Subject: INCIDENT CLOSURE
NORTH CAROLINA
Environmental Quality
June 22, 2022
NOD-2022-SS-0001
North Carolina Department of Transportation
NCDWR Project No. 20201935
TIP U-6251
Buncombe County
Dear Mr. Anderson and Mr. Goodson:
Bradley Goodson
Tennoca Construction Company
1575 Smoky Park Hwy
Candler, NC 28715
The Division of Water Resources conducted a follow up site inspection on June 22, 2022, related to the Notice of
Deficiency NOD-2022-SS-0001. The written response and restoration activities performed have satisfactorily
resolved the violations noted in the subject Notice of Deficiency.
Thank you for your attention to this matter. If you have any questions or require any additional information, please
contact me at (828) 296-4650 or kevin.mitchell@ncdenr.gov.
Sincerely,
DocuSigned by:
Kcv• Mad-td
D9ACAD48D566453...
Kevin Mitchell
Division of Water Resources
Enclosures: Site Inspection Report dated June 22, 2022
cc: Lori Beckwith, US Army Corps of Engineers Asheville Regulatory Field Office (via email)
Roger Bryan, NC Department of Transportation (via email)
Stan Aiken, NC Division of Energy, Mineral, and Land Resources (via email)
Amy Chapman, NC Division of Water Resources (via email)
File Copy
e:!5�D,EQ2�
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
Wetland Inspection Report
Project Num: 20201935 Version: I
Project Name: NCDOT -Enka Commerce Park (U-6251) Heritage
County: Buncom�e e
Location: NCDOT -Enka Commerce Park (U-6251) Heritage Drive
Latitude: +350 32' 54"
SW Plan Location:
Site Owner Name: NC DOT Division 13
Inspection Date: 6/22/2022
Reason for Inspection: Follow-up
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title:
On -Site Representative(s):
Primary Inspector: Robert K Mitchell
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Status: Issued
Project Type: New Road/Highway
Region: Asheville
Longitude: -82' 38' 51"
Phone:
Phone:
Inspection Summary:
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 22, 2022. Jimmy Ownby
and Josh Surret were present during the inspection.
Sediment has been removed from the stream. No additional remediation is required. Coir fiber matting has been
installed along the banks around the headwalls.
- Recommend adding a measure at the end of the haul road before the culvert outlet on the south side of the culvert.
- Recommend adding cover to any exposed slopes adjacent to the headwalls before rain events and at the end of the
work day.
page: 1
Site Number: 20201935 Owner: Bryan, Roger D
Inspection Date: 6/22/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up
Permit (401 WOO
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
page: 2