� ♦py, i ,�` i _ - 0C. �4}.. ♦O^y 4` l`` ♦pry w ` �.. �... . O 4 4 p -_ ♦a' 4 � s do �`' ♦p 4 � � � 1 ®ti 4ti a A � a 0 4 46 # l 4 _ oil] f yQ � _ i ♦p yy ♦p. IM 4 f % ♦a♦ .q ♦p� �. ig1 I t?1 r ►� IVA t r 1 f %p" .gy >� r rl fi6H5#RF1E S0' Ar 4 1 ' - 1 it FIELD DITCH PLUG - y 4W N � 1� � _ � 1 ♦ o. � � �,� ,ter � _ 1 � i i} tia h 4 - ' c4 � � �• 4 ��rTfdT =i�'�� 4 � .' 4 i ♦pry ,►rye - ♦ +p `� Q�� air j c � � '�ag0 - p♦ I {i, w I —EXISTING DITCH (PARTIALLY FILLED) ,I oy 3_r �. v• 4gtiJ� 6 1 pa (A;,FL 9 Minimum Elevation Minimum Elevation Maximum Elevation Color 8.500 9 -000 13.000 9.000 9 -900 ■ 8.500 10-OW . v• 4gtiJ� 6 1 pa (A;,FL 9 Minimum Elevation Minimum Elevation Maximum Elevatim Color 101]00 10 -500 13.000 10.900 11 -DD0 S61]00 11.000 11 -500 ■ v• 4gtiJ� 6 1 pa (A;,FL 9 04,11 0 0 ty 0 • s. _ A; A5- BUILTS REV. No. DATE DESCFUPTipN. LEGEND Minimum Elevation Maximum Elevation Color 11.500 93 -000 " w orz 13.000 16 -000 ■ S61]00 25.000 ELEVATION 04,11 0 0 ty 0 • s. _ A; A5- BUILTS REV. No. DATE DESCFUPTipN. LEGEND f'R9P9FiE$SPILLWAY w u{PYRAMAT TURF I, REINFORCEMENT) " w orz I%§ 9T C) a PRePOSEB DITCH CROSSING z L] (# 57 STONE) ELEVATION �7 PRBPOSEE#RIP RAP PRE - CONSTRUCTION SPOT 5" - 12" CLASS B ] _ PR6P95E9 TOP OF BERM PR6PeSEB 8" ROCK PAD (LARGE SIZE MINE REJECTS) / PR6P65ESDITCH FILL keP6SEB FLOW ARROW PR9P65EB SLOPE ARROW PRBPGSEB MAJOR PLUG (LENGTH = 100') -PR6P65€B MINOR PLUG (LENGTH = 59) F'149r96c ^c PIPE AND RIPRAP �y PRE-CONSTRUCTION SURVEY SPOT ELEVATION PRE - CONSTRUCTION LID 1 j. 1W , I%§ 9T as 82 ;a7: 9d '&i. 87 .89 AR W ` ELEVATION X1250 PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS - BUILT SPOT GRADES NOTE: 43 1 j. KEY MAP 0 50 700 150 SCALE IN FEET �gPlE�ai 5a��wi a u k �L Z� U M1 Z M a Q U <Z ¢0 [if 4 LL m z � Q � J __j Z U — L LL o x H O V Z rya: 1002 DRAWN BY RC DATE: 01/16/14 SHEET: 04.81 1W , I%§ 9T as 82 ;a7: 9d '&i. 87 .89 EC 'Fc 55 ' '57 a6 I'm I'S I" I ax, { 53 54 43 as fn _ i 3B,3� -, .','TRICAM AL�G . ALUJ7 23 — PROJECT BOUAVARY - -i4. O DENOTES THIS SHEET 1S- P7iA5E7 IV 6 7'' PHASE.T I_ KEY MAP 0 50 700 150 SCALE IN FEET �gPlE�ai 5a��wi a u k �L Z� U M1 Z M a Q U <Z ¢0 [if 4 LL m z � Q � J __j Z U — L LL o x H O V Z rya: 1002 DRAWN BY RC DATE: 01/16/14 SHEET: 04.81 I Y I at i� ► *0 41 I y ► � i 4 Op � y ` a^ i g FIELD je+ 54" DITCH PLUG I® l 44 f B, EXIS ` �j f \� 4 kI i If Of +>g - + Wp _z ' 1'' AS _ PR6P95E9 Minimum Elevation Minimum Elevation ation Color 777 f 10.500 11 -DDO ■ 11.000 11.500 . Wp _z ' 1'' AS FIELQ DITCH PLUG c _ PR6P95E9 Minimum Elevation Minimum Elevation Maximum Elevation Colo[ 101 m0 10.500 f 10.500 11 -DDO 16.000 11.000 11.500 ■ FIELQ DITCH PLUG c 1 jr $1 �41k L A5- BUILTS IM4 a° M , a r �� .► LEGEND _ PR6P95E9 Minimum Elevation Maximum Elevation Odor 11.500 13.DD0 r / PR6P65EEDITCH 13.000 18.080 ■ 16.000 25.000 MAJOR PLUG 1 jr $1 �41k L A5- BUILTS IM4 a° M , a r �� .► LEGEND _ PR6P95E9 PRE)POSEB SPILLWAY w 8" ROCK PAD u(PYRAMAT TURF MINE REJECTS) r / PR6P65EEDITCH REINFORCEMENT) w orz PRE)P65EF) SLOPE ARROW o a MAJOR PLUG PRePBSEB DITCH CROSSING z J i PR6PE)SE6MINOR I (# 57 STONE) PR6PB5EERIP RAP ( S" - 12" CLASS B ) _ PR6P95E9 TOP OF BERM DPRBP9SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) r / PR6P65EEDITCH FILL +... -_ ""�IP88E=FLOW ARROW PRE)P65EF) SLOPE ARROW MAJOR PLUG (LENGTH = 100') J i PR6PE)SE6MINOR PLUG (LENGTH = SO') P%P6SSEEfPIPE AND �® RIPRAP �5 PRE - CONSTRUCTION ' SURVEY SPOT ELEVATION eh PRE - CONSTRUCTION LIDAR ELEVATION Z� U X12 5D PRE - CONSTRUCTION SPOT ELEVATION a 11.40 AS -BUILT SPOT GRADES Q NOTE: U ¢ z F J 0 � THIS LEGEND SUPERCEDES LEGEND ON 4 LL C1.2 WHEN CONFLICTING. � w ED NI Y,73 1 31 - pia le ll I 9 I a-L CL r L � J __J CL Z LL KEY MAP (6 O Q x H - 00 0 50 700 150 SCALE IN FEET PRDJ. NO.: 1002 DRAWN BY RC :EV.No. Dare DESCRIPTION DATE: 01116114 - SHEET'. - Lq 4.8� + e!iS:FRHe:F 5o, LD DITCH PLUG 's 1p % 0 -F-Jwe �,3.MW 0 C3 0 0 0 0 0 - EXISTING DITCH (PARTIALLY FILLED) 0 C, a C III Minimumi Eli Maximum Elevation 0-ow 7.500 7.500 8.000 Li &DIDD 8.500 A- 1Q, FIELD DITCH PLUG 6' 4 IN 1 'C5 9tR4ff 513' FIELD DITCH PLUG =Now - ,CH t11 I _7 it — I"I ! -OI- (5"-12" CLASS B) L Sr � PR6PE)5EE) TOP OF BERM I j7, PRE)PeSEB 8" ROCK PAD J: 6- r (LARGE SIZE MINE REJECTS) PR6PE)5EE) DITCH FILL 5 PREIPE)SEB FLOW ARROW Ot ~B 'SLOPE ARROW 4 MAJOR PLUG (LENGTH = 100') 00* I PR8PE)SEB MINOR PLUG -7 f (LENGTH = 59) PROPeSED PIPE AND RIPRAP tU b PRE-CONSTRUCTION SURVEY SPOT ELEVATION PRE-CONSTRUCTION LIDAR LIJ 0 ELEVATION X175D PRE-CONSTRUCTION SPOT M z ELEVATION (12,00 o AS - BUILT SPOT GRADES 0 NOTE: L) < Z I.— J 0 [if THIS LEGEND SUPERCEDES LEGEND ON 0 LL C1.2 WHEN CONFLICTING. w 0 LEGEND Minimum Elevation Minimum Elevation Maximum Elevation Wor 8,500 9-OW 13.000 9.000 9-900 ■ 9.600 10-OW E I _7 it — I"I ! -OI- (5"-12" CLASS B) L Sr � PR6PE)5EE) TOP OF BERM I j7, PRE)PeSEB 8" ROCK PAD J: 6- r (LARGE SIZE MINE REJECTS) PR6PE)5EE) DITCH FILL 5 PREIPE)SEB FLOW ARROW Ot ~B 'SLOPE ARROW 4 MAJOR PLUG (LENGTH = 100') 00* I PR8PE)SEB MINOR PLUG -7 f (LENGTH = 59) PROPeSED PIPE AND RIPRAP tU b PRE-CONSTRUCTION SURVEY SPOT ELEVATION PRE-CONSTRUCTION LIDAR LIJ 0 ELEVATION X175D PRE-CONSTRUCTION SPOT M z ELEVATION (12,00 o AS - BUILT SPOT GRADES 0 NOTE: L) < Z I.— J 0 [if THIS LEGEND SUPERCEDES LEGEND ON 0 LL C1.2 WHEN CONFLICTING. w 0 LEGEND Minimum Elevation Minimum Clavajori Maximum EkwaWn Color 101= 10-SDD 13.000 lDM I I _DD0 16.000 11.000 11-500 ■ I _7 it — I"I ! -OI- (5"-12" CLASS B) L Sr � PR6PE)5EE) TOP OF BERM I j7, PRE)PeSEB 8" ROCK PAD J: 6- r (LARGE SIZE MINE REJECTS) PR6PE)5EE) DITCH FILL 5 PREIPE)SEB FLOW ARROW Ot ~B 'SLOPE ARROW 4 MAJOR PLUG (LENGTH = 100') 00* I PR8PE)SEB MINOR PLUG -7 f (LENGTH = 59) PROPeSED PIPE AND RIPRAP tU b PRE-CONSTRUCTION SURVEY SPOT ELEVATION PRE-CONSTRUCTION LIDAR LIJ 0 ELEVATION X175D PRE-CONSTRUCTION SPOT M z ELEVATION (12,00 o AS - BUILT SPOT GRADES 0 NOTE: L) < Z I.— J 0 [if THIS LEGEND SUPERCEDES LEGEND ON 0 LL C1.2 WHEN CONFLICTING. w 0 EXISTING DITCH MR" --,-(PARTIALLY FILLED) 0 0 II LEGEND Minimum Elevation Maximum Elevation PREPOSEB SPILLWAY (PYRAMAT TURF REINFORCEMENT) orz a m 1w, PRePOSEB DITCH CROSSING (# 57 STONE) 13.000 I 1 PROPOSE) RIP RAP 16.000 EXISTING DITCH MR" --,-(PARTIALLY FILLED) 0 0 II AS- GUILTS Minimum Elevation Maximum Elevation Color 11.500 13-000 13.000 16-0100 ■ 16.000 25.000 AS- GUILTS 2! _j < LL KEY MAP CL5 O < [L 0 LJ a so 1100 1150 SCALE IN FEET PRQJ. NO.: 1002 DRAWN BY RC W. No. DATE DESCRIPTION DATE: 01116/14 -- -- -- 04.83 53 4 STREAM AUGNMENT 23 PROJECTSOLIADARY is Ill- E] DENOTES THIS SHEET 14, PHASE 7 10, PHASE3 2! _j < LL KEY MAP CL5 O < [L 0 LJ a so 1100 1150 SCALE IN FEET PRQJ. NO.: 1002 DRAWN BY RC W. No. DATE DESCRIPTION DATE: 01116/14 -- -- -- 04.83 U o f 0 C3 LEGEND Minimum EWvipjm Maximum Elevation Color PRePE)SEB SPILLWAY 13.000 —PROJECT BOUNDARY lo.mo 11-000 (PYRAMAT TURF 71.000 X12 5D PRE-CONSTRUCTION SPOT 4;,. REINFORCEMENT) 01 _j CL x; -50' i PHASE I AS - BUILT SPOT GRADES o w FIELD DITCH PLUG 0 a: L) NOTE: < Z 0 PReP85EB DITCH CROSSING z THIS LEGEND SUPERCEDES LEGEND ON � (# 57 STONE) zo < cj PRePE8EB RIP RAP 0 5" - 12" CLASS B PROPOSEE) TOP OF BERM PROP19SEB F' ROCK PAD (LARGE SIZE MINE REJECTS) PRISPOSEE) DITCH FILL A 8r3EEl •FLOW ARROW P Re P 9F7F 8 SLOP F ARROW PREIPGSEB L C MAJOR PLUG (LENGTH = 100') II 4t dr PR9pe5E8 MINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND F j ° P 9 RIPRAP LLJ PRE-CONSTRUCTION SURVEY SPOT ELEVATION eh PRE-CONSTRUCTION LIDAR 14 w Minimum EWvipjm Maximum Elevation Color ELEVATION 13.000 —PROJECT BOUNDARY lo.mo 11-000 ■ 71.000 X12 5D PRE-CONSTRUCTION SPOT 4;,. 11 Is DENOTES THIS SHEET ELEVATION _j CL PHASE I AS - BUILT SPOT GRADES :, M 0 PHASE 3 0 a: L) NOTE: < Z 0 THIS LEGEND SUPERCEDES LEGEND ON � KEY MAP (100 < 0) Its jL, 0 0 Exi&_TiNG DITCH 0", 11 (PARTIALLY FILLED) L 4M"- j1py d ;;ll A Mai A eeNGTRUeT FIELD DITCH PI 1 IG Aw 0 MEN& SLAILT Minimum EW"lion Maximum Elevation Color Mi.Iu.Ew,&U. I Maximum F-atiM Wor 8.500 9-DH 7.509 8.000 ■ 9.000 9-500 s 8.000 8.500 10-000 ■ AS-BUILTS Minimum EWvipjm Maximum Elevation Color 10.000 13.000 —PROJECT BOUNDARY lo.mo 11-000 ■ 71.000 11-500 ■ AS-BUILTS Minimum ElwyAon Maximum Elevation Color 11.500 13.000 —PROJECT BOUNDARY tlaocl 16-000 ■ 16.000 25.000 ■ AS-BUILTS DATE: 01M6114 SKEET 04.84 —PROJECT BOUNDARY < 22 cz 11 Is DENOTES THIS SHEET _j _j CL PHASE I Z) < X (D PHASE 3 0 a: z 7C3 , C LL Cl KEY MAP (100 < fl 0 ua 0 510 too 1510 SCALE IN FEET PROJA40. 1002 twAWN BY RC DATE: 01M6114 SKEET 04.84 I_ I t s i i LEGEND � i H "'• \if = PRBPBSEBSPILLWAY w .F, v { (PYRAMAT TURF REINFORCEMENT) oz rn w o a ' PR@F'ASEB DITCH CROSSING (# 57 STONE) a �, RBP88E9RIP RAP 1 { 5" - 12" CLASS B ) >, _) TOP OFBERM 4 PROPOSEB 87 ROCK PAD D ( LARGE SIZE MINE REJECTS) RE)PASEE3 DITCH FILL ..?FLOW ARROW P R6P95E#3 SLOP F ARROW h; PR9P95Ef3 r v MAJOR PLUG (LENGTH =100') 1 t- ` - PR9P65EBMINOR PLUG Mlnimum Elevation Maximum Elevation Cider Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevatim Color 3 0.080 7.500 ■ 8.500 9 -OW 14.000 10.500 r 1 -500 9.000 ■ 9.000 9 -50i:t ■ 10.540 11.000 , Y 8.7180 6.500 �' 9.500 10 -OW . 71.000 11.57/0 ■ Minimum Elevation Maximum Elevation Color (LENGTH = SO') 13.000 MU7 I 18.080 ■ SB.000 25.008 fRBF95EE PIPE AND _ RIPRAP PRE - CONSTRUCTION � �I t�5 SURVEY SPOT ELEVATION PRE- CONSTRUCTION LIDAR �? 0 ELEVATION �tc `te"STR IST50' N� I PRE CONSTRUCTION SPOT X12 SQ a FIELD DITCH FIELD DITCH PLUG ELEVATION - �i @' 11.40 AS - BUILT SPOT GRADES NOTE: 0 <Z THIS LEGEND SUPERCEDES LEGEND ON O C1.2 WHEN CONFLICTING. fi J U U Uyti _. U m - EXISTING DITCH ( PARTIALLY FILLED _ PIr F I ` ."- EXISTING DITCF (PARTIALLY FILLED - f too :es f( o a u+ 94 n p, $ tj 62 63: 04 M $7 88 A i. gq VU t T3 .tom O STREAM ALtGNMCNT TC 2! PROJECT BOUNDARY - ❑ DENOTES THIS SKEET _j PHASE 7 Q t PHASE 3 [} � Q Mlnimum Elevation Maximum Elevation Cider Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevatim Color 3 0.080 7.500 ■ 8.500 9 -OW 14.000 10.500 r 1 -500 9.000 ■ 9.000 9 -50i:t ■ 10.540 11.000 , Y 8.7180 6.500 �' 9.500 10 -OW . 71.000 11.57/0 ■ AS- GUILTS LL KEY MAP Q 2 0 50 100 150 SCALE IN FEET PRDJ. NO.: 1002 DRAWN BY- RI. EmTE: 01116114 SHEET: 04.85 Minimum Elevation Maximum Elevation Color (1.500 13.000 MU7 43.000 18.080 ■ SB.000 25.008 AS- GUILTS LL KEY MAP Q 2 0 50 100 150 SCALE IN FEET PRDJ. NO.: 1002 DRAWN BY- RI. EmTE: 01116114 SHEET: 04.85 1 ^•� — •I- 19 r } ♦� ` � � "dry ``� • O � � �- �9 . ! b r •0���1 X91 -11 O r. �. ♦ r 1 ` _ _ eeP46:FRWe:F 50'___ l FIELD WTCH PLUG 11ID �� � v Y �' lJ •� i �I 7 1 s ' T _a !� t IL� • �411IL '•v JV,-; •. 1 .lob � ,.IC I � �► { -1 EXISTING DITCH (PARTIALLY FILLED) 0 r 'y � rd� N� t A I'°I• lit as _ � ! ] .0'+ t7 j ONO -I- D F 1 FIELD DITCH PLUG r,• «I I dr .. uEXISTING DIT o i ► (PARTIALLY�s 1• +i �' " �' ^.i tia• ON t t I i �+ �.• � ,�` ', t 1D1__µ /-' �� Ot'�j I� "' 4 �b NL r - Y '♦ ! I, Minimum Elevalion Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color 0.000 7.500 8.500 9:000 10.000 10.500 11.500 13.000 7.500 6.000 ■ 9.000 9.500 ■ 10.500 11.000 ■ 13.000 18.000 ■ 8.000 8.590 ■ 9.500 10.000 ■ 11.000 11.500 ■ 16.000 25.000 . AS- GUILTS r I! i REV. No, DATE DE$CRIPTION. LEGEND PRE)POSEB SPILLWAY k (PYRAMAT TURF REINFORCEMENT) o z PReP95EE3DITCH CROSSING a i (tt 57 STONE) PRBPOSEE#RIP RAP ( S" - 12" CLASS B ) PRISPBSED TOP OF BERM PR6P9SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PR61P65ED DITCH FILL . -..- PlRAPE)SEEIFLOW ARROW MAJOR PLUG (LENGTH = 100') PR'9POSEB MINOR PLUG - (LENGTH= 50 ") PROP9SEE)PIPE AND RIPRAP 1 &h PRE - CONSTRUCTION ' SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR `R1 ELEVATION 4 PRE - CONSTRUCTION SPOT X1250 ELEVATION 12.00)# AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. c ■ AL y �D 9 STREAM ALIGNMENT — PROJECT BOUNDARY O DE0VK7TES PHISSHEET . PHASE 7 PHHASE3 KEY MAP 0 % ion tau SCALE IN FEET v a6 m -m Aa` '2 Uz 4 J fv � M } Q Q ¢0 Ir 4 LL x m a) C6 CL � J C. Z LL CL(6 O x 1 ( O r ,I N PRQJ. NO.: 1 ❑RAWk BY RC QMTE: 01116/14 SHEET 04.8E i T I vim sit dim- �. " EXISTING D C IT H NUB 44er ., j Mw t L^ O v i FIELD DITCH PLUG ar rlrr i CO r r� d { o e +1 1. A. Am Minimum Elevalion Maximum Elevmion CaM1r 3 OA00 4.500 ■ S 7.500 9.000 ■ a 8.000 8.500 �! J EXISTING DITCH (PARTIALLY FILLED) k LEGEND PRBPBSED Minimum Elevation Minimum Elevation Maximum Elevation Color 8.500 9.000 13.000 9.000 8.900 16A00 8.500 10-OW . J EXISTING DITCH (PARTIALLY FILLED) k LEGEND PRBPBSED Minimum Elevation Minimum Elevation Maximum Elavatiorl Color 101= 10 -SD0 13.000 10.500 11.000 16A00 11.000 11.51/0 ■ J EXISTING DITCH (PARTIALLY FILLED) k LEGEND PRBPBSED Minimum Elevation Maximum Elevation Color 11.500 13.000 r / PR13P65ED 13.000 18.000 ■ 16A00 25.000 PRBPGSEB MAJOR PLUG J EXISTING DITCH (PARTIALLY FILLED) k LEGEND PRBPBSED PRE)POSEB SPILLWAY N w 8" ROCK PAD (PYRAMAT TURF MINE REJECTS) r / PR13P65ED REINFORCEMENT) c z PRE)P8SEB SLOPE ARROW m o IL PRBPGSEB MAJOR PLUG 2OP9SED PIPE AND (LENGTH = 100') - PRBP65€B PRePEI DITCH CROSSING z (# 57 STONE) PRBPOSEE#RIP RAP I( S" - 12" CLASS B ) PRBPBSED TOP OF BERM DPRE)P9SEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) r / PR13P65ED DITCH FILL kePE)SEB FLOW ARROW PRE)P8SEB SLOPE ARROW 14 PRBPGSEB MAJOR PLUG 2OP9SED PIPE AND (LENGTH = 100') - PRBP65€B MINOR PLUG A5- BUILTS jjj'_ •_. gg tW IOt* (LENGTH = 59) ' 81 82 i 89:, 9d BS 94 ! 2OP9SED PIPE AND RIPRAP ,j �h PRE - CONSTRUCTION Q 23 SURVEY SPOT ELEVATION to _ 18, O DENOTES THIS SHEET ' 1 <. �_ C CL 'b? PRE - CONSTRUCTION LIDAR ¢ T PHASE.T '' Q ELEVATION LL r PRE- CONSTRUCTION SPOT X1256 (6 O Q 2 H ELEVATION O r ,I 11.40 AS -BUILT SPOT GRADES Q L.J 0 so l00 1150 NOTE: ¢ z F PRDJ. NO.: 1002 DRAWN BY J 0 THIS LEGEND SUPERCEDES LEGEND ON O LL C1.2 WHEN CONFLICTING. m A5- BUILTS jjj'_ •_. gg tW IOt* ' 81 82 i 89:, 9d BS 94 89 +B . 43 ae '.22 rr PROJECT BOUAVARY Q 23 to _ 18, O DENOTES THIS SHEET ' 1 <. �_ C CL PHASE 1 ¢ T PHASE.T '' = �} LL KEY MAP (6 O Q 2 H O r ,I � L.J 0 so l00 1150 SCALE IN FEET PRDJ. NO.: 1002 DRAWN BY RC DATE: 01116/14 SHEET: 04.87 +I {11 III I ,Ili I 'l, LIPIE - ee Sh lQ S • r a - r e 4 -EXISTING DITCH a� (PARTIALLY FILLFD) f i' Qp__� 50' A FIELD DITCH PL6G } i 1 r 1:31 D J.jrf��� -C Jam` 11 6l V A a V - „ v ell a [3 c 4k r ICI ., - l '� (,' a 1 b 'bra C� I, 0�1 r7 °fl d 1 ° typ p C`ty q� e a L7 v 0g. U p 6� � a Y - 41 L �� r G E dam'4 L"' _ _ '�' 1 b 5[ t'h j} gyp•. L`'� �6. p I 00 P a© o c _ D o �21 r q \ vk tl �Cv� q� ,-::I T DITCH J; �J S r © 4J i1 <7 ° a 44' rj 12.51 MATel t> v EXISTING O is r © 0 GRADE . d l {'R6PBSEB SPILLWAY Minimum Elevation Maximum Elevation Color 8.500 9.000 9.000 9.900 ■ 9.500 10.000 ■ r 1:31 D J.jrf��� -C Jam` 11 6l V A a V - „ v ell a [3 c 4k r ICI ., - l '� (,' a 1 b 'bra C� I, 0�1 r7 °fl d 1 ° typ p C`ty q� e a L7 v 0g. U p 6� � a Y - 41 L �� r G E dam'4 L"' _ _ '�' 1 b 5[ t'h j} gyp•. L`'� �6. p I 00 P a© o c _ D o �21 r q \ vk tl �Cv� q� ,-::I T DITCH J; �J S r © 4J i1 <7 ° a 44' rj 12.51 MATel t> v EXISTING O is r © 0 GRADE . d LJ vJ 3CISTINGDITCH o�. a. � L7 Lp AS- GUILTS LEGEND l {'R6PBSEB SPILLWAY Minimum Elevation Maximum Elevsborl Color 10.000 10.500 10.500 11.000 ■ 11.000 11.500 ■ LJ vJ 3CISTINGDITCH o�. a. � L7 Lp AS- GUILTS LEGEND l {'R6PBSEB SPILLWAY Minimum Elevation Maximum Elevation Color 11.500 93.000 43.000 18.000 ■ 16.000 25.000 PRBP88E9RIP RAP LJ vJ 3CISTINGDITCH o�. a. � L7 Lp AS- GUILTS LEGEND l {'R6PBSEB SPILLWAY w (PYRAMAT TURF REINFORCEMENT) C: rn w PRePBSEB DITCH CROSSING c"9 (# 57 STONE) L_Tj PRBP88E9RIP RAP 1 i53 54 ( 5" - 12" CLASS B ) _ STOP OF BERM DPROPOSEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRePASEE3 DITCH FILL ..?FLOW ARROW I— PRePBSE#3SLOPFARROW =Ed MAJOR PLUG (LENGTH =100') —PRE)PGSEBMINOR PLUG (LENGTH = 59) PRBPISSEI1 PIPE AND RIPRAP t$� PRE- CONSTRUCTION SURVEY SPOT ELEVATION �? PRE- CONSTRUCTION LIDAR D ELEVATION X12 5Q PRE CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1_2 WHEN CONFLICTING. KEY MAP 0 so 106 15o SCALE IN FEET �n Eta Aai€�w�i �k �u s 41 Z U z in 0 Z v 0 O L[. U) cu ILL C 2 � V Pltcu.lyo.: 1002 DRAWN BY- RC DATE. 01116114 SHEET'. 04.88 i 14$ 10}, 405 WF_%T_1M I Bl 95 X95 97 ai 82 : a7: 94 05 67 .89 c"9 ha 1 T1 2 ?S N.. 11, 110TWiT 1 i53 54 in 3� t { ` .','TKAM AL.1GNME1JT � sa 1`l p. — _ _ —PROJECT BCiJNOARY ` y, 7--�J"�ja E] DENOTES THIS SHEET 13 1S- Pl{A$E7 � g 111x. 6 T... PHASE.O KEY MAP 0 so 106 15o SCALE IN FEET �n Eta Aai€�w�i �k �u s 41 Z U z in 0 Z v 0 O L[. U) cu ILL C 2 � V Pltcu.lyo.: 1002 DRAWN BY- RC DATE. 01116114 SHEET'. 04.88 09w I� a A YO �^ - ,. EXISTI EXISTING DITCH 0 ,/ J a 0 0�4 v b LTUll P I}. g �p ❑ �ry cos 4 U a 0° �C� 0 0 0 P n o D o f e EXISTING DITCH L ITCFI " 4XISTING DITCH 1N� H f�}J EX 5 0 15, MP NORTH � ,I • 6 I N. .61 . a S. al + 6 � g C: tY C O ? C - ,i�I, Y � Q n 0 11 O1�.. V Y a a� a 0 1 II TOP OF BANK 4 r� ay EXIST4NG DITCH 3� a XISTING DITCH a EXISTING DIT C C G G C C ID s R1 A;1 9 O I. C 0 0 0 C C NORTH PROP _ AL NT ` LL m ! I MATCH LINE - See Sheet 04.79 4 Minimum Elevation Maximum ElevB*m CWor 8.500 9 -dOd z 0 9 -5DD 0� 9.500 1D:ODD 0 A YO �^ - ,. EXISTI EXISTING DITCH 0 ,/ J a 0 0�4 v b LTUll P I}. g �p ❑ �ry cos 4 U a 0° �C� 0 0 0 P n o D o f e EXISTING DITCH L ITCFI " 4XISTING DITCH 1N� H f�}J EX 5 0 15, MP NORTH � ,I • 6 I N. .61 . a S. al + 6 � g C: tY C O ? C - ,i�I, Y � Q n 0 11 O1�.. V Y a a� a 0 1 II TOP OF BANK 4 r� ay EXIST4NG DITCH 3� a XISTING DITCH a EXISTING DIT C C G G C C ID s R1 A;1 9 O I. C 0 0 0 C C NORTH PROP _ AL NT ` LL m ! I MATCH LINE - See Sheet 04.79 4 LEGEND ' PRBPBSEB SPILLWAY G D(PYRAMAT TURF aNI! �`�' � ON Q� °ry o ° NO REINFORCEMENT) `� o � a PRBPOSEf+DITCH CROSSING a {# 57 STONE} a EXISTING DITCH EXISTING DITCH PRePBSE&RIP RAP (5" - 12" CLASS B) ry ti u a o _ PR$PASE�TOP OF BERM b 0, q 0 c7 V 0 I ION PROPOSEB 87 ROCK PAD I r c ( LARGE SIZE MINE REJECTS) 038 $ o u PR9RB9EBDiTCH �, r r rf / FRE)PASEf) DITCH FILL y1 PROPERTY LINE.; CENTERLINE ALIGNMENT -. 54 +00.40 (F -F m ' a +20 -00 (F -F-) + ""O E?FLOW ARROW A a z f'ReP95E)SLOPFARROW � k PRBPB5EB -� - - - - - MAJOR PLUG - - (LENGTH =100') s _ I PRE)P65EBMINOR PLUG (LENGTH = S4') fR9i�5EB PIPE AND LL -- - - 1 - I 1 �® RIPRAP Q c 54+00.00 (F -F) a5 PRE-CONSTRUCTION 52 +20.00 (F F -) BERM SURVEY SPOT ELEVATION Al ? PRE CONSTRUCTION LIDAR 1 PH2 N CENTER LINE OF BEWA a -- : C ELEVATION C - ALIGNMENT 4SEE)12.50 PRE - CONSTRUCTION SPOT a SPILLWAY DETAIL �- ' ELEVATION � EXISTING SHEET ' AS - BUILT SPOT GRADES O 12.00 010.1 & C102) GRADE W` v 0 4 126 �_ NOTE: z F + BERM SHIFTEp 10+ SOUTH �� THIS LEGEND SUPERCEDES LEGEND ON J O IQ" I PH2 N CENTER LINE OF BERM �a- D.UE TO ENCROACWEN7 ^ C1_2 WHEN GON''FLICTiNG, LL LL ALIGNMF 0 %N NORTH PROI?E'1RTY LINE (� Q m TOP OF BANK O � LM1 4C 0 C S E, PlRepoqEv BERM BERM SHIFTED 10+ EAST DUE TO W U) Z c J O _ �LL ENCROACHMENT ON WEST PROPERTY LINE' KEY MAP (13 D 11 � 0 54 146 156 B SCALE IN FEET PRa. NO.: 1002 DRAWN BY- RC Ev.No. DATE DESCRIPTION DATE: 01116114 SHEET: A5- BUILTS 04.89 1 Minimum Elevation Maximum ElevB*m CWor 8.500 9 -dOd z 9.000 9 -5DD ■ 9.500 1D:ODD ■ LEGEND ' PRBPBSEB SPILLWAY G D(PYRAMAT TURF aNI! �`�' � ON Q� °ry o ° NO REINFORCEMENT) `� o � a PRBPOSEf+DITCH CROSSING a {# 57 STONE} a EXISTING DITCH EXISTING DITCH PRePBSE&RIP RAP (5" - 12" CLASS B) ry ti u a o _ PR$PASE�TOP OF BERM b 0, q 0 c7 V 0 I ION PROPOSEB 87 ROCK PAD I r c ( LARGE SIZE MINE REJECTS) 038 $ o u PR9RB9EBDiTCH �, r r rf / FRE)PASEf) DITCH FILL y1 PROPERTY LINE.; CENTERLINE ALIGNMENT -. 54 +00.40 (F -F m ' a +20 -00 (F -F-) + ""O E?FLOW ARROW A a z f'ReP95E)SLOPFARROW � k PRBPB5EB -� - - - - - MAJOR PLUG - - (LENGTH =100') s _ I PRE)P65EBMINOR PLUG (LENGTH = S4') fR9i�5EB PIPE AND LL -- - - 1 - I 1 �® RIPRAP Q c 54+00.00 (F -F) a5 PRE-CONSTRUCTION 52 +20.00 (F F -) BERM SURVEY SPOT ELEVATION Al ? PRE CONSTRUCTION LIDAR 1 PH2 N CENTER LINE OF BEWA a -- : C ELEVATION C - ALIGNMENT 4SEE)12.50 PRE - CONSTRUCTION SPOT a SPILLWAY DETAIL �- ' ELEVATION � EXISTING SHEET ' AS - BUILT SPOT GRADES O 12.00 010.1 & C102) GRADE W` v 0 4 126 �_ NOTE: z F + BERM SHIFTEp 10+ SOUTH �� THIS LEGEND SUPERCEDES LEGEND ON J O IQ" I PH2 N CENTER LINE OF BERM �a- D.UE TO ENCROACWEN7 ^ C1_2 WHEN GON''FLICTiNG, LL LL ALIGNMF 0 %N NORTH PROI?E'1RTY LINE (� Q m TOP OF BANK O � LM1 4C 0 C S E, PlRepoqEv BERM BERM SHIFTED 10+ EAST DUE TO W U) Z c J O _ �LL ENCROACHMENT ON WEST PROPERTY LINE' KEY MAP (13 D 11 � 0 54 146 156 B SCALE IN FEET PRa. NO.: 1002 DRAWN BY- RC Ev.No. DATE DESCRIPTION DATE: 01116114 SHEET: A5- BUILTS 04.89 1 Minimum Elevatan Maximum Elevsbw Cdor 74.000 10 -500 z 70.540 17 -DDO ■ 71.000 77 -590 �' LEGEND ' PRBPBSEB SPILLWAY G D(PYRAMAT TURF aNI! �`�' � ON Q� °ry o ° NO REINFORCEMENT) `� o � a PRBPOSEf+DITCH CROSSING a {# 57 STONE} a EXISTING DITCH EXISTING DITCH PRePBSE&RIP RAP (5" - 12" CLASS B) ry ti u a o _ PR$PASE�TOP OF BERM b 0, q 0 c7 V 0 I ION PROPOSEB 87 ROCK PAD I r c ( LARGE SIZE MINE REJECTS) 038 $ o u PR9RB9EBDiTCH �, r r rf / FRE)PASEf) DITCH FILL y1 PROPERTY LINE.; CENTERLINE ALIGNMENT -. 54 +00.40 (F -F m ' a +20 -00 (F -F-) + ""O E?FLOW ARROW A a z f'ReP95E)SLOPFARROW � k PRBPB5EB -� - - - - - MAJOR PLUG - - (LENGTH =100') s _ I PRE)P65EBMINOR PLUG (LENGTH = S4') fR9i�5EB PIPE AND LL -- - - 1 - I 1 �® RIPRAP Q c 54+00.00 (F -F) a5 PRE-CONSTRUCTION 52 +20.00 (F F -) BERM SURVEY SPOT ELEVATION Al ? PRE CONSTRUCTION LIDAR 1 PH2 N CENTER LINE OF BEWA a -- : C ELEVATION C - ALIGNMENT 4SEE)12.50 PRE - CONSTRUCTION SPOT a SPILLWAY DETAIL �- ' ELEVATION � EXISTING SHEET ' AS - BUILT SPOT GRADES O 12.00 010.1 & C102) GRADE W` v 0 4 126 �_ NOTE: z F + BERM SHIFTEp 10+ SOUTH �� THIS LEGEND SUPERCEDES LEGEND ON J O IQ" I PH2 N CENTER LINE OF BERM �a- D.UE TO ENCROACWEN7 ^ C1_2 WHEN GON''FLICTiNG, LL LL ALIGNMF 0 %N NORTH PROI?E'1RTY LINE (� Q m TOP OF BANK O � LM1 4C 0 C S E, PlRepoqEv BERM BERM SHIFTED 10+ EAST DUE TO W U) Z c J O _ �LL ENCROACHMENT ON WEST PROPERTY LINE' KEY MAP (13 D 11 � 0 54 146 156 B SCALE IN FEET PRa. NO.: 1002 DRAWN BY- RC Ev.No. DATE DESCRIPTION DATE: 01116114 SHEET: A5- BUILTS 04.89 1 Minimum Elevator Maximum Elevation CWor 11.500 13 -DDO z 13.000 16 -000 E 76A00 25.000 N LEGEND ' PRBPBSEB SPILLWAY G D(PYRAMAT TURF aNI! �`�' � ON Q� °ry o ° NO REINFORCEMENT) `� o � a PRBPOSEf+DITCH CROSSING a {# 57 STONE} a EXISTING DITCH EXISTING DITCH PRePBSE&RIP RAP (5" - 12" CLASS B) ry ti u a o _ PR$PASE�TOP OF BERM b 0, q 0 c7 V 0 I ION PROPOSEB 87 ROCK PAD I r c ( LARGE SIZE MINE REJECTS) 038 $ o u PR9RB9EBDiTCH �, r r rf / FRE)PASEf) DITCH FILL y1 PROPERTY LINE.; CENTERLINE ALIGNMENT -. 54 +00.40 (F -F m ' a +20 -00 (F -F-) + ""O E?FLOW ARROW A a z f'ReP95E)SLOPFARROW � k PRBPB5EB -� - - - - - MAJOR PLUG - - (LENGTH =100') s _ I PRE)P65EBMINOR PLUG (LENGTH = S4') fR9i�5EB PIPE AND LL -- - - 1 - I 1 �® RIPRAP Q c 54+00.00 (F -F) a5 PRE-CONSTRUCTION 52 +20.00 (F F -) BERM SURVEY SPOT ELEVATION Al ? PRE CONSTRUCTION LIDAR 1 PH2 N CENTER LINE OF BEWA a -- : C ELEVATION C - ALIGNMENT 4SEE)12.50 PRE - CONSTRUCTION SPOT a SPILLWAY DETAIL �- ' ELEVATION � EXISTING SHEET ' AS - BUILT SPOT GRADES O 12.00 010.1 & C102) GRADE W` v 0 4 126 �_ NOTE: z F + BERM SHIFTEp 10+ SOUTH �� THIS LEGEND SUPERCEDES LEGEND ON J O IQ" I PH2 N CENTER LINE OF BERM �a- D.UE TO ENCROACWEN7 ^ C1_2 WHEN GON''FLICTiNG, LL LL ALIGNMF 0 %N NORTH PROI?E'1RTY LINE (� Q m TOP OF BANK O � LM1 4C 0 C S E, PlRepoqEv BERM BERM SHIFTED 10+ EAST DUE TO W U) Z c J O _ �LL ENCROACHMENT ON WEST PROPERTY LINE' KEY MAP (13 D 11 � 0 54 146 156 B SCALE IN FEET PRa. NO.: 1002 DRAWN BY- RC Ev.No. DATE DESCRIPTION DATE: 01116114 SHEET: A5- BUILTS 04.89 1 1 1 5 s i 2 1 J s 9 0 \Qti I LEGEND gag 0�a 0 PR6POSEB SPILLWAY (PYRAMAT TURF REINFORCEMENT) F R6PASEEDITCH CROSSING (# 57 STONE) O II PRBPB5EE) RIP RAP a o �p� yib ( LARGE SIZE MINE REJECTS) 9.500 10.000 PRRPB5EB DITCH FILL 0 �iff PR8PA5EB FLOW ARROW C 4 C? e °. r o ° EXISTING DITCH m 4 I 0 U 0 0 � 56 00:()0 (F•F) e c(a � �-r �{ 4v ry PERM ^ \ yr a 0\ STING off' PRA-P -ASER9 DITCH V( 58 +00.00 (F -F) r M _ O ,s,00,00 (F -F) 4. .� 56 +DD -00 (F -F) di r FIELDt6ITCH PLUG ° i a d 7 u I V ° /� a I ° I O U EXISTING DITCH 17 0 � h c� o R fLJJ d \O' \O' 0 NORTH PROPERTY LINE ALIGNMENT f 60 +Do,00 (F-F) 'W m D � II TOP OF BAN 4 O q 0 U g1 9 a 0 0 0 - 0 A +CO.oa (F -Fl '1246 re U BERM 62 +00.00 (F -F) 0 6t} -oo.00 (F-F ) EXIST NG E E 0 1 XA 4h�? LEGEND J ( 5" - 12" CLASS B ) 0�a 0 PR6POSEB SPILLWAY (PYRAMAT TURF REINFORCEMENT) F R6PASEEDITCH CROSSING (# 57 STONE) G g o i a z EXISTING ➢ITCH PRBPB5EE) RIP RAP PR9PE)SEB B" ROCK PAD — (LENGTH = 57) PROPeSEI}PIPE AND �l=J RIPRAP - -� �h PRE - CONSTRUCTION 12 71 Ta SURVEY SPOT ELEVATION e TOP OFo4NfC' ti PRE- CONSTRUCTION LIDAR ELEVATION m U 86 +00.00 (F -F) X12 SQ PRE - CONSTRUCTION SPOT 64 +DO -flu jF F) O Q ELEVATION a �► 72.00 AS BUILT SPOT GRADES M BERM SHIFTED tot SOUTH ~ O DUE TO ENCROACHMENT ON / NOTE: ¢ a NORTH PROPERTY LINE ( THIS LEGEND SUPERCEDES LEGEND ON o h - C1.2 WHEN CONFLICTING. a 4A 1'* h eeo- O O i1 P O O 0 E I ITCH + {PA &LY FILLED) �; Y _ �, ltl Iy ►. p Ok . b'u - °'S °4 1 �i3'j" ✓15.. A* R VA 3 ^sue o l6 qL € a•. Ali !!!' w /'�� ]71�,0�e �e:� [�.F p� : t .. a ,4 k p \° �,_t° - -,' "l.' �SIV 4;``e' �i�''UL■ - 1,.�:. Q' 1 O 1 . t7 27 J ( 5" - 12" CLASS B ) Minimum Elevation `I _ PRISPOSE;T TOP OF BERM EXISTING ➢ITCH 9:000 PR9PE)SEB B" ROCK PAD o �p� yib ( LARGE SIZE MINE REJECTS) 9.500 10.000 PRRPB5EB DITCH FILL I PR8PA5EB FLOW ARROW PHASE 3 PRBP65F$ SLOPE ARROW {u� p . 6 MAJOR PLUG (LENGTH = 1001) PRBP68EB MINOR PLUG — (LENGTH = 57) PROPeSEI}PIPE AND �l=J RIPRAP - -� �h PRE - CONSTRUCTION 12 71 Ta SURVEY SPOT ELEVATION e TOP OFo4NfC' ti PRE- CONSTRUCTION LIDAR ELEVATION m U 86 +00.00 (F -F) X12 SQ PRE - CONSTRUCTION SPOT 64 +DO -flu jF F) O Q ELEVATION a �► 72.00 AS BUILT SPOT GRADES M BERM SHIFTED tot SOUTH ~ O DUE TO ENCROACHMENT ON / NOTE: ¢ a NORTH PROPERTY LINE ( THIS LEGEND SUPERCEDES LEGEND ON o h - C1.2 WHEN CONFLICTING. a 4A 1'* h eeo- O O i1 P O O 0 E I ITCH + {PA &LY FILLED) �; Y _ �, ltl Iy ►. p Ok . b'u - °'S °4 1 �i3'j" ✓15.. A* R VA 3 ^sue o l6 qL € a•. Ali !!!' w /'�� ]71�,0�e �e:� [�.F p� : t .. a ,4 k p \° �,_t° - -,' "l.' �SIV 4;``e' �i�''UL■ - 1,.�:. Q' 1 O 1 . t7 AS —B U I LTS 1 0 h � tiff tC -.4 -- - . STREAM AuGNMENT 27 Minimum Elevation Maximum Elevation Cdor 8.500 9:000 9.000 9.500 ■ 9.500 10.000 . AS —B U I LTS 1 0 h � tiff tC -.4 -- - . STREAM AuGNMENT 27 Minimum Elevation Maximum Elevation Cdor 10.000 10.500 10.500 11.000 , 11.000 11.500 ■ AS —B U I LTS 1 0 h � tiff tC -.4 -- - . STREAM AuGNMENT 27 Minimum Elevation Maximum Elevation Cdor 11.500 13.000 13.000 18.000 ■ 16.000 25.000 ■ AS —B U I LTS 1 0 h � tiff tC -.4 -- - . STREAM AuGNMENT 27 �� ?3 — T @ PROJECOt/NQARY 19 •: OENO TES THIS SHE r WI PHASE 1 10 � t PHASE 3 KEY MAP 0 % too 1% SCALE IN FEET v � Z 4 CIO _j J il (D ` � Z 4 �.�// �- LL �O !>I PRDJ. NO.: 1002 twAWN BY RC DATE: 01/16/14 SKEET: 04.90 (LENGTH = 59) 11,211911 t, 'ROPeSED PIPE AND RIPRAP - 1 _33,* 'PRepesEBBERM 80 6? PRE-CONSTRUCTION 7840.00 (F -F) 0 SURVEY SPOT ELEVATION 12' 14+00.00 (F -I 76+00.00 (F F) 4 ry Ir PRE-CONSTRUCTION LIDAR + { F -F) ELEVATION jp+oo,00 (F-F) :7ePE)SEE) DITCH w ,Z;�+moo (F-F) 4Q, PRE-CONSTRUCTION SPOT qk­ M60 0 P v X1250 >: a AAl F;:FR. 5(y ELEVATION IT LUG TOP OF C1:2=.aa * AS -BUILT SPOT GRADES 0 Z L) 013 NOTE, < 0 E A THIS LEGEND SUPERCEDES LEGEND ON LL E P C1.2 WHEN CONFLICTING. < w 0 All *4111p* 4M EXISTING DITCH (PARTIALLY FILLED. EXISTING DITCH (PARTIALLY FILLED) �b, 0 quit G or III No ir Minimum lion MuirntmiElmnitim Cdw ai0 -00 7.500 8.000 ■ 8.000 8.500 05 LEGEND p Color 8,500 9-OW ( 5• - 12• CLASS 8 PRE)POSEB SPILLWAY (PYRAMATTURF r g EXISTING DITCH EXISTING DITCH EXISTING DITCH EXISTING DITCH KtINFORCEMENT) a> 10 e w. A CS O 0 EXISTING DITCH 1 ob, HOMPSON 0 0 0 PReII DITCH CROSSING i uj 0 z �0 57 STONE) o PRE)PeSEB 8" ROCK PAD 9 PRGPE)SEE) RIP RAP (LENGTH = 59) 11,211911 t, 'ROPeSED PIPE AND RIPRAP - 1 _33,* 'PRepesEBBERM 80 6? PRE-CONSTRUCTION 7840.00 (F -F) 0 SURVEY SPOT ELEVATION 12' 14+00.00 (F -I 76+00.00 (F F) 4 ry Ir PRE-CONSTRUCTION LIDAR + { F -F) ELEVATION jp+oo,00 (F-F) :7ePE)SEE) DITCH w ,Z;�+moo (F-F) 4Q, PRE-CONSTRUCTION SPOT qk­ M60 0 P v X1250 >: a AAl F;:FR. 5(y ELEVATION IT LUG TOP OF C1:2=.aa * AS -BUILT SPOT GRADES 0 Z L) 013 NOTE, < 0 E A THIS LEGEND SUPERCEDES LEGEND ON LL E P C1.2 WHEN CONFLICTING. < w 0 All *4111p* 4M EXISTING DITCH (PARTIALLY FILLED. EXISTING DITCH (PARTIALLY FILLED) �b, 0 quit G or III No ir Minimum lion MuirntmiElmnitim Cdw ai0 -00 7.500 8.000 ■ 8.000 8.500 dri Maximum Elevation Color 8,500 9-OW ( 5• - 12• CLASS 8 9.000 9-wo EXISTING DITCH EXISTING DITCH EXISTING DITCH EXISTING DITCH 16.000 25.000 PR6PE)SEE) )TOP OF BERM w. —EXISTING DITCH EXISTING DITCH EXISTING DITCH PRE)PeSEB 8" ROCK PAD 0, 0 0 0 O 0 0 (LARGE SIZE MINE REJECTS) PR6PE)SEE) DITCH FILL 78100-00 (F -F) PkePE)SEB FLOW ARROW TOP OF BANK NORTH PROPERTY LINE -F) ALIG VMENT 74+00-00 (F-F) F) 4] PREW19SEF) SLOPE ARROW 0 ().Do (F-F) 0 (r PRBPGSEB pr v MAJOR PLUG —4 PL­ (LENGTH = 100') PRE)POSEB MINOR PLUG (LENGTH = 59) 11,211911 t, 'ROPeSED PIPE AND RIPRAP - 1 _33,* 'PRepesEBBERM 80 6? PRE-CONSTRUCTION 7840.00 (F -F) 0 SURVEY SPOT ELEVATION 12' 14+00.00 (F -I 76+00.00 (F F) 4 ry Ir PRE-CONSTRUCTION LIDAR + { F -F) ELEVATION jp+oo,00 (F-F) :7ePE)SEE) DITCH w ,Z;�+moo (F-F) 4Q, PRE-CONSTRUCTION SPOT qk­ M60 0 P v X1250 >: a AAl F;:FR. 5(y ELEVATION IT LUG TOP OF C1:2=.aa * AS -BUILT SPOT GRADES 0 Z L) 013 NOTE, < 0 E A THIS LEGEND SUPERCEDES LEGEND ON LL E P C1.2 WHEN CONFLICTING. < w 0 All *4111p* 4M EXISTING DITCH (PARTIALLY FILLED. EXISTING DITCH (PARTIALLY FILLED) �b, 0 quit G or III No ir Minimum lion MuirntmiElmnitim Cdw ai0 -00 7.500 8.000 ■ 8.000 8.500 M* 1 10 IN V, 96 07 a) I:M. 114 1 Il5 67 F0 ?I 7� 73 74 73 76 Ti 71 9z CI} 67 12 STRLAM Aa VALUJIF 2! 7' 1 28', a — - - — PROJECT BOUNDARY Ill. E] DENOTES THIS SHEET 14 PHASE? 6Lryn Q. PHASE3 Z < LL KEY MAP < [L - 0 LJ 0 so ico 150 SCALE IN FEET PRQJ. NO.: 1002 DRAWN BY RC EmTE: 01116/14 SHEET C4.91 Minimum Elawation, Maximum Elevation Color 8,500 9-OW 9.000 9-wo 9.600 11-s00 ■ M* 1 10 IN V, 96 07 a) I:M. 114 1 Il5 67 F0 ?I 7� 73 74 73 76 Ti 71 9z CI} 67 12 STRLAM Aa VALUJIF 2! 7' 1 28', a — - - — PROJECT BOUNDARY Ill. E] DENOTES THIS SHEET 14 PHASE? 6Lryn Q. PHASE3 Z < LL KEY MAP < [L - 0 LJ 0 so ico 150 SCALE IN FEET PRQJ. NO.: 1002 DRAWN BY RC EmTE: 01116/14 SHEET C4.91 Minimum tlevilim Maximum EIwvs5W Color TO.(= 10.500 10.900 ll-DDO 11.000 11-s00 ■ M* 1 10 IN V, 96 07 a) I:M. 114 1 Il5 67 F0 ?I 7� 73 74 73 76 Ti 71 9z CI} 67 12 STRLAM Aa VALUJIF 2! 7' 1 28', a — - - — PROJECT BOUNDARY Ill. E] DENOTES THIS SHEET 14 PHASE? 6Lryn Q. PHASE3 Z < LL KEY MAP < [L - 0 LJ 0 so ico 150 SCALE IN FEET PRQJ. NO.: 1002 DRAWN BY RC EmTE: 01116/14 SHEET C4.91 minimum Elevation Maximum Elevation Color 11.500 1313130 AS-BUILTS 13.000 16-010D 16.000 25.000 M* 1 10 IN V, 96 07 a) I:M. 114 1 Il5 67 F0 ?I 7� 73 74 73 76 Ti 71 9z CI} 67 12 STRLAM Aa VALUJIF 2! 7' 1 28', a — - - — PROJECT BOUNDARY Ill. E] DENOTES THIS SHEET 14 PHASE? 6Lryn Q. PHASE3 Z < LL KEY MAP < [L - 0 LJ 0 so ico 150 SCALE IN FEET PRQJ. NO.: 1002 DRAWN BY RC EmTE: 01116/14 SHEET C4.91 CJ IW�ERHAt LEGEND D8 I PRePE)SEB SPILLWAY (PYRAMATTURF REINFORCEMENT) E PRePOSEB DITCH CROSSING aus 0 0 17 0 . 4j 0 0 0 0 (# 57 STONE) CT PRePE)SEB RIP RAP H L //-EXISTING DITCH 0 Br-+()Q 00 (F-F) 111� (5"-12" CLASS B) 0 PRE)POSEE) TOP OF BERM TOP OF BANK.--\ 13 C, PROPOSEB 87ROCK PAD 4. ,,'NORTH PROPERTY 14E 111r:` I I 0 0 0 4 0 AqG 6 , (LARGE SIZE MINE REJECTS) F-F)-- 'k7 PR6FIeSEE3 DITCH FILL 82+00-00 — -- -- -- — — — — — — — — — — — I.t __ 90 - 0 8 '00.00 F-F) 80�oo_00 ib. --ow BERM TRANSITION BACK TO ORIGINAL ALIGNMENT P e � 1, BERM SHIFTED 10± SOUTH ENCROACHM50WN PROPER I 01. 0 Minimum Elevation I Maximum Elevation Color 0.000 7.500 ■ 7.500 8.000 I &DIDD 8.500 ■ 9.600 10-OW is vw 84100.00 (F-F) TRUef 50' FIELD DITCH PLUG A dN N— -0 J& j 0 Minimum ElevmSon Minimum Elevation Maximum Elevation Wor 8,500 9-000 I 9.000 9-900 ■ 9.600 10-OW is N— -0 J& j 0 II Ii MEN-- Ism 4 snow 07- - \ --- —, -, 88,00.00F.F) 86+0CQ_0b [F- F}=RvP 1c, SE-49 DITCH EXISTING GRADE - — —14 EXISTING DITCH A) (PARTIALLY FILL AID -41 tl L L � b NOT eet 048 0 0 Minimum ElevmSon Minimum 611wvatim Maximum EkWwat Color 10.000 10-500 13.000 10.500 1I_DD0 16.000 11.000 11-5110 ■ II Ii MEN-- Ism 4 snow 07- - \ --- —, -, 88,00.00F.F) 86+0CQ_0b [F- F}=RvP 1c, SE-49 DITCH EXISTING GRADE - — —14 EXISTING DITCH A) (PARTIALLY FILL AID -41 tl L L � b NOT eet 048 0 0 AS- GUILTS 90+00,00 (F•F) 92+-00, (LENGTH = SO') II C1 PROPISSEE PIPE AND c .I RIPRAP FAV -,w PRE -CONSTRUCTION w 7-w SURVEY SPOT ELEVATION Minimum ElevmSon Maximum Elevation Color 11.500 13-000 JU7 13.000 16-000 ■ 16.000 25.000 AS- GUILTS 90+00,00 (F•F) 92+-00, (LENGTH = SO') II C1 PROPISSEE PIPE AND c .I RIPRAP FAV -,w PRE -CONSTRUCTION w 7-w SURVEY SPOT ELEVATION FIELD DITCH PLUG eh PRE-CONSTRUCTION LIDAR ELEVATION T PRE-CONSTRUCTION SPOT X175D ELEVATION AS - BUILT SPOT GRADES z 0 NOTE: Z THIS LEGEND SUPERCEDES LEGEND ON 0 LL C1_2 WHEN CONFLICTING, 40 ~ EXISTING DITCH *1p �,tPARTIALLY FILLED) 0 JIF - N rs AA 3E Aii 31 Sf SZ 89. 94 1 71 7 73 74 VIE" I N11 1, Q3 is —PROJECT BOUAVAR Y 72 cu 18 -Ie. E] DENOTES THIS &ccr _j 14 PHASE PHASE3 0 OE < LL C13 0 0 so 10D 1150 SCALE IN FEET DRAWN BY, RC Ev. No. DATE DESCRIPTION DATE 01116114 SHEET -- -- -- 04.92 i117 'o - ✓v '��4 n v f- ) 1 ` -S'4 b �-a ��. - U,�1 �1'HAL JSF� GC31P� ` + 178 r• ©44. PG 5 v � d 4 Ka 0 � vo , , ;'� c � 11� P^ E SL 75- ✓ - ��� ExIST10 d .�IT/ GH V Vl it ENDQr ROAD MARK ERS {FUTURE} ' EXIS TING DITCH r iCISTING DITCH j d EXISTING DITCH i I 4 d f� ✓ NORTH PROPERTY LI (� TOP OP $ANK t)} v a 0 E;_4 ALIGNMENT `� ��1 � r 1� 101 +0G 2e0b;0.0 �F 0.00 (F -F) w I I I I'I i T f} �a ,1j 4 +0000(F -F) q� - o • Minimum Efeaalion I Maximum Elevation I Color 3 Low 7.504 ■ r 7.500 8.040 ■ a 8.600 6.500 �! 8.500 10 -OW . 'g6 +00 00 (F•F) c. 0y �o J II 1t I 98 +06.p0 (F -F ) eepisf:Rue 5o, ,I 4b FIELD DITCH PLUG I y ,I �~ I I l Minimum Elevation Minimum Elevation Maximum Elevation CWor 8.500 9.D00 I, 9.000 8.904 ■ 8.500 10 -OW . 'g6 +00 00 (F•F) c. 0y �o J II 1t I 98 +06.p0 (F -F ) eepisf:Rue 5o, ,I 4b FIELD DITCH PLUG I y ,I �~ I I e' r ,o 100 +00.00 IF -F) } iN>Ati�l- - EXISTING3,- GRADE _X- A� 'J J °r-v— EXISTING DIT (PARTIALLY FI LED} l Minimum Elevation Minimum Elevation Maximum Elevation Color 10. ma 10 -SDD I, 10.5D0 11.000 18.000 11AOD 11.504 ■ e' r ,o 100 +00.00 IF -F) } iN>Ati�l- - EXISTING3,- GRADE _X- A� 'J J °r-v— EXISTING DIT (PARTIALLY FI LED} 1 — PRePE*EB'BERM 102 +00 PROP86ES DITCH A5- BUILTS TOP A jjj� •- LEGEND l Minimum Elevation Maximum Elevation Color 11.500 13.13D0 w o o: 13.000 18.080 ■ 18.000 25.Dt10 1 — PRePE*EB'BERM 102 +00 PROP86ES DITCH A5- BUILTS TOP A jjj� •- LEGEND l F'RE3PBSEB SPILLWAY (PYRAMAT TURF w REINFORCEMENT) orz w o o: PRePBSEB DITCH CROSSING ' z (# 57 STONE) b PRBP88E9RIP RAP i (5" - 12" CLASS B) _ STOP OF BERM DPROPOSEB 8 ROCK PAD ( LARGE SIZE MINE REJECTS) PRePASEE3 DITCH FILL 91? . -PReper3EEI FLOWARROW >~ PRePBSFF) SLOPF ARROW MAJOR PLUG (LENGTH =100') —PRBPGSEB MINOR PLUG (LENGTH = S0') PRBPeSEE PIPE AND RIPRAP �5 PRE- CONSTRUCTION SURVEY SPOT ELEVATION t A eh PRE - CONSTRUCTION LIDAR ELEVATION X12 5D PRE - CONSTRUCTION SPOT a ELEVATION 11.00 AS - BUILT SPOT GRADES z O MOTE: z F J 0 THIS LEGEND SUPERCEDES LEGEND ON 0 LL C1.2 WHEN CONFLICTING, n to !(0 IOM1� _ at Q V, as es j ae V U7 (J 69 71 xa 'I a .?51 n' (� 1gp 85 Mf.57' 7B .�.- ti0 81Le '64 ?5 a1 a Imo. f7 FTREAMAL1.41JM[F.T T! Z �_ L/ 31 — - - —PROJECT 6CiJNDARY 22 u - 18 DENOTES THIS SHEET J R 14 PHASE I LL OE Z ILL KEY MAP L13 D 2 0 50 146 150 SCALE IN FEET PRCU. rYO.: 1002 MAWN SV- RC DATE: 01116114 SHEET'. 04.93 r. 91 i ROYAL ROAD f ALIGNMENT ' - >+4�99}65'EBDITCH �$ JD END OF ROAD M 50 �idh4�f.�HH- q 1 EXISTING s Il GRADE ' � { r i s { �r l� � - EXISTING DITCH (PARTIALLY FILLED) Minimum Elevation I Maximum Elevation I Cetor 3 0-60 7.500 ■ r 7.500 8.000 ■ 8.000 6.500 ■ a 10.000 . r D ( 5" - 12" CLASS B ] Minimum Elevation Maximum Elevation CWor 8.500 2000 . _ 9.000 9.500 ■ 9.500 10.000 . r D ot r its '► -+ k J" • � i ,3EX1*9T1G DITCH • I � � e .r 1 r1l i- �. 1 ( 5" - 12" CLASS B ] Minimum Elevation Maximum Elevation Color 111000 10.500 _ 10.500 11.000 . 11.006 11.560 ■ ot r its '► -+ k J" • � i ,3EX1*9T1G DITCH • I � � e .r 1 r1l i- �. 1 AS- GUILTS LEGEND j PRBPE)SEB SPILLWAY K (PYRAMAT TURF U A REINFORCEMENT) Q W p � i N C) 6 PRE) '8S€E DITCH CROSSING z (# 57 STONE) o fRBP65E-BRIP RAP ( 5" - 12" CLASS B ] Minallum Elevation Maximum Elevation Color 11.500 13.000 m 02 13.006 16.000 . 161100 25.000 . AS- GUILTS LEGEND j PRBPE)SEB SPILLWAY K (PYRAMAT TURF U A REINFORCEMENT) Q W p � i N C) 6 PRE) '8S€E DITCH CROSSING z (# 57 STONE) o fRBP65E-BRIP RAP OL (LENGTH = 50') PRAPE)SED PIPE AND RIPRAP g PRE - CONSTRUCTION SURVEY SPOT ELEVATION e PRE - CONSTRUCTION LIDAR G ELEVATION Z � V 012.50 PRE - CONSTRUCTION SPOT } ELEVATION r 72.00 AS - BUILT SPOT GRADES O NOTE: ¢ z F �o THIS LEGEND SUPERCEDES LEGEND ON O C1.2 WHEN CONFLICTING. 00 ( 5" - 12" CLASS B ] O� go 94 11 1 96 9; PRE)P85EB TOP OF BERM DPR9P95EB a° ROCK PAD m 02 ( LARGE SIZE MINE REJECTS) PRBP65EBDITCH FILL -. - FLOW ARROW PRE)P85EB SLOPE ARROW PROPFJSEB MAJOR PLUG (LENGTH = 100') 53 "36 w u l PRBP85E$ MINOR PLUG OL (LENGTH = 50') PRAPE)SED PIPE AND RIPRAP g PRE - CONSTRUCTION SURVEY SPOT ELEVATION e PRE - CONSTRUCTION LIDAR G ELEVATION Z � V 012.50 PRE - CONSTRUCTION SPOT } ELEVATION r 72.00 AS - BUILT SPOT GRADES O NOTE: ¢ z F �o THIS LEGEND SUPERCEDES LEGEND ON O C1.2 WHEN CONFLICTING. 00 DATE: 01)16114 SHEET: 04.94 O� go 94 11 1 96 9; m 02 53 "36 w u l CL 10 i/ . .','TRCAI., AUGNMENT 29 — - - — PROJECT BOUNDARY 12 23 .is Ia O DENOTES Tins SHEET -u _J J rt 0 111.. PHASE 1 _ LL $ d 8'1 � PHASE3 IY Q � LL KEY MAP M O 2 F M I�rlrn� V �J o sa 100 656 SCALE IN FEET PR6A. ND.: 1002 DRAWN BV: RC DATE: 01)16114 SHEET: 04.94 M � r 1 + 41IL^ 4., I ILM STING DITCH RTIALLY FILLED) v 46 Fmi MATTH LINE - Sep Sheet 04.99 11 :, TC LM•q�- IkWheet _J�," _• . �' 14"x' 19 C7 C] O• F r 4if f O 4'� N4O Q A% 2 .° Minimum EWvalion Maximum Elevellon COW Minimum Elevation Maximum Elevation CWor Minimum Elevation Maximum Elevation Cdor 3 0.000 7.500 ■ 8.500 9:000 10.000 10.500 r 7.5W 8.000 8.000 9.500 ■ 10.500 11.D00 , 8.000 8.500 ` 9.500 10.000 . 11.000 11.500 ■ r� 1/ o .w • 1 } >t # l l i Y LEGEND Minimum Elevation Maximum Elevation Cdor 11.500 13.000 41000 18 -006 ■ 16.000 25.000 ■ 1 } >t # l l i Y LEGEND PRBPeSEB SPILLWAY N k 53 '* d3' (PYRAMAT TURF r1 REINFORCEMENT) W c z m Ri EAMALIGNMENY jul� �R9PBSEE DITCH CROSSING q "o (#57 STONE) a PRBPOSEB RIP RAP (5"-12" CLASS B) _ PROPOSED TOP OF BERM g a J D•PRAPRAF: F' ROCK PAD ( LARGE SIZE MINE REJECTS) g 8 a � DITCH FILL / �m�LL ^s'g E - U f PROPISSEE FLOW ARROW a a 9 2� z PRBPBSEB SLOPE ARROW #x �R9Pe9E1 ` MAJOR PLUG` (LENGTH = 100') s -PR6P65EB MINOR PLUG - (LENGTH = 51Y) PRSPe5EB PIPE AND RIPRAP PRE -CONSTRUCTION SURVEY SPOT ELEVATION ma PRE - CONSTRUCTION LIDAR I, ELEVATION / U n )1 �, PRE - CONSTRUCTION SPOT Si r 6 L 12 5Q ELEVATION � a z J� 12.00 AS - BUILT SPOT GRADES � � O `9 (0 O �M�, O 7 { - =�? • 4 1 4 x =1 THIS LEGEND SUPERCEDES LEGEND ON J o c o d' o i o. C1.2 WHEN CONFLICTING. Ld ;I EXISTING DITCH ,—EXISTING FILLED�ry i1 +' ` > �� I d4. t � L 1 1 � r` A5- BUILTS s cta i 91 ?5 9fi 1 (� 31 82 83 94 = M 87 89 Val, 71 72 T3 1,. -' n 17s" 53 '* d3' �__ T EAMALIGNMENY jul� GOP ECT ROJ UNDARY - — Q J 14. DENOTES THIS SHEET 1 <- �_ peg. LL. PHASE? v PHASE 3 � 0 K Z LL (6 C] 4►ry ❑ KEY MAP x I[L © 0 ui 0 yp ion 14 SCALE IN FEET PROJ, NO.: 1002 twAWN BY RC DATE: 01116114 SHEET' 04.95 i• �+ -tee O l �. '1 1, U _—EXISTING DITCHT {PARTIALLY FILLED} `?*R 1' I: Ak w Ark .,. _ 0 NM. ca 1 Q a -�s 2 Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color Minimum Elevation Maximum Elevation Color 3 0.000 7.500 ■ 8.600 9.000 10100 10.500 11.500 13.DD0 r 7.500 8.000 ■ 9.000 9 -500 ■ 10.500 17.000 , 13.000 16.000 ■ Y $.000 8.500 �'� 8.500 10 -OW . 71.000 11.57/0 ■ 16100 25.000 L r- i C? EXISTING DITCH i (PARTIALLY FILLED) I 41. AS- GUILTS 91? 9 j •- 96 LEGEND F'R6PBSEB SPILLWAY (PYRAMAT TURF N w REINFORCEMENT) w orz o a PRePBSEB DITCH CROSSING z (# 57 STONE) PRBP88E9RIP RAP ( 5" - 12'• CLASS B ) _ STOP OF BERM DPROPOSEB 8" ROCK PAD ( LARGE SIZE MINE REJECTS) PRE)PASEE3 DITCH FILL ..?FLOW ARROW >~ PR6P9SF#3SLOPFARROW �RBPBSEf3 =Ed MAJOR PLUG (LENGTH =100') —PRE)PGSEBMINOR PLUG (LENGTH = S0') PRBPeSEE PIPE AND RIPRAP $5 PRE- CONSTRUCTION L SURVEY SPOT ELEVATION �? P RE -CONSTRUCTION LIDAR Q ELEVATION Z z X17 5D PRE - CONSTRUCTION SPOT , ELEVATION 11.40 AS - BUILT SPOT GRADES z O N{?l E: z F J 0 THIS LEGEND SUPERCEDES LEGEND ON 0 LL C1.2 WHEN CONFLICTING, m 1 IuB -tut 111 ro w :a 97 115 67 89 IL 74 !3- 76 nl- co _4 .� vrr.[nu wL.iGrAu:N7 rr 23 � — - - — PROJECT BOUAVARY Q cu 15 14. E] DENOTES THIS SHEET J R 1 <. PHASE 7 L.L D, V 6 PfW SE 3 0 •�!' �Z) LL KEY MAP L13 D 2 I° D 50 100 150 SCALE IN FEET PRDJ. NO.: 1002 DRAWN BY, RC EmTE: 01116114 SHEET'. 04.9E w-Tj qw 'II !�I ��W I T III 6 Ai Q M EXISTING DITCH (PARTIALLY FILLED) "�' A 1 4+ �Q t' � er�rrs�r�5o' FIELD DITCI jVLUG 01. a I , -fCH Lokii= �Ke t .1 " { a LEGEND ' �� �(✓v {� _ _ _ _ _ --- fRePE)SEBSPILLWAY k (PYRAMAT TURF � 6 � O �� �� REINFORCEMENT) W C3 �7 ('6a' ` C1@f9Bff}DITCHCRQSSING az 57 STONE) e PRBP88E-BRIP RAP �� (5° - 12° CLASS B) t/\<} p0 rr Q py {�Qa 3Pf TOP OF BERM P � " � P � � a � TRaPvaEcrB" ROCK PAD � p �n- �°''�°' 4 ��j =r�°j (LARGE SIZE MINE REJECTS) n 4p v p i p ° 6s Q Q a �,/ v it f / PRePOSEE) DITCH FILL .r'R'.-%EB FLOW ARROW J Q � ems,,+ � 4 ...,,...,,..� r) >~ f'R9P95EB SLOP EARROW �RBPe5EB MAJOR PLUG (LENGTH = 100') Minimum €levaJon Maximum Elevation Cdor Minimum Elevation Maximum Elevs*M Cdor Minimum ElavAon Maximum Elevation Cdor 8 0.000 7.500 ■ 8.500 9:000 10.000 10.500 11.500 13.000 7.500 8.000 ■ 9.000 9.500 ■ 10.500 11 -DW , 13.000 18.000 ■ 8.000 8.590 ■. 9.500 10.000 ■ 11.000 11.500 ■ 16.000 25.000 ■ r �� pirO £0MS44RUEff 50' FIELD DITCH PLUG �b AS -B U I LTS c f�� PR9P85EB MINOR PLUG t ria %rJ (LENGTH = 50') $$ _ p fR@F65EFiPIPE AND RIPRAP 0� � � 05 PRE - CONSTRUCTION SURVEY SPOT ELEVATION � V a o A ci i� a� PRE - CONSTRUCTION LIDAR AID a CTS I" W f 7 0 ELEVATION I U a. �.. �J o q X12 5Q PRE - CONSTRUCTION SPOT tr � EXf3TING.EaIT6H Q ELEVATION AS - BUILT SPOT GRADES M - O r` NOTE: ¢ Z � a �a x THIS LEGEND SUPERCEDES LEGEND ON o C12 WHEN CONFLICTING. m � lyj Ij a � L +, n �. CS 00 V e 0 - 9 � t er``'' ��O N L 4 J }•L Y i fC Z 7C3 Z) LL a KEY MAP Q Q fl0 �4r SCALE IN FEET PROJ. NO.: 1002 twAWN BY RC REV. No. DATE DESCRIPTION'. GATE: 01116.194 SHEET: 04.97 a_ M Minimum EWvalion M Maximum Elevation C Cdw M r �� pirO £0MS44RUEff 50' FIELD DITCH PLUG �b AS -B U I LTS c f�� PR9P85EB MINOR PLUG t ria %rJ (LENGTH = 50') $$ _ p fR@F65EFiPIPE AND RIPRAP 0� � � 05 PRE - CONSTRUCTION SURVEY SPOT ELEVATION � V a o A ci i� a� PRE - CONSTRUCTION LIDAR AID a CTS I" W f 7 0 ELEVATION I U a. �.. �J o q X12 5Q PRE - CONSTRUCTION SPOT tr � EXf3TING.EaIT6H Q ELEVATION AS - BUILT SPOT GRADES M - O r` NOTE: ¢ Z � a �a x THIS LEGEND SUPERCEDES LEGEND ON o C12 WHEN CONFLICTING. m � lyj Ij a � L +, n �. CS 00 V e 0 - 9 � t er``'' ��O N L 4 J }•L Y i fC Z 7C3 Z) LL a KEY MAP Q Q fl0 �4r SCALE IN FEET PROJ. NO.: 1002 twAWN BY RC REV. No. DATE DESCRIPTION'. GATE: 01116.194 SHEET: 04.97 � , 4 EXISTING GRADE N go C � " Q�' 0 JI ILI, _j C> I r. �� „ }� [ • a a �3 Ci ��' Pfl9PAR15- ROAD flu��j p r NORTH PROPERTY LINE ALIGNMENT q_7 U n K 4 e� 4 a n A a p a � ° Iv J a `ti U U a • ` �� " o ° a / 4L� �" f 9.00:.. V v G] r� U C?r vl 7N d p" 11 17 `jL7T c, > 4I S n 0 a y f30 . �' V� Js + c� ' IE SING DITCH EXISTING PITCH �? g a = 5 a a EXISTING DITCH ° ° 0 0 ° , � • �• r - -- � " ^ (r V � , iii o 11 Minimum EWvalion Maximum Elevellon Color Minimum €levaeon Maximum Elevation Color Maximum Elevation 0.000 71.500 ■ 8.500 9.000 _1 IN 7.500 8.090 9.000 9.560 ■ 11 -500 8.000 6.500 ` 9.500 10.000 ■ I 0, / } Ca G a Q x c� ilt4 t r 0 f LEGEND PR9PGSEB SPILLWAY G (PYRAMAT TURF 9 REINFORCEMENT) W c i G Q 0 0 p1m: PR'9PBSEE DITCH CROSSING i (# 97 STONE) RIP RAP -_� (5 - 12" CLASS B } c ti �,�XISTING DITCH 1 _ PROPOSED TOP OF BERM a � v � - (PARTIALLY FILLED) 0 fl PRBP95EE) 8" ROCK PAD PIPE CROSSING DETAIL ( LARGE SIZE MINE REJECTS) (SEE SHEET C9.2) rPRE)POSEE) DITCH FILL PROPISSEIB FLOW ARROW ry AT GRADE CROSSING DETAIL / / PR9PE3SF8 SLOPE ARROW (SEE SHEET C10 -1) ,r @P89EE1 DITCH % i/ B mowMAJOR PLUG (LENGTH = 100') a $' �°' rx / MINOR PLUG 4 -EXIST! 0 GRADE U ��' (LENGTH = 50`) TOP OF BANK �@ PIPE AND rxw RIPRAP 1 D9; ' PRE- CONSTRUCTION [7 y SURVEY SPOT ELEVATION ¢7 , tr P y II " 0 &L Ile I e PRE- CONSTRUCTION LIDAR ELEVATION 01250 PRE - CONSTRUCTION SPOT m ELEVATION r z AS - BUILT SPOT GRADES 0 U 00 z ti^ ti a THIS LEGEND SUPERCEDES LEGEND ON J O 13 BERM � � � G1.2 WHEN CONFLICTING. i 0.50 ,. m EXISTING ROADSIDE DITCH (FILLED)_�Ic�' �' �� fib• r , y1 rry r EXISTING ROADSIDE r DITCH 01 (PARTIALLY,FILLEO ROYAL ROAD ALIGNMENT ' t III �,y � r ° - .� � o�•'� t � + Ni7i 36 0.50 f1] fn Z J CL �© x 70< � o / KEY MAP L 0 ',0 too 150 Aw 4 SCALE IN FEET 471 Nx.'..JAT DRAWN By RC Minimum Elevation Minirnum Eiev Non Maximum Elevation Color 13.000 10.000 10.500 _1 IN 10.500 11.000 ■ 1 1.000 11 -500 ■ x c� ilt4 t r 0 f LEGEND PR9PGSEB SPILLWAY G (PYRAMAT TURF 9 REINFORCEMENT) W c i G Q 0 0 p1m: PR'9PBSEE DITCH CROSSING i (# 97 STONE) RIP RAP -_� (5 - 12" CLASS B } c ti �,�XISTING DITCH 1 _ PROPOSED TOP OF BERM a � v � - (PARTIALLY FILLED) 0 fl PRBP95EE) 8" ROCK PAD PIPE CROSSING DETAIL ( LARGE SIZE MINE REJECTS) (SEE SHEET C9.2) rPRE)POSEE) DITCH FILL PROPISSEIB FLOW ARROW ry AT GRADE CROSSING DETAIL / / PR9PE3SF8 SLOPE ARROW (SEE SHEET C10 -1) ,r @P89EE1 DITCH % i/ B mowMAJOR PLUG (LENGTH = 100') a $' �°' rx / MINOR PLUG 4 -EXIST! 0 GRADE U ��' (LENGTH = 50`) TOP OF BANK �@ PIPE AND rxw RIPRAP 1 D9; ' PRE- CONSTRUCTION [7 y SURVEY SPOT ELEVATION ¢7 , tr P y II " 0 &L Ile I e PRE- CONSTRUCTION LIDAR ELEVATION 01250 PRE - CONSTRUCTION SPOT m ELEVATION r z AS - BUILT SPOT GRADES 0 U 00 z ti^ ti a THIS LEGEND SUPERCEDES LEGEND ON J O 13 BERM � � � G1.2 WHEN CONFLICTING. i 0.50 ,. m EXISTING ROADSIDE DITCH (FILLED)_�Ic�' �' �� fib• r , y1 rry r EXISTING ROADSIDE r DITCH 01 (PARTIALLY,FILLEO ROYAL ROAD ALIGNMENT ' t III �,y � r ° - .� � o�•'� t � + Ni7i 36 0.50 f1] fn Z J CL �© x 70< � o / KEY MAP L 0 ',0 too 150 Aw 4 SCALE IN FEET 471 Nx.'..JAT DRAWN By RC AS -B U I LTS REV. No DATE DESCRIPTION'. DATE: 01t16114 SHEET: 04.98 Minimum Elevation Maximum Elevation Color t t.504 13.000 mw 13.000 16.000 IN 16.004 25.000 IN AS -B U I LTS REV. No DATE DESCRIPTION'. DATE: 01t16114 SHEET: 04.98 APO PIPE CROSSING DETAIL .•. PARKING LOT LEGEND PRBPBSEB SPILLWAY (PYRAMAT TURF REINFORCEMENT) (SEE SHEET C9.2) 9 [SEE SHEET C7 t�� PR@PBSEE}DITCH CROSSING �* 116. 6 +717.81 lrjl� e {# 57 STONE} STA.16 +2Q 2 - 18'" CALP p _ PRBPBSEBRIP RAP (SEE SHEET C9.2) .. r a. L� (5" - 12" CLASS B j h y ^i `- ; ^a I o h _EXISTING ROA[SI�DE O� O o o C O r, O O O DITCH 0 _ PR6PBSEE)TOP OF BERM V I {'FILLED) 1 ROYAL ROAD 4 ALIGNMENT _ - -- — PRBPBSE&8" ROCK PAD — — — — — - `�� PARKING LOT EL = 10.88 -_ — PARKING LOT_E�1f5 71 i F -� — N � � — � =T — r - — — — � (LARGE SIZE MINE REJECTS) J -' - ,s.00 -- - s,nu — — — ,7:00 - OT EL = 10.77 AR— i T - P RKING L q.P PARKING LOT EL i0 98 z2 9a -T ± � - y �RBPt35E8 DITCH FILL — — — — — I �� -� _ �� —T - — — — 1- - _ " ' -�" -� -.9• -.L ►- / �RBP65EEFLOW ARROW IF I ii '? #r � ', �l y 1 ■ - PR9P65EBSLOPE ARROW a EXISTIN ROR'OSIDE - \' Y l l— �1RBPeB DITCH MAJOR PLUG `[FILLED) � � � � ..� - (LENGTH = 100') STA. 11 +00 PIPE CROSSING b�TAIL PARKING LOT -2 -18" CALP0 a e (S � c (SEE SHE - 16 II+, 7Q_81b ° ti 4 E . SHEET 7.0 O O 0 � i O P� > PR9PB8E9 MIN OR PLUG EE S E7 CO � (LENGTH = 57) ROP95EBPIPE AND {r' T RIPRAP PRE- CONSTRUCTION 4) 140 SURVEY SPOT ELEVATION O b?` PRE - CONSTRUCTION LIDAR ELEVATION 1 a .a) PRE - CONSTRUCTION SPOT ! �' .� ` ii12.5Q ELEVATION ..12.00 * AS - BUILT SPOT GRADES 1 I f t ,,� ♦ �- " > ,� NOTE: 0 1 O O� o O� �3 THIS LEGEND SUPERCEDES LEGEND ON A ryIl _ 10 III 9 I H,, ' LLED) } I V1 ,� .�� 1t1lAlfCy __liNE - _ �r Mwmum Elevation Mokmon Elevation Cower Minimum Elevation Maximum Elevation CWor 0.090 7.500 ■ 8.500 9.000 e 7.500 8.ow 9.000 9.%0 E 8.090 8.50@ 9.500 10 -D00 0 cb A* * C1.2 WHEN CONFLICTING. T_ it4 ' ■ O 0�1 09 b 04h 0 VC4.95 ., 1 '.1 1Di Pi Minimum Elevation Maximum E wvaemt tutor 10.000 10.500 Maximum Elevation 10.500 11.000 T. r1AW 11.500 ■ 0 cb A* * C1.2 WHEN CONFLICTING. T_ it4 ' ■ O 0�1 09 b 04h 0 VC4.95 ., KEY MAP 0 50 100 150 SCALE IN FEET ®� WE N O r 2 2zw 5 a �x I� oClia H_ I L _ J z ?z cr z ��o r o U ¢O O LL m LJi _j J R 0 LL L ° Q z r 9 PRa.Na.: 1002 ow�wN 9r: RC DATE: 01116114 "HEFT: 04.99 1 '.1 1Di Pi Minimum Elevation Maximum Elevation CWOr T. 1,.500 13000 �' ----J� AS.—B U I LTS 13.000 16.000 1 'S 16.000 25.000 ■ KEY MAP 0 50 100 150 SCALE IN FEET ®� WE N O r 2 2zw 5 a �x I� oClia H_ I L _ J z ?z cr z ��o r o U ¢O O LL m LJi _j J R 0 LL L ° Q z r 9 PRa.Na.: 1002 ow�wN 9r: RC DATE: 01116114 "HEFT: 04.99 1 '.1 1Di Pi 91 T. 81 82 83. I sa 05 �a aT eB I'g VO 11 T2 TS 1174 1 'S A3 4, 3a 3 •35t- .331 STREAM ALIGNMENT � 311 � t? a'• � a zs —__ - PanjEeTSnunrDAar E DENOTES THIS SHEET i 13 14 . PHASE '! _ lI B 1d _ 5 8 PHASE 3 KEY MAP 0 50 100 150 SCALE IN FEET ®� WE N O r 2 2zw 5 a �x I� oClia H_ I L _ J z ?z cr z ��o r o U ¢O O LL m LJi _j J R 0 LL L ° Q z r 9 PRa.Na.: 1002 ow�wN 9r: RC DATE: 01116114 "HEFT: 04.99 N. +39.85 aF1 l 0, 100' ROADSFDE DITCH PLUG — — — -- - - - - - - - - - — —' - -- z ' c - 00 00 21+00 24,013 25 *00 26 +tlD 31-00 T - - - - - SLUG EL Sp.u4 ; - e -- PCIL' -'141 f - - - - -- -- -- --------- z ` � z l z f i1 7.500 ■ C 1.500 8.000 ■ a y1 c Mtif 10 -SDD PRePBSEB DITCH CROSSING 9.000 S- (# 57 STONE) 1 10.500 ll -DDO r 8.500 11.000 i ■ * '. Iay•' 19,' O , All 10 r ;F DITC 4 } �h �, .•_ 1 A06 1S# H ' !' IR "00 ! s E �l l IF' . ' Apr r Ip _j� h l ° �a�hl 0 Sh O 7 ±. V0 OA 14 t Q �. Minimum Eki"llon I Maximum Elevation I Calar 0 -000 7.500 ■ C 1.500 8.000 ■ a &DDD 0.500 10.000 10 -SDD PRePBSEB DITCH CROSSING M 70AS �T F q (c; , `� 11 1 , !. hf L O A. AS- GUILTS LEGEND Minimum Elevation Minimum Elevation Maximum Elevation Minimum Elevation Maximum Elavatiml Color 8.600 7,7 ■ 10.000 10 -SDD PRePBSEB DITCH CROSSING 9.000 (# 57 STONE) 1 10.500 ll -DDO 8.500 11.000 11 -509 ■ AS- GUILTS LEGEND Minimum Elevation Maximum Elevation Color 11.500 13 -DDD 13.000 16 -0106 ■ 16.000 25.Dt10 AS- GUILTS LEGEND PRE)POSEB SPILLWAY w (PYRAMAT TURF REINFORCEMENT) w C: o a PRePBSEB DITCH CROSSING z (# 57 STONE) 1 PR6PB5EERIP RAP L� - _ (S" - 12" CLASS B) _EXISTING RF} M 7CM PR6P95E9 TOP OF BERM s e ci DPR6P6SEB 8" ROCK PAD P ( LARGE SIZE MINE REJECTS) 3 $ o 4 ! .PR6P65EB-DITCH FILL A E -+Rel"19SEBFLOW ARROW a € w a PRE)P65EB SLOPE ARROW e . W u acs MAJOR PLUG (LENGTH =100') s PR6PE)SE6MINOR PLUG �~ (LENGTH = S0') PR91eSEE PIPE AND RIPRAP t�5 PRE - CONSTRUCTION 4 SURVEY SPOT ELEVATION �? PRE- CONSTRUCTION LIDAR 0 ELEVATION X17 5D PRE - CONSTRUCTION SPOT a ELEVATION 1i.00 AS - BUILT SPOT GRADES O NOTE: O ¢ z F J 0 THIS LEGEND SUPERCEDES LEGEND ON O LL C1.2 WHEN CONFLICTING. ` m IFja 5A e• I 43 5 '3� '37 wnh31 932 T?' II,�S p ct� CL � J _J Z LL KEY MAP CL5 O Q x H O LJ 0 50 100 150 SCALE IN FEET PRa.ta�.: laoz DRAWN BV- RC :EV.No. DATE DESCRIPTION DATE: 01116114 - SHEET: C4.1 00 1 a l"7 ,% LEGEND PRePE)SEB SPILLWAY k (PYRAMAT TURF REINFORCEMENT) W c z m R�q PRE)P95EB DITCH CROSSING a i (# 57 STONE) e PRBP88EB RIP RAP ( 5" - 12" CLASS B ) Rf74 Ro i' IV � \\ � PRepeSEB 48" HDPE �' � CD> vG �] 4 ° e �\ STOP OF BERM (SEE .SHEET C8.2) FILLM) ♦;., y A.- 00 Q? i�r �° w . 1 P 'rROPeSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) cl ROYAL_RC] , _ r _ _ _ - _ - _ _ _ - - -� - Q d d ° it �f / `DITCH FILL - _- - - - - - - =a - - Lk r aj, `EXISTINGWCH D b r - �6. r j 4 • r,R, p r3EB FLOW ARROW EXISTING ROAD §IDE \ _12:80 ' DITCH �'b �s y�4 p g'} >~ f�R8P95E$ SLOP FARROW (FILLED) L .� ....�,- �. �\ ,• \ \�:: Ca � o S� � � � 1j �4 nQ PREIPGSEB C MAJOR PLUG '6�� (LENGTH = 100') lb p Q n PR9P85E8 •MINOR PLUG ati :r c �I � I EXISTING IPARTIALLY .`l -,. c �L \" f .0 © aj V o t� CJ (LENGTH - 56 ) fRSPeSEB PIPE AND a RIPRAP a o o o $5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR OP OF BANK UU a 0 ELEVATION a a b X12 5Q PRE - CONSTRUCTION SPOT ELEVATION L) 1i.fl0 AS - BUILT SPOT GRADES \ , \y lb �® � � � � THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. t \ \r TOP OF BANK PRe DITCH J CIO nxp� � a PRBF16SEE BERM MATCH / EXISTING GRADE a t 1 a� C Minimum EWvalion M Maximum Elevation C CoW M Rf74 Ro i' IV � \\ � PRepeSEB 48" HDPE �' � CD> vG �] 4 ° e �\ STOP OF BERM (SEE .SHEET C8.2) FILLM) ♦;., y A.- 00 Q? i�r �° w . 1 P 'rROPeSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) cl ROYAL_RC] , _ r _ _ _ - _ - _ _ _ - - -� - Q d d ° it �f / `DITCH FILL - _- - - - - - - =a - - Lk r aj, `EXISTINGWCH D b r - �6. r j 4 • r,R, p r3EB FLOW ARROW EXISTING ROAD §IDE \ _12:80 ' DITCH �'b �s y�4 p g'} >~ f�R8P95E$ SLOP FARROW (FILLED) L .� ....�,- �. �\ ,• \ \�:: Ca � o S� � � � 1j �4 nQ PREIPGSEB C MAJOR PLUG '6�� (LENGTH = 100') lb p Q n PR9P85E8 •MINOR PLUG ati :r c �I � I EXISTING IPARTIALLY .`l -,. c �L \" f .0 © aj V o t� CJ (LENGTH - 56 ) fRSPeSEB PIPE AND a RIPRAP a o o o $5 PRE - CONSTRUCTION SURVEY SPOT ELEVATION PRE - CONSTRUCTION LIDAR OP OF BANK UU a 0 ELEVATION a a b X12 5Q PRE - CONSTRUCTION SPOT ELEVATION L) 1i.fl0 AS - BUILT SPOT GRADES \ , \y lb �® � � � � THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. t \ \r TOP OF BANK PRe DITCH J CIO nxp� � a PRBF16SEE BERM MATCH / EXISTING GRADE a t 1 a� C Minimum Elevaton Maximum Elevation CWor Minimum ElWalion Maximum Elevs*M Cdor B 0.000 7.500 ■ 8.500 9:006 i 10.000 10.560 1.509 8.000 9.000 9.500 ■ 10.500 11.000 , 8.000 8.500 ` 9.500 10.000 . 11.000 11.500 ■ Minimum ElavAon Maximum Elevation Cdor 11.500 13.000 13.000 18.000 ■ 16.000 25.000 ■ 0� \ i \ P '�1 iS V opi 1 ,Qr � `\• , FIELD DITCH PLUG I a EXrING DITCH II AS -B U I LTS D9' 4 �p a a a DITCH al �a I i G 0 6 a P Q ASr._ 11"J Yl «Jp b 0 Q � n P . Q b fl • W\ Tre[ Ara xs.IU111[NT — PROJECT BOUNDARY O DENOTES THIS SHEET - PHASE 7 PHASE 3 KEY MAP o sa tau 1% SCALE IN FEET a� aJ v� w �mtr� E5� �aa�LL.i z �L M1 �r�r ,"1 r FD a Z � M O f3 Z ¢o w m s f17 4 CIO _ J CL V - 7 Z 1i LL 4 O ! 11 PRDJ, NO.: 1002 tRAWN BY RC DATE: 01/16/14 SHEET: C4.101 Minimum EWvalion M Maximum Elevation C CoW M Minimum ElavAon Maximum Elevation Cdor 11.500 13.000 13.000 18.000 ■ 16.000 25.000 ■ 0� \ i \ P '�1 iS V opi 1 ,Qr � `\• , FIELD DITCH PLUG I a EXrING DITCH II AS -B U I LTS D9' 4 �p a a a DITCH al �a I i G 0 6 a P Q ASr._ 11"J Yl «Jp b 0 Q � n P . Q b fl • W\ Tre[ Ara xs.IU111[NT — PROJECT BOUNDARY O DENOTES THIS SHEET - PHASE 7 PHASE 3 KEY MAP o sa tau 1% SCALE IN FEET a� aJ v� w �mtr� E5� �aa�LL.i z �L M1 �r�r ,"1 r FD a Z � M O f3 Z ¢o w m s f17 4 CIO _ J CL V - 7 Z 1i LL 4 O ! 11 PRDJ, NO.: 1002 tRAWN BY RC DATE: 01/16/14 SHEET: C4.101 0� \ i \ P '�1 iS V opi 1 ,Qr � `\• , FIELD DITCH PLUG I a EXrING DITCH II AS -B U I LTS D9' 4 �p a a a DITCH al �a I i G 0 6 a P Q ASr._ 11"J Yl «Jp b 0 Q � n P . Q b fl • W\ Tre[ Ara xs.IU111[NT — PROJECT BOUNDARY O DENOTES THIS SHEET - PHASE 7 PHASE 3 KEY MAP o sa tau 1% SCALE IN FEET a� aJ v� w �mtr� E5� �aa�LL.i z �L M1 �r�r ,"1 r FD a Z � M O f3 Z ¢o w m s f17 4 CIO _ J CL V - 7 Z 1i LL 4 O ! 11 PRDJ, NO.: 1002 tRAWN BY RC DATE: 01/16/14 SHEET: C4.101 KEY MAP o sa tau 1% SCALE IN FEET a� aJ v� w �mtr� E5� �aa�LL.i z �L M1 �r�r ,"1 r FD a Z � M O f3 Z ¢o w m s f17 4 CIO _ J CL V - 7 Z 1i LL 4 O ! 11 PRDJ, NO.: 1002 tRAWN BY RC DATE: 01/16/14 SHEET: C4.101 MATCH LG N E - See Sheet C4_ -1 c' ; OL a 4 g Q 4 E�GRA 0 0; t� � �tr'••j f1 t o o u t 'P ® ° 5 I p Q � ' 'Y ' ''-� atiS , 6 + S NORTH PFJpER i II a o IG dti! 7�-. u4 �"I 11p�Jy)i'�%P 1 q., is ALIG T apn Q f Ar d a a « l,,VVEYERHA8USER ;> J a " I � y� '^.1 r1 �✓+1 g P..}f!!l�1�1L 7� {� '�'0�.. fj ' J J {L,,0 9 1� p �t� / V I�i(i� ,r j d I II Ir �t a 'a jam' ° " �c ' v WEYFRHAEbSER ooMpANY +�., 8 a j A 08 1 044AG 5.37 � ' }� � � 6. 1 6'Q w� d 4T'� m q A �L- q E, Si [. 79 -7 o,R' l� (IJ�i� J a. I_ �}Q D r� o• 0 SK, Q o 1.7 u 8.7 'I era fl'Ao cbd 6 /9D� IG 11 p 0 G ° O Oo it !� ° {`�+1�j 9 0...,.'• (7 EXISTING DIT EXISTING DITCW EXISTING DITCH $ �TrA rs a �` $ 1f ,J'C'S f �() C) I 'i ' Q '� 'sJII - 5 �aLl J L 8.75 y o MATCH LITE - See Sheet C4.98 Mlnlmum Etevadwr Maximum Elaxadwn cow Minimum Efe+ratlon Maximum Elevation Gofer 0.000 7.500 9.590 9.090 7.500 6-000 8.000 9 -500 E 8.000 6.500 8.500 10.OW . ►o O a � TOP OF BANK k 0 c a + N 01 f7 0 0 0 +m II, 6 h �^ w a U� PROS BERM )Q MINOR PLUG PRBPeSEE SPILLWAY Mlnumum Etwadaa Maximum Efevation Gofer 10.009 10.500 1 10.5W, 11.000 SURVEY SPOT ELEVATION 11A00 11 .500 ■ ►o O a � TOP OF BANK k 0 c a + N 01 f7 0 0 0 +m II, 6 h �^ w a U� PROS BERM )Q MINOR PLUG PRBPeSEE SPILLWAY Cl D(PYRAMAT TURF Minlenum Elevation Munnam Elervadon Color O 11.590 13 -000 SURVEY SPOT ELEVATION d 13.000 16.000 ELEVATION 312.50 161100 25.000 ■ ►o O a � TOP OF BANK k 0 c a + N 01 f7 0 0 0 +m II, 6 h �^ w a U� PROS BERM )Q 62 � U O d AS- GUILTS LEGEND MINOR PLUG PRBPeSEE SPILLWAY Cl D(PYRAMAT TURF PRoPBoEQPIPE AND REINFORCEMENT) w o�� O oim P SURVEY SPOT ELEVATION d z C ELEVATION 312.50 0� ELEVATION 62 � U O d AS- GUILTS LEGEND MINOR PLUG PRBPeSEE SPILLWAY r,1 D(PYRAMAT TURF PRoPBoEQPIPE AND REINFORCEMENT) w o�� oim +�h SURVEY SPOT ELEVATION PRePeSEEI DITCH CROSSING z (# 57 STONE) 1 I IPRSPBSEBRIP RAP k J (5" - 12" CLASS B) _ STOP OF BERM DPROPOScv8" ROCK PAD (LARGE SIZE MINE REJECTS) < i PROPOSED DITCH FILL w.--- PROPISSEIBFLOW ARROW 1 i'R9PE3SFR SLOPE ARROW PRBP65EEB =Ed MAJOR PLUG (LENGTH = 100') 1 soon "iyy =13 'x TIRI MINOR PLUG -PRRBPBSEB (LENGTH � 50') El PRoPBoEQPIPE AND - RIPRAP PRE - CONSTRUCTION +�h SURVEY SPOT ELEVATION mb PRE - CONSTRUCTION LIDAR C ELEVATION 312.50 PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS - BUILT SPOT GRADES NOTE= 1 soon "iyy =13 'x TIRI Ara xx.101111NT —PROJECT BOUNDARY El OEN4TE5 77nS SNEE>"' - PHASE f PHASE3 KEY MAP 0 50 100 150 SCALE IN FEET 3m =3 Y� G 0 ZS� U a Z 0 L) O r� 1' r 7 Z Q a. � �rJ�ny < V C? Z LL Co © Q tic rn r PRUJ. NO.: 1002 DRAWN BY: RC DATE. O1116114 SHEET: 04.102 h v 1b 14 r) y 0 C II I �I II II. eti 1. II 't� a I 4 I i o I o 0 LI I F I "c'c"aN S+RUar 50' ^� FIELD�DITCH PLUG a �4 y c3 .I 4 111 I 'b. I li I EXISTING DITCH (PARTIALLY FILLED) II � U � I I Minimum Ele"lion I Maximum Elevation 3 0.000 7.500 r 7.500 8.000 8.000 6.500 i! 9.000 G t t1 i7 �1 0� 0 4` rs c % U 4b` U ► i �` . LEGEND ¢, 0' PRePE)SEB SPILLWAY w 2 o C' c © u (PYRAMAT TURF �y. 0 t REINFORCEMENT] W o z m o a p ; i FReP85EE1 DITCH CROSSING a i �l i ' (# 57 STONE) i 0 PRBP85EB RIP RAP Minimum Elevation Minimum Elevation Maximum Elevation Odor 8.500 9.900 13.000 9.000 9 -500 ■ 8.500 10-OW . t t1 i7 �1 0� 0 4` rs c % U 4b` U ► i �` . LEGEND ¢, 0' PRePE)SEB SPILLWAY w 2 o C' c © u (PYRAMAT TURF �y. 0 t REINFORCEMENT] W o z m o a p ; i FReP85EE1 DITCH CROSSING a i �l i ' (# 57 STONE) i 0 PRBP85EB RIP RAP g �a 0 p { 5" - 12" CLASS B ) STOP OF BERM �r. T ROPeSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) {I ` v ✓ / PRePOSEE) DITCH FILL ..?FLOW ARROW AD l4, P ReP85EB SLOP F ARROW Al �RBPGSEB GeNSTRH 50' 4 � h N t • s • ' MAJOR PLUG FIELD DITCH PLUG -- _ : J r (LENGTH = 100'} fiR8P85EBMINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND ti II RIPRAP Aft __ . 4. 0b PRE - CONSTRUCTION SURVEY SPOT ELEVATION 0 0 0l l a o ❑ I �? PRE - CONSTRUCTION LIDAR 0 ELEVATION 1 X12 50 PRE - CONSTRUCTION SPOT -T m ELEVATION 1 a 1 4_ 12.110 AS - BUILT SPOT GRADES Z M , O a �ti a �6 ah t NOTE: ¢ z � � THIS LEGEND SUPERCEDES LEGEND ON EXISTING DITCH C1.2 WHEN CONFLICTING. II (PARTIALLY FILLED) w 0' Qr �C' Ash U { P 07. Minimum Elevation Minimum Elevation 0 0 10.000 10.500 13.000 10.500 11.000 18.000 11.000 n o g �a 0 p { 5" - 12" CLASS B ) STOP OF BERM �r. T ROPeSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) {I ` v ✓ / PRePOSEE) DITCH FILL ..?FLOW ARROW AD l4, P ReP85EB SLOP F ARROW Al �RBPGSEB GeNSTRH 50' 4 � h N t • s • ' MAJOR PLUG FIELD DITCH PLUG -- _ : J r (LENGTH = 100'} fiR8P85EBMINOR PLUG (LENGTH = 50') PRSPeSEB PIPE AND ti II RIPRAP Aft __ . 4. 0b PRE - CONSTRUCTION SURVEY SPOT ELEVATION 0 0 0l l a o ❑ I �? PRE - CONSTRUCTION LIDAR 0 ELEVATION 1 X12 50 PRE - CONSTRUCTION SPOT -T m ELEVATION 1 a 1 4_ 12.110 AS - BUILT SPOT GRADES Z M , O a �ti a �6 ah t NOTE: ¢ z � � THIS LEGEND SUPERCEDES LEGEND ON EXISTING DITCH C1.2 WHEN CONFLICTING. II (PARTIALLY FILLED) w 0' Qr �C' Ash U { P 07. ^,a } 1b �� N I I I I I I II . iI 0 0 rf C C I I 1 ' i _c I- Q J ril 0 V Z 7C3¢ LL ❑ ad 1 KEY MAP Q x r�� 0 so . , S SCALE IN FEET 144 154 Minimum Elevation Minimum Elevation Maximum Elevation Color 10.000 10.500 13.000 10.500 11.000 18.000 11.000 11.5110 ■ ^,a } 1b �� N I I I I I I II . iI 0 0 rf C C I I 1 ' i _c I- Q J ril 0 V Z 7C3¢ LL ❑ ad 1 KEY MAP Q x r�� 0 so . , S SCALE IN FEET 144 154 AS -B U I LTS jjj'_ .-._ . - PRCK1 NO.: 1002 LRAWN BY RC -TE: 01116/14 SHEET: C4.1 03 Minimum Elevation Maximum Elevation Odor 11.500 13.000 E 13.000 16.000 ■ 18.000 25.000 AS -B U I LTS jjj'_ .-._ . - PRCK1 NO.: 1002 LRAWN BY RC -TE: 01116/14 SHEET: C4.1 03 m° °I s �� ��}� O p 4 `` O 4 .0dr 4 Ilk c T L ` e8N8;FRHG 5fl F IL IELD DITCH PLUG i $ Q I� ! t if jo Q + I r 4 (PA $wl Minimum Eevation I Maxim""' Elevellon 3 Minimum €levation 7 0.000 7.500 r 7.500 8.000 8.000 6.500 Y ► d fi A ` r 1� flit AA T4AIn F b O TING DITC s TI LY FILL fl s s s ■ Ah _'I 9 1 fl 0 IF 8.500 8.000 9.500 Minimum Elevation Maximum Elsva Lion Cdor 10.000 10.500 10.500 11.006 , 11.000 11.s00 ■ Minimum Elevation Maximum Elevation Odor 11.500 13.000 tlao0 18.000 ■ 16.000 25.000 A5— BUILTS ell LEGEND PR8P8SEB SPILLWAY k $ "$ -- (PYRAMAT TURF REINFORCEMENT) N c z jB r� o� FR@f'9Bff}DITCH CROSSING a i (# 57 STONE) e a r PReP68EBRIP RAP { 5" - 12" CLASS B ) _ PROPOSEB TOP OF BERM DPR@PBSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) r f / PRISPOSEE) DITCH FILL ""?FLOW ARROW PROP85EF) SLOPE ARROW PRBPGSEB w�d MAJOR PLUG (LENGTH = 100') -R8P85E8 MINOR PLUG f� (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP 05 PRE - CONSTRUCTION SURVEY SPOT ELEVATION El/ eh PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5Q PRE - CONSTRUCTION SPOT ELEVATION I a 12.{10 AS - BUILT SPOT GRADES � O U NOTE: ¢ z � 01 j ► THIS LEGEND SUPERCEDES LEGEND ON o C1.2 WHEN CONFLICTING. x 10 KEY MAP a xd ion 14 SCALE IN FEET c� CL Q � J J CL �Q Z CLL �° Q x r [L 0 PROJ, NO.: 1002 twAWN BY RC DATE: 01/16/14 SHEET: �10 Minimum €levation 7 7,o- Minimum Elevation Maximum Elsva Lion Cdor 10.000 10.500 10.500 11.006 , 11.000 11.s00 ■ Minimum Elevation Maximum Elevation Odor 11.500 13.000 tlao0 18.000 ■ 16.000 25.000 A5— BUILTS ell LEGEND PR8P8SEB SPILLWAY k $ "$ -- (PYRAMAT TURF REINFORCEMENT) N c z jB r� o� FR@f'9Bff}DITCH CROSSING a i (# 57 STONE) e a r PReP68EBRIP RAP { 5" - 12" CLASS B ) _ PROPOSEB TOP OF BERM DPR@PBSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) r f / PRISPOSEE) DITCH FILL ""?FLOW ARROW PROP85EF) SLOPE ARROW PRBPGSEB w�d MAJOR PLUG (LENGTH = 100') -R8P85E8 MINOR PLUG f� (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP 05 PRE - CONSTRUCTION SURVEY SPOT ELEVATION El/ eh PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5Q PRE - CONSTRUCTION SPOT ELEVATION I a 12.{10 AS - BUILT SPOT GRADES � O U NOTE: ¢ z � 01 j ► THIS LEGEND SUPERCEDES LEGEND ON o C1.2 WHEN CONFLICTING. x 10 KEY MAP a xd ion 14 SCALE IN FEET c� CL Q � J J CL �Q Z CLL �° Q x r [L 0 PROJ, NO.: 1002 twAWN BY RC DATE: 01/16/14 SHEET: �10 Minimum Elevation Maximum Elevation Odor 11.500 13.000 tlao0 18.000 ■ 16.000 25.000 A5— BUILTS ell LEGEND PR8P8SEB SPILLWAY k $ "$ -- (PYRAMAT TURF REINFORCEMENT) N c z jB r� o� FR@f'9Bff}DITCH CROSSING a i (# 57 STONE) e a r PReP68EBRIP RAP { 5" - 12" CLASS B ) _ PROPOSEB TOP OF BERM DPR@PBSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) r f / PRISPOSEE) DITCH FILL ""?FLOW ARROW PROP85EF) SLOPE ARROW PRBPGSEB w�d MAJOR PLUG (LENGTH = 100') -R8P85E8 MINOR PLUG f� (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP 05 PRE - CONSTRUCTION SURVEY SPOT ELEVATION El/ eh PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5Q PRE - CONSTRUCTION SPOT ELEVATION I a 12.{10 AS - BUILT SPOT GRADES � O U NOTE: ¢ z � 01 j ► THIS LEGEND SUPERCEDES LEGEND ON o C1.2 WHEN CONFLICTING. x 10 KEY MAP a xd ion 14 SCALE IN FEET c� CL Q � J J CL �Q Z CLL �° Q x r [L 0 PROJ, NO.: 1002 twAWN BY RC DATE: 01/16/14 SHEET: �10 A5— BUILTS ell LEGEND PR8P8SEB SPILLWAY k $ "$ -- (PYRAMAT TURF REINFORCEMENT) N c z jB r� o� FR@f'9Bff}DITCH CROSSING a i (# 57 STONE) e a r PReP68EBRIP RAP { 5" - 12" CLASS B ) _ PROPOSEB TOP OF BERM DPR@PBSEB F' ROCK PAD ( LARGE SIZE MINE REJECTS) r f / PRISPOSEE) DITCH FILL ""?FLOW ARROW PROP85EF) SLOPE ARROW PRBPGSEB w�d MAJOR PLUG (LENGTH = 100') -R8P85E8 MINOR PLUG f� (LENGTH = 50') PRSPeSEB PIPE AND RIPRAP 05 PRE - CONSTRUCTION SURVEY SPOT ELEVATION El/ eh PRE - CONSTRUCTION LIDAR 0 ELEVATION X12 5Q PRE - CONSTRUCTION SPOT ELEVATION I a 12.{10 AS - BUILT SPOT GRADES � O U NOTE: ¢ z � 01 j ► THIS LEGEND SUPERCEDES LEGEND ON o C1.2 WHEN CONFLICTING. x 10 KEY MAP a xd ion 14 SCALE IN FEET c� CL Q � J J CL �Q Z CLL �° Q x r [L 0 PROJ, NO.: 1002 twAWN BY RC DATE: 01/16/14 SHEET: �10 0 a 1` IL gAtCH L11 jib 0 v 00'6 o0 Lam° 6Q P '_ C> 4 P 6.. h o 1] q, 0Q� 9'1 61) R a F�SANK �S a 1, 4 a q0 A. 1J o` /may O p J 4 ° NK PR61"OSEE)DIT `Q 0 so 41 1 CJ 0 i1 1 V 0. cb- Q O'er e p - O .. O PREP BERM MA+eii EXISTING D C".> v G 4 ( , , •� GRADE S � ° ° 4 15 0 '57 ra x t. y t J C3 0 s o l v Minimum Elevation Maximum Elevation Wor Minimum Elevation Maximum Elavatiorl Color 0-" 7.500 ■ 8.500 9-" 10.000 10.500 ;! . 1 7.500 8.000 9.000 9.900 10.500 11.000 , W $.000 8.500 t 9.500 10.000 ■ 11.000 1100 .5 ■ Minimum Elevation Maximum Elevation Color 11.500 13.000 13.000 18.000 ■ 15.000 25.000 AS- GUILTS �a LEGEND F'R6PBSEB SPILLWAY w (PYRAMAT TURF REINFORCEMENT) prz C) a PRePBSEB DITCH CROSSING z (# 57 STONE) PRBP88E9RIP RAP ( 5" - 12" CLASS B ) _ STOP OF BERM DPROPOSEB 8 ROCK PAD ( LARGE SIZE MINE REJECTS) PR@PASEE3 DITCH FILL ..?FLOW ARROW I— PR6PBSE#3 SLOPE ARROW PRBPeGEB =Ed MAJOR PLUG (LENGTH =100') -PR9PGSEBMINOR PLUG (LENGTH = 59) PRBPeSEE PIPE AND RIPRAP t$� PRE- CONSTRUCTION SURVEY SPOT ELEVATION aM PRE - CONSTRUCTION LIDAR D ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1_2 WHEN CONFLICTING. i 10a1P}, 4p§ ye son s R -82 :t7: U 95 c"9 h0 T1 2 ?S 14 i5 75 "' ;fly go a0 81 ''az , 53 54 1 `4 F 4T 43 In _ 3B 31_ .','TRrA. AL G1114[hT p. y, 1 — PROJECT BCiJNOARY 7--" 11 - -- E] DENOTES THIS SHEET 13 14- P{ASE7 � g 111x. a 7'' PHASE. KEY MAP 0 50 100 750 SCALE IN FEET 14 e� a'e w Sal_ =E� a Aai€�w�i �L � O C) Z 0 0 U7 co IL Vi � Q c OE �0 Q C D 2 � V PRDJ. NO.: 1002 DRAWN BY- RC DATE: 01116114 SHEET: 04.105 4 Minimum Elevalon M Maximum Elevation C Color M Minimum Elevation Maximum Elevation Color 11.500 13.000 13.000 18.000 ■ 15.000 25.000 AS- GUILTS �a LEGEND F'R6PBSEB SPILLWAY w (PYRAMAT TURF REINFORCEMENT) prz C) a PRePBSEB DITCH CROSSING z (# 57 STONE) PRBP88E9RIP RAP ( 5" - 12" CLASS B ) _ STOP OF BERM DPROPOSEB 8 ROCK PAD ( LARGE SIZE MINE REJECTS) PR@PASEE3 DITCH FILL ..?FLOW ARROW I— PR6PBSE#3 SLOPE ARROW PRBPeGEB =Ed MAJOR PLUG (LENGTH =100') -PR9PGSEBMINOR PLUG (LENGTH = 59) PRBPeSEE PIPE AND RIPRAP t$� PRE- CONSTRUCTION SURVEY SPOT ELEVATION aM PRE - CONSTRUCTION LIDAR D ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1_2 WHEN CONFLICTING. i 10a1P}, 4p§ ye son s R -82 :t7: U 95 c"9 h0 T1 2 ?S 14 i5 75 "' ;fly go a0 81 ''az , 53 54 1 `4 F 4T 43 In _ 3B 31_ .','TRrA. AL G1114[hT p. y, 1 — PROJECT BCiJNOARY 7--" 11 - -- E] DENOTES THIS SHEET 13 14- P{ASE7 � g 111x. a 7'' PHASE. KEY MAP 0 50 100 750 SCALE IN FEET 14 e� a'e w Sal_ =E� a Aai€�w�i �L � O C) Z 0 0 U7 co IL Vi � Q c OE �0 Q C D 2 � V PRDJ. NO.: 1002 DRAWN BY- RC DATE: 01116114 SHEET: 04.105 AS- GUILTS �a LEGEND F'R6PBSEB SPILLWAY w (PYRAMAT TURF REINFORCEMENT) prz C) a PRePBSEB DITCH CROSSING z (# 57 STONE) PRBP88E9RIP RAP ( 5" - 12" CLASS B ) _ STOP OF BERM DPROPOSEB 8 ROCK PAD ( LARGE SIZE MINE REJECTS) PR@PASEE3 DITCH FILL ..?FLOW ARROW I— PR6PBSE#3 SLOPE ARROW PRBPeGEB =Ed MAJOR PLUG (LENGTH =100') -PR9PGSEBMINOR PLUG (LENGTH = 59) PRBPeSEE PIPE AND RIPRAP t$� PRE- CONSTRUCTION SURVEY SPOT ELEVATION aM PRE - CONSTRUCTION LIDAR D ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1_2 WHEN CONFLICTING. i 10a1P}, 4p§ ye son s R -82 :t7: U 95 c"9 h0 T1 2 ?S 14 i5 75 "' ;fly go a0 81 ''az , 53 54 1 `4 F 4T 43 In _ 3B 31_ .','TRrA. AL G1114[hT p. y, 1 — PROJECT BCiJNOARY 7--" 11 - -- E] DENOTES THIS SHEET 13 14- P{ASE7 � g 111x. a 7'' PHASE. KEY MAP 0 50 100 750 SCALE IN FEET 14 e� a'e w Sal_ =E� a Aai€�w�i �L � O C) Z 0 0 U7 co IL Vi � Q c OE �0 Q C D 2 � V PRDJ. NO.: 1002 DRAWN BY- RC DATE: 01116114 SHEET: 04.105 ( 5" - 12" CLASS B ) _ STOP OF BERM DPROPOSEB 8 ROCK PAD ( LARGE SIZE MINE REJECTS) PR@PASEE3 DITCH FILL ..?FLOW ARROW I— PR6PBSE#3 SLOPE ARROW PRBPeGEB =Ed MAJOR PLUG (LENGTH =100') -PR9PGSEBMINOR PLUG (LENGTH = 59) PRBPeSEE PIPE AND RIPRAP t$� PRE- CONSTRUCTION SURVEY SPOT ELEVATION aM PRE - CONSTRUCTION LIDAR D ELEVATION X12 5D PRE - CONSTRUCTION SPOT ELEVATION 11.40 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1_2 WHEN CONFLICTING. i 10a1P}, 4p§ ye son s R -82 :t7: U 95 c"9 h0 T1 2 ?S 14 i5 75 "' ;fly go a0 81 ''az , 53 54 1 `4 F 4T 43 In _ 3B 31_ .','TRrA. AL G1114[hT p. y, 1 — PROJECT BCiJNOARY 7--" 11 - -- E] DENOTES THIS SHEET 13 14- P{ASE7 � g 111x. a 7'' PHASE. KEY MAP 0 50 100 750 SCALE IN FEET 14 e� a'e w Sal_ =E� a Aai€�w�i �L � O C) Z 0 0 U7 co IL Vi � Q c OE �0 Q C D 2 � V PRDJ. NO.: 1002 DRAWN BY- RC DATE: 01116114 SHEET: 04.105 KEY MAP 0 50 100 750 SCALE IN FEET 14 e� a'e w Sal_ =E� a Aai€�w�i �L � O C) Z 0 0 U7 co IL Vi � Q c OE �0 Q C D 2 � V PRDJ. NO.: 1002 DRAWN BY- RC DATE: 01116114 SHEET: 04.105 4 V n V U_ I�1 4 Q p O O °I O n A � o 4 G d O °� Q qU LI a� V° 0 Q a O A V �j o O .t r A 1 a u " LEGEND 3 ° ° N PR8PG EEI SPILLWAY j p J o?° I :�� I fr (PYRAMAT TURF c I O i)° REINFORCEMENT) w o� i 33 030: W v � o. 1 fRePeSEB DITCH CROSSING z z I d (# 57 STONE) o a c 'I I I PR6P6SESRIP RAP (5" - 12" CLASS B) -EXISTING DITCH TimPOSEvTOP OF BERM I 1I _*� / v c 1 o a ' ' ' 0 ° d 4l , )8" ROCK PAD l TI t [ C v �I�II } d U %� hV . r� C��✓1J,� rJ`T l © � I I I -0 j o 6 • ` b a ��a d o p m �a +',. � �� 71 1�MA � O L�1� ?�y J �} V �D y�C� $' r✓ 1 �� D Q ' k 1 1 �r� r f ( LARGE SIZE MINE REJECTS) Qs EXISTING DITCH EiTDITCH FILL EXISTING DITCH Ab p �; D O p �p n fR9P6SEB FLOW ARROW PREIPE)SPH SLOPE ARROW 0� Q 47 EXISTING DITCH I - o a ° � . 9' � Q n� ay�o a , � o y/�y� ° >� p '. �r MAJOR PLUG • %, � �. � i 1, I (LENGTH = 700') 6 a��� v aID o� � NORTH PROPERTY LINED ^� ❑� V i INO' p� { � . ' PRBPBSE$MI NOR PLUG ° V Q� a �j ffJJl Ll 1� / %� GfiAQE 14 ALIGNMENT .ti i1 o �r p �`�)!... 1 1 i I ' (LENGTH = 50`) SPILLWAY 4 I i�� S 1':: i r4�.� y� I , .. _?ROAD t•- C7 I- a n ? � fR6P9SEB PIPE AND 4 SEE SHEET w ( )I u� r —.. ( � � � r �^ * (� t00.p0 (H -H� 070.1& C102) 130 +00.00 H -H f 32 00.00 (H -H} 0 - � RIPRAP i 128 +50.00 (i� Y r I _ EXISTING ®�J o !1 Qnry GRADE q o -a 1 t'+ Qli V LI �P� I - f � [ ✓� q � n Vd 1 l Jj (j rrt1 i l JJ t i,/':, i■ ;4+(✓L d o it 1 R AD 4 II 1: O ➢ + G � EXISTING DITCH $ EXISTING DITCH p � N j i f1 1 a 1 1 EXISTING GRA DEM P OF BANK CD 10 33 MAT v -7.r r,- GRADE PROPeSEEI BERM i all, • 1 1 .` Minimum Elevalion Maximum Elevallw, COW Minimum Elevation Maximum Elevetron CWor Minimum EfeveNon Maximum Elevation Cekr Minimum Elevation Maximum Elevation Calar 0.000 7.500 ■ 5.544 9.000 10.000 1@.50@ _1 17.500 13.0@@ 1 -500 8.000 ■ 9.000 9 -500 ■ 10.500 11.000 ■ 13.000 16.001) . $.000 6.500 `' 8.500 10.0@@ . 11.0@0 71.540 ■ 16.000 25 -DW . r 1 I 130 +00.00 (H -H) f PRePeSEBDITCH —' C A5- BUILTS t-:7 132 +00.00(H -H) ICI Q� v I II eE)NS;FRHET 50' I FIELD DITCH PLUG 8 I I EXISTING DITCH (PARTIALLY FILLED. E1 134 +00.00 M 1�ry 0 PRE - CONSTRUCTION SURVEY SPOT ELEVATION m PRE CONSTRUCTION LIDAR ELEVATION 01250 PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. 1 193 177` i� 98 tpp so- f 9i j S6 96 y7 m"4 70 11 '13 75 y :'TRCAli AlGNWnT � Ty _ — PRLL/ECTBULlNDARY El AEN3TES7tffsSHEET tq PHASE f A5- BUILTS t-:7 132 +00.00(H -H) ICI Q� v I II eE)NS;FRHET 50' I FIELD DITCH PLUG 8 I I EXISTING DITCH (PARTIALLY FILLED. E1 134 +00.00 M 1�ry 0 PRE - CONSTRUCTION SURVEY SPOT ELEVATION m PRE CONSTRUCTION LIDAR ELEVATION 01250 PRE - CONSTRUCTION SPOT ELEVATION 12.00 AS - BUILT SPOT GRADES NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. KEY MAP 9 So too 150 SCALE IN FEET ZS� U z U O LL U7 (n Z c J � ?Q Z LL O Q E Z'1 PR- ND.: 1002 bwawly BY: RC DATE: 01116114 SMEET: C4.10J6 1 193 177` i� 98 tpp so- � 9i j S6 96 y7 m"4 70 11 '13 75 1 32 33 4— :'TRCAli AlGNWnT � Ty _ — PRLL/ECTBULlNDARY El AEN3TES7tffsSHEET tq PHASE f i PHASES KEY MAP 9 So too 150 SCALE IN FEET ZS� U z U O LL U7 (n Z c J � ?Q Z LL O Q E Z'1 PR- ND.: 1002 bwawly BY: RC DATE: 01116114 SMEET: C4.10J6 _ - 1 `? P a V c a 136.09 � � c> Z_/ f a LEGEND � a o 0 V �q S) • a , o PRBPESEB SPILLWAY c G {PYRAMAT TURF ) � TING DITCH REINFORCEMENT) 0 a w. w a, J Q ' PRBPOSEB DITCH CROSSING a (# 57 STONE) Q 4 v V as R •#'RE3PBSEB RIP RAF 0 6 0 O oa O j D X40 <' 4} {5 ° -12" CLASS B) M1 O 4 � d o Q b C� [� a - ` p ~o t -L 1- - �® �_ o R6POSE8 TOP OF BERM d b a — _ C} 1'RGPE3SEB 87 ROCK PAD ( LARGE SIZE MINE REJECTS) cu R$POSEDITCH FILL W AEISER CDdPAT a 39 &; fG isB a o EXISTING DITCH PC SL 79 -7 � YERHAEJ SER u �� .�..�- fR@P95EB FLOW ARROW f' 1 RBPASE& SLOPE ARROW Q N=d PRE)FIeSEB o _ 0 r " [��4 1 '� a 1 e a �-' w• :i - q,• 0• �• W (LENGTH 100') +H, r ,) ' J PRE)PE)SEBMINOR PLUG TOP OF BANK 1.36 +00.00 (H-H) 13.00 (H -H (H-H) o a ei 0 s a D O 4 Minimum Elevation NdRTH P�PER I F LINE, ALIGNMENT �{ J EXISTING GRADE c y 144 +Q0.011 [H-FI) _r (LENGTH = SQ') 145 +00A0 [H -Hj ■ 4 1 142 +00.0 ( I I_H) .- 8.000 8.500 t 8.500 138 +00.00 (H -H) 140 +00.00 (H -H) ■ 4 53 AND �� 136 +00.00 (H -H) TOP OF BANK _ J PROPOSED ROAD vrrsOAU �.iGr�r,�te.r RIPRAP L7� BEN�y ROAD �r, ^fir �` '� I,� ' AF � � f3 1S- 5 PRE- CONSTRUCTION 41 5 6 7'• PHASE. 146 o 011 f� SURVEY SPOT ELEVATION - — - - - ,d1.ri0 14a 4n • 3� -. PRE- CONSTRUCTION LIDAR a ELEVATION • • Iy _ _ m z � CJ - .. R - -,, _._ X12 SQ PRE - CONSTRUCTION SPOT , x ELEVATION -- - - - - T#1f159 _ _ - -- - - 11. - -- - 075 n ,. AS - BUILT SPOT GRADES z to ,' E1dU0— E105i� -' 111R, ^r - X99 B0 -1G :�G u ' �$ NOTE: O 0 •' 1 i PROPE)SEBBERM -- mac DITCH THIS LEGEND SuPERCEDES LEGEND ON O TOP OF BANK 1.36 +00.00 (H-H) 13.00 (H -H (H-H) o a ei 0 s a D O 4 Minimum Elevation Maximum Elevation CWar 0A0o 7.500 ■ 7.500 8.000 [ .- 8.000 8.500 t a I {{ 144 +00. ) y 146 +00.00 (H -H) i l 14DI+ 0 00 (H -H) 1d2 +fl0.00 (H -Hj 'a ,1 ` #kPrTG'i-H I �� �th'�� � � 11 cr, EXISTING y u rF " + �p fi GRAD �r%7 . "" `�.�0 ' ©� FIELD DITCH PLUG II t FIELD DITCH PLUG IV + EXISTIN4DITCH h0 y� - EXISTINGVITCH �?� (PAF,2TIALLY FILLED) I C) 4 1 (PARTIALLY FILL} o ::' ` a o 1 _ it• � lip � 1 k i 3.. 9 a , _ -- - 1 1 1104 495 Minimum Elevation Maximum Elevation C.Wor 8.500 9.000 [ 9.000 9 -500 ■ 8.500 10:000 ■ I {{ 144 +00. ) y 146 +00.00 (H -H) i l 14DI+ 0 00 (H -H) 1d2 +fl0.00 (H -Hj 'a ,1 ` #kPrTG'i-H I �� �th'�� � � 11 cr, EXISTING y u rF " + �p fi GRAD �r%7 . "" `�.�0 ' ©� FIELD DITCH PLUG II t FIELD DITCH PLUG IV + EXISTIN4DITCH h0 y� - EXISTINGVITCH �?� (PAF,2TIALLY FILLED) I C) 4 1 (PARTIALLY FILL} o ::' ` a o 1 _ it• � lip � 1 k i 3.. 9 a , _ -- - AS- GUILTS EV. No. DATE DESCRIPTION C1.2 WHEN CONFLICTING, tLQI m , 1 1 1104 495 Minimum Elevation Maximum Elevation Colo[ 101m 10 -5DD [ 10.500 11.000 ■ 11.000 11.5011 0 AS- GUILTS EV. No. DATE DESCRIPTION C1.2 WHEN CONFLICTING, tLQI m , 1 1 1104 495 Minimum Elevation Maximum Elevation CWor 11.500 13.000 MU7 13.000 18.000 ■ 16A00 25.000 0 AS- GUILTS EV. No. DATE DESCRIPTION C1.2 WHEN CONFLICTING, tLQI m , 1 1 1104 495 % 1W I Ig6 9T _ 31 62 85. 69 fly 67 .89 I' du 71 7211, 70 1 "4_1 75 T6 791- 190 62, 53 31 32 1{ vrrsOAU �.iGr�r,�te.r fl• L7� - PROJECT BCiJNOARY E] DENOTES THIS SHEET f3 1S- PHASE? 5 6 7'• PHASE. KEY MAP 0 50 106 750 SCALE IN FEET U) � Q c J 0 ILL 1°J C x I- PRCU. NO.: 1002 DRAWN BY, RC DATE: 01116114 SHEET: C4.107 ri V@ LEGEND q, PROPOSEB SPILLWAY r z 7 D" 0 110 (PYRAMATTURF z g C:J o REINFORCEMENT) 9 4 v PRePOSEB DITCH CROSSING ZD L p Q a 4 a d Q m p Q (# 57 STONE) z, C> PRGPE)SEE) RIP RAP C, 0 AF� n Q Q0 ISTING DITCH 0 0 0 (7 7- WA�Y�Wfl U U) NORTH PROPERTY LINE Uj ALIGNMENT T —EXISTING 0 _j 0 GRADE 0 0 J 154-00.00:H-H' H) � T 148+00.00 (H-H) 150 +00-00 (H-H) 152+()0. j I W PR8P8SEB ROAD TOP OF K BENFEWELL ROAD i52 00 t53 •LK) 4y T T -I 01 d-H) 0 AN iwqm 5" - 12" CLASS 8 % C? 4 PR6PE)SEE) TOP OF BERM � PRE)PeSEB 8"ROCK PAD 9,17MER (LARGE SIZE MINE REJECTS) WIELD J. "o Wa I'YTE V�G 5020 V IC7 PR6PE)SEE) DITCH FILL 0 a 0 FReP88EB FLOW ARROW off° o PRE)PeSFEi SLOPE ARROW _N1 N. PRBPGSEB ii MAJOR PLUG (LENGTH = 100') TRANSITION INTO , Q; o�XISTING ROAD o 10 PR8PE)5E6 MINOR PLUG D (LENGTH = SCY) 0 PRapeSEE PIPE AND 110 RIPRAP ri is.a� 41 ZN b PRE-CONSTRUCTION SURVEY SPOT ELEVATION PRE-CONSTRUCTION LIDAR 0 ELEVATION Z ID z X175D ELEVATION 50 J�Q q Cy DES 0 1' l TOP OF BANq� AS - BUILT SPOT GRADES PRE)pq*ED DITCH L) PF�9iPeSEB BER-Mz— lb�� %r 1 Z117 0 NOTE: Z i.- < 0 0 0 0 _j 1 i — EXISTING I THIS LEGEND SUPERCEDES LEGEND ON � \n 1:�� j F>2ppO 00 (H -H) GRADE C1.2 WHEN CONFLICTING. < -H) w 148+00-00 CHO Vo+(*.00 (H l, ROAD Vvi I'l r\ MENT> V� CH PLUG 4w DIT O 0 0 0 0 0 0 PROP Fp BE k- % 0 1 DITCH H*:Feh! . FILLED) EXISTING C o 4Lo wL 0 r LA 0 10 E 0 1. 7 ER 4e k j 0 Minimum Elevation I Maximum Elevation I Color 0-wo 7.500 ■ 7.500 8.000 ■ &ODD 8.500 ■ 9.600 10-OW E TOP OF BANK 0 0 AS- GUILTS Minimum Elevation Minimum Elevation Maximum Elevation Color 8,500 9-OW 13.000 9.000 9-wo ■ 9.600 10-OW E TOP OF BANK 0 0 AS- GUILTS Minimum Elevation MinimurriElevation MaximumLlavation Color 10100 10-500 13.000 10.m ll-DDO l6wo 11.000 11-sw ■ TOP OF BANK 0 0 AS- GUILTS Minimum Elevation Maximum Elevation Color 11.500 13-DDI) 13.000 16-010D ■ l6wo 25.GW TOP OF BANK 0 0 AS- GUILTS KEY MAP a so 1106 150 L SCALE IN FEET a) (n CL 2! _j CL (D Z < LL O CL PZ.NO.: 1002 DRAWN BY, RC [vkTF: 01116114 SHEET C4.108 \ ----------- 10 KEY MAP a so 1106 150 L SCALE IN FEET a) (n CL 2! _j CL (D Z < LL O CL PZ.NO.: 1002 DRAWN BY, RC [vkTF: 01116114 SHEET C4.108 \ ----------- 30.00 0.00 AS -BUILT LIDAR PRECONSTRUCTION GRADES 30.00 m 20.DO m D 0 z 10.00 10-OD 2000 . 82.9' STA: 2 +00.00 PHASE III 2S. E -E SEE SHEET 04.52 & 64} D• - -}- 24.0' - 20:0' PARKING - STALL PROPOSED DITCH BOTTOM `- - {FUT _ 8.0' 'MATC PROPOSE D -- 4r E7(ISTfWfv GRADE MATCH EXIST. TOP OF BERM (FUTURE) GRADE 30.00 40.00 50.00 60.00 70.00 80.00 90.00 L co w 0 J 9 I r0 i N m STA: 4 +00.00 {SECTION E -E SEE SHEET 04.52 & 64} 998.0' PHASE III 20.0' EXISTING LU z f. MATCH E (STING GRADE +�N 110.00 120.00 130.00 140.00 150.00 EXISTING m 20,00- r _ 20 GRADE m °g C w i W W Q O� 30.00 z 10.00 .•r.�.�..�_.._. -. w r' 0.00 AS -BUILT LIDAR PRECONSTRUCTION GRADES 30.00 m 20.DO m D 0 z 10.00 10-OD 2000 . 82.9' STA: 2 +00.00 PHASE III 2S. E -E SEE SHEET 04.52 & 64} D• - -}- 24.0' - 20:0' PARKING - STALL PROPOSED DITCH BOTTOM `- - {FUT _ 8.0' 'MATC PROPOSE D -- 4r E7(ISTfWfv GRADE MATCH EXIST. TOP OF BERM (FUTURE) GRADE 30.00 40.00 50.00 60.00 70.00 80.00 90.00 L co w 0 J 9 I r0 i N m STA: 4 +00.00 {SECTION E -E SEE SHEET 04.52 & 64} 998.0' PHASE III 20.0' EXISTING LU z f. MATCH E (STING GRADE +�N 110.00 120.00 130.00 140.00 150.00 160.00 170.00 _ � n _ 20 rn 2000 . °g °$ w i RI -r -r 30 30.00 - 8 -0' STA; 10 +00.00 (SECTION E -E SEE SHEET C4.53 & 65) -30 -} 20 --+10. N G� Q cL a a v'sm 8� 55_ _� F .tea f Ifl _ w - 20 rn 2000 . � °g °$ w i RI PROPOSED w DITCH BOTTOM $ 8 w w rig {FUTURE} $ Tlpl q q 1D 10-OD STA; 10 +00.00 (SECTION E -E SEE SHEET C4.53 & 65) -30 -} 20 --+10. N G� Q cL a a v'sm 8� 55_ _� F .tea f Ifl 30.00 r 20.00 IT! 1 O z 10 -00 0 -00 AS -BUILT LIDAR 30.D0 m 20.D0 m C a z 10.Do t��v p P I.. -1�@ pj M r n r r r r EXISTING GRADE MATCH PROPOSED IL Z MISTING GRADE DITCH BOTTOM w N y W D (FUTURE) g - .. W .' �+ Pf1tOPOSED MATCH TOP OF BERM EXIST, _ w - � w i w w OPOSED MATCH Tlpl EXIST. OF BERM TOP OF BERM EXIST. - UTURE GRADE 910.00 120.00 Q( 0-00 FUTURE GRADE 0.0 0.06 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 iDD.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 9D.D© 100.00 11D.00 120.00 0 -( AS BUILT LIDAR AS -BUILT LIDAR PRE N TRU ��9 �,r ( CS Lt7 C11i N u5 ' 2 ^ N t IS ' ` r IN I� vi I I�. N N N 'N I kpi N csi p1mm GRADES GRADES I= TEn - [® to r t �°' t -i 30.00 r 20.00 IT! 1 O z 10 -00 0 -00 AS -BUILT LIDAR 30.D0 m 20.D0 m C a z 10.Do t��v p P I.. -1�@ pj M r n r r r r EXISTING GRADE MATCH PROPOSED IL Z MISTING GRADE DITCH BOTTOM w N y W D (FUTURE) g - .. W .' �+ Pf1tOPOSED MATCH TOP OF BERM EXIST, 30 30.00 STA: 12 +00.00 (SECTION E -E SEE SHEET 04.53 & 65) 30 z R: D 118.0` y PHASE fll �, M 65.0' 25.0' 2 0' $.D' v z EXISTING U 20 Dl 20.00 GRACE 20 F a^0 O Z � �� PROPOSED O D O J dJ:*'- w.�,.- ..,,,,,..f.�.�..- ,.�� - --• r� DITCH BOTTOM g - o w O W � '^ 10. z 10.00 ...,,w4, � _ {FUTURE} -, -- g-- -•- - -- -. 10. � vl � w ' ' •• • � �' � � i �� � � OSE PROPp TOP OF BERM MATCH MATCH EXIST - (FUTURE) EXISTING GRAPE GRADE L 0.( 4.00 R( r 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 700.00 110.00 120.00 0.00 10.00 2000 . 30.60 40.00 50.00 60.00 76.00 8_0.00 90.60 100.00 110.06 720.00 = ( I MI° ,ter nni r tf7 n�i yr n irs a N rn AS -BUILT LIDAR _,;; o`ti ® °�- M n' n � n m rn o n n9n rn � MIX IN r o • • PRECONSTRLCTIDN ' v cee�TTi njl�+ N�ic^a` 0 1-! 1 Cy uY r W W r I v r^ a n n n n m m CCs "� U o 0 o w C co f GRADES r f rl^ t _.. ...._�_.�_.I. L 0 STA: 8 +00.00 (SECTION E -E SEE SHEET C4.52 & 64) STA: 14 +20.00 (SECTION F -F SEE SHEET 04.65) a- 118.0' - 30 76.00 87.0' - - - - 30. cn 0 PHASE Itll � n,/ 65.0' 25.0' 20.0' 8.0' 31.0' 14.0' 24.0' - -129 V EXISTING 20 m 2000 . - - - - - 20. J > }} o GRADE n n n n F EXISTING w w W LLJ MATCH PROPOSED w y w w A GRADE w w .. ....•.,�,v.,,,....T...T...,...� _ EXISTING GRADE pITGH BOTTOM o w q w O J S g w D O Q y _ ��• ti _8 8 SURE] S _ z = - - - -- �`- - - - - -- - w �.•• I. ems._ _ - -- - --- 10 70.00 ..r. .... - _ o � - - - -�� - - - ........ 10. 1 ........f,.^.•r ........ �^\ `w a ♦ w ! :T11 PROPOSED LL PROPOSED MATCH XtlSTING LL w TOP OF BERM P OF BERM GRADE - {FUTURE] EXIST. MATCH EXIST. GRADE W GRADE PROPOSED DITCH BOTTOM i � 0.00 0.0 0.00 O.0 O 0.00, 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 1pQ,00 110.00 920,00 0,00 10.00 20.00 30.00 40.06 50,00 60.00 70.00 80.94 50.00 100.00 110.00 � CL AS -BUILT LIDAR AS -BUILT LIDAR ua's � ,�I� �jm � �; '.q 'n'� N � �In '� ON TRp TIDN PREC NSTRDCTION aQ; ©�; c� ��; as �; p1d GRADES GRAPES PROJ. NO. : 1002 IGN - C] TH 01 RC AL MENT - N R L ,SCALE 11" ?( 17" = 1" - ZQ' H PROPOSED FILL ��i�'/ PROPOSED CUT - 3 AS -BUILT Y WATER SURFACE ��** pp II II II ��++ 22�t X 34,t = 1" = 10'H PROP(]SED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r , - PRE- CONSTRUCTCON COLLECTED IN FIELD) 1' - � �' V EXISTING GRADES AS -BUILT SPOT GRADES [FOR ROAD BASE] GATE: 01116/14 SHEET: C�rs4m sa o a w n vii n m in u'�i ppFW rim �i^ r N O iN W D7 O! DI O� It0 139.9r FUTURE G GRADE 4.00 R( r 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 700.00 110.00 120.00 0.00 10.00 2000 . 30.60 40.00 50.00 60.00 76.00 8_0.00 90.60 100.00 110.06 720.00 = ( I MI° ,ter nni r tf7 n�i yr n irs a N rn AS -BUILT LIDAR _,;; o`ti ® °�- M n' n � n m rn o n n9n rn � MIX IN r o • • PRECONSTRLCTIDN ' v cee�TTi njl�+ N�ic^a` 0 1-! 1 Cy uY r W W r I v r^ a n n n n m m CCs "� U o 0 o w C co f GRADES r f rl^ t _.. ...._�_.�_.I. L 0 STA: 8 +00.00 (SECTION E -E SEE SHEET C4.52 & 64) STA: 14 +20.00 (SECTION F -F SEE SHEET 04.65) a- 118.0' - 30 76.00 87.0' - - - - 30. cn 0 PHASE Itll � n,/ 65.0' 25.0' 20.0' 8.0' 31.0' 14.0' 24.0' - -129 V EXISTING 20 m 2000 . - - - - - 20. J > }} o GRADE n n n n F EXISTING w w W LLJ MATCH PROPOSED w y w w A GRADE w w .. ....•.,�,v.,,,....T...T...,...� _ EXISTING GRADE pITGH BOTTOM o w q w O J S g w D O Q y _ ��• ti _8 8 SURE] S _ z = - - - -- �`- - - - - -- - w �.•• I. ems._ _ - -- - --- 10 70.00 ..r. .... - _ o � - - - -�� - - - ........ 10. 1 ........f,.^.•r ........ �^\ `w a ♦ w ! :T11 PROPOSED LL PROPOSED MATCH XtlSTING LL w TOP OF BERM P OF BERM GRADE - {FUTURE] EXIST. MATCH EXIST. GRADE W GRADE PROPOSED DITCH BOTTOM i � 0.00 0.0 0.00 O.0 O 0.00, 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 1pQ,00 110.00 920,00 0,00 10.00 20.00 30.00 40.06 50,00 60.00 70.00 80.94 50.00 100.00 110.00 � CL AS -BUILT LIDAR AS -BUILT LIDAR ua's � ,�I� �jm � �; '.q 'n'� N � �In '� ON TRp TIDN PREC NSTRDCTION aQ; ©�; c� ��; as �; p1d GRADES GRAPES PROJ. NO. : 1002 IGN - C] TH 01 RC AL MENT - N R L ,SCALE 11" ?( 17" = 1" - ZQ' H PROPOSED FILL ��i�'/ PROPOSED CUT - 3 AS -BUILT Y WATER SURFACE ��** pp II II II ��++ 22�t X 34,t = 1" = 10'H PROP(]SED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r , - PRE- CONSTRUCTCON COLLECTED IN FIELD) 1' - � �' V EXISTING GRADES AS -BUILT SPOT GRADES [FOR ROAD BASE] GATE: 01116/14 SHEET: C�rs4m sa o a w n vii n m in u'�i ppFW rim �i^ r N O iN W D7 O! DI O� It0 139.9r GATE: 01116/14 SHEET: C�rs4m sa o a w n vii n m in u'�i ppFW rim �i^ r N O iN W D7 O! DI O� It0 139.9r 30 -00 M 20 -00 IT a O z 10 -00 0 -00 J I A: Io*uu.VU k=i_:I IUN 'r -Y c7tt .ritt I U4.D9f 30, 30 -00 10.00 81.0' 20. r 20.00 m - - 90.OD 24.0' 12.0' 31.0' 14.0' EXISTING r1 j1j 5 °o $ j r p� rr GRADE w 8 XISTING j GRADE S$ W .- ...... V_/-/-"" PROPOSED TOP OF BERM ICU MATCH -00 PROPOSED DITCH BOTTOM ,po MATCH EXIST. GRADE MATCH E1s O.OD AS- BUILT LIDAR PRECONS�TRUCTIDH GI RADES 30.00 m 20.00 IT! 1 )0 20 -00 30.00 2 m o -im 31.0' -I i 'd;lw 0 (D�ms STA: 20+00.00 - 81.0 14.0' - loo 80.00 90.00 30, 30 -00 10.00 2_0.00 20. r 20.00 m - 80.00 70.OD W-00 90.OD 100.00 110.00 o= AS -BUILT LIDAR w r1 O O� w 11a v °l a 10 °• -•• AS -BUILT LIDAR -00 IPRECONSTRUCTION TOP OF BERM MATCH EXIST. GRACIE R'7 lw C MATCH E1s z'7'F 0.0 0 -00 q [-� -;n V C4j' O.OD AS- BUILT LIDAR PRECONS�TRUCTIDH GI RADES 30.00 m 20.00 IT! 1 )0 20 -00 30.00 2 m o -im 31.0' -I i 'd;lw 0 (D�ms STA: 20+00.00 - 81.0 14.0' - loo 80.00 90.00 0,00 10.00 2_0.00 30.00 40.00 50.00 80.00 70.OD W-00 90.OD 100.00 110.00 EXISTING"�F AS -BUILT LIDAR cal n r1 uoI� M m N w 11a v °l a t[pD 'la loo � N AS -BUILT LIDAR AS -BUILT SPOT GRADES (FOR ROAD BASE) IPRECONSTRUCTION TOP OF BERM MATCH EXIST. GRACIE R'7 lw C r m z'7'F rw - Gll ro q [-� -;n V C4j' r [i � E N N Z Qo m 0,00 10.00 2000 . 30.00 40.00 50.00 0.0c 60.00 70.00 60.00 90.00 100,00 110.00 0-00 of a 47 W A rn+0 w �lw cn ov ciiw ra ..- m CV -n CD'n cry; r- <D n 33 aa'w N °' 81as -, O1 a'' °i AS -BUILT LIDAR PRECONSTRUCTI N GRADES GRADES E STA: 22 +00.00 (SECTION F -F SEE SHEET C4.69) 30.00 GRDrS 81 Q, - ( 30.( 30.00 STA: 18 +00.00 (SECTION F -F SEE SHEET C4.65) sD.DD Sit' 30. 30.00 31.(Y 14.0" 24.0' 12.0' EXISTING ° E S rn 20,00 8 20. m 20.00 c r m GRADE �� n r m S w w a Ww LL �J a o °W °W a o� sg sg 10.00 -. -- d --- ' °----•'_ rr �rTn T r -- -- •,� r - -. -. ... t0. 10.00 s... -. 7 MATCH TI N % / ZLIN I �/,,t' ��� PROPOSED MA [XISTI PROPOSED DITCH BOT1`OM :% - MATCH EXIST. GRADE O.OD AS- BUILT LIDAR PRECONS�TRUCTIDH GI RADES 30.00 m 20.00 IT! 1 )0 20 -00 30.00 2 m o -im 31.0' -I i 'd;lw 0 (D�ms STA: 20+00.00 - 81.0 14.0' - loo 80.00 90.00 190.01 ;v �N Flo a V �l0 w•Ea - I� rirn y7 r_ Qj d. g I .., W �V/'J► 0.0 0 O 110 -00 n AS -BUILT LIDAR REf:.ONSTRUCYM Oi w GRADES X30.1 30.00' 24.0' 12.0' - _E&STING S S GRADE 20.1 � z090 w; w; m O pj :j S 8 8 �' g I .., W �V/'J► O 10.00 �'Y...... �• MATCH EXISTING"�F WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS j ° - - ...- .,- ...�.......- ..- .�..- ...- ...._.- .._.�..... - , ..PROPOSED 10.0 10-00 � F- GRADE EXISTING GRADE AS -BUILT SPOT GRADES (FOR ROAD BASE) TOP OF BERM MATCH EXIST. GRACIE 20.( ti 0 'A Z Qo 0 -00 0,00 10.00 2000 . 30.00 40.00 50.00 0.0c 60.00 70.00 60.00 90.00 100,00 110.00 0-00 AS -BUILT LIDAR a 47 W D rslm mlo N1� a'N Iq Biv N's1' �'n lq- l I w cDlw roles 7ca�!w rn+0 w �lw cn ov ciiw ra ..- m CV -n CD'n cry; r- <D n 33 aa'w N °' 81as -, O1 a'' °i AS -BUILT LIDAR PRECONSTRUCTI N GRADES RE N TRU TI H GRADES E STA: 22 +00.00 (SECTION F -F SEE SHEET C4.69) 30.00 - 81 Q, - ( 30.( 30.00 30.0 2Q.0 (D �x a a a 1o.e v'sm 8� o.oc 0 10.00 20 -00 30.00 40.00 50 -00 60 -00 70.00 60.00 90.00 100.00 110.00 S 4g m - CD rn m c+) ^ nln o SIN C4 �l o. v lira Ala ro;o oiow1� x 5 V m €s�� E oci STA: 26 +00.00 (SECTION F -F SEE SHEET C4.69) 4 a I€ � a LL . z 30.( g 31.V 14A' 24.0' 129' k EXISTING _ _ 85; 85 GRADE u 24.f Ill m J 6 W W s$ sg C XISTING,! PROPOSED -` TOP OF BERM GRADE MATCH EXIST. GRADE PROPOSED DITCH O.00 0 10.00 20.00 30.00 40.00 5090 6_0.00 70.00 80.00 80.00 100.00 110.00 Moo Q mu, iIN pi o� mid � o ra yj ni rpo, � o r o aio Rio po w 11.1 MATCHIEXISTING GRADE 30.0 z 60.00 70 -00 60.00 w w "a['s�+v c�h,a e�l� a'� = 0 c 0 90.00 100.00 110.00 ra'w w t+ln ��^ � o t71o_ _ W �V/'J► v Z z X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS M } (SECTION F -F SEE SHEET - 04.79) 30.0 PRE- CONSTRUCTION � F- EXISTING GRADE AS -BUILT SPOT GRADES (FOR ROAD BASE) 20.( ti 0 Z Qo � af O 10.0 7 w ►+ ) In 7 0 o.oc 099 10.00 n a0 o cv -ei 20..00 30 -00 40.00 50.00 n w co v w iN r�o wlao v _ •- iv 60.00 70 -00 60.00 w w "a['s�+v c�h,a e�l� a'� = 0 c 0 90.00 100.00 110.00 ra'w w t+ln ��^ � o t71o_ _ W �V/'J► Y WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS STA: 30 +00.00 810, (SECTION F -F SEE SHEET - 04.79) 30.0 PRE- CONSTRUCTION 0 ' 31.0' 14.0' 24.0' 12.0' 31.0' 14.0' 24.0' 12.0' t m 20.00 - - EXISTING 8 20.( m 20.00 EXISTING -. - -.8 $ 8 24:( J E Z5 rn r GRADE o f r GRADE F" F - _ x T T NW Wes W J J D W 'i W .a � ; - . - W W 0 O O : 10.00 tDc 10.00 10.c a MATO EXISTING PRQPOSED MATCH EXISTING PROPOSED 'C LL GRADE TOP OF BERM GRADE Mx TOP OF BERM O h/ •f MATCH EXIST. GRADE MATCH IST. GRADE LL 0 QO j .•. 0.0( O.OD .PROPOSED DITCH BOTTOM 0-0c Q_ Q W 0.,00 10.00 20.003.0.00 40.00 50.00 60.00 70.00 8090 90.00 100.0 110.00 D.DO 10.00 24.00 30.00 40.00 50.00 60.00 70.00 Woo 90.00 100,0D 110.00 AS -BUILT LIDAR N r. color - ' -. ,c a u-� 0-w w N ,n ro N q m A R�yVom pli uy 6 r a .n n Afi -3UILT LIDAR enim c m i ¢Ia en� win 4-a c ;m 'co a n u7iq i +D r- r n a o 0 4 07 i> o min �Im N mi m; D,mi dim ni � w:m eilr w m o! �; M aS m o Ci coo 61, GRADES i '� i r i a 8 GRADES �P _� =�^ PR°.i.rw.: 1002 IGN EN - O CiRAwNSI' RC AL M T - N RTH PL ;SCALE 11" ?( 17" = 1" - 20' H PROPOSED FILL PROPOSED CUT 3 1 " =20'V -" AS -BUILT Y WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS r 1 r - 10' - PRE- CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE AS -BUILT SPOT GRADES (FOR ROAD BASE) DATE: 01/16114 SHEET: C5 2 30,00 m 20.00 m A O z 10,00 0,00 31.0' EXISTING } GRADE F� w Ili 0. � MATCH IEXISTING ... I GRADE ;7114: 31 +9U.UU 14.0' 24.0' w a'1 k=U I IVIV I' -P' =t .7I'1tt 1 4;4.1`.7) 12,0' - 8. Q u W u W LL W LL W O O PROPOSED TOP OF BERM MATCH rXIST. GRADE 30.f 30,00 20,f m 20.00 r m d 10,0 10.00 0 -0I 0 -00 0,00 10.00 20.00 30:00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 AS -BUILT LIDAR - T� a-: 70W�7 AS -BUILT LIDAR � n m. v PRECONST n1I6 d p C GRAD 6 m ES GRADES T 0t mm- +VTVU.VV t0rL, 11LJIVr-1•.7Ct SMtt 1. L4. f U) - - (SECTION F -F RELOCATED 121 31.0' 74.0' 24,0' 12.0' EAST DUE TO ENCROACHMENT - -----'---------�------- -- -- ---- EkIS71NG ---- - - - - -- ----- `--- - - - - -- --- - - - - "$ $ g $ ON WEST PROPERTY LANE) .K GRADE yy. Ir 1____ _____L________ J__ -.. - -I " -- LL J LL J d �_ - - - - -- q W T 1- - Q W .. PROPOSED - 0. '... CH EXISTING t y - -. GRADE TOP OF BERM MATCH EXIST. GRADE PROPOSED DITCH BOTTOM O.DD 10.IN ZO.UU�m.UU 40.00 tC.UU 6uluu lluMu bu.OU 9Uu.UU�140.00 170.OU h SIN 0 m �+ 04 �m N4PIm t+ R cis -1. L � ui��l'6 06 0; a ri Flo � o rla 3'I G �E 2 pa a 0 11) 0.' c STA: 34 +80.00 (SECTION F -F SEE SHEET 04.79) STA: 42 +00.00 (SECTION F -F SEE SHEET_ 04.79) - 30.00 89.0, - 30.I 30.00 61,0' 3'_ (SECTION F-F RELOCATED 121 31 -01 14.0 24.0' - 12 -0' 24.0' 12.0' -+ EAST DUE TO ENCROACHMENT m 2Q.QO EXISTING 8 2Q I m 20 aQ EXISTING B ' 8 P ON WEST P OP €RTY LIINE 2 11 m GRADE S$ $ 8 r GRADE 8$ 8� ) 11 11 11 11 m �' �' m F �w w s n �W LL b �W LL LLL W 2 0 O W •i W T Z 0 p - Z 10.00 -• ^W- ......,T m 20.00 m F EXISTING GRADE .. 20.f 20 -00 m I� m m GRADE EXISTING MATCH EXISTING GRADE Q p 0.00 z 10.00 PROPOSED _ _ -,. DITCH BI MATCH 0.00 10.00 20.00 AS -BUILT LIDAR�,� d- h'� _ NsCfCTidAI� .......,. csa -. ml� GRADES SCALE 11" X 17" = 1" - 20' H 61 .0' 70 4 10.00 - ,; --. _ ,.. 3 ...... . . ". �.... .- .. 30.00 m 20,00 m 1 0 Z 10.00 0,00 _ 0 o , __ _- -. _ '- ...- ......- 10-( Z 10 0 fY J 'y ,� .- _ - _ ...........,... �......._ ._ �. _.. PROPOSED Pd2®POSED aT, • . a TOP OF BERM M TCH EkISTING .TOP OF GERM MATCH EXIST. GRADE GRADE MATCH EXIST, GRADE 0.0( 0.00 .,.,.....,. 0. 30 40,00 50.00 60.00 70.00 80.00 90.00 100.00 110,00 0,00 10.00 20,00 30.00 40..00 50.00 60,00 70.00 80..00 90.00 100,00 110,00 ro`1_ii;im ° ^ - uN o °rp a �lm° ILv .� DI v � lo A$ -BUILT LIDAR cj N,, uv lv r tlm d .M _ a - GRADES PRECONSTRUCTION w JL STA: 36 +00.00 SECTION F -F SEE SHEET 0479 81.0' 31.0' 14.0' 24.0' 12.0' 8 8 8 S EXISTING N GRADE n x n W y W W ...... LL s "MATC EXISTING PROPOSED GRADE 7pP OF BERM MATCH EXIST. GRADE i 0.00 1 D.DO 20.90 AS -BUILT LIDAR G1 PRECOHSTRUC710N GRADES 39.00 T-- I v'sm 88 s �a��LL�z F �C 30.f 30.00 60_.00 70.00 - STA: 14.0' 44 +00,00 (SECTION F -F SEE SHEET 04.79) (SECTION F -F RELOCATED 10t 24.0' 12.0' EAST DUE TO ENCROACHMENT ON WEST PROPERTY LIINE) 053 S$ 3 m 20.00 m 6_0.00 70.00 Iwo W m v iG a I EXISTING GRADE 31.0' 20.f 20 -00 m I� m m GRADE EXISTING w LLJ Q p ? z 10.00 a: ` _ _ -,. Z MATCH EXISTING (SECTION F -F SEE SHEET C4.89) GRADE PROPOSED DITCH B v'sm 88 s �a��LL�z F �C 30.f 30.00 60_.00 70.00 - STA: 14.0' 44 +00,00 (SECTION F -F SEE SHEET 04.79) (SECTION F -F RELOCATED 10t 24.0' 12.0' EAST DUE TO ENCROACHMENT ON WEST PROPERTY LIINE) 053 S$ 3 Z � U Z - r 6_0.00 70.00 Iwo W m v iG a I m ,3 31.0' 20.f 20 -00 m I� m m GRADE EXISTING _ {� cn f a - w 2 0 0 Z Qo STA: 38 +00.40 SECTION F -F SEE SHEET 04.79 II.I Z STA: 46 +00.00 (SECTION F -F SEE SHEET C4.89) d- C ALIGNMENT = NORTH PL J .......,. 3 3o.0Q SCALE 11" X 17" = 1" - 20' H 61 .0' 70 4 10.00 - ,; --. _ ,.. 3 ...... . . ". �.... .- .. 0 W V l WATER SURFACE fu1R CH EXISTING PROPOSED GRADE PROPOSED WATER (ELEVATIONS BELOW WATER SURFACE WHERE m Z n GRADE 14.0' 24,7 12,9 . TOP OF BERM MATC EXIST. GRADE EXISTING GRADE 0 14.a 24.0' 12.0' 0.0[ 0 -00 EAST DUET ENCROACHMENT P ED DITCH. TT ......,.. 0 - 30.00 40.00 50.00 60_.00 70.00 89.00 90.00 100,00 110.00 0.. 10.00 20.00 �� �iw IN fa rr a i 30.00 40.00 50.00 4 N h f� W W m C¢Im ®71^ l v ra$ cri of v Ll =1 I 6_0.00 70.00 Iwo W m v iG a I m ,3 84.00 NI- piN cwi a 90.00 1 - 110.00 cn tnIw r m�N .dip v ci - cti; c' ° I� m m �� 47 h d o _ {� cn W N n re t� m AS -BUILT LIDAR ap rn © In c i o .r o p' p r PREC TIDN rn o �¢ a CQ m � AS -BUILT LIDAR Mlle V �%ly h g} d CO M � FV ll+. C9 "1 W o p a fV a e^! v p c3 d a Q v PRECONSTRUCTIGN �I cfl - -� •� _.� � r�r_I GRADES STA: 38 +00.40 SECTION F -F SEE SHEET 04.79 GRADES STA: 46 +00.00 (SECTION F -F SEE SHEET C4.89) d- C ALIGNMENT = NORTH PL - 8101 - 3 3o.0Q SCALE 11" X 17" = 1" - 20' H 61 .0' PROPOSED FILL M PROPOSED CUT 3 3 3 1 " =20'V 0 AS -BUILT Z WATER SURFACE 22" X 34" = 1" = 10' H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS (SECTION F- RELOCATED 121 n COLLECTED IN FIELD) 14.0' 24,7 12,9 EXISTING GRADE 31.0• 14.a 24.0' 12.0' EAST DUET ENCROACHMENT L.f_ 88 $$ 2 LLW W PROPOSED I . TOP OF BERM MATCH EXIST. GRADE m 20.00 EXISTING 71 GRADE m F C w CL Z J ff 2 10.00 - - 5 MATCH EXISTI NG � GRADE PROPOSED DITCH B(7TT 0.00 _. . _... - I 1 0 0.00 0.00 10.00 2000 . 30.00 40.00 50.00 60.00 70.00 80..00 110.00 QO 10.00 AS -BUILT LIDAR N m N Q' PRECONSTDREUS TION c� o �� 47 h d o W o N Mlvl co co K,1� tl o o N �n O n c2 o N n re t� m AS -BUILT LIDAR ap rn © In c i o .r o p' p r PREC TIDN ,20.00 Iryl Iryl h h l h 04 (D _[2 GRADES C ALIGNMENT = NORTH PL SCALE 11" X 17" = 1" - 20' H � PROPOSED FILL M PROPOSED CUT 3 3 1 " =20'V AS -BUILT Z WATER SURFACE 22" X 34" = 1" = 10' H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS r 1" = 10' V PRE - CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE �� -\ AS -BUILT SPOT GRADES (FOR ROAD BASE) 8$ 8 S ON WEST PROPERTY LIINE} c U - -------------- - 2. J u u o.. "... U W .........- fl LIJ �. �✓�/�^ PROPOSED '� U_ T4P OF BERM O fy MATCH XIST. GRADE - w S. 30.00 40.00 50.04 60.00 70.40 50.00 90.04 i0c �00 110.00 Q. OP CL s 12 rn PIP c61M tim o+. C4G �P 1y4 {qG qi5 cps PR011. NO.: 1002 mAwN sr- RC WTE: 01/16114 SHEET: C5,3 30.00 m 20.00 C 4 z 10.00 0 "00 AS -BUILT LIDAR N I GRADES 30.00 3 1 m; 141 Tuv.V V kam, I I JN r -r 7Cv Jntt l u4.rse bu.uu ru.uu uu.uu e1.o^ (SECTION F -F RELOCATED 12t IIu.uu C � EAST DUE TO ENCROACHMENT 0I°❑' 31.0' 14.9 24.0' 12.0' ON WEST PROPERTY LIINE) 0- Ala S 53 $ $ -7 EXISTING GRADE �'-- • ..�. -. - -. = - Q.. N m 20.0 20.00 w w W W w m Q -� IGRADE PROPOSEDDITCHBOTTOM ............... $ 8 Q /;•' PROPOSED %%' .-OP OF BERM / •••••• ^ -- -' MATCH EXIST. GRADE MATCH iu.uu Zu.uu 1n o [nl- rD p ci p❑ m 20.00 bu.uu ru.uu uu.uu m 100.gq IIu.uu C � W 0I°❑' v�m CV10 °ry 010 0 0- Ala z 10,00 - �'-- • ..�. -. - -. = - Q.. GRADE 20.0 20.00 MAT] EXISTING f w w m GRADE (SECTION F -F SEE SHEET C4.89) AS -BUILT SPOT GRADES (FOR ROAD BASE) PROPOE O.OD 0.00 10.00 AS -BUILT LIDAR PRECONSTRUCTION I p�o 30.00 mr 2000 . In a 4 z 10.00 0.00 AS -BUILT LIDAR PRECONSTRUCTION GRAD €S 30.00 31.0' 20.00 - 1 go � I� pi- 31.9 EXISTING } GRADE � W W QIL J MATCH I GRADE 30.01 30.00 20.0 M 20.00 n1 D 1 O 10.0( Z 10.00 0.00 0.00 ;w.uu 4u.uu su.uu bu.uu ru.uu uu.uu vu.uu 100.gq IIu.uu ❑ o 24.0' o6 0I°❑' v�m CV10 °ry 010 [�ilnsnl, AS -BUILT LIDAR Ola 1� Ala 88 �10 F E = GRA0E5 GRADE 20.0 20.00 EAST DUE TO ENCROACHMENT 12'0 ON WEST PROPERTY LIINE) 3$ 8S - w w m STA: 48 +60.00 (SECTION F -F SEE SHEET C4.89) AS -BUILT SPOT GRADES (FOR ROAD BASE) 14 W 810, MATCf, - 3 W GRADE 30.0' 30.00 PROPOSE6 LL SPILLWAY DETAIL TOP OF'BERM 31.0' EXISTING } GRADE H �w W a� MATC EXISTING GRADE I P IY H BUTT J 1n. .iaTYV.W (�Cli [ IVIY r -� .7CC .7nCC1 ti:+.�VJ (SECTION F -F RELOCATED 181 81.0' ` 24.0' 12.(Y IT 20.00 EAST DUE TO ENCROACHMENT ON WEST PROPERTY LIINE] 14.0' " 2 w 8$ 88 81.0' F E = 2 GRADE 20.0 20.00 EAST DUE TO ENCROACHMENT 12'0 ON WEST PROPERTY LIINE) 3$ 8S - w w m EXISTING GRADE 8 s AS -BUILT SPOT GRADES (FOR ROAD BASE) 14 W W MATCf, r 3 W GRADE PROPOSE6 LL TOP OF'BERM LLI a0� 8 & ❑W © MATCH EXIST, GRADE I, 1[�00p.00 20.00 3((00�.00 40.00 SOA0 80.00 x c� 8 8 ` E EXISTINGISTING IT 20.00 1I 20'V w " 2 w STA: 58 +00.00 (SEI 81.0' F E 140' 240' 120' (SEE SHEET C70.1 &C10.2) 31.0' -1- 14.0' -- - 24.0' r p J4TLV.VV 'komu I Ium r-r amm .omrm 1 V - a1.0• 14.9 24.0' 12.0' ro a n W W W W $ O B Fl I �7 T Y i t' TOP OF BERM f � i v 30, 20. o ' a a? a 10. v'sm 88 70.00 80.00 90.00 100.00 110.00 PROPOSED FILL x c� 8 8 ` E EXISTINGISTING IT 20.00 1I 20'V w " 2 w - "- X 34" = 1" = 10'H Aa�LL�i F E = w CL GRADE 20.0 20.00 EAST DUE TO ENCROACHMENT 12'0 ON WEST PROPERTY LIINE) 3$ 8S - F fl EXISTING GRADE 8 s AS -BUILT SPOT GRADES (FOR ROAD BASE) v' MATCf, EXISTING GRADE 3 W GRADE LL LLI a0� 8 & ❑W © I, PROPOSED " P-- • if3P OF BERM MATC4 EXISTING t MATCH EXIST. GRADE GRADE 0.00 D.00 PROPOSED DITCH B 30.00 40.00 50.00 60.00 70.00 80.00 90.00 1DO.00 110.00 O.OD 10 -00 20 "00 -- tI" - 1 a'o 1 III N m `� -�- �i ° �°n yl- AS -BUILT LIDAR a a zi ry10 ao A o ocl w , p PREGSTRUCTIOH a GRADES r p J4TLV.VV 'komu I Ium r-r amm .omrm 1 V - a1.0• 14.9 24.0' 12.0' ro a n W W W W $ O B Fl I �7 T Y i t' TOP OF BERM f � i v 30, 20. o ' a a? a 10. v'sm 88 70.00 80.00 90.00 100.00 110.00 PROPOSED FILL x c� co "': N um p h M O� o n r o 0 o ti[o 0 T =!-" tom.., E EXISTING IT 20.00 1I 20'V w " 2 w F -F SEE SHEET C4.90) X 34" = 1" = 10'H Aa�LL�i (SECTION F -F RELOCATED 18t w CL - 11 - �' V O EAST DUE TO ENCROACHMENT 12'0 ON WEST PROPERTY LIINE) 3$ 8S 20. F fl P+�oPasEo TOP OF BERM MATC H EXIST. GRADE 0.0 00.00 110.00 a � C. (4a o0 STA: 60 +00:00 SECTION F -F SEE SHEET 04.80 30.fM 30.00 - 3q. z a1.o' (SECTION F -F RELOCATED 181 - _ z z EAST DUE TO ENCROACHMENT ro 31.0' 14.0' 24.0' 12.9 v - ON WEST PROPERTY LIINE) o � 88 88 0 20.0 20.00 GRADE EXISTING . . 20.. ti L) 111 _. ; Q F I�w -- ...gWpW O J_ ..%..... L ... 10.01 Z 10.40 -- .(. - _ Y 10. L V J .•.•f,1ATC EXISTING f•� PROPOSED m GRADE TOP Or BERM MATCH EXIST. GRADE 0.00 0.00 PROPOSED DITCH BOTTOM 4.0 rr � 0.00 10.00 20.00 3090 40.00 50.00 60.00 7090 80.00 90.00 100.00 110.00 0 00 10.00 20.00 30.00 40.00 SOAG 80.00 70.00 80.00 90.00 100.00 110.00 _ V PROPOSED FILL •d o d ci �d Td ©.o wi� SCALE 11" 31.9 =!-" tom.., N EXISTING IT 20.00 1I 20'V w m w 22" X 34" = 1" = 10'H �w WATER (ELEVATIONS BELOW WATER SURFACE WHERE g I L�• w CL - 11 - �' V O �O� COLLECTED IN FIELD) z 10.06 fl EXISTING GRADE P+�oPasEo TOP OF BERM MATC H EXIST. GRADE 0.0 00.00 110.00 a � C. (4a o0 STA: 60 +00:00 SECTION F -F SEE SHEET 04.80 30.fM 30.00 - 3q. z a1.o' (SECTION F -F RELOCATED 181 - _ z z EAST DUE TO ENCROACHMENT ro 31.0' 14.0' 24.0' 12.9 v - ON WEST PROPERTY LIINE) o � 88 88 0 20.0 20.00 GRADE EXISTING . . 20.. ti L) 111 _. ; Q F I�w -- ...gWpW O J_ ..%..... L ... 10.01 Z 10.40 -- .(. - _ Y 10. L V J .•.•f,1ATC EXISTING f•� PROPOSED m GRADE TOP Or BERM MATCH EXIST. GRADE 0.00 0.00 PROPOSED DITCH BOTTOM 4.0 rr � 0.00 10.00 20.00 3090 40.00 50.00 60.00 7090 80.00 90.00 100.00 110.00 0 00 10.00 20.00 30.00 40.00 SOAG 80.00 70.00 80.00 90.00 100.00 110.00 _ V 14.9 as °, n° a0 c°%c�iln ml� T o n d ; O ryio N � a 1~ w o c l rsr9ii � i "' °r a 'v AS -BUILT LIDAR 17° l p° m 9m cv o � ECONSTRUCTION C4. C J N C4 C'i Cc^r i 1 6 0. cn GRADES STAN 54 +00.00 (SECTION F -F SEE SHEET C4.89) STA: 62 +00.00 (SECTION F -F SEE SHEET C4.90) d- U) J' (SECTION F -F RELOCATED 18± 30.0 36.00 - 81 9 (SECTION F -F RELOCATED 18t 30' in 0 EAST DUE TO ENCROACHMENT EAST DUE TO ENCROACHMENT 24.0' 12.0' ON WEST PROPERTY LIINE) 31.0 1d "0' 24.0 12.9 ON WEST PROPERTY LIINE) 8 2 8 2 EXISTING 8 8 8 8 co :a T 26.0 m 2D.DO - w 20. J n 1 11 11 r GRADE 1 I y W N W C WWl W N w ~ w w i w o v 1 a " 6 0 g Z O � Q 10.00---- a yy �... _ -. - ..,,- .......s.T 10. ¢ r %T� /�• _ LLI fPROPOSED - OP.p$ED 'C LL TOP OF1 ERM y TOP-OF BERM O MATC EXISTING MATCH EXIST, GRADE GRADE r MATCH EXIST. GRADE C H W 0.00 0.00 6.00 O.D. _� CJ 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110 "00 0.01) 10,00 20.00 30.00 4_0.00 50.0D 60.00 70.00 80.00 90.00 100.00 110..00 AS -BUILT LIDAR AS -BUILT LIDAR o,o N',,� � o � ul'1- ,n! ra ❑ ❑ r> ry ro a 4?q AIa pplo In c7 n r m m a n PRECONSTRUCTION PRECONSTRU I N r;oi T:ry Q�r1 'jpM l=la S,j ai ap;ai o ® c�i o n o p,° 1002 GRADES -.. _ .._ GRADES �' , PROJ. NQ.: IGN E - Q mAwN sr- RC �,� �1� pti 1 �� PROPOSED FILL •d o d ci �d Td ©.o wi� SCALE 11" 31.9 =!-" tom.., N EXISTING IT 20.00 1I 20'V V �I- 43�v1 m } F 22" 14.9 as °, n° a0 c°%c�iln ml� T o n d ; O ryio N � a 1~ w o c l rsr9ii � i "' °r a 'v AS -BUILT LIDAR 17° l p° m 9m cv o � ECONSTRUCTION C4. C J N C4 C'i Cc^r i 1 6 0. cn GRADES STAN 54 +00.00 (SECTION F -F SEE SHEET C4.89) STA: 62 +00.00 (SECTION F -F SEE SHEET C4.90) d- U) J' (SECTION F -F RELOCATED 18± 30.0 36.00 - 81 9 (SECTION F -F RELOCATED 18t 30' in 0 EAST DUE TO ENCROACHMENT EAST DUE TO ENCROACHMENT 24.0' 12.0' ON WEST PROPERTY LIINE) 31.0 1d "0' 24.0 12.9 ON WEST PROPERTY LIINE) 8 2 8 2 EXISTING 8 8 8 8 co :a T 26.0 m 2D.DO - w 20. J n 1 11 11 r GRADE 1 I y W N W C WWl W N w ~ w w i w o v 1 a " 6 0 g Z O � Q 10.00---- a yy �... _ -. - ..,,- .......s.T 10. ¢ r %T� /�• _ LLI fPROPOSED - OP.p$ED 'C LL TOP OF1 ERM y TOP-OF BERM O MATC EXISTING MATCH EXIST, GRADE GRADE r MATCH EXIST. GRADE C H W 0.00 0.00 6.00 O.D. _� CJ 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110 "00 0.01) 10,00 20.00 30.00 4_0.00 50.0D 60.00 70.00 80.00 90.00 100.00 110..00 AS -BUILT LIDAR AS -BUILT LIDAR o,o N',,� � o � ul'1- ,n! ra ❑ ❑ r> ry ro a 4?q AIa pplo In c7 n r m m a n PRECONSTRUCTION PRECONSTRU I N r;oi T:ry Q�r1 'jpM l=la S,j ai ap;ai o ® c�i o n o p,° 1002 GRADES -.. _ .._ GRADES �' , PROJ. NQ.: IGN E - Q mAwN sr- RC �,� �1� pti 1 �� PROPOSED FILL •d o d ci �d Td ©.o wi� SCALE 11" 31.9 �� ��� E�1 /f�l0 EXISTING IT 20.00 1I 20'V GRADE m } F 22" X 34" = 1" = 10'H �w WATER (ELEVATIONS BELOW WATER SURFACE WHERE g I L�• w CL - 11 - �' V O �O� COLLECTED IN FIELD) z 10.06 EXISTING GRADE 8 s AS -BUILT SPOT GRADES (FOR ROAD BASE) MATCf, EXISTING GRADE 14.9 as °, n° a0 c°%c�iln ml� T o n d ; O ryio N � a 1~ w o c l rsr9ii � i "' °r a 'v AS -BUILT LIDAR 17° l p° m 9m cv o � ECONSTRUCTION C4. C J N C4 C'i Cc^r i 1 6 0. cn GRADES STAN 54 +00.00 (SECTION F -F SEE SHEET C4.89) STA: 62 +00.00 (SECTION F -F SEE SHEET C4.90) d- U) J' (SECTION F -F RELOCATED 18± 30.0 36.00 - 81 9 (SECTION F -F RELOCATED 18t 30' in 0 EAST DUE TO ENCROACHMENT EAST DUE TO ENCROACHMENT 24.0' 12.0' ON WEST PROPERTY LIINE) 31.0 1d "0' 24.0 12.9 ON WEST PROPERTY LIINE) 8 2 8 2 EXISTING 8 8 8 8 co :a T 26.0 m 2D.DO - w 20. J n 1 11 11 r GRADE 1 I y W N W C WWl W N w ~ w w i w o v 1 a " 6 0 g Z O � Q 10.00---- a yy �... _ -. - ..,,- .......s.T 10. ¢ r %T� /�• _ LLI fPROPOSED - OP.p$ED 'C LL TOP OF1 ERM y TOP-OF BERM O MATC EXISTING MATCH EXIST, GRADE GRADE r MATCH EXIST. GRADE C H W 0.00 0.00 6.00 O.D. _� CJ 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110 "00 0.01) 10,00 20.00 30.00 4_0.00 50.0D 60.00 70.00 80.00 90.00 100.00 110..00 AS -BUILT LIDAR AS -BUILT LIDAR o,o N',,� � o � ul'1- ,n! ra ❑ ❑ r> ry ro a 4?q AIa pplo In c7 n r m m a n PRECONSTRUCTION PRECONSTRU I N r;oi T:ry Q�r1 'jpM l=la S,j ai ap;ai o ® c�i o n o p,° 1002 GRADES -.. _ .._ GRADES �' , PROJ. NQ.: IGN E - Q mAwN sr- RC �,� �1� pti 1 �� PROPOSED FILL •d o d ci �d Td ©.o wi� AL M NT - N RTH PL PROPOSED FILL �/���/f�,�/,� SCALE 11" X 17" = 1" - 201 H �� ��� E�1 /f�l0 PROPOSED CUT 1I 20'V "' ° "' " - -•• AS -BUILT = WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE g I L�• r - 11 - �' V PRE- CONSTRUCTCON COLLECTED IN FIELD) EXISTING GRADE 8 s AS -BUILT SPOT GRADES (FOR ROAD BASE) GATE: 01/16/14 SHEET: C5.4 I STA: 64 +0.0.00 (SECTION F -F SEE SHEET C4.90 ) STA: 72 +00.00 (SECTION F -F SEE SHEET 04.91 30. 30.00 30.[ (SECTION F- RELOCATED 181 (SECTION F -F RELOCATED 181 31.6' 14.0' 24.0' 12.0' EAST DUE TO ENCROACHMENT 31,01 14.9 24.0' 120' EAST DUE TO ENCROACHMENT e 89 8 8. ON WEST P OPERTY LIINE) 88 88 ON WEST PROPERTY LIINE) EXISTING w ry EXISTING, « w o 20.06 - GRADE �� • n n 20. m 20.00 GRADE n . . n �` Z0.0 "' in m - r l m g g 5 5 y uJZ - . {{ • . -- - . a Q a. .... . ...... .. z 0 0 J 0 10.60 16.• 14.60 14.0 ....,... _ - PROPOSED ...... •rF /� PROPOSED TOP QKBERM / TOP.OK SERM ` MATCH EXISTING MATC .EXISTING / GRADE MATCH EXIST. GRADE GRADE MATCH EXIST. GRADE �. 0.00 12 BOTTOM - 0.0 D. -TI 1 I ...., 0 I 4.0( '� " 8 PROPOSED DITCH OTT D.pp 16.00 26.00 34.00 44.40 56.00 60 00 70,40 84.40 94.06 100.00 110.00 4,44 10.06 20.04 30.04 40.06 50.00 60,0D 70.04 80.00 90,00 100.00 11_0.00 AS -BUILT LIDAR A!* NIm a)' v m prn 1n ciao calm cn•I, -�I,n AS -BUILT LIDAR r.!m a�lv, rn n, m e N m coa°�� c�lao rn!m 9- .n of r n Wp w [G�� o'er IP1 y N�o t+ ff�l bi ,I .I �. `- ^. `'ice <Dm C7'u3 N'n Q ��o ayl0 o:.m C4.0 T cpn PRECONSTRUCTION NI- a jl rn y ,� r r NI° oil 01 ;z w a of ary�ri cFilri o N u1 : an N w pplo o o N'[3 ri •� P o m° �S a GRADES i^ ri^ ,R, ,r�•- ,r.- t --� -�- _ GRADES g �, �° 30.0 2d�H ii 1�Ji2 F 20.0 10.0 7.60 S n m 1,1w zn rn an nn An rn 60 00 7000 80 Oa 9000 11000 1000 20 OQ 3d 06 4006 5600 80 OQ 7D 06 8006 9600 11000 AS -BUILT LIDAR PRECONSTRUCTION GRADES 30,00 1 0 0.00 100,40 AS -BUILT LIDAR PRECONSTRUCTION GRADES 0o 0D a a >�N m r. a Wo m vi t1ryry � mN�� e+4� as cv o Ob 17 Q} n o 0 M IE)"I r °m tv o; ap e; cio `d Flo ci STA: 66 +00.00 (SECTION F -F SEE SHEET C4.._ 110.00 30,00- (SECTION F -P RELOCATED 18t 81.0' 12.0' - 30. 30.00 99 g g ON WEST PROPERTY LIINE) (SECTION F -F RELOCATED 17t ^� c cv 31.0' 14.0" 24.0' 12.0' EAST DUE TO ENCROACHMENT ON 4i7 Nm g g g g ON WEST PROPERTY LIINE) PROPOSED TOP -OF BERM m 20.00 EXISTING 20. m 20.04 J GRADE _ �� . m r EXISTING C ww w� �� m S W W .............. -• ' • . , �' yJ W W A 1 9 0 a .,,. . �. WATER (ELEVATIONS BELOW WATER SURFACE WHERE r _ 11 - �1 U .. PRE-CONSTRUCTION COLLECTED IN FIELD) - re r EXISTING GRADE F .. ........... - - -- "•�. ,.,...�..--- ---- z 10.00 y MATCH ISTING TOP. OF BERM ; 10! 10,00 7 0.00 10.6 GRADE MATCH EXIST. i ..... ........:.... P - P - IT - H TT GRADE 0.0 0.00 30.0 2d�H ii 1�Ji2 F 20.0 10.0 7.60 S n m 1,1w zn rn an nn An rn 60 00 7000 80 Oa 9000 11000 1000 20 OQ 3d 06 4006 5600 80 OQ 7D 06 8006 9600 11000 AS -BUILT LIDAR PRECONSTRUCTION GRADES 30,00 1 0 0.00 100,40 AS -BUILT LIDAR PRECONSTRUCTION GRADES 0o 0D a a >�N m r. a Wo m vi t1ryry � mN�� e+4� as cv o Ob 17 Q} n o 0 M IE)"I r °m tv o; ap e; cio `d Flo ci �c v STA: 68 +00.0 81 D' (SECTION F -F SEE SHEET C4.91 STA: 76 +00.00 (SECTION F -F SEE SHEET C4.91) 30. 34.00 - 81.0' 30.0 (SECTION F- RELOCATED 171 (SECTION F- RELOCATED 171 ? 31.0' 14.0' 24.0' 12.0' EAST DUET ENCROACHMENT 31 A' 14.0' 24.0' 120' EAST DUET ENCROACHMENT g g $ g ON WEST PROPERTY LIINE) g g 8 g ON WEST PROPERTY LIINE) v z EXISTING O R1 20.00 � GRADE m..a 20. r 20.60 n . �` 20X0 in O rrl H 00 7 < , U _ WZ _ aw a EXISTING W� GRADE aW 4'0U x rl O O� i /�� -- _ O O�% 8g gg O 2 1Q.Q4 Di _. ,Yf -. ar�.,> ...> _. 1Q.i Z 10.00 es - -- `.� �' `' -- - 10.0 V! RM j� _ j' �� PROPOSED •.... - - IIATCN %XISTING H XISTING 7OP.0E6ERM GRADE i./ GRADE MATCH EXIST. GRADE MATGH EXI57. GRADE " °••• PROPOSED DITCH 60TTOM Q.QO L!� - 0.0 6X46 0.60 L 4•D4 10.00 20.00 30.00 40.00 50.00 6000 70.00 80.00 90.00 100.00 110.00 0,00 1060 20.00 30.040.00 50.00 60.00 70.00 80.00 9D,00 1D0.00 110.00 AS -BUILT LIDAR k')I c7 E- col m �Im h_ o�oim co, r m1- oim AS -BUILT LIDAR v o u m wl0 d �,o c a m r M r w N rn opl cTi- tia rn _ �v cm" n tilm ci Na a, m_ �Im rpm roa Ro N� 4m mN r�s PRECUNSTRUCTION o pj ry AIM �' N r1- c4lr c6 - ti�� �i� r�r 00 PRECONSTRUCTION r�: ry cn ri ®lo � 1aj M Lo Aj 0 0 o r O r o p oa LIJ GRADES r I I I � I� GRADES � � � � (ri � 36.60 M 20.00 r- m n Q Z 10 -00 0.00 - - - -- 31,0' EXISTING } GRADE W W MATCH XISTING GRADE P PO D DITCH TT r pM, f VTVV.VV kaou 11ll IY r-r .JLL ammim1 1: 4..M. II - 81.6 60.00 70.00 80.00 90.00 100.00 110.00 AS -BUILT LIDAR (SECTION F -P RELOCATED 18t 14.6' 24,0' 12.0' - EAST DUE TO ENCROACHMENT 99 g g ON WEST PROPERTY LIINE) eilo r+i ^� c cv N W MN [+7N ON 4i7 Nm C4 ai PROPOSED TOP -OF BERM v rid pO (SECTION F -F SEE SHEET C4.91 STA: 76 +00.00 (SECTION F -F SEE SHEET C4.91) 30. 34.00 - 81.0' 30.0 (SECTION F- RELOCATED 171 (SECTION F- RELOCATED 171 ? 31.0' 14.0' 24.0' 12.0' EAST DUET ENCROACHMENT 31 A' 14.0' 24.0' 120' EAST DUET ENCROACHMENT g g $ g ON WEST PROPERTY LIINE) g g 8 g ON WEST PROPERTY LIINE) v z EXISTING O R1 20.00 � GRADE m..a 20. r 20.60 n . �` 20X0 in O rrl H 00 7 < , U _ WZ _ aw a EXISTING W� GRADE aW 4'0U x rl O O� i /�� -- _ O O�% 8g gg O 2 1Q.Q4 Di _. ,Yf -. ar�.,> ...> _. 1Q.i Z 10.00 es - -- `.� �' `' -- - 10.0 V! RM j� _ j' �� PROPOSED •.... - - IIATCN %XISTING H XISTING 7OP.0E6ERM GRADE i./ GRADE MATCH EXIST. GRADE MATGH EXI57. GRADE " °••• PROPOSED DITCH 60TTOM Q.QO L!� - 0.0 6X46 0.60 L 4•D4 10.00 20.00 30.00 40.00 50.00 6000 70.00 80.00 90.00 100.00 110.00 0,00 1060 20.00 30.040.00 50.00 60.00 70.00 80.00 9D,00 1D0.00 110.00 AS -BUILT LIDAR k')I c7 E- col m �Im h_ o�oim co, r m1- oim AS -BUILT LIDAR v o u m wl0 d �,o c a m r M r w N rn opl cTi- tia rn _ �v cm" n tilm ci Na a, m_ �Im rpm roa Ro N� 4m mN r�s PRECUNSTRUCTION o pj ry AIM �' N r1- c4lr c6 - ti�� �i� r�r 00 PRECONSTRUCTION r�: ry cn ri ®lo � 1aj M Lo Aj 0 0 o r O r o p oa LIJ GRADES r I I I � I� GRADES � � � � (ri � 36.60 M 20.00 r- m n Q Z 10 -00 0.00 - - - -- 31,0' EXISTING } GRADE W W MATCH XISTING GRADE P PO D DITCH TT r pM, f VTVV.VV kaou 11ll IY r-r .JLL ammim1 1: 4..M. II - 81.6 60.00 70.00 80.00 90.00 100.00 110.00 AS -BUILT LIDAR (SECTION F -P RELOCATED 18t 14.6' 24,0' 12.0' - EAST DUE TO ENCROACHMENT 99 g g ON WEST PROPERTY LIINE) eilo r+i ^� c cv N W -- y w -- - -` - - GRADES g ON WEST PROPERTY W PROPOSED TOP -OF BERM MATCH EXIST. GRADE STA: 78 +00.00 (SECTION F -F SEE SHEET 04.91) 30. 30.00 30.0 20. 10.1 0.0 0.00 1 D.DO 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 AS -BUILT LIDAR �� rn n rri r� rn wm Np1Ir m o'er �i^ aim m'a v,q o N'o AS -E v PMONSTRU. eilo r+i ^� c cv vlcn �c< N• a; c� ciF ri� eV r o c GRADES g ON WEST PROPERTY LIINE) m 20.00 r J ALIGNMENT = NORTH PL - EXISTING C SCALE 11" X 17" = 1" - 201 H �� PROPOSED FILL V Z7 PROPOSED CUT 3 1� = 241 V -• ' • . , AS -BUILT = WATER SURFACE 22" X 34" = 1 10' H �- PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r _ 11 - �1 U PRE-CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE 1f)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) �Id r cflm m1O N a6 rn I�Id 1� M u] W �Iw l0 V c*ro �� rl AS- B U I LTS GATE: 01/16114 SHEET: C5,5 81.0 (SECTION F -F RELOCATED 17t 0 31.0' 14.0' 24.0' 12.0' EAST DUE TO ENCROACHMENT -0 0 99 g g ON WEST PROPERTY LIINE) m 20.00 r J } - EXISTING C F W GRADE w N 7 m w LL w W aZ....... �- • •' S ,.. 8 \ 0 O ; 7- 10..00 10.6 1 1 . . d ,•_ •r ^° .. Y ; ~ .=s - !. / PROPOSED MATCH XISTING TOP OF BERM '�O GRADE f -. MATCH E ST. GRADE _ 1 PROPOSED DITCH BOTTOM - -- • -•••° •' _ W 0 .00 0.00 0.00 10.00 20.00 3d.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 q rn f LIDAR Tr �- �- �- - U ]ES PROJ_ NO.: 1002 mAWNsr -- RC. �Id r cflm m1O N a6 rn I�Id 1� M u] W �Iw l0 V c*ro �� rl AS- B U I LTS GATE: 01/16114 SHEET: C5,5 30.00 m 2000 . 12.4^ 90.00 - r EXISTING ° $ C �Z GRADE n a w r n r'$ CL ........: O O y z 1040 a O MATCH EXIST. GRADE O aj GRADES MATCH XISTING f mid, GRADE 0_0D :_, d m g I PROPOSE 20.0d 30..01) 0.00 tfl:r AS -BUILT LIDAR v 80.00 90.00 140,00 110.00 Rio kwONSTRVCTION �IW 30.00 r 20.00 m 's 10.00 S i 7 S 0.00 AS -BUILT LIDAR ? PRECONSTRUCTION GRADES i 30.00 m 20.00 r m C a 0 Z 70.(10 0.00 AS -BUILT LIDAR PRECONSTRUCT16N GRADES 30.00 _-._.._a ------ MATCH EXISTING GRADE h STA: 80 +00.00 (SECTION F -F SEE SHEET 04.92) 30.0 30.40 8L0' (SECTION F -F RELOCATED 18t .0^ 24.0' 12.0' EAST DUE TO ENCROACHMENT $ $ ON WEST PROPERTY LIINE) EXISTING 20.0 m 20.00 m GRADE r n } {- m - y ffUj ow ow a1 ss o C) 10.0 Z 10.0 CL r PROPOSED" E MATCH ISTING J STA: 88 +00_00 81 -0" 37.0' 14.0' F -F SEE SHEET C4.92) 24.0' 12.4^ 90.00 30.1 EXISTING ° $ $ o GRADE n 7 m °° i r n r'$ Ir0 ........: 10.[ 4 y LL W O MATCH EXIST. GRADE O aj GRADES PROPOSER 30,[ N 20.(� a�a C a 10.c - 60.00 70.00 80.00 90.00 30.1 TOP QF- - 70.00 80.00 20.( �E- 50.00 GRADE h i r 6r'v Gild cnlh ° TOP OF BERM. r'$ Ir0 ........: 10.[ u5 co' 12 H BOTTOM .h 1v D n Q rI7r d 4(1 n ° GI ........... ,.• °' MATCH EXIST. GRADE 0.00 0.40 aj GRADES , r. ao PROPOSED DITCH BOTTOM f mid, MATCH EXIST. GRADE 0.0( :_, d m g 0.00 0.00 20.0d 30..01) 40.00 50.00 60.0d 70.00 80.00 90.00 140,00 110.00 0.00 10.00 2000 30.00 40 :00 50.00 60.00 70.00 04:00 90.00 100.00 110.00 '� 8 Z i i,N cPN �N 'N'° tilao apn tV'� n; o ra.m r� o< AS -BUILT LIDAR 40�o N u [] %` PRECONSTRUCTION:� EXISTING _ `� . 7 n� 2Q.0 in v °Y aii� �;O r,v oy:o GRADE w w w cG:� NIA ;° of ruT �I� r� G4 aim GD T O v W � u GRADES Qi STA: 82 +00.00 {SECTION F -F SEE SHEET 04.92) 30,0 30.00 81.0' (SECTION F -F RELOCATED 181 31'(7 -I- 14.0' 24.0' 12.0' EAST DUE TO ENCROACHMENT 8 g 8 S ON WEST PROPERTY LIINE) - EXISTING 24.4 m 2000 . " GRADE r wW w� m w w w � E .--- _�..........:_.......,- 1d.0 1000 3 , - PROPOSED TOP OFVERM MATCH EXIST. GRADE �.... 0.00 0.00 ]0 40 -00 50.00 60.00 70.00 80.00 90.00 30.1 0,00 10.00 20.00 30.00 4_0.00 50.00 60.00 70.00 80.00 20.( �E- 50.00 60.00 h i r 6r'v Gild cnlh ° cn,m o;n -T ° ff1iQ C] �•'] O o r'$ Ir0 ........: 10.[ u5 co' 12 r, Si v� IN r. n ' o °rn o G a o n Nlr w .h 1v D n Q rI7r d 4(1 n ° GI Li 24.4' ]0 40 -00 50.00 60.00 70.00 80.00 90.00 1Q0 -00 110.00 0,00 10.00 20.00 30.00 4_0.00 50.00 60.00 70.00 80.00 90.00 100.00 110.01) 50.00 60.00 h i r 6r'v Gild cnlh ° cn,m o;n -T ° ff1iQ C] �•'] O o r'$ y w AS -BUILT LIDAR ao rn� I C3N"S I ........: "7 n �" �y , a pIN �I� a! 4O R mp N ;p W O „d�6i u5 co' 12 r, Si v� IN r. n ' o °rn o G a o n Nlr w .h 1v D n Q rI7r d 4(1 n ° GI Li 24.4' min � ggao 6Ti:d TI° aj GRADES , r. ao 4.o ti r iti = Gj P r mid, 6� m �p m 31.0' 14.0' 0.00 0.00 _ PROJ. NO.: 1002 $ STA: 84 +00.00 (SECTION F -F SEE SHEET 04.92) STA: 92 +00.00 (SECTION F -F SEE SHEET 04.92) Z SLO' 31.0' 14.0' 24.0' 11v --------- _____ __________r_________ -- - - EXISTIN ro r - IE ` GRADE :X LLI ___ , J ----------- L w w w LLO S o v - -- -r - - -- - - - -- - - -- PROPOSED MATCH PROP %ISTING - GRADE TOP OF GERM • �f ��%' ✓' MATCH EXIST. GRAPE PROPOSED DITCH BOTTOM 10.00 20.00 30.00 o Q id c6 : m z,q _:o N 31.0' 1m1 20.W 70.00 80.00 80.0�1gp -00 1).00 110.00 c1i ar AS -BUILT LIDAR m 20 -00 J_cal u 50.00 60.00 70.00 SO.OD C1 Z 10.00 - 100.00 ........: _,� - - MATCH [XISTING GRADE 0.00 . '-°- 10.00 AS -BUILT LIDAR 0410 PRECONSTRUCTION u.0 �u.uu 70.00 80.00 80.0�1gp -00 1).00 110.00 c1i ar AS -BUILT LIDAR 0.04 10.00 20 -00 30 -00 40.00 50.00 60.00 70.00 SO.OD 90.00 100.00 D. W 110.00 �� n W � cry L r, Si v� IN r. n ' o °rn o G a o n Nlr w .h 1v D n Q rI7r d 4(1 n ° GI NiN t®v tn1� Io ti qla 24.4' 12.0' v w iac , r. ao v.a n � P � 31.0' 14.0' 0.00 0.00 _ PROJ. NO.: 1002 $ S g 8 Z 20.0 m 20.00 mA:WN sr- RC EXISTING T m . 7 2Q.0 in v D O r m GRADE w w w F O W � u m uyw Qi a 9_j ss ss LL 10.0 Z 10.00 .. .,.,::� _ W __ -. PROPOSED 10.0 � r^. TOP OF BERM Z MATCH EXISTING . GRADE MATCH EXIST, GRADE 0 000 4_0.01) 50.OD 60.00 70.00 80.00 80.0�1gp -00 1).00 110.00 c1i ar AS -BUILT LIDAR 0.04 10.00 20 -00 30 -00 40.00 50.00 60.00 70.00 SO.OD 90.00 100.00 D. W 110.00 �� n W � cry L r, Si v� IN r. n ' o °rn o G a o n Nlr w .h 1v D n Q rI7r d 4(1 n ° GI NiN t®v tn1� Io ti qla o di c � N v w iac , r. ao v.a n gp�. o7 P � N � ,> PROPOSED TOP OF BERM MATCH EXIST. GRADE 0.00 0.00 _ PROJ. NO.: 1002 mA:WN sr- RC _81- 14.0' 2000 . 3000 40 C4 M N' ° 4oQ• N ° N° e• STA: 86+00.06 (SECTION F -F SEE SHEET C4.92) 30.0 0' AS -BUILT LIDAR PRECONSTRUCTION GRADES 24.0' 12.0' 0.00 10.00 20.04 30.00 40.00 50.00 60.00 g $ 90.00 140.00 110.00 EXISTING ° 20.0 20.00 r11 a1,° I GRADE 11 rn r, Si v� IN r. n ' o °rn o G a o n Nlr w wa m r•'N �. q at7.� o w ''� tli ai r m �I o w a"� Ole- N t a� N� n M o' e3i W t� tw g �3 _ ,> PROPOSED TOP OF BERM MATCH EXIST. GRADE 0.00 0.00 _ 0 [L U) o co �0 4 Qx w 7 LL 2 0 w ] 50.00 80.00 70.00 80.00 90.00 1Q0-99 110.00 n n r4� �n I m ar rn AS -BUILT LIDAR PRECONSTRUCTION GRADES /i PROPOSED CUT 0.00 10.00 20.04 30.00 40.00 50.00 60.00 70.00 80.00 90.00 140.00 110.00 O IZ N v - yp;° r11 a1,° I to r v1 n •O ° �;oi � � � � COLLECTED IN FIELD) r, Si v� IN r. n ' o °rn o G a o n Nlr w a�'n n 1) o 6 P r•'N �. q at7.� o w ''� tli ai r m �I o w a"� Ole- N t a� N� n M o' e3i W _ _ PROJ. NO.: 1002 mA:WN sr- RC ALIGNMENT = NORTH PL SCALE 11" X 17" = 1" - 20' H ���_ PROPOSED FILL /i PROPOSED CUT 3 1 " =20'V AS-BUILT = WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS r - 1' r - �' V PRE - CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) DATE: 01/16114 SHEET: 05,6 30.00 E M 2D.00 m O 2 1D,00 0.00 AS -BUILT LIDAR NSTRUCTION GRADES 30.00 m 20:00 m 's Q 10.00 S d i 7 S 0.00 AS -BUILT LIDAR R TION GRADES i 3D.DO m 2D.00 m a z 1D.DOi 0.90 AS -BUILT LIDAR GRADES 30-001 tom, I iviv r -r or-c or 81.0' 31.0' 14.0' 24-' 12.0' D! EXISTING 111 GRADE LL p J $ $ g o w MATCH EXISTING PROPOSED GRADE TOP OFSERM PBQPO�gD;2IjQH BOTTOM w k4 LL w o W.., is � �- �� -�`� •_��.�� MATCH EXIST GRADE 30.( 30 -00 20.1 m 20.00 C 0 10.( 10.00 0.01 O.OD a I n: , vvrvv -w (O CI. I KAY 1--r OLL OCILL I 1.4.`)3 2000 . 30.00 61.0• 60.00 70.00 80.00 90_.00 100,00 11.0.00 24.0' 12.0' GRADE 10.00 CO OD 31.0' 14.0• ra EXISTING na n Ian m rn no - ra AS -BUILT LIDAR .r} Nio co! RO aA Qa: �[+ rn N N cm � A of r➢'a Ub �'": NIA aD,rn ao 7 C! Go rV ws 011 u] r N v N1 si ti[o L,,IIg w alai ap{oa o ¢a G',ro of ai m 0 of � S WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS f f 1 I GRADE -°- i n 'r .. - °,..•.- .�.• --� -` EXISTING GRADE - I GRADES w w, w 0.2 .. ❑ .mot. LLu�l �w Q J S $ g O 6 MATCH ISTING GRADE - PROPi}.SED _Dd.Q8 BOTTOM- MATCH EXISTING PROPOSED ' TOP OF BERM MATCH EXIST. GRADE ..... 0.00 10.00 2000 . 30.00 4000 5000 60.00 70.00 80.00 90_.00 100,00 11.0.00 10.00 GRADE 10.00 CO OD 20.00 30.00 'a M QD' cq R h+i� N 40.00 In I+ ra 5000 0.00 "° N co r r�-- na n Ian m rn no - ra AS -BUILT LIDAR .r} Nio co! RO aA Qa: �[+ rn N N cm � A of r➢'a Ub �'": NIA aD,rn ao 7 C! Go rV ws 011 u] r N v N1 si ti[o L,,IIg w alai ap{oa o ¢a G',ro of ai m 0 of � D WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS f f 1 I _ I 'r .. - °,..•.- .�.• --� -` EXISTING GRADE - I GRADES GRADE .. ❑ .mot. _ TOP OF BERM 4 _ _ ° . 1a.i 10.04 r W MATCH EXISTING PROPOSED PROPOSED _ MATCH '� 1L_ MATCH EXIST. GRADE OF BERM STA: 98+00,OD (SECTION F -F SEE SHEET 04,93) ROCK ROAD ... a 0.00 PR P SEE7 DITCH B a.v[ 40.00 50.00 60.00 70.DO 80.00 STA: ip6+00.0p SE( CTION 04 Lq r -. 1w O7 M 81.0' �?�ul 0,00 mI �% cMn t 30.( 30.00 FUTURE 16.0' 20 00 30.DO 40.00 50.00 60.00 70.00 80.00 90.09 100.00 110.49 -30.00 -20.00 -10.00 AS -BUILT LIDAR N AS -BUILT LIDAR VR I� rota cv r o r r'Im arE�i IiIPe G`7i.m o �a m c� N m n CVI 'at^ gal as. ai rn a'i, - rn�a NIA ail (SECTIO G -G RELOCATED 21 EAST DUE TO ENC ro a cv o 00,E 31.0' 1002 14.0' 24.0' 12.0' ._. - GRADES 26.0' 14.0' - EXISTING 20 .1 20.00 2.0' $ - - } GRADE ' . r m a �n °` � U Z `3 a Lw Z �w LLw ">' 4 w 1'1 O 9 4 d ..::_. -. MATCH .. .... _•_�'- EXISTING .... .// R p. �- 7 PROPOSED - - -- - -- •... �` ._. .. ............ ,..._..__.._._....._........... _ 1 a.[ 10-. - 4 GRADE � TOP OF BERM "'�- MATCH EXISTING PROPOSED °`- MATCH EXIST. GRADE GRADE ROCK ROAD PE-OPMD1 IT H 0.01 0 -00 AS -BUILT LIDAR ECONSIKULAWN -30.00 P ❑ (FUTURE) PROPOSED IT H -20.DO -10.00 0 -00 10.00 �r1' a sorrom 20.00 30.00 - NI 0.00 10.00 20.00 30.49 40.DD 50.D0 60.00 70.00 8000 90.00 100.00 110.40 I oo.�y �•°,w cqj' q co: -t N -:,o oAR .: - m an v Nj m N d NEr? IL?I'a N10? Wl. o? EN N ns �+ E G Glad m G.6 r'n rril u] mtn �[ a; of 0,- f_:j.o np;ao 4w 07:m ole, c4 a ii i I [ 1 i GRADES 31.0° EXISTING uJ W GRADE OZ CL MATCH I EXIST] NG GRADE 212w 10-0 47: W Q -n! 20 Io- n C. N C vWi p r z° as a O v'sm 8� lu.uu d1J.uv 'JD.yI V 109 00 11u.uu +� ISj b No rIN Ol R +} 9f p rn G -G SEE SHEET C4.94) 2 E E u '6.0• 30.E Aal€�I��i ROACHMENT ON WEST PROP RTY LINE) 24.0' 12.0' EXISTING U F - S � 20. GRADE � °- �r �� a ❑W IL 0,�� /..... 10.4 c� :7'� PROPOSED '3� TOP OF BERM MATCH EXIST. GRADE O.0. _40.DO 50.00 6y�0�y.00 70.00 80.DO -O'er Q't MIS 6ii°' Oi {a' O on STA: 14(3+00.00 (SECTION F -F SEE SHEET C4.93 ) STA: 108 +00.00 (SECTION G-G SEE SHEET 04.98) 81.0' 30.4 39.DV 16.0' 78,0' 30.( (SECTIO G -G RELOCATED 2t EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) ? z 14.0° 24 -9 12.0' 28.0' 14.0' 2410' 12.0' � r` M } r Z $ J11. 2.o EXISTING _ 20.1 Fr 29.90 • $ GRADE 2 S 19 R 2v.( � � 0 N' �y C w? w QZ F E � O 8 $ 8 10 0 w $ S g 8 ° s •.,-. ................:,..,- ...�.:..,.T.,...._..,_._.. -... 10.( 10.00 _,... ....... Q ./� PROPOSED _ ...... PROPOSED PROPOSED m Z 1 .[ TOP OF BERM MATCH EXISTING PROPOSED � TOR OF BERM ... MATCH MATCH EXIST. GRADE ROCK ROAD 'f ".'� �� t EXIST. GRADE FUTURE GRADE lH BOTTOM D.01 9.00 0.0( L 20 -0 30.00 4000 50.00 60.00 70.00 80.00 90.00 100.00 110.00 30.00 20.00 - 10.00 0,00 10 -00 20 -00 30.00 40.00 50 -00 60.00 7D.00 50.00 _ ch r Cl to - r-: a �!w M m a) �- (m r*e.� AS -BUILT LIDAR �.- o m u) o;� so 0 11 LO N.o ID m � of n Q!, uz apl +7 t6 P �0 a% `- ,P N. �] N v N N ° ,r1 w O O 47; of °t rn ,f1 n (p R r Oi ,- in h �W/1� �P� !� c G_ T`l �� Ta T GRADES A.r r0, 01.w gplr R cj ry -.m np.0 Ci ui Fjm pfiw i VJ STA: 102+00.00 (SECTION F -F SEE SHEET 04.93) _ STA: 110+04.00 (SECTION G-G SEE SHEET 04.98) 18:0' 76.0' - 30.1 (SECTIO G -G RELOCATED 2t EAST UE TO ENCROACHMENT ON WEST PROP RTY L[NE) N Q 14.0' 24.0' - 12 -' I 26-(Y 14.0' 24 -' 12..0' � N I 2.0- EXISTING g Lr 1L 20.1 m 20.00 - _- 20.1 �w ww LL w Qo ❑ W ❑ rn ii 1W J z o w 8.5' 10..00 .:.- -..... -. -- --_ 31.0' m 20 -00 ._ - EXISTING m 10.00 GRADE "S 0 Lu WATER SURFACE w r) j D WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS r 1 �r 20 Io- n C. N C vWi p r z° as a O v'sm 8� lu.uu d1J.uv 'JD.yI V 109 00 11u.uu +� ISj b No rIN Ol R +} 9f p rn G -G SEE SHEET C4.94) 2 E E u '6.0• 30.E Aal€�I��i ROACHMENT ON WEST PROP RTY LINE) 24.0' 12.0' EXISTING U F - S � 20. GRADE � °- �r �� a ❑W IL 0,�� /..... 10.4 c� :7'� PROPOSED '3� TOP OF BERM MATCH EXIST. GRADE O.0. _40.DO 50.00 6y�0�y.00 70.00 80.DO -O'er Q't MIS 6ii°' Oi {a' O on STA: 14(3+00.00 (SECTION F -F SEE SHEET C4.93 ) STA: 108 +00.00 (SECTION G-G SEE SHEET 04.98) 81.0' 30.4 39.DV 16.0' 78,0' 30.( (SECTIO G -G RELOCATED 2t EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) ? z 14.0° 24 -9 12.0' 28.0' 14.0' 2410' 12.0' � r` M } r Z $ J11. 2.o EXISTING _ 20.1 Fr 29.90 • $ GRADE 2 S 19 R 2v.( � � 0 N' �y C w? w QZ F E � O 8 $ 8 10 0 w $ S g 8 ° s •.,-. ................:,..,- ...�.:..,.T.,...._..,_._.. -... 10.( 10.00 _,... ....... Q ./� PROPOSED _ ...... PROPOSED PROPOSED m Z 1 .[ TOP OF BERM MATCH EXISTING PROPOSED � TOR OF BERM ... MATCH MATCH EXIST. GRADE ROCK ROAD 'f ".'� �� t EXIST. GRADE FUTURE GRADE lH BOTTOM D.01 9.00 0.0( L 20 -0 30.00 4000 50.00 60.00 70.00 80.00 90.00 100.00 110.00 30.00 20.00 - 10.00 0,00 10 -00 20 -00 30.00 40.00 50 -00 60.00 7D.00 50.00 _ ch r Cl to - r-: a �!w M m a) �- (m r*e.� AS -BUILT LIDAR �.- o m u) o;� so 0 11 LO N.o ID m � of n Q!, uz apl +7 t6 P �0 a% `- ,P N. �] N v N N ° ,r1 w O O 47; of °t rn ,f1 n (p R r Oi ,- in h �W/1� �P� !� c G_ T`l �� Ta T GRADES A.r r0, 01.w gplr R cj ry -.m np.0 Ci ui Fjm pfiw i VJ STA: 102+00.00 (SECTION F -F SEE SHEET 04.93) _ STA: 110+04.00 (SECTION G-G SEE SHEET 04.98) 18:0' 76.0' - 30.1 (SECTIO G -G RELOCATED 2t EAST UE TO ENCROACHMENT ON WEST PROP RTY L[NE) N Q 14.0' 24.0' - 12 -' I 26-(Y 14.0' 24 -' 12..0' � N I 2.0- EXISTING g Lr 1L 20.1 m 20.00 - _- 20.1 �w ww LL w Qo ❑ W ❑ rn ii 1W J z o w 8.5' 10..00 .:.- -..... -. - ....... ._ ' -- _. _ ...,.... 10.( 10.00 ... _ "S MATCH EXISTING ��f = WATER SURFACE 22" X 34f1 = 1" = 10'H j PROPOSED WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS r 1 �r PRE- CONSTRUCTION COLLECTED IN FIELD) .. - °,..•.- .�.• --� -` EXISTING GRADE - n GRADE .. ❑ .mot. _ TOP OF BERM 4 _ _ ° . 1a.i 10.04 r W MATCH EXISTING PROPOSED PROPOSED _ MATCH '� 1L_ MATCH EXIST. GRADE OF BERM GRADE EXIST. GRADE ROCK ROAD ... a 0.00 PR P SEE7 DITCH B a.v[ 40.00 50.00 60.00 70.DO 80.00 _30.00 a� 04 Lq r -. 1w O7 M MIM �?�ul 0,00 mI �% cMn t FUTURE 0.00 10.00 20 00 30.DO 40.00 50.00 60.00 70.00 80.00 90.09 100.00 110.49 -30.00 -20.00 -10.00 AS -BUILT LIDAR N AS -BUILT LIDAR VR I� rota cv r o r r'Im arE�i IiIPe G`7i.m o �a m c� N m n CVI 'at^ gal as. ai rn a'i, - rn�a NIA ail cs m In a6 ro a cv o 00,E GRADES 1002 _ 1 _! ._. - GRADES RC DITCH BOTTOM 10,00 20.00 ALIGNMENT = NORTH PL J SCALE 11" X 7" = 1" = 20'H PROPOSED FILL /� , ff PROPOSED CUT 3 1" _ 20r AS -BUILT = WATER SURFACE 22" X 34f1 = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE AS-BUILTS r 1 �r PRE- CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE (ED,, AS- BUILT SPOT GRADES (FOR ROAD BASE) DITCH BOTTOM 10,00 20.00 DATE: 01/16114 SHEET: � C5, f j J �. W W dS vwi LL W cwn W �D0 L .. ❑ .mot. _ o 4 _ _ ° . 1a.i o r W PROPOSED MATCH '� 1L_ •' TOP OF BERM EXIST. GRADE _ n O � W CL a.v[ 40.00 50.00 60.00 70.DO 80.00 _30.00 a� 04 Lq r -. 1w O7 M MIM �?�ul mI �% cMn t ni N:;ed ao cd ff+la� rla7 ml PROJ- NO.: 1002 Di1AWN ar-- RC DATE: 01/16114 SHEET: � C5, f j 3D.D0 m 20.00 IrTi a 0 1 D.00 16.0' (SI STA: 112 +00.00 (SECTION G-G SEE SHEET C4.98) 76.0' G -G RELOCATED 2t EAST QUE TO ENCROACHMENT ON WEST PROPERTY LINE) 26A' 14.0' -1 24.0' 12.0" - 30.0 30.00 STA: 120 +00.00 (SECTION G -G SEE SHEET C4.102) 16.0' 76.(Y - - - - 30.( (SECTIOI G -G RELOCATED 21 EAST UE TO ENCROACHMENT 4N WEST PROP RTY LINE) G 26.0' 14.0' 24.0' 12.0' 2.0` EXISTING 20 :( � 8 " $ ° �. ° r u 8 GRAD€ �. A o (D d 2' d `� w a 4A w fl N W W f fl J a T q. pp pp 1 W O 0 W O m x�jl G G -$.a1 ... .;.. - rr ,.. a -- MATCH EXISTING PROPOSED T / f PROPOSED MATCH - �' - " PRQP6S_D ^� STOP OF GERM MATCH GRADE { MATCH EXISTING OF BERM EXIST. _ RACK ROAD GRADE GRADE ROCK RO.�D EXIST. (FUTURE 1 POSED DITCH BOTTOM FUTURE] OPQSED DITCH BOTTOM GRADE 0.00 -30.00 -20.00 - -10.00 0.00 10.00 20 -00 30.00 40 -00 50.00 60 -00 70 -00 0.00 0.00 80 -00 -30.00 -20.00 -10.00 AS -BUILT LIDAR on rnm o `ts0-t, LL € w `.�- y•....�T, PROPOSED 14.9 MATCH EXISTING ROCK ROAD E. GRADE AS -BUILT LIDAR 0.00 � qAln � -24.W -10.00 p, ,�,Ia csi w u] n CA:W chl� P ® V LL coin (g3�1n n GRADES ppi m '6 m �� ��� PROPOSED FILL 1"4.6 i 4! 6i i N :cn Niai Q6 a� M m O_m PRECONSTR m m GRADES = 1" = 10' H 1': 0 _� WATER (ELEVATIONS BELOW WATER SURFACE WHERE r 1" - 0' -- - - - - -- PRE- CONSTRUCTION q8 n q W EXISTING GRADE �R (ff \ I I 3D STA: 114 +00.00 (SECTION G-G SEE SHEET C4.98) 3D p 30,00 16 (SECTIO, G -G RELOCATED 2t EAST I UE TO ENCROACHMENT ON WEST PROP RTY LINE) 26.0' ICY 24.0' 12.0' m 20.x0 2 -0' _ EXISTING ro mg X LL -° c C LU Z IL O--- p_______. � fl 10,00 Id § MATCH EXISTING 'POSED GRADE ROCK ROAD TOP OF BERM {FUTURE] ROPOSED DITCH BOTTOM 0.00 S -30.00 -20.00 -10.00 0..00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 AS -BUILT LIDAR F J_ J." asln 5a ?� sD.oO 16.0' m ZU.UU r 76.0' g m 0.00 0.00 1 -10.00 0.00 10.00 20.00 30.OD x w t0 50.D0 60.00 70.DO 80.00 9 AS -BUILT LIDAR N W z 10.00 on rnm o `ts0-t, LL € w `.�- y•....�T, PROPOSED 14.9 MATCH EXISTING ROCK ROAD E. GRADE (FUTUR €) F 0.00 -30.00 -24.W -10.00 p, ,�,Ia csi w ml or +min nl^ AS -BUILT LIDAR 30.00 m 20.00 r m n z 10.00 STA: 116 +00.00 (SECTION G -G SEE SHEET C4.1 20.0 m 20.00 m a 0 _ - ^ 10.0 z 10 -00 MATCH EXIST.•• GRADE 0.00 0 -00 80.00 AS -BUILT LIDAR �.� �Y GRADES -- 30 0 30 OD 10.00 20.00 30.00 40.00 50.00 60.00 U]�C' t�IN �4 �Ge Imi� �Idmi c�l� erila� �il� svlal �I� esl"i 0.0( 70.00 50.00 u I A: 1 CL +VV.VV (Jtl; I IUIN Ci -Ci =t JF1tt 1 1:4.1 V2) 16.0' 76.0' (SECTIO G -G RELOCATED 2t EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) 26.0' 14.0' 24.0' 12.0' 2.0' EXISTING g _$ -GRADE - �S ffW LU W w w Y - W W a $g ®g v PROPOSED -�R PROPOSED TOP OF BERM MATCH EXISTING ROCK ROAD �, L GRADE (FUTURE ) OPOSED DITCH BOTTOM MATCH EXIST. GRADE 30.( 20. 0.0( -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 50.00 o 0 aii Flw rlm r- v'sm 8� �km Why �daH ii fJi2 F �C ao w c n m w N �_j qaN 1'- � fDl? N r (h N SIN VIN zplm a ai �.j w �.jim I: ui � ao oao ,�ilai STA: 124 +00.00 (SECTION G -G SEE SHEET C4.106) 30 76.0' 16.0' .. 76,{}'.. G -G RELOCATED 2± EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) (SECTIO G -G RELOCATED 2± EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) z z 26-Y 14.0' 24.0' 12.0' 26.0' 14.0' 24.0 12.0' M 2A EXISTING - - 2,p EXISTING v z GRADE $ o '�' $ 20.0 m 20.00 8 - -..._G $ -8 20.t O Li W W , 8 h Y 0. W W lU J 'O ~ W - J $ e $ 4 O z i U $$ 8g Ow ... .... � O W Ell w O W - - - �' - '•- •- -.. 10.0 10.00 r.r' LL 8 H 10 C �4 '^ -..... -. -.., . -... h Vl PROP ED TOP OF BERM MATCH ' ` - PROPOSED �%� TOP OF BERM MATCH i EXIST. MATCH EXISTING J ROCK ROAD EXIST. IOPOSEO DITCH BOTTOM GRADE D W 000 GRADE FUTURE bPOSED DITCH BOTTOM - GRADE 0 0( LL 10.00 20 -00 30.00 40.00 50.00 60 -00 70.00 80.00 -30 -00 -20.00 -10.00 D.00 10.00 20.00 39.00 40.00 50.00 00.00 70.00 50.00 r o Na u1 iN a_ l„ m IlI n C-4;0 AS -BUILT LID AR � _ UID Io r fl pc4 C r or 0. �OI;0 CT0x1'6 N in w w N io n Ew WPREOONSTRU I t j til L906 Cjla6 C410i < ai pj m 0)!m �'-1m t GRADES �pt � vJ STA: 118 +00.00 (SECTION G -G SEE SHEET C4.102) STA: 125 +40.00 (SECTION G-G SEE SHEET C4.1 OB) -- - 16.0' 76,0' (SECTIO G -G RELOCATED 21 EAST DUE TO ENCROACHMENT ON WEST PROPERTY LINE) 26.0' 14.0' 24.0' 12.0' 2.0' EXISTING - -- of n � - -- I -- m LU h - - x a - - - -, - ai w5 ___... 1• �. ___ _ N W W p yy,. W ,Wy LLI du PROPOSED MATCH EXISTING PROPOSED TOP OF BERM MATCH GRADE ROCK ROAD ..',r EXIST. (FUTURE) OPO6ED DITCH BOTTOM GRAPE 30.0 30,00 ?0.0 r 20.00 m a O 10.0 z 10.00 0.00 76.0' v'sm 8� �km Why �daH ii fJi2 F �C ao w c n m w N �_j qaN 1'- � fDl? N r (h N SIN VIN zplm a ai �.j w �.jim I: ui � ao oao ,�ilai STA: 124 +00.00 (SECTION G -G SEE SHEET C4.106) 30 76.0' 16.0' .. 76,{}'.. G -G RELOCATED 2± EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) (SECTIO G -G RELOCATED 2± EAST UE TO ENCROACHMENT ON WEST PROP RTY LINE) z z 26-Y 14.0' 24.0' 12.0' 26.0' 14.0' 24.0 12.0' M 2A EXISTING - - 2,p EXISTING v z GRADE $ o '�' $ 20.0 m 20.00 8 - -..._G $ -8 20.t O Li W W , 8 h Y 0. W W lU J 'O ~ W - J $ e $ 4 O z i U $$ 8g Ow ... .... � O W Ell w O W - - - �' - '•- •- -.. 10.0 10.00 r.r' LL 8 H 10 C �4 '^ -..... -. -.., . -... h Vl PROP ED TOP OF BERM MATCH ' ` - PROPOSED �%� TOP OF BERM MATCH i EXIST. MATCH EXISTING J ROCK ROAD EXIST. IOPOSEO DITCH BOTTOM GRADE D W 000 GRADE FUTURE bPOSED DITCH BOTTOM - GRADE 0 0( LL 10.00 20 -00 30.00 40.00 50.00 60 -00 70.00 80.00 -30 -00 -20.00 -10.00 D.00 10.00 20.00 39.00 40.00 50.00 00.00 70.00 50.00 r o Na u1 iN a_ l„ m IlI n C-4;0 AS -BUILT LID AR � _ UID Io r fl pc4 C r or 0. �OI;0 CT0x1'6 N in w w N io n Ew WPREOONSTRU I t j til L906 Cjla6 C410i < ai pj m 0)!m �'-1m t GRADES �pt � vJ STA: 118 +00.00 (SECTION G -G SEE SHEET C4.102) STA: 125 +40.00 (SECTION G-G SEE SHEET C4.1 OB) -- - 16.0' 76,0' (SECTIO G -G RELOCATED 21 EAST DUE TO ENCROACHMENT ON WEST PROPERTY LINE) 26.0' 14.0' 24.0' 12.0' 2.0' EXISTING - -- of n � - -- I -- m LU h - - x a - - - -, - ai w5 ___... 1• �. ___ _ N W W p yy,. W ,Wy LLI du PROPOSED MATCH EXISTING PROPOSED TOP OF BERM MATCH GRADE ROCK ROAD ..',r EXIST. (FUTURE) OPO6ED DITCH BOTTOM GRAPE 30.0 30,00 ?0.0 r 20.00 m a O 10.0 z 10.00 0.00 76.0' VJ 76.0' 0.00 0.00 -30.00 -2D.00 -10.00 0.00 10.00 20.00 30.OD 40.DO 50.D0 60.00 70.DO 80.00 9 AS -BUILT LIDAR TO ENCROACHMENT ON WEST PROPERTY on rnm € w AS -BUILT LIDAR N U I N 14.9 n. aJ I H N E. p a ad oiod N GRADES fl r EXISTING � 7 m $6 o n x x o h ALIGNMENT° = NORTH PL LL 30.0 30,00 ?0.0 r 20.00 m a O 10.0 z 10.00 0.00 76.0' VJ 76.0' 0.00 0.00 -30.00 -2D.00 -10.00 0.00 10.00 20.00 30.OD 40.DO 50.D0 60.00 70.DO 80.00 9 AS -BUILT LIDAR TO ENCROACHMENT ON WEST PROPERTY on rnm € w AS -BUILT LIDAR N U I N 14.9 n. aJ I H N E. p a ad oiod N GRADES fl r EXISTING � 7 m $6 o n x x o h ALIGNMENT° = NORTH PL LL - GRADE-- Y �. - SCALE 11" X 17" = 1" - 20' H �� ��� PROPOSED FILL PROPOSED CUT 3 1 " =20'V AS -BUILT Y WATER SURFACE 22" X 34" = 1" = 10' H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r 1" - 0' -- - - - - -- PRE- CONSTRUCTION q8 COLLECTED IN FIELD) q W EXISTING GRADE �R (ff \ AS -BUILT SPOT GRADES (FOR ROAD BASE) 30. � 76.0' VJ 76.0' (SECTIO G -G RELOCATED 21 EAST DUE TO ENCROACHMENT ON WEST PROPERTY LINE) J � 14.9 12.0' 26.0' 24,0 90.1 f fl r EXISTING � 7 m $6 o n x x o h LL - GRADE-- Y �. - UJ �_ W MATCH EXISTING W a. N GRADE.w� $8 q8 �� q W • PROPOSED ROCK ROAD��' FUTURE -...�� OPOSED DITCH BOTTOM •`TOP OF BERM w MATCH •••• EXIST. GRADE 30. � � V VJ a0. L LLf J � � r 90.1 f fl r � 7 C LL LL 2 L n -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 O A i N Q 4i� P -Ip RIP W n F m m t AS- B U I LTS q m �j 1� PRa. Ira.: 1002 CiRAWN SY: RC V. No. DATE DESCRIPTION DATE: lall16174 SHEET: C5,8 AS- B U I LTS q m �j 1� PRa. Ira.: 1002 CiRAWN SY: RC V. No. DATE DESCRIPTION DATE: lall16174 SHEET: C5,8 0.00 AS -BUILT LIDAR GRADES 30.00 M 20.00 ( r m 's O 10.00 S s 7 0.00 AS -BUILT LIDAR �57N k��il[1R l GRADES i 30.00 m 20.00 r L A 1 O z 10.00 ROCK ROAD �. (FUTURE -30.00 -20.00 -10.00 0.00 10.00 20..00 30.00 40.00 50.00 60.00 70.00 mIm a -.n c�Cp .ra eplo cn.,ms Im rY -, N m n: N c[i!� m:� sai Gilri .�Ir njlr NIA ri_n 031 n c r r- 16.0• - N H -H ffi w� MATCH EXISTING'- : PROPOSED GRADE - ROCK ROAD FUTURE -30.00 -20.00 -10.00 O n N1M tiln I`. P� MATCH EXISTING J 000 GRADE . -30.00 IT r. 30,01 30.00 STA: 128 +50.00 (SECTION H -H SEE SHEET C4.106) 30.00 16.0' 71.0' S ( ECTION H -H REL GATED 3t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) o 22" X 34" = 1" = 10'H 26.0' 10.0' 23.0' 12.0' (SECTION H -H r 2.0' M 20.00 r - $ }} - w - :XISFMG 61 a F "3 .......- - ....... GRADE -1 m w IL 0 40 0 "'� LL'' n_ MATCH EXISTING 0 w C7 $ 8 $- m' - I $ 0 0 10.00 GRADE B.4'.,. - l.. EXIST. �� - ROCK ROAD GRADE 0.00 0,00 FUTURE 80.00 PROPOSED TOP OF BERM 0.00 AS -BUILT LIDAR GRADES 30.00 M 20.00 ( r m 's O 10.00 S s 7 0.00 AS -BUILT LIDAR �57N k��il[1R l GRADES i 30.00 m 20.00 r L A 1 O z 10.00 ROCK ROAD �. (FUTURE -30.00 -20.00 -10.00 0.00 10.00 20..00 30.00 40.00 50.00 60.00 70.00 mIm a -.n c�Cp .ra eplo cn.,ms Im rY -, N m n: N c[i!� m:� sai Gilri .�Ir njlr NIA ri_n 031 n c r r- 16.0• - N H -H ffi w� MATCH EXISTING'- : PROPOSED GRADE - ROCK ROAD FUTURE -30.00 -20.00 -10.00 O n N1M tiln I`. P� MATCH EXISTING J 000 GRADE . -30.00 IT r. 30,01 30.00 b n cn' a ! m 4A : m csY: m 1.,p o M^ ��_pp_ N '� N N�C!3� n M ro ro o m o, m C6 n s S EXISTING o 22" X 34" = 1" = 10'H v (SECTION H -H r 20.01 m 20..00 r - �4 - - OLI w O 10.00 ry "3 .......- - ....... D MATCH EXISTING r- m PROPOSED ROCK ROAD 0 40 0 GRADE m n_ -30.00 10.04 10.00 0. W 9.2• \ MATCH PROPOSED l.. EXIST. �� - ROCK ROAD GRADE 0.00 0,00 FUTURE 80.00 -30,00 -20.00 -10.00 w r a � v AS -BUILT LIDAR PRECONSTRUCTION 7r,: M1! I Gi! GRADES .^i IA: 130 +VV.VV [.7a to I IU N I7 -17 Jtt witt I i:4.1 V4) 71.0' AXED 2t SOUTH DUE TO ENCROACF MENT ON NORTH PROP RTY LINE) 26.0' 10.0' 23.0' 12.0' EXISTING $ $ $ GRADE W W W W PROPOSEb _ - - _ 4 v MATCH - -. TOP OF BERM EXIST. GRADE 30.01 30.00 I i 16.0' - 20.01 m 20.00 m ee �_ ww m O 10.04 z 10.00 - __w_ -- MATCH EXISTING W PROPOSED GRADE ROCK ROAD 0.00 0.00 FUTURE 10.00 20,00 30.00 40.D0 50.00 60.00 70.00 80.00 -30.00 -20.00 -10.00 (DIN m:m �l D n1e IQ'� mtYY r r� AS -BUILT LIDAR 1DI✓M � N qi0 rld (0;;, wIn � � _ {? rn Q n op r- PRECONSTRUC ION GRADES STA: 132 +00.00 {SECTION H -H SEE SHEET 04.106) 71.0' 30.01 30.00 - 16.0' TED 3t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) (SECTION H- 26.0' 10.0' 23.0' 12.0' - 2.0' - g 20.01 m 20.00 S _ STA: 136 +00.00 (SECTION H -H SEE SHEET C4.107) - - 71.0' - - - 301 ]GATED 31 SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.0' 10.0' 23.0' 12.0' jC 2.D• EXISTING � Ir o a GRADE m ¢ 2 LL W 0 PROPOSED TOP OF BERM MATCH EXIST. PROPOS GRADE 0V 0 10.00 20.00 30.00 40.00 50.00 60.00 70.00 60.00 C9M grn in ro NF-I w-iN Mien I`- F NIN Mn �� p: n '6 �`• N n eeY I+I cd c! � 0 arI h _I I - STA: 138 +00.00 (SECTION H -H SEE SHEET C4.107) 71 A' 30.4 26.0' 10.0' 23.0' 12,0' 2 S 20.( EXISTING � � GRADE i ww ww 1 8 $ S $ �� .'�ROPOSEO ry ;.....• TOP OF BERM MATCH EXIST. _.. GRADE A an 9n nn an nn An nn cn m an nn 7n nn An m N^ (� P_ _! ✓a W 1a tin cg b n cn' a ! m 4A : m csY: m 1.,p o M^ ��_pp_ N '� N N�C!3� n M ro ro o m o, m C6 n m lv> A m a? $' o m -; ^ G }IADI.' mj' MIN NIM GYM M co W n n wlii7 M I S w' q •t' w us in � N d rY �I m r•i n mlw� 1i`' C','ryja` C:3 °7 q7 - �' 'r ry' COiw _.... ...�r.L m �� ��� PROPOSED FILL s S EXISTING o 22" X 34" = 1" = 10'H v WATER (ELEVATIONS BELOW WATER SURFACE WHERE r w S EXISTING GRADE OLI w O 10.00 GRADE "3 .......- - ....... n a m PROPOSED ROCK ROAD 0 40 y� (FUTURE) n_ -30.00 -20.00 -10 DO AS -BUILT LIDAR , �w m1m m!M ➢ �� O w v w LL o o p ...... ..... 10.04 �' 10.00 $ e T ... ��..- .- .- ...... #ROPOSEf7 -: PROPOSED _J `i - TOP OF BERM MATCH MATCH EXISTING PROPOSED _ ROCK ROAD .. EXIST. GRADE ROCK ROAD FUTURE GRADE (FUTURE) a.DD 0.00 XD -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60 -00 I 70.00 80 -00 - 30.00 -20,00 °10.00 AS -BUILT LIDAR �I w'! v o N w r as n m a- r cY m AS -BUILT LIDAR r`! ein cN n m {Slue s� c o � n w PRECONSTRUCTION td.Ih nl� '0' I. w� d 'N' d ajlo] r• m C � 6ir cc7 w IFIRECUNSTRUCTION 30.00 STA: 140 +00.00 (SECTION H -H SEE SHEET C4.107) 71.0' _L DCATED 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.01 23.0' 12.0' 2.(y } EXISTING GRADE r d C) g& g g O W W m PROPOSED TOP OF BERM MATCH EXIST. �����n�����s��GRADE n nn 10.00 20.00 3000 40.00 50.00 6000 7000 80.00 00 w A lv> A m a? $' o m -; ^ G }IADI.' mj' MIN NIM GYM M co W n n wlii7 M I S w' q •t' w us in � N d rY �I m r•i n mlw� 1i`' C','ryja` C:3 °7 q7 - �' 'r ry' COiw _.... ...�r.L I GRADES STA: 134 *00.00 SECTION H -H SEE SHEET C4.106) 30.01 30-00 16,0° 26.0' �^ 2.0' 20-00- IO n N P.:. it 06 Gs 06 m �� ��� PROPOSED FILL s S AS -BUILT Z WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r _ 1 - V PRE-CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE O w O 10.00 4I.5• "3 .......- - ....... n a MATCH EXISTING GRADE PROPOSED ROCK ROAD 0 40 (FUTURE) -30.00 -20.00 -10 DO AS -BUILT LIDAR , Im m1m m!M 71.0' 10.0' 23.0' 12.0' EXISTING $ o 20.0, r 20.00 S° R m GRADE " " ' � 3g R $" O " 10.01 10..00 ^PROPOSED'.y MATCH .TOP OF BERM EXIST. GRADE 0.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 �^ a N °0�m 3 cN�ae E nn o AS -BUILT LIDAR a cp r �Im m r n aGjioo u-j {yIr Lfi 1w aGj'm �lr[i o €n app N _ _ GRADES ALIGNMENT = NORTH PL IO n N P.:. it 06 Gs 06 SCALE 11" X 17" = 1" - 20' H �� ��� PROPOSED FILL PROPOSED CUT 3 1 " =20'V AS -BUILT Z WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r _ 1 - V PRE-CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE �\ AS -BUILT SPOT GRADES (FOR ROAD BASE) w4 LL�LL� MATCH EXISTINGy PROPOSED GRADE ROCK ROAD (FUTURE; ZD IA: T4Z *UU.VU {AtC,I IVN Iy -17 btt MittI 1. AW) H -H REL CATED 3t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.0' 10.0' 23.0' 12.0' 2.(y 99 J EXISTING ° UJ - -- GRADE w a� LL, W or 8g S$ a u IL PROPOSED TOP OF BERM MATCH EXIST. GRADE -30.00 - 20.00 -10.00 0.00 10.00 20.00 3D.00 40.00 5D.00 BD.00 70.00 80.00 ® IO n N P.:. it 06 Gs 06 N! rn giz :8 r N D N ry 00 rai rxi N tte ny w RY -:I'd m wed AS- B U I LTS �m v'sm 8 a z m W y y o E Alf LL�i F �C 0.0c 30.( �M z M } Z a 20 :) .E m O � U D X 0 2 10.t 4 r ^ m �z 0.0( 0 c) LIJ V CO 30 -C 20.I c LL! fl 0: w 10.4 7 LL o 2 0.0( w 0 IL PROJ. NO.: 1002 Di1AWN sr- RC DATE: 01/16114 SHEET: C5,9 30.00 SECTION G -G m 2000 .-$ . $ _� - .. m MATCH coin IL?'s aYi� p ltf .t min EXISTING. 1- ffiIr afi� rim r r n µ�ylw ffiIr ;OO GRADE rir d 10.00 0.00 EXISTING m w a. tl STA: 144 +00.00 (SECTION H -H SEE SHEET C4.107) - - 71.(Y TED 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.0' 10.0' 23.0' 12.0' 2.0' I M 20.00 IT a O Z 10.00 0 -00 AS -BUILT LIDAR PRECONSTRUCTION GRADES 30AD 30 30.D0 20 m 20.00 r STA: 152 +00.00 (SECTION H -H SEE SHEET C4.108) . $ _� - .. EXISTING r- PROPOSED _j coin IL?'s aYi� p ltf .t min plr aR C"7io N ffiIr afi� rim r r n µ�ylw ffiIr ;OO W ROCK ROAD m 6 m ,jjc6 roam CIO 0.00 EXISTING m w a. tl (FUTURE) aanansED�1 -30.00 - 20,017 -10.00 0.04 $8 10.40 AS -BUILT LIDAR coin m w Win - 10 RECONSTRUCTION IN ql,r (91N M GRADES (dim r-ln adlw w'35 PROPOSED I M 20.00 IT a O Z 10.00 0 -00 AS -BUILT LIDAR PRECONSTRUCTION GRADES 30AD 30 30.D0 20 m 20.00 r STA: 152 +00.00 (SECTION H -H SEE SHEET C4.108) J IA: 1401UV.VU koc%. 11VIY 1-1 -I1 .'ACC ancc1 W. IV 1) 16.0' 71.0" SECTION G -G RE OCATED 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.0' 10.0' 230' 12.0' WLLJ EXISTING w N 11 w MATCH EXISTING . j D GRADE LL LL GRADE W ,,, ly $ $ $ $ o, W v W �Q iL � T T •.. ��� % `�`�'` % PROPOSED yl PROP05ED ` 111 iff TO OF BERM MATCH ROCK ROAD `t L EXIST. FUTURE GRADE -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 50.00 . $ _� - .. EXISTING r- MIN coin IL?'s aYi� p ltf .t min plr aR C"7io N ffiIr afi� rim r r n µ�ylw ffiIr ;OO W op co 0 to � m 6 m ,jjc6 roam CIO � w =IC6 EXISTING m w a. tl GRADE w W m '� GRADE LL w w �' 0 J 1im $8 S8 0 Z 10.00 GRADE - .[ti- w.er - - 10 - - - - M _ ..,,,........,....... c) LIJ c PROPOSED MATCH EXISTING JI PROPOSED SCALE 11" X 17" '" 70P OF BERM MATCH �� ��� PROPOSED FILL GRADE ROCK ROAD PROPOSED CUT 3 EXIST, A FUTURE WATER SURFACE Z GRADE O.00 O -30.00 -20-00 -10.00 0,00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 PRE- CONSTRUCTION AS -BUILT LIDAR FRECONSTRUCTION PRO�IER m' 4,n m -1111 i� �Im 1[7 � w ffi ev n a P co; 1dio im io ,6 16 �?I6 ffii16 0I.�.�lo�i� GRADES �'�.ffi�m wim 6!� "'i°i�i min Qo ff AS -BUILT SPOT GRADES (FOR ROAD BASE) LL O PROPOSED J 2 ~ w 0 IZ PROJ. NO.: 1002 MA TOP O MATCH MATCH EXISTING J PROPOSED f TOP OF BERM .. EXIST. GRADE ROCK ROAD EXI nyw GRADE or 0.00 AS -BUILT LI DA (FUTURE) _ - GR 20.00 30.00 40410 50.00 50.00 70.00 WOO -30.00 a' -20.00 u� - 10..00 CAD P n 10.00 Njw rn 20-00 t,1i, 0 30.00 g4 40.00 ar 50.00 60.00 70.00 80.00 [A w H o m 'spin N 'm r-- ffiIq m - ` L6 05 cl 06 .0 O ro ° j. n co GRADES ]m J IA: 1401UV.VU koc%. 11VIY 1-1 -I1 .'ACC ancc1 W. IV 1) 16.0' 71.0" SECTION G -G RE OCATED 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.0' 10.0' 230' 12.0' WLLJ EXISTING w N 11 w MATCH EXISTING . j D GRADE LL LL GRADE W ,,, ly $ $ $ $ o, W v W �Q iL � T T •.. ��� % `�`�'` % PROPOSED yl PROP05ED ` 111 iff TO OF BERM MATCH ROCK ROAD `t L EXIST. FUTURE GRADE -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 50.00 3c 30.00 2C m rn 20.00 m n 1 0 10 10.00 0.' 0.00 STA: 148 +00.00 (SECTION H -H SEE SHEET C4.108) 30 .. 71:0'. G -G RE OCAT €D 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26 -0' 10.0' 23.0' 12.0° -20r m 20.00 . $ _� - .. I+0 MIN coin IL?'s aYi� p ltf .t min plr aR C"7io N ffiIr afi� rim r r n µ�ylw ffiIr ;OO p� r Dim n7�ja? op co 0 to � Coles Ln m 6 m ,jjc6 roam CIO � w =IC6 3c 30.00 2C m rn 20.00 m n 1 0 10 10.00 0.' 0.00 STA: 148 +00.00 (SECTION H -H SEE SHEET C4.108) 30 .. 71:0'. G -G RE OCAT €D 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26 -0' 10.0' 23.0' 12.0° -20r m 20.00 . $ _� - .. -10.00 0.00 -. .�$ _ 21: C AS -BUILT �Rc � O F- r � EXISTING w y ca al H1 0 mr U m w a. tl Z QJ O GRADE LL w w lm cnry 0 J 1im $8 S8 0 Z 10.00 o n" - .[ti- w.er - - 10 - - - - ....- ,,...- ...... _ ..,,,........,....... c) LIJ c PROPOSED MATCH EXISTING JI PROPOSED SCALE 11" X 17" '" 70P OF BERM MATCH �� ��� PROPOSED FILL GRADE ROCK ROAD PROPOSED CUT 3 EXIST, AS -BUILT FUTURE WATER SURFACE 22" X 34" GRADE O.00 O -30.00 -20-00 -10.00 0,00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 PRE- CONSTRUCTION AS -BUILT LIDAR FRECONSTRUCTION i�i it min m' 4,n m -1111 i� �Im 1[7 � w ffi ev n a P co; 1dio im io ,6 16 �?I6 ffii16 0I.�.�lo�i� GRADES �'�.ffi�m wim 6!� "'i°i�i min Qo ff f 30.00 m 20.00 m a O Z 10.00 0.00 0 m wW 0 W MATCH EXISTING-j PROPOSED GRADE ROCK ROAD (FUTURE'. il IM. IMVTVV.VV kdml IR/IN M-M occ On= 4 .IUO) 71.0' G -G RE OCATED 2t SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) - -- 26.0' 10.0' 23.0' 12.0' - a. 2.0' - e�5 � c EXISTING GRADE LL LL w. PROPOSED TOP OF BERM MATCH EXIST. GRADE 3c 2C 10 0.1 m� �1 LL a W - MATCH EXISTING Y PROPOSED GRADE ROCK ROAD (FUTURE' cl I A: IU,+TVV.VU [ack., 1 RAY 11-11 JCC onca 1 1..4. IU01 71.0' G -G R€ OCATED 21 SOUTH DUE TO ENCROACHMENT ON NORTH PROPERTY LINE) 26.0' 1Off 23.0' 12.0' 2.0' Lu w EXISTING EL GRADE lit o m PROPOSED MATCH 0//_ TOP OF BERM EXIST. GRADE -30.D0 -20.D0 -10.00 0.00 10.00 AS -BUILT LIDAR njo OR'� ma1 o PREC NSTRUCTIGN 610 0 M a0106 ro 6 AS- BUILTS 30. N G� 20. n (D a a a Q' 10' 3 D.D 30. al€� 10! I ol� O.a 2000 . 30.00 40.00 C4 1;]l a1 col- (p n aam ON w Mir+ �iw -30.00 -2000 -10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 AS -BUILT �Rc � O F- r � ca al H1 0 mr U m Z QJ O lm cnry a;lw ,�;Im nllcd ,ticd ajl L m 7 GRAD - - - - - - c) LIJ c ALIGNMENT = NORTH PL SCALE 11" X 17" = 1"= 20'H �� ��� PROPOSED FILL Ulm PROPOSED CUT 3 1 24'V " = AS -BUILT M WATER SURFACE 22" X 34" = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r _ 1" _ V PRE- CONSTRUCTION COLLECTED IN FIELD) D: ° LLI EXISTING GRADE ff AS -BUILT SPOT GRADES (FOR ROAD BASE) AS- BUILTS 30. N G� 20. n (D a a a Q' 10' 3 D.D 30. al€� 10! I ol� O.a 2000 . 30.00 40.00 C4 1;]l a1 col- (p n aam ON w Mir+ �iw 50.00 60.00 70-DO 80.D0 04. IV N '�T' Ib 6DIr] ",rim m In m pl:,n a Q r, r 0 CO 4C6 Z z Z -S fv M } F- r � 0 mr U Z QJ O LL LL t1 / L m 7 0 c) LIJ c N 0 V J �0 LIJ D: ° LLI LL O 2 ~ w 0 IZ PROJ. NO.: 1002 DRAWN sr: RC IEV. No. DATE DESCRIPTION DATE: 01/18114 SHEET: C5.1 0 30.00 M 2D.00 C 1 0 Z 1D.DO 0. DO AS -BUILT LIDAR STA: 13 +00.00 (SECTION 1 -1 SEE SHEET C4.78) 71.6° PEELE 12.6" 24.0' 5,0' 30.0' ROAD 8g Sg 8 MATCH : : d 7 EXISTING GRADE EXISTING �W Nw g g g g GRADE CL a ❑ w PROPOSED o. MATCH TOP OF BERM ... : �� EXISTING RADE PROPOSED - 100.OD •90.00 - -80.00 • •70.00 - - 60.00 - 50.00 - - 40.00 - - _ - 2_0.00 - -10.00 0,00 1 10.00 prMp G�1� N [•- �o s sns a o o m o o n _3_0.06 - n N N yr u7 w pj r -12 t trl' D �Sl a 4 J 30.00 20.00 10.00 0.00 STA: 20 +00.00 (SECTION 1 -1 SEE SHEET 04.88) 30.00 71.0' pEELL 30.00 12,0' 24,0' 5.0' 300 ROAD rral 20.00 MATCH r n N - W- - 20.00 0 cL m EXISTING GRADE w w T a p J EXISTING z y w w 8 g 0C GRADE LL ..........� LL w o 8 MATCH 0. O EXISTING GRADE u ...........� ...s..... ... .--- - 10.00 � 10.00 9. -..__. . -.--.� .. - - r -• w � m PROPOSED TOP OF BERM PROPOSED 0.00 IT H TT - - 100.00 -90.00 -80.00 -70.00 50.00 -50.00 -40.00 -30.QO -20.DO -10.00 0.00 10.60 PREBUILT LIDAR PRE N TRUCTION GRADES SECTION I I SEE SHEET C4 88 `pn rNS;�m miry mn c�.I� °o'v gjloe djlT W:v Ni0 N • p -m �jiR V ao CCI(a p:C+ C O STA: 14 +00.00 ( ) STA: 22 +00.00 ( } - 30.DO - - - - 30.00 30.00 - - 71.0' PEELE 71.0' PEELE 12.9 24.0' 5.0' 30.0' ROAD 12,0' 24,0' 5.0' 30A' ROAD $$ gg M 2D.00 MATCH " n $. g W 2D.W 20.00 MATCH n y d § O q u� N g g a EXISTING e EXISTING GRADE w w EXISTING IZ n o m EXISTING GRADE h N } �� - -- LL w $ GRADE _ D� `o w H J g g g g /� GRADE J O a p D r �! . // a 0.00 30.00 20.00 v'sm Sg F c 10.00 ... .- .............._-..Y�... -^. ^� .....". -..,7 - - ,%r- - �.,�..T- _ ................ .....- - 10.00 � 10.00 ... <r... - --- .. • -y.Y., -10.00 y PROPOSED MATCH PROPOSED MATCii TOP OF BERM �a " ' EXISTING RADE TOP OF BERM EXISTIN GRADE 3 PROPOSED PROPOSED 0.00 0.00 0.00 0.00 j - 100.6D -90.00 -80.00 -70.00 450.00 -50.00 -40.00 -30.00 -20.00 - 10.00 0.00 10.00 -100.00 -90�.0D -80,0D -70.00 $0.00 -50.00 -40,00 30.00 -20�.00 -10.00 0.00 10,00 i AS -BUILT LIDAR ra r ca .r m ^ �;a' o Mao op. N cv N �Im r AS -BUILT LIDAR ��.- to ��N rn ��8 10 r Iw N m c m ^ OED r w ua ^ ar ^ ko r l r• arl cviN m a ^ rn v, m o7 Io so a w u1 ao eye PREC GRRADES Tt ga�w�Q.w r 6 r �;lo ,rim v d m 9 p [7 a PREC GRADES TK1N 6i�16 �� Ci� ® r 4s�d7 G 'C G bC v C G O o STA: 16 +00.00 (SECTION 1 -1 SEE SHEET C4.78) STA: 24 +00.00 (SECTION 1 -1 SEE SHEET C4.88) 30.00 m 20.60 m m n 1 D - 100.00 -90,00 -80.00 -70.00 -80.00 -50,00 X0.00 -30.00 -20.00 -10.00 0.00 10.00 - 100.00 -90.00 - 80.00 -70.00 -80,00 -50.00 -00.00 -30.06 -20.00 -i0.aa 0.00 10.00 AS -BUILT LIDAR gala 0 ItiI r c°0C w M c^gIw ' ^ rI u`ily ° W 'PREC N TRUCTI ��� n °' co 6j di alb m mI N N �jla �jiai ai � 4 a a �rt GRADES _� -�. -1 � � � L AJJ 9 f STA: 18 +00.00 (SECTION 1 -1 SEE SHEET C4.78) STA: 26 +00.00 (SECTION 1 -1 SEE SHEET 04.88) 36.00 - - PEELE 36.06 30.00 36.60 719° 12.0" 24.0' S.0" 30,0' ROAD M 26.60 ?..g WI W 20.60 MATCH u n C EXISTING GRADE h w J 9° EXISTING O. 1 i 0 L" w w J S g g GRADE EL .... - n - Z 16.60 - ._....-' -... .....� .. __F.� �. -_ -- _. •-:... _., -",..- 10.00 j _ _� PROPOSED MATCH TOP OF BERM :. i .. ..........: EXISTING RADE PROPOSED 30.00 3090 2000 . m 20..00 r m n O 10.00 z 10.00 D DO 0 00 71.0' PEEL 12.0' 24.0' s a 30.0, ROAD MATCH n n n n .S..e._ - Ir -Lfl EXISTING GRADE w ueai EXISTING 0- r w w. w. J 8 GRADE R. a. PROPOSED �. , �� MATCH ....... EXIST N GRADE TOP OF BERM PROPOSED DITCH QOTTOM 30.00 Z U z S v M } c4 Z m 20.00 "' r- 0 L) Z QO LL O 16.00 W V l In 7 0 000 AS -BUILT LIDAR PRE. N TRU TI N GRADES I a n a o1 o n � .n �i� 6�fimo rn:v " afro n� �.m �� m .n 6ii�' W'_D C1Io Oil +Yj� a ° as 71.o PEELE [I) 0 12.0' 24.0' S.U' 30.0' ROAD N $g 88 F ca LrryL m 20.OD MATCH � - � .. Lu 20.00 J �� . . Y.° 0. C EXISTING GRADE ta j m. EXISTING O w ow a� �r� LL $$ $g GRADE 10.00 __ _ _ ' _... .,..,:. -.- .., .,,,.,.,.,........w4..,.�...,,. O.DO _ 1 �� W .::�,' . -.. ��.� PROPOSED MATCH LL f TOP OF BERM EXISTING RAPE jl -- PROPOSED W DITCH QTT n [i ? 0.00 O.OD 0.00 - 100.OD -90.00 -50.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.DO 10.00 AS -BUILT LIDAR AS -BUILT LIDAR PRECONSTRUCTION PRECDNSTRUCTI6N GRADES GRADES �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 `pn rNS;�m miry mn c�.I� °o'v gjloe djlT W:v Ni0 N • p -m �jiR V ao CCI(a p:C+ C O STA: 14 +00.00 ( ) STA: 22 +00.00 ( } - 30.DO - - - - 30.00 30.00 - - 71.0' PEELE 71.0' PEELE 12.9 24.0' 5.0' 30.0' ROAD 12,0' 24,0' 5.0' 30A' ROAD $$ gg M 2D.00 MATCH " n $. g W 2D.W 20.00 MATCH n y d § O q u� N g g a EXISTING e EXISTING GRADE w w EXISTING IZ n o m EXISTING GRADE h N } �� - -- LL w $ GRADE _ D� `o w H J g g g g /� GRADE J O a p D r �! . // a 0.00 30.00 20.00 v'sm Sg F c 10.00 ... .- .............._-..Y�... -^. ^� .....". -..,7 - - ,%r- - �.,�..T- _ ................ .....- - 10.00 � 10.00 ... <r... - --- .. • -y.Y., -10.00 y PROPOSED MATCH PROPOSED MATCii TOP OF BERM �a " ' EXISTING RADE TOP OF BERM EXISTIN GRADE 3 PROPOSED PROPOSED 0.00 0.00 0.00 0.00 j - 100.6D -90.00 -80.00 -70.00 450.00 -50.00 -40.00 -30.00 -20.00 - 10.00 0.00 10.00 -100.00 -90�.0D -80,0D -70.00 $0.00 -50.00 -40,00 30.00 -20�.00 -10.00 0.00 10,00 i AS -BUILT LIDAR ra r ca .r m ^ �;a' o Mao op. N cv N �Im r AS -BUILT LIDAR ��.- to ��N rn ��8 10 r Iw N m c m ^ OED r w ua ^ ar ^ ko r l r• arl cviN m a ^ rn v, m o7 Io so a w u1 ao eye PREC GRRADES Tt ga�w�Q.w r 6 r �;lo ,rim v d m 9 p [7 a PREC GRADES TK1N 6i�16 �� Ci� ® r 4s�d7 G 'C G bC v C G O o STA: 16 +00.00 (SECTION 1 -1 SEE SHEET C4.78) STA: 24 +00.00 (SECTION 1 -1 SEE SHEET C4.88) 30.00 m 20.60 m m n 1 D - 100.00 -90,00 -80.00 -70.00 -80.00 -50,00 X0.00 -30.00 -20.00 -10.00 0.00 10.00 - 100.00 -90.00 - 80.00 -70.00 -80,00 -50.00 -00.00 -30.06 -20.00 -i0.aa 0.00 10.00 AS -BUILT LIDAR gala 0 ItiI r c°0C w M c^gIw ' ^ rI u`ily ° W 'PREC N TRUCTI ��� n °' co 6j di alb m mI N N �jla �jiai ai � 4 a a �rt GRADES _� -�. -1 � � � L AJJ 9 f STA: 18 +00.00 (SECTION 1 -1 SEE SHEET C4.78) STA: 26 +00.00 (SECTION 1 -1 SEE SHEET 04.88) 36.00 - - PEELE 36.06 30.00 36.60 719° 12.0" 24.0' S.0" 30,0' ROAD M 26.60 ?..g WI W 20.60 MATCH u n C EXISTING GRADE h w J 9° EXISTING O. 1 i 0 L" w w J S g g GRADE EL .... - n - Z 16.60 - ._....-' -... .....� .. __F.� �. -_ -- _. •-:... _., -",..- 10.00 j _ _� PROPOSED MATCH TOP OF BERM :. i .. ..........: EXISTING RADE PROPOSED 30.00 3090 2000 . m 20..00 r m n O 10.00 z 10.00 D DO 0 00 71.0' PEEL 12.0' 24.0' s a 30.0, ROAD MATCH n n n n .S..e._ - Ir -Lfl EXISTING GRADE w ueai EXISTING 0- r w w. w. J 8 GRADE R. a. PROPOSED �. , �� MATCH ....... EXIST N GRADE TOP OF BERM PROPOSED DITCH QOTTOM 30.00 Z U z S v M } c4 Z m 20.00 "' r- 0 L) Z QO LL O 16.00 W V l In 7 0 000 AS -BUILT LIDAR PRE. N TRU TI N GRADES I a n a o1 o n � .n �i� 6�fimo rn:v " afro n� �.m �� m .n 6ii�' W'_D C1Io Oil +Yj� a ° as 71.o PEELE [I) 0 12.0' 24.0' S.U' 30.0' ROAD N $g 88 F ca LrryL m 20.OD MATCH � - � .. Lu 20.00 J �� . . Y.° 0. C EXISTING GRADE ta j m. EXISTING O w ow a� �r� LL $$ $g GRADE 10.00 __ _ _ ' _... .,..,:. -.- .., .,,,.,.,.,........w4..,.�...,,. O.DO _ 1 �� W .::�,' . -.. ��.� PROPOSED MATCH LL f TOP OF BERM EXISTING RAPE jl -- PROPOSED W DITCH QTT n [i ? 0.00 O.OD 0.00 - 100.OD -90.00 -50.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.DO 10.00 AS -BUILT LIDAR AS -BUILT LIDAR PRECONSTRUCTION PRECDNSTRUCTI6N GRADES GRADES �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 STA: 14 +00.00 ( ) STA: 22 +00.00 ( } - 30.DO - - - - 30.00 30.00 - - 71.0' PEELE 71.0' PEELE 12.9 24.0' 5.0' 30.0' ROAD 12,0' 24,0' 5.0' 30A' ROAD $$ gg M 2D.00 MATCH " n $. g W 2D.W 20.00 MATCH n y d § O q u� N g g a EXISTING e EXISTING GRADE w w EXISTING IZ n o m EXISTING GRADE h N } �� - -- LL w $ GRADE _ D� `o w H J g g g g /� GRADE J O a p D r �! . // a 0.00 30.00 20.00 v'sm Sg F c 10.00 ... .- .............._-..Y�... -^. ^� .....". -..,7 - - ,%r- - �.,�..T- _ ................ .....- - 10.00 � 10.00 ... <r... - --- .. • -y.Y., -10.00 y PROPOSED MATCH PROPOSED MATCii TOP OF BERM �a " ' EXISTING RADE TOP OF BERM EXISTIN GRADE 3 PROPOSED PROPOSED 0.00 0.00 0.00 0.00 j - 100.6D -90.00 -80.00 -70.00 450.00 -50.00 -40.00 -30.00 -20.00 - 10.00 0.00 10.00 -100.00 -90�.0D -80,0D -70.00 $0.00 -50.00 -40,00 30.00 -20�.00 -10.00 0.00 10,00 i AS -BUILT LIDAR ra r ca .r m ^ �;a' o Mao op. N cv N �Im r AS -BUILT LIDAR ��.- to ��N rn ��8 10 r Iw N m c m ^ OED r w ua ^ ar ^ ko r l r• arl cviN m a ^ rn v, m o7 Io so a w u1 ao eye PREC GRRADES Tt ga�w�Q.w r 6 r �;lo ,rim v d m 9 p [7 a PREC GRADES TK1N 6i�16 �� Ci� ® r 4s�d7 G 'C G bC v C G O o STA: 16 +00.00 (SECTION 1 -1 SEE SHEET C4.78) STA: 24 +00.00 (SECTION 1 -1 SEE SHEET C4.88) 30.00 m 20.60 m m n 1 D - 100.00 -90,00 -80.00 -70.00 -80.00 -50,00 X0.00 -30.00 -20.00 -10.00 0.00 10.00 - 100.00 -90.00 - 80.00 -70.00 -80,00 -50.00 -00.00 -30.06 -20.00 -i0.aa 0.00 10.00 AS -BUILT LIDAR gala 0 ItiI r c°0C w M c^gIw ' ^ rI u`ily ° W 'PREC N TRUCTI ��� n °' co 6j di alb m mI N N �jla �jiai ai � 4 a a �rt GRADES _� -�. -1 � � � L AJJ 9 f STA: 18 +00.00 (SECTION 1 -1 SEE SHEET C4.78) STA: 26 +00.00 (SECTION 1 -1 SEE SHEET 04.88) 36.00 - - PEELE 36.06 30.00 36.60 719° 12.0" 24.0' S.0" 30,0' ROAD M 26.60 ?..g WI W 20.60 MATCH u n C EXISTING GRADE h w J 9° EXISTING O. 1 i 0 L" w w J S g g GRADE EL .... - n - Z 16.60 - ._....-' -... .....� .. __F.� �. -_ -- _. •-:... _., -",..- 10.00 j _ _� PROPOSED MATCH TOP OF BERM :. i .. ..........: EXISTING RADE PROPOSED 30.00 3090 2000 . m 20..00 r m n O 10.00 z 10.00 D DO 0 00 71.0' PEEL 12.0' 24.0' s a 30.0, ROAD MATCH n n n n .S..e._ - Ir -Lfl EXISTING GRADE w ueai EXISTING 0- r w w. w. J 8 GRADE R. a. PROPOSED �. , �� MATCH ....... EXIST N GRADE TOP OF BERM PROPOSED DITCH QOTTOM 30.00 Z U z S v M } c4 Z m 20.00 "' r- 0 L) Z QO LL O 16.00 W V l In 7 0 000 AS -BUILT LIDAR PRE. N TRU TI N GRADES I a n a o1 o n � .n �i� 6�fimo rn:v " afro n� �.m �� m .n 6ii�' W'_D C1Io Oil +Yj� a ° as 71.o PEELE [I) 0 12.0' 24.0' S.U' 30.0' ROAD N $g 88 F ca LrryL m 20.OD MATCH � - � .. Lu 20.00 J �� . . Y.° 0. C EXISTING GRADE ta j m. EXISTING O w ow a� �r� LL $$ $g GRADE 10.00 __ _ _ ' _... .,..,:. -.- .., .,,,.,.,.,........w4..,.�...,,. O.DO _ 1 �� W .::�,' . -.. ��.� PROPOSED MATCH LL f TOP OF BERM EXISTING RAPE jl -- PROPOSED W DITCH QTT n [i ? 0.00 O.OD 0.00 - 100.OD -90.00 -50.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.DO 10.00 AS -BUILT LIDAR AS -BUILT LIDAR PRECONSTRUCTION PRECDNSTRUCTI6N GRADES GRADES �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 30.00 Z U z S v M } c4 Z m 20.00 "' r- 0 L) Z QO LL O 16.00 W V l In 7 0 000 AS -BUILT LIDAR PRE. N TRU TI N GRADES I a n a o1 o n � .n �i� 6�fimo rn:v " afro n� �.m �� m .n 6ii�' W'_D C1Io Oil +Yj� a ° as 71.o PEELE [I) 0 12.0' 24.0' S.U' 30.0' ROAD N $g 88 F ca LrryL m 20.OD MATCH � - � .. Lu 20.00 J �� . . Y.° 0. C EXISTING GRADE ta j m. EXISTING O w ow a� �r� LL $$ $g GRADE 10.00 __ _ _ ' _... .,..,:. -.- .., .,,,.,.,.,........w4..,.�...,,. O.DO _ 1 �� W .::�,' . -.. ��.� PROPOSED MATCH LL f TOP OF BERM EXISTING RAPE jl -- PROPOSED W DITCH QTT n [i ? 0.00 O.OD 0.00 - 100.OD -90.00 -50.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.DO 10.00 AS -BUILT LIDAR AS -BUILT LIDAR PRECONSTRUCTION PRECDNSTRUCTI6N GRADES GRADES �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 AS -BUILT LIDAR PRE. N TRU TI N GRADES I a n a o1 o n � .n �i� 6�fimo rn:v " afro n� �.m �� m .n 6ii�' W'_D C1Io Oil +Yj� a ° as 71.o PEELE [I) 0 12.0' 24.0' S.U' 30.0' ROAD N $g 88 F ca LrryL m 20.OD MATCH � - � .. Lu 20.00 J �� . . Y.° 0. C EXISTING GRADE ta j m. EXISTING O w ow a� �r� LL $$ $g GRADE 10.00 __ _ _ ' _... .,..,:. -.- .., .,,,.,.,.,........w4..,.�...,,. O.DO _ 1 �� W .::�,' . -.. ��.� PROPOSED MATCH LL f TOP OF BERM EXISTING RAPE jl -- PROPOSED W DITCH QTT n [i ? 0.00 O.OD 0.00 - 100.OD -90.00 -50.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.DO 10.00 AS -BUILT LIDAR AS -BUILT LIDAR PRECONSTRUCTION PRECDNSTRUCTI6N GRADES GRADES �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 71.o PEELE [I) 0 12.0' 24.0' S.U' 30.0' ROAD N $g 88 F ca LrryL m 20.OD MATCH � - � .. Lu 20.00 J �� . . Y.° 0. C EXISTING GRADE ta j m. EXISTING O w ow a� �r� LL $$ $g GRADE 10.00 __ _ _ ' _... .,..,:. -.- .., .,,,.,.,.,........w4..,.�...,,. O.DO _ 1 �� W .::�,' . -.. ��.� PROPOSED MATCH LL f TOP OF BERM EXISTING RAPE jl -- PROPOSED W DITCH QTT n [i ? 0.00 O.OD 0.00 - 100.OD -90.00 -50.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.DO 10.00 AS -BUILT LIDAR AS -BUILT LIDAR PRECONSTRUCTION PRECDNSTRUCTI6N GRADES GRADES �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 �I� WIC N r ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 . _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 " 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r PRE- CONSTRUCTION COLLECTED IN FIELD) al 1" = 1 EXISTING GRADE (ff)-\ AS -BUILT SPOT GRADES (FOR ROAD BASE) - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 - 90.00 -80.00 -70.00 _60.00 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 0.09 - IZ Q N 3a iL. N 901 N :�➢ GIB CD r. go PROJ.NO.: 1002 mAWNar -- RC. AS- B U I LTS DATE: 01116114 SHEET: 05.11 AS- B U I LTS DATE: 01116114 SHEET: 05.11 30 -00 M 20 -00 m a O Z 1P -OP 12.0 8g 8g MATCH EXISTING GRADE m m 4 PROPOSED TOP OF BERM STA: 28 +00.00 (SECTION 1 -1 SEE SHEET C4.88) 71.:0' W rceLe 24,0' 5.0' 30.0' ROAD PEELE ROAD 30.0• Hg / / ✓ / / /�/ � � e -` AS -BUILT Y J EXISTING 0 on 8 8 GRADE a Ik W p $ PRE - CONSTRUCTION a Z EXISTING GRADE w MATCH EXISTING EXISTING RADE U OPOSED W J 121TQH TT M 30.00 30.00 20 -00 M 20.00 m n 1 O 10.00 Z 10.00 O.QO D.PO STA: 36 +00.00 (SECTION 1 -1 SEE SHEET C4.97) - -- 12.6 8 $ W 24.0' 71.0' SO o C�VIm n o �o p0 PEELE ROAD 30.0• 'r / / ✓ / / /�/ 8 } -` AS -BUILT Y ui r � MATCH n WATER (ELEVATIONS BELOW WATER SURFACE WHERE r 1" = 1 PRE - CONSTRUCTION a Z EXISTING GRADE w 9 Q EXISTING D U W J g 8 GRADE a QO W O � D PROPOSED MATCH TOP OF BERM 10.00 EXISTING BADE WV ) PROPOSED z IT H 9=QM 0.00 3o.DP � a 20.aP o a a a 10.00 n� v'sm 8$ 0 -00 0.00 �a I - 100.00 - 90.00 -80.00 -70.00 -60.00 - 50.00 -40.00 -30.00 -20.00 -10.00 0.00 10.00 - 100.00 -90.00 -80.00 -70.00 -60.00 -50.00 40.00 -30.00 -20.00 -10.00 0.00 1x.00 .g fi AS- BUILT LIDAR PRECONSTRUCTION GRADES OU n 'm n6! CCNI r m O? co P �; O rn 010 % N cy1a V � = ID � m V I I W AS -BUILT LIDAR m c N x GRA6E8 gym- -LLB y SECTION 1 -1 SEE SHEET C4.97 SECTION 1 -1 SEE SHEET 04.97 $ E STA: 3D +00.00 ( ) STA: 3ES +OD.UO t a LL i s6.66 - 71.OP PEELE 30.00 30.00 - -- 710 PEELE 30.66 12.0' 24.0' 5.0' 30.0'. ROAD 12.0' 24.0' 5.0' 30.0' ROAD m 20.00 - MATCH .. w. -ry +� o lu lu Z 20.00 20.00 -MATCH S A Z. -. 20.00 m EXISTING GRADE w a. EXISTING Q J m EXISTING GRADE n w T O J EXISTING ' y w' LLw m j 8 8 GRADE d. y w LL w 8 8 MATCH �- GRADE LL 0 a o LLw m g c g O a o LLw 8: 8 EXISTING GRADE c - - S Z 10.00 - - - .�', /jam% ! - - _ 10.00 z 16:00 - ` - - - - - rte.. _ • -.- -- -10.00 Imo, i- --- - -__ -- EXISTING RRDE w y PROPOSED PROPOSED TOP OF BERM TOP OF BERM 1 PROPOSED _ PROPOSED 0.00 0.00 0.00 - H SOTTO .0.00 - 106.00 -90.00 -80.00 - 70.00 -60.00 -50.00 -40.00 -30.00 20.00 10.00 0,00 10.00 _19 90 00 - 8_0.00 - 7_0.00 -50.00 - 50.00 -40.00 -30.00 -20 -00 -10.00 10,00 i AS -BUILT LIDAR m n p r) ro'v r`w�ey o �In h as'b n'rn AS-BUILT LIDAR cp n w ra n m_ dry n u7� Gs N;N ro rov PRECONSTRUCTION co W n.. ir-I e}la ry g g CSI NIO pRECONSTRBCTKIN r C o C? n (V w� alp cow m _ N w N w cnl� Ogi cein ro r_ r' di= �iP of +fl^ aR -^ mm opo o r �^ ©^ mm �6 mI.S v v GRADES _ I _ I � ^ _ _I GRADES i STA: 32 +00.00 (SECTION 1 -1 SEE SHEET 04.97) STA: 40 +00,00 (SECTION 1 -1 SEE SHEET C4.101) 30.00 m 20 -0 pjrn qoa poi � C�CI'� co m � CVI� �io per a � o C�VIm n o �o p0 pP m m C n O Z 10.06 o.0a 7.00 30.00 0.00 m 20.00 r, m C n D ).00 Z 10.00 00 0.00 30.d0 Z � U Z ALIGNMENT = PEELE RD. -S fv SCALE 11" X 17" = 1 - 20 H �� PROPOSED FILL / / ✓ / / /�/ M } -` AS -BUILT Y WATER SURFACE r � F- WATER (ELEVATIONS BELOW WATER SURFACE WHERE r 1" = 1 PRE - CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE $-� AS- BUILT SPOT GRADES (FOR ROAD BASE) 20.00 U Z QO � D 10.00 WV ) m z 0.00 L_0 r - 700.00 -90.00 -80.DO -70.00 -80.00 -50.00 -40.00 -30.00 - 2_0.00 -10.00 0.00 10 00 - 100.00 -90.06 -80.00 -70.00 -80.00 -50.00 -00.00 -30.00 -20.00 -10.00 0.00 10.00 _ AS -BUILT LIDAR o apIa v� AS -BUILT LIDAR {� ,C�r, plIra a @ h r a) W PRE GRADES TI t, '�i° 4ii° 66 f+i rn rlr 6+i� ° � ° c7 ° C ° a PRE. GRADES I U) T VJ a STA: 34 +00.00 (SECTION 1 -1 SEE SHEET C4.97) STA; 42+00.00 (SECTION 1 -1 SEE SHEET C4.101) 34.00. 71.0' PEELE 30.00 30.00 - 71.0` PEELE 30•� cn 12.0' 24.0` 5.0` 30.0` ROAD 12.0' 24.0' 5.0' .30.0' - ROAD M 20.D0 - -$ 8 W Z 20 00 m 20.00 " $ g L�tl W 20.00 J MATCH n. . a d Z r MATCH n n n n 8 Z C EXISTING GRADE ' w F : EXISTING D EXISTING GRADE h w w �� - EXISTING 0 m 8 S GRADE 0- p " w " w 8 8 GRADE a o w o w LLw g 8 0 © o g m g D 10.00- - _ - -, - - -- - - - 90.00 10.00 - - - - 10.00 5 PROPOSED / MATCH PROPOSED _ `� MATCH O LL TOP OF BERM EXISTING RADE TOP OF BERM EXISTING RADE _ PROPOSED PROPOSED ^ W s luilgti 0.00 0.00 0.00 0.00 �- O - 100.00 -90.00 -80.00 - 70..00 -60.00 - 5_0_.00 -40.00 - 3_0.00 - 2_0.00 -10.00 D.DD 10 -00 - 100.00 -90-OD -80.00 - 70.00 -60-OD -50.00 110.00 -30.00 - 20.00 -10.00 0.00 10.00 AS -BUILT LIDAR n m n n n Im eoir ors AS -BUILT LIDAR F� o �N Cluj i�l� oP cry RE N RUC TIO N o -ti p Q; N o ellw c� c o o f? o PRECONSTRW TI N GRADES rn rn r _ I_ ai _ IcEr vi�v GRADES aIv m� o cn+s� svm dill° SIN °LIn cols �m n'° �° �°- � vir mo_ �o ao^ rM �o _ ALIGNMENT = PEELE RD. SCALE 11" X 17" = 1 - 20 H �� PROPOSED FILL / / ✓ / / /�/ PROPOSED CUT 3 1 _ 20' -` AS -BUILT Y WATER SURFACE 22" X 34 "' = 1" = 10'H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r 1" = 1 PRE - CONSTRUCTION COLLECTED IN FIELD) EXISTING GRADE $-� AS- BUILT SPOT GRADES (FOR ROAD BASE) aIv m� o cn+s� svm dill° SIN °LIn cols �m n'° �° �°- � vir mo_ �o ao^ rM �o u1 c u7 011 Qi sa Qylo r c7 �I� �I� iCi� lq')4i Q - -� N AS- B U I LTS �m GATE: 01118/14 SHEET: 2 C o° _ PRa- rya.: 1002 OiiAWN(3Y: RC. 3a.D1 STA: 44 +00.00 (SECTION 1 -1 SEE SHEET 04.101) Ov 71.1 L� 12.0' 24.1' 5.17 30.D' ROAD g M 20.01 MATCH ry 8 g w Z 2090 C EXISTING GRADE w w EXISTING 0 -ni o f o W T w GRADE g w $ LL � a 10.01 ..- _.- .:...........b..} -- -1:- -- -. _ . !� � -.�j� /T r.,, �._ 1D.D0 PROPOSED MATCH TOP OF BERM EXISTING RADE PROPOSED 090 DITCH §Q=OM 0.01 - 100.D0 - 9_0.00 -80.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.00 0.00 10..00 AS -B�LIDAR PRECO 46 0, 6 2 o _.. r STA: 46+00.00 (SECTION 1 -1 SEE SHEET C4.101) 30.00 - 71.0' _PEELE__ 30.00 120 24 -V 5.0' 3fl.o ROAD g8 g8 m 2000 w 20.00 c MATCH § m EXISTING GRADE ] § Y . w Y 1 • g g ...........: v . _....._,.•- IL t �.0 EXISTING a GRADE .. .� - -.- .... ...:.- ^Z 1000 - . . 10.00 . - MATCH PRO .POSED EXISTING GRA PROPOSED TOP OF BERM NITQw QTTQLA 0.00 71.0' 0 -4U.UU - 12.0' 24.0' 0.00 3 - 100.00 -90.DO -8D.00 -7D.D0 -6D DO 5D.00 -4D.00 31.00 -20.00 -1D.00 0.00 1000 PROPOSED i AS -BUILT LIDAR PRECONSTRUCTIDN C41 Q'm a da:m 'o a11� m t7i_ .ry aspe Oi4 C4 c+i1a dw gl} * 1a al- p�7- �p v fy ptm yy-- 4� O M rn C7 -rr i6 i Ci16 c - Ifl1 d,Q' �� v a GRADES a r TOP OF BERM LL =s^ -. ••PftOPOS�D EXISTIN i co . .n;n z 2 a 0 � Ln 11 rRa. a1).: 1002 0.00 - nl a -' - STA: 49 +00.00 (SECTION 1 -1 SEE SHEET C4.101) 30.OD GRADES r 71.0' PEELE - .30.00 DITCH POTTOM 0.00 12A' 24.0' -50.00 5.0' 30.0' ROAD 10.00 0 S g 8 g �_�.r m 20.01 c; ai en �10 m1 ° c71. v+ p) 4' N o N � O o r �_ W �7.- 8$ w 2 20.00 C _s _�� MATCH EXISTING GRADE y J q° d EXISTING O STA: 54 +00.00 (SECTION 1 -1 SEE SHEET C4.105) O O w 71.0 PEELE w 12.0' GRADE C EL 5,V 0 ROAD 8g Sg EXISTING G m 20.00 .• 10.01 - . PROPOSED _ ...... EXISTING GRADE J .Y ' . - D.DO 0.00 0 a. J TOP OF BERM ....... PROPOSED 0.00 100.00 -90.00 -80.00 -70.00 -60.00 - 50.00 -40.00 -30.00 - 20.00 -10.00 0A0, 10.00 AS -BUILT LIDAR PRECONSTRM1ICTION 011 o v - A'n rim rn so �? N a tv',° .n'a OI s•.o c,'i rn. Q cs n ol. of ry w� o a GRADESla o'm -� ID .m 7000 f s STA: 50 +00.00 (SECTION 1 -1 SEE SHEET C4.101) Do 30 r 20.00 m 1 0 Z 10.00 20.00 70.00 I STA: 52 +00.00 (SECTION 1 -1 SEE SHEET 04.105) w 30.00 71 0' - PEELE 30.00 G r - - -- -- - - - - -- 12.0' 24.0' S.D' 30.fY ROAD g C ___ _____.f ------ - ___._.. w m 20.00 MATCH $ 8 8 Ld .� 20.00 a --- m w i EXISTING a a _ EXISTING GRADE w w W a y LL a W GRADE a .. LL g g a 71.0' 0 -4U.UU - 12.0' 24.0' u ROAD B.D' 30.0' -70�.00 - 8. MATCH T EXISTING GRADE w J LL w LL w w w 8 i r!" 20.00 PROPOSED LL 8 8 68 d a. O MATCH 4 EXISTING GRADE _ EXISTING GRADE MATCH f. PROPOSED - TOP OF BERM t. -..' . . PROPOSED DITCH BOTTOM N a N � 20.00 70.00 I STA: 52 +00.00 (SECTION 1 -1 SEE SHEET 04.105) w 30.00 71 0' - PEELE 30.00 G r - - -- -- - - - - -- 12.0' 24.0' S.D' 30.fY ROAD g C ___ _____.f ------ - ___._.. w m 20.00 MATCH $ 8 8 Ld .� 20.00 a --- m w i EXISTING a a _ EXISTING GRADE w w W a y LL a W GRADE a .. LL g g a MATCH PROPOSED .. EXISTTI G GRADE TOP OF BERM " " -' - . -' PROPOSED 0.00 - IT - H POMM 0.00 - 100.00 -90.00 -80.00 -70.00 -60.00 - 50.00 -40.00 30.00 -20.00 -10.00 0.00 10.00 AS -BUILT LIDAR r°s PRE R N ar of rn rsi o o {]o GRAD r eo sf 7- ES STA: 56+00.D0 (SECTION 1 -1 SEE SHEET 04.105) Z 30.00 71.0' _E .. 30.00 v ry Z M } . 12.0' - 24.1' - 5.0' 30.0' ROAD F- ig $g cfl 0 m 20.01 MATCH . ~ w 20.00 Q F LLI EXISTING GRADE w ,� w w o EXISTING .�-.1 J O af ->-I o '� 4 w w "S ? $ GRADE a LL 0 o W g g d ¢ 10.01 ..r,..;...._..,,_..,.�...,.:.. . o- 11 11)00 m PROPOSED MATCH /'^y TOP OF BERM i EXISTING RARE. �•i PROPOSED 0.00 Qual qQmm D.DO _ - 100.00 -90.00 -80.00 -70.00 - 60,00 _5000 -40 °.30.00 - 20,00 -10 °00 000 10.03 AS-BUILT LIDAR etnjn n{r O10 _ sn - - w Cj w .0 s,o a C q C14 c; o 0 GRADES U) CL 30.00 STA: 58 +00.00 (SECTION 1 -1 SEE SHEET 04.105) � m 20.00 r m A 1 0 Z 10.00 0.00 30.00 f1] 0 -4U.UU - C u - 100.00 - -90.00 - -80.00 - -70�.00 - -60.00 50. D0 0 20.00 PROPOSED LL -10.00 0 -00 10.00 #0P AS -BUILT LIDAR a MATCH m�� N N a N � �� v a W a r TOP OF BERM LL 1 0 -. ••PftOPOS�D EXISTIN GRADE co . .n;n z 2 a 0 � Ln 11 rRa. a1).: 1002 0.00 - nl a -' - -- G GRADES r DITCH POTTOM 0.00 - 100.00 -90.0.0 -8-0�.D0°- -70.00 -60.00 -50.00 -40.DO 30.00 -20.DO -10.00 0 10.00 0 �_�.r AS -BUILT LIDAR c; ai en �10 m1 ° c71. v+ p) 4' N o N � O o Q111 Lp'� �_ W �7.- cm MiQ a w TION TRECONSTRUf GRADES _. _s _�� STA: 54 +00.00 (SECTION 1 -1 SEE SHEET C4.105) 30.00 71.0 PEELE 30.Oo 12.0' 24.0' 5,V 30.0' ROAD 8g Sg m 20.00 .• 'K S - Irl Lu 20.00 r C EXISTING GRADE J s EXISTING 0 a. J GRADE - c 0 7000 MATCH PROPOSED .. EXISTTI G GRADE TOP OF BERM " " -' - . -' PROPOSED 0.00 - IT - H POMM 0.00 - 100.00 -90.00 -80.00 -70.00 -60.00 - 50.00 -40.00 30.00 -20.00 -10.00 0.00 10.00 AS -BUILT LIDAR r°s PRE R N ar of rn rsi o o {]o GRAD r eo sf 7- ES STA: 56+00.D0 (SECTION 1 -1 SEE SHEET 04.105) Z 30.00 71.0' _E .. 30.00 v ry Z M } . 12.0' - 24.1' - 5.0' 30.0' ROAD F- ig $g cfl 0 m 20.01 MATCH . ~ w 20.00 Q F LLI EXISTING GRADE w ,� w w o EXISTING .�-.1 J O af ->-I o '� 4 w w "S ? $ GRADE a LL 0 o W g g d ¢ 10.01 ..r,..;...._..,,_..,.�...,.:.. . o- 11 11)00 m PROPOSED MATCH /'^y TOP OF BERM i EXISTING RARE. �•i PROPOSED 0.00 Qual qQmm D.DO _ - 100.00 -90.00 -80.00 -70.00 - 60,00 _5000 -40 °.30.00 - 20,00 -10 °00 000 10.03 AS-BUILT LIDAR etnjn n{r O10 _ sn - - w Cj w .0 s,o a C q C14 c; o 0 GRADES U) CL 30.00 STA: 58 +00.00 (SECTION 1 -1 SEE SHEET 04.105) � m 20.00 r m A 1 0 Z 10.00 0.00 30.00 f1] SU.uu - -4U.UU - C u - 100.00 - -90.00 - -80.00 - -70�.00 - -60.00 50. D0 0 20.00 J LL -10.00 0 -00 10.00 AS -BUILT LIDAR a Lu m�� N N a N � �� v a W a r 70.00 LL 1 0 a ry c 0o n c ca 0 L f_ co . .n;n z 2 a 0 � Ln 11 rRa. a1).: 1002 0.00 - nl a -' - MENT - p D DRAWN BY: RC ALf r -PEELE . ;SCALE 11" x 17" = 1" - 20' H �� PROPOSED FILL PROPOSED CUT 3 -` AS -BUILT i WATER SURFACE ��++ pp II ff II ��++ 1' " =24'V 1`1ti7'vV�LT�7 22" X 34" = 1" = 10' H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r - PRE- CONSTRUCTION COLLECTED IN FIELD) 1" - V EXISTING GRADE Cam--\ AS -BUILT SPOT GRADES (FOR ROAD BASE) DATE: 01116114 SHEET: 05.13 SU.uu - -4U.UU - - 3U .U11 - -LU.W -IU.W 0.00 1u -uu - - 100.00 - -90.00 - -80.00 - -70�.00 - -60.00 50. D0 0 00.00 - - 30.00 - -21).00 - -10.00 0 -00 10.00 AS -BUILT LIDAR a a� n m m�� N N a N � �� v a a a a r r: o �' n A AS -BUILT LIDAR 1 1 0 a ry c 0o n c c7» p ( (D ,� rn o � co . .n;n z z,I,v n � Ln 11 rRa. a1).: 1002 PREGOHSTRDCit • GRADES W -' - -- G GRADES r - KI M �_�.r -PEELE . ;SCALE 11" x 17" = 1" - 20' H �� PROPOSED FILL PROPOSED CUT 3 -` AS -BUILT i WATER SURFACE ��++ pp II ff II ��++ 1' " =24'V 1`1ti7'vV�LT�7 22" X 34" = 1" = 10' H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r - PRE- CONSTRUCTION COLLECTED IN FIELD) 1" - V EXISTING GRADE Cam--\ AS -BUILT SPOT GRADES (FOR ROAD BASE) DATE: 01116114 SHEET: 05.13 DATE: 01116114 SHEET: 05.13 30.00 r 20.00 m g 1 0 z 10.00 a.a0 - 100 -00 -90.00 - 80.00 -70.00 -60.00 -50.00 -40.00 -30.00 -20.00 -10.OD 0.00 1D.00 STA 60 +00.00 (SECTION 1 -1 SEE SHEET C4.108) I 30.09 G aWi p r z° 20.00 0 a a a 10.00 0.00 AS -BUILT LIDAR GRADES 71Z ;SCALE 11 `° X 7 °, = 1 `° _Q° H 12.Cr 24.0° s.a' / / ✓ / //� /fry ROAD 30.0° -40.00 30.00 -20.00 -10.00 0.00 10.00 MATCH r ii it v EXISTING GRADE �i m " " LL o D D y c ........... ..... LL i++ d "? - PROPOSED TOP OF BERM LO O MATCH EXISTING GRADE Z -I EXISTING GRADE Pa p r ua1 aD a n w y o r- Ld 6 °' PR6PO$ER 12.0' -- 24.0' 5.0' - 30.0' ROAD I 30.09 G aWi p r z° 20.00 0 a a a 10.00 0.00 AS -BUILT LIDAR GRADES a�i`r° c ;SCALE 11 `° X 7 °, = 1 `° _Q° H PROPOSED FILL / / ✓ / //� /fry STA: 62 +00.00 (SECTION 1 -1 SEE SHEET C4.108) - 30.00 -40.00 30.00 -20.00 -10.00 0.00 10.00 AS -BUILT LIDAR T5.0' - PEELE 30.xO �y w p P .6 , xr wl rn a o° Pa p r ua1 aD a n w y o r- Ld 6 o;c.i 12.0' -- 24.0' 5.0' - 30.0' ROAD o .a PRE- CONSTRUCTION - - - - -- - vi $ 8 $ 8 m 20.00 r EXISTING GRADE MATCH " w UJ 20.00 II x II Y e 0_ § e EXISTING GRADE N w 4i EXISTING y 8 > _ W .. W LL W 8 EXISTING N GRADE a o g a ...... .... LL W 8 G GRADE 10.00 .- ...- :- •- _._.�._�•.� - - -- �-. N p °....� �.�, _ -- .�., _� s- �_ ;. ......... ..... ..� 10.00 § PROPOSED TOP OF BERM 3 PROPOSED tarlO �r� �I o °a inm t �'�a nl° I I ��m �m ®a ni17 C,11 o SrijC c�i;m Lei QI� a�i`r° c 0.00 ;SCALE 11 `° X 7 °, = 1 `° _Q° H PROPOSED FILL / / ✓ / //� /fry PROPOSED CUT -90.00 -80.00 - 70.00 -60.00 -50.00 -40.00 30.00 -20.00 -10.00 0.00 10.00 AS -BUILT LIDAR WATER SURFACE �y w p P .6 , xr wl rn a o° Pa p r ua1 aD a n w y o r- Ld 6 o;c.i GkA6F5it`TI6Fi o .a PRE- CONSTRUCTION - - - - -- - vi COLLECTED IN FIELD) EXISTING GRADE STA: 64+00.00 (SECTION 1 -1 SEE SHEET C4.108) 30.00 m 20.00 m Y O Z 10.00 0:00 12.0' 8. MATCH _ _ _ -EXISTING GRADE w I N - - -- --- - - -- -- LL PROPOSED TOP OF BERM I�n 24.0' Ye w LL 'w 71.0' ---I 5.0' 30.0' MATCH S 8 S EXISTING GRADE .�f `•' •'PROPOSED DtlTCH BOTTOM role ROAD LL z EXISTING r GRADE 0.00 30.00 20.00 10.09 0.00 - 100.00 - 90,00 -80.00 -70.00 -60.DO -50,00 -40 -DO -30.00 -20.00 -10.00 0.00 10.00 -� T_ AS -BUILT LIDAR ,..3 srla a w Lnin m1m w n NIIM o 4710 Wi❑ �i47 TL N d,ih LnIc ? d - 1N PRECONSTRUCTION R6 d, OD 0 OIL; M r r; ::-6 a 6 of GRADES ��I r ALIGNMENT = PEELE RD. ;SCALE 11 `° X 7 °, = 1 `° _Q° H PROPOSED FILL / / ✓ / //� /fry PROPOSED CUT 3 1 °, _ 20'V -` AS -BUILT Y WATER SURFACE _ 22° X 34° = 1 , - 1 Q' H PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE r 1" = 10' V -- - PRE- CONSTRUCTION - - - - -- - COLLECTED IN FIELD) EXISTING GRADE AS -BUILT SPOT GRADES (FOR ROAD BASE) AS -B U I LTS 'gym r -- sm c�iw c E %mod k�_ �a�LL�z F Ifl z rn 0 ¢© 0 7 U LLJ J CD Z 0 U N �V] rU) J �D �w LL O 2 LLJ A © LLrtl PROJ. NO.: 1002 DRAWN SY RC DATE: 01116/14 SHEET: C5.14 1 .1 I iS I TOP OF DITCH 4 w I SCALE 11" X 17" - 1° = 40' PARKING LOT DETAIL {At Small Road SCALE 22" X 34" - 1" = 20' (SEE GRADING PLAN SHEET C4 -64) 0 20' 40' w SCALE IN FEET - APPROXIMATE " =N 12" LAYER REJECT QUARRY MATERIAL ON EDGE OF ROAD TOP OF US 200 GEOTEXTILE FABRIC OR S" OF CLASS "A" RIPRAP ON TOP OF US 200 GEOT ILE FABRIC PARKING LOT CONSTRUCTED ON WHEEL STOP WHITE (TYP J NORTHSIDE OF ROYAL ROAD WHEEL STOP BLUE (HANDICAP) I a BOTTOM OF DITCH SCALE 1 " x 17° - 1° = 40' PARKING LOT DETAIL (At Royal Road s SCALE 22" X 34" - 1" = 20' (SEE GRADING PLAN SHEET C4.99) u DITCH 0 20' SCALE IN FEET 4SIq CE _ _ _ — 9.93 ' ________ APPROXIMATE EDGE OF ROAD qh a PRIlP85EII LOW ARROW f4k6P58EB -SLOPE ARROW _ °_----- - -_ - -- MAJOR PLUG -- - -- (LENGTH =100') 23 .1 T-'T CF DITCH E € LL d f'R8P63EBi+AINOR PLUG CENTERLINE OF BERM (FUTURE) e81!4F[2HP;F 12" LAYER REJECT QUARRY MATERIAL ON TOP OF US 200 ° MATCH EXISTIN (LENGTH = 50') a e a PR8PeSFH IPE AND RIPRAP x e EXISTING SURVEY SPOT ' ELEVATION X41 o EXISTING LIDAR ELEVATION G X 12.50 FROPOSEB POT ELEVATION NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. T r, ° -. APPROX. 1-706,TION OF EXISTINdGATE Z z to O v Z O (7 U) J J JU ?0 0 !I` ' GEOTEXTILE FABRIC OR 8" OF U EXISTING CLASS "A" RIPRAP ON TOP OF LL ROADSIDE DITCH US 200 GEQTEXTILE FABRIC + co D MATCH EXISTING, #, Q £BN5+RHe+100' CENTERLINE O 'BERM 0 a i " TOP OF BERM i ROADSIDE DITCH PLUG PARKING LOT DETAIL (At Small Roams FILL EXISTING DITCH (SEE GRADING PLAN SHEET 04.78) - PRO1NO.: 1002 r / i✓ �� (PARTIALLY FILLED) -- SGµE IN FEET fiNAWN SV RC SCALE 11" X 17" - 1" = 40' EV.NO. DATE DESCRIPTION "IF: 01116114 SCALE 22" X 34" - 1" = 20' SHEET: AS -P U I LTS C7.1 i LEGEND 44 6E ESTOP OF BERM N M a - Rm- PRQP96GEo -o' ROCK PAD N ? I w o ( LARGE SIZE MINE REJECTS) PR9P96E9 DITCH FILL PRIlP85EII LOW ARROW f4k6P58EB -SLOPE ARROW _ °_----- - -_ - -- MAJOR PLUG -- - -- (LENGTH =100') 23 .1 T-'T CF DITCH E € LL d f'R8P63EBi+AINOR PLUG CENTERLINE OF BERM (FUTURE) e81!4F[2HP;F 12" LAYER REJECT QUARRY MATERIAL ON TOP OF US 200 ° MATCH EXISTIN (LENGTH = 50') a e a PR8PeSFH IPE AND RIPRAP x e EXISTING SURVEY SPOT ' ELEVATION X41 o EXISTING LIDAR ELEVATION G X 12.50 FROPOSEB POT ELEVATION NOTE: THIS LEGEND SUPERCEDES LEGEND ON C1.2 WHEN CONFLICTING. T r, ° -. APPROX. 1-706,TION OF EXISTINdGATE Z z to O v Z O (7 U) J J JU ?0 0 !I` ' GEOTEXTILE FABRIC OR 8" OF U EXISTING CLASS "A" RIPRAP ON TOP OF LL ROADSIDE DITCH US 200 GEQTEXTILE FABRIC + co D MATCH EXISTING, #, Q £BN5+RHe+100' CENTERLINE O 'BERM 0 a i " TOP OF BERM i ROADSIDE DITCH PLUG PARKING LOT DETAIL (At Small Roams FILL EXISTING DITCH (SEE GRADING PLAN SHEET 04.78) - PRO1NO.: 1002 r / i✓ �� (PARTIALLY FILLED) -- SGµE IN FEET fiNAWN SV RC SCALE 11" X 17" - 1" = 40' EV.NO. DATE DESCRIPTION "IF: 01116114 SCALE 22" X 34" - 1" = 20' SHEET: AS -P U I LTS C7.1 i I� E aa_ EXISTING ROADSIDE �a orz �a w o�a L-- a" �x � 1 �m Zap 131 ° OFF: 21 -96 - - - �"'-- - - �?�- - = w° E E - - - - _ - 18 HDPE PIPE STA' 15 +54.62 - - _ _ - � C OF 17.81 OFF: 17.86 _ J - -- a 2 r a -- -- _ - �. - _ OFF 23.30 - - 18, HDPE PIPE 18" HDPE PIPE 18' HDPE PIPE PLUG EL - 11,29 INV. L = 8.93 fNV, EL =8.41 PLUG �EL 4 - i INV. EL= 8.46_- _ -- -- - - __ _ -,�- -- - - ;1 \ 9,85-t" ~�'� �' // // r I 60" HDPE PIPE - 2 - 60" HDPE / / r EXISTIF�t§R 60'° HDPE P {NV. EL. i r / ,� .~ % / / // r /,/ j OA 1D DITCH r - €L�241 i 50tLO1dC} o 100. / r r 80' LONG 8 1 OPE J� r 45' ery INV. EL ROADSIDE DITCH PLUG r i / r 9 � 0 38(9.421 {SEE DETAIL J \_ -s (FUTURE) r/ /r rr Xr l,r /! r/ I iI ]SCALE 11 " X 17" - 1 " = 40" SCALE 22" X 34" - 1 " = 20" �' PLUG EL h SHEET C11.2) _ / / F / r, / // RIP -RAP CLASS B 2' THICK ^ / r i r ; EXISTING DITCH TO BE FILLED OVER 6" #57 STONE OVER \ Ir r r / { / / J/ // < WIMUCK AND WOOD CHIPS F 200 US GEOTEXTILE X, PIPE CROSSING DETAIL cr (SMALL ROAD) 0 1. 40' 6v' SCALE 11" x 17" -1° - 40" PIPE CROSSING DETAIL @a (SMALL ROAD) 0 20, 1, (SEE GRADING PLAN SHEET 04.53 & C4,65) SCALE 22" X 34" - 1" - 20" (SEE GRADING PLAN SHEET 04.75) � � z SCALE IN FEET SCALE IN FEET z D PIPE - -- O EXISTING RO 1DE S A. DITCH]r -i q �r PLUG EL 18 "rHDPE PIP =11.14 INV EL 826 _9.54-------- - r/, STA. 110 +40 2 - 18" HDPE- 517+ LONG INV. EL. 9.0= i r r / / J ✓ {SEE DETAIL EXISTING ROADSIDE DITCH m STA: 136 +76.99 _ OFF: - 23.f3d _ - •fi ._ _ STA; 138 +7q.6 _ -� 1$" HDPE PIPE -� - - -- r _ OFF: -24.09 STA_ 110+5103 � - - - - - - -- 18" HDPE PIPE - -- T 1Dd' ',INV, EL -8:42 in OFF: -22.38 - _ _ _ P KI G L T �--� -- ROADSIDE DITCH PLUG 18 'HDPE PIPE I -(PUT a - - - - - -- - - - - - - - EI =1 .8 -_ - - -- -- LL� �If I;1RE}' - - -- PARKING LOT EL= 11.97 ' sser0 � -, STA: 136 +69,26 _ -? _r - 11A6 #3¢F X590±- OFF: 16.44 _ �i -- - WHORE PIPE + J {/) STA: 110 +49.34 'J PLUG €L =10.40 INV. L _ 84.5 OFF: 17-3131 pFF: 19,02 �� -rw`�� - 9.93 18" HpPE PIPE 18 "HOPE PIPE = i�y�� t -- _ - - -- _ - - - NV. EL = 7.83 f . _ EXISTING ROADSIDE DITCH �3 ¢ ( j o Lu _ CL - EXISTING DITCH TO BE FILLED CEN LI BERM WI o EXISTING ROADSIDE DITCH N1 - CCt3:tFFlt3�r 1 OU' ROADSIDE DITCH PLUG / rr r / // / SHEET 11.2) PIPE CROSSING DETAIL a (SMALL ROAD) SCALE 11" X 17" - 1" - 40 °' 0 s0, a0' E0 r / (SEE GRADING PLAN SHEET C4.78} SCALE 22" X 34" PRa- 10D2 EXISTING DITCFiTO BE FILLED / rr r/ y/ , Ji - 1" = 20" 17ii ' SCALE IN FEET AWN (3Y: RC. J); WIMUCKAr�D D CHIPS / r /// � / J� / /r �' 3 1 Ill i. sSCALE 11" x 17° - 1° = 40° PIPE CROSSING DETAIL @ (SMALL ROAD) a �, 40' A j_B LT SCALE 22" X 34" - 1" = 20" (SEE GRADING PLAN SHEET C4.76) SCALE IN FEET GATE: 01/16/14 SHEET: C9. 1 �c NORTH R I T RIP -RAP CLASS B 2' THICY E OVER &'#57 STONE OVER US 200 US GEOTEXTILE P f r� � � Ft ©AIIKi - 8 EXISTING ]ROADSIDE DITC P EB 8 P #57 60 I STO�V� U OfEXTII E '. fNV. L = 1.99 60" HDPE PIP - STA: 15 +55.56 PLUG EL 10.04 _ ~^ 1NV EL - 2.09 OFF: - 18.19 F- - - SEP TI -t11 + OFF: - 19.48' - - -- 18 "HDPE PIPE -, INV. EL = 8.56 71 18" HDPE PIPE 4 M� - -- I� E aa_ EXISTING ROADSIDE �a orz �a w o�a L-- a" �x � 1 �m Zap 131 ° OFF: 21 -96 - - - �"'-- - - �?�- - = w° E E - - - - _ - 18 HDPE PIPE STA' 15 +54.62 - - _ _ - � C OF 17.81 OFF: 17.86 _ J - -- a 2 r a -- -- _ - �. - _ OFF 23.30 - - 18, HDPE PIPE 18" HDPE PIPE 18' HDPE PIPE PLUG EL - 11,29 INV. L = 8.93 fNV, EL =8.41 PLUG �EL 4 - i INV. EL= 8.46_- _ -- -- - - __ _ -,�- -- - - ;1 \ 9,85-t" ~�'� �' // // r I 60" HDPE PIPE - 2 - 60" HDPE / / r EXISTIF�t§R 60'° HDPE P {NV. EL. i r / ,� .~ % / / // r /,/ j OA 1D DITCH r - €L�241 i 50tLO1dC} o 100. / r r 80' LONG 8 1 OPE J� r 45' ery INV. EL ROADSIDE DITCH PLUG r i / r 9 � 0 38(9.421 {SEE DETAIL J \_ -s (FUTURE) r/ /r rr Xr l,r /! r/ I iI ]SCALE 11 " X 17" - 1 " = 40" SCALE 22" X 34" - 1 " = 20" �' PLUG EL h SHEET C11.2) _ / / F / r, / // RIP -RAP CLASS B 2' THICK ^ / r i r ; EXISTING DITCH TO BE FILLED OVER 6" #57 STONE OVER \ Ir r r / { / / J/ // < WIMUCK AND WOOD CHIPS F 200 US GEOTEXTILE X, PIPE CROSSING DETAIL cr (SMALL ROAD) 0 1. 40' 6v' SCALE 11" x 17" -1° - 40" PIPE CROSSING DETAIL @a (SMALL ROAD) 0 20, 1, (SEE GRADING PLAN SHEET 04.53 & C4,65) SCALE 22" X 34" - 1" - 20" (SEE GRADING PLAN SHEET 04.75) � � z SCALE IN FEET SCALE IN FEET z D PIPE - -- O EXISTING RO 1DE S A. DITCH]r -i q �r PLUG EL 18 "rHDPE PIP =11.14 INV EL 826 _9.54-------- - r/, STA. 110 +40 2 - 18" HDPE- 517+ LONG INV. EL. 9.0= i r r / / J ✓ {SEE DETAIL EXISTING ROADSIDE DITCH m STA: 136 +76.99 _ OFF: - 23.f3d _ - •fi ._ _ STA; 138 +7q.6 _ -� 1$" HDPE PIPE -� - - -- r _ OFF: -24.09 STA_ 110+5103 � - - - - - - -- 18" HDPE PIPE - -- T 1Dd' ',INV, EL -8:42 in OFF: -22.38 - _ _ _ P KI G L T �--� -- ROADSIDE DITCH PLUG 18 'HDPE PIPE I -(PUT a - - - - - -- - - - - - - - EI =1 .8 -_ - - -- -- LL� �If I;1RE}' - - -- PARKING LOT EL= 11.97 ' sser0 � -, STA: 136 +69,26 _ -? _r - 11A6 #3¢F X590±- OFF: 16.44 _ �i -- - WHORE PIPE + J {/) STA: 110 +49.34 'J PLUG €L =10.40 INV. L _ 84.5 OFF: 17-3131 pFF: 19,02 �� -rw`�� - 9.93 18" HpPE PIPE 18 "HOPE PIPE = i�y�� t -- _ - - -- _ - - - NV. EL = 7.83 f . _ EXISTING ROADSIDE DITCH �3 ¢ ( j o Lu _ CL - EXISTING DITCH TO BE FILLED CEN LI BERM WI o EXISTING ROADSIDE DITCH N1 - CCt3:tFFlt3�r 1 OU' ROADSIDE DITCH PLUG / rr r / // / SHEET 11.2) PIPE CROSSING DETAIL a (SMALL ROAD) SCALE 11" X 17" - 1" - 40 °' 0 s0, a0' E0 r / (SEE GRADING PLAN SHEET C4.78} SCALE 22" X 34" PRa- 10D2 EXISTING DITCFiTO BE FILLED / rr r/ y/ , Ji - 1" = 20" 17ii ' SCALE IN FEET AWN (3Y: RC. J); WIMUCKAr�D D CHIPS / r /// � / J� / /r �' 3 1 Ill i. sSCALE 11" x 17° - 1° = 40° PIPE CROSSING DETAIL @ (SMALL ROAD) a �, 40' A j_B LT SCALE 22" X 34" - 1" = 20" (SEE GRADING PLAN SHEET C4.76) SCALE IN FEET GATE: 01/16/14 SHEET: C9. 1 APPROXIMATE EDGE IN�Is'--s -� � ��OF EkISTiNG ROAD Aj STA:12 +34.38 Q OFF: -32.07 48' HDPE PIPE $ -12,00 JV. EL = 3.92 AR KING LOT it 4 L = 10.60 fiCH EXISTING . f 'PARKING LOT om SMALL R&AY7 ALIGNMENT EL= 81 - - -- -- -� - -- _' O 139i00 138' ��.•{ � � r ` � - - e \ APPROXIMATE EDGE - OF EXISTING ROAD MATCH EXISTING - - t ` SCALE 11" X 17" � 1" = 40" SCALE 22"' X 34" - 1" = 20" TOP OF BERM J MATCH EXISTING \ \ OFF: -30.27 48' HOPE PIPE INV FI =I flit PIPE CROSSING DETAIL cal (SMALL ROAD (SEE GRADING PLAN SHEET 04,78) (SEE DETAIL SHEET 011.2) MATCH EXISTING \ \ I APPROX LOCATION OF EXISTING, GATE } f EXISTING PIPE r t r STA:48 +49,9 OFF: -28.14 APPROXIMATE EDGE 'HDPE PIPE \ NV. OF EL = 2.8fl ISTING ROAD \\� EXISTING 48' N 1 W uTi a prz w o�a a" �x \ LE MATCI EXITING r PEELE ROAD ALIGNMENT 39.00 _ATC�N` I f ' °I -ROYAL ROAD ALIGNMENT Y -` EXISTING Ii�� ------ i ,rr -_, - - -- - -- 40� \\ - -- - STA: 47 +28. z 6bilto. OFF: -26.39 4 I 48" HDPE PIPE INV. EL = 2.81 CENTERLINE OF BERM - DITCH (ROYAL ROAD) 0 2T - - i lif ! - N (SEE GRADING PLAN SHEET 04.101) - - lllbKnP OF MATCH EXISTING - 0 20 SCALE 11 " X 17" - 1 " = 40" SCALE 22"X 34" - 1"=20" E m Y;�^si3 R� U f - r1 PIPE CROSSING DETAIL @ (ROYAL ROAD) 0 2T 40' 60, (SEE GRADING PLAN SHEET 04.101) z SCALE IN FEET '.. th z n 0 Z ¢ o - EXISTING DITCH 0 G9Pi€T -RWG 100' APPROXIMATE EDGE ROADSIDE DITCH PLUG m OF EXISTING ROAD - - - - STA: 16 +20.89 - I' STA: 16 +29.5$ - -- - - _ OFF: -18.57 OFF: -19.39 - J 18" HDPE PIPE 18" HDPE PIPE _ _ - Q) INV. EL =7.30 INV. EL =7.11 - - - - - - -- ------------ U7 —+- - - - w ----- - - - - -- - - V -__ STA; 16 +20.42 STA: 16 +29.77 z OFF: 21.98 OFF: 21.77 {� 98' HDPE PIPE 18" HDPE PIPE -rl - - - - -- - J - U) 'INV. EL = 7.03 - - a s„ v - - — — — STA. 48 m 28- ' 1 2 - 18" CALP _J7 3B`tBMf { V'� EXISTING DITCH I I PIPE CROSSING DETAIL @ (ROYAL ROAD) PIPE CROSSING DETAIL @ (ROYAL ROAD) r SCALE 11" X 17" - 1" = 40" (SEE GRADING PLAN SHEET 04.99) 0 1. 40' 60 s SCALE 22" X 34" - 1" = 20" (SEE DETAIL SHEET Cl 1.2) SCALE IN FEET cc LL' c UJ CL O a SCALE 11 X 17 - 1 = 40 (SEE GRADING PLAN SHEET C4.99) 0 z0• 40• 6u• PRDJ.NO. 1002 SCALE 22" X 34 °' - 1 "' = 20" : (SEE DETAIL SHEET 011.2) SCALE INFEET DRAWN BY- RC AS -B U I LTS REV. No, DATE DESCRIPTICY4 DAT €: 07116114 SHEET: 9 2 7r4ATCH EXI _ N w G T a�x° w O r �B / � 12 +1- 12" TYPE'B' RIPR - US 200 FILTER FABRIC II % y -MATCH EXISTING '1 GRADE N o M d a 10' _ ( — BERM SHIFTED 10t DUE TO OBSTRUCTION ON _ - - 18:0 S q _ + PROPERTY LINE-- --- ►- .. ---�., I - �.- I / - -_°.' -- STING _ Li CL 413 stl 12.01.'1' 412 —L39 i�j � / _ ° i�YiEsi �s �. 3 10.08'' o E� t. C 10.01 ° $ 4 NT y _ v 11 85 12.37 �.X 49 4 11 7 T4_4 - I T.5G -' PYRAMAT TURF . ER'F'YLI r,�' REINFORCEMENT - � 2.34 y6 70 ; 7.30 128 +50.00 (N -H] 'S9 775�5�, 7.50 }L 2' OL ' - _' '` 1 8.87 2,74 4.32 �:B.E �- TOE OF BERM R; - w- - TOP OF BERM ELEV. E R 72.44 ±�" MAC' . SCALE 11"X 1 7 - V=40' SPILLWAY DETAIL SCALE 11"X 17-l"=40' SPILLWAY DETAIL SCALE 22" X 34" - 1" = 20' (SEE GRADING PLAN SHEET C4_89) zo 4a ea SCALE 22" X 34" - 1" = 20' a zu, 40' so' (SEE GRADING PLAN SHEET C4.106) Z SCALE IN FEET SCALE IN FEET M j 20.00 131 12' 12l 76, r 20.00 i 0 m J k EXISTING -GRADE MATCH 7) SEE DETAL {THIS SHEET) % 10.69 GRADE CROSSING " EXISTING w GRADE m _ AP9>OXih9AT1Fr EDGE j / .... U� ROAD ir - w 9.32 ¢ j y.4d 91 -Pi .—.gam_ [,. / ,f r :� r ",: i MATCH EXISTING GRADE 6' LAYER OF CLASS "A` STONE fn {n �. L ROAD US 200 FILTER FABRIC OR STABILIZATION FABRIC 18" LAYER OF CLASS "B" STONE PYRAMAT TURF 0� • 10..x` '^' ° .� .� - ,. YtNMENT J_ � REINFORCEMENT✓" 11.G2 i9 �--J- ■./ ?0.37 s o..D6 -40.00 -30.00 -20.00 a.o0 -50.00 0.00 1000 20 -DO 3O.DO 40D0 .� 9.4 ONEAT- GRAOECROSSING US 200 STABILIZATION EE DETAIL THIS SHEET) SCALE 11" X 17'" - 1" = 20' AT -GRADE CROSS SECTION X -X J w - FABRIC UNDER STONE � - -- � e:ri� ue 9.56 s z; :.°� �.• J -i] f 9_.32 - ? 9 25 //f SCALE 22" X 34" - 1" = 10° LEGEND PROPOSED SPILLWAY (SEE GRADING PLAN SHEET C4.98) o v Q LL (10 C? J J EXISTING ROADSIDE cr 1 U X DITCH {PYRAMAT TURF REINFORCEMENT) PROPOSED FILL PROPOSED CUT 2 O [� AS -BUILT WATER SURFACE s d PYRAMAT TURF REINFORCEMENT PROPOSED DITCH CROSSING 1 (# 5 STONE) NE) - - - - — � PROPOSED RIP RAP PROPOSED GRADE WATER (ELEVATIONS BELOW WATER SURFACE WHERE PRE - CONSTRUCTION COLLECTED IN FIELD) - - - - - - - - - AS -BUILT SPOT GRAZES EXISTING GRADE (FOR ROAD SASE] PRDJ NO 1002 fipAWNBV RC r � Ev. No. __RATE 4ESCwwropea DATE: 01 I9 611 d PROPOSED TOP OF BERM SHEET: SCALE 11" X 17" -1" = 40' AT -GRADE CROSSING DETAIL c 21r 41 c:,. PROPOSED S" ROCK PAD —g �T O. SCALE 22" X 34" - 1" = 20' — (SEE GRADING PLAN SHEET CAM) SCALE INFEET 1©1 (LARGE SIZE MINE REJECTS) TOP OF BANK BOTTOM DITCH TOP OF BANK TOE OF SLOPE TOP OF BERM TOE OF SLOPE TYPICAL SPILLWAY Ml A k 1 1! I r 4 A l EXISTING GRAOE 1.5' WI TH PYRAMAT TURF - - - PROPOSE DITCH II ----- - - - - -- j-' EL 2-0' j I1 .11. 19, .1'. IA, EL. 11 5' EL. 14.0' PYRAMAT TURF REINFORCEMENT (TOP LAYER) WRAP AROUND FACE OF BERM 1 TYPE "B" RIP -RAP NOTES: WI TH PYRAMAT TURF REINFORCEMENT 1. INSTALL PYRAMAT TURF REINFORCEMENT MAT IN (BOTTOM LAYER) ACCORDANCE WITH MANUFACTURER'S SECTION VIEW RECOMMENDATIONS. 2. AT A MINIMUM USE 2- DIFFERENT LAYERS OF PLACEMENT OF PYRAMAT. THE BOTTOM LAYER SHOULD BE USED AT THE SPILLWAY FLOOR AND DISCHARGE FLUME. A SEPARTE - TOP LAYER SHOULD BE USED ON THE SIDE WALLS OF THE SPILLWAY AND FRONT AND BACK FACES OF THE BERM. 3, SUBMIT SHOP DRAWINGS TO ENGINEER TWO WEEKS PRIOR TO STARTING WORK FOR REVIEW AND APPROVAL FOR DIFFERENT PLACEMENT OF PYRAMAT. SPILLWAY STA. 48 +80 (SEE GRADING PLAN SHEET 04.89) SCALE, 1" = 10' 1' EXISTING - GRADE PROP0SED DITCH I- EL. 2.p / 1 4' 12' 4' 10' 0' 2' . EL 10. � L_- _ r EL. 8.0' 12" TYPE "B" RIP -RAP SECTION VIEW WITH PYRAMAT TURF REINFORCEMENT (BOTTOM LAYER) SPILLWAY STA. 125 +50 (SEE GRADING PLAN SHEET 04.106) SCALE: 1" = 10' :KF--- - - - - - PYRAMAT TURF REINFORCEMENT (TOP LAYER) WRAP AROUND FACE OF BERM NOTES: 1. INSTALL PYRAMAT TURF REINFORCEMENT MAT IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. 2. AT A MINIMUM USE 2- DIFFERENT LAYERS OF PLACEMENT OF PYRAMAT, THE BOTTOM LAYER SHOULD BE USED AT THE SPILLWAY FLOOR AND DISCHARGE FLUME. A SEPARTE - TOP LAYER SHOULD BE USED ON THE SIDE WALLS OF THE SPILLWAY AND FRONT AND BACK FACES OF THE BERM. 3. SUBMIT SHOP DRAWINGS TO ENGINEER TWO WEEKS PRIOR TO STARTING WORK FOR REVIEW AND APPROVAL FOR DIFFERENT PLACEMENT OF PYRAMAT. AS- B U I LTS �m 18" 3' 10' �- EL.. 10.0' 7 TOP OF BERM ��EE✓ TOE OF BERM WRAP PYRAMAT AROUND FACE OF THE BERM (TOP LAYER) FACE BERMI SPILLWAY ,2n FACE BERM/ SPILLWAY f TOP OF BERM TOE OF BERM )RAP PYRAMAT AROUND FACE OF THE BERM (TOP LAYER) N W (D a C ca x � 0 r v'sro 8� Ec°ate �idaH LLf�2 z� F tr r IC ID z3 ° z M r a Z to 0 O ¢© t� L N M 0- J c 4 co LIJ J 0 0 }4} C¢ LL J Cu ° J x �0 a 0 PROJ- NO.: 1002 mAwR Br: RC DATE: 01/16114 SHEET: 010.2 NOTES: F MAX- 1. USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY AS DIRECTED. 2, PROVIDE 5' -0" STEEL POST OF THE SELF- FASTENER ANGLE STEEL TYPE. 3. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 16° ABOVE GROUND SURFACE. li w*] a, Ey.I c FILTER CL TEMPORARY SILT FENCE Not to Scat® �111T Llklj 1.6 MIN. FILTER CLOTH UPSTREAM ELEVATION CLAY WITH SHELL K RDAdc�yp DITCH (10' -14' DEPTH FROM BORROW AREA) �IrCM r FIELP TkIl 1 LEN ` 10' FIELD DITCH EXTENTION� z ONLY AT FIELD DITCH LOCATIONS ° FIELD DITCH— ROADSIDE DITCH— CLAYEY SAND OR SANDY CLAY F (2' -10' DEPTH FROM 13ORROW AREA) CLAY WITH SHELL (10' -14' DEPTH FROM BORROW AREA) 100" ROADSIDE DITCH PLUG not to sr-ale NOTES: 1 CONTRACTOR TO EXCAVATE TEST PITS AT EACH BORROW SITE IN THE PRESENCE OF THE ENGINEER TO DETERMINE SUITABILITY OF CLAY LAYERS FOR PLUG MATERIAL- 2. PLUGS WILL BE CONSTRUCTED FROM BORROW MATERIAL EXCAVATED FROM ONE PIT PER PLUG LOCATED NO LESS THAN 100' FROM THE PLUG IN ANY DIRECTION. ESTIMATED SIZE OF EACH BORROW PIT IS 80'xSV T.W. 3. EXTEND PLUG MATERIAL 10' INSIDE FIELD DITCH AT EACH INTERSECTION OF A ROADSIDE DITCH WITH A FIELD DITCH, euoe TEMPORARY MODIFIED ROCK CHECK DAM CROSS - SECTION VIEW -MINOR NOTES: TO BE CONSTRUCTED AT INTERSECTIONS OF INTERNAL FIELD DITCHES AND INTERNAL ROADSIDE DITCHES; DAMS TO BE REMOVED PRIOR TO CONSTRUCTION COMPLETION. 12" OF NCD C FILTER CL f� CLAYEY SAND OR SANDY CLAY (2' -10' DEPTH FROM BORROW AREA) FIELD DITCH CLAY WITH SHELL (10' -14' DEPTH FROM BORROW AREA) CLAYEY SAND OR SANDY CLAY (2' -10' DEPTH FROM BORROW AREA) 50' FIELD DITCH PLUG not to Scale .L ar �v.5le.aic ay.� IN - -° —CLAY FROM LOCAL BORROW P'.- 1.S' (MIN) EXISTING DITCH -. 7' (MIN) TYPICAL DITCH PLUG - SECTION not to scale UPSTREAM ELEVATION .5'MIN. I H TEMPORARY MODIFIED ROCK CHECK DAM CROSS- SECTION VIEW - MAJOR NOTES: TO BE CONSTRUCTED AT INTERSECTIONS OF INTERNAL ROADSIDE DITCHES (Le. BAY CITY NO, 1) AND EXTERNAL ROADSIDE DITCHES (Le, SR 1002); DAMS TO BE REMOVED PRIOR TO CONSTRUCTION COMPLETION. AS -B U I LTS IIIIII�� n 1-° �6 � 8 MI U C �x O A LS Z �0 C1 w x W co s � � J W ca LU J � �n J ` 0 Q ry cLL LLI C13 0 Z F- LU 0_ ° '(D PRO.I. No.: 1002 DRAWN or RC DATE: 01116114 SHEET: 011.1 ALTERNATE 1 TYPE 01 OR IV HIGH ALTERNATE 2 INTENSITY RED RETROREFLEC71VE SHEETING MOUNTED ON .125" ALUMINUM PANEL S —12' TOP .� jp, ,� r, (VARIES SEE PLAN) Lys a 0 TO BE FILLED wf SAND 4 r 3c MINERAL SOIL BERM � r 1 law N\ �., MUCK LAYER DEPTH r NINE 3" DIA- RED PRISMATIC .,. VARIES AVG PLASTIC REFLECTORS ( KEY WAY (GON'Tj SAND & MINERAL SOIL)) WOVEN STABILIZATION FABRIC (US 200); WIDTH VARIES — 2 SHEETS WJ MIN. 1 ' c OVERLAP 's i NOTES; 1. KEY WAY SHALL EXTEND THROUGH THE ORGANIC SOILS AND TIE TO THE MINERAL SOILS. PERIMETER BERM SHALL BE CONSTRUCTED WITH SUITABLE MINERAL SOILS EXCAVATED FROM THE PERIMETER DITCHES. 2, ORGANIC ANDIOR MINERAL SOILS EXCAVATED FROM THE PERIMETER DITCHES BERM AND KEY WAYS THAT IS UNSUITABLE FOR BERM CONSTRUCTION SHALL BE DISPOSED OF IN THE DITCHES IDENTIFIED TO BE FILLET] BY WOOD CHIPS ANDIOR MUCK, KEY WAY DETAIL N.T.S. AREA TO BE SEEDED Sc MULCHED — 150' TOTAL 75' 75' OF PROPOSED BYPASS DITCH S 4 +f g EROSION CONTROL MATTING SEED & MULCH MATER DEPTH VARIABLE 2 MAIf. 1. VERIFY ALL DOWNSTREAM ROCK CHECK DAMS ARE WORKING PROPERLY PRIOR TO CONSTRUCTING PROPOSED DITCH- 2- IMMEDIATELY AFTER DITCH EXCAVATION, SEED WITH A TEMPORARY SEED IN RATES AS LISTED BELOW OR IN SECTION 6.10 NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL- 3. IMMEDIATELY AFTER SEED APPLICATION, INSTALL EROSION CONTROL MATTING (BIONET - C125EIN, BIOD -MAT 40 OR OTHER APPROVED EQUALS) IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 4. IMMEDIATELY AFTER SEEDING AND PLACEMENT OF EROSION CONTROL MATTING, APPLY MULCH OR HAY AT A RATE NOT LESS THAN 2.6 TONS PER ACRE (NO MORE THAN 25% OF THE GROUND SURFACE SHOULD BE VISIBLE AFTER APPLICATION) . 5- AFTER HAY APPLICATION, "ANCHOR" HAY EITHER WITH SEVERAL PASSES OF A TRACKED PIECE OF EQUIPMENT OR OTHER APPROPRIATE TOOL. 6. AFTER RAINSTORMS INSPECT ALL MULCHED AND SEEDED AREAS FOR RILL EROSION. TEMPORARY SEEDING: SEPTEMBER - MARCH: RYE GRAIN 120 LBS. PER ACRE - APRIL - AUGUST : BROWNTOP MILLET 40 LBS. PER ACRE. TEMPORARY BYPASS DITCH AND CROSS - SECTION V.T.S. TYPICAL APPLICATION AT END OF ROADWAY (DEAD END) REGARDLESS OF WHETHER GUARDRAIL IS INSTALLED ••i l J_ -L L 3 MARKERS MINIMUM 7' U— CHANNEL POSTS (1.12 LB/FT) END OF ROAD MARKERS N. T. S. MATCH EXISTING ROAD ALIGNMENT AND GRADE 2 1 BOTTOM 48" HOPE SMOOTH WALL OF DITCH 116' LONG INV- EL = 4.V TER TO CENTER MINIMUM TYP- CLASS "B" RIP -RAP (10'x 10'x 2') OVER FILTER FABRIC JV. EL = 1.01 BOTTOM OF DITCH N W � G awi prz° (D ai a o M U yli c O o PEELE ROAD INTERSECTION z �m 0 2 ROADWAY EL. 1T- 13' 2 ,"', n 0 EXISTING 1 12" MIN. 1 a 0 Q GRADE - - -- 1 -- - - - -� — - -- — EL VARIES J . U. INV. 18" CALP PIPE m EXISTING 50'3 LONG TYP. CLASS "B" DITCH RIP -RAP (10' x 1D' x 2') EXISTING TYPICAL CULVERT DETAIL OVER FILTER FABRIC DITCH N 4' PIPE PROJECTION M ANCHOR FABRIC FROM TOE OF SLOPE SIDE DRIVEWAYI/ LOPE SUMP ROADWAY SECTION ;'`-ice �r i • �f f`��i ,� ',� ? 0 J PROP. DRIVEWAY/ TOP OF ROCK TO BE 6" z ROADWAY CULVERT 8ELOW PIPE INVERT ELEV. � LL W O Z W 12" GRAVEL (3H -4 "0) RIP —RAP OVER WOVEN STABILIZATION FABRIC (USF 200) J NOTES,- TO TOP OF BANK EACH END A 5 -BUILT S 1. SUMP WIDTH — 5' WIDTH FOR PIPE DIAMETERS X24',- 10' WIDTH FOR PRO J. No -: 1DD2 PIPE DIAMETERS X24" DRAWN By: RC: 2. RIP RAP ADJACENT TO DRIVEWAYIROAD TO TOP OF BANK; RIP RAP REV.N.. DATE DESMPTION DATE: 01116/14 DITCH SIDE SLOPES TO ELEV 10' OR TOP OF PIPE, WHICHEVER 1S ,G REATER SHEET: Cl CULVERT RIP -RAP SECTION 1 ' APPENDIX B PERMITS, CERTIFICATIONS, AND NURSERY CERTIFICATES U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW- 2001 -10096 County: Beaufort U.S.G.S. Quad: NC- AURORA GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner: PotashCorp Attn: Mr. Jeff Furness Address: 1530 NC Hwv 306 South Aurora, North Carolina 27806 Agent: CZR Incorporated Attn: Ms. Julia Kirkland Berger Address: 4709 College Acres Drive Suite 2 Wilmington, North Carolina 28403 -1725 Size and location of property (water body, road name /number, town, etc.): Approximately 3667 acres (aka The P Lands and U Lands Restoration Site: Phases 1, 2 and 3) near the headwaters of South Creek located on the east and west sides of Bav City Highway (SR 1002), southeast of the Town of Aurora, Beaufort County. North Carolina Latitude: 35.233831 Longitude: - 76.775742 Description of projects area and activity: This permit authorizes excavation, mechanized land clearing and the placement of fill material associated with the construction of the P Lands and U Lands Restoration Site Phases 1 land 3 Authorized impacts to waters of the U.S. are identified in the table on page 2 of this authorization. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NW27 SEE ATTACHED NATIONWIDE AND SPECIAL CONDITIONS. Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated February 6, 2012 . Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and /or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e, are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733 -1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Anny verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits. If there are any questions regarding this very leation, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Tom Steffeni ay910 4615. Corps Regulatory Official Date: -= 1 7Z,,9 (2 Expiration Date of Verification: 04/j6/2014 Page lof 3 Summary of Authorized Impacts and Required Mitigation NWP /GP Open Water (acres)* Wetland (acres)** Unim octant Stream (If) Important Stream (if) -TernPorarYAPer111arrent Temporary Permanent Temporary Permanent Temporary Fpermanent 27 0 15.19 381 0 0 0 0 0 Impact total 0 15.19 381 0 0 0 0 0 Total Loss of Waters of the US ( acres) = 0 Required Wetland Mitigation (acres) = 0 Total Loss of Waters of the US (If) = 0 Required Stream Mitigation (If) = 0 Additional Remarks: Supporting documentation, attached figures and appendices for the project purpose was submitted with the PCN and titled "Compensatory Mitigation Plan for the P lands and U Lands Restoration Site ". * Individual open water impact locations are detailed in Exhibit A attached to the PCN and represent the addition of plugs and/or fill into multiple ditches to recharge the hydrology of the surrounding wetlands. ** Individual wetland impact locations (WI-W22) are also detailed in Exhibit A. Impacts are represented as temporary impacts necessary to fulfill the overall project purpose of wetland restoration/reestablishment and enhancement/rehabilitation. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit ht tp:// per2 .nwp.usace.anny.mil /survey.html to complete the survey online. Copy Furnished: Jonathan T. Ricketts Inc. Page 2 of 3 JE Determination of Jurisdiction: A. ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued _ Action ID _ Basis For Determination The site exhibits wetland criteria as defined in the 1987 Corps Wetland Delineation Manual and prior to the implementation of the Interim Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coast Plain Region. Remarks: All necessary parameters were evaluated and documented on the appropriate data forms. Waters of the US determinations were documented based on the presence of an ordinary high water mark pursuant to Regulatory Guidance Letter 05 -05; Ordinary High water Mark (OHWM) Identification. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Actjurisdicfion for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303 -8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by * *It is not necessary to submit an RFA ,,fornyto the Division Office if you do not object to the determination in this correspondence. ** Corps Regulatory Official: ✓V� 5 Date: 04/18/2012 Expiration Date: Page 3 of 3 J1-- Action ID Number: SAW- 2001 -10096 / P and U Lands Restoration Site / NWP 27 County: Beaufort Permittee: PotasbCorp / Mr. Jeff Furness Date Permit Issued: 04/18/2012 Project Manager: Tom Steffens / David Lekson Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Mr. David Lekson Washington Regulatory Field Office 2407 West 5`h Street Washington, North Carolina 27889 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NATIONWIDE PERMIT 27 DEPARTMENT OF THE ARMY CORPS OF ENGINEERS FINAL NOTICE OF ISSUANCE AND MODIFICATION OF NATIONWIDE PERMITS FEDERAL REGISTER AUTHORIZED MARCH 19, 2012 _Aquatic Habitat Restoration, Establishment, and Enhancement Activities. Activities in waters of the United States associated with the restoration, enhancement, and establishment of tidal and non -tidal wetlands and riparian areas, the restoration and enhancement of non -tidal streams and other non -tidal open waters, and the rehabilitation or enhancement of tidal streams, tidal wetlands, and tidal open waters, provided those activities result in net increases in aquatic resource functions and services. To the extent that a Corps permit is required, activities authorized by this NWP include, but are not limited to: the removal of accumulated sediments; the installation, removal, and maintenance of small water control structures, dikes, and berms, as well as discharges of dredged or fill material to restore appropriate stream channel configurations after small water control structures, dikes, and berms, are removed; the installation of current deflectors; the enhancement, restoration, or establishment of riffle and pool stream structure; the placement of in- stream habitat structures; modifications of the stream bed and /or banks to restore or establish stream meanders; the backfilling of artificial channels; the removal of existing drainage structures, such as drain tiles, and the filling, blocking, or reshaping of drainage ditches to restore wetland hydrology; the installation of structures or fills necessary to establish or re- establish wetland or stream hydrology; the construction of small nesting islands; the construction of open water areas; the construction of oyster habitat over unvegetated bottom in tidal waters; shellfish seeding; activities needed to reestablish vegetation, including plowing or discing for seed bed preparation and the planting of appropriate wetland species; re- establishment of submerged aquatic vegetation in areas where those plant communities previously existed; re- establishment of tidal wetlands in tidal waters where those wetlands previously existed; mechanized land clearing to remove non - native invasive, exotic, or nuisance vegetation; and other related activities. Only native plant species should be planted at the site. This NWP authorizes the relocation of non -tidal waters, including non -tidal wetlands and streams, on the project site provided there are net increases in aquatic resource functions and services. Except for the relocation of non -tidal waters on the project site, this NWP does not authorize the conversion of a stream or natural wetlands to another aquatic habitat type (e.g., stream to wetland or vice versa) or uplands. Changes in wetland plant communities that occur when wetland hydrology is more fully restored during wetland rehabilitation activities are not considered a conversion to another aquatic habitat type. This NWP does not authorize stream channelization. This NWP does not authorize the relocation of tidal waters or the conversion of tidal waters, including tidal wetlands, to other aquatic uses, such as the conversion of tidal wetlands into open water impoundments. Compensatory mitigation is not required for activities authorized by this NWP since these activities must result in net increases in aquatic resource functions and services. Reversion. For enhancement, restoration, and establishment activities conducted: (1) In accordance with the terms and conditions of a binding stream or wetland enhancement or restoration agreement, or a wetland establishment agreement, between the landowner and the U.S. Fish and Wildlife Service (FWS), the Natural Resources Conservation Service (MRCS), the Farm Service Agency (FSA), the National Marine Fisheries Service (NMFS), the National Ocean Service (NOS), U.S. Forest Service (USFS), or their designated state cooperating agencies; (2) as voluntary wetland restoration, enhancement, and establishment actions documented by the NRCS or USDA Technical Service Provider pursuant to NRCS Field Office Technical Guide standards; or (3) on reclaimed surface coal mine lands, in accordance with a Surface Mining Control and Reclamation Act permit issued by the Office of Surface Mining Reclamation and Enforcement ( OSMRE) or the applicable state agency, this NWP also authorizes any future discharge of dredged or fill material associated with the reversion of the area to its documented prior condition and use (i.e., prior to the restoration, enhancement, or establishment activities). The reversion must occur within five years after expiration of a limited term wetland restoration or establishment agreement or permit, and is authorized in these circumstances even if the discharge occurs after this NWP expires. The five -year reversion limit does not apply to agreements without time limits reached between the landowner and the FWS, NRCS, FSA, NMFS, NOS, USFS, or an appropriate state cooperating agency. This NWP also authorizes discharges of dredged or fill material in waters of the United States for the reversion of wetlands that were restored, enhanced, or established on prior- converted cropland or on uplands, in accordance with a binding agreement between the landowner and NRCS, FSA, FWS, or their designated state cooperating agencies (even though the restoration, enhancement, or establishment activity did not require a section 404 permit). The prior condition will be documented in the original agreement or permit, and the determination of return to prior conditions will be made by the Federal agency or appropriate state agency executing the agreement or permit. Before conducting any reversion activity the permittee or the appropriate Federal or state agency must notify the district engineer and include the documentation of the prior condition. Once an area has reverted to its prior physical condition, it will be subject to whatever the Corps Regulatory requirements are applicable to that type of land at the time. The requirement that the activity results in a net increase in aquatic resource functions and services does not apply to reversion activities meeting the above conditions. Except for the activities described above, this NWP does not authorize any future discharge of dredged or fill material associated with the reversion of the area to its prior condition. In such cases a separate permit would be required for any reversion. Reporting. For those activities that do not require pre - construction notification, the permittee must submit to the district engineer a copy of: (1) The binding stream enhancement or restoration agreement or wetland enhancement, restoration, or establishment agreement, or a project description, including project plans and location map; (2) the NRCS or USDA Technical Service Provider documentation for the voluntary stream enhancement or restoration action or wetland restoration, enhancement, or establishment action; or (3) the SMCRA permit issued by OSMRE or the applicable state agency. The report must also include information on baseline ecological conditions on the project site, such as a delineation of wetlands, streams, and /or other aquatic habitats. These documents must be submitted to the district engineer at least 30 days prior to commencing activities in waters of the United States authorized by this NWP. Notification: The permittee must submit a pre - construction notification to the district engineer prior to commencing any activity (see general condition 31), except for the following activities: (1) Activities conducted on non - Federal public lands and private lands, in accordance with the terms and conditions of a binding stream enhancement or restoration agreement or wetland enhancement, restoration, or establishment agreement between the landowner and the U.S. FWS, NRCS, FSA, NMFS, NOS, USFS or their designated state cooperating agencies; (2) Voluntary stream or wetland restoration or enhancement action, or wetland establishment action, documented by the NRCS or USDA Technical Service Provider pursuant to NRCS Field Office Technical Guide standards; or (3) The reclamation of surface coal mine lands, in accordance with an SMCRA permit issued by the OSMRE or the applicable state agency. However, the permittee must submit a copy of the appropriate documentation to the district engineer to fulfill the reporting requirement. (Sections 10 and 404) Note: This NWP can be used to authorize compensatory mitigation projects, including mitigation banks and in -lieu fee projects. However, this NWP does not authorize the reversion of an area used for a compensatory mitigation project to its prior condition, since compensatory mitigation is generally intended to be permanent. NATIONWIDE PERMIT CONDITIONS The following General Conditions must be followed in order for any authorization by a NWP to be valid: 1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. (c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. 3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized. 4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. 5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by NWP 27. 6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act). 7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization. 8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and /or restricting its flow must be minimized to the maximum extent practicable. 9. Management of Water Flows. To the maximum extent practicable, the pre - construction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization and storm water management activities, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre - construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities). 10. Fills Within 100 -Year Floodplains. The activity must comply with applicable FEMA- approved state or local floodplain management requirements. 11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. 12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low -flow or no -flow. 13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre - construction elevations. The affected areas must be revegetated, as appropriate. 14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWT general conditions, as well as any activity - specific conditions added by the district engineer to an NWP authorization. 15. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. 16. Wild and Scenic Rivers. No activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). 17. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights. 18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which "may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed. (b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will review the documentation and determine whether it is sufficient to address ESA compliance for the NWP activity, or whether additional ESA consultation is necessary. (c) Non - federal permittees must submit a pre - construction notification to the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally - listed endangered or threatened species or designated critical habitat, the pre - construction notification must include the name(s) of the endangered or threatened species that might be affected by the proposed work or that utilize the designated critical habitat that might be affected by the proposed work. The district engineer will determine whether the proposed activity "may affect" or will have "no effect" to listed species and designated critical habitat and will notify the non- Federal applicant of the Corps' determination within 45 days of receipt of a complete pre - construction notification. In cases where the non - Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the project, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification the proposed activities will have "no effect" on listed species or critical habitat, or until Section 7 consultation has been completed. If the non - Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps. (d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add species - specific regional endangered species conditions to the NWPs. (e) Authorization of an activity by a NWP does not authorize the "take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from the U.S. FWS or the NMFS, The Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word "harm" in the definition of "take" means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering. on (f) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the U.S. FWS and NMFS or their world wide web pages at http: / /www.f\vs.gov/ or httn: / /www.fws.gov/ipac and htttp : / /www.noaa.gov /fisheries.html respectively. 19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for obtaining any "take" permits required under the U.S. Fish and Wildlife Service's regulations governing compliance with the Migratory Bird Treaty Act or the Bald and Golden Eagle Protection Act. The permittee should contact the appropriate local office of the U.S. Fish and Wildlife Service to determine if such "take" permits are required for a particular activity. 20. Historic Properties. (a) In cases where the district engineer determines that the activity may affect properties listed, or eligible for listing, in the National Register of Historic Places, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied. (b) Federal permittees should follow their own procedures for complying with the requirements of Section 106 of the National Historic Preservation Act. Federal permittees must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will review the documentation and determine whether it is sufficient to address section 106 compliance for the NWP activity, or whether additional section 106 consultation is necessary. (c) Non - federal permittees must submit a pre - construction notification to the district engineer if the authorized activity may have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the pre - construction notification must state which historic properties may be affected by the proposed work or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location of or potential for the presence of historic resources can be sought from the State Historic Preservation Officer or Tribal Historic Preservation Officer, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre - construction notifications, district engineers will comply with the current procedures for addressing the requirements of Section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include background research, consultation, oral history interviews, sample field investigation, and field survey. Based on the information submitted and these efforts, the district engineer shall determine whether the proposed activity has the potential to cause an effect on the historic properties. Where the non - Federal applicant has identified historic properties on which the activity may have the potential to cause effects and so notified the Corps, the non - Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects or that consultation under Section 106 of the NHPA has been completed. (d) The district engineer will notify the prospective permittee within 45 days of receipt of a complete pre - construction notification whether NHPA Section 106 consultation is required. Section 106 consultation is not required when the Corps determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR §800.3(a)). If NHPA section 106 consultation is required and will occur, the district engineer will notify the non - Federal applicant that he or she cannot begin work until Section 106 consultation is completed. If the non - Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps. (e) Prospective permittees should be aware that section 110k of the NHPA (16 U.S.C. 470h -2(k)) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of Section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO /THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties. 21. Discovery of Previously Unknown Remains and Artifacts. If you discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately notify the district engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The district engineer will initiate the Federal, Tribal and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 22. Designated Critical Resource Waters. Critical resource waters include, NOAA- managed marine sanctuaries and marine monuments, and National Estuarine Research Reserves. The district engineer may designate, after notice and opportunity for public comment, additional waters officially designated by a state as having particular environmental or ecological significance, such as outstanding national resource waters or state natural heritage sites. The district engineer may also designate additional critical resource waters after notice and opportunity for public comment. (a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, and 52 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. (b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, and 38, notification is required in accordance with general condition 31, for any activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after it is determined that the impacts to the critical resource waters will be no more than minimal. 23. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that adverse effects on the aquatic environment are minimal: (a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site). (b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal. (c) Compensatory mitigation at a minimum one -for -one ratio will be required for all wetland losses that exceed 1/10 -acre and require pre - construction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse effects of the proposed activity are minimal, and provides a project - specific waiver of this requirement. For wetland losses of 1 /10 -acre or less that require pre - construction notification, the district engineer may determine on a case -by -case basis that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment. Compensatory mitigation projects provided to offset losses of aquatic resources must comply with the applicable provisions of 33 CFR part 332. (1) The prospective perminee is responsible for proposing an appropriate compensatory mitigation option if compensatory mitigation is necessary to ensure that the activity results in minimal adverse effects on the aquatic environment. (2) Since the likelihood of success is greater and the impacts to potentially valuable uplands are reduced, wetland restoration should be the first compensatory mitigation option considered. (3) If permittee- responsible mitigation is the proposed option, the prospective permittee is responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan may be used by the district engineer to make the decision on the NWP verification request, but a final mitigation plan that addresses the applicable requirements of 33 CFR 332.4(c)(2) — (14) must be approved by the district engineer before the permittee begins work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation (see 33 CFR 332.3(k)(3)). (4) If mitigation bank or in -lieu fee program credits are the proposed option, the mitigation plan only needs to address the baseline conditions at the impact site and the number of credits to be provided. (5) Compensatory mitigation requirements (e.g., resource type and amount to be provided as compensatory mitigation, site protection, ecological performance standards, monitoring requirements) may be addressed through conditions added to the NWP authorization, instead of components of a compensatory mitigation plan. (d) For losses of streams or other open waters that require pre - construction notification, the district engineer may require compensatory mitigation, such as stream rehabilitation, enhancement, or preservation, to ensure that the activity results in minimal adverse effects on the aquatic environment. (e) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2 -acre, it cannot be used to authorize any project resulting in the loss of greater than 1/2 -acre of waters of 6 the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that a project already meeting the established acreage limits also satisfies the minimal impact requirement associated with the NWPs. (f) Compensatory mitigation plans for projects in or near streams or other open waters will normally include a requirement for the restoration or establishment, maintenance, and legal protection (e.g., conservation easements) of riparian areas next to open waters. In some cases, riparian areas may be the only compensatory mitigation required. Riparian areas should consist of native species. The width of the required riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. If it is not possible to establish a riparian area on both sides of a stream, or if the waterbody is a lake or coastal waters, then restoring or establishing a riparian area along a single bank or shoreline may be sufficient. Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis. In cases where riparian areas are determined to be the most appropriate form of compensatory mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses. (g) Permittees may propose the use of mitigation banks, in -lieu fee programs, or separate permittee- responsible mitigation. For activities resulting in the loss of marine or estuarine resources, permittee- responsible compensatory mitigation may be environmentally preferable if there are no mitigation banks or in -lieu fee programs in the area that have marine or estuarine credits available for sale or transfer to the permittee. For permittee- responsible mitigation, the special conditions of the NWP verification must clearly indicate the parry or parties responsible for the implementation and performance of the compensatory mitigation project, and, if required, its long -term management. (h) Where certain functions and services of waters of the United States are permanently adversely affected, such as the conversion of a forested or scrub -shrub wetland to a herbaceous wetland in a permanently maintained utility line right -of -way, mitigation may be required to reduce the adverse effects of the project to the minimal level. 24. Safety of Impoundment Structures. To ensure that all impoundment structures are safely designed, the district engineer may require non - Federal applicants to demonstrate that the structures comply with established state dam safety criteria or have been designed by qualified persons. The district engineer may also require documentation that the design has been independently reviewed by similarly qualified persons, and appropriate modifications made to ensure safety. 25. Water Quality. Where States and authorized Tribes, or EPA where applicable, have not previously certified compliance of an NWP with CWA Section 401, individual 401 Water Quality Certification must be obtained or waived (see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality. 10 26. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)). The district engineer or a State may require additional measures to ensure that the authorized activity is consistent with state coastal zone management requirements. 27. Regional and Case -By -Case Conditions. The activity must comply with any regional conditions that may have been added by the Division Engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone Management Act consistency determination. 28. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed 1/3 -acre. 29. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a nationwide permit verification, the permittee may transfer the nationwide permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the letter, and the letter must contain the following statement and signature: "When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below." (Transferee) (Date) 30. Compliance Certification. Each permittee who receives an NWP verification letter from the Corps must provide a signed certification documenting completion of the authorized activity and any required compensatory mitigation. The success of any required permittee- responsible mitigation, including the achievement of ecological performance standards, will be addressed separately by the district engineer. The Corps will provide the permittee the certification document with the NWP verification letter. The certification document will include: 11 (a) A statement that the authorized work was done in accordance with the NWP authorization, including any general, regional, or activity- specific conditions; (b) A statement that the implementation of any required compensatory mitigation was completed in accordance with the permit conditions. If credits from a mitigation bank or in -lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(1)(3) to confirm that the permittee secured the appropriate number and resource type of credits; and (c) The signature of the permittee certifying the completion of the work and mitigation. 31. Pre - Construction Notification. (a) Timing. Where required by the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre - construction notification (PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary to make the PCN complete. The request must specify the information needed to make the PCN complete. As a general rule, district engineers will request additional information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the district engineer. The prospective permittee shall not begin the activity until either: (1) Be or she is notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or (2) 45 calendar days have passed from the district engineer's receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer. However, if the permittee was required to notify the Corps pursuant to general condition 18 that listed species or critical habitat might be affected or in the vicinity of the project, or to notify the Corps pursuant to general condition 20 that the activity may have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that there is "no effect" on listed species or "no potential to cause effects" on historic properties, or that any consultation required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) and/or Section 106 of the National Historic Preservation (see 33 CFR 330.4(g)) has been completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee may not begin the activity until the district engineer issues the waiver. If the district or division engineer notifies the permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). (b) Contents of Pre - Construction Notification: The PCN must be in writing and include the following information: (1) Name, address and telephone numbers of the prospective permittee; (2) Location of the proposed project; 12 (3) A description of the proposed project; the project's purpose; direct and indirect adverse environmental effects the project would cause, including the anticipated amount of loss of water of the United States expected to result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity. The description should be sufficiently detailed to allow the district engineer to determine that the adverse effects of the project will be minimal and to determine the need for compensatory mitigation. Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. (Sketches usually clarify the project and when provided results in a quicker decision. Sketches should contain sufficient detail to provide an illustrative description of the proposed activity (e.g., a conceptual plan), but do not need to be detailed engineering plans); (4) The PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters on the project site, but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many waters of the United States. Furthermore, the 45 day period will not start until the delineation has been submitted to or completed by the Corps, as appropriate; (5) If the proposed activity will result in the loss of greater than 1/10 -acre of wetlands and a PCN is required, the prospective permittee must submit a statement describing how the mitigation requirement will be satisfied, or explaining why the adverse effects are minimal and why compensatory mitigation should not be required. As an alternative, the prospective permittee may submit a conceptual or detailed mitigation plan. (6) If any listed species or designated critical habitat might be affected or is in the vicinity of the project, or if the project is located in designated critical habitat, for non - Federal applicants the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed work or utilize the designated critical habitat that may be affected by the proposed work. Federal applicants must provide documentation demonstrating compliance with the Endangered Species Act; and (7) For an activity that may affect a historic property listed on, determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, for non - Federal applicants the PCN must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. Federal applicants must provide documentation demonstrating compliance with Section 106 of the National Historic Preservation Act. (c) Form of Pre - Construction Notification: The standard individual permit application form (Form ENG 4345) may be used, but the completed application form must clearly indicate that it is a PCN and must include all of the information required in paragraphs (b)(1) through (7) of this general condition. A letter containing the required information may also be used. (d) Agency Coordination: (1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the project's adverse environmental effects to a minimal level. 13 (2) For all NWP activities that require pre - construction notification and result in the loss of greater than 1/2 -acre of waters of the United States, for NWP 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52 activities that require pre - construction notification and will result in the loss of greater than 300 linear feet of intermittent and ephemeral stream bed, and for all NWP 48 activities that require pre- construction notification, the district engineer will immediately provide (e.g., via e- mail, facsimile transmission, overnight mail, or other expeditious manner) a copy of the complete PCN to the appropriate Federal or state offices (U.S. FWS, state natural resource or water quality agency, EPA, State Historic Preservation Officer (SHPO) or Tribal Historic Preservation Office (THPO), and, if appropriate, the NMFS). With the exception of NWP 37, these agencies will have 10 calendar days from the date the material is transmitted to telephone or fax the district engineer notice that they intend to provide substantive, site - specific comments. The comments must explain why the agency believes the adverse effects will be more than minimal. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the pre - construction notification. The district engineer will fully consider agency comments received within the specified time frame concerning the proposed activity's compliance with the terms and conditions of the NWPs, including the need for mitigation to ensure the net adverse environmental effects to the aquatic environment of the proposed activity are minimal. The district engineer will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each pre - construction notification that the resource agencies' concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. (3) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by Section 305(b)(4)(B) of the Magnuson- Stevens Fishery Conservation and Management Act. (4) Applicants are encouraged to provide the Corps with either electronic files or multiple copies of pre- construction notifications to expedite agency coordination. D. District Engineer's Decision 1. In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest. For a linear project, this determination will include an evaluation of the individual crossings to determine whether they individually satisfy the terms and conditions of the NWP(s), as well as the cumulative effects caused by all of the crossings authorized by NWP. If an applicant requests a waiver of the 300 linear foot limit on impacts to intermittent or ephemeral streams or of an otherwise applicable limit, as provided for in NWPs 13, 21, 29, 36, 39, 40, 42, 43, 44, 50, 51 or 52, the district engineer will only grant the waiver upon a written determination that the NWP activity will result in minimal adverse effects. When making minimal effects determinations the district engineer will consider the direct and indirect effects caused by the NWP activity. The district engineer will also consider site specific factors, such as the environmental setting in the 14 vicinity of the NWP activity, the type of resource that will be affected by the NWP activity, the functions provided by the aquatic resources that will be affected by the NWP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that aquatic resource functions will be lost as a result of the NWP activity (e.g., partial or complete loss), the duration of the adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g., watershed or ecoregion), and mitigation required by the district engineer. If an appropriate functional assessment method is available and practicable to use, that assessment method may be used by the district engineer to assist in the minimal adverse effects determination. The district engineer may add case - specific special conditions to the NWP authorization to address site - specific environmental concerns. 2. If the proposed activity requires a PCN and will result in a loss of greater than 1/10 - acre of wetlands, the prospective permittee should submit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for projects with smaller impacts. The district engineer will consider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment of the proposed activity are minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the district engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, after considering mitigation, the district engineer will notify the permittee and include any activity - specific conditions in the NWP verification the district engineer deems necessary. Conditions for compensatory mitigation requirements must comply with the appropriate provisions at 33 CFR 332.3(k). The district engineer must approve the final mitigation plan before the permittee commences work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. The district engineer must review the proposed compensatory mitigation plan within 45 calendar days of receiving a complete PCN and determine whether the proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment. If the net adverse effects of the project on the aquatic environment (after consideration of the compensatory mitigation proposal) are determined by the district engineer to be minimal, the district engineer will provide a timely written response to the applicant. The response will state that the project can proceed under the terms and conditions of the NWP, including any activity - specific conditions added to the NWP authorization by the district engineer. 3. If the district engineer determines that the adverse effects of the proposed work are more than minimal, then the district engineer will notify the applicant either: (a) That the project does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; (b) that the project is authorized under the NWP subject to the applicant's submission of a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level; or (c) that the project is authorized under the NWP with specific modifications or conditions. Where the district engineer determines that mitigation is required to ensure no more than minimal adverse effects occur to the aquatic environment, the activity will be authorized within the 45 -day PCN period, with activity - specific 15 conditions that state the mitigation requirements. The authorization will include the necessary conceptual or detailed mitigation or a requirement that the applicant submit a mitigation plan that would reduce the adverse effects on the aquatic environment to the minimal level. When mitigation is required, no work in waters of the United States may occur until the district engineer has approved a specific mitigation plan or has determined that prior approval of a final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation. 1. District Engineers have authority to determine if an activity complies with the terms and conditions of an NWT. 2. NWPs do not obviate the need to obtain other federal, state, or local permits, approvals, or authorizations required by law. 3. NWPs do not grant any property rights or exclusive privileges. 4. NWPs do not authorize any injury to the property or rights of others. 5. NWPs do not authorize interference with any existing or proposed Federal project. Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse environmental effects on surface water quality resulting from development. BMPs are categorized as structural or non - structural. Compensatory mitigation: The restoration (re- establishment or rehabilitation), establishment (creation), enhancement, and /or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse impacts which remain after all appropriate and practicable avoidance and minimization has been achieved. Currently serviceable: Useable as is or with some maintenance, but not so degraded as to essentially require reconstruction. Direct effects: Effects that are caused by the activity and occur at the same time and place. Discharge: The term "discharge" means any discharge of dredged or fill material. Enhancement: The manipulation of the physical, chemical, or biological characteristics of an aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s). Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic resource area. Ephemeral stream: An ephemeral stream has flowing water only during, and for a short duration after, precipitation events in a typical year. Ephemeral stream beds are located above the water table year- round. Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source of water for stream flow. Establishment (creation): The manipulation of the physical, chemical, or biological characteristics present to develop an aquatic resource that did not previously exist at an upland site. Establishment results in a gain in aquatic resource area. High Tide Line: The line of intersection of the land with the water's surface at the maximum height reached by a rising tide. The high tide line may be determined, in the absence 16 of actual data, by a line of oil or scum along shore objects, a more or less continuous deposit of fine shell or debris on the foreshore or berm, other physical markings or characteristics, vegetation lines, tidal gages, or other suitable means that delineate the general height reached by a rising tide. The line encompasses spring high tides and other high tides that occur with periodic frequency but does not include storm surges in which there is a departure from the normal or predicted reach of the tide due to the piling up of water against a coast by strong winds such as those accompanying a hurricane or other intense storm. Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior. This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria (36 CFR part 60). Independent utility: A_test to determine what constitutes a single and complete non - linear project in the Corps regulatory program. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi -phase project that depend upon other phases of the project do not have independent utility. Phases of a project that would be constructed even if the other phases were not built can be considered as separate single and complete projects with independent utility. Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still reasonably foreseeable. Intermittent stream: An intermittent stream has flowing water during certain times of the year, when groundwater provides water for stream flow. During dry periods, intermittent streams may not have flowing water. Runoff from rainfall is a supplemental source of water for stream flow. Loss of waters of the United States: Waters of the United States that are permanently adversely affected by filling, flooding, excavation, or drainage because of the regulated activity. Permanent adverse effects include permanent discharges of dredged or fill material that change an aquatic area to dry land, increase the bottom elevation of a waterbody, or change the use of a waterbody. The acreage of loss of waters of the United States is a threshold measurement of the impact to jurisdictional waters for determining whether a project may qualify for an NWP; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offset losses of aquatic functions and services. The loss of stream bed includes the linear feet of stream bed that is filled or excavated. Waters of the United States temporarily filled, flooded, excavated, or drained, but restored to pre - construction contours and elevations after construction, are not included in the measurement of loss of waters of the United States. Impacts resulting from activities eligible for exemptions under Section 404(f) of the Clean Water Act are not considered when calculating the loss of waters of the United States. Non -tidal wetland: A non -tidal wetland is a wetland that is not subject to the ebb and flow of tidal waters. The definition of a wetland can be found at 33 CFR 328.3(b). Non -tidal wetlands contiguous to tidal waters are located landward of the high tide line (i.e., spring high tide line). Open water: For purposes of the NWPs, an open water is any area that in a year with normal patterns of precipitation has water flowing or standing above ground to the extent that an ordinary high water mark can be determined. Aquatic vegetation within the area of standing or 17 flowing water is either non - emergent, sparse, or absent. Vegetated shallows are considered to be open waters. Examples of "open waters" include rivers, streams, lakes, and ponds. Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding areas (see 33 CFR 328.3(e)). Perennial stream: A perennial stream has flowing water year -round during a typical year. The water table is located above the stream bed for most of the year. Groundwater is the primary source of water for stream flow. Runoff from rainfall is a supplemental source of water for stream flow. Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes. Pre - construction notification: A request submitted by the project proponent to the Corps for confirmation that a particular activity is authorized by nationwide permit. The request may be a permit application, letter, or similar document that includes information about the proposed work and its anticipated environmental effects. Pre - construction notification may be required by the terms and conditions of a nationwide permit, or by regional conditions. A pre - construction notification may be voluntarily submitted in cases where pre - construction notification is not required and the project proponent wants confirmation that the activity is authorized by nationwide permit. Preservation: The removal of a threat to, or preventing the decline of, aquatic resources by an action in or near those aquatic resources. This term includes activities commonly associated with the protection and maintenance of aquatic resources through the implementation of appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or functions. Re- establishment: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural /historic functions to a former aquatic resource. Re- establishment results in rebuilding a former aquatic resource and results in a gain in aquatic resource area and functions. Rehabilitation: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in aquatic resource area. Restoration: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic resource area, restoration is divided into two categories: re- establishment and rehabilitation. Riffle and pool complex: Riffle and pool complexes are special aquatic sites under the 404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient sections of streams. Such stream sections are recognizable by their hydraulic characteristics. The rapid movement of water over a course substrate in riffles results in a rough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools are deeper areas associated with riffles. A slower stream velocity, a streaming flow, a smooth surface, and a finer substrate characterize Pools. Riparian areas: Riparian areas are lands adjacent to streams, lakes, and estuarine- marine shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems, through 10 which surface and subsurface hydrology connects riverine, lacustrine, estuarine, and marine waters with their adjacent wetlands, non - wetland waters, or uplands. Riparian areas provide a variety of ecological functions and services and help improve or maintain local water quality. (See general condition 23.) Shellfish seeding: The placement of shellfish seed and/or suitable substrate to increase shellfish production. Shellfish seed consists of immature individual shellfish or individual shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate may consist of shellfish shells, shell fragments, or other appropriate materials placed into waters for shellfish habitat. Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at separate and distant locations. The term "single and complete project" is defined as that portion of the total linear project proposed or accomplished by one owner /developer or partnership or other association of owners /developers that includes all crossings of a single water of the United States (i.e., a single waterbody) at a specific location. For linear projects crossing a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and complete project for purposes ofNWl? authorization. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of such features cannot be considered separately. Single and complete non - linear project: For non - linear projects, the term "single and complete project" is defined at 33 CFR 330.2(i) as the total project proposed or accomplished by one owner /developer or partnership or other association of owners /developers. A single and complete non - linear project must have independent utility (see definition of "independent utility "). Single and complete non - linear projects may not be "piecemealed" to avoid the limits in an NWP authorization. Stormwater management: Stormwater management is the mechanism for controlling stormwater runoff for the purposes of reducing downstream erosion, water quality degradation, and flooding and mitigating the adverse effects of changes in land use on the aquatic environment. Stormwater management facilities: Stormwater management facilities are those facilities, including but not limited to, stormwater retention and detention ponds and best management practices, which retain water for a period of time to control runoff and /or improve the quality (i.e., by reducing the concentration of nutrients, sediments, hazardous substances and other pollutants) of stormwater runoff. Stream bed: The substrate of the stream channel between the ordinary high water marks. The substrate may be bedrock or inorganic particles that range in size from clay to boulders. Wetlands contiguous to the stream bed, but outside of the ordinary high water marks, are not considered part of the stream bed. Stream channelization: The manipulation of a stream's course, condition, capacity, or location that causes more than minimal interruption of normal stream processes. A channelized stream remains a water of the United States. Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef, permanent 19 mooring structure, power transmission line, permanently moored floating vessel, piling, aid to navigation, or any other manmade obstacle or obstruction. Tidal wetland: A tidal wetland is a wetland (i.e., water of the United States) that is inundated by tidal waters. The definitions of a wetland and tidal waters can be found at 33 CFR 328.3(b) and 33 CFR 328.3(fl, respectively. Tidal waters rise and fall in a predictable and measurable rhythm or cycle due to the gravitational pulls of the moon and sun. Tidal waters end where the rise and fall of the water surface can no longer be practically measured in a predictable rhythm due to masking by other waters, wind, or other effects. Tidal wetlands are located channelward of the high tide line, which is defined at 33 CFR 328.3(d). Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1) Guidelines. They are areas that are permanently inundated and under normal circumstances have rooted aquatic vegetation, such as seagrasses in marine and estuarine systems and a variety of vascular rooted plants in freshwater systems. Waterbodv:For purposes of the NWPs, a waterbody is a jurisdictional water of the United States. If a jurisdictional wetland is adjacent —meaning bordering, contiguous, or neighboring — to a waterbody determined to be a water of the United States under 33 CFR 328.3(a)(I) -(6), that waterbody and its adjacent wetlands are considered together as a single aquatic unit (see 33 CFR 328.4(c)(2)). Examples of "waterbodies" include streams, rivers, lakes, ponds, and wetlands. M Final Regional Conditions 2012 NOTICE ABOUT WEB LINKS IN THIS DOCUMENT. The web links (both internal to our District and any external links to collaborating agencies) in this document are valid at the time ofpublication. However, the Wilmington District Regulatory Program web page addresses, as with other agency web sites, may change over the timeframe of the five year Nationwide Permit renewal cycle, in response to policy mandates or technology advances. While we will make every effort to check on the integrity of our web links and provide re- direct pages whenever possible, we ask that you report any broken links to us so we can keep the page information current and usable. We apologize in advanced for any broken links that you may encounter, and we ask that you navigate from the regulatory home page (wetlands and stream permits) of the Wilmington District Corps of Engineers, to the "Permits" section of our web site to find links for pages that cannot be found by clicking directly on the listed web link in this document. Final 2012 Regional Conditions for Nationwide Permits (NWP) in the Wilmington District 1.0 Excluded Waters The Corps has identified waters that will be excluded from the use of all NWP's during certain timeframes. These waters are: 1.1 Anadromous Fish Spawning Areas Waters of the United States identified by either the North Carolina Division of Marine Fisheries ( NCDMF) or the North Carolina Wildlife Resources Commission ( NCWRC) as anadromous fish spawning areas are excluded during the period between February 15 and June 30, without prior written approval from NCDMF or NCWRC and the Corps. 1.2 Trout Waters Moratorium Waters of the United States in the twenty -five designated trout counties of North Carolina are excluded during the period between October 15 and April 15 without prior written approval from the NCWRC. (See Section 2.7 for a list of the twenty -five trout counties). 1.3 Sturgeon Spawning Areas as Designated by the National Marine Fisheries Service (NMFS) Waters of the United States designated as sturgeon spawning areas are excluded during the period between February 1 and June 30, without prior written approval from the NMFS. 21 2.0 Waters Requiring Additional Notification The Corps has identified waters that will be subject to additional notification requirements for activities authorized by all NWP's. These waters are: 2.1 Western NC Counties that Drain to Designated Critical Habitat For proposed activities within Waters of the U.S. that require a Pre - Construction Notification pursuant to General Condition 31 (PCN) and are located in the sixteen counties listed below, applicants must provide a copy of the PCN to the US Fish and Wildlife Service, 160 Zillicoa Street, Asheville, North Carolina 28801. This PCN must be sent concurrently to the US Fish and Wildlife Service and the Corps Asheville Regulatory Field Office. Please see General Condition 18 for specific notification requirements related to Federally Endangered Species and the following website for information on the location of designated critical habitat. Counties with tributaries that drain to designated critical habitat that require notification to the Asheville US Fish and Wildlife Service: Avery, Cherokee, Forsyth, Graham, Haywood, Henderson, Jackson, Macon Mecklenburg, Mitchell, Stokes, Surry, Swain, Transylvania, Union and Yancey. Website and office addresses for Endangered Species Act Information: The Wilmington District has developed the following website for applicants which provides guidelines on how to review linked websites and maps in order to fulfill NWP general condition 18 requirements: hqp:// www .saw.usace.army.mil/wetlands/ESA Applicants who do not have intemet access may contact the appropriate US Fish and Wildlife Service offices listed below or the US Army Corps of Engineers at (910) 251- 4633: US Fish and Wildlife Service Asheville Field Office 160 Zillicoa Street Asheville, NC 28801 Telephone: (828) 258 -3939 Asheville US Fish and Wildlife Service Office counties: All counties west of and including Anson, Stanly, Davidson, Forsyth and Stokes Counties US Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, NC 27636 -3726 Telephone: (919) 856 -4520 Raleigh US Fish and Wildlife Service Office counties: all counties east of and including Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties. 22 2.2 Special Designation Waters Prior to the use of any NWP in any of the following identified waters and contiguous wetlands in North Carolina, applicants must comply with Nationwide Permit General Condition 31 (PCN). The North Carolina waters and contiguous wetlands that require additional notification requirements are: "Outstanding Resource Waters" (ORW) or "High Quality Waters" (HQW) as designated by the North Carolina Environmental Management Commission; "Inland Primary Nursery Areas" (IPNA) as designated by the NCWRC; "Contiguous Wetlands" as defined by the North Carolina Environmental Management Commission; or "Primary Nursery Areas" (PNA) as designated by the North Carolina Marine Fisheries Commission. 2.3 Coastal Area Management Act (CAMA) Areas of Environmental Concern Non - federal applicants for any NWP in a designated "Area of Environmental Concern" (AEC) in the twenty (20) counties of Eastern North Carolina covered by the North Carolina Coastal Area Management Act (CAMA) must also obtain the required CAMA permit. Development activities for non - federal projects may not commence until a copy of the approved CAMA permit is furnished to the appropriate Wilmington District Regulatory Field Office (Wilmington Field Office — 69 Darlington Avenue, Wilmington, NC 28403 or Washington Field Office — 2407 West 5th Street, Washington, NC 27889). 2.4 Barrier Islands Prior to the use of any NWP on a barrier island of North Carolina, applicants must comply with Nationwide Permit General Condition 31 (PCN). 2.5 Mountain or Piedmont Bogs Prior to the use of any NWP in a Bog classified by the North Carolina Wetland Assessment Methodology ( NCWAM), applicants shall comply with Nationwide Permit General Condition 31 (PCN). The latest version of NCWAM is located on the NC DWQ web site at: httn: / /t)ortal.nedenr.ora /web /wq /s" /wsMdu /ncwam . 2.6 Animal Waste Facilities Prior to use of any NWP for construction of animal waste facilities in waters of the US, including wetlands, applicants shall comply with Nationwide Permit General Condition 31 (PCN). 2.7 Trout Waters Prior to any discharge of dredge or fill material into streams or waterbodies within the twenty - five (25) designated trout counties of North Carolina, the applicant shall comply with Nationwide Permit General Condition 31 (PCN). The applicant shall also provide a copy of the notification to the appropriate NCWRC office to facilitate the determination of any potential 23 impacts to designated Trout Waters. Notification to the Corps of Engineers will include a statement with the name of the NC WRC biologist contacted, the date of the notification, the location of work, a delineation of wetlands, a discussion of alternatives to working in the mountain trout waters, why alternatives were not selected, and a plan to provide compensatory mitigation for all unavoidable adverse impacts to mountain trout waters. NCWRC and NC Trout Counties Western Piedmont Region Coordinator Alleghany Caldwell Watauga 20830 Great Smoky Mtn. Ex resswa Ashe Mitchell Wilkes Waynesville, NC 28786 Avery Stokes Swain Telephone: 828 452 -2546 Burke Surry Transylvania Mountain Region Coordinator Buncombe Henderson Polk 20830 Great Smoky Mtn. Expressway Cherokee Jackson Rutherford Waynesville, NC 28786 Clay Macon Swain Telephone: 828 452 -2546 Graham Madison Transylvania Fax: (828 ) 452 -7772 Haywood McDowell Yancey 3.0 List of Corps Regional Conditions for All Nationwide Permits The following conditions apply to all Nationwide Permits in the Wilmington District: 3.1 Limitation of Loss of Perennial Stream Bed NWPs may not be used for activities that may result in the loss or degradation of greater than 300 total linear feet of perennial, intermittent or ephemeral stream, unless the District Commander has waived the 300 linear foot limit for ephemeral and intermittent streams on a case -by -case basis and he determines that the proposed activity will result in minimal individual and cumulative adverse impacts to the aquatic environment. Loss of stream includes the linear feet of stream bed that is filled, excavated, or flooded by the proposed activity. Waivers for the loss of ephemeral and intermittent streams must be in writing and documented by appropriate /accepted stream quality assessments *. This waiver only applies to the 300 linear feet threshold for NWPs. *NOTE: Applicants should utilize the most current methodology prescribed by Wilmington District to assess stream function and quality. Information can be found at: http: / /www.saw.usace. army. mil /wetlands /permits /nwp /nwp2012 (see "Quick Links ") 1"' 3.2 Mitigation for Loss of Stream Bed For,any NWP that results in a loss of more than 150 linear feet of perennial and /or ephemeral /intermittent stream, the applicant shall provide a mitigation proposal to compensate for more than minimal individual and cumulative adverse impacts to the aquatic environment. For stream losses less than 150 linear feet, that require a PCN, the District Commander may determine, on a case -by -case basis that compensatory mitigation is required to ensure that the activity results in minimal adverse effect on the aquatic environment. 3.3 Pre - construction Notification for Loss of Streambed Exceeding 150 Feet. Prior to use of any NWT for any activity which impacts more than 150 total linear feet of perennial stream or ephemeral/ intermittent stream, the applicant must comply with Nationwide Permit General Condition 31 (PCN). This applies to NWPs that do not have specific notification requirements. If a NWP has specific notification requirements, the requirements of the NWP should be followed. 3.4 Restriction on Use of Live Concrete For all NWPs which allow the use of concrete as a building material, live or fresh concrete, including bags of uncured concrete, may not come into contact with the water in or entering into waters of the US. Water inside coffer dams or casings that has been in contact with wet concrete shall only be returned to waters of the US when it is no longer poses a threat to aquatic organisms. 3.5 Requirements for Using Riprap for Bank Stabilization For all NWPs that allow for the use of riprap material for bank stabilization, the following measures shall be applied: 3.5.1. Filter cloth must be placed underneath the riprap as an additional requirement of its use in North Carolina waters. 3.5.2. The placement of riprap shall be limited to the areas depicted on submitted work plan drawings. 3.5.3. The riprap material shall be clean and free from loose dirt or any pollutant except in trace quantities that would not have an adverse environmental effect. 3.5.4. It shall be of a size sufficient to prevent its movement from the authorized alignment by natural forces under normal conditions. 3.5.5. The riprap material shall consist of clean rock or masonry material such as, but not limited to, granite, marl, or broken concrete. 25 3.5.6. A waiver from the specifications in this Regional Condition may be requested in writing. The waiver will only be issued if it can be demonstrated that the impacts of complying with this Regional condition would result in greater adverse impacts to the aquatic environment. 3.6 Safe Passage Requirements for Culvert Placement For all NWPs that involve the construction/installation of culverts, measures will be included in the construction /installation that will promote the safe passage of fish and other aquatic organisms. The dimension, pattern, and profile of the stream above and below a pipe or culvert should not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed culvert should be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. Spring flow should be determined from gage data, if available. In the absence of such data, bankfull flow can be used as a comparable level. In the twenty (20) counties of North Carolina designated as coastal counties by the Coastal Area Management Act (CAMA): All pipes /culverts must be sufficiently sized to allow for the burial of the bottom of the pipe /culvert at least one foot below normal bed elevation when they are placed within the Public Trust Area of Environmental Concern (AEC) and /or the Estuarine Waters AEC as designated by CAMA, and/or all streams appearing as blue lines on United States Geological Survey (USGS) 7.5- minute quadrangle maps. Circular Culvert I 12 Inches 4 Invert In all other counties: Culverts greater than 48 inches in diameter will be buried at least one foot below the bed of the stream. Culverts 48 inches in diameter or less shall be buried or placed on the stream bed as practicable and appropriate to maintain aquatic passage, and every effort shall be made to maintain the existing channel slope. The bottom of the culvert must be placed at a 26 depth below the natural stream bottom to provide for passage during drought or low flow conditions. Culverts are to be designed and constructed in a manner that minimizes destabilization and head cutting. Destabilizing the channel and head cutting upstream should be considered and appropriate actions incorporated in the design and placement of the culvert. A waiver from the depth specifications in this condition may be requested in writing. The waiver will be issued if it can be demonstrated that the proposal would result in the least impacts to the aquatic environment. All counties: Culverts placed within riparian and/or riverine wetlands must be installed in a manner that does not restrict the flow and circulation patterns of waters of the United States. Culverts placed across wetland fills purely for the purposes of equalizing surface water do not have to be buried. 3.7 Notification to NCDENR Shellfish Sanitation Section Applicants shall notify the NCDENR Shellfish Sanitation Section prior to dredging in or removing sediment from an area closed to shell fishing where the effluent may be released to an area open for shell fishing or swimming in order to avoid contamination from the disposal area and cause a temporary shellfish closure to be made. Such notification shall also be provided to the appropriate Corps of Engineers Regulatory Field Office. Any disposal of sand to the ocean beach should occur between November 1 and April 30 when recreational usage is low. Only clean sand should be used and no dredged sand from closed shell fishing areas may be used. If beach disposal were to occur at times other than stated above or if sand from a closed shell fishing area is to be used, a swimming advisory shall be posted, and a press release shall be issued by the permittee. 3.8 Preservation of Submerged Aquatic Vegetation Adverse impacts to Submerged Aquatic Vegetation (SAV) are not authorized by any NWP within any of the twenty coastal counties defined by North Carolina's Coastal Area Management Act of 1974 (LAMA). 3.9 Sedimentation and Erosion Control Structures and Measures 3.9.1. All PCNs will identify and describe sedimentation and erosion control structures and measures proposed for placement in waters of the US. The structures and measures should be depicted on maps, surveys or drawings showing location and impacts to jurisdictional wetlands and streams. 27 4.0 Additional Regional Conditions for Specific Nationwide Permits 4.1 NWP #27 — Aquatic Habitat Restoration, Establishment, and Enhancement Activities. 4.1.1. If you are under contract to the North Carolina Ecosystem Enhancement Program (NCEEP) and are supplying a PCN for impacts associated with a mitigation project that will be used to supply mitigation credits to NCEEP, the PCN must include a cover letter from the NCEEP stating that they have reviewed and approved your restoration plan. M. Beverly Eaves Perdue Governor Charles Wakild, P. E. Director March 30, 2012 Resources Dee Freeman Secretary DWQ Project # 12 -0107 Beaufort County Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Furness: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise temporarily impact 381 acres of wetlands by soil disturbance and fill /plug 15.19 acres of waters for the purpose of wetland restoration /reestablishment and enhancement at the subject property, as described within your application dated February 1 st, 2012 and received by the N.C. Division of Wafer Quality (DWQ) on February 9t" , 2012. After reviewing your application, the proposed impacts are covered by General Water Quality Certification Number(s) 3689 (GC3689). The Certifications) allows you to use Nationwide Permit(s) 27 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non - discharge, and Stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: North Carolina Division of Water Quality Internet: www_newatet:c�ualit ;org 943 Washington Square Mall Phone: 252- 946 -6481 Washington, NC 27889 FAX 252- 946 -9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper NoithCarolina Naturallff Page 2 of 4 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), Trout (Tr), SA, WS -I, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 04B .0124) supercede all other sediment and erosion control requirements. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification and authorized by this written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion Amount Approved Plan Location or Units Reference Stream (feet) 404 Wetlands 381 (acres) PCN Information a. ff. _ Package Waters 15.19 (acres)'' PCN Information Package Buffers (square ft.) 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), Trout (Tr), SA, WS -I, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAC 04B .0124) supercede all other sediment and erosion control requirements. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification and authorized by this written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion Page 3 of 4 control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 5. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by DWQ. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources has released the project. 6. Work in the Dry All work in or adjacent to stream waters shall be conducted in a dry work area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. 7. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight /Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. 9. The applicant /permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. The authorization to proceed with your proposed Page 4 of 4 impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act 15A NCAC 02H..0500. If you have any questions, please telephone Amy Adams of the Washington Regional Office at 252- 948 -3917 or Ian McMillan of the 401 Webscape Unit at 919- 807 -6364 Sincerely, F Chuck Wa Enclosures: Certificate of Completion GC 3689 cc: Corps of Engineers Washington Regulatory Field Office DWQ 401 Oversight /Express Unit DCM, Doug Huggett, Morehead District Office DLR, Pat McClain, WaRO File copy Filename: 12- 0107_P_ULands_3689 /aa MMEMEM Water Quality Certification Number 3689 is issued in conformity with the requirements of Section 401, Public Laws 92 -500 and 95 -217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15A NCAC 2H .0500 and 15A NCAC 2B.0200 for the discharge of fill material to waters as described in 33 CFR 330 Appendix A (B) (13) and (27) of the Corps of Engineers regulations (i.e., Nationwide Permit Numbers 13 and 27) and Regional Permit 197800080. The category of activities shall include stream bank stabilization or stream restoration activity as long as impacts to waters or significant wetlands are minimized; wetland and riparian restoration or creation; and the construction and maintenance of bulkheads on non - Federal Energy Regulatory Commission (FERC) lakes. The State of North Carolina certifies that the specified category of activity will not violate . applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92 -500 and 95 -217 if conducted in accordance with the conditions set forth. All proposed fill or modification of wetlands and /or waters, including streams and streambanks, under this General Certification requires application to, and written approval from the Division of Water Quality (the "Division "), regardless of the purpose of the restoration, enhancement, stabilization, or creation activity. Bank Stabilization projects qualifying for Nationwide Permit 13 for erosion protection of up to 500 feet of stream banks to protect property are exempt from the requirement for written approval. Any impacts to riparian buffers associated with this work in the Neuse, Tar - Pamlico, Randleman and Catawba River Basins (or any other basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application [in accordance with 15A NCAC 2B .0200]) will require written approval, unless the activities are listed as "EXEMPT" from these Rules. In accordance with North Carolina General Statute Section 143- 215.3D(e), written approval for a 401 Water Quality General Certification must include the appropriate fee. If a project also requires a CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the two fees. Conditions of Certification: 1. Activities shall meet the definitions, design, and monitoring protocols specified within the US Army Corps of Engineers Wilmington District Regulatory Guidance Letter (RGL02 -02) and the Stream Mitigation Guidelines (April 2003) or any subsequent updates to these documents. 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - construction Notification and /or those authorized by this Certification, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Water Quality Certification No. 3689 l MyrortUMME Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor - owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and /or repair of erosion control measures and stormwater routing and treatment shall be on site at all times, .except for publicly funded linear transportation projects when materials can be accessed offsite in a timely manner.. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNA's), Trout (Tr), SA, WS -I, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sediment and erosion control requirements contained within Design Standards in Sensitive Watersheds (15A NCAG 04B .0124) supercede all other sediment and erosion control requirements. 4. No Sediment and Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures should not be placed in wetlands or waters outside of the permitted impact areas without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 5. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (N00010000) administered by the Division is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self - monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at htto: //h2o,enr.state.nc.us/su /Forms Documents.htm. The North Carolina Department of Transportation (NCDOT) shall be required to be in full compliance with the conditions related to construction activities within the most recent version of their individual NPDES (NCS000250) stormwater permit. Water Quality Certification No. 3689 6. Construction Moratoriums and Coordination If activities must occur during periods of high biological activity (i.e. sea turtle or bird nesting), then biological monitoring may be required at the request of other state or federal agencies and coordinated with these activities. This condition can be waived through written concurrence on a case by case basis upon reasonable justification. All moratoriums on construction activities established by the NC Wildlife Resources Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries. (DMF), or National Marine Fisheries Service (NMFS) to lessen impacts on trout, anadromous fish, larval /post - larval fishes and crustaceans, or other aquatic species of concern shall be implemented. This condition can be waived through written concurrence on a case by case basis upon reasonable justification. Work within the twenty-five (25) designated trout counties or identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate W RC, USFWS, NMFS, and /or DMF personnel. NC Wildlife Resources Commission will not object to construction of Natural Resources Conservation Service (NRCS)'urgent and compelling' sites during the spawning period provided these projects are, to the extent appropriate and practical, constructed by: a. Using flow diversion structures such as sandbags; b. Placing large -size rock toes and filter cloth backing for stabilization sites before backfilling; and c. Excavating new channel alignments in dry areas. Construction at non `urgent and compelling' sites shall not occur during the spawning period to minimize the potential adverse effects of multiple construction activities on trout or anadromous fish resources in this stream. 7. Work in the Dry All work in or adjacent to stream waters shall be conducted in a dry work area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. Exceptions to this condition require submittal to, and approval by, the Division. 8. Riparian Area Protection (Buffer) Rules Activities located in the protected 50 -foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse, Tar - Pamlico, Randleman, Catawba (or any other basin with buffer rules), shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0233, .0259, .0250 and .0243, and shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. All buffer rule requirements, including diffuse flow requirements, must be met. 9. Water Supply Watershed Buffers The 100 -foot wide (high- density development) or the 30 -foot wide vegetative buffer (all other development) must be maintained adjacent to all perennial waters except for allowances as Water Quality Certification No. 3689 provided in the Water Supply Watershed Protection Rules [15A NCAC 2B .0212 through .0215]. 10. If concrete is used during,the construction, then a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life /fish kills. 11. Any rip -rap shall be of such a size and density so as not to be able to be carried off by wave or current action and consist of clean rock or masonry material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except in specific areas required for velocity control and to ensure structural integrity of bank stabilization measures. If rip -rap is to be installed within the streambed, the amount and location must be-approved in writing by the Division of Land Resources and Division of Water Quality. However, rock vanes, wing deflectors, and similar structures for grade control and bank protection are acceptable. 12. If an environmental document is required under NEPA or SEPA, then this General Certification is not valid until a Finding of No Significant Impact or Record of Decision is issued by the State Clearinghouse. 13. Additional site - specific conditions may be added to the written approval attached to this Certification in order to ensure compliance with all applicable water quality and effluent standards. 14.This Certification shall expire three (3) years from the date of the approval letter from DWQ or on the same day as the corresponding Nationwide Permit, In accordance with General Statute 136 - 44.78, certifications issued to the NCDOT shall expire only upon expiration of the federal 404 Permit. The conditions in effect on the date of issuance of Certification for a specific project shall remain in effect for the life of the project, regardless of the expiration date of this Certification. If the construction process for approved activities will overlap the expiration and renewal date of the corresponding 404 Permit and the Corps allows for continued use of the 404 Permit, then the General Certification shall also remain in effect without requiring re- application and re- approval to use this Certification for the specific impacts. already approved. 15. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. 16. Certificate of Completion When written authorization is required for use of this certification, upon completion of all permitted impacts included within the approval and any subsequent modifications, the applicant shall be required to return the certificate of completion attached to the approval. One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NC, 27699 -1650. Non - compliance with or violation of the conditions herein set forth by a specific project shall result in revocation of this Certification for the project and may also result in criminal and /or civil penalties. Water Quality Certification No. 3689 4 The Director of the North Carolina Division of Water Quality may require submission of a formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or federally listed endangered or threatened aquatic species or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: November 1, 2007 DIVISION OF WATER QUALITY By a. Coleen H. Sullins Director History Note: Water Quality Certification Number 3689 replaces Water Quality Certification (WQC) Number 3399 issued March 2003, Water Quality Certification (WQC) Number 3495 issued December 31, 2004, and Water Quality Certification (WQC) Number 3626 issued March 2007, This WQC is rescinded when the Corps of Engineers reauthorizes Nationwide Permits 13 or 27 or Regional Permit 197800080 or when deemed appropriate by the Director of the Division of Water Quality. Water Quality Certification No. 3689 4 Totals. Package Temperature Carrier Name Van. Temperature Driver Signature Number of Racks Customer orAuthori d Signature ArborGen Employee Signature Gr l�J ��. PACKING SLIP ARBORGEN P and U Lands Mitigation Site Phase 2 PCS Phosphate Company, Inc. As -Built Report Aooendix B June 2014 Seedling Distribution Sheet ko South Carolina SuperTree Nursery SuperTree 5594 Highway 38 South Blenheim, SC 295.16 Circle One: COD or NOT Toll Free, 1 -800- 222 -1290 Phone: 843- 528 -3203 Fax: 843- 528 -3943 www.supertreeseedlings.com i I I Customer Name: Date: Ordered by:. Time: U a m).p.m.c Ship to Location: Lift Date Species Family Seedlot Gen. Pallet. Tag Vs Treatment- Pounce, etc. Avg. Sldgsl Box No. of Boxes Seedlings Shipped 3 r o n q 19 Coca . 1a U .,. q380 U 9TI w Q q 0 0 I i re v T s5 9 00 IJ got, � f.Q ee U C) I Iv 3 too 4 Totals. Package Temperature Carrier Name Van. Temperature Driver Signature Number of Racks Customer orAuthori d Signature ArborGen Employee Signature Gr l�J ��. PACKING SLIP ARBORGEN P and U Lands Mitigation Site Phase 2 PCS Phosphate Company, Inc. As -Built Report Aooendix B June 2014 Y q ' y Seedling Distribution Sheet South Carolina SuperTree Nursery Superlree ` 5594 Highway 38 South Sedlit 5 Blenheim, SC 29516 { Toll Free: 1 -800- 222 - .1290 Circle One: � or NOT Phone: 843- 528 -3203 Fax: 843 - 528 -3943. __q_ www.su p ertreeseedlin s.com g Customer Name: ':Date: `- Ordered by: Time: ` a.m.i.m. Ship to Location: Treatment- Avg. Sldgs/ No. of Lift Date Species Family Seedlot Gen. Pallet Tag Wss,` Pounce, Seedlings Shipped etc. Box Boxes CA v UO loo I 16o 0 Totals v Package Temperature Carrier Name Van Temperature Driver Signature Number of Racks Customer orAuthor ed Signature 1 ArborGen. Employee Signature PACKING SLIP ARBORGEN lJ P and U Lands Mitigation Site Phase 2 PCS Phosphate Company, Inc. As -Built Report Appendix B June 2014 Y �i ry uperTree Toll Free:. 1 -800- 222 -1290 Phone: 843- 528 -3203 Fax: 843- 528 -3943 www.supdrtreeseedlings.com Seedling Distribution Sheet South Carolina SuperTree Nursery 5594 Highway 38 South Blenheim, SC 29516 Circle.One: OT or NOT Customer Name: �C_5. L" -t .Td.Mr...1.1= Package Temperature Van Temperature Carrier Name f' Driver Signature J �� Number of Racks Customer or Author' a ignature ArborGen Employee Signature PACKING SLIP. ARBORGEN P and U Lands Mitigation Site Phase 2 PCS Phosphate Company, Inc. As -Built Report ADoendix B June 2014 r Seedling Distribution Sheet„ . 2 �> South Carolina SuperTree Nursery Supe&T e 5594 Highway 38 South S&&4 Blenheim, SC 29516 � Circle One: OT or NOT, Toll Free: 1- 800 - 222 -1290 - Phone: 843- 528 -3203 Fax: 843-528-3943 9 www.su. ertreeseedlin s.com Customer Name: - C CJ4 I), ` Ordered by: Date: . Time: a.m. 'm. w .. Shi p to Location: C w . Lift Date Species Family Seedlot Gen. Pallet Tag Vs Treatment Pounce, etc. Avg. Sidgs/ Box No. of Boxes Seedlings Shipped o_ /j G1 L? I U C } • 50 ( o i qL 19, AUQ I- 3 6C f � _ _ q 9 -qu0 9031 .71 q T,_ 1 A �1. , I q � ,o v q �� fit cca IOU IL qAU '5 boo 5 �. Totals Package Temperature �. Carrier Name Van Temperature Driver Signature f Number of Racks -� Customer orAuthor�9d)ignature v ArborGen Employee Signature PACKING SLIP ARBORGEN-� P and U Lands Mitigation Site Phase 2 PCS Phosphate Company, Inc. As -Built Report Appendix B June 2014 4 SuupeerTree` Toll Free: 1- 800- 222 -1290 Phone: 843- 528 -.3203 r6x: 843 - 528 -3943 "W. supertreeseedli ngs. com Date: t �' Time: Gc a. m. p.m. Seedling Distribution Sheet .� South Carolina SuperTree Nursery 5594"Highway 38 South Blenheim, SC 29516 Circle One: O or NOT Customer Name: Ordered by: A 1 ' Ship to Location: r1 f �!" Lift Date Species Family Seedlot Gen. Pallet Tag Vs Treatment- Pounce, etc. Avg. Sldgs/ Box No. of Boxes Seedlings Shipped q c� 1()o r 6r 00 q 1 00 [ lac., , r4t' 10 U Totals ` c Package Temperature Van Temperature Carrier Name Driver Signature. �'`"/ Number of Racks � customer orAuthori Signature ArborGen Employee Signature$ PACKING SLIP P and U Lands Mitigation Site Phase 2 As -Built Report AnDendix B A.RBORGEN PCS Phosphate Company, Inc. June 2014 E c Lupedree' Wfinp y toil Free: 1 -800- 222 -1290 . Phone: 943 =528 -3203 Fax: 843 - 528 -3943 www.superVeese.edlings.com Date: t i Time. 0 U rya. p.m. Seedling Distribution Sheet South Carolina SuperTree Nursery 5594 Highway 38 South Blenheim, SC 29516 Circle One: Na (oT � or NOT 1 Customer Name: Ordered by: Ship to Location. Lift Date Species Family Seedlot Gen. Pallet Tag Vs Treatment- Pounce, etc. Avg. Sldgs/ Box No. of Boxes Seedlings Shipped b ja_ 59 n c? 6 (o f AW& r ! U r Utyc C -�- r t Q o G?.A t ✓ � � � � � � t I C✓ � jJt �i 4l.^" ('1j l 1 V 6U 4! Totals Package Temperature Van Temperature Carrier Name Driver Signature Number of Racks Customer or Authorized Signature _ ArborGen Employee Signature PACKING SLIP ARBoRGENO� P and U Lands Mitigation Site Phase 2 PCS Phosphate Company, Inc. As -Built Report ADoendix B June 2014 m O N (7 N C S6 LL LL s ra L El U 16 s E n: o° E N d h +, O) CL P and U Lands Mitigation Site Phase 2 As -Built Report Aooendix B PCS Phosphate Company, Inc. June 2014 N O r U ? CO ca o U-) _0 M 0 W i3 (D m 7 V) V!J U) (D -0 �' ( ! Z U O C O O O C1 O It (D O O O O O Q O N O M 0 N M O O O O ti N M (D (D U f5 -- d' (D (D N (3) A (D N I~ 6) 1­ O 0) CO 00 > CO N O CO O 0 'qr M r 00 O r LO qt (D to M N M M Lr) r N U') O LD M -a CO N (A O O N N (D (3) Q O r J O LO I;r O 00 00 d7 N r 07 r O ti (D O LLL N L() M O O M CO r- 1_ (D M O N N r M (D LO N (D LO r 1­ 00 � IT I­ (c ¢ J N O O O O O C) O O O O O O O O E r M O O O O 1� N 00 CD Q N 1` M M cc o" M N il- (D N 1� O r O V 7 O N M N M r M 00 r CO N N r M 0 G. r M N M CO O M O O LO N (D [D N LO O N r Ef N O r a L!') i O (j 00 ) N O N O O N C) O N O N C) w a 0 J N O N LO 'd' 00 O 00 0 C) 0) O O (A r__ O M (D v' 4) v- (D LO N U) r 00 P_ lot r Q j N J is N 0 [) D) 0) 0)i 0) CD O (4 C C C C C C CI C C 0 V :3 � :3 F- F- M M 1— F- F- F- % H - - a vs a 04 o 0 a c� ' ° o 0 E E �I i m 0 n M U C N (S) p 0 Q IG ((Uj L) E E N -UC •� U V L — #U L (p Q (b U) (� (O LE ID LL L 0 = 0. V n i L 0 (Q x +-+ M u) v (B ?' > > U U C 8 U L ! L L ) z 3 L L M 0 3 0 ' CL 0? �G (n N CF) (M � N w 0 71 :3 0 0 :3 m -0 D- a 0 CL U) 1 (1) EL (0) E= 7 P and U Lands Mitigation Site Phase 2 As -Built Report Aooendix B PCS Phosphate Company, Inc. June 2014 APPENDIX C P AND U LANDS PHASE 2 SELECTED PHOTOGRAPHS Photo 1. Helicopter used for herbicide application May 2012. Photo 2. Post - timbering debris pile collection north side Small Road. P and U Lands Mitigation Site Phase 2 C -1 PCS Phosphate Company, Inc. As -Built Report June 2014 Photo 3. Perimeter ditch south side of Small Road; view to W. Photo 4. Perimeter ditch south side Small Road near E- E; view to E. P and U Lands Mitigation Site Phase 2 C -2 PCS Phosphate Company, Inc. As -Built Report June 2014 W_ I Photo 5. Perimeter ditch at corner of Royal Road near well 87; view N. (1.24.13) Photo 6. Planters in Phase 2 near monitoring well 68; view NNE. P and U Lands Mitigation Site Phase 2 C -3 PCS Phosphate Company, Inc. As -Built Report June 2014