Loading...
HomeMy WebLinkAbout20220622_U-6251 EnkaCommercePark_CLOROY COOPER Governor ELIZABETH S. EISER Secretary RICHARD E. ROGERS, JR. Director Tim W. Anderson, P.E. Division 13 Engineer North Carolina Department of Transportation 55 Orange Street, Asheville, NC 28801 Subject: INCIDENT CLOSURE NORTH CAROLINA Environmental Quality June 22, 2022 NOD-2022-SS-0001 North Carolina Department of Transportation NCDWR Project No. 20201935 TIP U-6251 Buncombe County Dear Mr. Anderson and Mr. Goodson: Bradley Goodson Tennoca Construction Company 1575 Smoky Park Hwy Candler, NC 28715 The Division of Water Resources conducted a follow up site inspection on June 22, 2022, related to the Notice of Deficiency NOD-2022-SS-0001. The written response and restoration activities performed have satisfactorily resolved the violations noted in the subject Notice of Deficiency. Thank you for your attention to this matter. If you have any questions or require any additional information, please contact me at (828) 296-4650 or kevin.mitchell@ncdenr.gov. Sincerely, DocuSigned by: Kcv• Mad-td D9ACAD48D566453... Kevin Mitchell Division of Water Resources Enclosures: Site Inspection Report dated June 22, 2022 cc: Lori Beckwith, US Army Corps of Engineers Asheville Regulatory Field Office (via email) Roger Bryan, NC Department of Transportation (via email) Stan Aiken, NC Division of Energy, Mineral, and Land Resources (via email) Amy Chapman, NC Division of Water Resources (via email) File Copy e:!5�D,EQ2� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 919.707.9000 Wetland Inspection Report Project Num: 20201935 Version: I Project Name: NCDOT -Enka Commerce Park (U-6251) Heritage County: Buncom�e e Location: NCDOT -Enka Commerce Park (U-6251) Heritage Drive Latitude: +350 32' 54" SW Plan Location: Site Owner Name: NC DOT Division 13 Inspection Date: 6/22/2022 Reason for Inspection: Follow-up Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: On -Site Representative(s): Primary Inspector: Robert K Mitchell Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Status: Issued Project Type: New Road/Highway Region: Asheville Longitude: -82' 38' 51" Phone: Phone: Inspection Summary: Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 22, 2022. Jimmy Ownby and Josh Surret were present during the inspection. Sediment has been removed from the stream. No additional remediation is required. Coir fiber matting has been installed along the banks around the headwalls. - Recommend adding a measure at the end of the haul road before the culvert outlet on the south side of the culvert. - Recommend adding cover to any exposed slopes adjacent to the headwalls before rain events and at the end of the work day. page: 1 Site Number: 20201935 Owner: Bryan, Roger D Inspection Date: 6/22/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow-up Permit (401 WOO Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ page: 2