HomeMy WebLinkAbout20190863 Ver 1_Year 0 Monitoring Report_2022_20220622Mitigation Project Information Upload
ID#* 20190863
Version* 1
Select Reviewer: *
Erin Davis
Initial Review Completed Date 06/22/2022
Mitigation Project Submittal - 6/22/2022
..................................................................................................................................................................................................................................................................
Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name: *
Matthew Reid
Project Information
ID#:*
20190863
Existing ID#
Project Type:
Project Name:
County:
• DMS Mitigation Bank
Oak Hill Dairy Mitigation Site
Gaston
Document Information
Mitigation Document Type: *
Mitigation Monitoring Report
File Upload:
Signature
............................................
Print Name: *
Signature:*
Email Address: *
matthew.reid@ncdenr.gov
Version:* 1
Oak Hill Dairy_100120_MY0_2022.pdf
Existing Version
61.09MB
Please upload only one PDF of the complete file that needs to be submitted...
Matthew Reid
at
y @�@5urIs
•
MONITORING YEAR 0 OAK HILL DAIRY MITIGATION SITE
Gaston County, NC
ANNUAL REPORT Catawba River basin
FINAL HUC 03050102
DMS Project No. 100120
May 2022 DMS Contract No. 7867
DMS RFP No. 16-007704 (Date of Issue: September 6,
2018)
USACE Action ID No. SAW-2019-00833
DWR Project No. 2019-0863
Data Collection Dates:January 2022—March 2022
PREPARED FOR:
11111
NC Department of Environmental Quality
Division of Mitigation Services
1652 Mail Service Center
Raleigh, NC 27699-1652
PREPARED BY:
WILDLANDS
ENGINEERING
Wildlands Engineering, Inc.
1430 South Mint Street, Suite 104
Charlotte, NC 28203
Phone: 704.332.7754
Fax: 704.332.3306
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
MARC RECKTENWALD
Director
June 9, 2022
Ms. Kristi Suggs
Wildlands Engineering, Inc.
1430 S. Mint St, Suite 104
Charlotte, NC 28203
NORTH CAROLINA
Environmental Quality
Subject: Oak Hill Dairy Draft MY0 Report Review
Catawba River Basin — CU# 03050102
Gaston County
DMS Project ID No. 100120
Contract # 7867
Dear Ms. Suggs,
The Division of Mitigation Services (DMS) received the Draft Mitigation Plan for Oak Hill Dairy from
Wildlands Engineering, Inc on May 23, 2022. The Project is expected to provide 4,618.933 SMUs and
7.680 WMUs. The following are the DMS review team's comments on the draft report.
• Please add "Date of Issue: September 6, 2018" following RFP number on title page.
• Table of Contents: A set of coordinates is accidently shown under 1.3 Project Attributes.
Please revise for final.
• CCPV: Recommend labeling BMP1 and BMP2.
• Photos of BMP1 and BMP2 show a considerable amount of ponded water. Does WEI expect
the BMPs to hold water year-round or dry seasonally?
• 3.2 Vegetation Areas of Concern: WEI has identified and treated several of the most
concerning invasive species prior to and during the construction process. Please continue
aggressively treating the kudzu, knotweed, bamboo and marsh dewflower as new
populations are observed on the site. Also, please note on future CCPV maps the locations
of invasives and where treatment occurs.
• Several areas were not planted with bare roots due to depth of standing water. Does WEI
intend to plant these areas at a later date?
• Sheet 1.14: Pools on UT2 profile are shown and noted as being filled with sediment. WEI
expects the pools to adjust as vegetation becomes established. Please provide an update in
MY1 regarding the UT2 stream conditions. Note that UT2 is not a credited reach.
Digital Deliverable Comments
• Draft digital deliverables were reviewed and complete.
D_E
NORTH CAROLINA
Department otEnvironmental nuaI
North Carolina Department of Environmental Quality I Division of Mitigation Services
217 West Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652
919.707.8976
At your earliest convenience, please provide a written response letter addressing the DMS
comments provided and one final hard copy of the revised/updated Baseline Monitoring Document
and Record Drawings. The comment response letter should be included in the revised report after
the report cover page. Please include a full final electronic copy with electronic support files on a
CD or USB drive.
Sincerely,
Matthew Reid
Western Project Manager
NCDENR — Division of Mitigation Services
5 Ravenscroft Dr., Suite 102
Asheville, NC 28801
828-231-7912
D_E
NORTH CAROLINA
Department of Environmental Quality
North Carolina Department of Environmental Quality I Division of Mitigation Services
217 West Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652
919.707.8976
WILDLANDS
ENGINEERING
June 17, 2022
Mr. Matthew Reid
Western Project Manager
NCDEQ— Division of Mitigation Services
5 Ravenscroft Dr., Suite 102
Asheville, NC 28801
RE: Oak Hill Dairy Draft MY0 Report Review
Catawba River Basin — CU# 03050102 — Gaston County
DMS Project ID No. 100120
Contract # 7867
Dear Mr. Reid:
Wildlands Engineering, Inc. (Wildlands) has reviewed Division of Mitigation Services' (DMS)
comments from the Draft Monitoring Year 0 (MYO) Report for the Oak Hill Dairy Mitigation Site.
The report has been updated to reflect those comments. Wildlands responses to DMS's
comments are noted below.
DMS Comments, Matthew Reid:
1. Please add "Date of Issue: September 6, 2018" following RFP number on title page.
Wildlands Response: Title page has been updated to include RFP date of issue.
2. Table of Contents: A set of coordinates is accidently shown under 1.3 Project Attributes.
Please revise for final.
Wildlands Response: Wildlands has removed the set of coordinates from the table of
contents.
3. CCPV: Recommend labeling BMP1 and BMP2.
Wildlands Response: BMP labels are now shown on CCPV maps.
4. Photos of BMP1 and BMP2 show a considerable amount of ponded water. Does WEI expect
the BMPs to hold water year-round or dry seasonally?
Wildlands Response: Wildlands expects water levels for BMP1 to drawn down when
vegetation becomes established and dry -out during the drier months from late spring to
early fall. BMP2 should also draw down when vegetation becomes established and
during drier months; however, it will likely continue to hold a shallow pond of water
especially during monitoring years or months experiencing greater than average rainfall.
Wildlands will continue to monitor, and remedial action will be initiated if it is deemed
necessary.
5. 3.2 Vegetation Areas of Concern: WEI has identified and treated several of the most
concerning invasive species prior to and during the construction process. Please continue
aggressively treating the kudzu, knotweed, bamboo and marsh dewflower as new
populations are observed on the site. Also, please note on future CCPV maps the locations of
invasives and where treatment occurs.
Wildlands Response: Invasive species presence will continue to be monitored, treated,
and documented in future monitoring reports.
6. Several areas were not planted with bare roots due to depth of standing water. Does WEI
intend to plant these areas at a later date?
Wildlands Response: Wildlands does not anticipate the installation of bare roots in
these areas in the future. The areas that were not planted with bare roots due to
standing water were planted with live stakes of species tolerant to inundation.
Wildlands did not anticipate that these wetland areas would hold water, so these areas
were not separated from the remainder of the wetland planting areas during the design
phase of the project. However, after construction was complete, it was more evident
that these areas may remain inundated or be inundated for long periods of time.
Therefore, to increase survival and establishment of woody vegetation in these areas,
Wildlands decided to use live stakes rather than bare roots in the inundated areas and
based this judgement on past project experience on sites with similar site conditions
and professional experience.
7. Sheet 1.14: Pools on UT2 profile are shown and noted as being filled with sediment. WEI
expects the pools to adjust as vegetation becomes established. Please provide an update in
MY1 regarding the UT2 stream conditions. Note that UT2 is not a credited reach.
Wildlands Response: A brief summation of UT2 stream conditions will be included in
MY1.
As requested, Wildlands has included one hard copy of the revised/updated Baseline
Monitoring Document and Record Drawings and has placed the DMS comment letter and our
response letter after the report's cover page. A full final electronic copy of the report and
support files are included on a USB drive. Please let me know if you have any questions.
Sincerely,
Kristi Suggs
Senior Environmental Scientist
ksuggs@wildlandseng.com
OAK HILL DAIRY MITIGATION SITE
Monitoring Year 0 Annual Report
TABLE OF CONTENTS
Section 1: PROJECT OVERVIEW 1-1
1.1 Project Quantities and Credits 1-1
1.2 Project Goals and Objectives 1-4
1.3 Project Attributes 1-6
Section 2: As -Built Condition (Baseline) 2-8
2.1 As-Built/Record Drawings 2-8
2.1.1 Oak Hill Creek Reach 1 2-8
2.1.2 Oak Hill Creek Reach 2 2-8
2.1.3 Oak Hill Creek Reach 3 2-9
2.1.4 Oak Hill Creek Reach 4 2-9
2.1.5 UT1 Reach 1 2-9
2.1.6 UT1 Reach 2 2-9
2.1.7 UT1A ..2-10
2.1.8 UT1B ..2-10
2.1.9 UT2 ....2-10
2.1.10 UT3 .2-10
2.1.11 Wetland Grading #4, Cross-section #6 2-10
2.1.12 Wetland Grading #3, Cross-section #7 2-10
2.1.13 Vegetation Planting List & Plan 2-11
2.1.14 Fencing Plan 2-11
2.1.15 Monitoring Components 2-11
Section 3: Monitoring Year 0 Data Assessment 3-12
3.1 Vegetative Assessment 3-12
3.2 Vegetation Areas of Concern 3-12
3.3 Stream Assessment 3-12
3.4 Stream Areas of Concern 3-13
3.5 Hydrology Assessment 3-13
3.6 Wetland Assessment 3-13
3.7 Adaptive Management Plan 3-13
3.8 Monitoring Year 0 Summary 3-13
Section 4: METHODOLOGY 4-1
Section 5: REFERENCES 5-1
TABLES
Table 1: Project Quantities and Credits 1-1
Table 2: Goals, Performance Criteria, and Improvements 1-4
Table 3: Project Attributes 1-6
:IGURE.
Figure la-c
APPENDICES
Appendix A
Current Condition Plan View
Visual Assessment Data
Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
Table 4a-c
Table 5
Visual Stream Morphology Stability Assessment Table
Vegetation Condition Assessment Table
Stream Photographs
Vegetation Plot Photographs
Groundwater Well Photographs
Groundwater Well Installation Data Sheets
Appendix B Vegetation Plot Data
Table 6 Vegetation Plot Data
Table 7 Vegetation Performance Standards Summary Table
Appendix C Stream Geomorphology Data
Cross -Section Plots
Longitudinal Profile
Reach wide and Cross Section Pebble Counts
Table 8a-d Baseline Stream Data Summary
Table 9 Cross -Section Morphology Monitoring Summary
Appendix D Project Timeline and Contact Information
Table 10 Project Activity and Reporting History
Table 11 Project Contact Table
Appendix E Record Drawings and Sealed As -built Survey
Appendix F Correspondence
DMS Technical Workgroup Memo (10/19/2021)
Pebble Count Data Requirements — M. Reid (10/27/2021 email)
Oak Hill Dairy Mitigation Site
41, Monitoring Year 0 Annual Report - FINAL ii
Section 1: PROJECT OVERVIEW
The Oak Hill Dairy Mitigation Site (Site) is in Gaston County, approximately 2 miles northeast of
Cherryville and 7 miles southwest of Lincolnton. Watersheds UT1, UT1A, UT1B, and Oak Hill Creek drain
into Indian Creek, which drains to the Catawba River. Both Indian Creek and Catawba River are listed as
high restoration priorities in the 2013 Catawba River Basin Restoration Priorities (RBRP) and the 2008-
2010 Indian Creek and Howards Creek Local Watershed Plan (LWP). Table 3 presents information related
to the project attributes.
1.1 Project Quantities and Credits
Mitigation work within the Site included restoration, enhancement I, and enhancement II of perennial
and intermittent stream channels, and the creation, re-establishment, and rehabilitation of wetland
areas. Table 1 below shows stream credits by reach and the total amount of stream credits expected at
closeout.
Table 1: Project Quantities and Credits
PROJECT MITIGATION
QUANTITIES
Project
Segment
Mitigation
Plan
Footage12
As Built
Footage
Mitigation
Category
Restoration
Level
Mitigation
Ratio
(X:1)
Credits
Comments
Stream
Oak Hill Creek
R1
488.527
489.000
Warm
El
1.5
325.685
Restored dimension and
profile, created a floodplain
bench, planted buffers,
treated invasive species,
fenced out livestock, and
protected with a
conservation easement.
Oak Hill Creek
R2
470.085
470.000
Warm
R
1.0
470.085
Restored dimension, profile
pattern, and floodplain
access, planted buffers,
treated invasive species,
fenced out livestock, and
protected with a
conservation easement.
Oak Hill Creek
R3
877.051
877.000
Warm
R
1.0
877.051
Restored dimension, profile
pattern, and floodplain
access, planted buffers,
treated invasive species,
fenced out livestock,
provided stormwater
treatment, and protected
with a conservation
easement.
Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
1-1
PROJECT MITIGATION
QUANTITIES
Project
Segment
Mitigation
Plan
Footagel z
As Built
Footage
Mitigation
Category
Restoration
Level
Mitigation
Ratio
(X:1)
Credits
Comments
Oak Hill Creek
R4
388.273
388.900
Warm
R
1.0
388.273
Restored dimension, profile
pattern, and floodplain
access, planted buffers,
treated invasive species,
fenced out livestock, and
protected with a
conservation easement.
UT1 R1
217.749
218.000
Warm
R
1.0
217.749
Restored dimension, profile
pattern, and floodplain
access, planted buffers,
fenced out livestock, and
protected with a
conservation easement.
UT1 R2
1,834.520
1,834.100
Warm
R
1.0
1,834.520
Restored dimension, profile
pattern, and floodplain
access, planted buffers,
fenced out livestock,
provided stormwater
treatment, and protected
with a conservation
easement.
UT1A
469.110
469.600
Warm
R
1.0
469.110
Restored dimension, profile,
and pattern, planted buffers,
fenced out livestock, and
protected with a
conservation easement.
UT1B
291.680
292.100
Warm
Ell
8.0
36.460
Planted buffers, treated
invasive species, fenced out
livestock, and protected with
a conservation easement.
Wetland
Project
Segment
Mitigation
Plan
Acreage
As -Built
Acreage
Mitigation
Category
Restoration
Level
Mitigation
Ratio
(X:1)
Credits
Comments
Wetland Re -berm
establishment
4.859
4.863
RR
RE
1.0
4.859
Raised stream bed
elevation, plugged/filled
drainage features,
removed
material, planted
native wetland
vegetation community,
treated invasive species,
fenced out livestock and
protected with a
conservation easement.
Oak Hill Dairy Mitigation Site
41, Monitoring Year 0 Annual Report - FINAL
1-2
PROJECT MITIGATION
QUANTITIES
Project
Segment
Mitigation
Plan
Footage,'
As Built
Footage
Mitigation
Category
Restoration
Level
Mitigation
Ratio
(X:1)
Credits
Comments
Wetland
Rehabilitation
1.805
1.805
RR
RH
1.0
1.805
Raised stream bed
elevation, plugged/filled
drainage features,
removed cultivation and
vegetation
management impacts,
removed
berm material, planted
native wetland
vegetation community,
treated invasive species,
fenced out livestock,
provided stormwater
treatment, and protected
with a conservation
easement.
Wetland
Rehabilitation
0.284
0.284
RR
RH
1.5
0.189
Raised stream bed
elevation, plugged/filled
drainage features, removed
berm material, planted and
supplementally planted
native wetland
vegetation community,
treated invasive species,
fenced out livestock and
protected with a
conservation easement.
Wetland
Creation
2.481
2.480
RR
C
3.0
0.827
Raised stream bed
elevation, plugged/filled
drainage features,
removed
berm material, planted
native wetland
vegetation community,
treated invasive species,
fenced out livestock and
protected with a
conservation easement.
Total Stream Credits:
4,618.933
Total Wetland Credits:
7.680
1. Crossing lengths have been removed from restoration footage.
2. No direct credit for BMPs on site.
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
1-3
Restoration Level
Stream
Riparian Wetland
Non -Rip
Warm
Cool
Cold
Riverine
Non-Riverine
Wetland
Restoration
4,256.788
Re-establishment
4.859
Rehabilitation (1:1 & 1.5:1)
1.994
Enhancement
Enhancement I
325.685
Enhancement 11
36.460
Creation
0.827
Preservation
Totals
4,618.933
7.680
1.2 Project Goals and Objectives
The project is intended to provide numerous ecological benefits. Table 2 below describes expected
outcomes to water quality and ecological processes and provides project goals and objectives.
Table 2: Goals, Performance Criteria, and Functional Improvements
Goal
Objective/
Treatment
Likely Functional
Uplift
Performance
Criteria
Measurement
Cumulative
Monitoring
Results
Treat
concentrated
agricultural
runoff.
Install stormwater
BMPs to treat
runoff areas of
concentrated
agricultural runoff
before it enters the
stream channel.
Reduce agricultural
and
sediment inputs to
the project,
which will reduce
likelihood of
accumulated fines
and excessive
algal blooms from
nutrients.
There is no required
performance
standard for this
metric.
Visually inspect
BMPs and
document with
photos.
N/A
Exclude
livestock
from stream
channels and
riparian
wetlands.
Install livestock
fencing as needed
to exclude
livestock from
stream channels,
wetlands, and
riparian areas, or
remove livestock
from adjacent
fields.
Reduce agricultural
and sediment
inputs to the
project. Reduce
sediment inputs
from bank erosion
and degradation.
Provide riparian and
wetland habitat.
Support all stream
and wetland
functions.
Prevent easement
encroachments.
Visually inspect
the perimeter of
the Site to ensure
no easement
encroachment is
occurring.
No easement
encroachments.
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
1-4
Goal
Objective/
Treatment
Likely Functional
Uplift
Performance
Criteria
Measurement
Cumulative
Monitoring
Results
Improve the
stability of
stream
channels.
Construct stream
channels that will
maintain stable
cross sections,
patterns, and
profiles over time.
Add bank
revetments and
instream structures
to protect
restored/
enhanced
streams.
Reduce sediment
inputs from bank
erosion. Reduce
shear stress on
channel boundary.
ER >_ 2.2 and BHR <_
1.2 with visual
assessments
showing progression
towards stability.
14 Cross-section
monitoring will be
assessed during
MY1, MY2, MY3,
MY5, and MY7 and
visual inspections
will be assessed
annually.
Cross -sections
show streams
are stable and
functioning as
designed. ERs
are over 2.2
and BHRs are
below 1.2.
Improve
instream
habitat.
Install habitat
features such as
constructed steps,
cover logs, and
brush toes on
restored/enhanced
streams. Add
woody materials to
channel beds.
Construct pools of
varying depth.
Increase and
diversify available
habitats for
macroinvertebrates,
fish, and
amphibians leading
to colonization and
increase in
biodiversity over
time.
There is no required
performance
standard for this
metric.
N/A
N/A
Reconnect
channels
with
floodplains
and riparian
wetlands.
Reconstruct stream
channels with
designed bankfull
dimensions and
depth based on
reference reach
data.
Reduce shear stress
on channel; Hydrate
adjacent wetland
areas; Filter
pollutants out of
overbank flows.
Four bankfull events
in separate years
within the 7-year
monitoring period.
Three automated
pressure
transducers were
installed on
restoration
reaches and will
record flow
elevations and
durations.
Reported in
MY1.
Restore
wetland
hydrology,
soils, and
plant
communities.
Restore and
enhance riparian
wetlands by raising
stream bends,
filling existing ditch
network, removing
berm material over
relic hydric soils,
and planting native
wetland species.
Increase water
storage, increase
groundwater
recharge, water
quality treatment
through retention,
and increase habitat
for aquatic and
terrestrial species.
Free groundwater
within 12 inches of
soil surface for a
minimum of 12% (28
consecutive days) of
the growing season
Eleven (11)
groundwater
gages were
installed in
wetland re -
establishment,
creation, and
rehabilitation
areas and
monitored
annually.
Reported in
MY1.
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
1-5
Goal
Objective/
Treatment
Likely Functional
Uplift
Performance
Criteria
Measurement
Cumulative
Monitoring
Results
Restore and
enhance
native
floodplain
and
streambank
vegetation.
Plant native tree
and understory
species in riparian
zones and plant
native shrub and
herbaceous species
on streambanks.
Reduce sediment
inputs from bank
erosion and runoff.
Increase nutrient
cycling and storage
in floodplain.
Provide riparian
habitat. Add a
source of LWD and
organic material to
stream.
Survival rate of 320
stems per acre at
MY3, 260 planted
stems per acre at
MY5 and a height of
8 ft., and 210 stems
per acre at MY7 with
a height of 10 ft.
Thirteen (13)
permanent and 6
mobile one
hundred square
meter vegetation
plots are placed on
2% of the planted
area of the Site
and monitored
during MY1, MY2,
MY3, MY5, and
MY7.
All 19
vegetation plots
have a planted
stem density
greater than
320 stems per
acre.
Permanently
protect the
project Site
from harmful
uses.
Establish
conservation
easements on the
Site. Crop field
removal and
exclusion of
livestock.
Protect Site from
encroachment on
the riparian corridor
and direct impact to
streams and
wetlands.
Prevent easement
encroachment.
Visually inspect
the perimeter of
the Site to ensure
no easement
encroachment is
occurring.
No easement
encroachments.
1.3 Project Attributes
The project is bordered by residential properties and an active dairy farm comprised of cattle pastures,
an outdoor feeding area, and row crops. Based on historic aerials from 1950 to 2016, the streams
existed in their same location for over 60 years. Agricultural use of the land was consistent during this
period as well. Several alterations to the Site visible from historical aerial photography were the addition
of the large pond in northeast corner of the Site between 1964 and 1973, and the addition of the no -
discharge waste lagoon south of the large pond between 2006 and 2009. Additionally, most structures
were built between 1964 and 1976 with the two large feed barns being built within the last 15 years.
The Site, based on aerial photography, has a history of ditching, field grading, and stream channelization
which increased drainage effects and impaired wetland hydrology. Table 3 below and Table 9 in
Appendix C present additional information on pre -restoration conditions.
Table 3: Project Attributes
PROJECT
INFORMATION
Project Name
Oak Hill Dairy
Mitigation Site
County
Gaston County
Project Area (acres)
20.4
Project Coordinates
35.403339, -81.351724
PROJECT WATERSHED
SUMMARY INFORMATION
Physiographic
Province
Piedmont
River Basin
Catawba River
USGS HUC 8-digit
03050102
USGS HUC 14-digit
03050102050010
DWR Sub -basin
03-08-35
Land Use Classification
24% agriculture, 40%
forested, 36% developed
Project Drainage Area
(acres)
1,070 (Oak Hill
Creek)
Percentage of Impervious Area
11.6%
Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
1-6
RESTORATION TRIBUTARY
SUMMARY
INFORMATION
Parameters
Oak Hill Creek
UT1
UT1A
UT1B
Pre -project length (feet)
2,417
1,958
482
292
Post -project (feet)
2,225
2,052
470
292
Valley confinement (Confined, moderately
confined, unconfined)
Moderately
Confined to
Unconfined
Unconfined
Confined
Moderately Confined
Drainage area (acres)
1070
333
12
4
Perennial, Intermittent, Ephemeral
Perennial
Intermittent/Perennial
DWR Water Quality Classification
C
Dominant Stream Classification (existing)
B4c/G4c/C4/E5
F4/G4
F6b
Cb
Dominant Stream Classification (proposed)
C4
C4
E4b
Cb
Dominant Evolutionary class (Simon) if
applicable
Stage IV/V
Stage IV/V
Stage IV
Stage I
REGULATORY
Parameters
CONSIDERATIONS
Applicable?
Resolved?
Supporting
Documentation
Water of the United States - Section 404
Yes
Yes
SAW-2019-00833
Water of the United States - Section 401
Yes
Yes
DWR# 2019-0863
Endangered Species Act
Yes
Yes
Categorical Exclusion in Mitigation
Plan (Wildlands, 2021)
Historic Preservation Act
Yes
Yes
FEMA Floodplain Compliance
Yes
Yes
Conditional Letter of Map
Revision (CLOMR)
Essential Fisheries Habitat
No
N/A
N/A
Coastal Zone Management Act No
N/A
N/A
eV1 etIand Summary n
ormation
Parameters
Wetland A
Wetland B
Wetland C
Wetland D
Pre project
area (acres)
2.203
0.138
0.021
0.028
Wetland
Type
Bottom Hardwood
Forest
Headwater Forest
Headwater Forest
Headwater Forest
Mapped Soil
Series
Chewacla loam,
Wedowee sandy loam,
Worsham loam
Chewacla loam,
Pacolet sandy clay
loam, Pacolet
sandy loam
Chewacla loam,
Pacolet sandy loam
Pacolet sandy loam
Drainage
Class
Somewhat poorly
drained, Well -drained,
Poorly drained
Somewhat poorly
drained, Well -Somewhat
drained, Well
drained
poorly
drained, Well-
drained
Well drained
Soil Hydric
Status
No, No, Yes
No, No, No
No, No
No
Source of
Hydrology
Groundwater/Overbank
Groundwater
Groundwater
Groundwater
Restoration
or
enhancement
method
Enhancement
Enhancement
Enhancement
Enhancement
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL
1-7
Parameters
Wetland F
Wetland J
Wetland K1
Pre project
area (acres)
0.131
0.047
<0.000
Wetland
Type (non-
riparian,
riparian)
Headwater Forest
Headwater Forest
Bottomland Hardwood
Forest
Mapped Soil
Series
Chewacla loam
Helena sandy loam
Chewacala loam
Drainage
Class
Somewhat poorly
drained
Moderately well drained
Somewhat poorly drained
Soil Hydric
Status
No
No
No
Source of
Hydrology
Groundwater
Groundwater/Overbank
Groundwater
Restoration
or
enhancement
method
Enhancement
Enhancement
None
'No wetland credit is being sought for Wetland K.
Section 2: As -Built Condition (Baseline)
The Site construction was completed on January 21, 2022, and as -built surveys were completed in
March 2022. The survey included developing an as -built topographic surface; as well as, surveying the
as -built channel centerlines, top of banks, structures, and monitoring components. The Site's
construction planting was completed on 02/21/22. Monitoring device installation and vegetative and
substrate data collection were completed by 02/21/2022.
2.1 As-Built/Record Drawings
A sealed half-size set of the record drawing and as -built survey are in Appendix E which includes the
post -construction survey, alignments, structures, and monitoring features. Field adjustments made
during construction that differ from the design plans are shown as red lines on the record drawing.
These adjustments were made during construction, where needed, based on field evaluations and are
listed below.
2.1.1 Oak Hill Creek Reach 1
• STA: 100+31— INCREASED BANK GRADING TO STABILIZE BEGINNING OF STREAM
ENHANCEMENT
• STA: 102+17 — BANK ROUGH ADDED TO INCREASE FLOODPLAIN ROUGHNESS
• STA: 102+21— LOG SILL ADDED IN PLACE OF ROCK SILL DUE TO EXCESS LOGS
• STA: 102+98 — LOG SILL ADDED FOR EXTRA GRADE CONTROL
• STA: 104+58 — LOG VANE REPLACED BY LOG J-HOOK FOR ADDITIONAL GRADE CONTROL
• STA: 104+91— LOG VANE NOT BUILT TO AVOID DISTURBANCE TO STABLE BANK AND TOE
• STA: 105+39 — RIFFLE EXTENDED ACROSS FORD CROSSING FOR ADDITIONAL STABILITY
2.1.2 Oak Hill Creek Reach 2
• STA: 107+30 — LOG SILL NOT BUILT DUE TO SUFFICIENT GRADE CONTROL PROVIDED BY RIFFLE
4/Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL 2-8
• STA: 110+23 — BRUSH TOE ADDED TO PROTECT BANK AT CONFLUENCE
2.1.3 Oak Hill Creek Reach 3
• STA: 110+69 — LOG J-HOOK ADDED IN PLACE OF ROCK SILL FOR EXTRA STABILITY
• STA: 112+63 — GEOLIFT NOT BUILT DUE TO SUFFICIENT BANK STABILITY
• STA: 112+66 — GEOLIFT NOT BUILT DUE TO SUFFICIENT BANK STABILITY
• STA: 115+29 — LOG J-HOOK ADDED IN PLACE OF ROCK SILL FOR ADDED POOL STABILITY
• STA: 116+56 — LOG SILL ADDED IN PLACE OF LOG J-HOOK; BEND SUFFICIENTLY PROTECTED BY
BRUSH TOE
• STA: 117+84 — LOG J-HOOK ADDED IN PLACE OF LOG SILL FOR ADDED STABILITY
• STA: 118+18 — BANK ROUGHENING EXTENDED TO IMPROVE CONFLUENCE STABILITY
2.1.4 Oak Hill Creek Reach 4
• STA: 120+34 — LOG SILL ADDED IN PLACE OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE
MATERIAL
• STA: 120+86 — BANK ROUGHENING ADDED FOR STABILITY
• STA: 122+57 — STABILIZED OUTLET CHANNEL; ADDED FOR ROADSIDE CULVERT
• STA: 122+71— LOG J-HOOK NOT BUILT DUE TO EXTENSION OF GEOLIFT
2.1.5 UT1 Reach 1
• STA: 200+21— RIPRAP ADDED TO STABILIZE BANK
• STA: 200+37 — ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY
• STA: 200+88 — LOG SILL NOT BUILT DUE TO TREE SAVES ON RIGHT BANK AND ADEQUATE GRADE
CONTROL FROM RIFFLE
• STA: 201+63 — BANK ROUGHENING ADDED TO ROUGHEN FLOODPLAIN
2.1.6 UT1 Reach 2
• STA: 202+26 — LOG J-HOOK BUILT IN PLACE OF ROCK SILL TO INCREASE CONFLUENCE STABILITY
• RIPRAP ADDED TO STABILIZE INLET OF BMP 1
• STA: 205+04 — BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY
• STA: 205+93 — BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY
• STA: 206+80 — BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY
• STA: 207+42 — LOG SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL
• STA: 208+49 — LOG SILL BUILT IN PLACE OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE
MATERIAL
• STA: 209+43 — VEGETATED GEOLIFT NOT BUILT DUE TO ADEQUATE BANK STABILITY
• STA: 210+63 — LOG SILL BUILT AT TAIL OF RIFFLE IN LOG STEP RIFFLE SEQUENCE
• STA: 212+51— ROCK SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL
• STA: 214+38 — ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY
• STA: 217+03 — BRIDGE REPLACED CULVERT CROSSING FOR LANDOWNER ACCESS
• STA: 219+02 — LOG SILL INSTALLED INSTEAD OF ROCK SILL AS CONTINUATION OF LOG DROP
RIFFLE
• STA: 219+99 — LOG SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL
• STA: 220+78 — ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY
Oak Hill Dairy Mitigation Site
41, Monitoring Year 0 Annual Report - FINAL 2-9
2.1.7 UT1A
• STA: 300+63 — LOG SILL BUILT IN PLACE OF ROCK SILL FOR DIVERSITY
• STA: 300+96 — LOG SILL INSTALLED INSTEAD OF ROCK SILL FOR DIVERSITY
• STA: 301+00 — 302+20 — PROFILE ADJUSTED TO ACCOMMODATE STRUCTURE DESIGN CHANGES
FOR STREAM STABILITY
• STA: 301+06 — RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION
• STA: 301+32 — RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION
• STA: 301+45 — LOG SILL INSTALLED INSTEAD OF ROCK SILL FOR DIVERSITY
• STA: 301+52 — RIPRAP ADDED TO STABILIZE BANK
• STA: 302+05 — INSTALLED (1) LONG RIFFLE WITH (1) LOG SILL INSTEAD OF (2) RIFFLES WITH (1)
LOG SILL AND (1) ROCK SILL FOR ADDED STREAM STABILTY
• STA: 302+60 — 304+90 — PROFILE ADJUSTED TO ACCOMMODATE STRUCTURE DESIGN CHANGES
FOR STREAM STABILITY
• STA: 302+79 — INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES AND (2)
LOG SILLS FOR STREAM STABILITY
• STA: 303+16 — INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES AND (2)
ROCK SILLS FOR ADDED STREAM STABILITY
• STA:303+54— INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES, (1) LOG
SILL, AND (1) ROCK SILL FOR STREAM STABILITY
• STA: 303+83 — INSTALLED (1) LONG RIFFLE AND (1) ROCK SILL INSTEAD OF (2) RIFFLES, (1) ROCK
SILL, AND (1) LOG SILL FOR STREAM STABILITY
• STA: 304+19 — RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION
• STA: 304+59 — LOG SILL BUILT IN PLACE OF ROCK SILL FOR ADDED DIVERSITY
2.1.8 UT1B
• NO CHANGES
2.1.9 UT2
• STA: 2+33 — RIPRAP ADDED TO STABILIZE DRAINAGE PIPE
• STA: 2+79 — BOULDER TOE INSTALLED INSTEAD OF BRUSH TOE FOR ADDITIONAL BANK
STABILITY
• STA: 3+25 — BRUSH TOE NOT INSTALLED DUE TO ADEQUATE BANK STABILITY
2.1.10 UT3
• STA: 300+50 — RIPRAP ADDED TO STABILIZE CULVERT INLET
• STA: 300+83 — RIPRAP ADDED TO STABILIZE CUVLERT OUTLET
• STA: 302+18 — BRUSH TOE NOT INSTALLED DUE TO ADEQUATE BANK STABILITY
2.1.11 Wetland Grading #4, Cross-section #6
• STA: 0+19 — 0+64— WETLAND GRADING ADJUSTED TO REDUCE FLOODPLAIN SLOPE
2.1.12 Wetland Grading #3, Cross-section #7
• STA: 1+23 — 1+57 — WETLAND GRADING EXTENDED TO TIE SLOPE INTO EXISTING GROUND
• STA: 2+58 — 2+70 — FLOODPLAIN GRADING ADJUSTED TO SOFTEN SLOPE GRADE AT FLOODPLAIN
TIE-IN
Oak Hill Dairy Mitigation Site
41, Monitoring Year 0 Annual Report - FINAL 2-10
2.1.13 Vegetation Planting List & Plan
As -built changes in species planted and densities were minimal when compared to design. Species
replacements and planting density adjustments were made due to availability of the species at the time
of planting. All species replacements were approved species or alternate species within the Final
Mitigation Plan's planting list (Wildlands, 2021), so no approval for the inclusion of the species is
needed.
Open Buffer Planting Zone
• Tag alder (Alnus serrulata) was replaced by elderberry (Sambucus canadensis).
• Northern red oak (Quercus rubra), slippery elm (Ulmus rubra), and sweetshrub (Calycanthus
floridus) were added at densities of 5%, 1% and 1%, respectively.
• The stem density of persimmon (Diospyros virginiana) bare roots was increased from 5% to 6%.
Wetland Planting Zone
• Tag alder was reduced from 5% to 1%.
• Silky dogwood (Cornus amomum) was added at a density of 1%.
• Silky willow (Salix sericea) was added at a density of 2%.
• Live stakes of black willow (Salix nigra) were added at a density of 1%.
Partially Vegetated Buffer Zone
• Stem densities for American hornbeam (Carpinus caroliniana), strawberry bush (Euonymus
americana), pawpaw (Asima triloba), and American beech (Fagus grandifolia) were increased
from 10% to 14%.
• Densities for slippery elm, witch hazel (Hamamelis virginiana), , sweetshrub, and flowering
dogwood (Cornus florida) were decreased from 10% to 7%.
• Densities for spicebush (Lindera benzoin) and northern red oak were reduced from 10% to 8%.
Planting Plan
• Sheets 3.3— 3.5 — No bare roots were planted due to the depth of standing water.
2.1.14 Fencing Plan
• UT1 REACH 2 — FENCE LINE ADJUSTED TO RUN CLOSER TO TOE OF SLOPE
• OAK HILL CREEK REACH 1 & 2 — FENCE LINE MOVED TO TOP OF SLOPE
2.1.15 Monitoring Components
Installed monitoring devices and plot locations closely mimic the locations of those proposed in the
Site's Mitigation Plan. Minor deviations from these locations were made when professional judgement
deemed them necessary to better represent as -built field conditions or when installation of the device in
the proposed location was not physically feasible.
Vegetation Monitoring Plots
• Permanent Vegetation Plot (VP1) was moved from the right side of UT1A to the left side of
UT1A.
• VP2 was moved the left side on UT1 Reach 1 to the right side of UT1 Reach 1.
• Mobile Vegetation Plot 5 (MVPS) was moved from the left side of Oak Hill Creek Reach 3 to the
left floodplain of UT1 Reach 2 near the confluence of Oak Hill Creek Reach 3. The previous
location for this mobile vegetation plot was inadvertently located within the extents of BMP2.
Oak Hill Dairy Mitigation Site
41, Monitoring Year 0 Annual Report - FINAL 2-11
Cross -sections
• Cross-section 3 (XS3) was moved upstream on UT1 Reach 1 due to a large diameter tree within
the floodplain.
Section 3: Monitoring Year 0 Data Assessment
Annual monitoring and site visits were conducted during MYO to assess the condition of the project. The
vegetation and stream success criteria for the Site follow the approved success criteria presented in the
Mitigation Plan (Wildlands, 2021). Performance criteria for vegetation, stream, and hydrologic
assessment are located in Section 1.2 Table 3: Goals, Performance Criteria, and Functional
Improvements. The first annual monitoring assessment (MY1) will be completed in the fall of 2022, at
least 6 months after the MYO assessment. The Site will be monitored for a total of seven years, with the
final monitoring activities scheduled for 2028.
3.1 Vegetative Assessment
The MYO vegetative survey was completed in February 2022. Vegetation monitoring resulted in a stem
density range of 445 to 688 planted stems per acre which is well above the interim requirement of 320
stems per acre required at MY3. Average stem density was 603 planted stems per acre. All 13
permanent and 6 mobile vegetation plots met the interim success criteria and are on track to meet the
final success criteria required for MY7. Herbaceous vegetation is establishing itself across the site. Refer
to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table and
Appendix B for Vegetation Plot Data.
3.2 Vegetation Areas of Concern
Vegetation management and herbicide applications were implemented prior and during construction to
prevent the spread of invasive species that could compete with planted native species. A dense stand of
bamboo (Phyllostachys aurea) was mechanically removed along UT1A during construction. Kudzu
(Pueraria montana) was removed along UT1B. Other areas of Chinese privet (Lingustrum sinese),
Japanese privet (Lonicera japonica), Japanese knotweed (Polgonum cuspidatum), English Ivy (Hendra
helix), marsh dewflower (Murdannia keisak), and multiflora rose (Rosa multiflora), were treated on the
Site during construction. Invasive species will continue to be monitored, mapped, and controlled as
necessary throughout the monitoring period.
3.3 Stream Assessment
Morphological surveys for MYO were conducted from February 2022 to March 2022. All streams within
the Site are stable and functioning as designed. All 14 cross sections at the Site show little to no change
from design in the bankfull area and width -to -depth ratio, and bank height ratios are less than 1.2.
Reachwide and riffle 100-count substrate sampling were conducted during baseline condition
assessment to classify the reach and characterize the riffle pavement. Riffles along most reaches have a
median particle size classification of medium gravel to small cobble. Based on a DMS Technical
Workgroup memo from 10/19/21 and concurrence received on 10/27/2021 from the DMS project
manager for the Site, pebble counts will not be conducted during the remaining monitoring years unless
requested by the IRT or deemed necessary by best professional judgement. Refer to Appendix A for the
Visual Stream Morphology Stability Assessment Table and Stream Photographs. Refer to Appendix C for
Stream Geomorphology Data.
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL 3-12
3.4 Stream Areas of Concern
Inspection of stream structures and banks did not identify any stream areas of concern, indicating that
the stream is preforming as designed. The Site will continue to be monitored and any issues will be
mapped and reported throughout the monitoring period.
3.5 Hydrology Assessment
Crest Gages (CG) were installed on Oak Hill Creek, UT1, and UT1A to monitor bankfull events.
Hydrologic data will be collected and reported during MY1.
3.6 Wetland Assessment
Eleven groundwater gages were installed before the start of the growing season in wetland creation,
rehabilitation, and re-establishment areas to determine wetland hydrology success across different
restoration levels. Soil profile descriptions and groundwater gage photographs were taken during
installation and are located in Appendix A. Groundwater gage data will be collected and reported during
MY1.
3.7 Adaptive Management Plan
Site maintenance and adaptive measurement implementation will follow those outlined in the project's
Final Mitigation Plan (Wildlands, 2021). No adaptive management plans are needed at this time.
3.8 Monitoring Year 0 Summary
Overall, the Site looks good, is performing as intended, and is on track to meet success criteria. All
vegetation plots are exceeding the MY3 interim requirement of 320 planted stems per acre, and all
streams within the Site are stable and meeting project goals. Herbaceous vegetation is
establishing itself across the site. Invasive species were treated and/or physically removed across the
Site prior to and during construction and will continued to be assessed throughout the monitoring years.
Summary information and data related to the performance of various project and monitoring elements
can be found in the tables and figures in the report appendices. All raw data supporting the tables and
figures in the appendices are available from DMS upon request.
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL 3-13
Section 4: METHODOLOGY
Annual monitoring will consist of collecting morphologic, vegetative, and hydrologic data to assess
project success based on the goals outlined in the Site's Mitigation Plan (Wildlands, 2021). Monitoring
requirements will follow guidelines outlined in the NC IRT Stream and Wetland Mitigation Guidance
Update (2016). Installed monitoring devices and plot locations closely mimic the locations of those
proposed in the Site's Mitigation Plan. Deviations from these locations were made when professional
judgement deemed them necessary to better represent as -built field conditions or when installation of
the device in the proposed location was not physically feasible.
Geomorphic data was collected following the standards outlined in The Stream Channel Reference Site:
An Illustrated Guide to Field Techniques (Harrelson et al., 1994) and in Stream Restoration: A Natural
Channel Design Handbook (Doll et al., 2003). All Integrated Current Condition Mapping was collected by
either a professional licensed surveyor or an Arrow 100' Submeter GNSS Receiver and processed using
ArcPro. Crest gages, using automated pressure transducers, were installed in riffle cross -sections to
monitor stream hydrology throughout the year. Groundwater gages were installed using guidance from
the USACE's Technical Standard for Water -Table Monitoring of Potential Wetland Sites (2005). Stream
hydrology and vegetation monitoring protocols followed the Wilmington District Stream and Wetland
Compensatory Mitigation Update (NCIRT, 2016). Vegetation installation data collection follow the
Carolina Vegetation Survey-EEP Level 2 Protocol (Lee et al., 2008); however, vegetation data processing
follows the NC DMS Vegetation Data Entry Tool and Vegetation Plot Data Table (NCDMS, 2020).
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL 4-1
Section 5: REFERENCES
Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream
Restoration A Natural Channel Design Handbook.
Lee, Michael T., Peet, Robert K., Steven D., Wentworth, Thomas R. 2008. CVS-EEP Protocol for Recording
Vegetation Version 4.2. Retrieved: http://cvs.bio.unc.edu/protocol/cvs-eep-protocol-v4.2-lev1-
5.pdf.
North Carolina Division of Mitigation Services (NC DMS). 2007. Catawba River Basin Restoration
Priorities (RBRP). Raleigh, NC.
North Carolina Division of Mitigation Services (NCDMS). 2020. Vegetation Data Entry Tool and
Vegetation Plot Data Table. Raleigh, NC. https://ncdms.shinyapps.io/Veg Table Tool/
NC DMS and Interagency Review Team (IRT) Technical Workgroup. 2018. Standard Measurement of the
BHR Monitoring Parameter. Raleigh, NC.
NC DMS and IRT Technical Workgroup. 2021. Pebble Count Data Requirements. Raleigh, NC. October 19,
2021.
North Carolina Division of Water Quality (NCDWQ). 2011. Surface Water Classifications.
http://deq.nc.gov/about/divisions/water-resources/planning/classification-standards/classifications
North Carolina Geological Survey (NCGS). 2017. NCGS Publications.
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/north-carolina-geological-
survey/interactive-geologic-maps
NCGS. 1985. Geologic Map of North Carolina: Raleigh, North Carolina Department of Natural Resources
and Community Development, Geological Survey Section, scale 1:500,00, in color.
North Carolina Interagency Review Team (NCIRT). 2016. Wilmington District Stream and Wetland
Compensatory Mitigation Update. Accessed at: https://saw-
reg.usace.army.mil/PN/2016/Wilmington-District-Mitigation-Update.pdf
Natural Resources Conservation Service (NRCS). Web Soil Survey of Gaston County.
http://websoilsurvey.nres.usda.gov/app/HomePage.htm
Reid, M. 2021. Email Correspondence, Pebble Count Data Requirements. October 27, 2021.
Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199.
Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books
Schafale, M.P. 2012. Classification of the Natural Communities of North Carolina, Fourth Approximation.
North Carolina Natural Heritage Program, Raleigh, North Carolina.
Simon, A. 1989. A model of channel response in disturbed alluvial channels. Earth Surface Processes and
Landforms 14(1):11-26.
US Army Corps of Engineers (USACE). 2005. Technical Standard for Water -Table Monitoring of Potential
Wetland Sites. ERDC TN-WRAP-05-2.
Wildlands Engineering, Inc. (Wildlands). 2021. Oak Hill Dairy Mitigation Project Mitigation Plan. DMS,
Asheville, NC.
W Oak Hill Dairy Mitigation Site
Monitoring Year 0 Annual Report - FINAL 5-1
Conservation Easement
Project Parcels
Sheet Boundary
Internal_Crossings
Existing Wetlands
Wetland Creation (@3:1
ratio)
Wetland Re-establishment
(@1:1 ratio)
so Wetland Rehabilitation
(@1.5:1)
Wetland Rehabilitation
(@1:1 ratio)
BMP
Structures
Vegetation Plot Conditions (MYO)
Criteria Met (Permanent)
0 Criteria Met (Mobile)
4
ir
Enhancement I
Enhancement 11
Restoration
No credit
Non -Project Streams
TOB
Cross Section
"— Fencing
Topographic Contour (5ft)
• • Photo Point
• • Barotroll
• • Crest Gage
• . Groundwater Gage
Reach Breaks
U ParkingAccess
bokii/V WILDLANDS
ENGINEERING
0 75 150 300 Feet
1 1 1 1 1 1 1 1 1
Figure 1. Current Condition Plan View Key
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Environmental
Quality
Gaston County, NC
/
Reach,2
Conservation Easement
Project Parcels
Sheet Boundary
Internal_Crossings
Existing Wetlands
Wetland Creation (@3:1
ratio)
Wetland Re-establishment
(@1:1 ratio)
Wetland Rehabilitation
(@1.5:1)
Wetland Rehabilitation
(@1:1 ratio)
BMP
Structures
Vegetation Plot Conditions
(MYO)
Criteria Met (Permanent)
O Criteria Met (Mobile)
Enhancement I
Restoration
No credit
Non -Project Streams
TOB
Cross Section
Fencing
Topographic Contour (5ft)
• . Groundwater Gage
• • Photo Point
Reach Breaks
WILDLANDS
ENGINEERING
0 37.5 75 150 Feet
•
Figure la. Current Condition Plan View
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Environmental
Quality
Gaston County, NC
M1
■
1 P
1__,1 Conservation Easement
•
Project Parcels
Sheet Boundary
Existing Wetlands
Wetland Creation (@3:1
ratio)
Wetland Re-establishment
(@1:1 ratio)
Wetland Rehabilitation
(@1:1 ratio)
Vegetation Plot Conditions
(MVO)
Criteria Met (Permanent)
0 Criteria Met (Mobile)
BMP
I— Structures
Restoration
No credit
Non -Project Streams
TOB
Cross Section
• • — Fencing
Topographic Contour (5ft)
• • Photo Point
• • Crest Gage
• . Groundwater Gage
Reach Breaks
t
�WILDLANDS
ENGINEERING
0 37.5 75
150 Feet
1 1 1 1 1 1 1 1 1
Figure 1b. Current Condition Plan View
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Environmental
Quality
Gaston County, NC
'- 1 ■111
r
;AL
,,,,-"' i * \ ‘, '
�� \, a
N.
__. 1_47'..-'<,..............!.............._____. . , ,....-----.-.0.----..-4., \ \
,_1 Conservation Easement
Project Parcels
Sheet Boundary
Internal_Crossings
Existing Wetlands
Wetland Creation (@3:1
ratio)
Wetland Re-establishment
(@1:1 ratio)
�� Wetland Rehabilitation
(@1.5:1)
zz
BMP
Structures
Vegetation Plot Conditions
(MYO)
Criteria Met (Permanent)
O Criteria Met (Mobile)
Enhancement II
Restoration
No credit
Non -Project Streams
TOB
Cross Section
Fencing
Topographic Contour (5ft)
• • Barotroll
• • Crest Gage
• . Groundwater Gage
• • Photo Point
Reach Breaks
ParkingAccess
Baro--,,
GWG2\`
2019 Aerial Photograph
1
WILDLANDS
ENGINEERING
0 37.5 75 150 Feet
I I I
Figure lc. Current Condition Plan View
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Environmental
Quality
Gaston County, NC
Appendix A
Visual Assessment Data
Table 4. Visual Stream Morphology Stability Assessment Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Assessment Date: 4/18/2022
UT1A
Number
Stable, Total Amount of
Major Channel Category Metric Number in Unstable
Performing
As -Built Footage
as Intended
% Stable,
Performing as
Intended
Assessed Stream Length
470
Assessed Bank Length
940
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Totals:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
17
17
100%
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
5
5
100%
UT1B
Number
Stable, Total Amount of
Major Channel Category Metric Number in Unstable
Performing
as Intended As -Built Footage
% Stable,
Performing as
Intended
Assessed Stream Length
292
Assessed Bank Length
584
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Totals:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
0
0
N/A
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
0
0
N/A
Table 4. Visual Stream Morphology Stability Assessment Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Assessment Date: 4/18/2022
UT1 Reach 1
Number
Stable, Total Amount of
Major Channel Category Metric Number in Unstable
Performing
As -Built Footage
as Intended
% Stable,
Performing as
Intended
Assessed Stream Length
218
Assessed Bank Length
436
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Totals:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
0
0
N/A
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
1
1
100%
UT1 Reach 2
Number
Stable, Total Amount of
Major Channel Category Metric Number in Unstable
Performing
as Intended '=s-Built Footage
ilk
% Stable,
Performing as
Intended
Assessed Stream Length
1,834
Assessed Bank Length
3,668
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Tota Is:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
11
11
100%
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
13
13
100%
Table 4. Visual Stream Morphology Stability Assessment Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Assessment Date: 4/18/2022
Oak Hill Creek Reach 1
Major Channel Category
I Number
Stable, Total Amount of
Metric Number in Unstable
Performing
As -Built Footage
as lntended
% Stable,
Performing as
Intended
Assessed Stream Length
489
Assessed Bank Length
978
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Totals:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
3
3
100%
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
4
4
100%
Oak Hill Creek Reach 2
Number
Stable, Total Amount of
Major Channel Category Metric Number in Unstable
Performing
as Intended '=s-Built Footage
ilk
%Stable,
Performing as
Intended
Assessed Stream Length
470
Assessed Bank Length
940
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Totals:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
3
3
100%
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
4
4
100%
Table 4. Visual Stream Morphology Stability Assessment Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Assessment Date: 4/18/2022
Oak Hill Creek Reach 3
Major Channel Category
11 Number
Stable, Total Amount of
Metric Number in Unstable
Performing
As -Built Footage
as lntended
% Stable,
Performing as
Intended
Assessed Stream Length
877
Assessed Bank Length
1,754
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Tota Is:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
6
6
100%
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
7
7
100%
Oak Hill Creek Reach 4
Number
Stable, Total Amount of
Major Channel Category Metric Number in Unstable
Performing
as Intended '=s-Built Footage
ilk
%Stable,
Performing as
Intended
Assessed Stream Length
389
Assessed Bank Length
778
Bank
Surface Scour/
Bare Bank
Bank lacking vegetative cover resulting simply from
poor growth and/or surface scour.
0
100%
Toe Erosion
Bank toe eroding to the extent that bank failure
appears likely. Does NOT include undercuts that are
modest, appear sustainable and are providing
habitat.
0
100%
Bank Failure
Fluvial and geotechnical - rotational, slumping,
calving, or collapse.
0
100%
Totals:
0
100%
Structure
Grade Control
Grade control structures exhibiting maintenance of
grade across the sill.
3
3
100%
Bank Protection
Bank erosion within the structures extent of
influence does not exceed 15%.
4
4
100%
Table 5. Vegetation Condition Assessment Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Assessment Date: 2/21/22
Planted Acreage
19.1
Mapping
Vegetation Category Definitions Threshold
(ac)
Bare Areas Very limited cover of both woody and herbaceous material. 0.10
Combined
Acreage
0
% of Planted
Acreage
0%
Low Stem Density Woody stem densities clearly below target levels based on current MY stem count
0.10
Areas criteria.
0
0%
Total
0
0%
Areas of Poor Growth
Rates
Planted areas where average height is not meeting current MY Performance
Standard.
0.10
0
0%
Cumulative Total
0.0
0%
Easement Acreage 19.9
egetation Catego
Invasive Areas of
Concern
Definitions
I nvasives may occur outside of planted areas and within the easement and will
therefore be calculated against the total easement acreage. Include species with the
potential to directly outcompete native, young, woody stems in the short-term or
community structure for existing communities. Invasive species included in
summation above should be identified in report summary.
Mapping
Threshold
(ac)
0.10
Combined
Acreage
0
of
Easement
Acreage
0%
Easement
Encroachment Areas
Encroachment may be point, line, or polygon. Encroachment to be mapped consists
of any violation of restrictions specified in the conservation easement. Common
encroachments are mowing, cattle access, vehicular access. Encroachment has no
threshold value as will need to be addressed regardless of impact area.
none
0 Encroachments Noted
/ 0 ac
Stream Photographs
' ; } P 4 e j `r �.+i. t,y. a Ems+ "-.� .�,' -""'
-'- _,, F ' ]"'°' fir1,. r+'--* :ixe � ¢�� r F
3y_ „y r. c " �"�.�.r "yw --, s +:` z 4: . ,N, e9. M�� 1; �tr.. ,�,t"4 m„,+• , ,H v¢ s ,, R -s fir. „
,vw.,rr 4� .;R r ,. yF' l -^.F,M P ini J "aF 1��W t Y' 1�" 1 .J �� ...., i
•
a - t iw•
sm RiPa?
aI ! Pi
a v_ � -i A - .'.1 wr. 1 ` 3' ` ,. -. ,.
tit i�- ti+ -t,^c1x. ��d �k s 4'" .t,`�w� s"' `%--.,.l _ -?',7 '�s-R, '.,, -
S -iv h'm i Z F"Pr -s �+ s '�� & p � V •'' : �1 {" r xa A / �-!!• r E"` 4p
, .r�•{ s`_' kz. 'mowAi �� }It: y�yry�� i.e ... ,,t�.-.$; ' i - y� 'L ^1
•
'YF P p +Yx �,�y -`fS o f y} '�' r • t f.
h. ♦ f... -'7ik, N `.h"'t' ,.t }`�' nR+t� 1 ,W.� _ �a ,I.hr. •N'{� t !e _.. �- r_ 4w..
PP1—UT1A looking upstream (02/24/2022) PP1—UT1A looking downstream (02/24/2022)
•
f `��y „ ,�3r • i F t l
•
ix F � a tf A .
„ - s E '$�''. �e$wi `4 v t -?r ,' �` k _„„A, `' }.x '. -44— .7` x t- I�%!
-yam r ka , Y- f s t o s°'*.„.� r h r- r /' ';.'�" 1 fi:. -i, %:fk
4i0
4
$F,,, -�. roYr 3.' h I '-gam - a,t ' 6 � v � �Y `�?.�` `�2 1 /S C yy r
_ - z.: s - u. k a. ',sk ,s _ -• `-�i'3 "�gX 'g o tau+^ 'r`
I.
,,,,,„:,_.. .,,
yy h a 4 Sr^rs.,y`_'C :' t h�s t r "' ,A - x; �:.k. ,t .' 11,,,,,,s0,...
1 :s r a £ p ;o &"��A 4-4 i. ' 1.. S .' `, 5. �t T'K!. Fc.4
, s
1.
�'fir+-� .s� - ! s,,,-f t
j t - l.1 ,1 , .•:.a - .s_ ..-, °, ....�Su�. y v*t '� t>�u-.
PP2—UT1A looking upstream (02/24/2022) PP2—UT1 R1 looking upstream (02/24/2022)
,-...,:,,;:' :
•
�,,cc�'' -'
9t
a -7, 1. n
PP2—UT1 R2 looking downstream (02/24/2022)
11
9 _ j.F: K � I _
c ▪ c:i -as4i.. .,u
,+4, } b - ; 8 5 r i.Fr^'�r's fi l k akr -,
� �r�l[, 1. �s-^� � 1. sAt_. 4 .� a,yw,5 � v�,�`i��
• 3[[-d .. q y ri. ° F . ., y, .a,,.k: . x.«„`e4sa .Yy" - 4�3 &
� a ar r 5 s• ppe as= m
44zr ^r Y + � urn . .� ,�� � �y k.. YC" ����� •k[ S4:el$ti ��" ��. 3 ,� c,�a�- �;�sq
it a3'� �{ � tr `, �� �� A ��{k F,�'t y] �r� [ P� � �_-� i t IG
[�' ), ,, k'n 4 r i tY r to -.,Y TMrt S a - .r•"€ {°Vi'4�,� I P I ' w6 b. P
��++,,� � a 7=` ,i '� , ,'; y ,1," t�•F,4 �.[3 Lr s a v� -. ''.' $
i'R , ,A, ,' rr S ` ._ 'AS 3 K',' 'i • ';'P r'M.0 i ,fY 1 3 d 11 �1, _ ---_,__
•' .v,;; ,, a Y q a& a „ a' ' , p ,,,Itt}'�' h t ea. r:, ' '.w S _ S` „ F`_�'
L W «I' '' ss b t g _ a r .„
s `� ',r i- ter°�y .. .f ,, , ° ' 3, 6�{
,t a Y 4 r -, ,,,,,fi r er`,3, 3t V,, r t'' rr '^°s'� �'y�. -i„ �, �I� e'" J - k, .
4r �; { 3i�p�` ;,`V y �0y. sR i' ra s'v. n i4 1 b- 'i i ," a 9 mow_
'�. T _._ - 2 r ..., . ,.-YeS. .R ,A4•T,7.d Y-.., • a.'_. r,_ f# " 4 � Vt A'u:�s .is
PP3—UT1 R1 looking upstream (02/24/2022) PP3—UT1yy R1 looking downstream(02/24/2022)
ll �q' rr f T f, .r
� i �• lf I'le," ''.74,
� t �.�i�� �e� � ��0'�1' �:; '.. �;I a�'�"s. � �� .f r _1•
4- - �i,�,. v
t�, ''S';A�`Rl •,-.4"40r4 '..-•:-.5' fri:C1 ,'i-..,. ,4,$;e1.0‘EOV,!!;•g;2:,-,,;-'4,:!-';,JN7:1).-:' --:_-"A-tir ' -'titi-J41:14--!$'0),11,-re,, -lr',', L;".f.-:- •:.;-.''''-i*$.*----:•.-:-.7--,,:
,fe i.}ix l a �, T�it i r - s ,a3'r < -'� _ _ t Fe71 'fry
i"V i t ;'°I`> i _ ' .i - s ',i� >d+y _ el - ra .�" -, �' $ , -, a.E t5-
t .,,,;,,2414.k.?,:`...,, ,,::: :,;2,,t ,',,:,.:„Iti , ,, ..litt.,%,„,.;4Z,::n0,,,, -MI5..*::40? '4.: '::::..-.-,..-::-;[;11.-:7'-'-:-:'-;:::., :114741,*''''.. ..4;',.*HA ...'.4t,i'-sel7A:',P''''kMf•Mt. .131tt. :
,,,,,,....,- j. ..,„• rti,,,I.,-,,,..:,..,4;.!.. v.ts,,,.. ...k_.,---..4. .-..„..,24,tzt.:-...,,:4,-;',.-t.,*,.:.-„,1',..,..t.l. —,,.... ....--.-. k ,....-1-34--,.. ...„ -,,,.*---n-f...w.,,, ,..Nt.",,,.c:;..4t.... .-, ,,,,--..1-....,-'::-.-:!":,-'' ''''-..4."_er -:.'."•-- ..-
40%
as— gF � )' .4 y, rah s c . 4,. 5 sue"
y., `4 9=4`S!{3y w -r �vYsq? a . „n..y k F''3 �'"y .ref
't, i ',':7r5r' ,4,;i,[,r ,f�=�,' -4. T.-J: a ts-f - t� ,...cr e �" .� s ram "
,,,,,,.,,,.:,...v.::„„...,,,`'am ° 5 , 4 { , -. "` A
h`�^.A ..[ sy <a y'
+'i $,_ �. ".�.- `'� ;�" ,e+e b>7S.s .4x a ra,. d-i -. �: ."F-,.: .._ v .•. .. �`•qr.-
PP4—UT1B looking upstream(02/24/2022) PP4—UT1B looking downstream(02/24/2022)
*4111 1 w 7 e.. w«s '�,h i ,, a i s�'r. !'cam.;, .-.. . e' x,: T,�'` '1110 i
1,1
', - ' li lit To id r 1, a+ ,i ' I.-r-� y
i $ K , wi �;
�fi
x
•
$gig . �t y si',xs Ya 7 r k144. °�,° `� ..F r` - t�'„y?y,"f ^ - ,
g a n' s7 ..,1 W-. i, - �. �r •s ••P T.n,. - - -
ti cr'a r_„q a�.• " T� ,, r Lrn.4 �" a ,,.-s ". , ',�w - 4 V f ''
5 d'r '� i ' . - :� ;�;.r 'ate $ .v.
�' --,,,ire:
fi 'iT y�` 3"'� v. y> r --. ,- ec * -'fin �,x , l
°�..K�i.:. +1'1�� .?4�" ` r, d `" iitat'Sa> n....i, � ,- -.5-<_ -n, ;... 4.'-
PP5—UT1B looking upstream (02/24/2022) PP5—UT1B looking downstream (02/24/2022)
77{
�
7jf! pipe t
sS4 y
�yy 5 C� pL
x {
4`G V-x'e- -s'! [,a -1(ti,.. !.1'�+Jtf_i .A .r: e--h.:..,, x"n...PP6—UT1 R(2 looking upstream (02/24/2022) PP6—UT1 R2 looking downstream(02/24/2022)
1 { i e": t 4 X l 1P€g. f - �' . ' �
L a -'wr
.` '�1 1 i i. f y 4,7, f'1` f v423 : r 4 3kx - ac ,.
'§,iz " I{ � ix99'�i� � S#, f1 lc $f 'e k}�' - 1yyk��y'Y'1r'' S_ e �
6 'air^ 1,.G1- 'I r s' '7 ill g�„w `ei,l S 'r • • t _tai"�': r _ _ It°4-•�' ''-
}ds +I 1 '- f f tlri:. '`sa, e, ', r1 try
�e }�dD ai x+4se7 .YI s., t b �rs ti
,, -a., - "' , "?'fie -- . - i - A a
• 4tr d `
4
r}'3' mr € ; - :h x sty - ' -
.-X p P' ,a .' ,., d` '''�% .• 1 V,.'- y ri .4 ,-,r?;Asa., 5 .w°.' .1 5 __ ,,,,,,E_� vA q 4 `r .y 4 f —
Wet sty„ f '4'x xd.'.M , '` } • ..- S " Y 1. v4' f y y '3 -"mt d ..* Ly t•- ;>. f 4-V,,
li
rFv E "i ,,-,i. ,2 'f,,,, v „k W�d k 1& VF\ `t,, J' .iy, '_.
m, ,� '�li,,�..�,. �a�Y � ?' � .i�' .��,"� :�=1. .€� .�e� Sts�.e`�s,.'� '?�- Avr►a���.,� ,...
PP7—UT1B looking upstream (02/24/2022) PP7—UT1B—UT1 R2 Confluence(02/24/2022)
:,.'4.,,i,r':',i'ii. 1k I et ',1' '• - ' • -'
...8y .: 3 ell 1 ;a !'
`ems : . - - -
K
cr-
•
_'...y 2�.. •3 -*n F ' " r - - � - 'r• ^a" , -0 e'r �i,z r a S < <.I r_ "i. -� ;i i *t g = _S _ . --
•
_ r C �
- • a 0-4 ZYJ f d a, ' ,,, � M 4a
- ?r � "` 1 � r _ ° ; f_�..r.a.'
'`' i f y y� 'H i-a, - -. ,
PP8—UT1 R2 looking upstream (02/24/2022) PP8—UT1 R2 looking downstream (02/24/2022)
' ., r-i',•• ,k. '-,. ' ,, .11kI4,44-4- 7„,,,,,,i',..-, .,,,..,o--;;.z,----,
6 3
E, , ,,,,,., , 0 . , ,::A.t.,-,.."-;.1,1,:..i.° ; r, , .
.. .
,-=" K, 1 `C,,,.i."'" `1:11:,,;.#n..,1-7q7;.,i,V ;ft. ,,T,4-5! tii,
N { _
- ...-_ �,, ..`+"-fee
it-i
ar
.va,J - -,!,, -,,, -- ,mac „ _ :r-ta „4::" -. , " : ". 1 - ',
PP9—UT1 R2 looking upstream PP9—UT1 R2 looking downstream(02/24/2022) (02/24/2022)
i
i
l
' �. � � - ` 4 "°.'
i- 4
y 'a
•
s'k' Y.• a - �, rya. �.s
.!�� :^'',4 marts. ?. - .. r ,s' r-_ i ._ .� yr.�; g .'` .
PP10—UT1 R2 looking upstream (02/24/2022) PP10—UT1 R2 looking downstream (02/24/2022)
y' '�qh' ;fit aa i r«rr,t °3 9 o-
} Y
d 4�p9 r�.rr
, * a •. ,. .auc m: �AMF®CON`_ ,a
R� :: . .z, - - ` .. yam.•.— � p
t : :'may
'.. '" ' -`, n't ., ,s.- s asp .. .
a--*2.+ . - � � k ak-s.. r . . ,i s 5-;maay _ •
-4 '1 x ��[" ,� �� A y „I� , �.._ �. .,. fir�.1 ` ' e
,
'.'
�a .? M. 5 6'aT �"'_ -
PP11—UT1 R2 looking upstream (02/24/2022) PP11—UT1 R2 looking downstream (02/24/2022)
(,a
r
Sg ate
t. T - ..ram. t m, '--,fre}e , _ Si-A% "�` +Ks,°
e
� _ .-- "s'r' «+ t �r ,? r d e ?'
M "s�" fE
_ am
PP12—UT1 R2 looking upstream (02/24/2022) PP12—UT1 R2 looking downstream (02/24/2022)
�1 i . i r
-. AMF0425)145,42P3 AMFOCoar -
'r* a' E• :;.:at
.ex'm - m
3s t • .?,,,. ems-:., "N -1 .'i c, .4.41 '" k% v, _ SS
y a- _ 4J Z 5✓ -Seed s_ i Y , or
• y Y_ y y
L• t:::•, a�'rw. E 4 AY-O 'S4& k _r ,'4..
PP13—UT1 R2 looking upstream(02/24/202t2) PP13—UT1 R2 looking downstream (02/24/2022)
1.
n 1 4r- 3
°f # xP. 4� stay s;
" 1 z
" '-' ,x fin" 'ti n .y9
3. ._
F _fie. ...
,K�h _.. T nE
.
{ %wy 'e'er
• .y �" fdk" • -� ` # y-' '^ p er`
` Fi43 7 '," tff• it
• tI' Y c .o ? •
PP14—UT1 R2 looking upstream (02/24/2022) PP14—UT1 R2 looking downstream (02/24/2022)
14
d i d-r '4 r Y"��r p, I' 4, 'ITF pf,E � '. ,+?$,a}e r,�,��,4,, 'P I��s�a+ � 'S; , '. . r.-; + . fs.�.% , �•� .,,
t IP IrTy _
e3 `r,�,.? fs .f ., ..�
+"�..a , .5a' -F,6 h +� �. k' t Z - "" .sy ='BSc - s .?,..Y,.»...',
•
4 3 t SS d 4u!r!s ar - � , „x,m rr"�` ,� ,M ,
4 «. "!h i x v'x'rgrr ffi'" 14 r$t I a�- el i'4s u r i i- '-, H . .'r L1, " ,q,. -x a ;R x ', i... - -;
��,± .- '♦ '.%`-$: :4 !�41,7Ar'! ,7 r Yp, -Nis
-., 4. I ar'` `' �' •,yea 4 V ''- r -f 4 c '( '-W.y W. a " "`' `�
..... ._ 7?:. -' ` _'' bhp` r -S 5, �' et '
�.,t0 ' �9 �'•�t` A �A+�
PP15—Oak Hill R1 looking upstream (02/24/2022).-•-.,::,.-':"---_'-.,-.'-,•"-•,-'"--.'_..-'.:"','-.--.:.1:.',-,-",..-:.f.'-.-.:.t.t.-•,'..!,.,#..t'.1.4-,,'I',..-.'47.:,i--''Y1;'",'.d):•1''''-,A,-'4ir1-`,:i,,--';,:,Xt-i4.,1'A,'--,i,'2'.•-44,-T,t,-1.-4', PP15—Oak Hill R1 lookA.ing downstream(02/24/2:-1--2',.-.....-
2)
r , R� 4 yy4
y r m f a.k 1' s r 1, JI sa-- �- Z-� � I(I 1�i [ 4 13 �,-s •y S !
.r r",. f, �' -S,, 'F'„a;' - 1 ... A' -'`�e,.. �, �!r h 'I ai i 1 s
t. f..n�e...v'' ' M �� spy _ }
Y 5 i y .,.M. J __ L - -
l C k �a4 ''
0
` ,- _ ,'At ; _ - -
f ,.are._., i� -- S @ '' - "� 0 - Y,.
g
:a'n ,a , 9 x j.,r a 1i : ; „vm, 9 A'�'i -
n to
PP16—Oak Hill R1 looking upstream (02/24/2022) PP16—Oak Hill R1 looking downstream (02/24/2022)
^, ( ,
r
•
��''�� -� aa Q T. _ •,,' fie,--`'.^s' ,,
" � .
..A.W-i..,0..,-t,ems" ryti 14k' 4Ss� - ^���
i _ =-, - tea,+" ,'',.. ;" .
c
PP17—Oak Hill R2 looking upstream (02/24/2022) PP17—Oak Hill R2 looking downstream(02/24/2022)
a
tr. �a� aLl t e ' '> YC q_ ' V L, r t tik"d eqe
ti� a y
•
`� yam`j * �Y.-, , •. $' ° :R .? v F 1 '1 _ A ' Tt s� -3 , " ax -'q.F-
.�A as '
PP18—Oak Hill R2 looking upstream (02/24/2022) PP18—Oak Hill R2 looking downstream (02/24/2022)
�E - Yri
Y' f
,.l
-- _,oa _E..';`"," s- iq a. r _ __+ .t a -.'t r ' s 3 ,..i. Sm•_: -
- -' s -gam. L::"'" _ ''- ' n "%F`" '"`'" sue"µ"a
x
PP19—Oak Hill R2 looking upstream(02/24/2022) PP19—Oak Hill R2 looking downstream(02/24/2022)
t.
Vi ,4 z d ,l t d - he. «ig. 4 1 ' Mgt
:r ' .�y , .,-7'! - °' ' ...e - -`-� �n it ';'. - — i>'- r
x ' , 2:s - :'it " rr s " "sue, , t ^„-ems. r ��*".17 - e-
.',r'4' 9;'- �, f'c Viz' -a.;:y ° ��;.
i;e. a erg �. 5 '- ; a-»
PP20—UT1 R2 looking upstream (02/24/2022) PP20—Oak Hill R2 looking downstream (02/24/2022)
4 }�
$ r
1
r
'S'4' _ :' S a. - -
'ham '"' W f E�
.ram �`..=� � > ."� "'��-s�e
�F v
PP20—Oak Hill R2 upstream (02/24/2022)
F - t
.y eftr
ap '9 fi' dig, b]' ',h
L„ ,�, t 'S- .''n,�...4 1�"`'F' tp
- �•: `3^ fiyx�!'S }Y`. t 4 k s', 2t
'dam.d: 34� 'Ir .xfwe!�1 t' a.%<rYiE n. ro � J.
PP21—Oak Hill R3 looking upstream(02/24/2022) PP21—Oak Hill R3 looking downstream(02/24/2022)
,.
•
.-.' 7 S � '. = X�' / , "",4.a ,,'
:-,
....;:.7;z4w-.
,_ _,.., , ,.. -7,,,...„
` a t max' :.,,,- . - ,Ea „<, °`` - . ' 4 P'' bg r ,, te � & b{ : am. z, Yy w rc ' rr' } r ' a N
, -
i„,4,,
a.,
PP22—UT2 looking upstream (02/24/2022) PP22—UT2 looking downstream (02/24/2022)
Y K, ]Z �}. ; A3A9,. f f !
`94l yor. l
S" 4
{ 4`i• yip • _ w" _ �- rr, - .Ante-K fyr}T Y'1 �
! 9/V
f'11'.4.,tilki A — -v- • ':..,-;-'2-1•,-;,- -,_,..- -- - :_-_ - -7.3'. :-•,:.,..-:.;."-:-.,7- 4.47r:;wt,-;=:;-'''',;'44-4,1:' "'lr-- --.,.,- -- :,0_,.:'A'. •
fa F i
PP23—Oak Hill R3 looking upstream (02/24/2022) PP23—Oak Hill R3 looking downstream(02/24/2022)
:;
rr
'4: - ,;-jam ,"`y - - � _ �,� -� - �- .-
- • IA ..e,-„ },e =' a - :lir a 7~ • '�a T+�.;�.
�=, � 3^^� r �, 1 � +•k � -'r ar _',. z rP q'' r xE is x.
s a - r � $' e � em ,
PP24—UT3 looking upstream (02/24/2022) PP24—UT3 looking downstream(02/24/2022)
I rF
x;}ti to i pia, .^ -
:x - t z-
-, i - _
c 1• t_ .f
3 °-ems
�„ R^ r
am` Y _ ysF
�, '`t' „,„ �t ck."�• s s`, - - ,:^ •mot -_ - "° - -4
ram` 4 -m r-
�i ? " `'' 3� '1•�,„_ ;", .6� ��, '' om':
PP25—Oak Hill R4 looking upstream (02/24/2022) PP25—Oak Hill R4 looking downstream(02/24/2022)
�iQi vd o k - ,- ` 1 9+,,,.:!i fde A �1
A fiy
d
•
,� s `u'. .".i4.1... E+ 'may, . # _ ..
?a -= . _a24 „` "'�� .i -.ram
. _, - - ,sY ,., `v, ate
" ;u" ;.% .- t..hem c' '�;-. - -_
,y >' ' � � l `x -a tea, Y ' . ,. _aa. .P ,. [; P1 .'r v , '''-' were'. .
PP25
—UT3 looking upsteam (02/24/2022)
, ,�i' • �- ,'`"rr. 4,r, .a.,.+m � z. ,5', ,fir'
liti
`i ' x - 4 .W { =ate -
�:' _ - i. .:- •.' ,7" tom .✓�« ,4, ^° e ,. r .' , ' .:t `a
,t�. i -�'3r r ,�-�ASS + . i n� .�` l'� �' � � T. w�. _
jl2y �,. ka Y -� 'x - 3 ' i .. '" ? z `yF w, _ _.; 3 T 0 .': F
:,.' U .Kg � ,,ii �'+t A ,' ,,r' T-I �+"' �"".' -`+:"`'�, k'- ' sue"
•
�= +�--i t , 1 - - .„ _ _, .'.' -VW: ,r_,. ° r 2 -°,max #:. _. .s-e--. "
PP26—Right floodplain ditch looking upstream(02/24/2022) PP26—Right floodplain ditch looking downstream(02/24/2022)0.
/
t i
. , .
�A�1° r i.r i , i r t .. °' G a i n,,1 P;F1- P±f4 S
w
•
- __ _ tam. . . _ .A
. - - - • $�r'` �+p• `' +y I.---." f ,spa .
'+' d *� � 1 F - •
..
•
•
b
_ -_ '' Cg'.2"':(0-
7"'x:§ I, MBA.. c n A _ �? - ' s-_ .tiPP27—Oak Hill R4 upstrea 2/24/2022) PP27—Oak Hill R4 downstream (02/24/2022)
---crn
ate ,t '
a + t+r 'fir e s,
°mot,..--' -�: _, '°.,
PP27—Left floodplain ditch looking upstream (02/24/2022)
r %
a
- -r`- i �i n�-.?�. +fi r,. ,. T
II
txs �„ -` r_ '� �"' s- �4 3" u, ,,:: 4` r s r�n
at
;_ - e
•
PP1.1—BMP 1 looking north (02/24/2022) PP1.1—BMP 1 looking northwest(02/24/2022)
,;
t' A
R
8
'rc^� , /h y '., ,� -43.
X.
t.
' � :w M+AY
_ � U ''§�ax + 5-:, - i ` t '�5'i'- ¢ ., y-9 CdF '4aR ,:
,gair,;',Itifv,tirq.„,.,:,c ...i,--":: :41'‘,.,'F,,,,;:'::„'-'1::.,
wn,. :,,,,,,,,._, .._,,,, ; ,,,...,,,.........
..„,t-f,,,,, ,,,, , ,„..„...„.-..A*;
:1-4:& a_ -r9y'ic L,y'-r� .y tEr{LS nv zY�.is �.rP, - 14 v:. '^ .:4440, .1.'4,4,,'", ,,,,,44.,„.4,,,..„-,,,,.z.,,_ , ,..„,, olokit.,,-0,,, .,
PP1.2—BMP 1 looking west(02/24/2022)
4.:, t'
s �-
x' fir- -74 , .-.y
Tic.Y" '•xyu' .y
,,,...-4,:;,,*: -. -,,,"7-;r:7. '4-.,.:,.„'- ,l'grinVrt--*(..,„-- - ,-- :' - ' .._
6 0 --i-'- E. .,r i_, 4 R w �
h `' e. it •,.rr�4 ' � `'4' ' , ,--z I .yam.
t_ F4' & Fad ti k� * �s _ `4 'r '�, ` " s S.""' x
da�: ,a*N vt. ...on,
`fn+' 'q "- a 1 : j y - - ''- as -T ` '`-
-
r • '.. ,:�. .: % ' ' 4 H -a%i, r�, e_r "- . .. e_ -y
PP2.1—BMP 2 looking northwest(02/24/2022) PP2.1—BMP 2 looking northeast(02/24/2022)
Ewa=- '. ����. ui .'!�S',r"' _ 'I'"" _ x , �,' w a*viii.4 .,_ '
'', ' --'7 ,,,.. .4 , , , -,.' '' ' - ''' . . ---*--t"
z � a fxx f. ..
. it
" � '`, jt yflls �, A 7 s aLi � .f-. s' /`
r p^, 1 �� Fs�'y�'� y'?S�� 5 ,,�,� +r,.ow 1* ,.c'1*-.� ��+5y �:r � `��- -�s.'f� x �`�.�,��� ''
"�.. � �y,. � 3'4� �"�`� �a�3�'.,,.. '' _ E �: ���' - *�". •�r' r r,-.,.'��", JCr.�,
PP2.2—BMP 2 looking northwest(02/24/2022) PP2.2—BMP 2 looking west(02/24/2022)
Vegetation Plot Photographs
. f_ids F iyl 1: S1
• v Ali r .1
... Air---- -..,4,• � ._t .:A ./ -> . 12'1 p
)} Y }qq
e,r'.., -:-.1 lw.,......$ 4:,,,,,,,°,....:i - ,-..-41,.... . - - ' . :-..-.1) .A1- 1 r$ 'AI %lb. .vi f,..,,t,.;0'.1";' 't-1 4,.'.e."4'.'"'4' '."'.; . • ' '':' '" '',,,`--
.M 1
'
rf Y.pia 3'E ' d N '' 2
� " " k € _
�,�4 ; !
PERMANENT VEGETATION PLOT 1(02/21/2022) PERMANENT VEGETATION PLOT 2(02/21/2022)
k..,0: iK
.,
II' ' v ,i 4
Irk „d '
K
k.
" S .
zap s -
i
!y, a
rt
• k. f2-
PERMANENT VEGETATION PLOT 3(02/21/2022) PERMANENT VEGETATION PLOT 4(02/21/2022)
mod `
-.1
,, 1r
"
�+' •�'-
i r.c•. ,,,,•'tom + -
. via, APT 3 ¢ �' "9`\ phi c'
e ,yy, :
PERMANENT VEGETATION PLOT 5(02/21/2022) PERMANENT VEGETATION PLOT 6(02/21/2022)
r��pdyer r 0 ,'� �_,'1�.541 ,v �, a e '3 �v
loo
•
t'.. a i..r
s,. M—: •etas -r=��
•
X, 3 ;` r=$
y.•J f
t_
PERMANENT VEGETATION PLOT 7(02/21/2022) PERMANENT VEGETATION PLOT 8(02/21/2022)
V.$11.,14i rtIN!,'.-4f 1111,4y . _' - T, ...,42,,, ,A,..::,..;.1,::
Yl
at
.#¢- - . y - !` - � ey° .tea,,, �. onx �x ,:,
,x< � �� � � ma ��
ylp a a _ 1. ,g.
PERMANENT VEGETATION PLOT 9(02/21/2022) PERMANENT VEGETATION PLOT 10(02/21/2022)
- . 4 ..IV
PERMANENT VEGETATION PLOT 11(02/21/2022) PERMANENT VEGETATION PLOT 12(02/21/2022)
pp "
m
� �
-mot f" � :% ° 'f. ,. wS - }"
'Yh �� �' - s �;
Yy
r . � !",arm �-. �.� :-&.`R" .F
PERMANENT VEGETATION PLOT 13(02/21/2022)
—� v
��+.3. ,aes d��
khq ': --. 1,r is
•
• .r.. _i— a .,._-.,_.-
pi,
s
K �" 7 -'L ':ax lei s- .�, 4:w,r_.5�
kwf
✓F k� ew, 'ikj', .. 1 h � 11
.� +- .'- :1 K l�-^+6 y�,g_ x'�'�
7.
s h �'`•
� �d;�K� k,-��6y'Y�,a,„ "3r�""�"�+��`.trY ��9� � 2.� ���� _��q �`W�
... -3 ';`,,.a >. ,?'- ` ..a & #=rimy
MOBILE VEGETATION PLOT 1(02/21/2022J MOBILE VEGETATION PLOT 2(02/21/2022J
'&s;';
�� w ,� it -1
gg ggaa
dd y ggc
.�� s�,$1p ��, i ata q /y vim' !
� fit, � A� ' ��._ k' ��
It.
..- A ' `fir' ^" - -, - - - --
MOBILE VEGETATION PLOT 3(02/21/2022J MOBILE VEGETATION PLOT 4(02/21/2022J
v� S_
� `��%�. fib.. I �� � r 5�' � °"c ':r:,,:''';.-''''.7,..t*tf:;,,.,'.,,, ,, ,; .4:lt.:oil,,...:,..: - � �':
,.._,_ ._7:„.....,,ii:::,,$..,:4-,.::*.ritte.47.ii:114H.16,41';
-4,-::-,,.'N.',::-', . ,',tz,',,,.,*,,l',.',‘,•!.3 ip6:4-4°,,r.
-
- .,--",-'• ;..,7::,ei-:*lt4;.::i,,f.,gtVrr:*
_..p. - `''` '.1'" `a ea ,, h3 .,'.
f
�1 � � y- �i'V Y'� '� W^ � W��II Y��1I1uiIL
n aL
e^ .., �1 ¢ "-:.F a ..F _ tiQ :: = •
�a„, *n Yr./
MOBILE VEGETATION PLOT 5(02/21/2022J MOBILE VEGETATION PLOT 6(02/21/2022)
Groundwater Gage Photographs
l -rs"'..gb„ . '. .a :f ..'H ;i�r' .;n� : ;•.?'' �` ,.-et• h .H"
�+'' " ma�yy_d�,;. ;,y� .:. ha�n� L r , :. >-:• - yu -:-?.
,t ^?h.TP ''+`;;_- :s�� Ey�Y\fYs r � .r? t
,
.s :✓. - • .. t ''. 'se:•.;e:.,;d T';°'. '. i.;'::.�-:_en'' -ate: ,.' '
.£%. ` %e �wr dr. - - . �.
.=Y . "�a�'�,..;,. - �� r r _ : ;-,•�;"'' - - - _
•
1r:rJ�. i 4:;•:.''''''`'"?''' ''''I'''''';''
�hY X'' .: q.. ''.. '�Y m.✓1,+ ,.4 i 2
,
1 r
ri _.r:
��•". !M;'S1. .k •,`y2 :. .'z :• Y7e. R rrvhe -. • .,r:` "`'' - :_','::v,
: r, y' :g;. ^-L"'I.: x."�'._ w.y?LR y.•. - _ gb.i'`f,�:4::
•
a'F' qr'a '�'' YAK•' - - .t- .'k.� ,i ..�: f;, ss.. .:;"..':''''':.4
..'� '� It :�,,.,:, -j! �'a> •,ym.'a .,p::G
„Or
.: _ f. 3 - ;`.• :+SAY: - r• � >,�, • '`--%,,, -- i'44.1 _ ,
w6.
,.T: : -. .. .:: ,. g,
` ,
",7. . i je y�� `'�.�,L ca 4--,:.Y ��.,.'4y�',?�: e• •4,.• `�' 4`. �'M1��-.�Y��`� .�'
� � r ,d :.:. .�! ,. =l6:�: n,. ��ki<'��-^' _. „�.� .. i'u- �,.-,e:^,�',tiy„-s.,. ��ar. .a.: �.S-.,'%� ._.: �,-�:`• .�:�.......k� .. y
Groundwater Gage 1 (01/28/2022) Groundwater Gage 2 (01/28/2022)
• k W tea:. -• � - %
• <
A�-`T% sa,V:"w:'..{ x?�L - _• JK: ^ �. :v.)�-.N 5-.2, -.- "';., .-Lx t- .-,+.wa, •:
= •%-Ay'�fi t ` '.,Ms:' "fig.. riA.'„ :.i5:`. _ _ -"A .' v .: '' � .
<' o'J,,a 'J%or ... a..e SY'.�{''r -?. -r"i e _.'e ,,' E STs _ < r°
�,r�_ fir..
- s- �� t
44
Rryw `.
�w : ..='s - ,.. .yx�,.. _ - ' . - ^`ems:, "
r ,
.. � ,. r � ..,s °.•ate "`J_- ''•,:vr..' _'SA �'.;e��"� � - _ - `:�: �t�FN(,�u-� _�°•:.Y .;,�
` ' i. .,�' :O.N..,f: _.: , :,.
i^n, `,., ^S. -.Tire. _ r^ � �� '�.'•al :,` 'P "J'y �rs:y:,r. '_ tw"; t�-
. '�.1'.� - :?firA.• x', •a �. ! 2''re: : g;.. .: - F;. r ,+.�
v:+ • 58 •ir4. .s- _.`If :i.r �. : , N_i ...4, d?' 4�',i..
4101),-d
�x ::- • ,. a �f�+ - ,- ' .`:
s=' _ .ice - u ,x - '
r'.f :,•7.-.' y ,yam e_ ' ��sFs' G : fi r ' , .. -e• er_ r
s,- ' �T.' ,�,t ^'lT* .:.,'' 3 ... .. :E�. �5... ,y v ''•_ 9v 't:�:.X 't. i+ •
Groundwater Gage 3-(01/28/2022) Groundwater Gage 4 (01/28/2022)
H"-'kt�'-� _�:e.�.r. a. _ _ - - .-r^:=,-. -::ate:'
4.
:s. 1.� `.4, '..2' �'` �` - .mom.:
• - = Gvt• .1"w 'Y'?'sT '". .a'µ. .:'�£ ,~ :`."2 I+'�i' Y .:Ai'
j•yt_.
to _ 3 _
•yt
"":+:fie:$".. .-�".t_v ;._, . a✓m..� :^'. ... .. m ::,5':�:✓'� # �---s- �f :r ' - - -'�> ;;, .-e-1*..,
r. :
f .q_�� :. - :�:�':u" •'.," <y Jam'' fig'" , 3.. ,:4'_ ,, a,
.._ � . 'ram,�`'. �,'g... ,.,. - :-- " '-�... -"; "e _ , •f _ _ ':.�,` ' r::
a;
�3 +,, .-..'. re�-fit'
e,
L'L
'41.
. ('-y:' �•' .,,e`er-y�i .'.r. ,: <...-. `- _ '�•r '_4- _ _ F.�-' ..,�, - __ , •,-.::j1_ its• -
.. x"4. •,Y-: .:1 '}..:: - 1. Ca'.‹ti. :,' z - n-,:n - - .::.4.:�. .W`,,T"' ::N -
•
?�y�.'�.as.;w '. '4� a^y [r ::..r a-3'.`✓'... _r Rm=:t _ tr--ff'F .:? fYi a`.:. ,i, _ '.y,a�{, _A,`4 � '`u
E.X. d. u.%: T*xntr 4`& , ..:k,; - . r�: '::y_n�.Ay' :Y '-'"'1^.e-`.. - .'.,I-`'�, .-'fii'.
ALVA
r a
.:�fi -h.< .. " _., x... ?x.�e .t�!3 .b -- J s..-ors"`.. s�- _ ,'`" aF*.- - -
�a �.:&;'°,�a:` _ •''�.,•s;' T' '.'4�, r 'xaz
r rn'. .z ,Fa ;i:icy', . '' a.' ..
-n
y.
...,.:. „a _ ,;,'-:::'-".,� ,:i';5�.,. .•.;-...pry,?: �`"'-.:?.�s::.�. ,ar.. 11 . ' T. eba^`�" _ .:,s, ,�fcr:
Groundwater Gage 5 (01/28/2022) Groundwater Gage 6 (01/28/2022)
c.' ... ,te e=�sgiu q
ss' ; ;,.���y�. z� ,A ' s „n - w"e,� � -' a � .L
C hr --_d ' t � �iiTf ,� .4- fi 4�. _1 � f�4A d Ze_ �- t�F'�" � fi rx
r.:Ar. ::-—'',.-ilitler-' .z-i-.-.,,,%:',714.11---,...'.. ..**N4,-;-,u.,-14.--,04.-• ,i,114-4.4k•',.~-14 ,-,-''',"-Vt4.3,. .7-W . ,%-.:-...;:iitr4 -;..,:*"'•,.,,,,•
lii'l
56:
.,,,,,,,,-:,,,,,I...$'' - izp`,` t jn - c" ` 'sa,a,� k:�� -_�, r C''' .c to z ',,. � •:r .i,- .t -:
t i;\ a;,„,..-...,,A,..„;-,,,,, § # •"i ,f. ,. . i,1. ``� 3+ `Pz -9k`C"-ram. E � r� �ts9s;
• w k - _ {i.€ rig -. .•*».t• - '" A; _- _ i . / �'' w.
inn h- '4 a"tt - l -q��C .'wu '' + %x'- f SS,ays• *' , '. 5,,,„V 1 ¢4 v°p6 t -
4 !3� v 1 F3�. ,-� ' - 3c,.i { u 44: "rx ic. �'1�., '�'9'"s. "' - e.t 3„ - ``y'
Y X �:ti > - r ""''� 'A :S '1�. ..Ass. [Y! ,..r.' : 'A4d r., >iy.Istet.�'w 'a�b9dc''' -.x J f: ,t m .- -Y'�3 ,�..+ _
Groundwater Gage 7 (01/28/2022) Groundwater Gage 8 (01/28/2022)
rii'R `k/ �1°( eat �i 4 a. ::::- .t u- �yTC�.x.'� aV -
q 4a.35 `{`R y - F r.+i^. ���x� .'r a - -f '2 �C *, yk
'a,.`• y,F' %`�.:`- - ,-- -' 7 �'' - ;_ �l aP + gi.. �+, ' r € Ada '
fA,s ;. r, �}'q "� 1*r'7re�st,4 '" - -�, '7`" '': ` ^f r: • .,t sf" �� _
r`� 'v 7 N 6..Mr �• �� 5 "9 Tj -f^ -.' ` �
�'" 'a-•^� • - � � �' s . + , ;. .� a- sk ,may . a'
/ e' : r ` 't•'. d Vie `'Str' ""'h d" � a- --,F l�`
ft
r �x }' �' ?" ,, its{ 1' q: \:
t-
•
I "Y• 'z -Y
Pa K��_ ' & ? ,, - a .\•
i' �l /yAI^,��' �}-s- � a,,! A� 1 L .-- '44,1
.mow TTT .. ,, i i ! K-'C -.•.; ',-4-F , T/ - $�- • :� -/-i
'f� �%��tr- C _ J- '� 'a1M1F'X > - ` � - 1. . , :" t
•
'�yT,� , x ,i y { i� I ! -r+n-- - S" j-i'by A �`' Y r
Groundwater Gage 9 (01/28/2022) Groundwater Gage 10 (01/28/2022)
- a a.x I Tr l w hya .^.
Vxs �
' - , ' =;�'
.. ., ,1:7-,,iiiths' 1: .', .--,7-44-4,•.'-V-: 'Or.66''::.i?'-6&,i'f:''-.: i,-;,..-,-,Ai.:-:,zic.7----is 4" ..p
-.:,
o,,-,,j,v'.i'.„-v...
Fluci-I'4 ` c k. Y s<•,
_ 9 =N^S
Groundwater Gage 11-(01/28/2022)
MONITORING GAUGE INSTALLATION DATA SHEET
Proiect Name:
Proiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (Al:
Well Casing Height Above Ground (B).
Distance From Eve Bolt To Probe Sensor
Material:
Type of Measurement
Type of Logger:
Gauge Location:
0ND
Water Table Monitoring
C—twc—)1
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes:
kr4 ('t . IQIt# 4-k- `t t r [‘All
Y
ke w� 5 Soil Profile Description at Location of Well:
Depth Range LirC Color Red
Texture
Notes
P bI%
5YR'/b
s_.,ay t•,►N
t A/X
a o N
I —
'.S
I'll
1— 1•
1cf S �j
9r it Sl
S�� >5..,>\ r
1, 2�t,.1 �o,t
to i
.7" ?
IoYk t4 I
5 Yti J/GI
',1�1 a_.,
w..a ')t
S %.
?'S Y( 5/(�
` 1
R�do1c
,�f'/
U - --5
7.S� (1
����Scs �
v
A
el"
o pro
e30\k
\ICe.
'‘
VD.\ 1a 3)
2C•--•4h,‘ 4,•5
S 74 31' S I)
-7, 57(& / Sao/)
MONITORING GAUGE INSTALLATION DATA SHEET
Project Name:
Proiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eye Bolt To Probe Sensor
Material:
Type of Measurement:
Type of Logger:
Gauge Location:
UH0
Water Table Monitoring
C-) J
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
des
Depth Rance Lirfi
Soil Profile Description at Location of Well:
Color
edo,
here
Notes
is .- ► . Is7
51& S/ij
1is S/i.
f' s•..
_ 04 5 %-
LLt.
r 52.,.
v1t
2�.4 .�
2'5', )
`]Jj!(o
1,
`
�.. �o..,.k
(I/& Q� J i•
-7.3 —
Z it
5 71?Il f 1
l
R.c4.1 3O
�.gb.-�
7ti5rz
��, �
k.4 - C.
1QYA 3It
Y1C8l6.•'l
0r 4..'1lt- XLbt/4 k nliA IV
} \--0 lik06.t,
t
IyB
A
MONITORING GAUGE INSTALLATION DATA SHEET
Project Name:
Protect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A)
Well Casing Height Above Ground (B).
Distance From Eye Bolt To Probe Sensor
Material:
Type of Measurement:
Type of Logger:
Gauge Location:
o- :D
Water Table Monitoring
4Q00 11
3
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
k, G Soil Profile Description at Location of Well:
Depth Range 4itT.
Color
Texture
Notes
—6 - o.
',$TR 14
a, SYR.,y6
,t+ toaM
Rbeox SIo
4 14 - (.
wli j�
DYR S7
i ta,r•.
f� ppt ,, ! ❑'la
I_S=3av
6/
.S`ik4
Swn fe.,,+n
box 3OPla
3.D -'3A
aI
1.CIR �
S+i4�sand-
a .x 1010
n•ck- 5.'.i
!
a_SY iv i
s
sa,J9 ,t,ti'/
i
Slit S&.i'wrektwitin coLc1,ve
60\I (A)col2c. 6.37
MONITORING GAUGE INSTALLATION DATA SHEET
Project Name:
Project Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eve Bolt To Probe Sensor
Material:
Type of Measurement:
Type of Logger:
Gauge Location:
D
Water Table Monitoring
6-1 vl
-7vdIS6
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes:
Ffca. W {tr Fy +0
Depth Range gm.
` Soil Profile Description at Location of Well:
Color
Redox
Texture
Notes
n - 0.3
1.SYK
—
Clayt s.14.-
(_ ()
74.
10%( sy
svt y�(
s:U r.s44
is 7. r
_
1.gla`f
S
}.5yA y G
S say
,ft4o
I q, s x
g . �.ti
►o1& 5�
lot& 6�
sa.A1.; I....4
I51, bcpla..nS
'j..Z — 2..E
IOYf�
to`( /
�! 1.,.
30`t, Fle x
�.a - �-1 1
lo`jlZ 6�)
jo'U. 6 1
kt1� Set.
51{. t we
'A.\ - 5.1
1
1-. `(R 4/a
--^
16.,,,.1
aV I) !{1'avtl
.fang
A
MONITORING GAUGE INSTALLATION DATA SHEET
Project Name:
P.toiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A).
Well Casing Height Above Ground (B).
Distance From Eye Bolt To Probe Sensor
Material:
Type of Measurement:
Type of Logger:
Gauge Location:
Water Table Monitoring
c-)1...JC-
1.4
�2"PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes:
epth Range Eifri.
Soil Profile Description at Location of Well:
t%dax
r•
Notes
1114'`t
�Y i�-y-�
—
L oA,�
_
Z 7
,-,�..�..
RcckoA iO7 v
�. -, i , ,
io i - ,
tqlt..3-(-4.1..
�, �l-
Re&j o'fo 7reei- - Car.1•
- . M'o7(
S - 1
7, N-5�.+�t.1
IouvA
IZ,cto/ I S %o2+
b - -� . I.,
I qy 7 S - t
7 . e i1- LI •S
i (oa.,\
IL (c ' 1 Z, 5 rio
-- 4 - t
S �t w -
2 . S y li.1 fo
-�
pee ex 57n 7 1 gr> oAtc Cif
. ►--C�.2_
7. y5-T
41iCImeI
e$K,•IY/pi,.
s.v.ir (Oavi
MONITORING GAUGE INSTALLATION DATA SHEET
Proiect Name.
Proiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eve Bolt To Probe Sensor
Material:
Type of Measurement.
Type of Logger:
Gauge Location:
H`D
Water Table Monitoring
c.� w C7 ca
1 ti
PV
' PVC
2ell Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes:
I.t S' -j-, 'tree. 10.n4*r
is,v‘...5 Soil Profile Description at Location of Well:
Ranae!(rfl - -
Color
Redox
Te
Notes
6 - (,iq
•glk
—'
L.e,u,`f ta..W
„A" Ar.1,1 sc-41 till I.,/q
a.a
IoNR
SYK `j'
s-1i� o..M
ex AS_
°�
S'f
a.Sya
5;�4 og.,�
..OX I?.
3-
a.5 Y f 1
1-s YR 3
56n11 1904n
sa.x 3'7.
\\)A\- 1-0
OA-
B
J
A
•
1.22;
MONITORING GAUGE INSTALLATION DATA SHEET
Proiect Name:
Project Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eye Bolt To Probe Sensor
Material:
Tvpe of Measurement:
Tvpe of Logger:
Gauge Location:
U I -A
Water Table Monitoring
2" PVC Well Screen
Pressure, Tem.erature, & Depth
In -Situ Level Troll 100
1.2- to stwntn, w..A<r
Ve.-"*k.5
Soil Profile Description at Location of Well:
Depth Ranoea-
Color
Texture
Notes
O,.
AP
94"5YQ't S
so�7t+,„F
�4onfi (Isolo)�IO.
$
.
701IpsY'
j�efC
'5 i
5 / -
SSYRR
ac.ltp Itoa..M
e,
PR.�
L. - 1.
a.sSN 3511
I
3/ H
CLtiI�h
3. 5.2t
2..51 .511
r., .1 c,14, Ic
&IN
MONITORING GAUGE INSTALLATION DATA SHEET
Project Name:
Proiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eve Bolt To Probe Sensor
Material:
Tvpe of Measurement:
Tvpe of Logger:
Gauge Location:
Water Table Monitoring
C 'Jc- 8
07oo 5I
1.3cl
G.30 2"PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes:
rcc wu..ko. Jr ,a.,H
Depth Ranaesirrl
Soil Profile Description at Location of Well:
Color
Redox
Texture
Notes
0 - ff.-6,5
SYa
�-
orlw
6, G 5— 1,2
LOY S
S YR jj/
S� t
kid..
°),
i. t — ).
J
SYR. y
(At,.
_TM-
raw,
ox ADO 7,
-. .(,Q,S
1-..SYR
c3,.
s, 1•-
n x a..) 7..
�� - �..
1
.sr
s ,
,..
R .
LID
3.2., y.1
.5 (
y
(
.L.SY
Si I
.: `'i
r o.e `.
j,-5,Z
4K 5/1
SVR. S
X
c.1',�
YZJ v SOS.
A
1
MONITORING GAUGE INSTALLATION DATA SHEET
Proiect Name:
Proiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eve Bolt To Probe Sensor
Material:
Type of Measurement:
Type of Logger:
Gauge Location:
t- If)
Water Table Monitonng
C).-)
8es\-or
1.2.4
(o.�l¢
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes.
Depth Ranee,lin.'
` Soil Profile Description at Location of Well:
Redo
Notes
0. - r7.+-1
t o YR. �I�
`
,S i I+ , ,.....
�Q
Da"' .Z
*4,5Yft
a.5`(A y,/8
silt �Q.
Rai1x 5"70
I .
1.1
Y{t 41
—
Coati( Sand
'(5
S�cA ?�
c,iw laaai
a �x ID�7e
3g.
a
�yl.• ,,
px �10
. - .5.2
S�`t S
SY . S t
cl.l
kdiez '7n
I
MONITORING GAUGE INSTALLATION DATA SHEET
Proiect Name.
Proiect Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casino Length (A):
Well Casino Height Above Ground (B):
Distance From Eve Bolt To Probe Sensor
Material:
Type of Measurement:
Tvpe of Loaner:
Gauge Location:
O 1--k
Water Table Monitoring
C w C- 2 1 0
283580
I.
6.y4•
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Notes:
lien, e1.2'
`', Soil Profile Description at Location of Well:
Depth Ranaelirfl
I.s
1.5 -..az
2Z-a.
__'-4 - 3.D
3 . ;J - 14,0
4.d - d.2
Color
5741
a.sk s i
.5�
lQel �SS2..
Redox T
S'i fl 4 1.
s/P. .
v s419
ur
5 5,14
S4:g
C1oil
Notes
RR d a--
Qa eX lSh.
t2.aax 40?.
MONITORING GAUGE INSTALLATION DATA SHEET
Project Name:
Project Location:
Purpose of Gauge:
Gauge Description:
Gauge ID:
Serial Number:
Total Well Casing Length (A):
Well Casing Height Above Ground (B):
Distance From Eve Bolt To Probe Sensor
Material:
Tvpe of Measurement.
Tvpe of Logger:
Gauge Location:
H�
Water Table Monitoring
Pig
2" PVC Well Screen
Pressure, Temperature, & Depth
In -Situ Level Troll 100
Noes:
o ur Ca‘7 k
Depth Rance lin.l
Soil Profile Description at Location of Well:
Color
Redox
Texture
Notes
p
,.A
1b' R 7 -'Z
—
: If� q+c+.
P)i �.r,
. 'i
S ' it_ S -G
!Owyt Sr.+c�
to 9p. G d r i
.ax
.1 - Z-�l
7.SY (e-Z
syR-i/-
C,la/I0",-.
25lo
7.�i - ,c1
Z.S 5-
CjiZ <-g
c ySnnA kstw‘
G( °0 i(.ca(C i._.
- . - S.2-
C,tcYi 'Z,c /N
.._.
ac,.1 5,..0
A- fe- ), to -elk, Cd .4c/r
B
A
\"44/ .5
0.14 do ecok
Appendix B
Vegetation Plot Data
Table 6. Vegetation Plot Data
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Planted Acreage
Date of Initial Plant
Date(s) of Supplemental Plant(s)
Date(s) Mowing
Date of Current Survey
Plot size (ACRES)
19.1
2022-02-21
NA
2022-02-21
2022-02-21
0.0247
Scientific Name
Common Name
Tree/Sh
rub
Indicator
Status
Veg Plot 1 F
Veg Plot 2 F
Veg Plot 3 F
Planted
Total
Planted
Total
Planted
Total
Species
Included in
Approved
Mitigation Plan
Acer negundo
boxelder
Tree
FAC
Alnus serrulata
hazel alder
Tree
OBL
Amelanchier arborea
common rviceberry
Tree
FAC
2
2
Betula nigra
river birch
Tree
FACW
1
1
2
2
3
3
Calycanthus floridus
eastern sweetshrub
Shrub
FACU
2
2
Carya cordiformis
bitternut hickory
Tree
FACU
2
2
Celtic laevigata
sugarberry
Tree
FACW
1
1
Cephalanthus occidentalis
common buttonbush
orisilky
Shrub
OBL
Cornus amomum
dogwood
Shrub
FACW
1
1
Cornus florida
flowering dogwood
Tree
FACU
2
2
Diospyrosvirginiana
coon persimmon
Tree
FAC
1
1
1
1
Hamamelis virginiana
Americanwitchhazel
Tree
FACU
1
1
Lindera benzoin
northern spicebush
Tree
FAC
Liriodendron tulipifera
tuliptree
Tree
FACU
1
1
1
1
Nyssa sylvatica
blackgum
Tree
FAC
5
5
Oxydendrum arboreum
sourwood
Shrub
UPL
1
1
Platanus occidentalis
American sycamore
Tree
FACW
3
3
3
3
3
3
Populus deltoides
eastern cottonwood
Tree
FAC
1
1
Quercus alba
white oak
Tree
FACU
Quercus michauxii
swamp chestnut oak
Tree
FACW
1
1
Quercus nigra
water oak
Tree
FAC
Quercus pagoda
cherrybark oak
Tree
FACW
Quercus phellos
willow oak
Tree
FAC
Quercusrubra
northern red oak
Tree
FACU
1
1
Salix sericea
silky willow
Shrub
OBL
Sambucus canadensis
American black elderberry
Tree
1
1
1
1
Ulmus americana
American elm
Tree
FACW
2
2
Ulmus rubra
slippery elm
Tree
FAC
2
2
Sum
Performance Standard
15
15
13
13
17
17
Mitigation Plan
Performance
Standard
Current Year Stem Count
15
13
17
Stems/Acre
607
526
688
Species Count
10
Dominant Species Composition (%)
20
Average Plot Height(ft.)
2
2
2
%Invasives
0
0
0
Post Mitigation
Plan
Performance
Standard
rr
Current Year Stern Count
15
Stems/Acre
607
526
688
Species Count
10
8
8
Dominant Species Composition (%)
23
29
Average Plot Height (ft.)
2
2
2
% Invasives
N
1 . Bolded species re proposed for the current monitoring year, Italicized species are not approved, and a regular font Indicates that t e species has been approved.
2 . The "Species In luded In Approved Mitigation Plan" section contains only those species that were Included In the original approved mitigation plan. The "Post Mitigation Plan Species" section Includes species that are being proposed through a
mitigation plan ad endum for the current monitoring year (bolded), species that have been approved in prior monitoring years throug a mitigation plan addendum (regular font), and species that are not approved(italicized).
3 . The "Mitigation Plan Performance Standard" section Is derived only from stems Included In the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" Includes data from mitigation plan approved, post mitigation plan
a proved, and pro osed stems.
Table 6. Vegetation Plot Data
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Planted Acreage
Date of Initial Plant
Date(s) of Supplemental Plant(s)
Date(s) Mowing
Date of Current Survey
Plot size (ACRES)
19.1
2022-02-21
NA
2022-02-21
2022-02-21
0.0247
Scientific Name
Common Name
Veg Plot 4 F
Veg Plot 5 F
Veg Plot 6 F
Veg Plot 7 F
Planted
Total
Planted
Total
Planted
Total
Planted
Total
Species
Included in
Approved
Mitigation Plan
Acer negundo
boxelder
1
1
1
1
2
2
Alnus serrulata
hazel alder
1
1
Amelanchier arborea
common rviceberry
Betula nigra
river birch
5
5
3
3
2
2
1
1
Calycanthus floridus
eastern sweetshrub
Carya cordiformis
bitternut hickory
Celtis laevigata
sugarberry
1
1
1
1
1
1
Cephalanthus occidentalis
common buttonbush
on
2
2
1
1
Cornus amomum
silky dogwood
1
1
Cornus florida
flowering dogwood
Diospyrosvirginiana
coon persimmon
Hamamelis virginiana
Americanwitchhazel
Lindera benzoin
northern spicebush
2
2
Liriodendron tulipifera
tuliptree
Nyssa sylvatica
blackgum
1
1
1
1
Oxydendrum arboreum
sourwood
Platanus occidentalis
American sycamore
1
1
1
1
2
2
3
3
Populus deltoides
eastern cottonwood
Quercus alba
white oak
1
1
Quercus michauxii
swamp chestnut oak
2
2
1
1
Quercus nigra
water oak
1
1
4
4
1
1
Quercus pagoda
cherrybark oak
Quercus phellos
willow oak
2
2
1
1
2
2
Quercusrubra
northern red oak
1
1
Salix sericea
silky willow
Sambucus canadensis
American black elderberry
2
2
1
1
1
1
Ulmus americana
American elm
2
2
4
4
1
1
1
1
Ulmus rubra
slippery elm
Sum
Performance Standard
16
16
17
17
15
15
14
14
Mitigation Plan
Performance
Standard
Current Year Stem Count
16
17
_
14
Stems/Acre
648
688
,,..-
567
Species Count
IIIP1
10
9
RP
Dominant Species Composition (%)
24
27
Average Plot Height(ft.)
2
2
_
2
%Invasives
0
0
0
0
Post Mitigation
Plan
Performance
Standard
Current Year Stem Count
16
17
:5
:4
Stems/Acre
648
688
507
567
Species Count
9
10
9
10
Dominant Species Composition (%)
31
L 24
27
21
Average Plot Height (ft.)
2
2
2
2
%Invasives
0 '
1 0
MEIN
). Bolded species are proposed for the current monitoring year, Italicized species are not approved, and a regular font Indicates that the specie has been approved.
2). The "Species Included In Approved Mitigation Plan" section contains only those species that were Included 1 the original ap roved mitigation plan. The "Pos Mitigation Plan Species" section Includes species that are being proposed through a
mitigation plan addendum for the current monitoring year (bolded), species that have been approved in prior monitoring year through a mitig tion plan adde dum (regular font), and species that are not approved(italicized).
3). The "Mitigation Plan Performance Standard" section Is derived only from stems Included In the original mlti ation plan, whereas the "Post Mitigation Plan P rformance Standard" Includes data from mitigation plan approved, post mitigation plan
approved, and proposed stems.
Table 6. Vegetation Plot Data
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Planted Acreage
Date of Initial Plant
Date(s) of Supplemental Plant(s)
Date(s) Mowing
Date of Current Survey
Plot size (ACRES)
19.1
2022-02-21
NA
2022-02-21
2022-02-21
0.0247
Scientific Name
Common Name
Veg Plot 8 F
Veg Plot 9 F
Veg Plot 10 F
Planted
Total
Planted
Total
Planted
Total
Species
Included in
Approved
Mitigation Plan
Acer negundo
boxelder
1
1
1
1
1
1
Alnus serrulata
hazel alder
Amelanchier arborea
common rviceberry
1
1
Betula nigra
river birch
4
4
4
4
1
1
Calycanthus floridus
eastern sweetshrub
Carya cordiformis
bitternut hickory
Celtis laevigata
sugarberry
1
1
Cephalanthus occidentalis
common buttonbush
on
1
1
Cornus amomum
silky dogwood
1
1
Cornus florida
flowering dogwood
1
1
Diospyrosvirginiana
coon persimmon
Hamamelis virginiana
Americanwitchhazel
1
1
Lindera benzoin
northern spicebush
1
1
1
1
2
2
Liriodendron tulipifera
tuliptree
Nyssa sylvatica
blackgum
1
1
Oxydendrum arboreum
sourwood
Platanus occidentalis
American sycamore
5
5
2
2
1
1
Populus deltoides
eastern cottonwood
2
2
Quercus alba
white oak
1
1
Quercus michauxii
swamp chestnut oak
1
1
1
1
Quercus nigra
water oak
3
3
Quercus pagoda
cherrybark oak
Quercus phellos
willow oak
1
1
Quercusrubra
northern red oak
1
1
Salix sericea
silky willow
1
1
Sambucus canadensis
American black elderberry
2
2
1
1
Ulmus americana
American elm
1
1
Ulmus rubra
slippery elm
1
1
Sum
Performance Standard
16
16
16
16
15
15
Mitigation PlanIP
PerformanceDominant
Standard
Current Year Stem Count
16
16
_
Stems/Acre
648
648
Species Count
12
Species Composition (%)
1
20
Average Plot Height(ft.)
3
2
%Invasives
0
W0
0
Post Mitigation
Plan
Performance
Standard
Current Year Stern Count
10
16
:5
Stems/Acre
648
648
507
Species Count
11
12
Dominant Species Composition (%)
L 25
20
Average Plot Height (ft.)
3
2
3
% Invasives
0
1 0
0
). Bolded species are proposed for the current monitoring year, Italicized species are not approved, and a regu ar font Indicate that the specie has been approved.
2). The "Species Included In Approved Mitigation Plan" section contains only those species that were Included 1 the original ap roved mitigatio plan. The "Pos Mitigation Pla Species" sectio Includes species that are being proposed through a
mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitig tion plan adde dum (regular font), and species that are not approved (italicized).
3). The "Mitigation Plan Performance Standard" section is derived only from stems Included in the original miti ation plan, whereas the "Post Mitigation Plan Performance Standard" Includes d to from mitigation plan approved, post mitigation plan
approved, and proposed stems.
Table 6. Vegetation Plot Data
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Planted Acreage
Date of Initial Plant
Date(s) of Supplemental Plant(s)
Date(s) Mowing
Date of Current Survey
Plot size (ACRES)
19.1
2022-02-21
NA
2022-02-21
2022-02-21
0.0247
Scientific Name
Common Name
Veg Plot 11 F
Veg Plot 12 F
Veg Plot 13 F
Planted
Total
Planted
Total
Planted
Total
Species
Included in
Approved
Mitigation Plan
Acer negundo
boxelder
1
1
Alnus serrulata
hazel alder
1
1
Amelanchier arborea
common rviceberry
Betula nigra
river birch
4
4
1
1
5
5
Calycanthus floridus
eastern sweetshrub
Carya cordiformis
bitternut hickory
Celtis laevigata
sugarberry
1
1
Cephalanthus occidentalis
on
common buttonbush
1
1
1
1
Cornus amomum
silky dogwood
Cornus florida
flowering dogwood
Diospyrosvirginiana
coon persimmon
Hamamelis virginiana
Americanwitchhazel
1
1
Lindera benzoin
northern spicebush
2
2
1
1
1
1
Liriodendron tulipifera
tuliptree
Nyssa sylvatica
blackgum
2
2
1
1
Oxydendrum arboreum
sourwood
1
1
Platanus occidentalis
American sycamore
2
2
1
1
Populus deltoides
eastern cottonwood
3
3
Quercus alba
white oak
2
2
Quercus michauxii
swamp chestnut oak
1
1
1
1
Quercus nigra
water oak
2
2
Quercus pagoda
cherrybark oak
Quercus phellos
willow oak
3
3
2
2
Quercusrubra
northern red oak
Salix sericea
silky willow
Sambucus canadensis
American black elderberry
1
1
Ulmus americana
American elm
2
2
Ulmus rubra
slippery elm
Sum
Performance Standard
14
14
14
14
16
16
Mitigation Plan
Performance
Standard
Current Year Stem Count
14
14
16
Stems/Acre
567
567
648
Species Count
ill9
9
Dominant Species Composition (%)
21
IP
Average Plot Height(ft.)
3
2
2
%Invasives
0
0
0
Post Mitigation
Plan
Performance
Standard
Current Year Stem Count
-
14
16
Stems/Acre
_..-
567
648
Species Count
7
9
10
Dominant Species Composition (%)
29
L 21
31
Average Plot Height (ft.)
3
2
2
% Invasives
1 0
0
). Bolded species are proposed for the current monitoring year, Italicized species are not approved, and a regu ar font Indicate that the specie has been approved.
). The "Species I eluded In Approved Mitigation Plan" section contains only those species that were Included 1 the original ap roved mitigation plan. The "Pos Mitigation Pla Species" sectio Includes species that are being proposed through a
mitigation plan addendum for the current monitoring year (bolded), species that have been approved in prior monitoring year through a mitig tion plan adde dum (regular font), and species that are not approved(italicized).
3). The "Mitigation Plan Performance Standard" section Is derived only from stems Included In the original mlti ation plan, whereas the "Post Mitigation Plan P rformance Standard" Includes d to from mitigation plan approved, post mitigation plan
approved, and proposed stems.
Table 6. Vegetation Plot Data
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Planted Acreage
Date of Initial Plant
Date(s) of Supplemental Plant(s)
Date(s) Mowing
Date of Current Survey
Plot size (ACRES)
19.1
2022-02-21
NA
2022-02-21
2022-02-21
0.0247
Scientific Name
Common Name
Veg Plot 1 R
Veg Plot 2 R
Veg Plot 3 R
Veg Plot 4 R
Veg Plot 5 R
Veg Plot 6 R
Total
Total
Total
Total
Total
Total
Species
Included in
Approved
Mitigation Plan
Acer negundo
boxelder
1
Alnus serrulata
hazel alder
1
1
Amelanchier arborea
common rviceberry
Betula nigra
river birch
2
1
1
1
1
4
Calycanthus floridus
eastern sweetshrub
Carya cordiformis
bitternut hickory
2
Celtis laevigata
sugarberry
1
3
1
Cephalanthus occidentalis
on
common buttonbush
1
2
1
Cornus amomum
silky dogwood
1
1
Cornus florida
flowering dogwood
Diospyrosvirginiana
coon persimmon
Hamamelis virginiana
Americanwitchhazel
Lindera benzoin
northern spicebush
1
1
1
Liriodendron tulipifera
tuliptree
Nyssa sylvatica
blackgum
1
2
Oxydendrum arboreum
sourwood
Platanus occidentalis
American sycamore
2
3
1
5
1
3
Populus deltoides
eastern cottonwood
1
1
Quercus alba
white oak
Quercus michauxii
swamp chestnut oak
2
3
1
Quercus nigra
water oak
1
1
Quercus pagoda
cherrybark oak
2
1
Quercus phellos
willow oak
1
2
2
1
1
Quercusrubra
northern red oak
2
1
Salix sericea
silky willow
2
3
1
2
Sambucus canadensis
American black elderberry
1
1
Ulmus americana
American elm
2
1
Ulmus rubra
slippery elm
2
Sum
Performance Standard
15
11
15
14
16
14
Mitigation Plan
Performance
Standard
Current Year Stem Count
15
11
15
14
16
14
Stems/Acre
607
445
607
567
648
567
Species Count
0
7
10
9
Dominant Species Composition (%)
3
27
20
36
Average Plot Height(ft.)
2
2
2
2
2
2
%Invasives
0
0
0
0
0
Post Mitigation
Plan
Performance
Standard
Current Year Stem Count
15
11
15
14
16
14
Stems/Acre
607
445
607
567
648
567
Species Count
10
7
10
9
10
8
Dominant Species Composition (%)
13
27
20
36
19
29
Average Plot Height (ft.)
2
2
2
2
2
2
%Invasives
0
0
0
0
0
0
1 . Bolded species re proposed for the current monitoring year, Italicized species are not approved, and a regul r font Indicates that the specie has been approved.
2). The "Species In luded In Approved Mitigation Plan" section contains only those species that were Included In the original approved mltigatio plan. The "Post Mitigation Plan Species" sectio Includes species that are being proposed through a
mitigation plan ad endum for the current monitoring year (bolded), species that have been approved in prior monitoring years through a mitig tion plan addendum (regular font), and species hat are not approved (italicized).
3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mi igation Plan Performance Standard" includes da a from mitigation plan approved, post mitigation plan
a proved, and pro osed stems.
Table 7. Vegetation Performance Standards Summary Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Veg Plot 1 F
Veg Plot 2 F
Veg Plot 3 F
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
607
2
10
526
2
0
688
2
8
0
Veg Plot 4 F
Veg Plot 5 F
Veg Plot 6 F
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
%Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
648
2
9
0
688
2
10
0
607
2
9
0
Veg Plot 7 F
Veg Plot 8 F
Veg Plot 9 F
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
2
10
i
648
3
0
648
2
11
0
Veg Plot 10 F
Veg Plot 11 F
Veg Plot 12 F
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
607
3
12
567
3
7
0
567
2
9
0
Veg Plot 13 F
Veg Plot Group 1 R
Veg Plot Group 2 R
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
648
2
607
2
Veg Plot Group 3 R
Veg Plot Group 4 R
Veg Plot
Group 5 R
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
% Invasives
Stems/Ac.
Av. Ht. (ft)
# Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
2
10
0
567
2
648
2
Veg Plot
Group 6 R
Stems/Ac.
Av. Ht. (ft)
#Species
%Invasives
Monitoring Year 7
Monitoring Year 5
Monitoring Year 3
Monitoring Year 2
Monitoring Year 1
Monitoring Year 0
567
2 sr 8
0 1
*Each monitoring year represents a different plo for the random vegetation plot 'groups" Random plots are denoted with an R, and fixed plots with an F.
Appendix C
Stream Geomorphology Data
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 1-UT1A
303+62 Pool
815
813
c
0
r>
w
w 811
809
0 10 20 30
Width(ft)
MYO(3/2022) -Bankfull
fo : ( � :�
4.0Bankull Dimensi x-sectionns area(ft.sq.)
6.4 width(ft)
0.6 mean depth(ft) -"
1.4 max depth(ft)
7.1 ft _
0.6 hydraulicwetted radius(ft)
10.1 width-deptherimeter ratio r �"
etc
. '
)
r
,g, s� a
Survey Date: 3/2022
Field Crew: Kee Mapping&Surveying �` �
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 2-UT1A
303+78 Riffle
815
813
6. .,144.1qupro,....„,. ."---..-----.-------4-.......'
c
0
w 811
w
809 -
0 10 20 30 40
Width(ft)
MYO(3/2022) —Bankfull —Floodprone Area
—
Bankfull Dimensions , +� � S
1.2 x-section area(ft.sq.) "t ` " '' «1;
t a '�- +'
4.3 width(ft)
" �� .rtP tir-peyr " ,
e
0.3 mean depth(ft) t �1 3 $ ���' �f
0.5 max depth(ft) a '
4.4 wetted perimeter(ft)
0.3 hydraulic radius(ft)
15.0 width-depth ratio f,
9.3 W flood Prone area(ft)
2.2 entrenchment ratio
r . 1 '�
1.0 low bank height ratio } � � x .
Survey Date: 3/2022 "# i - .
Field Crew: Kee Mapping&Surveying a�'m 1 _00 aV . - -
- r ' th. �!
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 3-UT1 Reach 1
200+79 Riffle
816
814
812
c
0
'° 810
w
w
808
806
0 10 20 30 40 50 60
Width(ft)
— MY0(3/2022) —Bankfull —Floodprone Area
Bankfull Dimensions
22.0 x-section area(ft.sq.)
18.7 width(ft) wj
1.2 mean depth(ft)
1.8 max depth(ft)
19.3 wetted perimeter(ft) 14,
-
t
1.1 hydraulic radius(ft)
15.9 width-depth ratio l �
54.8 W flood prone area(ft) ti v
2.9 entrenchment ratio ' ; -
1.0 low bank height ratio
Survey Date: 3/2022
Field Crew: Kee Mapping&Surveying -;
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 4-UT1 Reach 2
204+51 Riffle
811
809
E.
0
m
. 807
805
0 10 20 30 40 50 60 70 80 90
Width(ft)
+MYO(3/2022) —Bankfull —Floodprone Area
Bankfull Dimensions �_
12.8 x-section area(ft.sq.)
16.4 width(ft) , t �
0.8 mean depth(ft) 4+
_ , ( a -
1.6 max depth(ft)
16.8 wetted perimeter(ft)
0.8 hydraulic radius(ft) -- �
21.0 width-depth ratio - - "'' „--#
100.0 W flood prone area(ft)
6.1 entrenchment ratio
1.0 low bank height ratio
Survey Date: 3/2022 ¢�� "\
Field Crew: Kee Mapping&Surveying �q
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 5-UT1 Reach 2
204+95 Pool
811 -
809
•
c
807
0
w
805
803
0 10 20 30 40 50 60 70
Width(ft)
MY0(3/2022) -Bankfull
Bankfull Dimensions26.1 x-section area(ft.sq.)
20.5 width(ft) �y
1.3 mean depth(ft)
3.0 max depth(ft) 'q'
21.7 wetted perimeter(ft)
1.2 hydraulic radius(ft)
16.1 width-depth ratio
•
Survey Date: 3/2022
Field Crew: Kee Mapping&Surveying x " .
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 6-UT1 Reach 2
212+84 Pool
804
802
800
798
0 10 20 30 40 50 60 70 80
Width(ft)
MY0(3/2022) -Bankfull
Bankfull Dimensions `` I
43.0 x-section area(ft.sq.)
� )b
24.2 width(ft)
1.8 mean depth(ft)
3.5 max depth(ft) .0 -
25.4 wetted perimeter(ft) j,
1.7 hydraulic radius(ft)
13.6 width-depth ratio
Survey Date: 3/2022
Field Crew: Kee Mapping&Surveying , >a
View Downstream
osstion Plots
Oak Hill Dairy Mitigation Site
•DMS Pro-Secject No.100120
Cr
Monitoring Year 0-2022
Cross-Section 7-UT1 Reach 2
213+34 Riffle
806
804
v 802
800 ,
0 10 20 30 40 50 60 70 80
Width(ft)
+MYO(3/2022) -Bankfull -Floodprone Area
Bankfull Dimensions f �
15.2 x-section area(ft.sq.) 4444M1 ` t ��' i i '
14.8 width(ft) s'= � x + i d - iy
t � � ti Ira
1.0 mean depth(ft) ! J�
1.8 max depth(ft)
15.3 wetted perimeter
1.0 hydraulic radius(ft) *
14.3 width-depth ratio ,.
89.6 W flood prone area(ft)
6.1 entrenchment ratios
a9" %F lY'u ay'L S
1.0 low bank height ratio `
{
Survey Date: 3/2022 '_
Field Crew: Kee Mapping&Surveying
;ram
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 8-UT1 Reach 2
218+86 Riffle
799 -
—4
T
c
', 797
w
795 ,
0 10 20 30 40 60 60
Width(ft)
— MY0(3/2022) —Bankfull —Floodprone Area
Bankfull Dimensions p
12.0 x-section area(ft.sq.)
15.4 width(ft)
0.8 mean depth(ft)
1.5 max depth(ft)
15.8 wetted perimeter(ft)
0.8 hydraulic radius(ft)
19.8 width-depth ratio
72.6 W flood prone area(ft)
4.7 entrenchment ratio
1.0 low bank height ratio
Survey Date: 3/2022 � t
Field Crew: Kee Mapping&Surveying * k Cx
:u 1... .:1.r — ' ;s t
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 9-Oak Hill Reach 1
103+34 Riffle
804
802
• •
800
0
v
w 798
796
0 10 20 30 40 50 60 70
Width(ft)
+MYO(3/2022) -Bankfull -Floodprone Area
Bankfull Dimensions
, 2
25.3 x-section area(ft.sq.) n
21.5 width(ft) f €f ;'`4
1.2 mean depth(ft) �
2.2 max depth(ft) 4 5
22.1 wetted perimeter(ft) ,�` ���
1.1 hydraulic radius(ft) ��t �' � '
18.2 width-depth ratio (-. �� 3�s F #
72.4 W flood prone area(ft) `k •-•A
.. _ =� _
3.4 entrenchment ratio �. 7-:
1.0 low bank height ratio •
Survey Date: 3/2022 F
Field Crew: Kee Mapping&Surveying `
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 10-Oak Hill Reach 2
107+14 Riffle
801
799
♦ •
E.
0
m
v 797
7.1
795 -
0 10 20 30 40 50 60 70
Width(ft)
-Bankfull+MYO(3/2022) -Floodprone Area
Bankfull Dimensions
z.
25.5 x-section area(ft.sq.)
21.2 width(ft) r° i
1.2 mean depth(ft)
2.1 max depth(ft)
21.9 wetted perimeter(ft)
1.2 hydraulic radius(ft)
17.7 width-depth ratio V ,
83.8 W flood prone area(ft) '�""� "� -°
4.0 entrenchment ratio : -r
1.0 low bank height ratio "�
Survey Date: 3/2022
= Vt: --
Field Crew: Kee Mapping&Surveying �`
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 11-Oak Hill Reach 2
107+57 Pool
799
797
795
793
0 10 20 30 40 50 60 70 80 90
Width(ft)
MY0(3/2022) -Bankfull
Bankfull Dimensions
11111111011
64.9 x-section area(ft.sq.) j t
29.7 width(ft) ,
r 1
2.2 mean depth(ft)
4.4 max depth(ft) - a(
31.8 wetted perimeter(ft)
2.0 hydraulic radius(ft)
13.6 width-depth ratio
•
Survey Date: 3/2022
Field Crew: Kee Mapping&Surveying
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 12-Oak Hill Reach 3
113+43 Pool
797
E.
793
0
v
w 791
789 -
0 10 20 30 40 50 60 70 80 90 100 110
Width(ft)
MY0(3/2022) -Bankfull
Bankfull Dimensions
73.1 x-section area(ft.sq.)
33.3 width(ft)
2.2 mean depth(ft) °,
4.2 max depth(ft) h
34.8 wetted perimeter(ft) • �Fl f�r _n
2.1 hydraulic radius(ft) '
15.2 width-depth ratio ��
c ,,..
Survey Date: 3/2022
'
Field Crew: Kee Mapping&Surveying
,ty
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 13-Oak Hill Reach 3
113+90 Riffle
799
797
795 s____--•
0
,
793
791 -
0 10 20 30 40 50 60 70 80 90
Width(ft)
+MYO(3/2022) -Bankfull -Floodprone Area
Bankfull Dimensions
31.5 x-section area(ft.sq.)
22.3 width(ft)
1.4 mean depth(ft)
2.6 max depth(ft) s
23.1 wetted perimeter(ft)
1.4 hydraulic radius(ft)
15.8 width-depth ratio - ems�.. . =
102.5 W flood prone area(ft)
�'
4.6 entrenchment ratio a - � �
1.0 low bank height ratio =' - .. e -
Survey Date: 3/2022 ' �
Field Crew: Kee Mapping&Surveying I. *X -�� w t-' "''
View Downstream
Cross-Section Plots
Oak Hill Dairy Mitigation Site
DMS Project No.100120
Monitoring Year 0-2022
Cross-Section 14-Oak Hill Reach 4
120+18 Riffle
795
793
791 }. -0- •
789
787
0 10 20 30 40 50 60 70
Width(ft)
- MY0(3/2022) -Bankfull -Floodprone Area
Bankfull Dimensions
36.1 x-section area(ft.sq.) v ��
26.0 width(ft)
a'
1.4 mean depth(ft)
2.7 max depth(ft)
26.8 wetted perimeter(ft) s.
1.3 hydraulic radius(ft) t -'
18.8 width-depth ratio
94.3 W flood prone area(ft)
3.6 entrenchment ratio
g
1.0 low bank height ratio � ��
•y. '�'a '� _ -�e*�" '° �N ,�, :: ''.
Survey Date: 3/2022 f -
Field Crew: Kee Mapping&Surveying
View Downstream
Longitudinal Profile Plots
Oak Hill Creek Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1A (STA 300+13 to 304+91)
Elevation (feet)
a ca o
in o
n
•
♦
• ♦ ♦ ♦ ♦
-
a• •
♦
--------- __A__ • ♦
fi
0
t
m
O130000 30050 30100 30150 30200 30250
Station (feet)
TW WSF LBKF/LTOB RBKF/RTOB • STRUCTURE
(MY0-3/2022) - (MY0-3/2022) ♦ (MYO-3/2022) ♦ (MY0-3/2022) (MY0-3/2022)
UT1A (STA 300+13 to 304+91)
Elevation (feet)
0
w a c
o In
I
I
I
.4
X
I
I
I
X
0 ♦ ___� ♦ ♦ ♦ •♦
I I
•
End Reach
I I
M
I
0V 30250 30300 30350 30400 30450 30500
Station (feet)
TW WSF LBKF/LTOB ♦ RBKF/RTOB • STRUCTURE
(MY0-3/2022) - (MY0-3/2022) (MY0-3/2022) (MY0-3/2022) (MY0-3/2022)
Longitudinal Profile Plots
Oak Hill Creek Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1 (STA 200+05 to 221+11)
Q1S
Elevation (feet)
o oo co C
D
0 . F
D L
V, 0
1 1
•
•
•
—I
r1,1 I
X ,
I
I
—
cr
x
—I
I
I
—I
Lei I
X 1
—I
• AAA&
T • •
:-.•-;4 --------- -- __
i
•
• • •
LA • •
A • A •
•
•A A •
•
• • • A • •
A • i
r
• • At AA
AA
--------------------
A •
A AA aA A
I I
L I
i• • • • t•
- Start Reach 1
i
I Start Reach 2
i
1
I
i
i 1
i 1
20100 20050 20000 20300 20350 20250 20200 20150 20400 20450 20500
Station (feet)
TW WSF LBKF/LTOB(MY0-3/2022) RBKF/RTOB • STRUCTURE
-
(MY0-3/2022)• (MY0-3/2022)
(MYO-3/2022) • (MY0-3/2022)
UT1 (STA 200+05 to 221+11)
Q1/1
Elevation (feet)
.1 00 CO C
O 0 0 F
n 0 ln C
•
i
•
•
• •
A
• i
------------
•
• 4
• ._ •
•
•
20500
20550
20600
TW
20650 20700
_ WSF (MY0-3/2022) I
20750
Station (feet)
LBKF/LTOB (MY0-3/2022) •
20800
RBKF/RTOB (MYO-3/2022)
20850
0
20900 20950 21000
STRUCTURE (MY0-3/2022)
—1----- (MYO-3/2022)
Longitudinal Profile Plots
Oak Hill Creek Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1 (STA 200+05 to 221+11)
Elevation (feet)
J W 00 C
n O tli
D O O
I
I
XS6
I
I
1
X
•
•
• •
I
.
J 21000 J.
21050 21100 21150 21200 21250 21300 21350 21400 21450 21500
Station (feet)
TW (MYO-3/2022) WSF (MYO-3/2022) ♦ LBKF/LTOB (MYO-3/2022) ♦ RBKF/RTOB (MYO-3/2022) • STRUCTURE (MYO-3/2022)
UT1 (STA 200+05 to 221+11)
805
1 I 1
1—
Internal CE
Crossing
,
I
,
I
co
Elevation (feet)
J V 00
D p O
J O
____________
•
♦ : s 1.
♦
.
End Reach 2
21500 21550 21600 21650 21700 21750 21800 21850 21900 21950 22000 22050 22100
Station (feet)
TW (MY0-3/2022) WSF (MYO-3/2022) • LBKF/LTOB (MYO-3/2022) ♦ RBKF/RTOB (MYO-3/2022) • STRUCTURE (MYO-3/2022) — — Start Internal CE crossing — — End Internal Crossing
Longitudinal Profile Plots
Oak Hill Creek Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Creek (STA 100+10 to 123+73)
Elevation (feet)
00
D . 0
J , N
I„
------------------------------------------------
•
•
• • .
! .
••• t •
I
•
• • • •
•--
-
--------------- I. ------------------------------------------------
Start Reach 1
I
I
I
I
10000 10050 10100 10150 10200 10250 10300 10350 10400 10450
Station (feet)
TW WSF LBKF/LTOB RBKF/RTOB • STRUCTURE
(MY0-3/2022) - (MY0-3/2022) • (MY0-3/2022) • (MY0-3/2022) (MY0-3/2022)
Oak Hill Creek (STA 100+10 to 123+73)
Internal
CE Crossing
1
1
0
`�
X
1
1
..
.4
X
Elevation (feet)
.1V 00
0 00 0
0 In 0
1
1
•
I
I
•
_ I♦
♦ I
♦•
• ♦ • • A•
• ♦ ♦
I
• • I ♦ •
1
I
I • ♦ • ♦
I
• •♦
4•
•
1
- Start Reach 2
1
1
I
1
I
I
1
I
10450 10500 10550 10600 10650 10700 10750 10800 10850 10900 10950 11000
Station (feet)
TW WSF LBKF/LTOB RBKF/RTOB STRUCTURE End internal
—40— (MY0-3/2022) - (MY0-3/2022) (MVO-3/2022) • (MY0-3/2022) • (MY0-3/2022) crossing
Longitudinal Profile Plots
Oak Hill Creek Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Creek (STA 100+10 to 123+73)
800
795
790
785
••
•
♦• •
1
•
•
ry
ti
F
1
L
ti
r
♦ ♦
•• k
I
• •
•
Start Reach 3
I
I
I
I
I
I
I
11000
11050
11100
�TW (MYO-3/2022)
11150
WSF (MY0-3/2022)
11200
11250
Station (feet)
♦ LBKF/LTOB (MY0-3/2022)
11300
♦ RBKF/RTOB (MY0-3/2022)
11350
11400
• STRUCTURE (MY0-3/2022)
11450
11500
Oak Hill Creek (STA 100+10 to 123+73)
.111
Elevation (feet)
J V V V
a'F/ O V°i
••♦
••♦
__
•
t
t
•
♦• •
t • ♦♦
.•
r ♦ •
•
♦ ♦
♦
•
AA
♦♦
•
♦• ♦ ♦ ♦ ♦ A
k
•
•
♦
•
•
•
♦
♦ •
♦
♦
•
•
-
♦
Start Reach
T
•
11500
11550
11600
TW
11650
WSF (MYO-3/2022)
11700
♦
11750
Station (feet)
LBKF/LTOB (MYO-3/2022)
♦
11800 11850
RBKF/RTOB (MYO-3/2022)
•
11900
STRUCTURE (MYO-3/2022)
11950
12000
(MYO-3/2022)
Longitudinal Profile Plots
Oak Hill Creek Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Creek (STA 100+10 to 123+73)
Elevation (feet)
V V V
W 00 p
F+ O tli O tli
I7,
I
I•
•
••
••
•
••
• • •
• • AA
• i
• ••
•
••
---
------------------------------------------------
•
•
•
• •
•
•
I
I
I
I
I
12050
12100
12150
WSF (MY0-3/2022) •
12200
Station (feet)
LBKF/LTOB (MY0-3/2022)
•
12250
RBKF/RTOB (MY0-3/2022)
•
12300
STRUCTURE (MY0-3/2022)
12350 12400
TW (MY0-3/2022)
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1A, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
18
18
18
18
e.C)
Very fine
0.062
0.125
3
3
3
21
Fine
0.125
0.250
2
7
9
9
30
Medium
0.25
0.50
4
4
4
34
Coarse
0.5
1.0
1
1
1
35
Very Coarse
1.0
2.0
2
2
4
4
39
40.
6$1%
Very Fine
2.0
2.8
39
Very Fine
2.8
4.0
1
1
1
40
Fine
4.0
5.6
40
Fine
5.6
8.0
2
2
2
42
Medium
8.0
11.0
1
1
2
2
44
Medium
11.0
16.0
4
4
4
48
Coarse
16.0
22.6
8
1
9
9
57
Coarse
22.6
32
11
2
13
13
70
Very Coarse
32
45
6
5
11
11
81
Very Coarse
45
64
6
1
7
7
88
\,
or
Small
64
90
5
2
7
7
95
Small
90
128
5
5
5
100
Large
128
180
100
Large
180
256
100
,zjr.SL
Small
256
362
100
Small
362
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16 =
Silt/Clay
D35 =
1.0
D50 =
17.3
D84 =
52.3
D95 =
90.0
D1oo =
128.0
inn Sit/cozy
Pebble Count
t Sand
UT1A, Reachwide
Particle Distribution
1 Gavel
1 co le♦
: oder�
B,dmck
_
i
ulatil
;'
k,
0.01
r
0 1 1
1
10
Particle Class Size (mm)
MY0-02/2022
T
100
1000
r
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1A, Cross -Section 2
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
8
8
8
0
Very fine
0.062
0.125
8
Fine
0.125
0.250
--
8
Medium
0.25
0.50
8
Coarse
0.5
1.0
--
8
Very Coarse
1.0
2.0
6
6
14
Very Fine
2.0
2.8
--
14
Very Fine
2.8
4.0
2
2
16
Fine
4.0
5.6
1
1
17
Fine
5.6
8.0
7
7
24
Medium
8.0
11.0
3
3
27
Medium
11.0
16.0
17
17
44
Coarse
16.0
22.6
23
23
67
Coarse
22.6
32
8
8
75
Very Coarse
32
45
13
13
88
Very Coarse
45
64
5
5
93
V5
C0
Small
64
90
5
5
98
Small
90
128
2
2
100
Large
128
180
--
100
Large
180
256
100
Small
256
362
--
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 2
Channel materials (mm)
D16 =
4.0
D35 =
13.1
D50 =
17.5
D84 =
40.5
D95 =
73.4
D1oo =
128.0
UT1A, Cross -Section 2
Pebble Count Particle Distribution
1 nn
Sit/Clay
1 Sand
1 Gravel
I Coyyyble
Boulder
B Brock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
/
—
•
•
0.01
1
0 1 1
1
10
Particle Class Size (mm)
t MY0-02/2022
1
100
i
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1R1, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
20
20
20
20
cie
Very fine
0.062
0.125
15
15
15
35
Fine
0.125
0.250
7
7
7
42
Medium
0.25
0.50
1
1
1
43
Coarse
0.5
1.0
43
Very Coarse
1.0
2.0
1
1
1
44
40.
6$1%
Very Fine
2.0
2.8
44
Very Fine
2.8
4.0
1
1
1
45
Fine
4.0
5.6
45
Fine
5.6
8.0
1
1
1
46
Medium
8.0
11.0
2
2
2
48
Medium
11.0
16.0
1
2
3
3
51
Coarse
16.0
22.6
5
3
8
8
59
Coarse
22.6
32
10
10
10
69
Very Coarse
32
45
9
1
10
10
79
Very Coarse
45
64
6
6
6
85
\,
or
Small
64
90
4
4
4
89
Small
90
128
9
9
9
98
Large
128
180
2
2
2
100
Large
180
256
100
,zjr.SL
Small
256
362
100
Small
362
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16 =
Silt/Clay
D35=
0.1
D50 =
14.1
D84 =
60.4
D95 =
113.8
D1oo =
180.0
inn Sit/Clay
Pebble Count
r Sand
UT1R1, Reachwide
Particle Distribution
r Gravel 1 Cobble
Boulder
B,dmck
F.
,
7
ulatil
;'
I/1411''''fr..j
u
0.01
r
0 1 1
10 100
Particle Class Size (mm)
MY0-02/2022
1000
r
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1R1, Cross -Section 3
Particle Class
SILT/CLAY
BEDROCK
Silt/Clay
Very fine
Fine
Medium
Coarse
Very Coarse
Very Fine
Very Fine
Fine
Fine
Medium
Medium
Coarse
Coarse
Very Coarse
Very Coarse
Small
Small
Large
Large
Small
Small
Medium
Large/Very Large
Bedrock
Diameter (mm)
min
0.000
0.062
0.125
0.25
0.5
1.0
2.0
2.8
4.0
5.6
8.0
11.0
16.0
22.6
32
45
64
90
128
180
256
362
512
1024
2048
max
0.062
0.125
0.250
0.50
1.0
2.0
2.8
4.0
5.6
8.0
11.0
16.0
22.6
32
45
64
90
128
180
256
362
512
1024
2048
>2048
Total
Riffle 100-
Count
4
Summary
Class
Percentage
4
2
8
2
8
2
6
10
6
8
6
14
10
18
6
2
6
10
6
8
6
14
10
18
6
100
100
Percent
Cumulative
4
4
4
4
6
14
14
14
14
16
22
32
38
46
52
66
76
94
100
100
100
100
100
100
100
100
Cross -Section 3
Channel materials (mm)
D16 =
8.0
D35 =
19.0
D50 =
40.2
D80. =
105.3
D95 =
135.5
D1oo =
180.0
1 nn Sit/Clay
UT1R1,
Pebble Count
1 Sand
Cross -Section 3
Particle Distribution
1 Gravel
I Cobble
Boulder
Bedrock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
•--10.
0-
•
•
1
•
10
0.01
0 1 1
10
Particle Class Size (mm)
t MY0-02/2022
100
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1R2, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
22
22
22
22
e.C)
Very fine
0.062
0.125
10
10
10
32
Fine
0.125
0.250
16
16
16
48
Medium
0.25
0.50
48
Coarse
0.5
1.0
48
Very Coarse
1.0
2.0
48
40.
6$1%
Very Fine
2.0
2.8
48
Very Fine
2.8
4.0
48
Fine
4.0
5.6
48
Fine
5.6
8.0
1
1
1
49
Medium
8.0
11.0
49
Medium
11.0
16.0
2
2
2
51
Coarse
16.0
22.6
1
1
1
52
Coarse
22.6
32
5
1
6
6
58
Very Coarse
32
45
11
11
11
69
Very Coarse
45
64
15
15
15
84
\,
or
Small
64
90
5
5
5
89
Small
90
128
11
11
11
100
Large
128
180
100
Large
180
256
100
o%Q'
Small
256
362
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16 =
Silt/Clay
D35=
0.1
D50=
13.3
D84 =
64.0
D95 =
109.1
D1oo =
128.0
inn Sit/clay
Pebble Count
t sand
UT1R2, Reachwide
Particle Distribution
1 Gavel
j co le♦
: oy
9idmck
Percent Cumulative (%)
W A Vi Q1 J W ID C
J 0 0 0 0 0 0 0 0 0 C
.._.
filer i
•
•
— •
•
/I
k,
0.01
r
0 1 1
10
Particle Class Size (mm)
MY0-02/2022
100
1000
r
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1R2, Cross -Section 4
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
0
Very Fine
2.0
2.8
--
0
Very Fine
2.8
4.0
0
Fine
4.0
5.6
2
2
2
Fine
5.6
8.0
2
Medium
8.0
11.0
--
2
Medium
11.0
16.0
4
4
6
Coarse
16.0
22.6
12
12
18
Coarse
22.6
32
24
24
42
Very Coarse
32
45
12
12
54
Very Coarse
45
64
16
16
70
.5
C0�
Small
64
90
8
8
78
Small
90
128
18
18
96
Large
128
180
2
2
98
Large
180
256
98
Small
256
362
2
2
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 4
Channel materials (mm)
D16 =
21.3
D35 =
28.9
D50 =
40.2
D80. =
101.2
D95 =
125.5
D1oo =
362.0
UT1R2, Cross -Section 4
Pebble Count Particle Distribution
i nn
Sit/Clay
1 Sand
1 Gravel
1 Cobble
0-
Be•drock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
—00 ,
I
0.01
0 1 1
10
Particle Class Size (mm)
t MYO-02/2022
100
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1R2, Cross -Section 7
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
0
Very Fine
2.0
2.8
--
0
Very Fine
2.8
4.0
0
Fine
4.0
5.6
--
0
Fine
5.6
8.0
0
Medium
8.0
11.0
2
2
2
Medium
11.0
16.0
6
6
8
Coarse
16.0
22.6
8
8
16
Coarse
22.6
32
12
12
28
Very Coarse
32
45
20
20
48
Very Coarse
45
64
22
22
70
.5
C0�
Small
64
90
8
8
78
Small
90
128
16
16
94
Large
128
180
6
6
100
Large
180
256
100
Small
256
362
--
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 7
Channel materials (mm)
D16 =
22.6
D35 =
36.1
D50 =
46.5
D80. =
102.7
D95 =
135.5
D1oo =
180.0
nn Sit/Clay
UT1R2,
Pebble Count
I Sand
Cross -Section 7
Particle Distribution
I Gravel
1 Cobble_
Brock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
1/j
0-0Boulder
0.01
• 0— 1 r•• a
0 1 1 10
Particle Class Size (mm)
t MY0-02/2022
1 i
100
i
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1R2, Cross -Section 8
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
2
2
2
Very Fine
2.0
2.8
--
2
Very Fine
2.8
4.0
2
Fine
4.0
5.6
--
2
Fine
5.6
8.0
2
Medium
8.0
11.0
--
2
Medium
11.0
16.0
2
2
4
Coarse
16.0
22.6
2
2
6
Coarse
22.6
32
4
4
10
Very Coarse
32
45
20
20
30
Very Coarse
45
64
30
30
60
.5
C0�
Small
64
90
24
24
84
Small
90
128
8
8
92
Large
128
180
8
8
100
Large
180
256
100
Small
256
362
--
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 8
Channel materials (mm)
D16 =
35.4
D35 =
47.7
D50 =
56.9
D84 =
90.0
D95 =
145.5
D1oo =
180.0
UT1R2, Cross -Section 8
Pebble Count Particle Distribution
nn
Sit/Clay
1 Sand
1 Gravel
1 Cobble_
Boulder
Brock
Percent Cumulative (%)
N W A V1 01 V CO l0 C
0 0 0 0 0 0 0 0 0 0 C
f/)
H
i��••••
1
•
i
0.01 01 1 10 100 1000 10000
Particle Class Size (mm)
t MY0-02/2022
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 1, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
2
2
2
2
e.C)
Very fine
0.062
0.125
2
2
2
4
Fine
0.125
0.250
15
15
15
19
Medium
0.25
0.50
5
5
5
24
Coarse
0.5
1.0
6
6
6
30
Very Coarse
1.0
2.0
2
2
2
32
40.
6$1%
Very Fine
2.0
2.8
32
Very Fine
2.8
4.0
3
3
3
35
Fine
4.0
5.6
2
2
2
37
Fine
5.6
8.0
2
2
2
39
Medium
8.0
11.0
4
4
4
43
Medium
11.0
16.0
2
2
4
4
47
Coarse
16.0
22.6
3
3
3
50
Coarse
22.6
32
2
2
4
4
54
Very Coarse
32
45
8
3
11
11
65
Very Coarse
45
64
21
21
21
86
\,
or
Small
64
90
7
7
7
93
Small
90
128
3
3
3
96
Large
128
180
4
4
4
100
Large
180
256
100
,zjr.SL
Small
256
362
100
Small
362
100
M
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16=
0.2
D35 =
4.0
D50=
22.6
D84 =
61.9
D95 =
113.8
D1oo =
180.0
inn Sit/Clay
Oak Hill
Pebble Count
t Sand
Reach 1, Reachwide
Particle Distribution
f Gravel 1 Cobble
Boulder
B,dmck
F.
,
fe..0
ulatil
;'
'elear*
Ir---jr.........."'.........-1
0.01 0 1 1 10
Particle Class Size (mm)
MY0-02/2022
T
100
1000
r
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 1, Cross -Section 9
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
0
Very Fine
2.0
2.8
--
0
Very Fine
2.8
4.0
0
Fine
4.0
5.6
--
0
Fine
5.6
8.0
0
Medium
8.0
11.0
5
5
5
Medium
11.0
16.0
7
7
11
Coarse
16.0
22.6
4
4
15
Coarse
22.6
32
17
16
31
Very Coarse
32
45
15
14
46
Very Coarse
45
64
28
27
72
.5
C0�
Small
64
90
19
18
90
Small
90
128
8
8
98
Large
128
180
--
98
Large
180
256
2
2
100
Small
256
362
--
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
105
100
100
Cross -Section 9
Channel materials (mm)
D16 =
23.0
D35 =
34.8
D50 =
47.6
D84 =
79.7
D95 =
110.9
D1oo =
256.0
Inn Sit/Clay
Oak Hill
Pebble Count
1 Sand
Reach 1, Cross -Section 9
Particle Distribution
1 Gravel 1 Cobble
Boulder
Be•drock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
,
ir.....—•
0.01
• 0— 1 r•• a
0 1 1 10
Particle Class Size (mm)
t MYO-02/2022
1 i
100
i
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 2, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
10
10
10
10
e.C)
Very fine
0.062
0.125
11
11
11
21
Fine
0.125
0.250
13
13
13
34
Medium
0.25
0.50
34
Coarse
0.5
1.0
34
Very Coarse
1.0
2.0
1
1
1
35
40.
6$1%
Very Fine
2.0
2.8
35
Very Fine
2.8
4.0
1
1
1
36
Fine
4.0
5.6
1
1
1
37
Fine
5.6
8.0
5
5
5
42
Medium
8.0
11.0
2
2
2
44
Medium
11.0
16.0
3
2
5
5
49
Coarse
16.0
22.6
3
2
5
5
54
Coarse
22.6
32
3
2
5
5
59
Very Coarse
32
45
4
1
5
5
64
Very Coarse
45
64
8
8
8
72
\,
or
Small
64
90
15
15
15
87
Small
90
128
8
8
8
95
Large
128
180
1
1
1
96
Large
180
256
3
3
3
99
,zjr.SL
Small
256
362
1
1
1
100
Small
362
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16=
0.1
D35=
2.0
D50=
17.1
D84 =
84.1
D95 =
128.0
D1oo =
362.0
inn Sit/Clay
Oak Hill
Pebble Count
r Sand
Reach 2, Reachwide
Particle Distribution
r Gavel
1 Cobble rV. : oulder•
+ B,dmck
Percent Cumulative (%)
W A Vi Q1 J W ID C
J 0 0 0 0 0 0 0 0 0 C
i
A'
r
y
0.01
r
0 1 1
10
Particle Class Size (mm)
MY0-02/2022
100
1000
r
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 2, Cross -Section 10
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
0
Very Fine
2.0
2.8
--
0
Very Fine
2.8
4.0
0
Fine
4.0
5.6
--
0
Fine
5.6
8.0
0
Medium
8.0
11.0
--
0
Medium
11.0
16.0
0
Coarse
16.0
22.6
6
6
6
Coarse
22.6
32
12
12
18
Very Coarse
32
45
8
8
26
Very Coarse
45
64
32
32
58
.5
C0�
Small
64
90
24
24
82
Small
90
128
14
14
96
Large
128
180
--
96
Large
180
256
4
4
100
Small
256
362
--
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 10
Channel materials (mm)
D16 =
30.2
D35 =
49.7
D50 =
58.6
D84 =
94.6
D95 =
124.8
D1oo =
256.0
Oak Hill Reach 2, Cross -Section 10
Pebble Count Particle Distribution
inn
Sit/Clay
1 Sand
1 Gravel
Cobb
mould-0
Bedrock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
,
u
0.01
• r r
0 1 1
i • • ♦ r•
10
Particle Class Size (mm)
t MYO-02/2022
100
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 3, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
32
32
32
32
e.C)
Very fine
0.062
0.125
6
6
6
38
Fine
0.125
0.250
1
1
1
39
Medium
0.25
0.50
2
2
2
41
Coarse
0.5
1.0
1
1
1
42
Very Coarse
1.0
2.0
2
2
2
44
40.
6$1%
Very Fine
2.0
2.8
44
Very Fine
2.8
4.0
44
Fine
4.0
5.6
2
2
2
46
Fine
5.6
8.0
2
2
2
48
Medium
8.0
11.0
2
2
2
50
Medium
11.0
16.0
50
Coarse
16.0
22.6
1
1
1
51
Coarse
22.6
32
2
2
2
53
Very Coarse
32
45
7
7
7
60
Very Coarse
45
64
12
12
12
72
\,
or
Small
64
90
11
11
11
83
Small
90
128
6
6
6
89
Large
128
180
6
6
6
95
Large
180
256
4
4
4
99
Small
256
362
99
Small
3620512
99
M
Medium
512
124
1
1
1
100
*
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16 =
Silt/Clay
D35=
0.1
D50 =
11.0
D84 =
95.4
D95 =
180.0
D1oo =
1024.0
inn Sit/Clay
Oak Hill
Pebble Count
r Sand
Reach 3, Reachwide
Particle Distribution
r Gavel
1 Cobble
r Boulder
B
drock
�
ulatil
;'
u
0.01
r
0 1 1
1
10
Particle Class Size (mm)
MY0-02/2022
T
100
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 3, Cross -Section 13
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
0
Very Fine
2.0
2.8
--
0
Very Fine
2.8
4.0
0
Fine
4.0
5.6
--
0
Fine
5.6
8.0
0
Medium
8.0
11.0
2
2
2
Medium
11.0
16.0
6
6
8
Coarse
16.0
22.6
4
4
12
Coarse
22.6
32
10
10
22
Very Coarse
32
45
10
10
32
Very Coarse
45
64
28
28
60
\ ea
LO
Small
64
90
20
20
80
Small
90
128
10
10
90
Large
128
180
2
2
92
Large
180
256
4
4
96
llllliONY
Small
256
362
2
2
98
Small
362
512
2
2
100
Medium
512
1024--
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 13
Channel materials (mm)
D16 =
26.0
D35 =
46.7
D50 =
56.4
D80. =
103.6
D95 =
234.4
D1oo =
512.0
Oak Hill Reach 3, Cross -Section 13
Pebble Count Particle Distribution
a nn Sit/Clay
I Sand
1 Gravel lder—
„rock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
,
/I1BOU
L,
0.01
•
0 1 1
• • a
10
Particle Class Size (mm)
t MVO 02/2022
1
100
1 i
1000
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 4, Reachwide
Particle Class
Diameter (mm)
Particle Count
Reach Summary
min
max
Riffle
Pool
Total
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
19
19
19
19
e.C)
Very fine
0.062
0.125
8
8
8
27
Fine
0.125
0.250
7
7
7
34
Medium
0.25
0.50
8
8
8
42
Coarse
0.5
1.0
3
3
3
45
Very Coarse
1.0
2.0
2
2
2
47
40.
6$1%
Very Fine
2.0
2.8
47
Very Fine
2.8
4.0
47
Fine
4.0
5.6
1
1
1
48
Fine
5.6
8.0
1
1
1
49
Medium
8.0
11.0
49
Medium
11.0
16.0
2
2
2
51
Coarse
16.0
22.6
7
7
7
58
Coarse
22.6
32
3
3
3
61
Very Coarse
32
45
12
1
13
13
74
Very Coarse
45
64
10
10
10
84
\,
or
Small
64
90
6
6
6
90
Small
90
128
6
6
6
96
Large
128
180
1
1
1
97
Large
180
256
1
1
1
98
,zjr.SL
Small
256
362
1
1
1
99
Small
362
512
1
1
1
100
Medium
512
0
124
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
100
Total
50
50
100
100
100
Reachwide
Channel materials (mm)
D16 =
Silt/Clay
D35 =
0.3
D50 =
13.3
D84 =
64.0
D95 =
120.7
D1oo =
512.0
1,, Sit/Clay
Oak Hill
Pebble Count
r Sand
Reach 4, Reachwide
Particle Distribution
1 Gavel
1 Cobble ri........41Elooler
B,dmck
i
ulatil
;'
•
1/1.....71(
.7.,..7.................1
u
0.01
r
0 1 1
r
10
Particle Class Size (mm)
MY0-02/2022
r
100
I
1000
r
10000
Reachwide and Cross -Section Pebble Count Plots
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Oak Hill Reach 4, Cross -Section 14
Particle Class
Diameter (mm)
Riffle 100-
Count
Summary
min
max
Class
Percentage
Percent
Cumulative
SILT/CLAY
Silt/Clay
0.000
0.062
--
0
0
Very fine
0.062
0.125
0
Fine
0.125
0.250
--
0
Medium
0.25
0.50
0
Coarse
0.5
1.0
--
0
Very Coarse
1.0
2.0
0
Very Fine
2.0
2.8
--
0
Very Fine
2.8
4.0
0
Fine
4.0
5.6
--
0
Fine
5.6
8.0
0
Medium
8.0
11.0
--
0
Medium
11.0
16.0
2
2
2
Coarse
16.0
22.6
2
2
4
Coarse
22.6
32
4
4
8
Very Coarse
32
45
14
14
22
Very Coarse
45
64
24
24
46
.5
C0�
Small
64
90
28
28
74
Small
90
128
8
8
82
Large
128
180
12
12
94
Large
180
256
6
6
100
Small
256
362
--
100
Small
362
512
100
Medium
512
1024
100
Large/Very Large
1024
2048
100
BEDROCK
Bedrock
2048
>2048
--
100
Total
100
100
100
Cross -Section 14
Channel materials (mm)
D16 =
38.9
D35 =
54.5
D50 =
67.2
D80. =
135.5
D95 =
190.9
D1oo =
256.0
Oak Hill Reach 4, Cross -Section 14
Pebble Count Particle Distribution
Inn
Sit/Clay
I Sand
I Gravel 1 Cobble
Boulder
Be•drock
Percent Cumulative (%)
N W A Ul 01 V CO l0 C
DOO 00 O O O O O C
,
7/-61-
JI
0.01
• 0— 1 r•• a
i
0 1 1 10 100
Particle Class Size (mm)
t MYO-02/2022
i
1000
10000
Table 8a. Baseline Stream Data Summary
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
PRE-EXISTING
CONDITIONS
' ESIGN
MONITORING BASELINE
(MYO)
Parameter
UT1A
Riffle Only
Min Max
n
Min Max
Min Max
n
Bankfull Width (ft)
9.9
1
5.5
4.3
1
Floodprone Width (ft)
12.2
1
8.0
12.0
9.3
1
Bankfull Mean Depth
0.2
1
0.5
0.3
1
Bankfull Max Depth
0.4
1
0.6
0.8
0.5
1
Bankfull Cross Sectional Area (ft2)
1.9
1
2.6
1.2
1
Width/Depth Ratio
51.0
1
12.0
15.0
1
Entrenchment Ratio
1.2
1
1.4
2.2
2.2
1
Bank Height Ratio
9.6
1
1.0
1.1
1.0
1
Max part size (mm) mobilized at bankfull
Silt
- -
17.5
1
Rosgen Classification
F6b
E4b
E4b
Bankfull Discharge (cfs)
3
7
Sinuosity
1.07
1.10
1.10
Water Surface Slope (ft/ft)2
0.0250
0.0320
0.0274
Other
Parameter
UT1 Reach 1
Riffle Only
Min Max
n
Min
Max
Min Max
n
Bankfull Width (ft)
15.9
1
17.0
18.7
1
Floodprone Width (ft)
24.5
1
37.0
85.0
54.8
1
Bankfull Mean Depth
0.7
1
1.1
1.2
1
Bankfull Max Depth
1.6
1
1.3
1.6
1.8
1
Bankfull Cross Sectional Area (ft2)
10.7
1
18.4
22.0
1
Width/Depth Ratio
23.4
1
16.0
15.9
1
Entrenchment Ratio
1.5
1
2.2
5.0
2.9
1
Bank Height Ratio
2.4
1
1.0
1.1
1.0
1
Max part size (mm) mobilized at bankfull
3.2
- -
40.2
1
Rosgen Classification
F4
C4
C4
Bankfull Discharge (cfs)
31
42
Sinuosity
1.03
1.20
1.20
Water Surface Slope (ft/ft)2
0.0077
0.0060
0.0064
Other
Table 8b. Baseline Stream Data Summary
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
PRE-EXISTING
CONDITIONS
ESIG
MONITORING BASELINE
k (MVO)
Parameter
UT1 Reach 2
Riffle Only
Min Max
n
Min Max
Min
Max
n
Bankfull Width (ft)
9.1
1
17.0
14.8
16.4
3
Floodprone Width (ft)
16.2
1
37.0
85.0
72.6
100.0
3
Bankfull Mean Depth
1.5
1
1.1
0.8
1.0
3
Bankfull Max Depth
2.2
1
1.3
1.6
1.5
1.8
3
Bankfull Cross Sectional Area (ft2)
14.1
1
18.4
12.0
15.2
3
Width/Depth Ratio
5.9
1
16.0
14.3
21.0
3
Entrenchment Ratio
1.8
1
2.2
5.0
4.7
6.1
3
Bank Height Ratio
2.4
1
1.0
1.1
1 0
3
Max part size (mm) mobilized at bankfull
3.3
- -
40.2
56.9
3
Rosgen Classification
G4
C4
C4
Bankfull Discharge (cfs)
52
51
Sinuosity
1.15
1.20
1.20
Water Surface Slope (ft/ft)2
0.0070
0.0070
0.0070
Other
Parameter
Oak Hill Reach 1
Riffle Only
Min Max
n
Min
Max
Min
Max
n
Bankfull Width (ft)
19.9
1
20.0
21.5
1
Floodprone Width (ft)
40.0
1
44.0
100.0
72.4
1
Bankfull Mean Depth
1.4
1
1.4
1.2
1
Bankfull Max Depth
1.7
1
1.7
2.1
2.2
1
Bankfull Cross Sectional Area (ft2)
27.5
1
28.4
25.3
1
Width/Depth Ratio
14.4
1
14.0
18.2
1
Entrenchment Ratio
2.0
1
2.2
5.0
3.4
1
Bank Height Ratio
2.4
1
1.0
1.1
1.0
1
Max part size (mm) mobilized at bankfull
22.6
- -
47.6
1
Rosgen Classification
B4c
C4
C4
Bankfull Discharge (cfs)
98
90
Sinuosity
1.30
1.20
1.20
Water Surface Slope (ft/ft)2
0.0070
0.0040
0.0046
Other
Table 8c. Baseline Stream Data Summary
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
PRE-EXISTING
CONDITIONS
ESIG
MONITORING BASELINE
k (MVO)
Parameter
Oak Hill Reach 2
Riffle Only
Min Max
n
Min Max
Min Max
n
Bankfull Width (ft)
14.6
1
23.0
21.2
1
Floodprone Width (ft)
79
1
51
115
83.8
1
Bankfull Mean Depth
1.9
1
1.5
1.2
1
Bankfull Max Depth
3
1
1.7
2.3
2.1
1
Bankfull Cross Sectional Area (ft2)
28.1
1
33.4
25.5
1
Width/Depth Ratio
7.6
1
16.0
17.7
1
Entrenchment Ratio
5.4
1
2.2
5.0
4.0
1
Bank Height Ratio
2.0
1
1.0
1.1
1.0
1
Max part size (mm) mobilized at bankfull
2.5
- -
58.6
1
Rosgen Classification
G4c
C4
C4
Bankfull Discharge (cfs)
94
88
Sinuosity
1.65
1.20
1.20
Water Surface Slope (ft/ft)2
0.0057
0.0055
0.0051
Other
Parameter
Oak Hill Reach 3
Riffle Only
Min Max
n
Min
Max
Min Max
n
Bankfull Width (ft)
19.3
1
25.0
22.3
1
Floodprone Width (ft)
49.8
1
55
125
102.5
1
Bankfull Mean Depth
1.5
1
1.8
1.4
1
Bankfull Max Depth
2.2
1
2.1
2.6
2.6
1
Bankfull Cross Sectional Area (ft2)
29.1
1
43.9
31.5
1
Width/Depth Ratio
12.9
1
14.0
15.8
1
Entrenchment Ratio
2.6
1
2.2
5.0
4.6
1
Bank Height Ratio
2.6
1
1.0
1.1
1.0
1
Max part size (mm) mobilized at bankfull
8.0
- -
56.4
1
Rosgen Classification
C4
C4
C4
Bankfull Discharge (cfs)
95
149
Sinuosity
1.15
1.20
1.20
Water Surface Slope (ft/ft)2
0.0052
0.0055
0.0060
Other
Table 8d. Baseline Stream Data Summary
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
PRE-EXISTING
CONDITIONS
ESIG
MONITORING BASELINE
k (MVO)
Parameter
Oak Hill Reach 4
Riffle Only
Min I Max
n
Min I Max
Min I Max
n
Bankfull Width (ft)
19.8
1
25.0
26.0
1
Floodprone Width (ft)
90.7
1
55
125
94.3
1
Bankfull Mean Depth
1.8
1
1.8
1.4
1
Bankfull Max Depth
2.3
1
2.1
2.6
2.7
1
Bankfull Cross Sectional Area (ft2)
35.1
1
43.9
36.1
1
Width/Depth Ratio
11.2
1
14.0
18.8
1
Entrenchment Ratio
4.6
1
2.2
5.0
3.6
1
Bank Height Ratio
2.3
1
1.0
1.1
1.0
1
Max part size (mm) mobilized at bankfull
1.7
- -
67.2
1
Rosgen Classification
E5
C4
C4
Bankfull Discharge (cfs)
122
156
---
Sinuosity
1.16
1.20
1.20
Water Surface Slope (ft/ft)2
0.0050
0.0070
0.0054
Other
Table 9. Cross -Section Morphology Monitoring Summary
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
UT1A
-
Cross -Section 1 (Pool)
Cross -Section 2 (R ffle)
Cross -Section 3 (R ffle)
Cross -Section 4 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MVO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
Bankfull Elevation (ft) - Based on AB-Bankfulll Area
811.26
810.59
810.05
807.79
Bank Height Ratio - Based on AB Bankfull 1 Area
1.0
1.0
1.0
1.0
Thalweg Elevation
809.87
810.08
808.20
806.22
LTOB2 Elevation
811.26
810.59
810.05
807.79
LTOB2 Max Depth (ft)
1.4
0.5
1.8
1.6
LTOB2 Cross Sectional Area (ft)
4.0
1.2
22.0
12.8
UT1 Reach
.
Cross -Section 5 (Pool)
Cross -Section 6 (Pool)
Cross -Section 7 (R ffle)
Cross -Section 8 (R ffle)
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
Bankfull Elevation (ft) - Based on AB-Bankfulll Area
807.22
802.40
802.44
797.65
Bank Height Ratio - Based on AB Bankfulll Area
1.0
1.0
1.0
1.0
Thalweg Elevation
804.21
798.88
800.62
796.18
LTOB2 Elevation
807.22
802.40
802.44
797.65
LTOB2 Max Depth (ft)
3.0
3.5
1.8
1.5
LTOB2 Cross Sectional Area ft2
26.1
43.0
15.2
12.0
ak Hill
Reach
VI
Cross
-Section 9 (R ffle)
Cross -Section 10 (Riffle)
Cross -Section 11 (Pool)
Cross -Section 12 (Pool)
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
Bankfull Elevation (ft) - Based on AB-Bankfull 1 Area
799.74
798.06
797.76
794.01
Bank Height Ratio - Based on AB Bankfulll Area
1.0
1.0
1.0
1.0
Thalweg Elevation
797.55
795.97
793.40
789.76
LTOB2 Elevation
799.74
798.06
797.76
794.01
LTOB2 Max Depth (ft)
2.2
2.1
4.4
4.2
LTOB2 Cross Sectional Area (ft2)
25.3
25.5
64.9
73.1
Cross -Section 13 (Riffle)
Cross -Section 14 (Riffle)
MYO
MY1
MY2
MY3
MY5
MY7
MYO
MY1
MY2
MY3
MY5
MY7
Bankfull Elevation (ft) - Based on AB-Bankfulll Area
794.36
790.90
Bank Height Ratio - Based on AB Bankfull 1 Area
1.0
1.0
Thalweg Elevation
791.77
788.21
LTOB2 Elevation
794.36
790.90
LTOB2 Max Depth (ft)
2.6
2.7
LTOB2 Cross Sectional Area (ft2)
31.5
36.1
'Bank Height Ratio (BHR) takes the As -built bankful area as the basis for adjusting each subsequent years bankfull elevation.
kLTOB Area and Max depth - These are based on the LTOB elevation for each years survey (The same elevation used for th LTOB in the BHR calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation)will
be recroded and tracked above as LTOB max depth.
Appendix D
Project Timeline and Contact Information
Table 10. Project Activity and Reporting History
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2022
Activity or Deliverable
Data CoIlecl Complete
N/A
Task Completion or Deliverable
Submission
April 2019
Project Instituted
Mitigation Plan Approved
July 2019 - March 2021
March 2021
Construction (Grading) Completed
September 2021-January 2022
January 2022
Planting Completed
February 2022
February 2022
As -Built Survey Completed
January - March 2022
April 2022
Baseline Monitoring Document (Year 0)
Stream Survey
February - March 2022
May 2022
Vegetation Survey
February 2022
Year 1 Monitoring
Stream Survey
2022
December 2022
Vegetation Survey
2022
Year 2 Monitoring
Stream Survey
2023
December 2023
Vegetation Survey
2023
Year 3 Monitoring
Stream Survey
2024
December 2024
Vegetation Survey
2024
Year 4 Monitoring
Year 5 Monitoring
Stream Survey
2026
December 2026
Vegetation Survey
7mF
Year 6 Monitoring
Year 7 Monitoring
Stream Survey
December 2028
Vegetation Survey
Table 11. Project Contact Table
Oak Hill Dairy Mitigation Site
DMS Project No. 100120
Monitoring Year 0 - 2021
Designer
Jake McLean, PE, CFM
Wildlands Engineering, Inc.
167-B Haywood Rd
Asheville, NC 28806
828.774.5547
Construction Contractor
Wildlands Construction, Inc.
312 W. Millbrook Rd, Suite 225
Raleigh, NC 27609
Monitoring Performers
Monitoring, POC
Wildlands Engineering, Inc.
Kristi Suggs
704.332.7754
Appendix E
Record Drawings and Sealed As -Built Survey
Oak Hill Dairy Mitigation Site Record Drawing
Gaston County, North Carolina
for
NCDEQ
Division of Mitigation Services
Vicinity Map
Not to Scale
STREAM ORIGINS
NAME
NORTHING
EASTING
OAK HILL CREEK
609299
1299430
UT1
610055
1297694
UT1A
610499
1297711
UT1B
609941
1297705
UT2
610266
1299747
UT3
610616
1299891
PRELIMINARY PLANS
ISSUED May 12, 2022
Sheet Index
Title Sheet
Project Overview
General Notes and Symbols
Stream Plan and Profile
Oak Hill Creek
UT1
UT1A
UT1B
UT2
UT3
Wetland Grading
Planting Sheets
Fencing and Gate Plan
Project Directory
0.1
0.2
0.3
2.1-2.4
3.1-3.5
4.1
Engineering:
Wildlands Engineering, Inc
License No. F-0831
167-B Haywood Rd
Asheville, NC 28806
Jake Mclean, PE, CFM
828-774-5547
Surveying:
Kee Mapping and Surveying, PA
88 Central Avenue
Asheville, NC 28801
Phillip B. Kee, PLS
828-645-8275
Owner:
NCDEQ-NC DMS
1652 Mail Service Center
Raleigh, NC 27699
Mathew Reid
828-231-7912
NCDEQ Contract No. 7867
DMS ID No. 100120
NC DWR#20190863
Catawba River Basin 03050102
cn
a)
•
H
C)
z
7
\
STA: 200+05
UT1
BEGIN REACH 1 - RESTORATION
r—
/
/
STA: 0+00
UT1B
BEGIN ENHANCEMENT
E�11
/
SC. a�
pe. ai
/
STA: 300+13
UT1A
BEGIN RESTORATION
\I
\
\\\ pl
zzo
•
EXISTING DAIRY
WASTE LAGOON
EXISTING
STRUCTURES
(TYP)
STA: 202+23
UT1
END REACH 1 - RESTORATION
BEGIN REACH 2 - RESTORATION
STA:304+91
UT1A
CONFLUENCE
SHEET 1.8
STA: 3+10
UT1B
END ENHANCEMENT 11
EROoN RUST; EP -1 9RPCI S\X)
OP�`)`E PW26-9-pG, 8o3 C-c
\pORS�ON OF OB.h9
-T /
/\
ERON RUSS EEP ER SR
GP �ERON69� T-3Cj ONE)
GP p\ P.G 803 QPG �603 j
08Og.oF SRPGj �GH )
f°\CI p8
HEFT 1.9
STA:123+96
OAK HILL CREEK
ROBERT ROAD- o.. ENDWORK
_
oc� —aw — oar— —aw co —N cil
30 �..3Ei+�3i� �r - o —
2 oI STA:123+73 r�� 11
OAK HILL CREEK
END REACH 4 - RESTORATION
STA: 119+00
OAK HILL CREEK
END REACH 3 - RESTORATION
BEGIN REACH 4 - RESTORATION
STA: 302+85
UT3
CONFLUENCE
STA: 110+23
OAK HILL CREEK
END REACH 2 - RESTORATION
BEGIN REACH 3 - RESTORATION
STA: 221+11
UT1
END WORK REACH 2 - RESTORATION
mG
°m
°m
STA: 105+53
OAK HILL CREEK
END REACH 1- ENHANCEMENT /
BEGIN REACH 2 - RESTORATION
°m
STA: 100+10
OAK HILL CREEK
BEGIN REACH 1 - ENHANCEMENT I
Ci
Ci
STA: 300+31
UT3
NO CREDIT
STA: 2+66
U T2
NO CREDIT
0' 100' 200'
300'
(HORIZONTAL)
Project Overview
z
Oak Hill Creek
Asbuilt Features Asbuilt Structures
Pre -Construction Features Design Features
R/W
OHE OHE
OUE OUE
X X X
OW OW
SS SS
SSE SSE SSE
Pre -Construction Property Line
Pre -Construction NCDOT Right -of -Way
Pre -Construction Top of Bank
Pre -Construction Overhead Utility Line
Pre -Construction Overhead Utility Easement
Pre -Construction Fence
Pre -Construction Overhead Utility
Pre -Construction Sanitary Sewer
Pre -Construction Sanitary Sewer Right of Way
Pre -Construction Tree Line
NNNNNNNNNNNNNNN1 Pre -Construction Storm Pipe
AIL AIL AIL AIL At
10000000
1 n n n n n n n
Pre -Construction Wetland
Pre -Construction Road
Pre -Construction Rip Rap
Pre -Construction Building
Pre -Construction Utility Pole
PROJECT NOTES:
Topographic survey was completed by Kee Mapping and Surveying, PA in July 2019.
Parcel boundary survey completed by Kee Mapping and Surveying, PA in October 2019.
Conservation easement survey completed by Kee Mapping and Surveying, PA in October 2020.
Topographic data supplemented with Lidar data from Feb - April 2017.
Riffle selection varied based on available materials at the Engineers' discretion. Field
coordination will be required.
Project Notes:
1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED.
10+00
MEM MEM
— Design Alignment
— Design Bankfull
— Design Major Contour (5' Interval)
Design Minor Contour
Design Permanent Culvert
Design Woven Wire Fence
Design Barbed Wire Fence
Design 8' Double Gate
Design 12' Single Gate
Design Structures
0,41m,Air4404�Y-;!1
11111
]1111111111
G
' V V V
a62
Q,
Design Various Constructed Riffles
Design Cascading Riffle/Rock Cascade
Design Brush Toe
Design Vegetated Soil Lift
Design Bank Roughening
Design Floodplain Roughening
Design BMP
Design Log Sill
Design Cover Log
Design LogJ-hook
Design Log Vane
Design Rock Sill
Design Boulder) -hook with Sill
Asbuilt Alignment
— Asbuilt Bankfull
CE CE Recorded CE
CE IX CE IX Recorded Internal Crossing
LOD Asbuilt LOD
(100) Asbuilt Major Contour (5' Interval)
Asbuilt Minor Contour
Asbuilt Permanent Culvert
X
X X Asbuilt Fence
-n
Asbuilt 8' Double Gate
Asbuilt 12' Single Gate
Asbuilt Permanent Ford Crossing
Asbuilt Stream Crossing - Culvert
IJIy,IJ1y,Ial
Va.0.
]I 1I1I1I1I1
] 1 1 1 1 1
V V V V
77 77 77
a a4
+ +
+ + +
0
0
0
QO
Q
NCO
PP#
VP#n
GWG #+
co #�
xs #
> —0
Asbuilt Various Constructed Riffles
Asbuilt Cascading Riffle/Rock Cascade
Asbuilt Brush Toe
Asbuilt Vegetated Soil Lift
Asbuilt BMP
Asbuilt Gravel Farm Road
Asbuilt Soil Farm Road
Asbuilt Bank Roughening
Asbuilt Boulder Toe
Asbuilt Riprap
Asbuilt Bridge Crossing
Asbuilt Log Sill
Asbuilt Cover Log
Asbuilt Log 1-hook
Asbuilt Rock Sill
Asbuilt Rock 1-hook with Sill
Asbuilt Log 1-Hook with Sill
Photo Point
Permanent Vegetation Plot
Ba rotrol I
Ground Water Gage
Crest Gage
Monitoring Cross Section
General Notes and Symbols
>
z
DESIGN
GRADE
N
NZ—
__
N./�
\
z/
i
\
%
\
\�\
/- 7
N.
��
\
/
\
\�
/�
i
z
ASBUILT
GRADE
STA: 100+10
OAK HILL CREEK
BEGIN REACH 1- ENHANCEMENT I
00
byys
CE
co
0
V7
b!J
•
Ct
Q
CJ
te�a)
I--1
•
•
•
rzt
•
•
121
•
Ct
O
GE
STA: 100+31
INCREASED BANK GRADING
TO STABILIZE BEGINNING
OF STREAM ENHANCEMENT
CE
HH
CE
QO�
VHHS
GE
PP15
CE
VI -US — vHHS
CE
GE
STA: 102+17
BANK ROUGH ADDED
TO INCREASE
FLOODPLAIN ROUGHNESS
STA: 102+21
LOG SILL ADDED IN
PLACE OF ROCK SILL
DUE TO EXCESS LOGS
a.1
VHS
GE
001
OAK HILL CREEK
VHHS �— VHS boys
CE
CE
GE
CE
CE
STA: 102+98
-LOG SILL ADDED FOR
EXTRA GRADE CONTROL
CE
CE
/yJ
/
vHHS
S _ VHH£
STA: 104+58
LOG VANE REPLACED_
BY LOG 1-HOOK FOR
ADDITIONAL GRADE CONTROL
CE
cE
cE
CE
Sheet Index
1.5
cn
1j8119u10l
12 1.4�(44
31.14
1.13
1.2
1.1
1.6
1.5
i
/
805
800
790
0'
2'
4'
ti
6'
805
0'
(VERTICAL)
20'
40'
60'
(HORIZONTAL)
2
DESIGN
GRADE
800
�
\
/
k
,
-
,
_____
,
\
/
, ,
,,,
790
, _
_ _.
,
ASBUILT
GRADE
104+00
yl
104+50
CE/X
k.00
CE,x
X X O t \ CE
i
1-/i
105+00
00
vcio
GWG5
4
i
SSE /`
`SS\SSA
!\ SSE ��_-
SS SSE
�� \SS\ \SSE
X�'30 SS
z- l \X,30 \ S.
Q/i�pP16 \X/3
105+50
STA: 105+53
OAK HILL CREEK_
END REACH 1- ENHANCEMENT I
BEGIN REACH 2 - RESTORATION
a
VHS
daps
dHjs
STA: 104+58
LOG VANE REPLACED
BY LOG 1-HOOK FOR
ADDITIONAL GRADE CONTROL
SS
\ SS
'30
106+00
pp18
STA: 105+53
INTERNAL EASEMENT CROSSING
-
`cE jR
STA:105+39
RIFFLE EXTENDED ACROSS cF
FORD CROSSING FOR
-
'ADDITIOONNALSTABILITY
_ Poi
ss �boi;
\yy
STA: 104+99
INTERNAL EASEMENT CROSSING \
STA: 104+91
LOG VANE NOT BUILT
TO AVOID DISTURBANCE
TO STABLE BANK AND TOE
SF
sF o
\ \ Ooi
SrF TS
\ssF \ \
106+50
107+00
107+00
STA: 107+30
LOG SILL NOT BUILT
-DUE TO SUFFICIENT
GRADE CONTROL
PROVIDED BY RIFFLE
aa,
007
VHdS
107+50
�. NitAS
/IV
imsmiam, Ix*
111111 `L
momevenom\\
'mammy *oat
MMM
®ENV
108+00
108+50
5 I�
i.12 1.4 ���1.5
1.7 hal
11,c.1.8�� 19�!/I1711 '.3114IFOOP"° UTl
1.13
1.2
1.1
1.6
V)
•
ct
I--1
O
CJ
a)
a)
I--1
•
•
0
•
rzt
•
•
I--1
•
ct
O
N
1�
E
11
11
1
1
CE CE
CE
STA: 110+23
OAK HILL CREEK
END REACH 2 - RESTORATION
BEGIN REACH 3 - RESTORATION
STA: 221+11
UT1
END REACH 2 - RESTORATION
STA: 110+23
BRUSH TOE ADDED
TO PROTECT BANK
AT CONFLUENCE
STA: 110+69
_LOG 1-HOOK ADDED
IN PLACE OF ROCK SILL
FOR EXTRA STABILITY
STA: 112+63
GEOLIFT NOT BUILT
DUE TO SUFFICIENT
BANK STABILITY
GWG8
LOD
Q
STA: 112+66
GEOLIFT NOT BUILT
DUE TO SUFFICIENT
/BAN K STABILITY
igigmerw, ma
mignatUltamtum
vim (4.\moin
X v
v
Sheet Index
1.5
o
����
1.12 1.4 'l,�
1.8 1.11
B��, 1.9 1.10 , 1.14
tiN^►I�� 1.3
UT]
1.13
1.1
cn
Qz
1.6
1.5
wI
STA: 112+66
GEOLIFT NOT BUILT
DUE TO SUFFICIENT
BANK STABILITY
D34
STA: 116+56
LOG SILL ADDED IN
PLACE OF LOG 1-HOOK
BEND SUFFICIENTLY
PROTECTED BY BRUSH TOE'
STA: 115+24
OAK HILL CREEK
STA: 4+47
UT2 CONFLUENCEA323
STA: 115+29
LOG 1-HOOK ADDED
IN PLACE OF ROCK SILL
FOR ADDED POOL STABILITY
V7
•
CJ
a)
•
•
•
•
•
•
O
GWG9
IIf
Sheet Index
1.12 O 1.4
a I �,
1.7 ` 9 1.8 1.1 1
N
1.9 1.10 `!/I' .3�1.14
1 UT1
1.13
STA: 119+00
\-oo OAK HILL CREEK
*�oo _; RESTORATION
BEGIN
REACH 4-RESTORATION
/ Voo CONFLUENCE
STA:117+84
LOG 1-HOOK ADDED
IN PLACE OF LOG SILL
FOR ADDED STABILITY
STA: 120+34
LOG SILL ADDED IN
PLACE OF ROCK SILL
DUE TO PREFERENCE FOR
USE OF ONSITE MATERIAL
STA: 118+18
BANK ROUGHENING
EXTENDED TO IMPROVE
CONFLUENCE STABILITY
STA: 120+86
-BANK ROUGHENING
ADDED FOR STABILITY
STA: 122+57
STABILIZED OUTLET
CHANNEL. ADDED
FOR ROADSIDE CULVERT>0
800
795
790
785
780
POOL FILLED WITH SEDIMENT
AS VEGETATION STABILIZES FLOODPLAIN
POOL SHOULD CLEAR
ASBUILT
GRADE
s
y
_ \
DESIGN
GRADE
\
STA:
123+73
END OAK J
HILL CREEK
121+80
122+00
122+50
123+00
123+50
800
795
790
785
780
124+00
EXISTING BOX CULVERT
13' X 8'
INVERT ELEVATION IN:786.09'
0' 2' 4' 6'
(VERTICAL)
0' 20' 40' 60'
(HORIZONTAL)
of
00
STA: 122+71
LOG 1-HOOK NOT BUILT DUE
TO EXTENSION OF GEOLIFT
i
i v
' —
dH0s c\_
a \
123+ppre#1011 le
..44111/41t-40041,110-' .7.X.--0'411::::::111ta
STA: 122+57 c _ -_ STA: 123+73
STABILIZED OUTLET "-0o-� OAK HILL CREEK
j0� moo' END REACH 4 - RESTORATION
CHANNEL. ADDED �O
FOR ROADSIDE CULVERT �� / \
PP2% ,cps �f �7�� STA:123+96
OAK HILL CREEK
END WORK
Sheet Index
1.6
1.5
1.12 1.44��lw 1.5
Y �,,
-•11
1.7 `�' 1.8 1.11
1;im 1.9 1.10 J�� ' .3 1.14
UT1
1.13 - iil
1.2
1.1
Oak Hill Creek
Stream Plan and Profiles
T
z
EXISTING ELLIPTICAL PIPE
10.3' X 6.8'
INVERT ELEVATION OUT: 809.05'
/
ASBUILT
GRADE
F
WITH INCREASED
SHALLOWER
LLED
POOL
WITH SEDIMENT
FLOODPLAIN
MAY NORMALIZE
THAN
DESIGN
AT
POOL
RELIEF
LEVEL
\__,
\
li
\
/
\-----/
\
/
\
/
_
DESIGN
GRADE
- STA: 200+05
UT1 ��� BANK AND ADEQUATE GRADE
BEGIN REACH 1 - 11;5•7C ATION CONTROL FROM RIFFLE
STA: 202+23
UT1
END REACH 1 - RESTORATION
BEGIN REACH 2 - RESTORATION
-TO TREE SAVES ON RIGHT CONFLUENCE
STA:304+91
200+88 UT1A
LOG SILL NOT BUILT DUE
STA: 200+21
RIPRAP ADDED TO
STABILIZE BANK
� 7 VP2
0
STA: 200+37 9 0
ROCK SILL NOT INSTALLED p0-\
DUE TO ADEQUATE STABILITY
p01
001
STA: 201+63
BANK ROUGHENING ADDED
TO ROUGHEN FLOODPLAIN
pp5 /
6/
STA:202+26
LOG 1-HOOK BUILT IN
PLACE OF ROCK SILL ,(
TO INCREASE
CONFLUENCE STABILITY
UT1B
O
cc
cE
cE
01
BMP 1
D-
VP3
CE CI
x�x_
1.12
�-3
1.8
T1' UT1
Sheet Index
1.2
1.1
1
14
1.6
1.15
a)
�- RIPRAP ADDED
FOR STABILITY
0I
N BMP1
0 X X X X \ ]X� J X30 30
(VT
LOD
30
Q-_ `_
117.1ali
vier wV ter
�Vv w o IF
D L
i0
L)
� y + " 30 --Yr
+— 3J =._yL" X]y �' 3J �• �J ��OU __-�030 �� LOD LOD
•/ p - -iii't04- N O�
STA: 206+80
q If BANK ROUGHENING INSTALLED FOR
uV T. L ADDITIONAL BANK STABILITY
CC ------ --STA:205+04
BANK ROUGHENING INSTALLED FOR
ADDITIONAL BANK STABILITY
p0�
001 ---p01
00"1 — 001
CE eE eE eE —X
X
PP8
STA: 205+93
BANK ROUGHENING INSTALLED FOR
ADDITIONAL BANK STABILITY
p01
001 — 001
001
001-
-STA:207+42
LOG SILL NOT INSTALLED
DUE TO ADEQUATE
GRADE CONTROL
001
LL D LOD
U
STA: 208+49
LOG SILL BUILT IN PLACE 1,
OF ROCK SILL DUE TO
PREFERENCE FOR USE
OF ONSITE MATERIAL
00-1
01 001
001 —
CF A CF CFX (''� �'GF ----77 CE CF CF C --+cam E �Q CE CE —
Sheet Index
02' 4'
6'
X \ Shared \ Projects \ 005-02182 Oak Phil Daffy \ M onttormg \ Basehne M onttormg - 2022 \ Plans \ AB-02182-Profiles-Tnks dwg
810
805
800
795
—
ASBUILT GRADE
DE
SIGN G
RADE
208+50
209+00
209+50
210+00
210+50
211+00
211+50
212+00
212+50
810
805
800
795
213+00
0'
20'
(VERTICAL)
40'
60'
(HORIZONTAL)
3x lb—c)kx30
.....
—11
' 007
X- 30 X 30 >4t3
LOD
LOD v.OD
STA: 208+49
LOG SILL BUILT IN PLACE 1,
OF ROCK SILL DUE TO
PREFERENCE FOR USE
OF ONSITE MATERIAL
001
nol
GUI
LOD
• LOD
--------
STA' 209+43
VEGETATED SOIL LIFT
NOT BUILT DUE TO
ADEQUATE BANK STABILITY
CE CF CE —7 CE 77— CE
001 — 001
CE CE CE
X X X X CE X X
007
06\
CE
CE
X X
40D
STA: 212+51
ROCK SILL NOT INSTALLED DUE'
TO ADEQUATE GRADE CONTROL
STA: 210+63
LOG SILL BUILT AS TAIL
OF RIFFLE IN LOG STEP
RIFFLE SEQUENCE
- 0(37
(9"
°' ----
CE
X
CE
X
X
CE
X
CE
X
CE
X
CE
X
CE
cE
Ic
Irn
n#-Q2D1c,4=kiLa
115-
CE
A
Iz
CE
I
2
\IP5
D3A
G21
Sheet Index
cl)
bz)
rt
-ci
X
o
u
a)
a)
cf▪ ) 0
.0
rt
* RI cn
0
z
Project Engmeer
X
>
�CE
col
VP6
VEG
STA: 214+38
ROCK SILL NOT INSTALLED
DUE TO ADEQUATE STABILITY
r,F
col
°E
CE
OOl
°E
001
CE
BRIDGE REPLACED
CULVERT CROSSING
STA: 217+18
INTERNAL
EASEMENT
CROSSING
1.12
Sheet Index
c�-
1.8
T1' UT1
.3
1.2
1.1
1.15
14
1;
STA:217+03
BRIDGE REPLACED I
=CULVERT CROSSING FOR
LAND OWNER ACCESS 4
STA: 216+88
INTERNAL EASEMENT CROSSING
oO>
'
G WG3 00>
CE
O
LC)I
STA::216 88 3J
INTERNAL EASEMENT CROSSING '1 LLI
STA:217+03
BRIDGE REPLACED
ULVERT CROSSING FORj,.
LAND OWNER ACCESS
41(
STA: 219+02
LOG SILL INSTALLED INSTEAD
OF ROCK SILL AS CONTINUATION
OF LOG DROP RIFFLE
STA: 217+18
INTERNAL EASEMENT
CROSSING 93A
STA: 219+99
LOG SILL NOT INSTALLED
DUE TO ADEQUATE GRADE CONTROL
STA: 220+78
ROCK SILL NOT INSTALLED
DUE TO ADEQUATE STABILITY
STA: 221+11
UT1
END REACH 2 - RESTORATION
STA: 110+23
CONFLUENCE WITH OAK HILL CREEK
STA: 301+00
STA: 3 2+20
PROFILE ADJUSTED TO ACCOMMODATE STRUCTURE
DESIGN CHANGES FOR STREAM STABILITY
ASBUILT GRADE
DESIGN GRA
810 802
0' 2'
0' 20'
304+90
IN
STA: 302+60
PROFILE
DESIGN
ADJUSTED
CHANGES
TO
ACCOMMODATE
FOR
STREAM
STABILITY
STRUCTURE
STA:
ASBUILT
GRADE
1
---)
I_J
1
-.
1
---,
I`
`
I
I -
II
I -I
I I`
J__,
I
1
I
I-\`
1
—
)
DESIGN
GRADE
I
I_ -
I--�
-I
300+00 300+50 301+00 301+50 302+00 302+50 302+50
�oD
STA: 300+13
UT1A
BEGIN RESTORATION
Lob --------
STA: 300+63
LOG SILL BUILT IN PLACE OF
ROCK SILL FOR DIVERSITY
301+00 , PP
STA: 301+52
RIPRAP ADDED TO
STABILIZE BANK
STA:3000+96
_--------- "� LOG SILL INSTALLED INSTEAD
(OF A ROCK SILL FOR DIVERSITY
STA: 302+79
INSTALLED (1) LONG RIFFLE AND
(1) LOG SILL INSTEAD OF (2) RIFFLES AND
(2) LOG SILLS FOR STREAM STABILITY
VP1
STA: 301+45
LOG SILL INSTALLED INSTEAD
OF ROCK SILL FOR DIVERSITY._---_ -_-
STA:301+32
RIFFLE AND ROCK SILL NOT
BUILT FOR POOL EXPANSION
STA: 301+06
RIFFLE AND ROCK SILL NOT BUILT
FOR POOL EXPANSION
U>\ o yam— CE CE —
O
/
303+00
303+50
304+00
X ,f�3D �9tx 30X—
O D
STA: 303+54- i - - --_. / l--- ---------
-"INSTALLED (1) LONG RIFFLE AND (1) LOG SILL --_------ �:`_, STA:303+83 -
INSTEAD OF (2) RIFFLES, (1) LOG SILL,- __ sQ-' INSTALLED (1) LONG RIFFLE AND (1) ROCK SILL
AND (1) ROCK SILL FOR STREAM STABILITY INSTEAD OF (2) RIFFLES, (1) ROCK SILL,
still_ __=AND (1) LOG SILL FOR STREAM STABILITYY
U815 ----- STA:304+59 "
x 'L
,.
' �a�i,�0 s— /Sheet Index
i u�- i Cti , +y't�r_..=fir FORL-- -
� F R.O.CK SILL
1 -- ��' ..',`. ADDED DIVERSITY SITY
Oft
00l egg dfi. �4 3, +5{
304+50
ERTICAL)
RIZONTAL)
305+00
STA: 302+05
INSTALLED (1) LONG RIFFLE WITH (1) LOG SILL
INSTEAD OF (2) RIFFLES WITH (1) LOG SILL
AND (1) ROCK SILL FOR ADDED STREAM STABILITY
STA: 303+16
_INSTALLED (1) LONG RIFFLE AND (1) LOG SILL
INSTEAD OF (2) RIFFLES AND
(2) ROCK SILLS FOR ADDED STREAM STABILITY
STA: 304+19
CIE —RIFFLE AND ROCK SILL NOT BUILT
FOR POOL EXPANSION
STA: 304+91
UT1A
END RESTORATION
STA:202+23
UT1 j 0
CONFLUENCE
001
PP4
6
0
CE CE
X X x
a0,
CE
STA: 00+00
UT1B
BEGIN - ENHANCEMENT II
03f`
oo,
PP5
A1k00
— CE CE /+
x X
\\
\ Go^ 2+00
UT1B
001
v
y-- v v
Pp1.1 �V 7
STA: 3+10
UT1B
END ENHANCEMENT II
810
Vp,
0C
c.
x-
0' 20' 40' 60'
(HORIZONTAL)
Sheet Index
z
INVERT OUT:792 51'
POOLS
FILLED
WITH SEDIMENT.
AS VEGETATION BECOMES ESTABLISHED IN
FLOODPLAIN, POOLS SHOULD ADJUST TO
\
ASBUILT
GRADE
LONG-TERM
STABLE
LEVELS
\_
_
,_ /
\ -
_/
y,
DESIGN
GRADE
STA: 2+79
SF, BOULDER TOE INSTALLED INSTEAD OF
BRUSH TOE FOR ADDITIONAL BANK STABILITY
STA: 2+33
RIPRAP ADDED TO STABILIZE
INITIAL DRAINAGE PIPE
SS.
STA: 2+66
BEGIN UT2 - NO CREDIT
36" DIAMETER HDPE
INVERT IN:792.63'
INVERT OUT:792.51'
VP10
STA: 4+89
END UT2
STA: 115+24
OAK HILL CREEK
CONFLUENCE
rt
0
ct
u
0
z
0
u
0
ct
(VERTICAL)
0' 20' 40' 60'
(HORIZONTAL)
Sheet Index
STA: 3+25
BRUSH TOE NOT INSTALLED DUE
TO ADEQUATE BANK STABILITY
- PROPOSED 36" CMP
INVERT IN:790.97'
INVERT
OUT:790.45'
DESIGN
GRADE
POOL
FILLED
WITH
SEDIMENT.
AS VEGETATION STABILIZES THE FLOODPLAIN
POOLS SHOULD CLEAR
/
z,_
_ _
_ _
_ _
_ _
\_i
N.
\
/
ASBUILT
GRADE
N
N.
J,t, sJ, -- _,P, N.
F\ \ \\ \
<<F sJ, J,t� \
\ \ �\
J, <<, J,s
`rF
\JfFv \
STA: 300+50
RIPRAP ADDED TO STABILIZE
CULVERT INLET
STA: 300+85
�0 4
4C
J,t<<, -J\� O
Xo\ I \ STA: 300+56• /a \\ 0T�
INVERT IN:790.97' \ \
'STA:300+83
RIPRAP ADDED TO STABILIZE
CULVERT OUTLET
J` \ \
c\ ss F\ \\ \\
STA:300+31 `P \ `rJ<<, \\ Q\\
\ \
BEGIN UT3 \ sJ, \\\ \\\
NO CREDIT
TIE TO EXISTING GRADE J` \ J` \a \
`JF\ JF \ \
ss \ \ \
J \ \
J�, \ \
\ \
\ \
1 \ oo \
STA: 302+85
END UT3
STA: 119+00
OAK HILL CREEK
CONFLUENCE
STA: 302+18
-BRUSH TOE NOT INSTALLED
DUE TO ADEQUATE BANK STABILITY
\ �o
o�
<00
Sheet Index
1.1.5
1.3. P 1.1.4��9
Y 4
1.2.1 9 1.2.2 1.2.5
��, 1.2.3 1.2.4 ,��' 1.5.1
t}t1 UT1 - �'•/
1.4.1
1.1.2
V)
b!J
•
ra
I--1
CJ
a)
a)
•
•
rzt
•
•
I --I
•
ra
O
CO
H
Cl�
1.6
1.6.1
EAKER /
WETLAND RE-ESTABLISHMENT 11-6541
.
PROPOSED AT A 1:1 CREDIT RATIO 4887 PG2200
////,
�1 /
jL / WETLAND REHABILITATION
PROPOSED AT A 1:1 CREDIT RATIO �j \ I
4� /
/ -_____I
+ + + + + WETLAND REHABILITATION
+++++ + + + + + PROPOSED AT A 1.5:1 CREDIT RATIO //�/ /
Lt _J
WETLAND CREATION
/
PROPOSED AT A 3:1 CREDIT RATIO
\
\\\
\
I RUSTY EAKER, JR\\\
V RUSTY EAKER, SR. \ \\ \ /
12691-70-3338
'14821 PG'. 58 (LOT36) \ \ \ / '
--------b /
MICHAELW W1ITESIDES&WIFE \1
LAUREN W WIITESIDES
PIN 2690.795818 \.
DB. 4786 PG'. 363
)
GABRIEL L. LAIL
PIN 2690-79-6528
DB. 4601 PG'. 1438
CE
it
CAMEFRON RUSTY EAKER, JR. &
CAMERON RUSTY EAKER, SR.
• • 0-79-8897
'.PORTION OF DB: 4949 PG: :. CT SIX
CAMERON RUSTY EAKER, JR. &
CAMERON RUSTY EAKER, SR.
PIN'. 2690-79-8664
DB. 4949 PG'. 1803 (TRACT FIVE)
CAMERON RUSTY EAKER, JR. &
CAMERON RUSTY EAKER, SR.
PIN'. 2690-79-9620
DB. 4949 PG 1803 (TRACT FOUR)
CE` CE �\ CE
CAMERON RUSTY EAKER, SR.
PIN 2690-89-1706
DB. 3262 PG'. 477
N ICOLE L. MASSEV
PIN 2690-09-05/
DB. 4782 PG'. 590
VA CAROLYN B. TURNEK(LIFE E)
VA� ROBERTF TURNER&
\ \ \ PIN 4999 PG 501
DB. 4999 PG'. 501
WETLAND 2
(SEE SHEET 2.3)
C
EXISTING POND
CAMERON RUSTY EAKER, JR. &
CAMERON RUSTY EAKER, SR.
PIN: 2691-90-0340
DB: 4949 PG: 1803 (TRACT ONE)
ALSO DB: 4949 PG: 1803
(TRACT #B OF TRACT EIGHT)
TERRY A. RIDDLEY & WIFE
LORIE B. RIDDLEY
PIN'. 2690-09-8022
DB. 4483 PG'. 1040
C/\
4
0
T RO o � q
*010
!/
// /
I
I
STA: 122+49
OUTLET CHANNEL STABILIZED FOR
ADDED SUPPORT TO ROADSIDE CULVERT
!/
//
/)
(./T3
HAROLD R. LINEBERGER & WIFE
V� PATSY E. LINEBERGER
' PIN 3601-00-0464
\ DB. 1898 PG'. 658
\ \ ESTATE FILE 14E//80
;Qa
`aJi
0
100'
200'
l
300'
(HORIZONTAL)
X \ Shared \ Proiects \ 005-02182 Oak H111 Daffy \ M omtormg \ Basehne M omtormg - 20
WETLAND RE-ESTABLISHMENT
PROPOSED AT A 1:1 CREDIT RATIO
- • • • WETLAND REHABILITATION
. „ . . PROPOSED AT A 1:1 CREDIT RATIO
+ WETLAND REHABILITATION
+ PROPOSED AT A 1.5:1 CREDIT RATIO
WETLAND CREATION
PROPOSED AT A 3:1 CREDIT RATIO
0.
2040' 60'
0.
(HORIZONTAL)
2' 4'
6'
(VERTICAL)
795
790
•
4
PRECONSTRUCTION GRADE
•
I
1
I
vv enana uracung ffoss-section 41
1
I
Section View VJ
I
I
I
I
..-----
_
I
I
I
TIED
TO EXISTING
WETLAND
CRED
TING
I
TIED TO EXISTING
GROUND
—
BOUNDARY(TYP)
CONSERVATION EASEMENT
BOUNDARY (TYP)
DESIGN GRADE
ASBUILT GRADE
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
795
790
3+70
795
790
788
WETLAND
BOUNDARY
Wetland Grading Cross -Section #2
CREDITING
(TYP)
Section View
I
CONSERVATION
BOUNDARY
EASEMENT
(TYP)
i\
/ I
I
ASBUILT
GRADE
1
I
N
\
I
I
I
I
I-
-I
1
1
I
I
I
I
I
\
/
/
I
1
1
I
I
DESIGN
GRADE
i•
I
I
, \
/
/
/
1
I
i
I
I---,.
I
°
/
---
I
1
1
PRECONSTRUCTION
GRADE
1
1
1
1+30
1+50
2+00
2+50
3+00
3+50
795
790
788
4+00
795
790
785
v v e Licu LLI _31. awl L6 ._,I u ssmie L um L It ..)
Section View
WETLAND
BOUNDARY
CREDITING
(
YP)
ASBUILT
GRADE
I
I
1
I
I
I
I
I
I
I
I
I
I
/
I
I
—
—
— — —
— — —
_
I
_ _
I
\
I—
I
Lu
I
I
PRECONSTRUCTION
GRADE
1
I
I
\
\
I
I
I
I
I
I
I
I
\
I
Lu
I
--, °°.----
DESIGN
GRADE
CONSERVATION
BOUNDARY
EASEMENT
(TYP)
0+50
1+00
1+50
2+00
2+50
3+00
795
790
785
3+30
STA: 122+49
-OUTLET CHANNEL STABILIZED FOR
ADDED SUPPORT TO ROADSIDE CULVERT
i
o'
20' 40' 60'
0'
(HORIZONTAL)
2' 4'
6' 810
(VERTICAL)
WETLAND RE-ESTABLISHMENT
PROPOSED AT A 1:1 CREDIT RATIO
WETLAND REHABILITATION
PROPOSED AT A 1:1 CREDIT RATIO
I d
T -
+ + + I WETLAND REHABILITATION
PROPOSED AT A 1.5:1 CREDIT RATIO
WETLAND CREATION
I PROPOSED AT A 3:1 CREDIT RATIO
805
800
795
Wetland Grading Cross -Section #4
Section View
WETLAND
BOUNDARY
CREDITING
(TYP)
DESIGN
GRADE
1
U
ASBUILT
GRADE
1
1
1
u
1
1
1
1
1
1
1
1
1
u
1
1
1
1
/
1
1
1
1
1
—
1
—1
1
1
I
1
1
\
1
1
1
11:\
1
1
TIED
INTO
_ TIED INTO
EXISTING
1
EXISTING
GROUND
GROUND
CONSERVATION
EASEMENT
BOUNDARY (TYP)
0+00
0+50
1+00
1+50
810
805
800
810
805
800
795 797
2+00
Wetland Grading Cross -Section #5
Section View
WETLAND
BOUNDARY
CREDITING
(TYP)
DESIGN
GRADE
TIED INTO
EXISTING
GROUND
1
1
1
1
1
—
TIED INTO
EXISTING
GROUND
�
ASBUILT
GRADE
1
1
1
1
,
___
__
1
1
1
W
,
1
1
......\—
v
'
r
1
1
1
1
1
�
1
1
1
1
CONSERVATION
EASEMENT
BOUNDARY
(TYP)
0+00
0+50
1+00
1+50
2+00
810
805
800
797
2+30
cn
3
V—Jctl
� O
O
r ,
Cn 0
oz
U
0
��
73
0
N
N
ct
ft
•
z
Wetland Grading Cross -Section #6
Section View
805
Wetland Grading Cross -Section #7
Section View
805
805
800
795
TIED INTO
GROUNDLu
EXISTING
DESIGN
CREDITING
(TYP)
WETLAND
BOUNDARY
i
I
u
1
Lu
V
--
,
11
TIED
rGROUND
INTO
EXIST
NG
Lu
V
1
1
IL
1
1
1
\
/
J
}
DESIGN
GRADE
1
��
1
ASBUILT
GRADE
DESIGN
EASEMENT
CONSERVATION
BOUNDARY
(TYP)
0+00
0+50
1+00
1+50
805
800
800
795
795 794
1+88
0
CONSERVATION EASEMENT
BOUNDARY (TYP)
T ED INTO
EXISTING GROUND
0+00
20' 40' 60'
0
(HORIZONTAL)
2' 4'
6'
(VERTICAL)
0+50
TIED INTO
EXISTING GROUND
- ASBUILT GRADE
WETLAND CRED TING
BOUNDARY (TYP)
L
_ T _
1+00
DESIGN GRADE —
800
795
794
1+50 2+00 2+50 2+89
WETLAND RE-ESTABLISHMENT
PROPOSED AT A 1:1 CREDIT RATIO
/LITATION
PROPOSED ATAWETLAND 61I1CREDIT RATIO
/R
+ + + + WETLAND REHABILITATION
+ + + PROPOSED AT A 1.5:1 CREDIT RATIO
-- J
WETLAND CREATION
PROPOSED AT A 3:1 CREDIT RATIO
Plan View
Wetland #3 and #4
OA- K - HILL CREEK
DESIGN
ALIGNMENT
SEE WETLAND 2
(SHEET 2.3)
U7
Q
taY
HLT,
T
0
50' 100' 150'
(HORIZONTAL)
z
i
Open Area Buffer Planting
Open Buffer Planting Zone Trees
Bare Root
Species
Common
Name
Max
Spacing
Indiv.
Spacing
Min.
Caliper
Size
Stratum
Wetland
Indicator
# of Stems
Acer negundo
Boxelder
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
10%
Platanus
occidentalis
Sycamore
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
15%
Betula nigra
River Birch
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
15%
Liriodendron
tulipifera
Tulip Poplar
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
2%
Quercus
phellos
Willow Oak
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
10%
Oxydendrum
arboreum
Sourwood
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
UPL
5%
Diospyros
virginiana
Persimmon
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
6%
Populus
deltoides
Eastern
Cottonwood
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
10%
Carya
cordiformis
Bitternut
Hickory
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
5%
Quercus alba
White Oak
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
5%
Quercus rubra
NortOak Red
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
5%
Ulmus rubra
Slippery Elm
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
1%
Total
89%
Open Buffer Planting Zone Small Trees / Shrubs
Bare Root
Species
Common
Name
Max
Spacing
Indiv.
Spacing
Min.
Caliper
Size
Stratum
Wetland
Indicator
# of Stems
Alnu.,
Tag Alder
12 ft.
6 12 ft.
0.25" 1.0"
Sub Canopy
OBL
2%
serrulata
Hamamelis
virginiana
Witch Hazel
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FACU
2%
Cornus florida
Flowering
Dogwood
12 ft.
6-12 ft.
0.25"-1.0"
Sub -Canopy
FACU
2%
Lindera benzoin
Spicebush
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
2%
Amelanchier
arborea
Serviceberry
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
2%
Calycanthus
floridus
Sweet Shrub
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FACW
1%
Sambucus
canadensis
Elderberry
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
2%
Total
11%
Notes:
(1) Substitute species: Sweetshrub, northern red oak, slippery elm.
(2) Transplants from on -site to be used at Designer's discretion for streambank and floodplain planting.
(3) Percentages of each species may be varied at Designer's discretion but shall not exceed 20% per each species.
(4) Designer may substitute container plantings or other plantings for bare roots.
TEMPORARY SEEDING
APPROVED DATE
TYPE
PLANTING
RATE (Ibs/acre)
Jan 1— May 1
Rye Grain (Secale Cereale)
120
Ladino clover (Trifolium Repens)
5
Crimson Clover (Trifolium incarnatum)
5
Straw Mulch
4,000
May 1— Aug 15
German Millet (Setaria italica)
40
Ladino clover (Trifolium Repens)
5
Crimson Clover (Trifolium incarnatum)
5
Straw Mulch
4,000
Aug 15 — Dec 31
Rye Grain (Secale Cereale)
120
Ladino clover (Trifolium Repens)
5
Crimson Clover (Trifolium incarnatum)
5
Straw Mulch
4,000
Note:
Rates of fertilizer and lime if necessary can be found in the site preparation plan
included in the specification documents.
Wetland Planting
Wetland Planting Zone Trees
Bare Root
Species
Common
Name
Max
Spacing
Indiv.
Spacing
Min.
Caliper
Size
Stratum
Wetland
Indicator
# of Stems
Platanus
occidentalis
Sycamore
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
15%
Betula nigra
River Birch
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
15%
Quercus
phellos
Willow Oak
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
10%
Ulmus
americana
American Elm
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
10%
Nyssa sylvatica
Black Gum
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
5%
Quercus
michauxii
Swamp
Chestnut Oak
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
8%
Acer negundo
Boxelder
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
5%
Quercus nigra
Water Oak
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
7%
Celtis laevigata
Sugarberry
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACW
5%
Total
80%
Wetland Planting Zone Small Trees/Shrubs
Bare Root
Species
Common
Name
Max
Spacing
Indiv.
Spacing
Min.
Caliper
Size
Stratum
Wetland
Indicator
# of Stems
Alnus serrulata
Tag Alder
12 ft.
6-12 ft.
0.25"-1.0"
Sub -Canopy
OBL
1%
Lindera benzoin
Spicebush
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
5%
Cephalanthus
occidentalis
Buttonbush
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
OBL
5%
Sambucus
canadensis
Elderberry
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
5%
Cornus
am om um
Silky Dogwood
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FACW
1%
Salix sericea
Silky Willow
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
OBL
2%
Livestakes
Salix nigra
Black Willow
8 ft
6-8 ft.
0.5"-1.5"
Shrub
OBL
1%
Total
20%
Notes:
1) Substitute species: Silky willow, silky dogwood.
2) Tag Alder shall be limited to Wetland 1 or other wetter areas of the site as designated by Designer.
3) Transplants from on -site to be used at Designer's discretion for streambank and floodplain planting.
4) Percentages of each species may be varied at Designer's discretion but shall not exceed 20% per each species.
5) Designer may substitute container plantings or other plantings for bare roots.
Partially Vegetated Buffer Area Planting
Open Buffer Planting Zone Trees
Bare Root
Species
Common
Name
Max
Spacing
Indiv.
Spacing
Min.
Caliper
Size
Stratum
Wetland
Indicator
# of Stems
Carpinus
caroliniana
American
Hornbeam
12 ft.
6-12 ft.
0.25"-1.0"
Sub -Canopy
FAC
14%
Euonymus
americana
Strawberry
Bush
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
14%
Lindera benzoin
Spicebush
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FAC
8%
Fagus
grandifolia
American
Beech
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
14%
Ulmus rubra
Slippery Elm
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FAC
7%
Hamamelis
virginiana
Witchhazel
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FACU
7%
Calycanthus
floridus
Sweetshrub
12 ft.
6-12 ft.
0.25"-1.0"
Shrub
FACU
7%
Cornus florida
Flowering
Dogwood
12 ft.
6-12 ft.
0.25"-1.0"
Sub -Canopy
FACU
7%
Asimina triloba
Pawpaw
12 ft.
6-12 ft.
0.25"-1.0"
Sub -Canopy
FAC
14%
Quercus rubra
NortOak Red
12 ft.
6-12 ft.
0.25"-1.0"
Canopy
FACU
8%
Total
100%
Riparian Corridor and
Inundated Wetland Planting
Streambank Planting Zone
Live Stakes
Species
Common Name
Max Spacing
Indiv.
Spacing
Min. Size
Stratum
Wetland
Indicator
% of Stems
Salix nigra
Black Willow
8 ft.
6-8 ft.
0.5"-1.5" cal.
Shrub
OBL
25%
Corpus amomum
Silky Dogwood
8 ft.
6-8 ft.
0.5"-1.5" cal.
Shrub
FACW
20%
Salix sericea
Silky Willow
8 ft.
6-8 ft.
0.5"-1.5" cal.
Shrub
OBL
25%
Cephalanthus
occidentalis
Buttonbush
8 ft.
6-8 ft.
0.5"-1.5" cal.
Shrub
OBL
15%
Sambucus
canadensis
Elderberry
8 ft.
6-8 ft.
0.5"-1.5" cal.
Shrub
FAC
15%
Total
100%
Herbaceous Plugs
Juncos effusus
Common Rush
5 ft.
3-5 ft.
1.0"- 2.0" plug
Herb
FACW
40%
Carex crinita
Fringed Sedge
5 ft.
3-5 ft.
1.0"- 2.0" plug
Herb
OBL
10%
Carex lurida
Lurid Sedge
5 ft.
3-5 ft.
1.0"- 2.0" plug
Herb
OBL
20%
Carex lupulina
Hop Sedge
5 ft.
3-5 ft.
1.0"-2.0" plug
Herb
OBL
15%
Scirpus cyperinus
Woolgrass
5 ft
3-5 ft.
1.0"-2.0" plug
Herb
FACW
15%
Total
100%
Note: See live staking and herbaceous plugs detail.
Permanent Seeding
Riparian Seeding - Open Canopy
Pure Live Seed (21 Ibs/ acre)
Approved Date
Species Name
Common Name
Stratum
Wetland
Indicator
Density
(Ibs/acre)
All Year
Schizachyrium scoparium
Little Bluestem
Herb
FACU
4.0
All Year
Panicum virgatum
Switchgrass
Herb
FAC
2.0
All Year
Panicum rigidulum
Redtop Panicgrass
Herb
FACW
1.0
All Year
Rudbeckia hirta
Blackeyed Susan
Herb
FACU
1.0
All Year
Coreopsis lanceolata
Lanceleaf Coreopsis
Herb
FACU
1.0
All Year
Echinacea purpurea
Purple coneflower
Herb
UPL
1.0
All Year
Panicum clandestinum
Deertongue
Herb
FAC
2.0
All Year
Elymus virginicus
Virginia Wild Rye
Herb
FACW
2.0
All Year
Sorghastrum nutans
Indiangrass
Herb
FACU
3.0
All Year
Bidens aristosa
Bur -Marigold
Herb
FACW
1.0
All Year
Helianthus angustifolia
Narrowleaf Sunflower
Herb
FACW
1.0
All Year
Coreopsis tinctoria
Plains corepsis
Herb
FAC
1.0
All Year
Achillea millefolium
Common yarrow
Herb
FACU
1.0
Wetland Seeding - Open Canopy
Pure Live Seed (19 Ibs/ acre)
Approved Date
Species Name
Common Name
Stratum
Wetland
Indicator
Density
(Ibs/acre)
All Year
Coleataenia anceps
Beaked Panicgrass
Herb
FAC
3.0
All Year
Carex vulpinoidea
Fox Sedge
Herb
OBL
2.0
All Year
Elymus virginicus
Virginia Wild Rye
Herb
FACW
4.0
All Year
Bidens aristosa
Bur -Marigold
Herb
FACW
3.0
All Year
Panicum cirgatum
Switchgrass
Herb
FAC
2.0
All Year
Polygonum pensylvanicum
Smartweed
Herb
FACW
0.5
All Year
Juncos effusus
Common Rush
Herb
OBL
1.5
All Year
Panicum dichotomiflorum
Panicgrass
Herb
FACW
2.0
All Year
Helianthus augustifolia
Narrowleaf sunflower
Herb
FACW
1.0
Notes:
(1) Apply Permanent Riparian seeding in all disturbed areas within Conservation Easement.
(2) Apply Permanent seeding in all other disturbed areas outside of Easement per specification.
O 0 0 0
7 V V V
O 0 0 0
Best Management Practice (BMP) Planting
Notes:
(1) Apply "Wetland Seeding - Open Canopy" seed mix to all disturbed
areas of BMP including bottom of basin.
(2) Apply "Riparian Corridor Planting - Herbaceous Plugs and Livestakes"
species in areas shown in detail.
Stabilization Seeding
Stabilization Seeding
Pure Live Seed (321bs/ac)
Species Name
Common Name
Ibs/acre
Festuca arundinacea
Fescue (KY 31)
20
Doctylis glomerate
Orchard Grass
12
Notes:
(1) Apply Pasture Seeding for grading outside Conservation
Easement, utility easements, and stream crossings.
(2) Install temporary seed and mulch with all permanent
seed.
m
Q
▪ w
•
.y
M�
z
i
OPEN BUFFER PLANTING
RIPARIAN CORRIDOR AND INUNDATED
WETLAND PLANTING
WETLAND PLANTING
PARTIALLY VEGETATED BUFFER PLANTING
aaaaaaa
ROY
0
v0v0
]-7 #
BMP PLANTING
SHEET 3.3
/
CE
Uri
CE
CE
/
/
h /
/
/ SHEET 3.4
/
/
/
/
/
/
/
/
/
/ yr
1120,p0�
/// /
/
/
RT�
s2s//;`)4<'
/
�F O
U I
AF
CE/ r \
�s1 ( I
wow. �
�� - .. I
0
I
/ c
fi
Lol
I 1
/2/
m
Q
ta,41
Q�
Planting Overview
MN
i
7
NO BARE ROOTS WERE PLANTED
DUE TO DEPTH OF STANDING WATER
CE
CE
NO BARE ROOTS WERE PLANTED
DUE TO DEPTH OF STANDING WATER
CE
CE
OPEN BUFFER PLANTING
RIPARIAN CORRIDOR AND INUNDATED
WETLAND PLANTING
WETLAND PLANTING
PARTIALLY VEGETATED BUFFER PLANTING
BMP PLANTING CONSISTS OF WETLAND
SEEDING, PLUGS (10'X10') AND LIVES
STAKES (10'X10')
c
CE
NO PLANTING
/A
_) _) -
O�O�C
• v •
CE
CE
pr14'-
BMP PLANTING
CE - CE
0 0 0
7 7 7 7 7
a
0
50'
100'
150'
(HORIZONTAL)
z
i
OPEN BUFFER PLANTING
RIPARIAN CORRIDOR AND INUNDATED
WETLAND PLANTING
WETLAND PLANTING
PARTIALLY VEGETATED BUFFER PLANTING
VOVOS
OOC
SSE
SS
SSE
BMP PLANTING
SSE
SS
SSE
V V V V V
n n n n 1
SSE / SSE SSE
SSE SSE
SS SS
SS SS
SSE SSE SSE SSE SE
NO BARE ROOTS WERE PLANTED
DUE TO DEPTH OF STANDING WATER
SS
SS
SSE
SS SSE
SS SSE
SS SSE
SS
CE
ce � cF
cF cE o ON
N�`� CREEK
cF
ce
CROSSING PLANTED WITH
STABILIZATION SEEDING
CE
CE ./
NO PLANTING
se
V
\SS sF
Js,\\
C
47f
EFIESIEFF
j
0
50' 100' 150'
(HORIZONTAL)
z
i
OPEN BUFFER PLANTING
RIPARIAN CORRIDOR AND INUNDATED
WETLAND PLANTING
WETLAND PLANTING
PARTIALLY VEGETATED BUFFER PLANTING
SE
SS
SSE
SSE
SSE
SSE
SS
SSE
SS
SSE
SSE S
SSE
SSE
BMP PLANTING
v0v0
]-7 #
NO BARE ROOTS WERE PLANTED
DUE TO DEPTH OF STANDING WATER
SSE
SS
SSE
SSE
Ss SSE
SSE SS = SSE SSE SSE SSE SSE SSE SSE SSE -
SSE SS SS SS SS SS Ss SS SSE_ SSE SSE SSE SSE SSE / gS SSE
V V V V V
n n n n 1
BMP PLANTING CONSISTS OF
WETLAND SEEDING, PLUGS (10X10)
AND LIVESTAKES (10X10)
SSE-
55 -
SSE
NO BARE ROOTS WERE PLANTED
DUE TO DEPTH OF STANDING WATER
55E-
- 55E 5S
SSE SSE _ 5S SSE
SS SSE
55 55E
SSE
SSE
SSE 55
SSE 55 55E
5S SSE
SSEi
of
0
0
124+00
59
tiD
0
50' 100' 150'
(HORIZONTAL)
z
- - •',- ,/,); //,z )', ,
' ' '/; ; r -", =
,c;r2
, j) ,';)1) )",
) , ," /
• • ' - • ,-_ ) „ )) ) f
/ I /
_--- ONE 12GATE AT NON —CROSSING ,
LOCATIONS (TYP)
MOVEDTO
TOPOFSLOPE
)
303Y
//
•;• )7'.) —
); • , ,
) • ; ) '
s • , '
' _ ,• „
, -
- -
7-,
2
lI
o
2
z
Project Engmeer
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
CERTIFICATE OF SURVEY AND ACCURACY
I, PHILLIP B. KEE CERTIFY THAT THE GROUND
TOPOGRAPHIC SURVEY PORTION OF THIS PROJECT WAS
COMPLETED UNDER MY DIRECT SUPERVISION FROM AN ACTUAL
SURVEY MADE UNDER MY DIRECT SUPERVISION; THAT THIS
SURVEY WAS PERFORMED AT THE 95% CONFIDENCE LEVEL TO
MEET THE FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS;
THAT THIS SURVEY WAS PERFORMED TO THE CLASS A
HORIZONTAL AND CLASS C VERTICAL WHERE APPLICABLE; THAT
THE ORIGINAL DATA WAS OBTAINED BETWEEN THE DATES OF
_2116/22=43/18/22___; THAT THE CONTOURS SHOWN AS
BROKEN LINES MAY NOT MEET THE STATED STANDARD AND
ALL COORDINATES ARE BASED ON NAD 83 (NSRS 2011) AND
ALL ELEVATIONS ARE BASED ON NAVD 88; THAT THE GPS
PORTION OF THIS PROJECT WAS TO PERFORM A GRID TIE TO
THE NC STATE PLANE COORDINATE SYSTEM AND THE
INFORMATION USED IS SHOWN & NOTED HEREON; THAT THIS
MAP MEETS THE SPECIFICATIONS FOR TOPOGRAPHIC SURVEYS
AS STATED IN TITLE 21, CHAPTER 56, SECTION .1606; THAT
THIS MAP WAS NOT PREPARED IN ACCORDANCE WITH G.S.
47-30, AS AMENDED AND DOES NOT REPRESENT AN OFFICIAL
BOUNDARY SURVEY.
GPS METADATA
SEE SURVEY CONTROL WILDLANDS ENGINEERING, INC. BY KEE
MAPPING & SURVEYING, PA (LICENSE # C-3039); SIGNED,
SEALED AND DATED ON DECEMBER 17, 2019 BY PHILLIP B.
KEE, NC PLS (LICENSE #4647).
WITNESS MY ORIGINAL SIGNATURE, LICENSE NUMBER, AND
SE150cB' ecp199; OF APRIL 2022, A.D.
r.1
D965004A7692407
PHILLIP B. KEE, PLS L-4647
SURVEYOR'S NOTES:
1. ALL DISTANCES AND COORDINATES ARE GROUND
MEASUREMENTS IN US SURVEY FEET UNLESS
OTHERWISE NOTED.
2. PROPERTY SUBJECT TO ALL EASEMENTS, RIGHT OF
WAYS AND RESTRICTIONS THAT ARE RECORDED,
UNRECORDED, WRITTEN AND UNWRITTEN.
3. CONSERVATION EASEMENT BOUNDARIES SHOWN
HEREON WERE TAKEN FROM PLATS OF SURVEY
ENTITLED: "A CONSERVATION EASEMENT SURVEY
FOR THE STATE OF NORTH CAROLINA, DIVISION OF
MITIGATION SERVICES, OAK HILL DAIRY SITE" AND
RECORDED IN PB: 93 PGS:53-56 DATED MARCH
23, 2021, RECORDED IN THE GASTON COUNTY
REGISTRY.
4. GASTON COUNTY GIS WEBSITE USED TO IDENTIFY
ADJOINING PROPERTY OWNERS.
5. BY GRAPHIC DETERMINATION, A PORTION OF THE
SUBJECT PROPERTY APPEARS TO LIE WITHIN A
SPECIAL FLOOD HAZARD AREA (SFHA) AS
DETERMINED BY THE FIRM. MAP# 3710269100K,
3710360100K, & 3710269000J DATED 09/28/2007.
6. STATE PLANE COORDINATES AND ELEVATIONS
WERE DERIVED FROM THE CONTROL SURVEY
PREPARED BY KEE MAPPING & SURVEYING. THE
HORIZONTAL DATUM IS NAD 83 (2011) AND THE
VERTICAL DATUM IS NAVD 88. ALL COORDINATES
SHOWN HEREON ARE GROUND MEASUREMENTS IN
US SURVEY FEET.
7. UTILITIES WERE LOCATED BASED ON VISIBLE ABOVE
GROUND STRUCTURES, THEREFORE THE LOCATION
OF UNDERGROUND UTILITIES ARE APPROXIMATE OR
MAY BE PRESENT AND NOT SHOWN HEREON. CALL
1-800-632-4949 BEFORE DIGGING.
8. STATIONING AND STREAM LABELS FOR PLAN AND
PROFILES ARE BASED OFF OF FINAL PLANS AND
DESIGN CENTERLINES PROVIDED BY WILDLANDS
ENGINEERING, INC.
9. CONTOUR INTERVAL: 1 FOOT
VERTICAL DATUM: NAVD 88
10. AREA OF LIMITS OF DISTURBANCE: 17.48 ACRES
11. WETLANDS SHOWN HEREON WERE PROVIDED BY
WILDLANDS ENGINEERING, INC.
(SHEET 7/2�------I
V r
4.
P �
40
CONTROL POINT
RBCC "KEE" (312)
GROUND COORDINATES
N: 61.87.39'
E: 1297865.44
ELEV: 832.73'
CONTROL POINT
RBCC "KEE" (311)
GROUND COORDINATES
N: 610116.93'
E: 1297759.67'
ELEV: 817.41'
003
4��
AN AS -BUILT SURVEY FOR
•
•
WILDLANDS ENGINEERING, INC.
THE STATE OF NORTH CAROLINA,
NCDEQ: DEPARTMENT OF MITIGATION SERVICES
"OAK HILL DAIRY MITIGATION SITE"
GASTON COUNTY, NORTH CAROLINA
CONTROL POINT
RBCC "KEE" (500)
GROUND COORDINATES
N: 611209.03'
E: 1298.9.38'
ELEV: 853.38'
CONTROL POINT
RBCC "KEE" (501)
GROUND COORDINATES
N: 610798.22'
E: 1297791.18'
ELEV: 837.61'
CONTROL POINT
RBCC "KEE" (310)
GROUND COORDINATES
N: 610218.65'
E: 1298114.62'
ELEV: 820.84'
IX c07 m. 407
�X _ V1
�SHEET8 X \DE \$ aft 00
SHEET 10 E
LHEET-.�.�.�.�.�._
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
CONTROL POINT
RBCC "KEE" (309)
GROUND COORDINATES
N: 610137.38'
E: 1298363.97'
ELEV: 822.01'
CONTROL POINT
RBCC "KEE" (308)
GROUND COORDINATES
N: 610115.05'
E: 1298698.65'
ELEV: 813.97'
CONTROL POINT
RBCC "KEE" (307)
GROUND COORDINATES
N: 610071.38'
E: 1299.0.05'
ELEV: 808.67'
SHEET # SHEET TITLE
1 "PROJECT OVERVIEW"
2 "BEGIN OAK HILL CREEK"
3 "OAK HILL CREEK"
4 "OAK HILL CREEK"
5 "OAK HILL CREEK"
6 "END OAK HILL CREEK"
7 "BEGIN UT1"
8 "UT1"
9 "UT1"
10 "END UT1"
11 "BEGIN UT1A"
12 "ENDUTIA&UT1B"
13 "UT2"
14 "UT3"
15 "CROSS -SECTIONS # 1-8"
16 "CROSS -SECTIONS # 9-14"
17 "LONGITUDINAL PROFILE:
18 "LONGITUDINAL PROFILE:
19 "LONGITUDINAL PROFILE:
20 "LONGITUDINAL PROFILE:
21 "LONGITUDINAL PROFILE:
22 "LONGITUDINAL PROFILE:
23 "LONGITUDINAL PROFILE:
CONTROL POINT
RBCC "KEE" (400)
GROUND COORDINATES
N: 609780.16'
E: 1299127.60'
ELEV: 800.83'
OAK HILL CREEK STA: 100+00-108+00"
OAK HILL CREEK STA: 108+00-116+00"
OAK HILL CREEK STA: 116+00-124+00"
UT1 STA: 200+00-212+00"
UT1 STA: 212+00-221+00"
UT1A STA: 300+00-305+00"
UT2 STA: 2+30-4+90 & UT3 STA: 300+40-302+80"
CONTROL POINT
RBCC "KEE" (401)
GROUND COORDINATES
N: 609529.75'
E: 1299266.95'
ELEV: 800.32'
R0116OA0
CONTROL POINT
RBCC 'KEE'(3.)
GROUND COORDINATES
N: 610949.68'
E: 1299579.61'
ELEV: 795.46'
CONTROL POINT
RBCC "KEE" (305)
GROUND COORDINATES
N: 6106..12'
E: 1299468.06'
ELEV: 802.20'
CONTROL POINT
RBCC "KEE" (306)
GROUND COORDINATES
N: 610346.17'
E: 1299232.63'
ELEV: 810.30'
SHEET 3
CONTROL POINT
RBCC "KEE" (402)
GROUND COORDINATES
N: 609797.97'
E: 1299388.66'
ELEV: 807.01'
CONTROL POINT
RBCC "KEE" (403)
GROUND COORDINATES
N: 609361.92'
E: 1299261.94'
ELEV: 8..98'
GRID NORTH
NAD 83 (2011)
CONTROL POINT
RBC "KEE" (302)
GROUND COORDINATES
N: 611235.06'
E: 1299706.36'
ELEV: 796.28'
O�
SHEET 113
13
O
0
D
m
z
0
m
A
0
SURVEY
AREA
e-
uge" ST
VICINITY MAP
a\ (NOT TO SCALE)
LEGEND
0 94/
c'A0 o
STRUCTURE NUMBER
• 1/2" RBCC (CROSS-SECTION REBAR)
5/8" RBC W/ "KEE" CONTROL CAP (AS NOTED)
• GAUGE (AS NOTED)
6 PHOTO POINT
�( UTILITY POLE
SEWER MANHOLE
• DECIDUOUS TREE
LOG SILL
ROCK SILL
LOG J-HOOK
MOBILE VEG PLOT
® BRUSH TOE
imsyt FLOOD PLAIN ROUGHENING
® BANK ROUGHENING
® BRUSH TOE W/ GEO LIFT
1 ((((,1 BOULDER TOE
®11
LOD
TB ---
DW
- CE
- CE-XS -
SS-
RBCC
RBC
INV
ELEV
NAVD
NAD
NSRS
CMP
CPP
PVC
VP
STA
RIFFLE
GRAVEL
RIP RAP
SOIL ROADBED
ASPHALT
MINOR CONTOUR
MAJOR CONTOUR
LIMITS OF DISTURBANCE
THALWEG
TOP OF BANK
DESIGN CENTERLINE
OVERHEAD WIRE
CONSERVATION EASEMENT
INTERNAL EASEMENT CROSSING
SEWER LINE
SEWER EASEMENT
REBAR W/ CAP SET IN CONCRETE
REBAR W/ CAP
INVERT
ELEVATION
NORTH AMERICAN VERTICAL DATUM
NORTH AMERICAN DATUM
NATIONAL SPATIAL REFERENCE SYSTEM
CORRUGATED METAL PIPE
CORRUGATED PLASTIC PIPE
POLYVINYL CHLORIDE PIPE
VEGETATED PLOT
STATION
SEAL: \\0111111//////
:'7'
_� o.S ALbv �_
" J-1/ -4647 °
5004A769 fib,:.
///��7�Q"""Of \\
///
/////BBII\\4s.tee
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
PROJECT OVERVIEW
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013-AB
# DATE
COUNTY:
GASTON
CHECKED BY:
PBK
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
REVISIONS
SHEET:
1 OF 23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
CONTROL POINT
RBCC "KEE" (401)
GROUND COORDINATES
N: 609529.75'
E: 1299266.95'
ELEV: 800.32'
CONTROL POINT
RBCC "KEE" (nn3)
vim)
GROUND COORDINATES
N: 609361.92'
E: 1299261.94'
ELEV: 804.98'
m
g
�/
°O, X / O00°' t7
m
I
PIN: 6/2" RBCC f
N: 609566.56'
N:
E: 1299306.88' \
Z: 800.97' 0
1 o0
i
0,
O
0' 40' 80' 120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
00
0
O
VP8
U
CROSS-SECTION #9 I
OQ
PO
co,
CE
C
8n7 7
� ` E07
GROUNDWATER GAUGE #4 tRo
BOLT ELEV: 803.83' ° 00
U
R-PIN: 1/2" RBCC
N: 609579.77'
E: 1299378.10'
Z: 800.26'
z00
BEGIN OAK HILL CREEK
STA: 100+10
SHEET 3
SHEET 2
GRID NORTH
NAD 83 (2011)
STRUCTURE TABLE -OAK HILL CREEK
#
DESCRIPTION
ELEVATION
1
ROCK SILL
798.24
2
LOG SILL
797.71
O
l
o° �o
cE �
cE
cE
SEAL:
eI C
AR
®ie
� s�B�
ocre
ocuSigned b o
:a. 1" L9 SEAL �e
°I464/
y 65004A769
°:..
— °®3�9h��
��7� 1110� B \\\
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
BEGIN
OAK HILL CREEK
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013-AB
SHEET SIZE:
11" X 17° (HALF SIZE)
DATE
REVISIONS
SHEET:
2 � 23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
2i8+0oz0
L-PIN: 1/2" RBCC
IN: bU`J`JbU.64'
E: 1299216.91'
Z: 798.28'
V v GROUNDWATER GAUGE #6
BOLT ELEV: 799.84'
° v
-417
0.6\''
m
0
°
IIm /
I
4 x a BUI mI oRBCC "KEE" (400)
GROUND COORDI
NATES
LJNTrOL POINT
m N: 609780.16'
E: 1299127.60'
ELEV: 800.83'
R-PIN: 1/2" RBCC
N:610011.26'
E: 1299201.26'
Z: 798.52'
L-PIN: 1/2" RBCC
N: 609893.24'
E: 1299218.17'
Z: 798.67'
CROSS-SECTION #11
R-PIN: 1/2" RBCC
N: 609923.66'
E: 1299305.87'
Z: 798.36'
R-PIN: 1/2" RBCC /
N: 609908.33'
E: 1299300.55'
Z: 798.48'
(;KU55-t(; I ION 141U
INTERNAL EASEMENT
CROSSING
STA: 105+53
GROUNDWATER GAUGE #5
BOLT ELEV: 800.51'
a
CONTROL POINT
RBCC "KEE" (402)
GROUND COORDINATES
N: 609797.97'
E: 1299388.66'
ELEV: 807.01'
INTERNAL EASEMENT
CROSSING
STA: 104+99
SHEET 4/13
SHEET 3
GRID NORTH
NAD 83 (2011)
STRUCTURE TABLE -OAK HILL CREEK
#
DESCRIPTION
ELEVATION
3
LOG J-HOOK
797.35
4
LOG J-HOOK
796.52
5
LOG SILL
7g6.12
0' 40' 80' 120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
SHEET 3
SHEET 2
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
OAK HILL CREEK
TOWNSHIP: COUNTY:
CHERRYVILLE GASTON NORTH CAROLINA
DRAWN BY: CHECKED BY:
NH PBK
SCALE: SURVEY DATE:
AS SHOWN 04/22/22
SURVEY BY:
KP, AC, JR, CB, DP
JOB: SHEET SIZE:
#2201013—AB 11" X 17" (HALF SIZE)
SHEET:
REVISIONS
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
SHEET 5/14
SHEET 4/13
GRID NORTH
NAD 83 (2011)
CONTROL POINT
RBCC "KEE" (306)
GROUND COORDINATES
N: 610346.17'
E: 1299232.63'
ELEV: 810.30'
S I RUC I URE I ABLE -OAK HILL CREEK
#
DESCRIPTION
ELEVATION
6
LOG J-HOOK
794.58
7
LOG J-HOOK
793.76
8
LOG J-HOOK
792.20
9
LOG SILL
791.49
/
GROUNDWATER GAUGE #7
BOLT ELEV: 798.95'
moo
MVP5
L-PIN: 1/2" RBCC
N: 610083.26'
E: 1299210.85'
Z: 798.16'
27
\+\
\,
7
/
/,
/
/
/
/
0'
i
o' I CROSS-SECTION
L-PIN: 1/2" RBCC
N: 610389.81'
E: 1299505.01'
Z: 794.82'
L-PIN: 1/2" RBCC— L -
N: 610384.13'
E: 1299500.20'
Z: 794.875'
CO
11
-81-- 81- _
INTERSECTION
OAK HILL CREEK
STA: 110+23
END UT1
STA: 221+11
40'
GROUNDWATER GAUGE #8
BOLT ELEV: 796.84'
MVP4
/
/
/
/
80' 120' po'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
/
c`P
/
R-PIN: 1/2" RBCC
N: 610417.96'
E: 1299603.58'
Z: 794.41'
R-PIN: 1/2" RBCC
N: 610333.72'
E: 1299616.91'
Z: 794.67'
p0
oso
SHEET 4/13
SHEET 3
SEAL:
EBI \e\\\��VIR() / es
'eS S j tr';
foff,°oct l,gwEby.��e
I��1�4L���47
�o
004A76• -:^..
,:,i2i,A7� 1� B I 1 \ \ \\\\e
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
OAK HILL CREEK
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013—AB
DATE
SHEET:
COUNTY:
GASTON
CHECKED BY:
PBK
SURVEY DATE:
04/22/22
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
oF 23
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
GRID NORTH
A NAD 83 (2011)
SHEET 6
SHEET 5/14
STRUCTURE TABLE -OAK HILL CREEK
#
DESCRIPTION
ELEVATION
10
LOG J-HOOK
790.38
11
LOG SILL
789.96
12
LOG J-HOOK
789.49
13
ROCK SILL
789.00
CONTROL POINT I
RBCC "KEE" (305)
GROUND COORDINATES
N: 610644.12'
E: 1299468.06'
ELEV: 802.20'
0p'
o \ oo
SHEET 5/14 ,X
SHEET 4/13 <
xi
0
d-,)7
/ �OO�
7ST
INTERSECTION
OAK HILL CREEK
A:115+24
END UT2
STA: 4+89
i
1-
1
INTERSECTION
OAK HILL CREEK
STA: 118+99
END U T 3
STA: 302+85
0
I O
R-PIN: 1/2" RBCC
N: 610817.43'
E: 1299742.90'
Z: 791.42'
moo
IINn\HATER (,AI I(,P #10
BOLT ELEV: 793.14'
o I
7 ,d
� 1
GROUNDWATER GAUGE #9 /
BOLT ELEV: 794.31'
/ 1001
W �
/ 00
W /
/ UO
0' 40'
80'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
0
48" CPP
INV IN: 790.97'
INV OUT: 790.45'
120'
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
OAK HILL CREEK
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013—AB
SHEET:
COUNTY:
GASTON
CHECKED BY:
PBK
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope
ID: B2BD400E-10BD-4052-8946-793A438C0C6D
okx\
GRID NORTH
NAD 83 (2011)
\ ow
x
30 3 / `op OW
ow
I 30 \ 00 0°
0 0
x
x
x
m
lx� I
//
x/
/
k/
CONTROL POINT
RBCC "KEE" (304) /m
GROUND COORDINATES i`Vc/N:610949.68'E: 1299579.61'
x
ELEV:795.46' // °
� 0
m
471
o
/
°� o0
a0
//
k/
/m
/m
/m
m
a01
JJ
a07 7
0
ow
GROUNDWATER GAUGE #11
BOLT ELEV: 79 I.78'
( LCROSS-SECTION #14
CREST GAUGE #3
BOLT ELEV: 791.17'
VP13
L-PIN: 1/2" RBCC
N: 610911.03'
,� / E: 1299731.15'
/ " Z: 791.02'
r
i
R-PIN: 1/2" RBCC
N: 610817.43'
E: 1299742.90'
Z: 791.42'
RpgRRT RoqD ,v36.)
30
30
6" PVC
INV IN: 790.45'
INV OUT: 788.88'
� /
®9v
/
13' X 8' BOX CULVERT
t/INV T7.09'
INV OUT:: O 784.67'
END OAK HILL CREEK I
STA: 123+96
�w\
�w\
Ow\
Ow
6" PVC
INV IN: 790.53'
INV OUT: 788.91'
0
STRUCTURE TABLE -OAK HILL CREEK
#
DESCRIPTION
ELEVATION
14
LOG SILL
788.48
15
LOG SILL
787.72
18" CPP
INV IN: 789.35'
/ s/ 1/ INV OUT: 787.67'
0'
40'
0
/
0
80'
120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
0
SHEET 6
SHEET 5/14
SEAL: \01e��� �0ARo ",,/
. ��S30®e+ �.
Do�u�Sigr1ed bye e
k647
7.
�a 6wo4A
°� 3Pn>
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
END
OAK HILL CREEK
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013—AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
0, 23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
0111
GRID NORTH
A NAD 83 (2011)
0
0
0
STRUCTURE TABLE-UT1
#
DESCRIPTION
ELEVATION
16
LOG J-HOOK
807.34
0
0
0
0
CONTROL POINT
RBCC "KEE" (311)
GROUND COORDINATES
N: 610116.93'
E: 1297759.67'
ELEV: 817.41'
30
0
SO
L-PIN: 1/L' RBCC
N: 610096.90'
E: 1297756.69'
Z: 814.95'
0
0
- o
•
'4
ago
3o
o°
m\co)
` 007
0
I I m
BEGIN UT1B I
STA: 00+00
d
CEX
XCE
R-PIN: 1/2" RBCC
N: 610202.47'
E: 1297869.94'
Z: 816.20'
R-PIN: 1/2" RBCC
N: 610198.37'
E: 1297871.61'
Z: 815.92'
CREST GAUGE #1
BOLT ELEV: 812.24'
3o
30 —
30
3o
INTERSECTION I
UT1
STA: 202+23
END UT1A
STA: 304+91
UT1 °° LOD I
FLOW L•7.,o5
��
o? f
oo� � -Eo-- � �-
f1f ��Jy'� i
i pO1
R-PIN: 1/2" RBCC
N: 610026.11'
E: 1297787.32'
Z: 81 1.43'
00
0o i
/ +
CE CE CE+/
X X X
vvvvvv vv
vvvvvvvvvvvv
vvvvvvvvvvvv
�vvv -
0
SHEET 11
SHEET 7/12
L-PIN: 1/2' RBCC
N: 610222.31'
E: 1297912.11'
Z: 814.74'
i
CROSS-SECTION #2 1 2 2
1
0
,c7
L^ \\
L-PIN: 1/2" RBCC\
N: 610193.04'
E: 13.30' T �\
Z: 813.30'
44, \ \ \\\ \\\\
INTERSECTION
UT1
STA: 203+56
END UT1B
STA: 3+10
N
007 vi �.�]Ol
/ Co
o 00
7So
4: + �C ° 870
o_Go,
CY
ro
0'
40'
80'
120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
S
- TB
1
1
1
1
SEAL: �0,. iL ''' C AR®‘�%,B/
o� SEAL �r-e =
c IIPI'PY:
e.
e
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
007 —
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013-AB
DATE
SHEET TITLE:
BEGIN UT1
COUNTY:
GASTON
STATE:
NORTH CAROLINA
CHECKED BY: SURVEY BY:
PBK KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
SHEET:
7 OF 23
ee
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
X
o30
X
GRID NORTH
NAD 83 (2011)
3 X
3D fix_
(OD 30
LOD
1
L-PIN:: 1/2" RBCC
N: 610047.51'
E: 1298044.27'
Z: 808.49'
1
x
30 X
/J LOD
1,OD `
/ r
810
L-PIN: 1/2" RBCC
N: 610068.43'
CROSS-SECTION #4 I
30 x
30x
E: 1298115.30'
Z: 810.29'
CROSS-SECTION #5
3o�x_
O r_
\ \ AGO /
VP3 \\805 —%0 �� ° r�
LOD V
CONTROL POINT
RBCC "KEE" (309)
GROUND COORDINATES
N: 610137.38'
E' 1298363 97'
ELEV: 822.01'
<O LOD
Lo�9000
815 O� LOD
'�i
GROUND WATER GAUGE #1 .i�lii�` .04 BOLT ELEV: 808.89' ll'ali! ��ilL� �Ir,ll�!ii�!I
(
40l CO/ OOl — — DOl — DOl _ °07
r\JR-PIN: 1/2" RBCC _ ° CO/ Doi Dot / °O1 Doi Doi
CE N: 609971.99'
E: 1298109.83'
x� --X N:
CEZ: 807.60'CE
x x rF
PIN: 1/2"
N 0�996�n 2Q RBCC --CE_���E
X�E.
UT1
FLOW
STRUCTURE TABLE-UT1
#
UtJC:KIV II ION
ELEVATION
17
LOG SILL
806.20
18
LOG SILL
805.64
19
LOG SILL
803.61
LOD
1
LOD
OD
0
80' 120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
°•G=
0 0 uSi r
r /L-- 4 6 4 %
s ° . ' 4A76924P l° \
�i-i,,_,t t1oB .1. \\\..-
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013—AB
SHEET:
SHEET TITLE:
UT1
COUNTY:
GASTON
CHECKED BY:
PBK
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
GRID NORTH
NAD 83 (2011)
co I 6)
I—
w w
w w
U) 1 U)
1
o� ors LOD 3s
LOD
l
400
CONTROL POINT
RBCC "KEE" (308)
GROUND COORDINATES
N: 610115.05'
E: 1298698.65'
ELEV: 813.97'
BAROTROLL
—� 3D�D GAUGE
GROUND WATER GAUGE #2
BOLT ELEV: 805.13'
CROSS-SECTION #6
CE — CE _ CE
L-PIN: 1/2" RBCC
N: 610007.72'
E: 1298746.97'
Z: 803.13'
R-PIN: 1/2" RBCC
N: 609911.07'
E: 1298737.30'
Z: 803.31'
STRUCTURE TABLE-UT1
#
DESCRIPTION
ELEVATION
20
LOG SILL
802.20
21
LOG SILL
801.51
22
LOG SILL
800.52
23
LOG SILL
799.26
vvv
vvvv
vvv
vv
R-PIN: 1/2" RBCC N
N: 609903.80'
E: 1298751.44'
Z: 803.30'
L-PIN: 1/2" RBCC
N: 609966.06'
E: 1298815.94'
Z: 802.61'
CROSS-SECTION #7
CREST GAUGE #2
BOLT ELEV: 802.96'
vvvv
vvv
v v
5iv
0' 40' 80' 120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
1
SEAL: e�'¢� 10��®%�B/
- cu ,jg Acey:
"o
irk 1it.-4647
£ ST.A769.:a °
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013—AB
SHEET:
SHEET TITLE:
UT1
COUNTY:
GASTON
CHECKED BY:
PBK
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
0, 23
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
1
GOT GOT
I
1 GE
GRID NORTH
A NAD 83 (2011)
CONTROL POINT
RBCC "KEE" (307)
GROUND COORDINATES
N: 610071.38'
E: 1299040.05'
ELEV: 808.67'
INTERNAL EASEMENT
CROSSING
STA: 216+88
BRIDGE
LOW CHORD: 801.39'
00- i o07
00-1 Oo�
°o>
GROUNDWATER GAUGE #3
BOLT ELEV: 802.46' GE ) GE 0
GE
GE GE
X
00
vv
v v.
v v
•
GROUNDWATER GAUGE #7 "
BOLT ELEV: 798.95'
SOD
STRUCTURE TABLE-UT1
#
DESCRIPTION
ELEVATION
24
ROCK SILL
798.43
25
LOG SILL
796.85
26
LOG SILL
795.92
•1 0
MVPS
LY IIV: I/L RBi.
N: 610083.26'
E: 1299210.85'
Z: 798.16'
/70
26
1 R-PIN: 1/2" RBCC
_„,,,,-----e______ N: 610011.26'
E: 1299201.26'
Z: 798.52'
L-PIN: 1/2" RBCC
N: 609960.84'
E: 1299216.91'
Z: 798.28'
GROUNDWATER GAUGE #6
BOLT ELEV: 799.84'
l)�Y
INTERNAL EASEMENT
CROSSING / L-PIN: 1/2" RBCC
STA: 217+18 N:609893.24'
E: 1299218.17'
X �1 / Z: 798.67'
op 007
X/
0
/ I I
4J�
x m
1 1
220+
4i
/
109+50
61
SHEET 4/13
SHEET 3
/
co
CROSS-SECTION #11
/
/
/
/
\
00 �� /
R-PIN: 1/2" RBCC / /
N:609923.66' & &
E: 1299305.87' / o
Z: 798.36' '
R-PIN: 1/2" RBCC //
°o
E: 1299300.55'
/)
N 609908 33'
CROSS -SECT
ION #10 / 1
/ o •/ ��
0' 40'
INTERSECTION
OAK HILL CREEK
STA: 110+23
END UT1
STA: 221+11
80'
/
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
120'
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013-AB
# DATE
SHEET:
SHEET TITLE:
END UT1
COUNTY: STATE:
GASTON NORTH CAROLINA
CHECKED BY: SURVEY BY:
PBK KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
GRID NORTH
NAD 83 (2011)
L1\
\Z\
\ \
1 \
POINT \ \
E" (312) \ \
\ `
39' \
b
73' \
COORDINATES
.44'
CONTROL
RBCC "KE
GROUND
N: 610487.
E:1297865
ELEV: 832.
0
0' 40' 80' 120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
HOUSE (AS DRAFTED
FROM AERIAL)
/
.6-
/
STRUCTURE TABLE-UT1A
#
DESCRIPTION
ELEVATION
27
ROCK SILL
821.90
28
LOG SILL
821.41
29
ROCK SILL
820.66
30
LOG SILL
820.18
31
ROCK SILL
819.50
32
LOG SILL
818.82
00
33
ROCK .ILL
ROCK/ SILL
818.22
34
LOG SILL
817.63
35
ROCK SILL
816.71
36
LOG SILL
815.57
37
ROCK SILL
814.64
38
ROCK SILL
813.91
39
LOG SILL
812.91
SHEET 11
SHEET 7/12
1
SEAL: �\ 10A®‘o",,
�°'CreSSQ®°�
„bj: �r•_
0
is 1
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
BEGIN UT1A
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013-AB
# DATE
COUNTY: STATE:
GASTON NORTH CAROLINA
CHECKED BY: SURVEY BY:
PBK KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
SHEET:
11
OF 23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
GRID NORTH
A NAD 83 (2011)
. —0111—
0
0
0
STRUCTURE TABLE-UT1A
#
DESCRIPTION
ELEVATION
40
�
LOG SILL
811.86
41
LOG SILL
810.66
42
ROCK SILL
809.85
43
ROCK SILL
809.03
44
ROCK SILL
808.85
45
LOG SILL
808.23
0
0
0
0
I I
BEGIN UT1
STA: 200+05
0
—
—
—
CONTROL POINT
RBCC "KEE" (311)
GROUND COORDINATES
N: 610116.93'
E: 1297759.67'
ELEV: 817.41'
So
30
0
0
0
L-PIN: 1/L' RBCC
N: 610096.90'
E: 1297756.69'
Z: 814.95'
0
N
o I I� O
N D /�
0 0
00
m
0
I I m
BEGIN UT1B I
STA:00+00 ,
6
0
CEX
—
—
R-PIN: 1/2" RBCC
N: 610202.47'
E: 1297869.94'
Z: 816.20'
R-PIN: 1/2" RBCC
N: 610198.37'
E: 1297871.61'
Z: 815.92'
30/
/ 30
30
SO
CREST GAUGE #1
BOLT ELEV: 812.24'
3o a
INTERSECTION
UT1
STA: 202+23
END UT1A
STA: 304+91
UTi
00 LOD
FLOW L`104,
iib0__
i t
ram_ r Ct
imisigo
R-PIN: 1/2" RBCC
N: 610026.11'
E: 1297787.32'
Z: 81 1.43'
CE CE
X X X
061
V V V V V
Vvvvvv vv
vvvvvvvvvvvv
vvvvvvvvvvvv
vvv
0 00,
o /
Co1
` 00^ co,
0
SHEET 11
SHEET 7/12
L-PIN: 1/2' RBCC
N: 610222.31'
E: 1297912.11'
\ \ Z: 814.74'
CROSS-SECTION #2
v\,c
\ o
L-PIN: 1/2" RBCC
N: 610193.04'
E: 1297923 57' -f-
Z: 813.30'
44
INTERSECTION
UT1
STA: 203+56
END UT1B
STA: 3+10
870
/\� 07 \
ao ,
1
SHEET 7/1:2
7B
I
1
1
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
COT —
CY'
CE CE �+
X
0'
40'
80'
120'
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
1
1
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013-AB
DATE
SHEET TITLE:
END UT1A
UT1B
oi
COUNTY:
GASTON
STATE:
NORTH CAROLINA
CHECKED BY: SURVEY BY:
PBK KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
SHEET:
120F23
ee
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
/
SHEET 5/14
SHEET 4/13
L00
L-PIN: 1/2" RBCC
N: 610389.81'
5.0 12
Z: 794.82'
° L-PIN: 1/2" RBCC
N: 610384.13'
E: 1299500.20'
Z: 794.875'
CROSS-SECTION #12
INTERSECTION
OAK HILL CREEK
STA: 115+24
END UT2
STA: 4+89
VVV:�
v v
vvv
v v
vv
R-PIN: 1/2" RBCC
N: 610417.96'
E: 1299603.58'
Z: 794.41'
R-PIN: 1/2" RBCC
N: 610333.72'
E: 1299616.91'
GROUNDWATER GAUGE #9
BOLT ELEV: 794.31'
BEGIN UT2
STA: 2+66
42" CPP
INV IN: 792.63'
INV OUT: 792.51'
°
O
O /
/
IQ° /
GROUNDWATER GAUGE #8
BOLT ELEV: 796.84' 0' 40' 80' 120'
os
GRID NORTH
A NAD 83 (2011)
STRUCTURE TABLE-UT2
#
Ut5UKIP T ION
ELEVATION
46
ROCK SILL
792.76
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013-AB
SHEET:
SHEET TITLE:
UT2
COUNTY:
GASTON
CHECKED BY:
PBK
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
MAPPING & SURVEYING
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
GRID NORTH
NAD 83 (2011)
SHEET V
SHEET 5/14
CONTROL POINT
RBCC "KEE" (305)
GROUND COORDINATES
N: 610644.12'
E: 1299468.06'
ELEV: 802.20'
A
SHEET 5/14
SHEET 4/13
6
0
\\ S
//77'1'
AID
Aaf
II
Algir
AlOr
i2f_'`
gat
i
INTERSECTION
OAK HILL CREEK
STA: 118+99
END UT3
STA: 302+85
INTERSECTION
OAK HILL CREEK
STA: 115+24
END UT2
STA: 4+89
27 -
�L
v
vvv
\
A
R-PIN: 1/2" RBCC
/ N: 610817.43'
E: 1299742.90'
Z: 791.42'
MVP6
•
GROUNDWATER GAUGE #9
BOLT ELEV: 794.31'
\
U °O
GROUNDWATER GAUGE #10
BOLT ELEV: 793.14'
0'
190'
o cuSigned by:Cmoo
fr4:(j*Y4Pn 111°
�®®®//IalBll\\4��\
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
TOWNSHIP:
CHERRYVILLE
DRAWN BY:
NH
SCALE:
AS SHOWN
JOB:
#2201013—AB
SHEET:
°
0
1
a
Lj
h
0
48" CPP
INV IN: 790.97'
INV OUT: 790.45'
6-
BEGIN UT3 I
IA: 300+31
STRUCTURE TABLE-UT3
#
DESCRIPTION
ELEVATION
47
ROCK SILL
791.00
40'
80'
0
O
ONE INCH = TWENTY FEET (FULL SIZE)
ONE INCH = FORTY FEET (HALF SIZE)
SHEET TITLE:
UT3
COUNTY:
GASTON
CHECKED BY:
PBK
STATE:
NORTH CAROLINA
SURVEY BY:
KP, AC, JR, CB, DP
SURVEY DATE:
04/22/22
SHEET SIZE:
11" X 17" (HALF SIZE)
REVISIONS
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
816
815
814
813
812
811
810
809
816
815
814
813
812
811
810
809
808
o ON o o� o
+ + + + +
0 0 0 0 0 0
808
CROSS-SECTION #1 -UT1A
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
809
809
808
807
806
v
808
807
806
00 O O O OV i0 (9 O 00 00) 00 O
N COO O O O O O O O O O
CROSS-SECTION #4 -UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
804
818
818
817
816
815
814
813
812
811
810
0
0
O O oCO � o
N ▪ + + +
0 0 0 0
O
0
817
816
815
814
813
812
811
810
CROSS-SECTION #2 -UT1A
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
812
812
311
811
810
810
309
809
Sob
808
307
807
806
806
305
805
804J
804
00 O O O ON CO V i0 , O
+ + + + + + + +
O O O O O O O O
CO rn o
+ + + + O O
CROSS-SECTION #5 -UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
804
803
802
801
800
803
802
801
800
00 O O O O0 , O 0
N CO V i0
0 0 0 0 0 0 0 0 0
+
CROSS-SECTION #7 -UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
800
816
816
315
815
814
814
313
813
812
812
311
811
810
810
309
809
808
808
0 o O O oo LO O O
N CO ' ro
0 0 0 0 0 0 0 0 0
CROSS-SECTION #3 -UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
804
804
803
802
801
800
799
798
00 o O O oN COv o , O Oro rn
+ + + + + + + + + +
O O O O O O O O O O
803
802
801
800
799
798
CROSS-SECTION #6 -UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
800
799
799
798
797
796
•
798
797
796
O O O O V i0 , O 0N CO 0
0 0 0 0 0 0 0 0 0
CROSS-SECTION #8 -UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
SEAL: eo"� 1CA®�o",,
SQ®°+
_� SEAL 7�e
fl",eirrki 0.
°650z4Hd 91 0
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
CROSS-SECTION #
1-8
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013-AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
150F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
802
802
301
801
300
80C
r99
799
r98
798
r97
1
797
r96
796
0 0 N o v coo N- c0
O O O O O O O O o
CROSS-SECTION #9 -OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
796
796
r95
795
794
794
r93
793
792
792
r91
791
790
790
r89
789
788
788
O O O O O O O O O O O O O 0
N ('7 'Cr B') + I+ 0 0) O N
+ + + + + + + + + + + + + +
O O O O O O O r
O O 0
CROSS-SECTION #12 -OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
800
800
r99
799
r98
798
r97
797
r96
796
r95
795
r94
794
0 0 N o v coo N- CO rn
+ + + + + + + + + +
O O O O O O O O O o
CROSS-SECTION #10 -OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
796
796
r95
795
r94
�
�.
794
�93
793
�92
792
r91
791
r90
790
00 O N O OV i0 CO O 00 0')) 00 O
+ + + + + + + + + + + +
O O O O O O O O O O r r
CROSS-SECTION #13 -OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
800
800
r99
799
r98
798
797
\\
797
r96
796
795
I
795
r94
794
793
793
r92
792
00 O N O V coo N- CO 00) O
+ + + + + + + + + + +
O O O O O O O O O o r
CROSS-SECTION #11 -OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
792
792
791
Ai_
790 790
789 789
788 788
0O O 'Cr L
OC) COCOO - CO 00O )
0 N
+ + + + + + + + + + +
O O O O O O O O O O
CROSS-SECTION #14 -OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
SEAL: e��\ ICAR° /,
0.'CAS30®e* /.
oa. SEAL r
LAfill7y.
;\';
��IIaIBII\\:��
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
CROSS-SECTION #
9-14
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013-AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
160F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
800
800
799
799
797
795
793
z
0
H
0
uJ
0)
co
co
0
797
795
793
792
O
O
799
O
O
O
o
07
O
O
O
o
co
O
O
O
0
O
0
O
+
0
o
co
0
O
CO
0
O
O
co
O
O
CO
O
0
O
co
O
792
o o
07
O
O
799
r97
797
I
r95
::"1----------
795
z
/
r93
AEN ICROISSINI
I I I 1
EM ENT IROSI
0
z
793
0
0
r91
in
0
(%)co
7
791
W
co
¢
0
ROSS-SECTIOI
r89
W
J
Q
INTERNA
0
789
NTERN I
1 1
r88
v
788
O
O
O
o
co
O
O
O
Lc)
O
O
0
O
+
0
o
co
0
O
CO
O
O
O
CO
O
o
co
CO
O
LONGITUDINAL PROFILE- OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
o
co
O
O
O
o
co
O
O
O
07
O
SEAL: 0(\e0AR0/
o��� 1%�B/
SiO °
_� SEAL fir:
▪ �o6!i?n7bY. _
/ 9b5004A76
�ipBII\\4���\\\ce
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
OAK HILL CREEK
STA: 100+00-108+00
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013—AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
170F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
798
798
797
795
793
791
HI3
z
O
H
0
W
0)
W
H
z
789
COCO
797
Q)
CO
m
797
795
793
791
789
o o +
O O O
797
r95
co
795
N
z
0
r93
t
z
0
H
uJ
W
793
0
°co?I
co
SR EE TIOFI
r91
co
05
co
CC
0
791
O
U
inH
?
r89
789
J
r87
787
LONGITUDINAL PROFILE- OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
LC)
SEAL: `\A 10A19 ..0.
oceak ed byr
o-4647
s� ,e "4o.
447._
u'r
tip
/,77��/IalBll\\��\\
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
OAK HILL CREEK
STA: 108+00-116+00
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013—AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
180F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
SEAL: e��° 10AR®)/%�B/
795
795
793
791
3
z
H
U
789
787
793
791
785
CO
793
m
co
m
789
787
785
793
791
789
z
0
H
U
791
789
787
787
785
LONGITUDINAL PROFILE- OAK HILL CREEK
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
785
/'//ia5iit P
\\\
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
OAK HILL CREEK
STA: 116+00-124+00
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013—AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
190F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
810
810
309
80S
807
807
co
z
305
0
/
o
Lu
�
co
0
CC
ION W/ UT'
co
803
7
80?
0
2
z
301
TERE
0
801
uJ
co
II
800
H
z
80C
00 NN ,r coo 0 0
+ + + + + +
O O O O O O
N N N N N N
809
0
0
0
+
O
0
O
0
O
CO
0
0
0
0
0
0
0
+
0
0
(.0
0
O
CO
0
0
0
CO
O
0
CO
0
0
+
0
0
O
CO
O
CO
CO
0
0
O
809
807
807
805
803
801
4
z
O
H
U
799
0 0
O N
O O
N N
uJ
0)
0)
co
0
U
z
0
H
0
uJ
0)
0)
co
i
805
803
801
805
0
+
0
O
799
0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
co co 0 N V co co 0 N V co co 0 N V co co 0
+ + + + + + + + + + + + + + + + + +
V V Lc) Lc) Lc) Lc) Lc) O O O O O r r r r r
O O O O O O O O O O O O O O O O 0
N N N N N N N N N N N N N N N N N
CO
O
805
803
803
801
799
0 0
+ +
CO CO
O O
N N
v coo co 0 NN v coo co 0 NN
+ + + + + + + + + +
CO CO co Q) Q) Q) Q) Q) O_ O_
O O O O O O O 0
N N N N N N N N N N
LONGITUDINAL PROFILE- UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
0
0
+
N
0
r
N
0
+
✓
N
0
r
N
801
799
0
co 0
N
_
N
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
UT1
STA: 200+00-212+00
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013-AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
200F 23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www. keemap. com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
805
805
303
z
80?
0
H
0
801
OSS-SECTION i -S
b I hl
in
co
co
801
0
U
r99
799
797
1
797
I
806
806
305
ENT CROSSING
iING
80E
803
80?
co
II
301
0
H
in
801
uJ
co
uJ
in
799
uJ
_1
in
J
799
Q
z
w
INTERNAI
r97
H
797
r95
`
795
\
794
794
+
co
N
798
798
797
797
795
793
791
0 0
CO
+ N
7
CO
z
0
H
0
uJ
0)
0
N
N
+
co
N
0
co
0
m
N
795
793
791
0o oN v coo o 0
N N N N N
LONGITUDINAL PROFILE- UT1
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
SEAL: �0�\\�`\ 10AR() i ,O,,
� cAssi �.
' Doali4r6d byr °
° LL-4647 =
/i,, Ip B I I. 1 \\\�
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
UT1
STA: 212+00-221+00
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013—AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
21 OF 23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
823 823
821 I ^ 821
V
819 I 819
817 /\ 817
815
815
813
811
z
0
H
U
uJ
0)
0)
co
0
0
z
0
H
0
uJ
0)
0)
co
0
0
813
811
809 809
807
O �
0
co
CO
0
co
CO
CO
LONGITUDINAL PROFILE- UT1A
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
CO
M
807
O 00
+j
SEAL: `c, 1CAP
%B/
occtel 6 bY' °
1:12:1:1\
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
UT1A
STA: 300+00-305+00
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013—AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
220F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D
797
796
795
794
793
792
791
790
42' CPP
INV IN: 792.63'
INV OUT: 792.51'
0 0
+ 71-
+ +
N N
796
795
797
796
795
794
793
792
co
CO
+
co
co
CO
CO
LONGITUDINAL PROFILE- UT2
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
0 0 0 0
co co
+ +
V V V V
796
795
794
794
793
793
792
792
791
790
789
+ coo +
0 0 0
0 0 0
co co co
48" CPP
INV IN: 790.97'
INV OUT: 790.45'
o �
0 0
CO CO
+
0
co
0
co
0
0
co
791
790
789
o o
N v coo om
+ + + + +
0 0 0 0 000 CO CO CO CO
LONGITUDINAL PROFILE- UT3
HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE
VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE
LEGEND
THALWEG
791
790
SEAL: 0,\eo��� ICAR®%�B/
7
r:
L-4 4 7
NOTE: SEE SHEET 1 FOR
SURVEYOR'S NOTES, LEGEND &
STATEMENT OF CERTIFICATION
ELEVATION DATUM: NAVD 88
CONTOUR INTERVAL: 1 FOOT
THIS IS A TOPOGRAPHIC
SURVEY FOR INFORMATIONAL
AND DESIGN PURPOSES
ONLY. IT SHOULD NOT BE
USED FOR CONVEYANCE OR
LEGAL PURPOSES.
AN AS -BUILT SURVEY FOR:
WILDLANDS
ENGINEERING, INC
SPO FILE NOS. 36-CR & 36-CS
DMS SITE ID NO. 100120
PROJECT:
OAK HILL DAIRY
MITIGATION SITE
SHEET TITLE:
LONGITUDINAL PROFILE:
UT2
STA: 2+30-4+90
UT3
STA: 300+40-302+80
TOWNSHIP:
CHERRYVILLE
COUNTY:
GASTON
STATE:
NORTH CAROLINA
DRAWN BY:
NH
CHECKED BY:
PBK
SURVEY BY:
KP, AC, JR, CB, DP
SCALE:
AS SHOWN
SURVEY DATE:
04/22/22
JOB:
#2201013-AB
SHEET SIZE:
11" X 17" (HALF SIZE)
DATE
REVISIONS
SHEET:
230F23
P.O. Box 2566
Asheville, NC 28802
(828) 575-9021
www.keemap.com
License # C-3039
Appendix F
Correspondence
Environmental
Quality
To: DMS Technical Workgroup, DMS operations staff
From: Periann Russell, Division of Mitigation Services (DMS)
RE: Pebble count data requirements
Date: October 19, 2021
The DMS Technical Work Group met September 29, 2021 to discuss Interagency Review Team (IRT) and
DMS requirements for collecting pebble count data as part of monitoring (MYO-MYx). Agreement was
reached between all attending parties that pebble count data will not be required during the monitoring
period for all future projects.
Sediment data and particle distribution will still be required for the mitigation plan as part of the
proposed design explanation and justification.
Pebble counts and/or particle distributions currently being conducted by providers for annual
monitoring may be discontinued at the discretion of the DMS project manager. If particle distribution
was listed as a performance standard in the project mitigation plan, the provider is required to
communicate the intent to cease data collection with the DMS project manager. The absence of pebble
count data in future monitoring reports where pebble count data was listed as part of monitoring in the
mitigation plan must be documented in the monitoring report. The September 29, 2021 Technical Work
Group meeting may be cited as the source of the new policy.
The IRT reserves the right to request pebble count data/particle distributions if deemed necessary
during the monitoring period.
Kristi Suggs
From: Reid, Matthew <matthew.reid@ncdenr.gov>
Sent: Wednesday, October 27, 2021 1:26 PM
To: Kristi Suggs
Cc: Mimi Caddell
Subject: RE: [External] FW: Pebble Count Data Requirements
I am absolutely OK with not doing pebble counts anymore!
As stated in the memo, please add a statement in the monitoring reports citing the policy.
Thanks!
Matthew Reid
Project Manager — Western Region
North Carolina Department of Environmental Quality
Division of Mitigation Services
828-231-7912 Mobile
matthew.reid@ncdenr.gov
Western DMS Field Office
5 Ravenscroft Dr
Suite 102
Asheville, NC 28801
%' lMthlrq Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Kristi Suggs [mailto:ksuggs@wildlandseng.com]
Sent: Wednesday, October 27, 2021 1:24 PM
To: Reid, Matthew <matthew.reid@ncdenr.gov>
Cc: Mimi Caddell <mcaddell@wildlandseng.com>
Subject: [External] FW: Pebble Count Data Requirements
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Matthew,
Jason Lorch in our Raleigh Office forwarded this meeting memo to me. It says that conducting pebble counts for DMS
monitoring (MYO — MY7) projects is no longer needed as long as it has been okayed by the DMS PM. Moving forward,
are you going to allow us to stop doing them on your projects? If so, will DBB projects be treated the same? Please let
me know. Thank you!
Kristi
1
Kristi Suggs I Senior Environmental Scientist
0: 704.332.7754 x110 M: 704.579.4828
Wildlands Engineering, Inc.
1430 S. Mint St, Suite 104
Charlotte, NC 28203
From: Jason Lorch <jlorch@wildlandseng.com>
Sent: Monday, October 25, 2021 9:05 AM
To: Kristi Suggs <ksuggs@wildlandseng.com>
Subject: FW: Pebble Count Data Requirements
FYI!
Jason Lorch, GISP 1 Senior Environmental Scientist
0: 919.851.9986 x107 M: 919.413.1214
Wildlands Engineering, Inc.
312 West Millbrook Road, Suite 225
Raleigh, NC 27609
From: Russell, Periann <periann.russell@ncdenr.gov>
Sent: Thursday, October 21, 2021 10:05 AM
To: King, Scott <Scott.King@mbakerintl.com>; Catherine Manner <catherine@waterlandsolutions.com>; Tugwell, Todd J
CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; adam.spiller@kci.com; Brad Breslow <bbreslow@res.us>;
Davis, Erin B <erin.davis@ncdenr.gov>; gginn@wolfcreekeng.com; grant lewis<glewis@axiomenvironmental.org>; Jeff
Keaton <ikeaton@wildlandseng.com>; katie mckeithan <Katie.McKeithan@mbakerintl.com>; Kayne Van Stell
<kayne@waterlandsolutions.com>; Kevin Tweedy <ktweedy@eprusa.net>; Reid, Matthew
<matthew.reid@ncdenr.gov>; Ryan Smith <rsmith@lmgroup.net>; Melia, Gregory <gregory.melia@ncdenr.gov>; Allen,
Melonie <melonie.allen@ncdenr.gov>; Famularo, Joseph T <Joseph.Famularo@ncdenr.gov>; Rich@mogmit.com; Bryan
Dick <Bryan.Dick@freese.com>; Ryan Medric <rmedric@res.us>; Kim Browning
<Kimberly.D.Browning@usace.army.mil>; Kayne Van Stell <kayne@waterlandsolutions.com>; Worth Creech
<worth@restorationsystems.com>; Jason Lorch <jlorch@wildlandseng.com>
Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Tsomides, Harry
<harry.tsomides@ncdenr.gov>; Reid, Matthew <matthew.reid@ncdenr.gov>; Dow, Jeremiah J
<ieremiah.dow@ncdenr.gov>; Horton, Jeffrey <ieffrey.horton@ncdenr.gov>; Ullman, Kirsten J
<Kirsten.Ullman@NCDENR.gov>; Ackerman, Anjie <aniie.ackerman@ncdenr.gov>; Blackwell, Jamie D
<iames.blackwell@ncdenr.gov>; Xu, Lin <lin.xu@ncdenr.gov>; Mir, Danielle <Danielle.Mir@ncdenr.gov>; Corson, Kristie
<kristie.corson@ncdenr.gov>; Russell, Periann <periann.russell@ncdenr.gov>; Sparks, Kimberly L
<Kim.sparks@ncdenr.gov>
Subject: Pebble Count Data Requirements
Please review the attached memo documenting the agreed upon policy for pebble count data requirements.
Please reply (me only) to this email if accept that this memo represents (or misrepresents) our discussion on Sept 29.
Thank you.
Periann Russell
Geomorphologist
Division of Mitigation Services, Science and Analysis
NC Department of Environmental Quality
2
919 707 8306 office
919 208 1426 mobile
beriann.russell@ncdenr.gov
Mailing: 1652 Mail Service Center Raleigh, NC 27699-1652
Physical: 217 West Jones Street Raleigh, NC 27603
`Nothlrq COMM
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
3