Loading...
HomeMy WebLinkAbout20190863 Ver 1_Year 0 Monitoring Report_2022_20220622Mitigation Project Information Upload ID#* 20190863 Version* 1 Select Reviewer: * Erin Davis Initial Review Completed Date 06/22/2022 Mitigation Project Submittal - 6/22/2022 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Matthew Reid Project Information ID#:* 20190863 Existing ID# Project Type: Project Name: County: • DMS Mitigation Bank Oak Hill Dairy Mitigation Site Gaston Document Information Mitigation Document Type: * Mitigation Monitoring Report File Upload: Signature ............................................ Print Name: * Signature:* Email Address: * matthew.reid@ncdenr.gov Version:* 1 Oak Hill Dairy_100120_MY0_2022.pdf Existing Version 61.09MB Please upload only one PDF of the complete file that needs to be submitted... Matthew Reid at y @�@5urIs • MONITORING YEAR 0 OAK HILL DAIRY MITIGATION SITE Gaston County, NC ANNUAL REPORT Catawba River basin FINAL HUC 03050102 DMS Project No. 100120 May 2022 DMS Contract No. 7867 DMS RFP No. 16-007704 (Date of Issue: September 6, 2018) USACE Action ID No. SAW-2019-00833 DWR Project No. 2019-0863 Data Collection Dates:January 2022—March 2022 PREPARED FOR: 11111 NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 PREPARED BY: WILDLANDS ENGINEERING Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Phone: 704.332.7754 Fax: 704.332.3306 ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director June 9, 2022 Ms. Kristi Suggs Wildlands Engineering, Inc. 1430 S. Mint St, Suite 104 Charlotte, NC 28203 NORTH CAROLINA Environmental Quality Subject: Oak Hill Dairy Draft MY0 Report Review Catawba River Basin — CU# 03050102 Gaston County DMS Project ID No. 100120 Contract # 7867 Dear Ms. Suggs, The Division of Mitigation Services (DMS) received the Draft Mitigation Plan for Oak Hill Dairy from Wildlands Engineering, Inc on May 23, 2022. The Project is expected to provide 4,618.933 SMUs and 7.680 WMUs. The following are the DMS review team's comments on the draft report. • Please add "Date of Issue: September 6, 2018" following RFP number on title page. • Table of Contents: A set of coordinates is accidently shown under 1.3 Project Attributes. Please revise for final. • CCPV: Recommend labeling BMP1 and BMP2. • Photos of BMP1 and BMP2 show a considerable amount of ponded water. Does WEI expect the BMPs to hold water year-round or dry seasonally? • 3.2 Vegetation Areas of Concern: WEI has identified and treated several of the most concerning invasive species prior to and during the construction process. Please continue aggressively treating the kudzu, knotweed, bamboo and marsh dewflower as new populations are observed on the site. Also, please note on future CCPV maps the locations of invasives and where treatment occurs. • Several areas were not planted with bare roots due to depth of standing water. Does WEI intend to plant these areas at a later date? • Sheet 1.14: Pools on UT2 profile are shown and noted as being filled with sediment. WEI expects the pools to adjust as vegetation becomes established. Please provide an update in MY1 regarding the UT2 stream conditions. Note that UT2 is not a credited reach. Digital Deliverable Comments • Draft digital deliverables were reviewed and complete. D_E NORTH CAROLINA Department otEnvironmental nuaI North Carolina Department of Environmental Quality I Division of Mitigation Services 217 West Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 At your earliest convenience, please provide a written response letter addressing the DMS comments provided and one final hard copy of the revised/updated Baseline Monitoring Document and Record Drawings. The comment response letter should be included in the revised report after the report cover page. Please include a full final electronic copy with electronic support files on a CD or USB drive. Sincerely, Matthew Reid Western Project Manager NCDENR — Division of Mitigation Services 5 Ravenscroft Dr., Suite 102 Asheville, NC 28801 828-231-7912 D_E NORTH CAROLINA Department of Environmental Quality North Carolina Department of Environmental Quality I Division of Mitigation Services 217 West Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 WILDLANDS ENGINEERING June 17, 2022 Mr. Matthew Reid Western Project Manager NCDEQ— Division of Mitigation Services 5 Ravenscroft Dr., Suite 102 Asheville, NC 28801 RE: Oak Hill Dairy Draft MY0 Report Review Catawba River Basin — CU# 03050102 — Gaston County DMS Project ID No. 100120 Contract # 7867 Dear Mr. Reid: Wildlands Engineering, Inc. (Wildlands) has reviewed Division of Mitigation Services' (DMS) comments from the Draft Monitoring Year 0 (MYO) Report for the Oak Hill Dairy Mitigation Site. The report has been updated to reflect those comments. Wildlands responses to DMS's comments are noted below. DMS Comments, Matthew Reid: 1. Please add "Date of Issue: September 6, 2018" following RFP number on title page. Wildlands Response: Title page has been updated to include RFP date of issue. 2. Table of Contents: A set of coordinates is accidently shown under 1.3 Project Attributes. Please revise for final. Wildlands Response: Wildlands has removed the set of coordinates from the table of contents. 3. CCPV: Recommend labeling BMP1 and BMP2. Wildlands Response: BMP labels are now shown on CCPV maps. 4. Photos of BMP1 and BMP2 show a considerable amount of ponded water. Does WEI expect the BMPs to hold water year-round or dry seasonally? Wildlands Response: Wildlands expects water levels for BMP1 to drawn down when vegetation becomes established and dry -out during the drier months from late spring to early fall. BMP2 should also draw down when vegetation becomes established and during drier months; however, it will likely continue to hold a shallow pond of water especially during monitoring years or months experiencing greater than average rainfall. Wildlands will continue to monitor, and remedial action will be initiated if it is deemed necessary. 5. 3.2 Vegetation Areas of Concern: WEI has identified and treated several of the most concerning invasive species prior to and during the construction process. Please continue aggressively treating the kudzu, knotweed, bamboo and marsh dewflower as new populations are observed on the site. Also, please note on future CCPV maps the locations of invasives and where treatment occurs. Wildlands Response: Invasive species presence will continue to be monitored, treated, and documented in future monitoring reports. 6. Several areas were not planted with bare roots due to depth of standing water. Does WEI intend to plant these areas at a later date? Wildlands Response: Wildlands does not anticipate the installation of bare roots in these areas in the future. The areas that were not planted with bare roots due to standing water were planted with live stakes of species tolerant to inundation. Wildlands did not anticipate that these wetland areas would hold water, so these areas were not separated from the remainder of the wetland planting areas during the design phase of the project. However, after construction was complete, it was more evident that these areas may remain inundated or be inundated for long periods of time. Therefore, to increase survival and establishment of woody vegetation in these areas, Wildlands decided to use live stakes rather than bare roots in the inundated areas and based this judgement on past project experience on sites with similar site conditions and professional experience. 7. Sheet 1.14: Pools on UT2 profile are shown and noted as being filled with sediment. WEI expects the pools to adjust as vegetation becomes established. Please provide an update in MY1 regarding the UT2 stream conditions. Note that UT2 is not a credited reach. Wildlands Response: A brief summation of UT2 stream conditions will be included in MY1. As requested, Wildlands has included one hard copy of the revised/updated Baseline Monitoring Document and Record Drawings and has placed the DMS comment letter and our response letter after the report's cover page. A full final electronic copy of the report and support files are included on a USB drive. Please let me know if you have any questions. Sincerely, Kristi Suggs Senior Environmental Scientist ksuggs@wildlandseng.com OAK HILL DAIRY MITIGATION SITE Monitoring Year 0 Annual Report TABLE OF CONTENTS Section 1: PROJECT OVERVIEW 1-1 1.1 Project Quantities and Credits 1-1 1.2 Project Goals and Objectives 1-4 1.3 Project Attributes 1-6 Section 2: As -Built Condition (Baseline) 2-8 2.1 As-Built/Record Drawings 2-8 2.1.1 Oak Hill Creek Reach 1 2-8 2.1.2 Oak Hill Creek Reach 2 2-8 2.1.3 Oak Hill Creek Reach 3 2-9 2.1.4 Oak Hill Creek Reach 4 2-9 2.1.5 UT1 Reach 1 2-9 2.1.6 UT1 Reach 2 2-9 2.1.7 UT1A ..2-10 2.1.8 UT1B ..2-10 2.1.9 UT2 ....2-10 2.1.10 UT3 .2-10 2.1.11 Wetland Grading #4, Cross-section #6 2-10 2.1.12 Wetland Grading #3, Cross-section #7 2-10 2.1.13 Vegetation Planting List & Plan 2-11 2.1.14 Fencing Plan 2-11 2.1.15 Monitoring Components 2-11 Section 3: Monitoring Year 0 Data Assessment 3-12 3.1 Vegetative Assessment 3-12 3.2 Vegetation Areas of Concern 3-12 3.3 Stream Assessment 3-12 3.4 Stream Areas of Concern 3-13 3.5 Hydrology Assessment 3-13 3.6 Wetland Assessment 3-13 3.7 Adaptive Management Plan 3-13 3.8 Monitoring Year 0 Summary 3-13 Section 4: METHODOLOGY 4-1 Section 5: REFERENCES 5-1 TABLES Table 1: Project Quantities and Credits 1-1 Table 2: Goals, Performance Criteria, and Improvements 1-4 Table 3: Project Attributes 1-6 :IGURE. Figure la-c APPENDICES Appendix A Current Condition Plan View Visual Assessment Data Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL Table 4a-c Table 5 Visual Stream Morphology Stability Assessment Table Vegetation Condition Assessment Table Stream Photographs Vegetation Plot Photographs Groundwater Well Photographs Groundwater Well Installation Data Sheets Appendix B Vegetation Plot Data Table 6 Vegetation Plot Data Table 7 Vegetation Performance Standards Summary Table Appendix C Stream Geomorphology Data Cross -Section Plots Longitudinal Profile Reach wide and Cross Section Pebble Counts Table 8a-d Baseline Stream Data Summary Table 9 Cross -Section Morphology Monitoring Summary Appendix D Project Timeline and Contact Information Table 10 Project Activity and Reporting History Table 11 Project Contact Table Appendix E Record Drawings and Sealed As -built Survey Appendix F Correspondence DMS Technical Workgroup Memo (10/19/2021) Pebble Count Data Requirements — M. Reid (10/27/2021 email) Oak Hill Dairy Mitigation Site 41, Monitoring Year 0 Annual Report - FINAL ii Section 1: PROJECT OVERVIEW The Oak Hill Dairy Mitigation Site (Site) is in Gaston County, approximately 2 miles northeast of Cherryville and 7 miles southwest of Lincolnton. Watersheds UT1, UT1A, UT1B, and Oak Hill Creek drain into Indian Creek, which drains to the Catawba River. Both Indian Creek and Catawba River are listed as high restoration priorities in the 2013 Catawba River Basin Restoration Priorities (RBRP) and the 2008- 2010 Indian Creek and Howards Creek Local Watershed Plan (LWP). Table 3 presents information related to the project attributes. 1.1 Project Quantities and Credits Mitigation work within the Site included restoration, enhancement I, and enhancement II of perennial and intermittent stream channels, and the creation, re-establishment, and rehabilitation of wetland areas. Table 1 below shows stream credits by reach and the total amount of stream credits expected at closeout. Table 1: Project Quantities and Credits PROJECT MITIGATION QUANTITIES Project Segment Mitigation Plan Footage12 As Built Footage Mitigation Category Restoration Level Mitigation Ratio (X:1) Credits Comments Stream Oak Hill Creek R1 488.527 489.000 Warm El 1.5 325.685 Restored dimension and profile, created a floodplain bench, planted buffers, treated invasive species, fenced out livestock, and protected with a conservation easement. Oak Hill Creek R2 470.085 470.000 Warm R 1.0 470.085 Restored dimension, profile pattern, and floodplain access, planted buffers, treated invasive species, fenced out livestock, and protected with a conservation easement. Oak Hill Creek R3 877.051 877.000 Warm R 1.0 877.051 Restored dimension, profile pattern, and floodplain access, planted buffers, treated invasive species, fenced out livestock, provided stormwater treatment, and protected with a conservation easement. Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 1-1 PROJECT MITIGATION QUANTITIES Project Segment Mitigation Plan Footagel z As Built Footage Mitigation Category Restoration Level Mitigation Ratio (X:1) Credits Comments Oak Hill Creek R4 388.273 388.900 Warm R 1.0 388.273 Restored dimension, profile pattern, and floodplain access, planted buffers, treated invasive species, fenced out livestock, and protected with a conservation easement. UT1 R1 217.749 218.000 Warm R 1.0 217.749 Restored dimension, profile pattern, and floodplain access, planted buffers, fenced out livestock, and protected with a conservation easement. UT1 R2 1,834.520 1,834.100 Warm R 1.0 1,834.520 Restored dimension, profile pattern, and floodplain access, planted buffers, fenced out livestock, provided stormwater treatment, and protected with a conservation easement. UT1A 469.110 469.600 Warm R 1.0 469.110 Restored dimension, profile, and pattern, planted buffers, fenced out livestock, and protected with a conservation easement. UT1B 291.680 292.100 Warm Ell 8.0 36.460 Planted buffers, treated invasive species, fenced out livestock, and protected with a conservation easement. Wetland Project Segment Mitigation Plan Acreage As -Built Acreage Mitigation Category Restoration Level Mitigation Ratio (X:1) Credits Comments Wetland Re -berm establishment 4.859 4.863 RR RE 1.0 4.859 Raised stream bed elevation, plugged/filled drainage features, removed material, planted native wetland vegetation community, treated invasive species, fenced out livestock and protected with a conservation easement. Oak Hill Dairy Mitigation Site 41, Monitoring Year 0 Annual Report - FINAL 1-2 PROJECT MITIGATION QUANTITIES Project Segment Mitigation Plan Footage,' As Built Footage Mitigation Category Restoration Level Mitigation Ratio (X:1) Credits Comments Wetland Rehabilitation 1.805 1.805 RR RH 1.0 1.805 Raised stream bed elevation, plugged/filled drainage features, removed cultivation and vegetation management impacts, removed berm material, planted native wetland vegetation community, treated invasive species, fenced out livestock, provided stormwater treatment, and protected with a conservation easement. Wetland Rehabilitation 0.284 0.284 RR RH 1.5 0.189 Raised stream bed elevation, plugged/filled drainage features, removed berm material, planted and supplementally planted native wetland vegetation community, treated invasive species, fenced out livestock and protected with a conservation easement. Wetland Creation 2.481 2.480 RR C 3.0 0.827 Raised stream bed elevation, plugged/filled drainage features, removed berm material, planted native wetland vegetation community, treated invasive species, fenced out livestock and protected with a conservation easement. Total Stream Credits: 4,618.933 Total Wetland Credits: 7.680 1. Crossing lengths have been removed from restoration footage. 2. No direct credit for BMPs on site. W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 1-3 Restoration Level Stream Riparian Wetland Non -Rip Warm Cool Cold Riverine Non-Riverine Wetland Restoration 4,256.788 Re-establishment 4.859 Rehabilitation (1:1 & 1.5:1) 1.994 Enhancement Enhancement I 325.685 Enhancement 11 36.460 Creation 0.827 Preservation Totals 4,618.933 7.680 1.2 Project Goals and Objectives The project is intended to provide numerous ecological benefits. Table 2 below describes expected outcomes to water quality and ecological processes and provides project goals and objectives. Table 2: Goals, Performance Criteria, and Functional Improvements Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Treat concentrated agricultural runoff. Install stormwater BMPs to treat runoff areas of concentrated agricultural runoff before it enters the stream channel. Reduce agricultural and sediment inputs to the project, which will reduce likelihood of accumulated fines and excessive algal blooms from nutrients. There is no required performance standard for this metric. Visually inspect BMPs and document with photos. N/A Exclude livestock from stream channels and riparian wetlands. Install livestock fencing as needed to exclude livestock from stream channels, wetlands, and riparian areas, or remove livestock from adjacent fields. Reduce agricultural and sediment inputs to the project. Reduce sediment inputs from bank erosion and degradation. Provide riparian and wetland habitat. Support all stream and wetland functions. Prevent easement encroachments. Visually inspect the perimeter of the Site to ensure no easement encroachment is occurring. No easement encroachments. W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 1-4 Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Improve the stability of stream channels. Construct stream channels that will maintain stable cross sections, patterns, and profiles over time. Add bank revetments and instream structures to protect restored/ enhanced streams. Reduce sediment inputs from bank erosion. Reduce shear stress on channel boundary. ER >_ 2.2 and BHR <_ 1.2 with visual assessments showing progression towards stability. 14 Cross-section monitoring will be assessed during MY1, MY2, MY3, MY5, and MY7 and visual inspections will be assessed annually. Cross -sections show streams are stable and functioning as designed. ERs are over 2.2 and BHRs are below 1.2. Improve instream habitat. Install habitat features such as constructed steps, cover logs, and brush toes on restored/enhanced streams. Add woody materials to channel beds. Construct pools of varying depth. Increase and diversify available habitats for macroinvertebrates, fish, and amphibians leading to colonization and increase in biodiversity over time. There is no required performance standard for this metric. N/A N/A Reconnect channels with floodplains and riparian wetlands. Reconstruct stream channels with designed bankfull dimensions and depth based on reference reach data. Reduce shear stress on channel; Hydrate adjacent wetland areas; Filter pollutants out of overbank flows. Four bankfull events in separate years within the 7-year monitoring period. Three automated pressure transducers were installed on restoration reaches and will record flow elevations and durations. Reported in MY1. Restore wetland hydrology, soils, and plant communities. Restore and enhance riparian wetlands by raising stream bends, filling existing ditch network, removing berm material over relic hydric soils, and planting native wetland species. Increase water storage, increase groundwater recharge, water quality treatment through retention, and increase habitat for aquatic and terrestrial species. Free groundwater within 12 inches of soil surface for a minimum of 12% (28 consecutive days) of the growing season Eleven (11) groundwater gages were installed in wetland re - establishment, creation, and rehabilitation areas and monitored annually. Reported in MY1. W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 1-5 Goal Objective/ Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Restore and enhance native floodplain and streambank vegetation. Plant native tree and understory species in riparian zones and plant native shrub and herbaceous species on streambanks. Reduce sediment inputs from bank erosion and runoff. Increase nutrient cycling and storage in floodplain. Provide riparian habitat. Add a source of LWD and organic material to stream. Survival rate of 320 stems per acre at MY3, 260 planted stems per acre at MY5 and a height of 8 ft., and 210 stems per acre at MY7 with a height of 10 ft. Thirteen (13) permanent and 6 mobile one hundred square meter vegetation plots are placed on 2% of the planted area of the Site and monitored during MY1, MY2, MY3, MY5, and MY7. All 19 vegetation plots have a planted stem density greater than 320 stems per acre. Permanently protect the project Site from harmful uses. Establish conservation easements on the Site. Crop field removal and exclusion of livestock. Protect Site from encroachment on the riparian corridor and direct impact to streams and wetlands. Prevent easement encroachment. Visually inspect the perimeter of the Site to ensure no easement encroachment is occurring. No easement encroachments. 1.3 Project Attributes The project is bordered by residential properties and an active dairy farm comprised of cattle pastures, an outdoor feeding area, and row crops. Based on historic aerials from 1950 to 2016, the streams existed in their same location for over 60 years. Agricultural use of the land was consistent during this period as well. Several alterations to the Site visible from historical aerial photography were the addition of the large pond in northeast corner of the Site between 1964 and 1973, and the addition of the no - discharge waste lagoon south of the large pond between 2006 and 2009. Additionally, most structures were built between 1964 and 1976 with the two large feed barns being built within the last 15 years. The Site, based on aerial photography, has a history of ditching, field grading, and stream channelization which increased drainage effects and impaired wetland hydrology. Table 3 below and Table 9 in Appendix C present additional information on pre -restoration conditions. Table 3: Project Attributes PROJECT INFORMATION Project Name Oak Hill Dairy Mitigation Site County Gaston County Project Area (acres) 20.4 Project Coordinates 35.403339, -81.351724 PROJECT WATERSHED SUMMARY INFORMATION Physiographic Province Piedmont River Basin Catawba River USGS HUC 8-digit 03050102 USGS HUC 14-digit 03050102050010 DWR Sub -basin 03-08-35 Land Use Classification 24% agriculture, 40% forested, 36% developed Project Drainage Area (acres) 1,070 (Oak Hill Creek) Percentage of Impervious Area 11.6% Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 1-6 RESTORATION TRIBUTARY SUMMARY INFORMATION Parameters Oak Hill Creek UT1 UT1A UT1B Pre -project length (feet) 2,417 1,958 482 292 Post -project (feet) 2,225 2,052 470 292 Valley confinement (Confined, moderately confined, unconfined) Moderately Confined to Unconfined Unconfined Confined Moderately Confined Drainage area (acres) 1070 333 12 4 Perennial, Intermittent, Ephemeral Perennial Intermittent/Perennial DWR Water Quality Classification C Dominant Stream Classification (existing) B4c/G4c/C4/E5 F4/G4 F6b Cb Dominant Stream Classification (proposed) C4 C4 E4b Cb Dominant Evolutionary class (Simon) if applicable Stage IV/V Stage IV/V Stage IV Stage I REGULATORY Parameters CONSIDERATIONS Applicable? Resolved? Supporting Documentation Water of the United States - Section 404 Yes Yes SAW-2019-00833 Water of the United States - Section 401 Yes Yes DWR# 2019-0863 Endangered Species Act Yes Yes Categorical Exclusion in Mitigation Plan (Wildlands, 2021) Historic Preservation Act Yes Yes FEMA Floodplain Compliance Yes Yes Conditional Letter of Map Revision (CLOMR) Essential Fisheries Habitat No N/A N/A Coastal Zone Management Act No N/A N/A eV1 etIand Summary n ormation Parameters Wetland A Wetland B Wetland C Wetland D Pre project area (acres) 2.203 0.138 0.021 0.028 Wetland Type Bottom Hardwood Forest Headwater Forest Headwater Forest Headwater Forest Mapped Soil Series Chewacla loam, Wedowee sandy loam, Worsham loam Chewacla loam, Pacolet sandy clay loam, Pacolet sandy loam Chewacla loam, Pacolet sandy loam Pacolet sandy loam Drainage Class Somewhat poorly drained, Well -drained, Poorly drained Somewhat poorly drained, Well -Somewhat drained, Well drained poorly drained, Well- drained Well drained Soil Hydric Status No, No, Yes No, No, No No, No No Source of Hydrology Groundwater/Overbank Groundwater Groundwater Groundwater Restoration or enhancement method Enhancement Enhancement Enhancement Enhancement W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 1-7 Parameters Wetland F Wetland J Wetland K1 Pre project area (acres) 0.131 0.047 <0.000 Wetland Type (non- riparian, riparian) Headwater Forest Headwater Forest Bottomland Hardwood Forest Mapped Soil Series Chewacla loam Helena sandy loam Chewacala loam Drainage Class Somewhat poorly drained Moderately well drained Somewhat poorly drained Soil Hydric Status No No No Source of Hydrology Groundwater Groundwater/Overbank Groundwater Restoration or enhancement method Enhancement Enhancement None 'No wetland credit is being sought for Wetland K. Section 2: As -Built Condition (Baseline) The Site construction was completed on January 21, 2022, and as -built surveys were completed in March 2022. The survey included developing an as -built topographic surface; as well as, surveying the as -built channel centerlines, top of banks, structures, and monitoring components. The Site's construction planting was completed on 02/21/22. Monitoring device installation and vegetative and substrate data collection were completed by 02/21/2022. 2.1 As-Built/Record Drawings A sealed half-size set of the record drawing and as -built survey are in Appendix E which includes the post -construction survey, alignments, structures, and monitoring features. Field adjustments made during construction that differ from the design plans are shown as red lines on the record drawing. These adjustments were made during construction, where needed, based on field evaluations and are listed below. 2.1.1 Oak Hill Creek Reach 1 • STA: 100+31— INCREASED BANK GRADING TO STABILIZE BEGINNING OF STREAM ENHANCEMENT • STA: 102+17 — BANK ROUGH ADDED TO INCREASE FLOODPLAIN ROUGHNESS • STA: 102+21— LOG SILL ADDED IN PLACE OF ROCK SILL DUE TO EXCESS LOGS • STA: 102+98 — LOG SILL ADDED FOR EXTRA GRADE CONTROL • STA: 104+58 — LOG VANE REPLACED BY LOG J-HOOK FOR ADDITIONAL GRADE CONTROL • STA: 104+91— LOG VANE NOT BUILT TO AVOID DISTURBANCE TO STABLE BANK AND TOE • STA: 105+39 — RIFFLE EXTENDED ACROSS FORD CROSSING FOR ADDITIONAL STABILITY 2.1.2 Oak Hill Creek Reach 2 • STA: 107+30 — LOG SILL NOT BUILT DUE TO SUFFICIENT GRADE CONTROL PROVIDED BY RIFFLE 4/Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 2-8 • STA: 110+23 — BRUSH TOE ADDED TO PROTECT BANK AT CONFLUENCE 2.1.3 Oak Hill Creek Reach 3 • STA: 110+69 — LOG J-HOOK ADDED IN PLACE OF ROCK SILL FOR EXTRA STABILITY • STA: 112+63 — GEOLIFT NOT BUILT DUE TO SUFFICIENT BANK STABILITY • STA: 112+66 — GEOLIFT NOT BUILT DUE TO SUFFICIENT BANK STABILITY • STA: 115+29 — LOG J-HOOK ADDED IN PLACE OF ROCK SILL FOR ADDED POOL STABILITY • STA: 116+56 — LOG SILL ADDED IN PLACE OF LOG J-HOOK; BEND SUFFICIENTLY PROTECTED BY BRUSH TOE • STA: 117+84 — LOG J-HOOK ADDED IN PLACE OF LOG SILL FOR ADDED STABILITY • STA: 118+18 — BANK ROUGHENING EXTENDED TO IMPROVE CONFLUENCE STABILITY 2.1.4 Oak Hill Creek Reach 4 • STA: 120+34 — LOG SILL ADDED IN PLACE OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE MATERIAL • STA: 120+86 — BANK ROUGHENING ADDED FOR STABILITY • STA: 122+57 — STABILIZED OUTLET CHANNEL; ADDED FOR ROADSIDE CULVERT • STA: 122+71— LOG J-HOOK NOT BUILT DUE TO EXTENSION OF GEOLIFT 2.1.5 UT1 Reach 1 • STA: 200+21— RIPRAP ADDED TO STABILIZE BANK • STA: 200+37 — ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY • STA: 200+88 — LOG SILL NOT BUILT DUE TO TREE SAVES ON RIGHT BANK AND ADEQUATE GRADE CONTROL FROM RIFFLE • STA: 201+63 — BANK ROUGHENING ADDED TO ROUGHEN FLOODPLAIN 2.1.6 UT1 Reach 2 • STA: 202+26 — LOG J-HOOK BUILT IN PLACE OF ROCK SILL TO INCREASE CONFLUENCE STABILITY • RIPRAP ADDED TO STABILIZE INLET OF BMP 1 • STA: 205+04 — BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY • STA: 205+93 — BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY • STA: 206+80 — BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY • STA: 207+42 — LOG SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL • STA: 208+49 — LOG SILL BUILT IN PLACE OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE MATERIAL • STA: 209+43 — VEGETATED GEOLIFT NOT BUILT DUE TO ADEQUATE BANK STABILITY • STA: 210+63 — LOG SILL BUILT AT TAIL OF RIFFLE IN LOG STEP RIFFLE SEQUENCE • STA: 212+51— ROCK SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL • STA: 214+38 — ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY • STA: 217+03 — BRIDGE REPLACED CULVERT CROSSING FOR LANDOWNER ACCESS • STA: 219+02 — LOG SILL INSTALLED INSTEAD OF ROCK SILL AS CONTINUATION OF LOG DROP RIFFLE • STA: 219+99 — LOG SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL • STA: 220+78 — ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY Oak Hill Dairy Mitigation Site 41, Monitoring Year 0 Annual Report - FINAL 2-9 2.1.7 UT1A • STA: 300+63 — LOG SILL BUILT IN PLACE OF ROCK SILL FOR DIVERSITY • STA: 300+96 — LOG SILL INSTALLED INSTEAD OF ROCK SILL FOR DIVERSITY • STA: 301+00 — 302+20 — PROFILE ADJUSTED TO ACCOMMODATE STRUCTURE DESIGN CHANGES FOR STREAM STABILITY • STA: 301+06 — RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION • STA: 301+32 — RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION • STA: 301+45 — LOG SILL INSTALLED INSTEAD OF ROCK SILL FOR DIVERSITY • STA: 301+52 — RIPRAP ADDED TO STABILIZE BANK • STA: 302+05 — INSTALLED (1) LONG RIFFLE WITH (1) LOG SILL INSTEAD OF (2) RIFFLES WITH (1) LOG SILL AND (1) ROCK SILL FOR ADDED STREAM STABILTY • STA: 302+60 — 304+90 — PROFILE ADJUSTED TO ACCOMMODATE STRUCTURE DESIGN CHANGES FOR STREAM STABILITY • STA: 302+79 — INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES AND (2) LOG SILLS FOR STREAM STABILITY • STA: 303+16 — INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES AND (2) ROCK SILLS FOR ADDED STREAM STABILITY • STA:303+54— INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES, (1) LOG SILL, AND (1) ROCK SILL FOR STREAM STABILITY • STA: 303+83 — INSTALLED (1) LONG RIFFLE AND (1) ROCK SILL INSTEAD OF (2) RIFFLES, (1) ROCK SILL, AND (1) LOG SILL FOR STREAM STABILITY • STA: 304+19 — RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION • STA: 304+59 — LOG SILL BUILT IN PLACE OF ROCK SILL FOR ADDED DIVERSITY 2.1.8 UT1B • NO CHANGES 2.1.9 UT2 • STA: 2+33 — RIPRAP ADDED TO STABILIZE DRAINAGE PIPE • STA: 2+79 — BOULDER TOE INSTALLED INSTEAD OF BRUSH TOE FOR ADDITIONAL BANK STABILITY • STA: 3+25 — BRUSH TOE NOT INSTALLED DUE TO ADEQUATE BANK STABILITY 2.1.10 UT3 • STA: 300+50 — RIPRAP ADDED TO STABILIZE CULVERT INLET • STA: 300+83 — RIPRAP ADDED TO STABILIZE CUVLERT OUTLET • STA: 302+18 — BRUSH TOE NOT INSTALLED DUE TO ADEQUATE BANK STABILITY 2.1.11 Wetland Grading #4, Cross-section #6 • STA: 0+19 — 0+64— WETLAND GRADING ADJUSTED TO REDUCE FLOODPLAIN SLOPE 2.1.12 Wetland Grading #3, Cross-section #7 • STA: 1+23 — 1+57 — WETLAND GRADING EXTENDED TO TIE SLOPE INTO EXISTING GROUND • STA: 2+58 — 2+70 — FLOODPLAIN GRADING ADJUSTED TO SOFTEN SLOPE GRADE AT FLOODPLAIN TIE-IN Oak Hill Dairy Mitigation Site 41, Monitoring Year 0 Annual Report - FINAL 2-10 2.1.13 Vegetation Planting List & Plan As -built changes in species planted and densities were minimal when compared to design. Species replacements and planting density adjustments were made due to availability of the species at the time of planting. All species replacements were approved species or alternate species within the Final Mitigation Plan's planting list (Wildlands, 2021), so no approval for the inclusion of the species is needed. Open Buffer Planting Zone • Tag alder (Alnus serrulata) was replaced by elderberry (Sambucus canadensis). • Northern red oak (Quercus rubra), slippery elm (Ulmus rubra), and sweetshrub (Calycanthus floridus) were added at densities of 5%, 1% and 1%, respectively. • The stem density of persimmon (Diospyros virginiana) bare roots was increased from 5% to 6%. Wetland Planting Zone • Tag alder was reduced from 5% to 1%. • Silky dogwood (Cornus amomum) was added at a density of 1%. • Silky willow (Salix sericea) was added at a density of 2%. • Live stakes of black willow (Salix nigra) were added at a density of 1%. Partially Vegetated Buffer Zone • Stem densities for American hornbeam (Carpinus caroliniana), strawberry bush (Euonymus americana), pawpaw (Asima triloba), and American beech (Fagus grandifolia) were increased from 10% to 14%. • Densities for slippery elm, witch hazel (Hamamelis virginiana), , sweetshrub, and flowering dogwood (Cornus florida) were decreased from 10% to 7%. • Densities for spicebush (Lindera benzoin) and northern red oak were reduced from 10% to 8%. Planting Plan • Sheets 3.3— 3.5 — No bare roots were planted due to the depth of standing water. 2.1.14 Fencing Plan • UT1 REACH 2 — FENCE LINE ADJUSTED TO RUN CLOSER TO TOE OF SLOPE • OAK HILL CREEK REACH 1 & 2 — FENCE LINE MOVED TO TOP OF SLOPE 2.1.15 Monitoring Components Installed monitoring devices and plot locations closely mimic the locations of those proposed in the Site's Mitigation Plan. Minor deviations from these locations were made when professional judgement deemed them necessary to better represent as -built field conditions or when installation of the device in the proposed location was not physically feasible. Vegetation Monitoring Plots • Permanent Vegetation Plot (VP1) was moved from the right side of UT1A to the left side of UT1A. • VP2 was moved the left side on UT1 Reach 1 to the right side of UT1 Reach 1. • Mobile Vegetation Plot 5 (MVPS) was moved from the left side of Oak Hill Creek Reach 3 to the left floodplain of UT1 Reach 2 near the confluence of Oak Hill Creek Reach 3. The previous location for this mobile vegetation plot was inadvertently located within the extents of BMP2. Oak Hill Dairy Mitigation Site 41, Monitoring Year 0 Annual Report - FINAL 2-11 Cross -sections • Cross-section 3 (XS3) was moved upstream on UT1 Reach 1 due to a large diameter tree within the floodplain. Section 3: Monitoring Year 0 Data Assessment Annual monitoring and site visits were conducted during MYO to assess the condition of the project. The vegetation and stream success criteria for the Site follow the approved success criteria presented in the Mitigation Plan (Wildlands, 2021). Performance criteria for vegetation, stream, and hydrologic assessment are located in Section 1.2 Table 3: Goals, Performance Criteria, and Functional Improvements. The first annual monitoring assessment (MY1) will be completed in the fall of 2022, at least 6 months after the MYO assessment. The Site will be monitored for a total of seven years, with the final monitoring activities scheduled for 2028. 3.1 Vegetative Assessment The MYO vegetative survey was completed in February 2022. Vegetation monitoring resulted in a stem density range of 445 to 688 planted stems per acre which is well above the interim requirement of 320 stems per acre required at MY3. Average stem density was 603 planted stems per acre. All 13 permanent and 6 mobile vegetation plots met the interim success criteria and are on track to meet the final success criteria required for MY7. Herbaceous vegetation is establishing itself across the site. Refer to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table and Appendix B for Vegetation Plot Data. 3.2 Vegetation Areas of Concern Vegetation management and herbicide applications were implemented prior and during construction to prevent the spread of invasive species that could compete with planted native species. A dense stand of bamboo (Phyllostachys aurea) was mechanically removed along UT1A during construction. Kudzu (Pueraria montana) was removed along UT1B. Other areas of Chinese privet (Lingustrum sinese), Japanese privet (Lonicera japonica), Japanese knotweed (Polgonum cuspidatum), English Ivy (Hendra helix), marsh dewflower (Murdannia keisak), and multiflora rose (Rosa multiflora), were treated on the Site during construction. Invasive species will continue to be monitored, mapped, and controlled as necessary throughout the monitoring period. 3.3 Stream Assessment Morphological surveys for MYO were conducted from February 2022 to March 2022. All streams within the Site are stable and functioning as designed. All 14 cross sections at the Site show little to no change from design in the bankfull area and width -to -depth ratio, and bank height ratios are less than 1.2. Reachwide and riffle 100-count substrate sampling were conducted during baseline condition assessment to classify the reach and characterize the riffle pavement. Riffles along most reaches have a median particle size classification of medium gravel to small cobble. Based on a DMS Technical Workgroup memo from 10/19/21 and concurrence received on 10/27/2021 from the DMS project manager for the Site, pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary by best professional judgement. Refer to Appendix A for the Visual Stream Morphology Stability Assessment Table and Stream Photographs. Refer to Appendix C for Stream Geomorphology Data. W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 3-12 3.4 Stream Areas of Concern Inspection of stream structures and banks did not identify any stream areas of concern, indicating that the stream is preforming as designed. The Site will continue to be monitored and any issues will be mapped and reported throughout the monitoring period. 3.5 Hydrology Assessment Crest Gages (CG) were installed on Oak Hill Creek, UT1, and UT1A to monitor bankfull events. Hydrologic data will be collected and reported during MY1. 3.6 Wetland Assessment Eleven groundwater gages were installed before the start of the growing season in wetland creation, rehabilitation, and re-establishment areas to determine wetland hydrology success across different restoration levels. Soil profile descriptions and groundwater gage photographs were taken during installation and are located in Appendix A. Groundwater gage data will be collected and reported during MY1. 3.7 Adaptive Management Plan Site maintenance and adaptive measurement implementation will follow those outlined in the project's Final Mitigation Plan (Wildlands, 2021). No adaptive management plans are needed at this time. 3.8 Monitoring Year 0 Summary Overall, the Site looks good, is performing as intended, and is on track to meet success criteria. All vegetation plots are exceeding the MY3 interim requirement of 320 planted stems per acre, and all streams within the Site are stable and meeting project goals. Herbaceous vegetation is establishing itself across the site. Invasive species were treated and/or physically removed across the Site prior to and during construction and will continued to be assessed throughout the monitoring years. Summary information and data related to the performance of various project and monitoring elements can be found in the tables and figures in the report appendices. All raw data supporting the tables and figures in the appendices are available from DMS upon request. W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 3-13 Section 4: METHODOLOGY Annual monitoring will consist of collecting morphologic, vegetative, and hydrologic data to assess project success based on the goals outlined in the Site's Mitigation Plan (Wildlands, 2021). Monitoring requirements will follow guidelines outlined in the NC IRT Stream and Wetland Mitigation Guidance Update (2016). Installed monitoring devices and plot locations closely mimic the locations of those proposed in the Site's Mitigation Plan. Deviations from these locations were made when professional judgement deemed them necessary to better represent as -built field conditions or when installation of the device in the proposed location was not physically feasible. Geomorphic data was collected following the standards outlined in The Stream Channel Reference Site: An Illustrated Guide to Field Techniques (Harrelson et al., 1994) and in Stream Restoration: A Natural Channel Design Handbook (Doll et al., 2003). All Integrated Current Condition Mapping was collected by either a professional licensed surveyor or an Arrow 100' Submeter GNSS Receiver and processed using ArcPro. Crest gages, using automated pressure transducers, were installed in riffle cross -sections to monitor stream hydrology throughout the year. Groundwater gages were installed using guidance from the USACE's Technical Standard for Water -Table Monitoring of Potential Wetland Sites (2005). Stream hydrology and vegetation monitoring protocols followed the Wilmington District Stream and Wetland Compensatory Mitigation Update (NCIRT, 2016). Vegetation installation data collection follow the Carolina Vegetation Survey-EEP Level 2 Protocol (Lee et al., 2008); however, vegetation data processing follows the NC DMS Vegetation Data Entry Tool and Vegetation Plot Data Table (NCDMS, 2020). W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 4-1 Section 5: REFERENCES Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration A Natural Channel Design Handbook. Lee, Michael T., Peet, Robert K., Steven D., Wentworth, Thomas R. 2008. CVS-EEP Protocol for Recording Vegetation Version 4.2. Retrieved: http://cvs.bio.unc.edu/protocol/cvs-eep-protocol-v4.2-lev1- 5.pdf. North Carolina Division of Mitigation Services (NC DMS). 2007. Catawba River Basin Restoration Priorities (RBRP). Raleigh, NC. North Carolina Division of Mitigation Services (NCDMS). 2020. Vegetation Data Entry Tool and Vegetation Plot Data Table. Raleigh, NC. https://ncdms.shinyapps.io/Veg Table Tool/ NC DMS and Interagency Review Team (IRT) Technical Workgroup. 2018. Standard Measurement of the BHR Monitoring Parameter. Raleigh, NC. NC DMS and IRT Technical Workgroup. 2021. Pebble Count Data Requirements. Raleigh, NC. October 19, 2021. North Carolina Division of Water Quality (NCDWQ). 2011. Surface Water Classifications. http://deq.nc.gov/about/divisions/water-resources/planning/classification-standards/classifications North Carolina Geological Survey (NCGS). 2017. NCGS Publications. https://deq.nc.gov/about/divisions/energy-mineral-land-resources/north-carolina-geological- survey/interactive-geologic-maps NCGS. 1985. Geologic Map of North Carolina: Raleigh, North Carolina Department of Natural Resources and Community Development, Geological Survey Section, scale 1:500,00, in color. North Carolina Interagency Review Team (NCIRT). 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update. Accessed at: https://saw- reg.usace.army.mil/PN/2016/Wilmington-District-Mitigation-Update.pdf Natural Resources Conservation Service (NRCS). Web Soil Survey of Gaston County. http://websoilsurvey.nres.usda.gov/app/HomePage.htm Reid, M. 2021. Email Correspondence, Pebble Count Data Requirements. October 27, 2021. Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books Schafale, M.P. 2012. Classification of the Natural Communities of North Carolina, Fourth Approximation. North Carolina Natural Heritage Program, Raleigh, North Carolina. Simon, A. 1989. A model of channel response in disturbed alluvial channels. Earth Surface Processes and Landforms 14(1):11-26. US Army Corps of Engineers (USACE). 2005. Technical Standard for Water -Table Monitoring of Potential Wetland Sites. ERDC TN-WRAP-05-2. Wildlands Engineering, Inc. (Wildlands). 2021. Oak Hill Dairy Mitigation Project Mitigation Plan. DMS, Asheville, NC. W Oak Hill Dairy Mitigation Site Monitoring Year 0 Annual Report - FINAL 5-1 Conservation Easement Project Parcels Sheet Boundary Internal_Crossings Existing Wetlands Wetland Creation (@3:1 ratio) Wetland Re-establishment (@1:1 ratio) so Wetland Rehabilitation (@1.5:1) Wetland Rehabilitation (@1:1 ratio) BMP Structures Vegetation Plot Conditions (MYO) Criteria Met (Permanent) 0 Criteria Met (Mobile) 4 ir Enhancement I Enhancement 11 Restoration No credit Non -Project Streams TOB Cross Section "— Fencing Topographic Contour (5ft) • • Photo Point • • Barotroll • • Crest Gage • . Groundwater Gage Reach Breaks U ParkingAccess bokii/V WILDLANDS ENGINEERING 0 75 150 300 Feet 1 1 1 1 1 1 1 1 1 Figure 1. Current Condition Plan View Key Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Environmental Quality Gaston County, NC / Reach,2 Conservation Easement Project Parcels Sheet Boundary Internal_Crossings Existing Wetlands Wetland Creation (@3:1 ratio) Wetland Re-establishment (@1:1 ratio) Wetland Rehabilitation (@1.5:1) Wetland Rehabilitation (@1:1 ratio) BMP Structures Vegetation Plot Conditions (MYO) Criteria Met (Permanent) O Criteria Met (Mobile) Enhancement I Restoration No credit Non -Project Streams TOB Cross Section Fencing Topographic Contour (5ft) • . Groundwater Gage • • Photo Point Reach Breaks WILDLANDS ENGINEERING 0 37.5 75 150 Feet • Figure la. Current Condition Plan View Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Environmental Quality Gaston County, NC M1 ■ 1 P 1__,1 Conservation Easement • Project Parcels Sheet Boundary Existing Wetlands Wetland Creation (@3:1 ratio) Wetland Re-establishment (@1:1 ratio) Wetland Rehabilitation (@1:1 ratio) Vegetation Plot Conditions (MVO) Criteria Met (Permanent) 0 Criteria Met (Mobile) BMP I— Structures Restoration No credit Non -Project Streams TOB Cross Section • • — Fencing Topographic Contour (5ft) • • Photo Point • • Crest Gage • . Groundwater Gage Reach Breaks t �WILDLANDS ENGINEERING 0 37.5 75 150 Feet 1 1 1 1 1 1 1 1 1 Figure 1b. Current Condition Plan View Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Environmental Quality Gaston County, NC '- 1 ■111 r ;AL ,,,,-"' i * \ ‘, ' �� \, a N. __. 1_47'..-'<,..............!.............._____. . , ,....-----.-.0.----..-4., \ \ ,_1 Conservation Easement Project Parcels Sheet Boundary Internal_Crossings Existing Wetlands Wetland Creation (@3:1 ratio) Wetland Re-establishment (@1:1 ratio) �� Wetland Rehabilitation (@1.5:1) zz BMP Structures Vegetation Plot Conditions (MYO) Criteria Met (Permanent) O Criteria Met (Mobile) Enhancement II Restoration No credit Non -Project Streams TOB Cross Section Fencing Topographic Contour (5ft) • • Barotroll • • Crest Gage • . Groundwater Gage • • Photo Point Reach Breaks ParkingAccess Baro--,, GWG2\` 2019 Aerial Photograph 1 WILDLANDS ENGINEERING 0 37.5 75 150 Feet I I I Figure lc. Current Condition Plan View Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Environmental Quality Gaston County, NC Appendix A Visual Assessment Data Table 4. Visual Stream Morphology Stability Assessment Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Assessment Date: 4/18/2022 UT1A Number Stable, Total Amount of Major Channel Category Metric Number in Unstable Performing As -Built Footage as Intended % Stable, Performing as Intended Assessed Stream Length 470 Assessed Bank Length 940 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 17 17 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 5 5 100% UT1B Number Stable, Total Amount of Major Channel Category Metric Number in Unstable Performing as Intended As -Built Footage % Stable, Performing as Intended Assessed Stream Length 292 Assessed Bank Length 584 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 0 0 N/A Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 0 0 N/A Table 4. Visual Stream Morphology Stability Assessment Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Assessment Date: 4/18/2022 UT1 Reach 1 Number Stable, Total Amount of Major Channel Category Metric Number in Unstable Performing As -Built Footage as Intended % Stable, Performing as Intended Assessed Stream Length 218 Assessed Bank Length 436 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 0 0 N/A Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 1 1 100% UT1 Reach 2 Number Stable, Total Amount of Major Channel Category Metric Number in Unstable Performing as Intended '=s-Built Footage ilk % Stable, Performing as Intended Assessed Stream Length 1,834 Assessed Bank Length 3,668 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Tota Is: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 11 11 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 13 13 100% Table 4. Visual Stream Morphology Stability Assessment Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Assessment Date: 4/18/2022 Oak Hill Creek Reach 1 Major Channel Category I Number Stable, Total Amount of Metric Number in Unstable Performing As -Built Footage as lntended % Stable, Performing as Intended Assessed Stream Length 489 Assessed Bank Length 978 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Oak Hill Creek Reach 2 Number Stable, Total Amount of Major Channel Category Metric Number in Unstable Performing as Intended '=s-Built Footage ilk %Stable, Performing as Intended Assessed Stream Length 470 Assessed Bank Length 940 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Table 4. Visual Stream Morphology Stability Assessment Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Assessment Date: 4/18/2022 Oak Hill Creek Reach 3 Major Channel Category 11 Number Stable, Total Amount of Metric Number in Unstable Performing As -Built Footage as lntended % Stable, Performing as Intended Assessed Stream Length 877 Assessed Bank Length 1,754 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Tota Is: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 6 6 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 7 7 100% Oak Hill Creek Reach 4 Number Stable, Total Amount of Major Channel Category Metric Number in Unstable Performing as Intended '=s-Built Footage ilk %Stable, Performing as Intended Assessed Stream Length 389 Assessed Bank Length 778 Bank Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour. 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse. 0 100% Totals: 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Table 5. Vegetation Condition Assessment Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Assessment Date: 2/21/22 Planted Acreage 19.1 Mapping Vegetation Category Definitions Threshold (ac) Bare Areas Very limited cover of both woody and herbaceous material. 0.10 Combined Acreage 0 % of Planted Acreage 0% Low Stem Density Woody stem densities clearly below target levels based on current MY stem count 0.10 Areas criteria. 0 0% Total 0 0% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard. 0.10 0 0% Cumulative Total 0.0 0% Easement Acreage 19.9 egetation Catego Invasive Areas of Concern Definitions I nvasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage. Include species with the potential to directly outcompete native, young, woody stems in the short-term or community structure for existing communities. Invasive species included in summation above should be identified in report summary. Mapping Threshold (ac) 0.10 Combined Acreage 0 of Easement Acreage 0% Easement Encroachment Areas Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area. none 0 Encroachments Noted / 0 ac Stream Photographs ' ; } P 4 e j `r �.+i. t,y. a Ems+ "-.� .�,' -""' -'- _,, F ' ]"'°' fir1,. r+'--* :ixe � ¢�� r F 3y_ „y r. c " �"�.�.r "yw --, s +:` z 4: . ,N, e9. M�� 1; �tr.. ,�,t"4 m„,+• , ,H v¢ s ,, R -s fir. „ ,vw.,rr 4� .;R r ,. yF' l -^.F,M P ini J "aF 1��W t Y' 1�" 1 .J �� ...., i • a - t iw• sm RiPa? aI ! Pi a v_ � -i A - .'.1 wr. 1 ` 3' ` ,. -. ,. tit i�- ti+ -t,^c1x. ��d �k s 4'" .t,`�w� s"' `%--.,.l _ -?',7 '�s-R, '.,, - S -iv h'm i Z F"Pr -s �+ s '�� & p � V •'' : �1 {" r xa A / �-!!• r E"` 4p , .r�•{ s`_' kz. 'mowAi �� }It: y�yry�� i.e ... ,,t�.-.$; ' i - y� 'L ^1 • 'YF P p +Yx �,�y -`fS o f y} '�' r • t f. h. ♦ f... -'7ik, N `.h"'t' ,.t }`�' nR+t� 1 ,W.� _ �a ,I.hr. •N'{� t !e _.. �- r_ 4w.. PP1—UT1A looking upstream (02/24/2022) PP1—UT1A looking downstream (02/24/2022) • f `��y „ ,�3r • i F t l • ix F � a tf A . „ - s E '$�''. �e$wi `4 v t -?r ,' �` k _„„A, `' }.x '. -44— .7` x t- I�%! -yam r ka , Y- f s t o s°'*.„.� r h r- r /' ';.'�" 1 fi:. -i, %:fk 4i0 4 $F,,, -�. roYr 3.' h I '-gam - a,t ' 6 � v � �Y `�?.�` `�2 1 /S C yy r _ - z.: s - u. k a. ',sk ,s _ -• `-�i'3 "�gX 'g o tau+^ 'r` I. ,,,,,„:,_.. .,, yy h a 4 Sr^rs.,y`_'C :' t h�s t r "' ,A - x; �:.k. ,t .' 11,,,,,,s0,... 1 :s r a £ p ;o &"��A 4-4 i. ' 1.. S .' `, 5. �t T'K!. Fc.4 , s 1. �'fir+-� .s� - ! s,,,-f t j t - l.1 ,1 , .•:.a - .s_ ..-, °, ....�Su�. y v*t '� t>�u-. PP2—UT1A looking upstream (02/24/2022) PP2—UT1 R1 looking upstream (02/24/2022) ,-...,:,,;:' : • �,,cc�'' -' 9t a -7, 1. n PP2—UT1 R2 looking downstream (02/24/2022) 11 9 _ j.F: K � I _ c ▪ c:i -as4i.. .,u ,+4, } b - ; 8 5 r i.Fr^'�r's fi l k akr -, � �r�l[, 1. �s-^� � 1. sAt_. 4 .� a,yw,5 � v�,�`i�� • 3[[-d .. q y ri. ° F . ., y, .a,,.k: . x.«„`e4sa .Yy" - 4�3 & � a ar r 5 s• ppe as= m 44zr ^r Y + � urn . .� ,�� � �y k.. YC" ����� •k[ S4:el$ti ��" ��. 3 ,� c,�a�- �;�sq it a3'� �{ � tr `, �� �� A ��{k F,�'t y] �r� [ P� � �_-� i t IG [�' ), ,, k'n 4 r i tY r to -.,Y TMrt S a - .r•"€ {°Vi'4�,� I P I ' w6 b. P ��++,,� � a 7=` ,i '� , ,'; y ,1," t�•F,4 �.[3 Lr s a v� -. ''.' $ i'R , ,A, ,' rr S ` ._ 'AS 3 K',' 'i • ';'P r'M.0 i ,fY 1 3 d 11 �1, _ ---_,__ •' .v,;; ,, a Y q a& a „ a' ' , p ,,,Itt}'�' h t ea. r:, ' '.w S _ S` „ F`_�' L W «I' '' ss b t g _ a r .„ s `� ',r i- ter°�y .. .f ,, , ° ' 3, 6�{ ,t a Y 4 r -, ,,,,,fi r er`,3, 3t V,, r t'' rr '^°s'� �'y�. -i„ �, �I� e'" J - k, . 4r �; { 3i�p�` ;,`V y �0y. sR i' ra s'v. n i4 1 b- 'i i ," a 9 mow_ '�. T _._ - 2 r ..., . ,.-YeS. .R ,A4•T,7.d Y-.., • a.'_. r,_ f# " 4 � Vt A'u:�s .is PP3—UT1 R1 looking upstream (02/24/2022) PP3—UT1yy R1 looking downstream(02/24/2022) ll �q' rr f T f, .r � i �• lf I'le," ''.74, � t �.�i�� �e� � ��0'�1' �:; '.. �;I a�'�"s. � �� .f r _1• 4- - �i,�,. v t�, ''S';A�`Rl •,-.4"40r4 '..-•:-.5' fri:C1 ,'i-..,. ,4,$;e1.0‘EOV,!!;•g;2:,-,,;-'4,:!-';,JN7:1).-:' --:_-"A-tir ' -'titi-J41:14--!$'0),11,-re,, -lr',', L;".f.-:- •:.;-.''''-i*$.*----:•.-:-.7--,,: ,fe i.}ix l a �, T�it i r - s ,a3'r < -'� _ _ t Fe71 'fry i"V i t ;'°I`> i _ ' .i - s ',i� >d+y _ el - ra .�" -, �' $ , -, a.E t5- t .,,,;,,2414.k.?,:`...,, ,,::: :,;2,,t ,',,:,.:„Iti , ,, ..litt.,%,„,.;4Z,::n0,,,, -MI5..*::40? '4.: '::::..-.-,..-::-;[;11.-:7'-'-:-:'-;:::., :114741,*''''.. ..4;',.*HA ...'.4t,i'-sel7A:',P''''kMf•Mt. .131tt. : ,,,,,,....,- j. ..,„• rti,,,I.,-,,,..:,..,4;.!.. v.ts,,,.. ...k_.,---..4. .-..„..,24,tzt.:-...,,:4,-;',.-t.,*,.:.-„,1',..,..t.l. —,,.... ....--.-. k ,....-1-34--,.. ...„ -,,,.*---n-f...w.,,, ,..Nt.",,,.c:;..4t.... .-, ,,,,--..1-....,-'::-.-:!":,-'' ''''-..4."_er -:.'."•-- ..- 40% as— gF � )' .4 y, rah s c . 4,. 5 sue" y., `4 9=4`S!{3y w -r �vYsq? a . „n..y k F''3 �'"y .ref 't, i ',':7r5r' ,4,;i,[,r ,f�=�,' -4. T.-J: a ts-f - t� ,...cr e �" .� s ram " ,,,,,,.,,,.:,...v.::„„...,,,`'am ° 5 , 4 { , -. "` A h`�^.A ..[ sy <a y' +'i $,_ �. ".�.- `'� ;�" ,e+e b>7S.s .4x a ra,. d-i -. �: ."F-,.: .._ v .•. .. �`•qr.- PP4—UT1B looking upstream(02/24/2022) PP4—UT1B looking downstream(02/24/2022) *4111 1 w 7 e.. w«s '�,h i ,, a i s�'r. !'cam.;, .-.. . e' x,: T,�'` '1110 i 1,1 ', - ' li lit To id r 1, a+ ,i ' I.-r-� y i $ K , wi �; �fi x • $gig . �t y si',xs Ya 7 r k144. °�,° `� ..F r` - t�'„y?y,"f ^ - , g a n' s7 ..,1 W-. i, - �. �r •s ••P T.n,. - - - ti cr'a r_„q a�.• " T� ,, r Lrn.4 �" a ,,.-s ". , ',�w - 4 V f '' 5 d'r '� i ' . - :� ;�;.r 'ate $ .v. �' --,,,ire: fi 'iT y�` 3"'� v. y> r --. ,- ec * -'fin �,x , l °�..K�i.:. +1'1�� .?4�" ` r, d `" iitat'Sa> n....i, � ,- -.5-<_ -n, ;... 4.'- PP5—UT1B looking upstream (02/24/2022) PP5—UT1B looking downstream (02/24/2022) 77{ � 7jf! pipe t sS4 y �yy 5 C� pL x { 4`G V-x'e- -s'! [,a -1(ti,.. !.1'�+Jtf_i .A .r: e--h.:..,, x"n...PP6—UT1 R(2 looking upstream (02/24/2022) PP6—UT1 R2 looking downstream(02/24/2022) 1 { i e": t 4 X l 1P€g. f - �' . ' � L a -'wr .` '�1 1 i i. f y 4,7, f'1` f v423 : r 4 3kx - ac ,. '§,iz " I{ � ix99'�i� � S#, f1 lc $f 'e k}�' - 1yyk��y'Y'1r'' S_ e � 6 'air^ 1,.G1- 'I r s' '7 ill g�„w `ei,l S 'r • • t _tai"�': r _ _ It°4-•�' ''- }ds +I 1 '- f f tlri:. '`sa, e, ', r1 try �e }�dD ai x+4se7 .YI s., t b �rs ti ,, -a., - "' , "?'fie -- . - i - A a • 4tr d ` 4 r}'3' mr € ; - :h x sty - ' - .-X p P' ,a .' ,., d` '''�% .• 1 V,.'- y ri .4 ,-,r?;Asa., 5 .w°.' .1 5 __ ,,,,,,E_� vA q 4 `r .y 4 f — Wet sty„ f '4'x xd.'.M , '` } • ..- S " Y 1. v4' f y y '3 -"mt d ..* Ly t•- ;>. f 4-V,, li rFv E "i ,,-,i. ,2 'f,,,, v „k W�d k 1& VF\ `t,, J' .iy, '_. m, ,� '�li,,�..�,. �a�Y � ?' � .i�' .��,"� :�=1. .€� .�e� Sts�.e`�s,.'� '?�- Avr►a���.,� ,... PP7—UT1B looking upstream (02/24/2022) PP7—UT1B—UT1 R2 Confluence(02/24/2022) :,.'4.,,i,r':',i'ii. 1k I et ',1' '• - ' • -' ...8y .: 3 ell 1 ;a !' `ems : . - - - K cr- • _'...y 2�.. •3 -*n F ' " r - - � - 'r• ^a" , -0 e'r �i,z r a S < <.I r_ "i. -� ;i i *t g = _S _ . -- • _ r C � - • a 0-4 ZYJ f d a, ' ,,, � M 4a - ?r � "` 1 � r _ ° ; f_�..r.a.' '`' i f y y� 'H i-a, - -. , PP8—UT1 R2 looking upstream (02/24/2022) PP8—UT1 R2 looking downstream (02/24/2022) ' ., r-i',•• ,k. '-,. ' ,, .11kI4,44-4- 7„,,,,,,i',..-, .,,,..,o--;;.z,----, 6 3 E, , ,,,,,., , 0 . , ,::A.t.,-,.."-;.1,1,:..i.° ; r, , . .. . ,-=" K, 1 `C,,,.i."'" `1:11:,,;.#n..,1-7q7;.,i,V ;ft. ,,T,4-5! tii, N { _ - ...-_ �,, ..`+"-fee it-i ar .va,J - -,!,, -,,, -- ,mac „ _ :r-ta „4::" -. , " : ". 1 - ', PP9—UT1 R2 looking upstream PP9—UT1 R2 looking downstream(02/24/2022) (02/24/2022) i i l ' �. � � - ` 4 "°.' i- 4 y 'a • s'k' Y.• a - �, rya. �.s .!�� :^'',4 marts. ?. - .. r ,s' r-_ i ._ .� yr.�; g .'` . PP10—UT1 R2 looking upstream (02/24/2022) PP10—UT1 R2 looking downstream (02/24/2022) y' '�qh' ;fit aa i r«rr,t °3 9 o- } Y d 4�p9 r�.rr , * a •. ,. .auc m: �AMF®CON`_ ,a R� :: . .z, - - ` .. yam.•.— � p t : :'may '.. '" ' -`, n't ., ,s.- s asp .. . a--*2.+ . - � � k ak-s.. r . . ,i s 5-;maay _ • -4 '1 x ��[" ,� �� A y „I� , �.._ �. .,. fir�.1 ` ' e , '.' �a .? M. 5 6'aT �"'_ - PP11—UT1 R2 looking upstream (02/24/2022) PP11—UT1 R2 looking downstream (02/24/2022) (,a r Sg ate t. T - ..ram. t m, '--,fre}e , _ Si-A% "�` +Ks,° e � _ .-- "s'r' «+ t �r ,? r d e ?' M "s�" fE _ am PP12—UT1 R2 looking upstream (02/24/2022) PP12—UT1 R2 looking downstream (02/24/2022) �1 i . i r -. AMF0425)145,42P3 AMFOCoar - 'r* a' E• :;.:at .ex'm - m 3s t • .?,,,. ems-:., "N -1 .'i c, .4.41 '" k% v, _ SS y a- _ 4J Z 5✓ -Seed s_ i Y , or • y Y_ y y L• t:::•, a�'rw. E 4 AY-O 'S4& k _r ,'4.. PP13—UT1 R2 looking upstream(02/24/202t2) PP13—UT1 R2 looking downstream (02/24/2022) 1. n 1 4r- 3 °f # xP. 4� stay s; " 1 z " '-' ,x fin" 'ti n .y9 3. ._ F _fie. ... ,K�h _.. T nE . { %wy 'e'er • .y �" fdk" • -� ` # y-' '^ p er` ` Fi43 7 '," tff• it • tI' Y c .o ? • PP14—UT1 R2 looking upstream (02/24/2022) PP14—UT1 R2 looking downstream (02/24/2022) 14 d i d-r '4 r Y"��r p, I' 4, 'ITF pf,E � '. ,+?$,a}e r,�,��,4,, 'P I��s�a+ � 'S; , '. . r.-; + . fs.�.% , �•� .,, t IP IrTy _ e3 `r,�,.? fs .f ., ..� +"�..a , .5a' -F,6 h +� �. k' t Z - "" .sy ='BSc - s .?,..Y,.»...', • 4 3 t SS d 4u!r!s ar - � , „x,m rr"�` ,� ,M , 4 «. "!h i x v'x'rgrr ffi'" 14 r$t I a�- el i'4s u r i i- '-, H . .'r L1, " ,q,. -x a ;R x ', i... - -; ��,± .- '♦ '.%`-$: :4 !�41,7Ar'! ,7 r Yp, -Nis -., 4. I ar'` `' �' •,yea 4 V ''- r -f 4 c '( '-W.y W. a " "`' `� ..... ._ 7?:. -' ` _'' bhp` r -S 5, �' et ' �.,t0 ' �9 �'•�t` A �A+� PP15—Oak Hill R1 looking upstream (02/24/2022).-•-.,::,.-':"---_'-.,-.'-,•"-•,-'"--.'_..-'.:"','-.--.:.1:.',-,-",..-:.f.'-.-.:.t.t.-•,'..!,.,#..t'.1.4-,,'I',..-.'47.:,i--''Y1;'",'.d):•1''''-,A,-'4ir1-`,:i,,--';,:,Xt-i4.,1'A,'--,i,'2'.•-44,-T,t,-1.-4', PP15—Oak Hill R1 lookA.ing downstream(02/24/2:-1--2',.-.....- 2) r , R� 4 yy4 y r m f a.k 1' s r 1, JI sa-- �- Z-� � I(I 1�i [ 4 13 �,-s •y S ! .r r",. f, �' -S,, 'F'„a;' - 1 ... A' -'`�e,.. �, �!r h 'I ai i 1 s t. f..n�e...v'' ' M �� spy _ } Y 5 i y .,.M. J __ L - - l C k �a4 '' 0 ` ,- _ ,'At ; _ - - f ,.are._., i� -- S @ '' - "� 0 - Y,. g :a'n ,a , 9 x j.,r a 1i : ; „vm, 9 A'�'i - n to PP16—Oak Hill R1 looking upstream (02/24/2022) PP16—Oak Hill R1 looking downstream (02/24/2022) ^, ( , r • ��''�� -� aa Q T. _ •,,' fie,--`'.^s' ,, " � . ..A.W-i..,0..,-t,ems" ryti 14k' 4Ss� - ^��� i _ =-, - tea,+" ,'',.. ;" . c PP17—Oak Hill R2 looking upstream (02/24/2022) PP17—Oak Hill R2 looking downstream(02/24/2022) a tr. �a� aLl t e ' '> YC q_ ' V L, r t tik"d eqe ti� a y • `� yam`j * �Y.-, , •. $' ° :R .? v F 1 '1 _ A ' Tt s� -3 , " ax -'q.F- .�A as ' PP18—Oak Hill R2 looking upstream (02/24/2022) PP18—Oak Hill R2 looking downstream (02/24/2022) �E - Yri Y' f ,.l -- _,oa _E..';`"," s- iq a. r _ __+ .t a -.'t r ' s 3 ,..i. Sm•_: - - -' s -gam. L::"'" _ ''- ' n "%F`" '"`'" sue"µ"a x PP19—Oak Hill R2 looking upstream(02/24/2022) PP19—Oak Hill R2 looking downstream(02/24/2022) t. Vi ,4 z d ,l t d - he. «ig. 4 1 ' Mgt :r ' .�y , .,-7'! - °' ' ...e - -`-� �n it ';'. - — i>'- r x ' , 2:s - :'it " rr s " "sue, , t ^„-ems. r ��*".17 - e- .',r'4' 9;'- �, f'c Viz' -a.;:y ° ��;. i;e. a erg �. 5 '- ; a-» PP20—UT1 R2 looking upstream (02/24/2022) PP20—Oak Hill R2 looking downstream (02/24/2022) 4 }� $ r 1 r 'S'4' _ :' S a. - - 'ham '"' W f E� .ram �`..=� � > ."� "'��-s�e �F v PP20—Oak Hill R2 upstream (02/24/2022) F - t .y eftr ap '9 fi' dig, b]' ',h L„ ,�, t 'S- .''n,�...4 1�"`'F' tp - �•: `3^ fiyx�!'S }Y`. t 4 k s', 2t 'dam.d: 34� 'Ir .xfwe!�1 t' a.%<rYiE n. ro � J. PP21—Oak Hill R3 looking upstream(02/24/2022) PP21—Oak Hill R3 looking downstream(02/24/2022) ,. • .-.' 7 S � '. = X�' / , "",4.a ,,' :-, ....;:.7;z4w-. ,_ _,.., , ,.. -7,,,...„ ` a t max' :.,,,- . - ,Ea „<, °`` - . ' 4 P'' bg r ,, te � & b{ : am. z, Yy w rc ' rr' } r ' a N , - i„,4,, a., PP22—UT2 looking upstream (02/24/2022) PP22—UT2 looking downstream (02/24/2022) Y K, ]Z �}. ; A3A9,. f f ! `94l yor. l S" 4 { 4`i• yip • _ w" _ �- rr, - .Ante-K fyr}T Y'1 � ! 9/V f'11'.4.,tilki A — -v- • ':..,-;-'2-1•,-;,- -,_,..- -- - :_-_ - -7.3'. :-•,:.,..-:.;."-:-.,7- 4.47r:;wt,-;=:;-'''',;'44-4,1:' "'lr-- --.,.,- -- :,0_,.:'A'. • fa F i PP23—Oak Hill R3 looking upstream (02/24/2022) PP23—Oak Hill R3 looking downstream(02/24/2022) :; rr '4: - ,;-jam ,"`y - - � _ �,� -� - �- .- - • IA ..e,-„ },e =' a - :lir a 7~ • '�a T+�.;�. �=, � 3^^� r �, 1 � +•k � -'r ar _',. z rP q'' r xE is x. s a - r � $' e � em , PP24—UT3 looking upstream (02/24/2022) PP24—UT3 looking downstream(02/24/2022) I rF x;}ti to i pia, .^ - :x - t z- -, i - _ c 1• t_ .f 3 °-ems �„ R^ r am` Y _ ysF �, '`t' „,„ �t ck."�• s s`, - - ,:^ •mot -_ - "° - -4 ram` 4 -m r- �i ? " `'' 3� '1•�,„_ ;", .6� ��, '' om': PP25—Oak Hill R4 looking upstream (02/24/2022) PP25—Oak Hill R4 looking downstream(02/24/2022) �iQi vd o k - ,- ` 1 9+,,,.:!i fde A �1 A fiy d • ,� s `u'. .".i4.1... E+ 'may, . # _ .. ?a -= . _a24 „` "'�� .i -.ram . _, - - ,sY ,., `v, ate " ;u" ;.% .- t..hem c' '�;-. - -_ ,y >' ' � � l `x -a tea, Y ' . ,. _aa. .P ,. [; P1 .'r v , '''-' were'. . PP25 —UT3 looking upsteam (02/24/2022) , ,�i' • �- ,'`"rr. 4,r, .a.,.+m � z. ,5', ,fir' liti `i ' x - 4 .W { =ate - �:' _ - i. .:- •.' ,7" tom .✓�« ,4, ^° e ,. r .' , ' .:t `a ,t�. i -�'3r r ,�-�ASS + . i n� .�` l'� �' � � T. w�. _ jl2y �,. ka Y -� 'x - 3 ' i .. '" ? z `yF w, _ _.; 3 T 0 .': F :,.' U .Kg � ,,ii �'+t A ,' ,,r' T-I �+"' �"".' -`+:"`'�, k'- ' sue" • �= +�--i t , 1 - - .„ _ _, .'.' -VW: ,r_,. ° r 2 -°,max #:. _. .s-e--. " PP26—Right floodplain ditch looking upstream(02/24/2022) PP26—Right floodplain ditch looking downstream(02/24/2022)0. / t i . , . �A�1° r i.r i , i r t .. °' G a i n,,1 P;F1- P±f4 S w • - __ _ tam. . . _ .A . - - - • $�r'` �+p• `' +y I.---." f ,spa . '+' d *� � 1 F - • .. • • b _ -_ '' Cg'.2"':(0- 7"'x:§ I, MBA.. c n A _ �? - ' s-_ .tiPP27—Oak Hill R4 upstrea 2/24/2022) PP27—Oak Hill R4 downstream (02/24/2022) ---crn ate ,t ' a + t+r 'fir e s, °mot,..--' -�: _, '°., PP27—Left floodplain ditch looking upstream (02/24/2022) r % a - -r`- i �i n�-.?�. +fi r,. ,. T II txs �„ -` r_ '� �"' s- �4 3" u, ,,:: 4` r s r�n at ;_ - e • PP1.1—BMP 1 looking north (02/24/2022) PP1.1—BMP 1 looking northwest(02/24/2022) ,; t' A R 8 'rc^� , /h y '., ,� -43. X. t. ' � :w M+AY _ � U ''§�ax + 5-:, - i ` t '�5'i'- ¢ ., y-9 CdF '4aR ,: ,gair,;',Itifv,tirq.„,.,:,c ...i,--":: :41'‘,.,'F,,,,;:'::„'-'1::., wn,. :,,,,,,,,._, .._,,,, ; ,,,...,,,......... ..„,t-f,,,,, ,,,, , ,„..„...„.-..A*; :1-4:& a_ -r9y'ic L,y'-r� .y tEr{LS nv zY�.is �.rP, - 14 v:. '^ .:4440, .1.'4,4,,'", ,,,,,44.,„.4,,,..„-,,,,.z.,,_ , ,..„,, olokit.,,-0,,, ., PP1.2—BMP 1 looking west(02/24/2022) 4.:, t' s �- x' fir- -74 , .-.y Tic.Y" '•xyu' .y ,,,...-4,:;,,*: -. -,,,"7-;r:7. '4-.,.:,.„'- ,l'grinVrt--*(..,„-- - ,-- :' - ' .._ 6 0 --i-'- E. .,r i_, 4 R w � h `' e. it •,.rr�4 ' � `'4' ' , ,--z I .yam. t_ F4' & Fad ti k� * �s _ `4 'r '�, ` " s S.""' x da�: ,a*N vt. ...on, `fn+' 'q "- a 1 : j y - - ''- as -T ` '`- - r • '.. ,:�. .: % ' ' 4 H -a%i, r�, e_r "- . .. e_ -y PP2.1—BMP 2 looking northwest(02/24/2022) PP2.1—BMP 2 looking northeast(02/24/2022) Ewa=- '. ����. ui .'!�S',r"' _ 'I'"" _ x , �,' w a*viii.4 .,_ ' '', ' --'7 ,,,.. .4 , , , -,.' '' ' - ''' . . ---*--t" z � a fxx f. .. . it " � '`, jt yflls �, A 7 s aLi � .f-. s' /` r p^, 1 �� Fs�'y�'� y'?S�� 5 ,,�,� +r,.ow 1* ,.c'1*-.� ��+5y �:r � `��- -�s.'f� x �`�.�,��� '' "�.. � �y,. � 3'4� �"�`� �a�3�'.,,.. '' _ E �: ���' - *�". •�r' r r,-.,.'��", JCr.�, PP2.2—BMP 2 looking northwest(02/24/2022) PP2.2—BMP 2 looking west(02/24/2022) Vegetation Plot Photographs . f_ids F iyl 1: S1 • v Ali r .1 ... Air---- -..,4,• � ._t .:A ./ -> . 12'1 p )} Y }qq e,r'.., -:-.1 lw.,......$ 4:,,,,,,,°,....:i - ,-..-41,.... . - - ' . :-..-.1) .A1- 1 r$ 'AI %lb. .vi f,..,,t,.;0'.1";' 't-1 4,.'.e."4'.'"'4' '."'.; . • ' '':' '" '',,,`-- .M 1 ' rf Y.pia 3'E ' d N '' 2 � " " k € _ �,�4 ; ! PERMANENT VEGETATION PLOT 1(02/21/2022) PERMANENT VEGETATION PLOT 2(02/21/2022) k..,0: iK ., II' ' v ,i 4 Irk „d ' K k. " S . zap s - i !y, a rt • k. f2- PERMANENT VEGETATION PLOT 3(02/21/2022) PERMANENT VEGETATION PLOT 4(02/21/2022) mod ` -.1 ,, 1r " �+' •�'- i r.c•. ,,,,•'tom + - . via, APT 3 ¢ �' "9`\ phi c' e ,yy, : PERMANENT VEGETATION PLOT 5(02/21/2022) PERMANENT VEGETATION PLOT 6(02/21/2022) r��pdyer r 0 ,'� �_,'1�.541 ,v �, a e '3 �v loo • t'.. a i..r s,. M—: •etas -r=�� • X, 3 ;` r=$ y.•J f t_ PERMANENT VEGETATION PLOT 7(02/21/2022) PERMANENT VEGETATION PLOT 8(02/21/2022) V.$11.,14i rtIN!,'.-4f 1111,4y . _' - T, ...,42,,, ,A,..::,..;.1,:: Yl at .#¢- - . y - !` - � ey° .tea,,, �. onx �x ,:, ,x< � �� � � ma �� ylp a a _ 1. ,g. PERMANENT VEGETATION PLOT 9(02/21/2022) PERMANENT VEGETATION PLOT 10(02/21/2022) - . 4 ..IV PERMANENT VEGETATION PLOT 11(02/21/2022) PERMANENT VEGETATION PLOT 12(02/21/2022) pp " m � � -mot f" � :% ° 'f. ,. wS - }" 'Yh �� �' - s �; Yy r . � !",arm �-. �.� :-&.`R" .F PERMANENT VEGETATION PLOT 13(02/21/2022) —� v ��+.3. ,aes d�� khq ': --. 1,r is • • .r.. _i— a .,._-.,_.- pi, s K �" 7 -'L ':ax lei s- .�, 4:w,r_.5� kwf ✓F k� ew, 'ikj', .. 1 h � 11 .� +- .'- :1 K l�-^+6 y�,g_ x'�'� 7. s h �'`• � �d;�K� k,-��6y'Y�,a,„ "3r�""�"�+��`.trY ��9� � 2.� ���� _��q �`W� ... -3 ';`,,.a >. ,?'- ` ..a & #=rimy MOBILE VEGETATION PLOT 1(02/21/2022J MOBILE VEGETATION PLOT 2(02/21/2022J '&s;'; �� w ,� it -1 gg ggaa dd y ggc .�� s�,$1p ��, i ata q /y vim' ! � fit, � A� ' ��._ k' �� It. ..- A ' `fir' ^" - -, - - - -- MOBILE VEGETATION PLOT 3(02/21/2022J MOBILE VEGETATION PLOT 4(02/21/2022J v� S_ � `��%�. fib.. I �� � r 5�' � °"c ':r:,,:''';.-''''.7,..t*tf:;,,.,'.,,, ,, ,; .4:lt.:oil,,...:,..: - � �': ,.._,_ ._7:„.....,,ii:::,,$..,:4-,.::*.ritte.47.ii:114H.16,41'; -4,-::-,,.'N.',::-', . ,',tz,',,,.,*,,l',.',‘,•!.3 ip6:4-4°,,r. - - .,--",-'• ;..,7::,ei-:*lt4;.::i,,f.,gtVrr:* _..p. - `''` '.1'" `a ea ,, h3 .,'. f �1 � � y- �i'V Y'� '� W^ � W��II Y��1I1uiIL n aL e^ .., �1 ¢ "-:.F a ..F _ tiQ :: = • �a„, *n Yr./ MOBILE VEGETATION PLOT 5(02/21/2022J MOBILE VEGETATION PLOT 6(02/21/2022) Groundwater Gage Photographs l -rs"'..gb„ . '. .a :f ..'H ;i�r' .;n� : ;•.?'' �` ,.-et• h .H" �+'' " ma�yy_d�,;. ;,y� .:. ha�n� L r , :. >-:• - yu -:-?. ,t ^?h.TP ''+`;;_- :s�� Ey�Y\fYs r � .r? t , .s :✓. - • .. t ''. 'se:•.;e:.,;d T';°'. '. i.;'::.�-:_en'' -ate: ,.' ' .£%. ` %e �wr dr. - - . �. .=Y . "�a�'�,..;,. - �� r r _ : ;-,•�;"'' - - - _ • 1r:rJ�. i 4:;•:.''''''`'"?''' ''''I'''''';'' �hY X'' .: q.. ''.. '�Y m.✓1,+ ,.4 i 2 , 1 r ri _.r: ��•". !M;'S1. .k •,`y2 :. .'z :• Y7e. R rrvhe -. • .,r:` "`'' - :_','::v, : r, y' :g;. ^-L"'I.: x."�'._ w.y?LR y.•. - _ gb.i'`f,�:4:: • a'F' qr'a '�'' YAK•' - - .t- .'k.� ,i ..�: f;, ss.. .:;"..':''''':.4 ..'� '� It :�,,.,:, -j! �'a> •,ym.'a .,p::G „Or .: _ f. 3 - ;`.• :+SAY: - r• � >,�, • '`--%,,, -- i'44.1 _ , w6. ,.T: : -. .. .:: ,. g, ` , ",7. . i je y�� `'�.�,L ca 4--,:.Y ��.,.'4y�',?�: e• •4,.• `�' 4`. �'M1��-.�Y��`� .�' � � r ,d :.:. .�! ,. =l6:�: n,. ��ki<'��-^' _. „�.� .. i'u- �,.-,e:^,�',tiy„-s.,. ��ar. .a.: �.S-.,'%� ._.: �,-�:`• .�:�.......k� .. y Groundwater Gage 1 (01/28/2022) Groundwater Gage 2 (01/28/2022) • k W tea:. -• � - % • < A�-`T% sa,V:"w:'..{ x?�L - _• JK: ^ �. :v.)�-.N 5-.2, -.- "';., .-Lx t- .-,+.wa, •: = •%-Ay'�fi t ` '.,Ms:' "fig.. riA.'„ :.i5:`. _ _ -"A .' v .: '' � . <' o'J,,a 'J%or ... a..e SY'.�{''r -?. -r"i e _.'e ,,' E STs _ < r° �,r�_ fir.. - s- �� t 44 Rryw `. �w : ..='s - ,.. .yx�,.. _ - ' . - ^`ems:, " r , .. � ,. r � ..,s °.•ate "`J_- ''•,:vr..' _'SA �'.;e��"� � - _ - `:�: �t�FN(,�u-� _�°•:.Y .;,� ` ' i. .,�' :O.N..,f: _.: , :,. i^n, `,., ^S. -.Tire. _ r^ � �� '�.'•al :,` 'P "J'y �rs:y:,r. '_ tw"; t�- . '�.1'.� - :?firA.• x', •a �. ! 2''re: : g;.. .: - F;. r ,+.� v:+ • 58 •ir4. .s- _.`If :i.r �. : , N_i ...4, d?' 4�',i.. 4101),-d �x ::- • ,. a �f�+ - ,- ' .`: s=' _ .ice - u ,x - ' r'.f :,•7.-.' y ,yam e_ ' ��sFs' G : fi r ' , .. -e• er_ r s,- ' �T.' ,�,t ^'lT* .:.,'' 3 ... .. :E�. �5... ,y v ''•_ 9v 't:�:.X 't. i+ • Groundwater Gage 3-(01/28/2022) Groundwater Gage 4 (01/28/2022) H"-'kt�'-� _�:e.�.r. a. _ _ - - .-r^:=,-. -::ate:' 4. :s. 1.� `.4, '..2' �'` �` - .mom.: • - = Gvt• .1"w 'Y'?'sT '". .a'µ. .:'�£ ,~ :`."2 I+'�i' Y .:Ai' j•yt_. to _ 3 _ •yt "":+:fie:$".. .-�".t_v ;._, . a✓m..� :^'. ... .. m ::,5':�:✓'� # �---s- �f :r ' - - -'�> ;;, .-e-1*.., r. : f .q_�� :. - :�:�':u" •'.," <y Jam'' fig'" , 3.. ,:4'_ ,, a, .._ � . 'ram,�`'. �,'g... ,.,. - :-- " '-�... -"; "e _ , •f _ _ ':.�,` ' r:: a; �3 +,, .-..'. re�-fit' e, L'L '41. . ('-y:' �•' .,,e`er-y�i .'.r. ,: <...-. `- _ '�•r '_4- _ _ F.�-' ..,�, - __ , •,-.::j1_ its• - .. x"4. •,Y-: .:1 '}..:: - 1. Ca'.‹ti. :,' z - n-,:n - - .::.4.:�. .W`,,T"' ::N - • ?�y�.'�.as.;w '. '4� a^y [r ::..r a-3'.`✓'... _r Rm=:t _ tr--ff'F .:? fYi a`.:. ,i, _ '.y,a�{, _A,`4 � '`u E.X. d. u.%: T*xntr 4`& , ..:k,; - . r�: '::y_n�.Ay' :Y '-'"'1^.e-`.. - .'.,I-`'�, .-'fii'. ALVA r a .:�fi -h.< .. " _., x... ?x.�e .t�!3 .b -- J s..-ors"`.. s�- _ ,'`" aF*.- - - �a �.:&;'°,�a:` _ •''�.,•s;' T' '.'4�, r 'xaz r rn'. .z ,Fa ;i:icy', . '' a.' .. -n y. ...,.:. „a _ ,;,'-:::'-".,� ,:i';5�.,. .•.;-...pry,?: �`"'-.:?.�s::.�. ,ar.. 11 . ' T. eba^`�" _ .:,s, ,�fcr: Groundwater Gage 5 (01/28/2022) Groundwater Gage 6 (01/28/2022) c.' ... ,te e=�sgiu q ss' ; ;,.���y�. z� ,A ' s „n - w"e,� � -' a � .L C hr --_d ' t � �iiTf ,� .4- fi 4�. _1 � f�4A d Ze_ �- t�F'�" � fi rx r.:Ar. ::-—'',.-ilitler-' .z-i-.-.,,,%:',714.11---,...'.. ..**N4,-;-,u.,-14.--,04.-• ,i,114-4.4k•',.~-14 ,-,-''',"-Vt4.3,. .7-W . ,%-.:-...;:iitr4 -;..,:*"'•,.,,,,• lii'l 56: .,,,,,,,,-:,,,,,I...$'' - izp`,` t jn - c" ` 'sa,a,� k:�� -_�, r C''' .c to z ',,. � •:r .i,- .t -: t i;\ a;,„,..-...,,A,..„;-,,,,, § # •"i ,f. ,. . i,1. ``� 3+ `Pz -9k`C"-ram. E � r� �ts9s; • w k - _ {i.€ rig -. .•*».t• - '" A; _- _ i . / �'' w. inn h- '4 a"tt - l -q��C .'wu '' + %x'- f SS,ays• *' , '. 5,,,„V 1 ¢4 v°p6 t - 4 !3� v 1 F3�. ,-� ' - 3c,.i { u 44: "rx ic. �'1�., '�'9'"s. "' - e.t 3„ - ``y' Y X �:ti > - r ""''� 'A :S '1�. ..Ass. [Y! ,..r.' : 'A4d r., >iy.Istet.�'w 'a�b9dc''' -.x J f: ,t m .- -Y'�3 ,�..+ _ Groundwater Gage 7 (01/28/2022) Groundwater Gage 8 (01/28/2022) rii'R `k/ �1°( eat �i 4 a. ::::- .t u- �yTC�.x.'� aV - q 4a.35 `{`R y - F r.+i^. ���x� .'r a - -f '2 �C *, yk 'a,.`• y,F' %`�.:`- - ,-- -' 7 �'' - ;_ �l aP + gi.. �+, ' r € Ada ' fA,s ;. r, �}'q "� 1*r'7re�st,4 '" - -�, '7`" '': ` ^f r: • .,t sf" �� _ r`� 'v 7 N 6..Mr �• �� 5 "9 Tj -f^ -.' ` � �'" 'a-•^� • - � � �' s . + , ;. .� a- sk ,may . a' / e' : r ` 't•'. d Vie `'Str' ""'h d" � a- --,F l�` ft r �x }' �' ?" ,, its{ 1' q: \: t- • I "Y• 'z -Y Pa K��_ ' & ? ,, - a .\• i' �l /yAI^,��' �}-s- � a,,! A� 1 L .-- '44,1 .mow TTT .. ,, i i ! K-'C -.•.; ',-4-F , T/ - $�- • :� -/-i 'f� �%��tr- C _ J- '� 'a1M1F'X > - ` � - 1. . , :" t • '�yT,� , x ,i y { i� I ! -r+n-- - S" j-i'by A �`' Y r Groundwater Gage 9 (01/28/2022) Groundwater Gage 10 (01/28/2022) - a a.x I Tr l w hya .^. Vxs � ' - , ' =;�' .. ., ,1:7-,,iiiths' 1: .', .--,7-44-4,•.'-V-: 'Or.66''::.i?'-6&,i'f:''-.: i,-;,..-,-,Ai.:-:,zic.7----is 4" ..p -.:, o,,-,,j,v'.i'.„-v... Fluci-I'4 ` c k. Y s<•, _ 9 =N^S Groundwater Gage 11-(01/28/2022) MONITORING GAUGE INSTALLATION DATA SHEET Proiect Name: Proiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (Al: Well Casing Height Above Ground (B). Distance From Eve Bolt To Probe Sensor Material: Type of Measurement Type of Logger: Gauge Location: 0ND Water Table Monitoring C—twc—)1 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes: kr4 ('t . IQIt# 4-k- `t t r [‘All Y ke w� 5 Soil Profile Description at Location of Well: Depth Range LirC Color Red Texture Notes P bI% 5YR'/b s_.,ay t•,►N t A/X a o N I — '.S I'll 1— 1• 1cf S �j 9r it Sl S�� >5..,>\ r 1, 2�t,.1 �o,t to i .7" ? IoYk t4 I 5 Yti J/GI ',1�1 a_., w..a ')t S %. ?'S Y( 5/(� ` 1 R�do1c ,�f'/ U - --5 7.S� (1 ����Scs � v A el" o pro e30\k \ICe. '‘ VD.\ 1a 3) 2C•--•4h,‘ 4,•5 S 74 31' S I) -7, 57(& / Sao/) MONITORING GAUGE INSTALLATION DATA SHEET Project Name: Proiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eye Bolt To Probe Sensor Material: Type of Measurement: Type of Logger: Gauge Location: UH0 Water Table Monitoring C-) J 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 des Depth Rance Lirfi Soil Profile Description at Location of Well: Color edo, here Notes is .- ► . Is7 51& S/ij 1is S/i. f' s•.. _ 04 5 %- LLt. r 52.,. v1t 2�.4 .� 2'5', ) `]Jj!(o 1, ` �.. �o..,.k (I/& Q� J i• -7.3 — Z it 5 71?Il f 1 l R.c4.1 3O �.gb.-� 7ti5rz ��, � k.4 - C. 1QYA 3It Y1C8l6.•'l 0r 4..'1lt- XLbt/4 k nliA IV } \--0 lik06.t, t IyB A MONITORING GAUGE INSTALLATION DATA SHEET Project Name: Protect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A) Well Casing Height Above Ground (B). Distance From Eye Bolt To Probe Sensor Material: Type of Measurement: Type of Logger: Gauge Location: o- :D Water Table Monitoring 4Q00 11 3 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 k, G Soil Profile Description at Location of Well: Depth Range 4itT. Color Texture Notes —6 - o. ',$TR 14 a, SYR.,y6 ,t+ toaM Rbeox SIo 4 14 - (. wli j� DYR S7 i ta,r•. f� ppt ,, ! ❑'la I_S=3av 6/ .S`ik4 Swn fe.,,+n box 3OPla 3.D -'3A aI 1.CIR � S+i4�sand- a .x 1010 n•ck- 5.'.i ! a_SY iv i s sa,J9 ,t,ti'/ i Slit S&.i'wrektwitin coLc1,ve 60\I (A)col2c. 6.37 MONITORING GAUGE INSTALLATION DATA SHEET Project Name: Project Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material: Type of Measurement: Type of Logger: Gauge Location: D Water Table Monitoring 6-1 vl -7vdIS6 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes: Ffca. W {tr Fy +0 Depth Range gm. ` Soil Profile Description at Location of Well: Color Redox Texture Notes n - 0.3 1.SYK — Clayt s.14.- (_ () 74. 10%( sy svt y�( s:U r.s44 is 7. r _ 1.gla`f S }.5yA y G S say ,ft4o I q, s x g . �.ti ►o1& 5� lot& 6� sa.A1.; I....4 I51, bcpla..nS 'j..Z — 2..E IOYf� to`( / �! 1.,. 30`t, Fle x �.a - �-1 1 lo`jlZ 6�) jo'U. 6 1 kt1� Set. 51{. t we 'A.\ - 5.1 1 1-. `(R 4/a --^ 16.,,,.1 aV I) !{1'avtl .fang A MONITORING GAUGE INSTALLATION DATA SHEET Project Name: P.toiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A). Well Casing Height Above Ground (B). Distance From Eye Bolt To Probe Sensor Material: Type of Measurement: Type of Logger: Gauge Location: Water Table Monitoring c-)1...JC- 1.4 �2"PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes: epth Range Eifri. Soil Profile Description at Location of Well: t%dax r• Notes 1114'`t �Y i�-y-� — L oA,� _ Z 7 ,-,�..�.. RcckoA iO7 v �. -, i , , io i - , tqlt..3-(-4.1.. �, �l- Re&j o'fo 7reei- - Car.1• - . M'o7( S - 1 7, N-5�.+�t.1 IouvA IZ,cto/ I S %o2+ b - -� . I., I qy 7 S - t 7 . e i1- LI •S i (oa.,\ IL (c ' 1 Z, 5 rio -- 4 - t S �t w - 2 . S y li.1 fo -� pee ex 57n 7 1 gr> oAtc Cif . ►--C�.2_ 7. y5-T 41iCImeI e$K,•IY/pi,. s.v.ir (Oavi MONITORING GAUGE INSTALLATION DATA SHEET Proiect Name. Proiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material: Type of Measurement. Type of Logger: Gauge Location: H`D Water Table Monitoring c.� w C7 ca 1 ti PV ' PVC 2ell Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes: I.t S' -j-, 'tree. 10.n4*r is,v‘...5 Soil Profile Description at Location of Well: Ranae!(rfl - - Color Redox Te Notes 6 - (,iq •glk —' L.e,u,`f ta..W „A" Ar.1,1 sc-41 till I.,/q a.a IoNR SYK `j' s-1i� o..M ex AS_ °� S'f a.Sya 5;�4 og.,� ..OX I?. 3- a.5 Y f 1 1-s YR 3 56n11 1904n sa.x 3'7. \\)A\- 1-0 OA- B J A • 1.22; MONITORING GAUGE INSTALLATION DATA SHEET Proiect Name: Project Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eye Bolt To Probe Sensor Material: Tvpe of Measurement: Tvpe of Logger: Gauge Location: U I -A Water Table Monitoring 2" PVC Well Screen Pressure, Tem.erature, & Depth In -Situ Level Troll 100 1.2- to stwntn, w..A<r Ve.-"*k.5 Soil Profile Description at Location of Well: Depth Ranoea- Color Texture Notes O,. AP 94"5YQ't S so�7t+,„F �4onfi (Isolo)�IO. $ . 701IpsY' j�efC '5 i 5 / - SSYRR ac.ltp Itoa..M e, PR.� L. - 1. a.sSN 3511 I 3/ H CLtiI�h 3. 5.2t 2..51 .511 r., .1 c,14, Ic &IN MONITORING GAUGE INSTALLATION DATA SHEET Project Name: Proiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material: Tvpe of Measurement: Tvpe of Logger: Gauge Location: Water Table Monitoring C 'Jc- 8 07oo 5I 1.3cl G.30 2"PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes: rcc wu..ko. Jr ,a.,H Depth Ranaesirrl Soil Profile Description at Location of Well: Color Redox Texture Notes 0 - ff.-6,5 SYa �- orlw 6, G 5— 1,2 LOY S S YR jj/ S� t kid.. °), i. t — ). J SYR. y (At,. _TM- raw, ox ADO 7, -. .(,Q,S 1-..SYR c3,. s, 1•- n x a..) 7.. �� - �.. 1 .sr s , ,.. R . LID 3.2., y.1 .5 ( y ( .L.SY Si I .: `'i r o.e `. j,-5,Z 4K 5/1 SVR. S X c.1',� YZJ v SOS. A 1 MONITORING GAUGE INSTALLATION DATA SHEET Proiect Name: Proiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material: Type of Measurement: Type of Logger: Gauge Location: t- If) Water Table Monitonng C).-) 8es\-or 1.2.4 (o.�l¢ 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes. Depth Ranee,lin.' ` Soil Profile Description at Location of Well: Redo Notes 0. - r7.+-1 t o YR. �I� ` ,S i I+ , ,..... �Q Da"' .Z *4,5Yft a.5`(A y,/8 silt �Q. Rai1x 5"70 I . 1.1 Y{t 41 — Coati( Sand '(5 S�cA ?� c,iw laaai a �x ID�7e 3g. a �yl.• ,, px �10 . - .5.2 S�`t S SY . S t cl.l kdiez '7n I MONITORING GAUGE INSTALLATION DATA SHEET Proiect Name. Proiect Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casino Length (A): Well Casino Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material: Type of Measurement: Tvpe of Loaner: Gauge Location: O 1--k Water Table Monitoring C w C- 2 1 0 283580 I. 6.y4• 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Notes: lien, e1.2' `', Soil Profile Description at Location of Well: Depth Ranaelirfl I.s 1.5 -..az 2Z-a. __'-4 - 3.D 3 . ;J - 14,0 4.d - d.2 Color 5741 a.sk s i .5� lQel �SS2.. Redox T S'i fl 4 1. s/P. . v s419 ur 5 5,14 S4:g C1oil Notes RR d a-- Qa eX lSh. t2.aax 40?. MONITORING GAUGE INSTALLATION DATA SHEET Project Name: Project Location: Purpose of Gauge: Gauge Description: Gauge ID: Serial Number: Total Well Casing Length (A): Well Casing Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material: Tvpe of Measurement. Tvpe of Logger: Gauge Location: H� Water Table Monitoring Pig 2" PVC Well Screen Pressure, Temperature, & Depth In -Situ Level Troll 100 Noes: o ur Ca‘7 k Depth Rance lin.l Soil Profile Description at Location of Well: Color Redox Texture Notes p ,.A 1b' R 7 -'Z — : If� q+c+. P)i �.r, . 'i S ' it_ S -G !Owyt Sr.+c� to 9p. G d r i .ax .1 - Z-�l 7.SY (e-Z syR-i/- C,la/I0",-. 25lo 7.�i - ,c1 Z.S 5- CjiZ <-g c ySnnA kstw‘ G( °0 i(.ca(C i._. - . - S.2- C,tcYi 'Z,c /N .._. ac,.1 5,..0 A- fe- ), to -elk, Cd .4c/r B A \"44/ .5 0.14 do ecok Appendix B Vegetation Plot Data Table 6. Vegetation Plot Data Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 19.1 2022-02-21 NA 2022-02-21 2022-02-21 0.0247 Scientific Name Common Name Tree/Sh rub Indicator Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Acer negundo boxelder Tree FAC Alnus serrulata hazel alder Tree OBL Amelanchier arborea common rviceberry Tree FAC 2 2 Betula nigra river birch Tree FACW 1 1 2 2 3 3 Calycanthus floridus eastern sweetshrub Shrub FACU 2 2 Carya cordiformis bitternut hickory Tree FACU 2 2 Celtic laevigata sugarberry Tree FACW 1 1 Cephalanthus occidentalis common buttonbush orisilky Shrub OBL Cornus amomum dogwood Shrub FACW 1 1 Cornus florida flowering dogwood Tree FACU 2 2 Diospyrosvirginiana coon persimmon Tree FAC 1 1 1 1 Hamamelis virginiana Americanwitchhazel Tree FACU 1 1 Lindera benzoin northern spicebush Tree FAC Liriodendron tulipifera tuliptree Tree FACU 1 1 1 1 Nyssa sylvatica blackgum Tree FAC 5 5 Oxydendrum arboreum sourwood Shrub UPL 1 1 Platanus occidentalis American sycamore Tree FACW 3 3 3 3 3 3 Populus deltoides eastern cottonwood Tree FAC 1 1 Quercus alba white oak Tree FACU Quercus michauxii swamp chestnut oak Tree FACW 1 1 Quercus nigra water oak Tree FAC Quercus pagoda cherrybark oak Tree FACW Quercus phellos willow oak Tree FAC Quercusrubra northern red oak Tree FACU 1 1 Salix sericea silky willow Shrub OBL Sambucus canadensis American black elderberry Tree 1 1 1 1 Ulmus americana American elm Tree FACW 2 2 Ulmus rubra slippery elm Tree FAC 2 2 Sum Performance Standard 15 15 13 13 17 17 Mitigation Plan Performance Standard Current Year Stem Count 15 13 17 Stems/Acre 607 526 688 Species Count 10 Dominant Species Composition (%) 20 Average Plot Height(ft.) 2 2 2 %Invasives 0 0 0 Post Mitigation Plan Performance Standard rr Current Year Stern Count 15 Stems/Acre 607 526 688 Species Count 10 8 8 Dominant Species Composition (%) 23 29 Average Plot Height (ft.) 2 2 2 % Invasives N 1 . Bolded species re proposed for the current monitoring year, Italicized species are not approved, and a regular font Indicates that t e species has been approved. 2 . The "Species In luded In Approved Mitigation Plan" section contains only those species that were Included In the original approved mitigation plan. The "Post Mitigation Plan Species" section Includes species that are being proposed through a mitigation plan ad endum for the current monitoring year (bolded), species that have been approved in prior monitoring years throug a mitigation plan addendum (regular font), and species that are not approved(italicized). 3 . The "Mitigation Plan Performance Standard" section Is derived only from stems Included In the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" Includes data from mitigation plan approved, post mitigation plan a proved, and pro osed stems. Table 6. Vegetation Plot Data Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 19.1 2022-02-21 NA 2022-02-21 2022-02-21 0.0247 Scientific Name Common Name Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Veg Plot 7 F Planted Total Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Acer negundo boxelder 1 1 1 1 2 2 Alnus serrulata hazel alder 1 1 Amelanchier arborea common rviceberry Betula nigra river birch 5 5 3 3 2 2 1 1 Calycanthus floridus eastern sweetshrub Carya cordiformis bitternut hickory Celtis laevigata sugarberry 1 1 1 1 1 1 Cephalanthus occidentalis common buttonbush on 2 2 1 1 Cornus amomum silky dogwood 1 1 Cornus florida flowering dogwood Diospyrosvirginiana coon persimmon Hamamelis virginiana Americanwitchhazel Lindera benzoin northern spicebush 2 2 Liriodendron tulipifera tuliptree Nyssa sylvatica blackgum 1 1 1 1 Oxydendrum arboreum sourwood Platanus occidentalis American sycamore 1 1 1 1 2 2 3 3 Populus deltoides eastern cottonwood Quercus alba white oak 1 1 Quercus michauxii swamp chestnut oak 2 2 1 1 Quercus nigra water oak 1 1 4 4 1 1 Quercus pagoda cherrybark oak Quercus phellos willow oak 2 2 1 1 2 2 Quercusrubra northern red oak 1 1 Salix sericea silky willow Sambucus canadensis American black elderberry 2 2 1 1 1 1 Ulmus americana American elm 2 2 4 4 1 1 1 1 Ulmus rubra slippery elm Sum Performance Standard 16 16 17 17 15 15 14 14 Mitigation Plan Performance Standard Current Year Stem Count 16 17 _ 14 Stems/Acre 648 688 ,,..- 567 Species Count IIIP1 10 9 RP Dominant Species Composition (%) 24 27 Average Plot Height(ft.) 2 2 _ 2 %Invasives 0 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count 16 17 :5 :4 Stems/Acre 648 688 507 567 Species Count 9 10 9 10 Dominant Species Composition (%) 31 L 24 27 21 Average Plot Height (ft.) 2 2 2 2 %Invasives 0 ' 1 0 MEIN ). Bolded species are proposed for the current monitoring year, Italicized species are not approved, and a regular font Indicates that the specie has been approved. 2). The "Species Included In Approved Mitigation Plan" section contains only those species that were Included 1 the original ap roved mitigation plan. The "Pos Mitigation Plan Species" section Includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded), species that have been approved in prior monitoring year through a mitig tion plan adde dum (regular font), and species that are not approved(italicized). 3). The "Mitigation Plan Performance Standard" section Is derived only from stems Included In the original mlti ation plan, whereas the "Post Mitigation Plan P rformance Standard" Includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 6. Vegetation Plot Data Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 19.1 2022-02-21 NA 2022-02-21 2022-02-21 0.0247 Scientific Name Common Name Veg Plot 8 F Veg Plot 9 F Veg Plot 10 F Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Acer negundo boxelder 1 1 1 1 1 1 Alnus serrulata hazel alder Amelanchier arborea common rviceberry 1 1 Betula nigra river birch 4 4 4 4 1 1 Calycanthus floridus eastern sweetshrub Carya cordiformis bitternut hickory Celtis laevigata sugarberry 1 1 Cephalanthus occidentalis common buttonbush on 1 1 Cornus amomum silky dogwood 1 1 Cornus florida flowering dogwood 1 1 Diospyrosvirginiana coon persimmon Hamamelis virginiana Americanwitchhazel 1 1 Lindera benzoin northern spicebush 1 1 1 1 2 2 Liriodendron tulipifera tuliptree Nyssa sylvatica blackgum 1 1 Oxydendrum arboreum sourwood Platanus occidentalis American sycamore 5 5 2 2 1 1 Populus deltoides eastern cottonwood 2 2 Quercus alba white oak 1 1 Quercus michauxii swamp chestnut oak 1 1 1 1 Quercus nigra water oak 3 3 Quercus pagoda cherrybark oak Quercus phellos willow oak 1 1 Quercusrubra northern red oak 1 1 Salix sericea silky willow 1 1 Sambucus canadensis American black elderberry 2 2 1 1 Ulmus americana American elm 1 1 Ulmus rubra slippery elm 1 1 Sum Performance Standard 16 16 16 16 15 15 Mitigation PlanIP PerformanceDominant Standard Current Year Stem Count 16 16 _ Stems/Acre 648 648 Species Count 12 Species Composition (%) 1 20 Average Plot Height(ft.) 3 2 %Invasives 0 W0 0 Post Mitigation Plan Performance Standard Current Year Stern Count 10 16 :5 Stems/Acre 648 648 507 Species Count 11 12 Dominant Species Composition (%) L 25 20 Average Plot Height (ft.) 3 2 3 % Invasives 0 1 0 0 ). Bolded species are proposed for the current monitoring year, Italicized species are not approved, and a regu ar font Indicate that the specie has been approved. 2). The "Species Included In Approved Mitigation Plan" section contains only those species that were Included 1 the original ap roved mitigatio plan. The "Pos Mitigation Pla Species" sectio Includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitig tion plan adde dum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems Included in the original miti ation plan, whereas the "Post Mitigation Plan Performance Standard" Includes d to from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 6. Vegetation Plot Data Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 19.1 2022-02-21 NA 2022-02-21 2022-02-21 0.0247 Scientific Name Common Name Veg Plot 11 F Veg Plot 12 F Veg Plot 13 F Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Acer negundo boxelder 1 1 Alnus serrulata hazel alder 1 1 Amelanchier arborea common rviceberry Betula nigra river birch 4 4 1 1 5 5 Calycanthus floridus eastern sweetshrub Carya cordiformis bitternut hickory Celtis laevigata sugarberry 1 1 Cephalanthus occidentalis on common buttonbush 1 1 1 1 Cornus amomum silky dogwood Cornus florida flowering dogwood Diospyrosvirginiana coon persimmon Hamamelis virginiana Americanwitchhazel 1 1 Lindera benzoin northern spicebush 2 2 1 1 1 1 Liriodendron tulipifera tuliptree Nyssa sylvatica blackgum 2 2 1 1 Oxydendrum arboreum sourwood 1 1 Platanus occidentalis American sycamore 2 2 1 1 Populus deltoides eastern cottonwood 3 3 Quercus alba white oak 2 2 Quercus michauxii swamp chestnut oak 1 1 1 1 Quercus nigra water oak 2 2 Quercus pagoda cherrybark oak Quercus phellos willow oak 3 3 2 2 Quercusrubra northern red oak Salix sericea silky willow Sambucus canadensis American black elderberry 1 1 Ulmus americana American elm 2 2 Ulmus rubra slippery elm Sum Performance Standard 14 14 14 14 16 16 Mitigation Plan Performance Standard Current Year Stem Count 14 14 16 Stems/Acre 567 567 648 Species Count ill9 9 Dominant Species Composition (%) 21 IP Average Plot Height(ft.) 3 2 2 %Invasives 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count - 14 16 Stems/Acre _..- 567 648 Species Count 7 9 10 Dominant Species Composition (%) 29 L 21 31 Average Plot Height (ft.) 3 2 2 % Invasives 1 0 0 ). Bolded species are proposed for the current monitoring year, Italicized species are not approved, and a regu ar font Indicate that the specie has been approved. ). The "Species I eluded In Approved Mitigation Plan" section contains only those species that were Included 1 the original ap roved mitigation plan. The "Pos Mitigation Pla Species" sectio Includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded), species that have been approved in prior monitoring year through a mitig tion plan adde dum (regular font), and species that are not approved(italicized). 3). The "Mitigation Plan Performance Standard" section Is derived only from stems Included In the original mlti ation plan, whereas the "Post Mitigation Plan P rformance Standard" Includes d to from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 6. Vegetation Plot Data Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 19.1 2022-02-21 NA 2022-02-21 2022-02-21 0.0247 Scientific Name Common Name Veg Plot 1 R Veg Plot 2 R Veg Plot 3 R Veg Plot 4 R Veg Plot 5 R Veg Plot 6 R Total Total Total Total Total Total Species Included in Approved Mitigation Plan Acer negundo boxelder 1 Alnus serrulata hazel alder 1 1 Amelanchier arborea common rviceberry Betula nigra river birch 2 1 1 1 1 4 Calycanthus floridus eastern sweetshrub Carya cordiformis bitternut hickory 2 Celtis laevigata sugarberry 1 3 1 Cephalanthus occidentalis on common buttonbush 1 2 1 Cornus amomum silky dogwood 1 1 Cornus florida flowering dogwood Diospyrosvirginiana coon persimmon Hamamelis virginiana Americanwitchhazel Lindera benzoin northern spicebush 1 1 1 Liriodendron tulipifera tuliptree Nyssa sylvatica blackgum 1 2 Oxydendrum arboreum sourwood Platanus occidentalis American sycamore 2 3 1 5 1 3 Populus deltoides eastern cottonwood 1 1 Quercus alba white oak Quercus michauxii swamp chestnut oak 2 3 1 Quercus nigra water oak 1 1 Quercus pagoda cherrybark oak 2 1 Quercus phellos willow oak 1 2 2 1 1 Quercusrubra northern red oak 2 1 Salix sericea silky willow 2 3 1 2 Sambucus canadensis American black elderberry 1 1 Ulmus americana American elm 2 1 Ulmus rubra slippery elm 2 Sum Performance Standard 15 11 15 14 16 14 Mitigation Plan Performance Standard Current Year Stem Count 15 11 15 14 16 14 Stems/Acre 607 445 607 567 648 567 Species Count 0 7 10 9 Dominant Species Composition (%) 3 27 20 36 Average Plot Height(ft.) 2 2 2 2 2 2 %Invasives 0 0 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count 15 11 15 14 16 14 Stems/Acre 607 445 607 567 648 567 Species Count 10 7 10 9 10 8 Dominant Species Composition (%) 13 27 20 36 19 29 Average Plot Height (ft.) 2 2 2 2 2 2 %Invasives 0 0 0 0 0 0 1 . Bolded species re proposed for the current monitoring year, Italicized species are not approved, and a regul r font Indicates that the specie has been approved. 2). The "Species In luded In Approved Mitigation Plan" section contains only those species that were Included In the original approved mltigatio plan. The "Post Mitigation Plan Species" sectio Includes species that are being proposed through a mitigation plan ad endum for the current monitoring year (bolded), species that have been approved in prior monitoring years through a mitig tion plan addendum (regular font), and species hat are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mi igation Plan Performance Standard" includes da a from mitigation plan approved, post mitigation plan a proved, and pro osed stems. Table 7. Vegetation Performance Standards Summary Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 607 2 10 526 2 0 688 2 8 0 Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species %Invasives Stems/Ac. Av. Ht. (ft) # Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 648 2 9 0 688 2 10 0 607 2 9 0 Veg Plot 7 F Veg Plot 8 F Veg Plot 9 F Stems/Ac. Av. Ht. (ft) #Species %Invasives Stems/Ac. Av. Ht. (ft) #Species %Invasives Stems/Ac. Av. Ht. (ft) #Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 2 10 i 648 3 0 648 2 11 0 Veg Plot 10 F Veg Plot 11 F Veg Plot 12 F Stems/Ac. Av. Ht. (ft) #Species %Invasives Stems/Ac. Av. Ht. (ft) #Species %Invasives Stems/Ac. Av. Ht. (ft) #Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 607 3 12 567 3 7 0 567 2 9 0 Veg Plot 13 F Veg Plot Group 1 R Veg Plot Group 2 R Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 648 2 607 2 Veg Plot Group 3 R Veg Plot Group 4 R Veg Plot Group 5 R Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species % Invasives Stems/Ac. Av. Ht. (ft) # Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 2 10 0 567 2 648 2 Veg Plot Group 6 R Stems/Ac. Av. Ht. (ft) #Species %Invasives Monitoring Year 7 Monitoring Year 5 Monitoring Year 3 Monitoring Year 2 Monitoring Year 1 Monitoring Year 0 567 2 sr 8 0 1 *Each monitoring year represents a different plo for the random vegetation plot 'groups" Random plots are denoted with an R, and fixed plots with an F. Appendix C Stream Geomorphology Data Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 1-UT1A 303+62 Pool 815 813 c 0 r> w w 811 809 0 10 20 30 Width(ft) MYO(3/2022) -Bankfull fo : ( � :� 4.0Bankull Dimensi x-sectionns area(ft.sq.) 6.4 width(ft) 0.6 mean depth(ft) -" 1.4 max depth(ft) 7.1 ft _ 0.6 hydraulicwetted radius(ft) 10.1 width-deptherimeter ratio r �" etc . ' ) r ,g, s� a Survey Date: 3/2022 Field Crew: Kee Mapping&Surveying �` � View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 2-UT1A 303+78 Riffle 815 813 6. .,144.1qupro,....„,. ."---..-----.-------4-.......' c 0 w 811 w 809 - 0 10 20 30 40 Width(ft) MYO(3/2022) —Bankfull —Floodprone Area — Bankfull Dimensions , +� � S 1.2 x-section area(ft.sq.) "t ` " '' «1; t a '�- +' 4.3 width(ft) " �� .rtP tir-peyr " , e 0.3 mean depth(ft) t �1 3 $ ���' �f 0.5 max depth(ft) a ' 4.4 wetted perimeter(ft) 0.3 hydraulic radius(ft) 15.0 width-depth ratio f, 9.3 W flood Prone area(ft) 2.2 entrenchment ratio r . 1 '� 1.0 low bank height ratio } � � x . Survey Date: 3/2022 "# i - . Field Crew: Kee Mapping&Surveying a�'m 1 _00 aV . - - - r ' th. �! View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 3-UT1 Reach 1 200+79 Riffle 816 814 812 c 0 '° 810 w w 808 806 0 10 20 30 40 50 60 Width(ft) — MY0(3/2022) —Bankfull —Floodprone Area Bankfull Dimensions 22.0 x-section area(ft.sq.) 18.7 width(ft) wj 1.2 mean depth(ft) 1.8 max depth(ft) 19.3 wetted perimeter(ft) 14, - t 1.1 hydraulic radius(ft) 15.9 width-depth ratio l � 54.8 W flood prone area(ft) ti v 2.9 entrenchment ratio ' ; - 1.0 low bank height ratio Survey Date: 3/2022 Field Crew: Kee Mapping&Surveying -; View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 4-UT1 Reach 2 204+51 Riffle 811 809 E. 0 m . 807 805 0 10 20 30 40 50 60 70 80 90 Width(ft) +MYO(3/2022) —Bankfull —Floodprone Area Bankfull Dimensions �_ 12.8 x-section area(ft.sq.) 16.4 width(ft) , t � 0.8 mean depth(ft) 4+ _ , ( a - 1.6 max depth(ft) 16.8 wetted perimeter(ft) 0.8 hydraulic radius(ft) -- � 21.0 width-depth ratio - - "'' „--# 100.0 W flood prone area(ft) 6.1 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2022 ¢�� "\ Field Crew: Kee Mapping&Surveying �q View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 5-UT1 Reach 2 204+95 Pool 811 - 809 • c 807 0 w 805 803 0 10 20 30 40 50 60 70 Width(ft) MY0(3/2022) -Bankfull Bankfull Dimensions26.1 x-section area(ft.sq.) 20.5 width(ft) �y 1.3 mean depth(ft) 3.0 max depth(ft) 'q' 21.7 wetted perimeter(ft) 1.2 hydraulic radius(ft) 16.1 width-depth ratio • Survey Date: 3/2022 Field Crew: Kee Mapping&Surveying x " . View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 6-UT1 Reach 2 212+84 Pool 804 802 800 798 0 10 20 30 40 50 60 70 80 Width(ft) MY0(3/2022) -Bankfull Bankfull Dimensions `` I 43.0 x-section area(ft.sq.) � )b 24.2 width(ft) 1.8 mean depth(ft) 3.5 max depth(ft) .0 - 25.4 wetted perimeter(ft) j, 1.7 hydraulic radius(ft) 13.6 width-depth ratio Survey Date: 3/2022 Field Crew: Kee Mapping&Surveying , >a View Downstream osstion Plots Oak Hill Dairy Mitigation Site •DMS Pro-Secject No.100120 Cr Monitoring Year 0-2022 Cross-Section 7-UT1 Reach 2 213+34 Riffle 806 804 v 802 800 , 0 10 20 30 40 50 60 70 80 Width(ft) +MYO(3/2022) -Bankfull -Floodprone Area Bankfull Dimensions f � 15.2 x-section area(ft.sq.) 4444M1 ` t ��' i i ' 14.8 width(ft) s'= � x + i d - iy t � � ti Ira 1.0 mean depth(ft) ! J� 1.8 max depth(ft) 15.3 wetted perimeter 1.0 hydraulic radius(ft) * 14.3 width-depth ratio ,. 89.6 W flood prone area(ft) 6.1 entrenchment ratios a9" %F lY'u ay'L S 1.0 low bank height ratio ` { Survey Date: 3/2022 '_ Field Crew: Kee Mapping&Surveying ;ram View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 8-UT1 Reach 2 218+86 Riffle 799 - —4 T c ', 797 w 795 , 0 10 20 30 40 60 60 Width(ft) — MY0(3/2022) —Bankfull —Floodprone Area Bankfull Dimensions p 12.0 x-section area(ft.sq.) 15.4 width(ft) 0.8 mean depth(ft) 1.5 max depth(ft) 15.8 wetted perimeter(ft) 0.8 hydraulic radius(ft) 19.8 width-depth ratio 72.6 W flood prone area(ft) 4.7 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2022 � t Field Crew: Kee Mapping&Surveying * k Cx :u 1... .:1.r — ' ;s t View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 9-Oak Hill Reach 1 103+34 Riffle 804 802 • • 800 0 v w 798 796 0 10 20 30 40 50 60 70 Width(ft) +MYO(3/2022) -Bankfull -Floodprone Area Bankfull Dimensions , 2 25.3 x-section area(ft.sq.) n 21.5 width(ft) f €f ;'`4 1.2 mean depth(ft) � 2.2 max depth(ft) 4 5 22.1 wetted perimeter(ft) ,�` ��� 1.1 hydraulic radius(ft) ��t �' � ' 18.2 width-depth ratio (-. �� 3�s F # 72.4 W flood prone area(ft) `k •-•A .. _ =� _ 3.4 entrenchment ratio �. 7-: 1.0 low bank height ratio • Survey Date: 3/2022 F Field Crew: Kee Mapping&Surveying ` View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 10-Oak Hill Reach 2 107+14 Riffle 801 799 ♦ • E. 0 m v 797 7.1 795 - 0 10 20 30 40 50 60 70 Width(ft) -Bankfull+MYO(3/2022) -Floodprone Area Bankfull Dimensions z. 25.5 x-section area(ft.sq.) 21.2 width(ft) r° i 1.2 mean depth(ft) 2.1 max depth(ft) 21.9 wetted perimeter(ft) 1.2 hydraulic radius(ft) 17.7 width-depth ratio V , 83.8 W flood prone area(ft) '�""� "� -° 4.0 entrenchment ratio : -r 1.0 low bank height ratio "� Survey Date: 3/2022 = Vt: -- Field Crew: Kee Mapping&Surveying �` View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 11-Oak Hill Reach 2 107+57 Pool 799 797 795 793 0 10 20 30 40 50 60 70 80 90 Width(ft) MY0(3/2022) -Bankfull Bankfull Dimensions 11111111011 64.9 x-section area(ft.sq.) j t 29.7 width(ft) , r 1 2.2 mean depth(ft) 4.4 max depth(ft) - a( 31.8 wetted perimeter(ft) 2.0 hydraulic radius(ft) 13.6 width-depth ratio • Survey Date: 3/2022 Field Crew: Kee Mapping&Surveying View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 12-Oak Hill Reach 3 113+43 Pool 797 E. 793 0 v w 791 789 - 0 10 20 30 40 50 60 70 80 90 100 110 Width(ft) MY0(3/2022) -Bankfull Bankfull Dimensions 73.1 x-section area(ft.sq.) 33.3 width(ft) 2.2 mean depth(ft) °, 4.2 max depth(ft) h 34.8 wetted perimeter(ft) • �Fl f�r _n 2.1 hydraulic radius(ft) ' 15.2 width-depth ratio �� c ,,.. Survey Date: 3/2022 ' Field Crew: Kee Mapping&Surveying ,ty View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 13-Oak Hill Reach 3 113+90 Riffle 799 797 795 s____--• 0 , 793 791 - 0 10 20 30 40 50 60 70 80 90 Width(ft) +MYO(3/2022) -Bankfull -Floodprone Area Bankfull Dimensions 31.5 x-section area(ft.sq.) 22.3 width(ft) 1.4 mean depth(ft) 2.6 max depth(ft) s 23.1 wetted perimeter(ft) 1.4 hydraulic radius(ft) 15.8 width-depth ratio - ems�.. . = 102.5 W flood prone area(ft) �' 4.6 entrenchment ratio a - � � 1.0 low bank height ratio =' - .. e - Survey Date: 3/2022 ' � Field Crew: Kee Mapping&Surveying I. *X -�� w t-' "'' View Downstream Cross-Section Plots Oak Hill Dairy Mitigation Site DMS Project No.100120 Monitoring Year 0-2022 Cross-Section 14-Oak Hill Reach 4 120+18 Riffle 795 793 791 }. -0- • 789 787 0 10 20 30 40 50 60 70 Width(ft) - MY0(3/2022) -Bankfull -Floodprone Area Bankfull Dimensions 36.1 x-section area(ft.sq.) v �� 26.0 width(ft) a' 1.4 mean depth(ft) 2.7 max depth(ft) 26.8 wetted perimeter(ft) s. 1.3 hydraulic radius(ft) t -' 18.8 width-depth ratio 94.3 W flood prone area(ft) 3.6 entrenchment ratio g 1.0 low bank height ratio � �� •y. '�'a '� _ -�e*�" '° �N ,�, :: ''. Survey Date: 3/2022 f - Field Crew: Kee Mapping&Surveying View Downstream Longitudinal Profile Plots Oak Hill Creek Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1A (STA 300+13 to 304+91) Elevation (feet) a ca o in o n • ♦ • ♦ ♦ ♦ ♦ - a• • ♦ --------- __A__ • ♦ fi 0 t m O130000 30050 30100 30150 30200 30250 Station (feet) TW WSF LBKF/LTOB RBKF/RTOB • STRUCTURE (MY0-3/2022) - (MY0-3/2022) ♦ (MYO-3/2022) ♦ (MY0-3/2022) (MY0-3/2022) UT1A (STA 300+13 to 304+91) Elevation (feet) 0 w a c o In I I I .4 X I I I X 0 ♦ ___� ♦ ♦ ♦ •♦ I I • End Reach I I M I 0V 30250 30300 30350 30400 30450 30500 Station (feet) TW WSF LBKF/LTOB ♦ RBKF/RTOB • STRUCTURE (MY0-3/2022) - (MY0-3/2022) (MY0-3/2022) (MY0-3/2022) (MY0-3/2022) Longitudinal Profile Plots Oak Hill Creek Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1 (STA 200+05 to 221+11) Q1S Elevation (feet) o oo co C D 0 . F D L V, 0 1 1 • • • —I r1,1 I X , I I — cr x —I I I —I Lei I X 1 —I • AAA& T • • :-.•-;4 --------- -- __ i • • • • LA • • A • A • • •A A • • • • • A • • A • i r • • At AA AA -------------------- A • A AA aA A I I L I i• • • • t• - Start Reach 1 i I Start Reach 2 i 1 I i i 1 i 1 20100 20050 20000 20300 20350 20250 20200 20150 20400 20450 20500 Station (feet) TW WSF LBKF/LTOB(MY0-3/2022) RBKF/RTOB • STRUCTURE - (MY0-3/2022)• (MY0-3/2022) (MYO-3/2022) • (MY0-3/2022) UT1 (STA 200+05 to 221+11) Q1/1 Elevation (feet) .1 00 CO C O 0 0 F n 0 ln C • i • • • • A • i ------------ • • 4 • ._ • • • 20500 20550 20600 TW 20650 20700 _ WSF (MY0-3/2022) I 20750 Station (feet) LBKF/LTOB (MY0-3/2022) • 20800 RBKF/RTOB (MYO-3/2022) 20850 0 20900 20950 21000 STRUCTURE (MY0-3/2022) —1----- (MYO-3/2022) Longitudinal Profile Plots Oak Hill Creek Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1 (STA 200+05 to 221+11) Elevation (feet) J W 00 C n O tli D O O I I XS6 I I 1 X • • • • I . J 21000 J. 21050 21100 21150 21200 21250 21300 21350 21400 21450 21500 Station (feet) TW (MYO-3/2022) WSF (MYO-3/2022) ♦ LBKF/LTOB (MYO-3/2022) ♦ RBKF/RTOB (MYO-3/2022) • STRUCTURE (MYO-3/2022) UT1 (STA 200+05 to 221+11) 805 1 I 1 1— Internal CE Crossing , I , I co Elevation (feet) J V 00 D p O J O ____________ • ♦ : s 1. ♦ . End Reach 2 21500 21550 21600 21650 21700 21750 21800 21850 21900 21950 22000 22050 22100 Station (feet) TW (MY0-3/2022) WSF (MYO-3/2022) • LBKF/LTOB (MYO-3/2022) ♦ RBKF/RTOB (MYO-3/2022) • STRUCTURE (MYO-3/2022) — — Start Internal CE crossing — — End Internal Crossing Longitudinal Profile Plots Oak Hill Creek Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Creek (STA 100+10 to 123+73) Elevation (feet) 00 D . 0 J , N I„ ------------------------------------------------ • • • • . ! . ••• t • I • • • • • •-- - --------------- I. ------------------------------------------------ Start Reach 1 I I I I 10000 10050 10100 10150 10200 10250 10300 10350 10400 10450 Station (feet) TW WSF LBKF/LTOB RBKF/RTOB • STRUCTURE (MY0-3/2022) - (MY0-3/2022) • (MY0-3/2022) • (MY0-3/2022) (MY0-3/2022) Oak Hill Creek (STA 100+10 to 123+73) Internal CE Crossing 1 1 0 `� X 1 1 .. .4 X Elevation (feet) .1V 00 0 00 0 0 In 0 1 1 • I I • _ I♦ ♦ I ♦• • ♦ • • A• • ♦ ♦ I • • I ♦ • 1 I I • ♦ • ♦ I • •♦ 4• • 1 - Start Reach 2 1 1 I 1 I I 1 I 10450 10500 10550 10600 10650 10700 10750 10800 10850 10900 10950 11000 Station (feet) TW WSF LBKF/LTOB RBKF/RTOB STRUCTURE End internal —40— (MY0-3/2022) - (MY0-3/2022) (MVO-3/2022) • (MY0-3/2022) • (MY0-3/2022) crossing Longitudinal Profile Plots Oak Hill Creek Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Creek (STA 100+10 to 123+73) 800 795 790 785 •• • ♦• • 1 • • ry ti F 1 L ti r ♦ ♦ •• k I • • • Start Reach 3 I I I I I I I 11000 11050 11100 �TW (MYO-3/2022) 11150 WSF (MY0-3/2022) 11200 11250 Station (feet) ♦ LBKF/LTOB (MY0-3/2022) 11300 ♦ RBKF/RTOB (MY0-3/2022) 11350 11400 • STRUCTURE (MY0-3/2022) 11450 11500 Oak Hill Creek (STA 100+10 to 123+73) .111 Elevation (feet) J V V V a'F/ O V°i ••♦ ••♦ __ • t t • ♦• • t • ♦♦ .• r ♦ • • ♦ ♦ ♦ • AA ♦♦ • ♦• ♦ ♦ ♦ ♦ A k • • ♦ • • • ♦ ♦ • ♦ ♦ • • - ♦ Start Reach T • 11500 11550 11600 TW 11650 WSF (MYO-3/2022) 11700 ♦ 11750 Station (feet) LBKF/LTOB (MYO-3/2022) ♦ 11800 11850 RBKF/RTOB (MYO-3/2022) • 11900 STRUCTURE (MYO-3/2022) 11950 12000 (MYO-3/2022) Longitudinal Profile Plots Oak Hill Creek Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Creek (STA 100+10 to 123+73) Elevation (feet) V V V W 00 p F+ O tli O tli I7, I I• • •• •• • •• • • • • • AA • i • •• • •• --- ------------------------------------------------ • • • • • • • I I I I I 12050 12100 12150 WSF (MY0-3/2022) • 12200 Station (feet) LBKF/LTOB (MY0-3/2022) • 12250 RBKF/RTOB (MY0-3/2022) • 12300 STRUCTURE (MY0-3/2022) 12350 12400 TW (MY0-3/2022) Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1A, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 18 18 18 18 e.C) Very fine 0.062 0.125 3 3 3 21 Fine 0.125 0.250 2 7 9 9 30 Medium 0.25 0.50 4 4 4 34 Coarse 0.5 1.0 1 1 1 35 Very Coarse 1.0 2.0 2 2 4 4 39 40. 6$1% Very Fine 2.0 2.8 39 Very Fine 2.8 4.0 1 1 1 40 Fine 4.0 5.6 40 Fine 5.6 8.0 2 2 2 42 Medium 8.0 11.0 1 1 2 2 44 Medium 11.0 16.0 4 4 4 48 Coarse 16.0 22.6 8 1 9 9 57 Coarse 22.6 32 11 2 13 13 70 Very Coarse 32 45 6 5 11 11 81 Very Coarse 45 64 6 1 7 7 88 \, or Small 64 90 5 2 7 7 95 Small 90 128 5 5 5 100 Large 128 180 100 Large 180 256 100 ,zjr.SL Small 256 362 100 Small 362 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35 = 1.0 D50 = 17.3 D84 = 52.3 D95 = 90.0 D1oo = 128.0 inn Sit/cozy Pebble Count t Sand UT1A, Reachwide Particle Distribution 1 Gavel 1 co le♦ : oder� B,dmck _ i ulatil ;' k, 0.01 r 0 1 1 1 10 Particle Class Size (mm) MY0-02/2022 T 100 1000 r 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1A, Cross -Section 2 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 8 8 8 0 Very fine 0.062 0.125 8 Fine 0.125 0.250 -- 8 Medium 0.25 0.50 8 Coarse 0.5 1.0 -- 8 Very Coarse 1.0 2.0 6 6 14 Very Fine 2.0 2.8 -- 14 Very Fine 2.8 4.0 2 2 16 Fine 4.0 5.6 1 1 17 Fine 5.6 8.0 7 7 24 Medium 8.0 11.0 3 3 27 Medium 11.0 16.0 17 17 44 Coarse 16.0 22.6 23 23 67 Coarse 22.6 32 8 8 75 Very Coarse 32 45 13 13 88 Very Coarse 45 64 5 5 93 V5 C0 Small 64 90 5 5 98 Small 90 128 2 2 100 Large 128 180 -- 100 Large 180 256 100 Small 256 362 -- 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 2 Channel materials (mm) D16 = 4.0 D35 = 13.1 D50 = 17.5 D84 = 40.5 D95 = 73.4 D1oo = 128.0 UT1A, Cross -Section 2 Pebble Count Particle Distribution 1 nn Sit/Clay 1 Sand 1 Gravel I Coyyyble Boulder B Brock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C / — • • 0.01 1 0 1 1 1 10 Particle Class Size (mm) t MY0-02/2022 1 100 i 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1R1, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 20 20 20 20 cie Very fine 0.062 0.125 15 15 15 35 Fine 0.125 0.250 7 7 7 42 Medium 0.25 0.50 1 1 1 43 Coarse 0.5 1.0 43 Very Coarse 1.0 2.0 1 1 1 44 40. 6$1% Very Fine 2.0 2.8 44 Very Fine 2.8 4.0 1 1 1 45 Fine 4.0 5.6 45 Fine 5.6 8.0 1 1 1 46 Medium 8.0 11.0 2 2 2 48 Medium 11.0 16.0 1 2 3 3 51 Coarse 16.0 22.6 5 3 8 8 59 Coarse 22.6 32 10 10 10 69 Very Coarse 32 45 9 1 10 10 79 Very Coarse 45 64 6 6 6 85 \, or Small 64 90 4 4 4 89 Small 90 128 9 9 9 98 Large 128 180 2 2 2 100 Large 180 256 100 ,zjr.SL Small 256 362 100 Small 362 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35= 0.1 D50 = 14.1 D84 = 60.4 D95 = 113.8 D1oo = 180.0 inn Sit/Clay Pebble Count r Sand UT1R1, Reachwide Particle Distribution r Gravel 1 Cobble Boulder B,dmck F. , 7 ulatil ;' I/1411''''fr..j u 0.01 r 0 1 1 10 100 Particle Class Size (mm) MY0-02/2022 1000 r 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1R1, Cross -Section 3 Particle Class SILT/CLAY BEDROCK Silt/Clay Very fine Fine Medium Coarse Very Coarse Very Fine Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Large/Very Large Bedrock Diameter (mm) min 0.000 0.062 0.125 0.25 0.5 1.0 2.0 2.8 4.0 5.6 8.0 11.0 16.0 22.6 32 45 64 90 128 180 256 362 512 1024 2048 max 0.062 0.125 0.250 0.50 1.0 2.0 2.8 4.0 5.6 8.0 11.0 16.0 22.6 32 45 64 90 128 180 256 362 512 1024 2048 >2048 Total Riffle 100- Count 4 Summary Class Percentage 4 2 8 2 8 2 6 10 6 8 6 14 10 18 6 2 6 10 6 8 6 14 10 18 6 100 100 Percent Cumulative 4 4 4 4 6 14 14 14 14 16 22 32 38 46 52 66 76 94 100 100 100 100 100 100 100 100 Cross -Section 3 Channel materials (mm) D16 = 8.0 D35 = 19.0 D50 = 40.2 D80. = 105.3 D95 = 135.5 D1oo = 180.0 1 nn Sit/Clay UT1R1, Pebble Count 1 Sand Cross -Section 3 Particle Distribution 1 Gravel I Cobble Boulder Bedrock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C •--10. 0- • • 1 • 10 0.01 0 1 1 10 Particle Class Size (mm) t MY0-02/2022 100 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1R2, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 22 22 22 22 e.C) Very fine 0.062 0.125 10 10 10 32 Fine 0.125 0.250 16 16 16 48 Medium 0.25 0.50 48 Coarse 0.5 1.0 48 Very Coarse 1.0 2.0 48 40. 6$1% Very Fine 2.0 2.8 48 Very Fine 2.8 4.0 48 Fine 4.0 5.6 48 Fine 5.6 8.0 1 1 1 49 Medium 8.0 11.0 49 Medium 11.0 16.0 2 2 2 51 Coarse 16.0 22.6 1 1 1 52 Coarse 22.6 32 5 1 6 6 58 Very Coarse 32 45 11 11 11 69 Very Coarse 45 64 15 15 15 84 \, or Small 64 90 5 5 5 89 Small 90 128 11 11 11 100 Large 128 180 100 Large 180 256 100 o%Q' Small 256 362 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35= 0.1 D50= 13.3 D84 = 64.0 D95 = 109.1 D1oo = 128.0 inn Sit/clay Pebble Count t sand UT1R2, Reachwide Particle Distribution 1 Gavel j co le♦ : oy 9idmck Percent Cumulative (%) W A Vi Q1 J W ID C J 0 0 0 0 0 0 0 0 0 C .._. filer i • • — • • /I k, 0.01 r 0 1 1 10 Particle Class Size (mm) MY0-02/2022 100 1000 r 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1R2, Cross -Section 4 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 0 Very Fine 2.0 2.8 -- 0 Very Fine 2.8 4.0 0 Fine 4.0 5.6 2 2 2 Fine 5.6 8.0 2 Medium 8.0 11.0 -- 2 Medium 11.0 16.0 4 4 6 Coarse 16.0 22.6 12 12 18 Coarse 22.6 32 24 24 42 Very Coarse 32 45 12 12 54 Very Coarse 45 64 16 16 70 .5 C0� Small 64 90 8 8 78 Small 90 128 18 18 96 Large 128 180 2 2 98 Large 180 256 98 Small 256 362 2 2 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 4 Channel materials (mm) D16 = 21.3 D35 = 28.9 D50 = 40.2 D80. = 101.2 D95 = 125.5 D1oo = 362.0 UT1R2, Cross -Section 4 Pebble Count Particle Distribution i nn Sit/Clay 1 Sand 1 Gravel 1 Cobble 0- Be•drock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C —00 , I 0.01 0 1 1 10 Particle Class Size (mm) t MYO-02/2022 100 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1R2, Cross -Section 7 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 0 Very Fine 2.0 2.8 -- 0 Very Fine 2.8 4.0 0 Fine 4.0 5.6 -- 0 Fine 5.6 8.0 0 Medium 8.0 11.0 2 2 2 Medium 11.0 16.0 6 6 8 Coarse 16.0 22.6 8 8 16 Coarse 22.6 32 12 12 28 Very Coarse 32 45 20 20 48 Very Coarse 45 64 22 22 70 .5 C0� Small 64 90 8 8 78 Small 90 128 16 16 94 Large 128 180 6 6 100 Large 180 256 100 Small 256 362 -- 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 7 Channel materials (mm) D16 = 22.6 D35 = 36.1 D50 = 46.5 D80. = 102.7 D95 = 135.5 D1oo = 180.0 nn Sit/Clay UT1R2, Pebble Count I Sand Cross -Section 7 Particle Distribution I Gravel 1 Cobble_ Brock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C 1/j 0-0Boulder 0.01 • 0— 1 r•• a 0 1 1 10 Particle Class Size (mm) t MY0-02/2022 1 i 100 i 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1R2, Cross -Section 8 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 2 2 2 Very Fine 2.0 2.8 -- 2 Very Fine 2.8 4.0 2 Fine 4.0 5.6 -- 2 Fine 5.6 8.0 2 Medium 8.0 11.0 -- 2 Medium 11.0 16.0 2 2 4 Coarse 16.0 22.6 2 2 6 Coarse 22.6 32 4 4 10 Very Coarse 32 45 20 20 30 Very Coarse 45 64 30 30 60 .5 C0� Small 64 90 24 24 84 Small 90 128 8 8 92 Large 128 180 8 8 100 Large 180 256 100 Small 256 362 -- 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 8 Channel materials (mm) D16 = 35.4 D35 = 47.7 D50 = 56.9 D84 = 90.0 D95 = 145.5 D1oo = 180.0 UT1R2, Cross -Section 8 Pebble Count Particle Distribution nn Sit/Clay 1 Sand 1 Gravel 1 Cobble_ Boulder Brock Percent Cumulative (%) N W A V1 01 V CO l0 C 0 0 0 0 0 0 0 0 0 0 C f/) H i��•••• 1 • i 0.01 01 1 10 100 1000 10000 Particle Class Size (mm) t MY0-02/2022 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 1, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 2 2 2 2 e.C) Very fine 0.062 0.125 2 2 2 4 Fine 0.125 0.250 15 15 15 19 Medium 0.25 0.50 5 5 5 24 Coarse 0.5 1.0 6 6 6 30 Very Coarse 1.0 2.0 2 2 2 32 40. 6$1% Very Fine 2.0 2.8 32 Very Fine 2.8 4.0 3 3 3 35 Fine 4.0 5.6 2 2 2 37 Fine 5.6 8.0 2 2 2 39 Medium 8.0 11.0 4 4 4 43 Medium 11.0 16.0 2 2 4 4 47 Coarse 16.0 22.6 3 3 3 50 Coarse 22.6 32 2 2 4 4 54 Very Coarse 32 45 8 3 11 11 65 Very Coarse 45 64 21 21 21 86 \, or Small 64 90 7 7 7 93 Small 90 128 3 3 3 96 Large 128 180 4 4 4 100 Large 180 256 100 ,zjr.SL Small 256 362 100 Small 362 100 M Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16= 0.2 D35 = 4.0 D50= 22.6 D84 = 61.9 D95 = 113.8 D1oo = 180.0 inn Sit/Clay Oak Hill Pebble Count t Sand Reach 1, Reachwide Particle Distribution f Gravel 1 Cobble Boulder B,dmck F. , fe..0 ulatil ;' 'elear* Ir---jr.........."'.........-1 0.01 0 1 1 10 Particle Class Size (mm) MY0-02/2022 T 100 1000 r 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 1, Cross -Section 9 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 0 Very Fine 2.0 2.8 -- 0 Very Fine 2.8 4.0 0 Fine 4.0 5.6 -- 0 Fine 5.6 8.0 0 Medium 8.0 11.0 5 5 5 Medium 11.0 16.0 7 7 11 Coarse 16.0 22.6 4 4 15 Coarse 22.6 32 17 16 31 Very Coarse 32 45 15 14 46 Very Coarse 45 64 28 27 72 .5 C0� Small 64 90 19 18 90 Small 90 128 8 8 98 Large 128 180 -- 98 Large 180 256 2 2 100 Small 256 362 -- 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 105 100 100 Cross -Section 9 Channel materials (mm) D16 = 23.0 D35 = 34.8 D50 = 47.6 D84 = 79.7 D95 = 110.9 D1oo = 256.0 Inn Sit/Clay Oak Hill Pebble Count 1 Sand Reach 1, Cross -Section 9 Particle Distribution 1 Gravel 1 Cobble Boulder Be•drock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C , ir.....—• 0.01 • 0— 1 r•• a 0 1 1 10 Particle Class Size (mm) t MYO-02/2022 1 i 100 i 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 2, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 10 10 10 10 e.C) Very fine 0.062 0.125 11 11 11 21 Fine 0.125 0.250 13 13 13 34 Medium 0.25 0.50 34 Coarse 0.5 1.0 34 Very Coarse 1.0 2.0 1 1 1 35 40. 6$1% Very Fine 2.0 2.8 35 Very Fine 2.8 4.0 1 1 1 36 Fine 4.0 5.6 1 1 1 37 Fine 5.6 8.0 5 5 5 42 Medium 8.0 11.0 2 2 2 44 Medium 11.0 16.0 3 2 5 5 49 Coarse 16.0 22.6 3 2 5 5 54 Coarse 22.6 32 3 2 5 5 59 Very Coarse 32 45 4 1 5 5 64 Very Coarse 45 64 8 8 8 72 \, or Small 64 90 15 15 15 87 Small 90 128 8 8 8 95 Large 128 180 1 1 1 96 Large 180 256 3 3 3 99 ,zjr.SL Small 256 362 1 1 1 100 Small 362 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16= 0.1 D35= 2.0 D50= 17.1 D84 = 84.1 D95 = 128.0 D1oo = 362.0 inn Sit/Clay Oak Hill Pebble Count r Sand Reach 2, Reachwide Particle Distribution r Gavel 1 Cobble rV. : oulder• + B,dmck Percent Cumulative (%) W A Vi Q1 J W ID C J 0 0 0 0 0 0 0 0 0 C i A' r y 0.01 r 0 1 1 10 Particle Class Size (mm) MY0-02/2022 100 1000 r 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 2, Cross -Section 10 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 0 Very Fine 2.0 2.8 -- 0 Very Fine 2.8 4.0 0 Fine 4.0 5.6 -- 0 Fine 5.6 8.0 0 Medium 8.0 11.0 -- 0 Medium 11.0 16.0 0 Coarse 16.0 22.6 6 6 6 Coarse 22.6 32 12 12 18 Very Coarse 32 45 8 8 26 Very Coarse 45 64 32 32 58 .5 C0� Small 64 90 24 24 82 Small 90 128 14 14 96 Large 128 180 -- 96 Large 180 256 4 4 100 Small 256 362 -- 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 10 Channel materials (mm) D16 = 30.2 D35 = 49.7 D50 = 58.6 D84 = 94.6 D95 = 124.8 D1oo = 256.0 Oak Hill Reach 2, Cross -Section 10 Pebble Count Particle Distribution inn Sit/Clay 1 Sand 1 Gravel Cobb mould-0 Bedrock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C , u 0.01 • r r 0 1 1 i • • ♦ r• 10 Particle Class Size (mm) t MYO-02/2022 100 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 3, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 32 32 32 32 e.C) Very fine 0.062 0.125 6 6 6 38 Fine 0.125 0.250 1 1 1 39 Medium 0.25 0.50 2 2 2 41 Coarse 0.5 1.0 1 1 1 42 Very Coarse 1.0 2.0 2 2 2 44 40. 6$1% Very Fine 2.0 2.8 44 Very Fine 2.8 4.0 44 Fine 4.0 5.6 2 2 2 46 Fine 5.6 8.0 2 2 2 48 Medium 8.0 11.0 2 2 2 50 Medium 11.0 16.0 50 Coarse 16.0 22.6 1 1 1 51 Coarse 22.6 32 2 2 2 53 Very Coarse 32 45 7 7 7 60 Very Coarse 45 64 12 12 12 72 \, or Small 64 90 11 11 11 83 Small 90 128 6 6 6 89 Large 128 180 6 6 6 95 Large 180 256 4 4 4 99 Small 256 362 99 Small 3620512 99 M Medium 512 124 1 1 1 100 * Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35= 0.1 D50 = 11.0 D84 = 95.4 D95 = 180.0 D1oo = 1024.0 inn Sit/Clay Oak Hill Pebble Count r Sand Reach 3, Reachwide Particle Distribution r Gavel 1 Cobble r Boulder B drock � ulatil ;' u 0.01 r 0 1 1 1 10 Particle Class Size (mm) MY0-02/2022 T 100 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 3, Cross -Section 13 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 0 Very Fine 2.0 2.8 -- 0 Very Fine 2.8 4.0 0 Fine 4.0 5.6 -- 0 Fine 5.6 8.0 0 Medium 8.0 11.0 2 2 2 Medium 11.0 16.0 6 6 8 Coarse 16.0 22.6 4 4 12 Coarse 22.6 32 10 10 22 Very Coarse 32 45 10 10 32 Very Coarse 45 64 28 28 60 \ ea LO Small 64 90 20 20 80 Small 90 128 10 10 90 Large 128 180 2 2 92 Large 180 256 4 4 96 llllliONY Small 256 362 2 2 98 Small 362 512 2 2 100 Medium 512 1024-- 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 13 Channel materials (mm) D16 = 26.0 D35 = 46.7 D50 = 56.4 D80. = 103.6 D95 = 234.4 D1oo = 512.0 Oak Hill Reach 3, Cross -Section 13 Pebble Count Particle Distribution a nn Sit/Clay I Sand 1 Gravel lder— „rock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C , /I1BOU L, 0.01 • 0 1 1 • • a 10 Particle Class Size (mm) t MVO 02/2022 1 100 1 i 1000 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 4, Reachwide Particle Class Diameter (mm) Particle Count Reach Summary min max Riffle Pool Total Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 19 19 19 19 e.C) Very fine 0.062 0.125 8 8 8 27 Fine 0.125 0.250 7 7 7 34 Medium 0.25 0.50 8 8 8 42 Coarse 0.5 1.0 3 3 3 45 Very Coarse 1.0 2.0 2 2 2 47 40. 6$1% Very Fine 2.0 2.8 47 Very Fine 2.8 4.0 47 Fine 4.0 5.6 1 1 1 48 Fine 5.6 8.0 1 1 1 49 Medium 8.0 11.0 49 Medium 11.0 16.0 2 2 2 51 Coarse 16.0 22.6 7 7 7 58 Coarse 22.6 32 3 3 3 61 Very Coarse 32 45 12 1 13 13 74 Very Coarse 45 64 10 10 10 84 \, or Small 64 90 6 6 6 90 Small 90 128 6 6 6 96 Large 128 180 1 1 1 97 Large 180 256 1 1 1 98 ,zjr.SL Small 256 362 1 1 1 99 Small 362 512 1 1 1 100 Medium 512 0 124 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 100 Total 50 50 100 100 100 Reachwide Channel materials (mm) D16 = Silt/Clay D35 = 0.3 D50 = 13.3 D84 = 64.0 D95 = 120.7 D1oo = 512.0 1,, Sit/Clay Oak Hill Pebble Count r Sand Reach 4, Reachwide Particle Distribution 1 Gavel 1 Cobble ri........41Elooler B,dmck i ulatil ;' • 1/1.....71( .7.,..7.................1 u 0.01 r 0 1 1 r 10 Particle Class Size (mm) MY0-02/2022 r 100 I 1000 r 10000 Reachwide and Cross -Section Pebble Count Plots Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Oak Hill Reach 4, Cross -Section 14 Particle Class Diameter (mm) Riffle 100- Count Summary min max Class Percentage Percent Cumulative SILT/CLAY Silt/Clay 0.000 0.062 -- 0 0 Very fine 0.062 0.125 0 Fine 0.125 0.250 -- 0 Medium 0.25 0.50 0 Coarse 0.5 1.0 -- 0 Very Coarse 1.0 2.0 0 Very Fine 2.0 2.8 -- 0 Very Fine 2.8 4.0 0 Fine 4.0 5.6 -- 0 Fine 5.6 8.0 0 Medium 8.0 11.0 -- 0 Medium 11.0 16.0 2 2 2 Coarse 16.0 22.6 2 2 4 Coarse 22.6 32 4 4 8 Very Coarse 32 45 14 14 22 Very Coarse 45 64 24 24 46 .5 C0� Small 64 90 28 28 74 Small 90 128 8 8 82 Large 128 180 12 12 94 Large 180 256 6 6 100 Small 256 362 -- 100 Small 362 512 100 Medium 512 1024 100 Large/Very Large 1024 2048 100 BEDROCK Bedrock 2048 >2048 -- 100 Total 100 100 100 Cross -Section 14 Channel materials (mm) D16 = 38.9 D35 = 54.5 D50 = 67.2 D80. = 135.5 D95 = 190.9 D1oo = 256.0 Oak Hill Reach 4, Cross -Section 14 Pebble Count Particle Distribution Inn Sit/Clay I Sand I Gravel 1 Cobble Boulder Be•drock Percent Cumulative (%) N W A Ul 01 V CO l0 C DOO 00 O O O O O C , 7/-61- JI 0.01 • 0— 1 r•• a i 0 1 1 10 100 Particle Class Size (mm) t MYO-02/2022 i 1000 10000 Table 8a. Baseline Stream Data Summary Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 PRE-EXISTING CONDITIONS ' ESIGN MONITORING BASELINE (MYO) Parameter UT1A Riffle Only Min Max n Min Max Min Max n Bankfull Width (ft) 9.9 1 5.5 4.3 1 Floodprone Width (ft) 12.2 1 8.0 12.0 9.3 1 Bankfull Mean Depth 0.2 1 0.5 0.3 1 Bankfull Max Depth 0.4 1 0.6 0.8 0.5 1 Bankfull Cross Sectional Area (ft2) 1.9 1 2.6 1.2 1 Width/Depth Ratio 51.0 1 12.0 15.0 1 Entrenchment Ratio 1.2 1 1.4 2.2 2.2 1 Bank Height Ratio 9.6 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull Silt - - 17.5 1 Rosgen Classification F6b E4b E4b Bankfull Discharge (cfs) 3 7 Sinuosity 1.07 1.10 1.10 Water Surface Slope (ft/ft)2 0.0250 0.0320 0.0274 Other Parameter UT1 Reach 1 Riffle Only Min Max n Min Max Min Max n Bankfull Width (ft) 15.9 1 17.0 18.7 1 Floodprone Width (ft) 24.5 1 37.0 85.0 54.8 1 Bankfull Mean Depth 0.7 1 1.1 1.2 1 Bankfull Max Depth 1.6 1 1.3 1.6 1.8 1 Bankfull Cross Sectional Area (ft2) 10.7 1 18.4 22.0 1 Width/Depth Ratio 23.4 1 16.0 15.9 1 Entrenchment Ratio 1.5 1 2.2 5.0 2.9 1 Bank Height Ratio 2.4 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull 3.2 - - 40.2 1 Rosgen Classification F4 C4 C4 Bankfull Discharge (cfs) 31 42 Sinuosity 1.03 1.20 1.20 Water Surface Slope (ft/ft)2 0.0077 0.0060 0.0064 Other Table 8b. Baseline Stream Data Summary Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 PRE-EXISTING CONDITIONS ESIG MONITORING BASELINE k (MVO) Parameter UT1 Reach 2 Riffle Only Min Max n Min Max Min Max n Bankfull Width (ft) 9.1 1 17.0 14.8 16.4 3 Floodprone Width (ft) 16.2 1 37.0 85.0 72.6 100.0 3 Bankfull Mean Depth 1.5 1 1.1 0.8 1.0 3 Bankfull Max Depth 2.2 1 1.3 1.6 1.5 1.8 3 Bankfull Cross Sectional Area (ft2) 14.1 1 18.4 12.0 15.2 3 Width/Depth Ratio 5.9 1 16.0 14.3 21.0 3 Entrenchment Ratio 1.8 1 2.2 5.0 4.7 6.1 3 Bank Height Ratio 2.4 1 1.0 1.1 1 0 3 Max part size (mm) mobilized at bankfull 3.3 - - 40.2 56.9 3 Rosgen Classification G4 C4 C4 Bankfull Discharge (cfs) 52 51 Sinuosity 1.15 1.20 1.20 Water Surface Slope (ft/ft)2 0.0070 0.0070 0.0070 Other Parameter Oak Hill Reach 1 Riffle Only Min Max n Min Max Min Max n Bankfull Width (ft) 19.9 1 20.0 21.5 1 Floodprone Width (ft) 40.0 1 44.0 100.0 72.4 1 Bankfull Mean Depth 1.4 1 1.4 1.2 1 Bankfull Max Depth 1.7 1 1.7 2.1 2.2 1 Bankfull Cross Sectional Area (ft2) 27.5 1 28.4 25.3 1 Width/Depth Ratio 14.4 1 14.0 18.2 1 Entrenchment Ratio 2.0 1 2.2 5.0 3.4 1 Bank Height Ratio 2.4 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull 22.6 - - 47.6 1 Rosgen Classification B4c C4 C4 Bankfull Discharge (cfs) 98 90 Sinuosity 1.30 1.20 1.20 Water Surface Slope (ft/ft)2 0.0070 0.0040 0.0046 Other Table 8c. Baseline Stream Data Summary Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 PRE-EXISTING CONDITIONS ESIG MONITORING BASELINE k (MVO) Parameter Oak Hill Reach 2 Riffle Only Min Max n Min Max Min Max n Bankfull Width (ft) 14.6 1 23.0 21.2 1 Floodprone Width (ft) 79 1 51 115 83.8 1 Bankfull Mean Depth 1.9 1 1.5 1.2 1 Bankfull Max Depth 3 1 1.7 2.3 2.1 1 Bankfull Cross Sectional Area (ft2) 28.1 1 33.4 25.5 1 Width/Depth Ratio 7.6 1 16.0 17.7 1 Entrenchment Ratio 5.4 1 2.2 5.0 4.0 1 Bank Height Ratio 2.0 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull 2.5 - - 58.6 1 Rosgen Classification G4c C4 C4 Bankfull Discharge (cfs) 94 88 Sinuosity 1.65 1.20 1.20 Water Surface Slope (ft/ft)2 0.0057 0.0055 0.0051 Other Parameter Oak Hill Reach 3 Riffle Only Min Max n Min Max Min Max n Bankfull Width (ft) 19.3 1 25.0 22.3 1 Floodprone Width (ft) 49.8 1 55 125 102.5 1 Bankfull Mean Depth 1.5 1 1.8 1.4 1 Bankfull Max Depth 2.2 1 2.1 2.6 2.6 1 Bankfull Cross Sectional Area (ft2) 29.1 1 43.9 31.5 1 Width/Depth Ratio 12.9 1 14.0 15.8 1 Entrenchment Ratio 2.6 1 2.2 5.0 4.6 1 Bank Height Ratio 2.6 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull 8.0 - - 56.4 1 Rosgen Classification C4 C4 C4 Bankfull Discharge (cfs) 95 149 Sinuosity 1.15 1.20 1.20 Water Surface Slope (ft/ft)2 0.0052 0.0055 0.0060 Other Table 8d. Baseline Stream Data Summary Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 PRE-EXISTING CONDITIONS ESIG MONITORING BASELINE k (MVO) Parameter Oak Hill Reach 4 Riffle Only Min I Max n Min I Max Min I Max n Bankfull Width (ft) 19.8 1 25.0 26.0 1 Floodprone Width (ft) 90.7 1 55 125 94.3 1 Bankfull Mean Depth 1.8 1 1.8 1.4 1 Bankfull Max Depth 2.3 1 2.1 2.6 2.7 1 Bankfull Cross Sectional Area (ft2) 35.1 1 43.9 36.1 1 Width/Depth Ratio 11.2 1 14.0 18.8 1 Entrenchment Ratio 4.6 1 2.2 5.0 3.6 1 Bank Height Ratio 2.3 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull 1.7 - - 67.2 1 Rosgen Classification E5 C4 C4 Bankfull Discharge (cfs) 122 156 --- Sinuosity 1.16 1.20 1.20 Water Surface Slope (ft/ft)2 0.0050 0.0070 0.0054 Other Table 9. Cross -Section Morphology Monitoring Summary Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 UT1A - Cross -Section 1 (Pool) Cross -Section 2 (R ffle) Cross -Section 3 (R ffle) Cross -Section 4 (Riffle) MYO MY1 MY2 MY3 MY5 MY7 MVO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfulll Area 811.26 810.59 810.05 807.79 Bank Height Ratio - Based on AB Bankfull 1 Area 1.0 1.0 1.0 1.0 Thalweg Elevation 809.87 810.08 808.20 806.22 LTOB2 Elevation 811.26 810.59 810.05 807.79 LTOB2 Max Depth (ft) 1.4 0.5 1.8 1.6 LTOB2 Cross Sectional Area (ft) 4.0 1.2 22.0 12.8 UT1 Reach . Cross -Section 5 (Pool) Cross -Section 6 (Pool) Cross -Section 7 (R ffle) Cross -Section 8 (R ffle) MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfulll Area 807.22 802.40 802.44 797.65 Bank Height Ratio - Based on AB Bankfulll Area 1.0 1.0 1.0 1.0 Thalweg Elevation 804.21 798.88 800.62 796.18 LTOB2 Elevation 807.22 802.40 802.44 797.65 LTOB2 Max Depth (ft) 3.0 3.5 1.8 1.5 LTOB2 Cross Sectional Area ft2 26.1 43.0 15.2 12.0 ak Hill Reach VI Cross -Section 9 (R ffle) Cross -Section 10 (Riffle) Cross -Section 11 (Pool) Cross -Section 12 (Pool) MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfull 1 Area 799.74 798.06 797.76 794.01 Bank Height Ratio - Based on AB Bankfulll Area 1.0 1.0 1.0 1.0 Thalweg Elevation 797.55 795.97 793.40 789.76 LTOB2 Elevation 799.74 798.06 797.76 794.01 LTOB2 Max Depth (ft) 2.2 2.1 4.4 4.2 LTOB2 Cross Sectional Area (ft2) 25.3 25.5 64.9 73.1 Cross -Section 13 (Riffle) Cross -Section 14 (Riffle) MYO MY1 MY2 MY3 MY5 MY7 MYO MY1 MY2 MY3 MY5 MY7 Bankfull Elevation (ft) - Based on AB-Bankfulll Area 794.36 790.90 Bank Height Ratio - Based on AB Bankfull 1 Area 1.0 1.0 Thalweg Elevation 791.77 788.21 LTOB2 Elevation 794.36 790.90 LTOB2 Max Depth (ft) 2.6 2.7 LTOB2 Cross Sectional Area (ft2) 31.5 36.1 'Bank Height Ratio (BHR) takes the As -built bankful area as the basis for adjusting each subsequent years bankfull elevation. kLTOB Area and Max depth - These are based on the LTOB elevation for each years survey (The same elevation used for th LTOB in the BHR calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the thalweg elevation (same as in the BHR calculation)will be recroded and tracked above as LTOB max depth. Appendix D Project Timeline and Contact Information Table 10. Project Activity and Reporting History Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2022 Activity or Deliverable Data CoIlecl Complete N/A Task Completion or Deliverable Submission April 2019 Project Instituted Mitigation Plan Approved July 2019 - March 2021 March 2021 Construction (Grading) Completed September 2021-January 2022 January 2022 Planting Completed February 2022 February 2022 As -Built Survey Completed January - March 2022 April 2022 Baseline Monitoring Document (Year 0) Stream Survey February - March 2022 May 2022 Vegetation Survey February 2022 Year 1 Monitoring Stream Survey 2022 December 2022 Vegetation Survey 2022 Year 2 Monitoring Stream Survey 2023 December 2023 Vegetation Survey 2023 Year 3 Monitoring Stream Survey 2024 December 2024 Vegetation Survey 2024 Year 4 Monitoring Year 5 Monitoring Stream Survey 2026 December 2026 Vegetation Survey 7mF Year 6 Monitoring Year 7 Monitoring Stream Survey December 2028 Vegetation Survey Table 11. Project Contact Table Oak Hill Dairy Mitigation Site DMS Project No. 100120 Monitoring Year 0 - 2021 Designer Jake McLean, PE, CFM Wildlands Engineering, Inc. 167-B Haywood Rd Asheville, NC 28806 828.774.5547 Construction Contractor Wildlands Construction, Inc. 312 W. Millbrook Rd, Suite 225 Raleigh, NC 27609 Monitoring Performers Monitoring, POC Wildlands Engineering, Inc. Kristi Suggs 704.332.7754 Appendix E Record Drawings and Sealed As -Built Survey Oak Hill Dairy Mitigation Site Record Drawing Gaston County, North Carolina for NCDEQ Division of Mitigation Services Vicinity Map Not to Scale STREAM ORIGINS NAME NORTHING EASTING OAK HILL CREEK 609299 1299430 UT1 610055 1297694 UT1A 610499 1297711 UT1B 609941 1297705 UT2 610266 1299747 UT3 610616 1299891 PRELIMINARY PLANS ISSUED May 12, 2022 Sheet Index Title Sheet Project Overview General Notes and Symbols Stream Plan and Profile Oak Hill Creek UT1 UT1A UT1B UT2 UT3 Wetland Grading Planting Sheets Fencing and Gate Plan Project Directory 0.1 0.2 0.3 2.1-2.4 3.1-3.5 4.1 Engineering: Wildlands Engineering, Inc License No. F-0831 167-B Haywood Rd Asheville, NC 28806 Jake Mclean, PE, CFM 828-774-5547 Surveying: Kee Mapping and Surveying, PA 88 Central Avenue Asheville, NC 28801 Phillip B. Kee, PLS 828-645-8275 Owner: NCDEQ-NC DMS 1652 Mail Service Center Raleigh, NC 27699 Mathew Reid 828-231-7912 NCDEQ Contract No. 7867 DMS ID No. 100120 NC DWR#20190863 Catawba River Basin 03050102 cn a) • H C) z 7 \ STA: 200+05 UT1 BEGIN REACH 1 - RESTORATION r— / / STA: 0+00 UT1B BEGIN ENHANCEMENT E�11 / SC. a� pe. ai / STA: 300+13 UT1A BEGIN RESTORATION \I \ \\\ pl zzo • EXISTING DAIRY WASTE LAGOON EXISTING STRUCTURES (TYP) STA: 202+23 UT1 END REACH 1 - RESTORATION BEGIN REACH 2 - RESTORATION STA:304+91 UT1A CONFLUENCE SHEET 1.8 STA: 3+10 UT1B END ENHANCEMENT 11 EROoN RUST; EP -1 9RPCI S\X) OP�`)`E PW26-9-pG, 8o3 C-c \pORS�ON OF OB.h9 -T / /\ ERON RUSS EEP ER SR GP �ERON69� T-3Cj ONE) GP p\ P.G 803 QPG �603 j 08Og.oF SRPGj �GH ) f°\CI p8 HEFT 1.9 STA:123+96 OAK HILL CREEK ROBERT ROAD- o.. ENDWORK _ oc� —aw — oar— —aw co —N cil 30 �..3Ei+�3i� �r - o — 2 oI STA:123+73 r�� 11 OAK HILL CREEK END REACH 4 - RESTORATION STA: 119+00 OAK HILL CREEK END REACH 3 - RESTORATION BEGIN REACH 4 - RESTORATION STA: 302+85 UT3 CONFLUENCE STA: 110+23 OAK HILL CREEK END REACH 2 - RESTORATION BEGIN REACH 3 - RESTORATION STA: 221+11 UT1 END WORK REACH 2 - RESTORATION mG °m °m STA: 105+53 OAK HILL CREEK END REACH 1- ENHANCEMENT / BEGIN REACH 2 - RESTORATION °m STA: 100+10 OAK HILL CREEK BEGIN REACH 1 - ENHANCEMENT I Ci Ci STA: 300+31 UT3 NO CREDIT STA: 2+66 U T2 NO CREDIT 0' 100' 200' 300' (HORIZONTAL) Project Overview z Oak Hill Creek Asbuilt Features Asbuilt Structures Pre -Construction Features Design Features R/W OHE OHE OUE OUE X X X OW OW SS SS SSE SSE SSE Pre -Construction Property Line Pre -Construction NCDOT Right -of -Way Pre -Construction Top of Bank Pre -Construction Overhead Utility Line Pre -Construction Overhead Utility Easement Pre -Construction Fence Pre -Construction Overhead Utility Pre -Construction Sanitary Sewer Pre -Construction Sanitary Sewer Right of Way Pre -Construction Tree Line NNNNNNNNNNNNNNN1 Pre -Construction Storm Pipe AIL AIL AIL AIL At 10000000 1 n n n n n n n Pre -Construction Wetland Pre -Construction Road Pre -Construction Rip Rap Pre -Construction Building Pre -Construction Utility Pole PROJECT NOTES: Topographic survey was completed by Kee Mapping and Surveying, PA in July 2019. Parcel boundary survey completed by Kee Mapping and Surveying, PA in October 2019. Conservation easement survey completed by Kee Mapping and Surveying, PA in October 2020. Topographic data supplemented with Lidar data from Feb - April 2017. Riffle selection varied based on available materials at the Engineers' discretion. Field coordination will be required. Project Notes: 1. DEVIATIONS FROM THE DESIGN WILL BE SHOWN IN RED. 10+00 MEM MEM — Design Alignment — Design Bankfull — Design Major Contour (5' Interval) Design Minor Contour Design Permanent Culvert Design Woven Wire Fence Design Barbed Wire Fence Design 8' Double Gate Design 12' Single Gate Design Structures 0,41m,Air4404�Y-;!1 11111 ]1111111111 G ' V V V a62 Q, Design Various Constructed Riffles Design Cascading Riffle/Rock Cascade Design Brush Toe Design Vegetated Soil Lift Design Bank Roughening Design Floodplain Roughening Design BMP Design Log Sill Design Cover Log Design LogJ-hook Design Log Vane Design Rock Sill Design Boulder) -hook with Sill Asbuilt Alignment — Asbuilt Bankfull CE CE Recorded CE CE IX CE IX Recorded Internal Crossing LOD Asbuilt LOD (100) Asbuilt Major Contour (5' Interval) Asbuilt Minor Contour Asbuilt Permanent Culvert X X X Asbuilt Fence -n Asbuilt 8' Double Gate Asbuilt 12' Single Gate Asbuilt Permanent Ford Crossing Asbuilt Stream Crossing - Culvert IJIy,IJ1y,Ial Va.0. ]I 1I1I1I1I1 ] 1 1 1 1 1 V V V V 77 77 77 a a4 + + + + + 0 0 0 QO Q NCO PP# VP#n GWG #+ co #� xs # > —0 Asbuilt Various Constructed Riffles Asbuilt Cascading Riffle/Rock Cascade Asbuilt Brush Toe Asbuilt Vegetated Soil Lift Asbuilt BMP Asbuilt Gravel Farm Road Asbuilt Soil Farm Road Asbuilt Bank Roughening Asbuilt Boulder Toe Asbuilt Riprap Asbuilt Bridge Crossing Asbuilt Log Sill Asbuilt Cover Log Asbuilt Log 1-hook Asbuilt Rock Sill Asbuilt Rock 1-hook with Sill Asbuilt Log 1-Hook with Sill Photo Point Permanent Vegetation Plot Ba rotrol I Ground Water Gage Crest Gage Monitoring Cross Section General Notes and Symbols > z DESIGN GRADE N NZ— __ N./� \ z/ i \ % \ \�\ /- 7 N. �� \ / \ \� /� i z ASBUILT GRADE STA: 100+10 OAK HILL CREEK BEGIN REACH 1- ENHANCEMENT I 00 byys CE co 0 V7 b!J • Ct Q CJ te�a) I--1 • • • rzt • • 121 • Ct O GE STA: 100+31 INCREASED BANK GRADING TO STABILIZE BEGINNING OF STREAM ENHANCEMENT CE HH CE QO� VHHS GE PP15 CE VI -US — vHHS CE GE STA: 102+17 BANK ROUGH ADDED TO INCREASE FLOODPLAIN ROUGHNESS STA: 102+21 LOG SILL ADDED IN PLACE OF ROCK SILL DUE TO EXCESS LOGS a.1 VHS GE 001 OAK HILL CREEK VHHS �— VHS boys CE CE GE CE CE STA: 102+98 -LOG SILL ADDED FOR EXTRA GRADE CONTROL CE CE /yJ / vHHS S _ VHH£ STA: 104+58 LOG VANE REPLACED_ BY LOG 1-HOOK FOR ADDITIONAL GRADE CONTROL CE cE cE CE Sheet Index 1.5 cn 1j8119u10l 12 1.4�(44 31.14 1.13 1.2 1.1 1.6 1.5 i / 805 800 790 0' 2' 4' ti 6' 805 0' (VERTICAL) 20' 40' 60' (HORIZONTAL) 2 DESIGN GRADE 800 � \ / k , - , _____ , \ / , , ,,, 790 , _ _ _. , ASBUILT GRADE 104+00 yl 104+50 CE/X k.00 CE,x X X O t \ CE i 1-/i 105+00 00 vcio GWG5 4 i SSE /` `SS\SSA !\ SSE ��_- SS SSE �� \SS\ \SSE X�'30 SS z- l \X,30 \ S. Q/i�pP16 \X/3 105+50 STA: 105+53 OAK HILL CREEK_ END REACH 1- ENHANCEMENT I BEGIN REACH 2 - RESTORATION a VHS daps dHjs STA: 104+58 LOG VANE REPLACED BY LOG 1-HOOK FOR ADDITIONAL GRADE CONTROL SS \ SS '30 106+00 pp18 STA: 105+53 INTERNAL EASEMENT CROSSING - `cE jR STA:105+39 RIFFLE EXTENDED ACROSS cF FORD CROSSING FOR - 'ADDITIOONNALSTABILITY _ Poi ss �boi; \yy STA: 104+99 INTERNAL EASEMENT CROSSING \ STA: 104+91 LOG VANE NOT BUILT TO AVOID DISTURBANCE TO STABLE BANK AND TOE SF sF o \ \ Ooi SrF TS \ssF \ \ 106+50 107+00 107+00 STA: 107+30 LOG SILL NOT BUILT -DUE TO SUFFICIENT GRADE CONTROL PROVIDED BY RIFFLE aa, 007 VHdS 107+50 �. NitAS /IV imsmiam, Ix* 111111 `L momevenom\\ 'mammy *oat MMM ®ENV 108+00 108+50 5 I� i.12 1.4 ���1.5 1.7 hal 11,c.1.8�� 19�!/I1711 '.3114IFOOP"° UTl 1.13 1.2 1.1 1.6 V) • ct I--1 O CJ a) a) I--1 • • 0 • rzt • • I--1 • ct O N 1� E 11 11 1 1 CE CE CE STA: 110+23 OAK HILL CREEK END REACH 2 - RESTORATION BEGIN REACH 3 - RESTORATION STA: 221+11 UT1 END REACH 2 - RESTORATION STA: 110+23 BRUSH TOE ADDED TO PROTECT BANK AT CONFLUENCE STA: 110+69 _LOG 1-HOOK ADDED IN PLACE OF ROCK SILL FOR EXTRA STABILITY STA: 112+63 GEOLIFT NOT BUILT DUE TO SUFFICIENT BANK STABILITY GWG8 LOD Q STA: 112+66 GEOLIFT NOT BUILT DUE TO SUFFICIENT /BAN K STABILITY igigmerw, ma mignatUltamtum vim (4.\moin X v v Sheet Index 1.5 o ���� 1.12 1.4 'l,� 1.8 1.11 B��, 1.9 1.10 , 1.14 tiN^►I�� 1.3 UT] 1.13 1.1 cn Qz 1.6 1.5 wI STA: 112+66 GEOLIFT NOT BUILT DUE TO SUFFICIENT BANK STABILITY D34 STA: 116+56 LOG SILL ADDED IN PLACE OF LOG 1-HOOK BEND SUFFICIENTLY PROTECTED BY BRUSH TOE' STA: 115+24 OAK HILL CREEK STA: 4+47 UT2 CONFLUENCEA323 STA: 115+29 LOG 1-HOOK ADDED IN PLACE OF ROCK SILL FOR ADDED POOL STABILITY V7 • CJ a) • • • • • • O GWG9 IIf Sheet Index 1.12 O 1.4 a I �, 1.7 ` 9 1.8 1.1 1 N 1.9 1.10 `!/I' .3�1.14 1 UT1 1.13 STA: 119+00 \-oo OAK HILL CREEK *�oo _; RESTORATION BEGIN REACH 4-RESTORATION / Voo CONFLUENCE STA:117+84 LOG 1-HOOK ADDED IN PLACE OF LOG SILL FOR ADDED STABILITY STA: 120+34 LOG SILL ADDED IN PLACE OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE MATERIAL STA: 118+18 BANK ROUGHENING EXTENDED TO IMPROVE CONFLUENCE STABILITY STA: 120+86 -BANK ROUGHENING ADDED FOR STABILITY STA: 122+57 STABILIZED OUTLET CHANNEL. ADDED FOR ROADSIDE CULVERT>0 800 795 790 785 780 POOL FILLED WITH SEDIMENT AS VEGETATION STABILIZES FLOODPLAIN POOL SHOULD CLEAR ASBUILT GRADE s y _ \ DESIGN GRADE \ STA: 123+73 END OAK J HILL CREEK 121+80 122+00 122+50 123+00 123+50 800 795 790 785 780 124+00 EXISTING BOX CULVERT 13' X 8' INVERT ELEVATION IN:786.09' 0' 2' 4' 6' (VERTICAL) 0' 20' 40' 60' (HORIZONTAL) of 00 STA: 122+71 LOG 1-HOOK NOT BUILT DUE TO EXTENSION OF GEOLIFT i i v ' — dH0s c\_ a \ 123+ppre#1011 le ..44111/41t-40041,110-' .7.X.--0'411::::::111ta STA: 122+57 c _ -_ STA: 123+73 STABILIZED OUTLET "-0o-� OAK HILL CREEK j0� moo' END REACH 4 - RESTORATION CHANNEL. ADDED �O FOR ROADSIDE CULVERT �� / \ PP2% ,cps �f �7�� STA:123+96 OAK HILL CREEK END WORK Sheet Index 1.6 1.5 1.12 1.44��lw 1.5 Y �,, -•11 1.7 `�' 1.8 1.11 1;im 1.9 1.10 J�� ' .3 1.14 UT1 1.13 - iil 1.2 1.1 Oak Hill Creek Stream Plan and Profiles T z EXISTING ELLIPTICAL PIPE 10.3' X 6.8' INVERT ELEVATION OUT: 809.05' / ASBUILT GRADE F WITH INCREASED SHALLOWER LLED POOL WITH SEDIMENT FLOODPLAIN MAY NORMALIZE THAN DESIGN AT POOL RELIEF LEVEL \__, \ li \ / \-----/ \ / \ / _ DESIGN GRADE - STA: 200+05 UT1 ��� BANK AND ADEQUATE GRADE BEGIN REACH 1 - 11;5•7C ATION CONTROL FROM RIFFLE STA: 202+23 UT1 END REACH 1 - RESTORATION BEGIN REACH 2 - RESTORATION -TO TREE SAVES ON RIGHT CONFLUENCE STA:304+91 200+88 UT1A LOG SILL NOT BUILT DUE STA: 200+21 RIPRAP ADDED TO STABILIZE BANK � 7 VP2 0 STA: 200+37 9 0 ROCK SILL NOT INSTALLED p0-\ DUE TO ADEQUATE STABILITY p01 001 STA: 201+63 BANK ROUGHENING ADDED TO ROUGHEN FLOODPLAIN pp5 / 6/ STA:202+26 LOG 1-HOOK BUILT IN PLACE OF ROCK SILL ,( TO INCREASE CONFLUENCE STABILITY UT1B O cc cE cE 01 BMP 1 D- VP3 CE CI x�x_ 1.12 �-3 1.8 T1' UT1 Sheet Index 1.2 1.1 1 14 1.6 1.15 a) �- RIPRAP ADDED FOR STABILITY 0I N BMP1 0 X X X X \ ]X� J X30 30 (VT LOD 30 Q-_ `_ 117.1ali vier wV ter �Vv w o IF D L i0 L) � y + " 30 --Yr +— 3J =._yL" X]y �' 3J �• �J ��OU __-�030 �� LOD LOD •/ p - -iii't04- N O� STA: 206+80 q If BANK ROUGHENING INSTALLED FOR uV T. L ADDITIONAL BANK STABILITY CC ------ --STA:205+04 BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY p0� 001 ---p01 00"1 — 001 CE eE eE eE —X X PP8 STA: 205+93 BANK ROUGHENING INSTALLED FOR ADDITIONAL BANK STABILITY p01 001 — 001 001 001- -STA:207+42 LOG SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL 001 LL D LOD U STA: 208+49 LOG SILL BUILT IN PLACE 1, OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE MATERIAL 00-1 01 001 001 — CF A CF CFX (''� �'GF ----77 CE CF CF C --+cam E �Q CE CE — Sheet Index 02' 4' 6' X \ Shared \ Projects \ 005-02182 Oak Phil Daffy \ M onttormg \ Basehne M onttormg - 2022 \ Plans \ AB-02182-Profiles-Tnks dwg 810 805 800 795 — ASBUILT GRADE DE SIGN G RADE 208+50 209+00 209+50 210+00 210+50 211+00 211+50 212+00 212+50 810 805 800 795 213+00 0' 20' (VERTICAL) 40' 60' (HORIZONTAL) 3x lb—c)kx30 ..... —11 ' 007 X- 30 X 30 >4t3 LOD LOD v.OD STA: 208+49 LOG SILL BUILT IN PLACE 1, OF ROCK SILL DUE TO PREFERENCE FOR USE OF ONSITE MATERIAL 001 nol GUI LOD • LOD -------- STA' 209+43 VEGETATED SOIL LIFT NOT BUILT DUE TO ADEQUATE BANK STABILITY CE CF CE —7 CE 77— CE 001 — 001 CE CE CE X X X X CE X X 007 06\ CE CE X X 40D STA: 212+51 ROCK SILL NOT INSTALLED DUE' TO ADEQUATE GRADE CONTROL STA: 210+63 LOG SILL BUILT AS TAIL OF RIFFLE IN LOG STEP RIFFLE SEQUENCE - 0(37 (9" °' ---- CE X CE X X CE X CE X CE X CE X CE cE Ic Irn n#-Q2D1c,4=kiLa 115- CE A Iz CE I 2 \IP5 D3A G21 Sheet Index cl) bz) rt -ci X o u a) a) cf▪ ) 0 .0 rt * RI cn 0 z Project Engmeer X > �CE col VP6 VEG STA: 214+38 ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY r,F col °E CE OOl °E 001 CE BRIDGE REPLACED CULVERT CROSSING STA: 217+18 INTERNAL EASEMENT CROSSING 1.12 Sheet Index c�- 1.8 T1' UT1 .3 1.2 1.1 1.15 14 1; STA:217+03 BRIDGE REPLACED I =CULVERT CROSSING FOR LAND OWNER ACCESS 4 STA: 216+88 INTERNAL EASEMENT CROSSING oO> ' G WG3 00> CE O LC)I STA::216 88 3J INTERNAL EASEMENT CROSSING '1 LLI STA:217+03 BRIDGE REPLACED ULVERT CROSSING FORj,. LAND OWNER ACCESS 41( STA: 219+02 LOG SILL INSTALLED INSTEAD OF ROCK SILL AS CONTINUATION OF LOG DROP RIFFLE STA: 217+18 INTERNAL EASEMENT CROSSING 93A STA: 219+99 LOG SILL NOT INSTALLED DUE TO ADEQUATE GRADE CONTROL STA: 220+78 ROCK SILL NOT INSTALLED DUE TO ADEQUATE STABILITY STA: 221+11 UT1 END REACH 2 - RESTORATION STA: 110+23 CONFLUENCE WITH OAK HILL CREEK STA: 301+00 STA: 3 2+20 PROFILE ADJUSTED TO ACCOMMODATE STRUCTURE DESIGN CHANGES FOR STREAM STABILITY ASBUILT GRADE DESIGN GRA 810 802 0' 2' 0' 20' 304+90 IN STA: 302+60 PROFILE DESIGN ADJUSTED CHANGES TO ACCOMMODATE FOR STREAM STABILITY STRUCTURE STA: ASBUILT GRADE 1 ---) I_J 1 -. 1 ---, I` ` I I - II I -I I I` J__, I 1 I I-\` 1 — ) DESIGN GRADE I I_ - I--� -I 300+00 300+50 301+00 301+50 302+00 302+50 302+50 �oD STA: 300+13 UT1A BEGIN RESTORATION Lob -------- STA: 300+63 LOG SILL BUILT IN PLACE OF ROCK SILL FOR DIVERSITY 301+00 , PP STA: 301+52 RIPRAP ADDED TO STABILIZE BANK STA:3000+96 _--------- "� LOG SILL INSTALLED INSTEAD (OF A ROCK SILL FOR DIVERSITY STA: 302+79 INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES AND (2) LOG SILLS FOR STREAM STABILITY VP1 STA: 301+45 LOG SILL INSTALLED INSTEAD OF ROCK SILL FOR DIVERSITY._---_ -_- STA:301+32 RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION STA: 301+06 RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION U>\ o yam— CE CE — O / 303+00 303+50 304+00 X ,f�3D �9tx 30X— O D STA: 303+54- i - - --_. / l--- --------- -"INSTALLED (1) LONG RIFFLE AND (1) LOG SILL --_------ �:`_, STA:303+83 - INSTEAD OF (2) RIFFLES, (1) LOG SILL,- __ sQ-' INSTALLED (1) LONG RIFFLE AND (1) ROCK SILL AND (1) ROCK SILL FOR STREAM STABILITY INSTEAD OF (2) RIFFLES, (1) ROCK SILL, still_ __=AND (1) LOG SILL FOR STREAM STABILITYY U815 ----- STA:304+59 " x 'L ,. ' �a�i,�0 s— /Sheet Index i u�- i Cti , +y't�r_..=fir FORL-- - � F R.O.CK SILL 1 -- ��' ..',`. ADDED DIVERSITY SITY Oft 00l egg dfi. �4 3, +5{ 304+50 ERTICAL) RIZONTAL) 305+00 STA: 302+05 INSTALLED (1) LONG RIFFLE WITH (1) LOG SILL INSTEAD OF (2) RIFFLES WITH (1) LOG SILL AND (1) ROCK SILL FOR ADDED STREAM STABILITY STA: 303+16 _INSTALLED (1) LONG RIFFLE AND (1) LOG SILL INSTEAD OF (2) RIFFLES AND (2) ROCK SILLS FOR ADDED STREAM STABILITY STA: 304+19 CIE —RIFFLE AND ROCK SILL NOT BUILT FOR POOL EXPANSION STA: 304+91 UT1A END RESTORATION STA:202+23 UT1 j 0 CONFLUENCE 001 PP4 6 0 CE CE X X x a0, CE STA: 00+00 UT1B BEGIN - ENHANCEMENT II 03f` oo, PP5 A1k00 — CE CE /+ x X \\ \ Go^ 2+00 UT1B 001 v y-- v v Pp1.1 �V 7 STA: 3+10 UT1B END ENHANCEMENT II 810 Vp, 0C c. x- 0' 20' 40' 60' (HORIZONTAL) Sheet Index z INVERT OUT:792 51' POOLS FILLED WITH SEDIMENT. AS VEGETATION BECOMES ESTABLISHED IN FLOODPLAIN, POOLS SHOULD ADJUST TO \ ASBUILT GRADE LONG-TERM STABLE LEVELS \_ _ ,_ / \ - _/ y, DESIGN GRADE STA: 2+79 SF, BOULDER TOE INSTALLED INSTEAD OF BRUSH TOE FOR ADDITIONAL BANK STABILITY STA: 2+33 RIPRAP ADDED TO STABILIZE INITIAL DRAINAGE PIPE SS. STA: 2+66 BEGIN UT2 - NO CREDIT 36" DIAMETER HDPE INVERT IN:792.63' INVERT OUT:792.51' VP10 STA: 4+89 END UT2 STA: 115+24 OAK HILL CREEK CONFLUENCE rt 0 ct u 0 z 0 u 0 ct (VERTICAL) 0' 20' 40' 60' (HORIZONTAL) Sheet Index STA: 3+25 BRUSH TOE NOT INSTALLED DUE TO ADEQUATE BANK STABILITY - PROPOSED 36" CMP INVERT IN:790.97' INVERT OUT:790.45' DESIGN GRADE POOL FILLED WITH SEDIMENT. AS VEGETATION STABILIZES THE FLOODPLAIN POOLS SHOULD CLEAR / z,_ _ _ _ _ _ _ _ _ \_i N. \ / ASBUILT GRADE N N. J,t, sJ, -- _,P, N. F\ \ \\ \ <<F sJ, J,t� \ \ \ �\ J, <<, J,s `rF \JfFv \ STA: 300+50 RIPRAP ADDED TO STABILIZE CULVERT INLET STA: 300+85 �0 4 4C J,t<<, -J\� O Xo\ I \ STA: 300+56• /a \\ 0T� INVERT IN:790.97' \ \ 'STA:300+83 RIPRAP ADDED TO STABILIZE CULVERT OUTLET J` \ \ c\ ss F\ \\ \\ STA:300+31 `P \ `rJ<<, \\ Q\\ \ \ BEGIN UT3 \ sJ, \\\ \\\ NO CREDIT TIE TO EXISTING GRADE J` \ J` \a \ `JF\ JF \ \ ss \ \ \ J \ \ J�, \ \ \ \ \ \ 1 \ oo \ STA: 302+85 END UT3 STA: 119+00 OAK HILL CREEK CONFLUENCE STA: 302+18 -BRUSH TOE NOT INSTALLED DUE TO ADEQUATE BANK STABILITY \ �o o� <00 Sheet Index 1.1.5 1.3. P 1.1.4��9 Y 4 1.2.1 9 1.2.2 1.2.5 ��, 1.2.3 1.2.4 ,��' 1.5.1 t}t1 UT1 - �'•/ 1.4.1 1.1.2 V) b!J • ra I--1 CJ a) a) • • rzt • • I --I • ra O CO H Cl� 1.6 1.6.1 EAKER / WETLAND RE-ESTABLISHMENT 11-6541 . PROPOSED AT A 1:1 CREDIT RATIO 4887 PG2200 ////, �1 / jL / WETLAND REHABILITATION PROPOSED AT A 1:1 CREDIT RATIO �j \ I 4� / / -_____I + + + + + WETLAND REHABILITATION +++++ + + + + + PROPOSED AT A 1.5:1 CREDIT RATIO //�/ / Lt _J WETLAND CREATION / PROPOSED AT A 3:1 CREDIT RATIO \ \\\ \ I RUSTY EAKER, JR\\\ V RUSTY EAKER, SR. \ \\ \ / 12691-70-3338 '14821 PG'. 58 (LOT36) \ \ \ / ' --------b / MICHAELW W1ITESIDES&WIFE \1 LAUREN W WIITESIDES PIN 2690.795818 \. DB. 4786 PG'. 363 ) GABRIEL L. LAIL PIN 2690-79-6528 DB. 4601 PG'. 1438 CE it CAMEFRON RUSTY EAKER, JR. & CAMERON RUSTY EAKER, SR. • • 0-79-8897 '.PORTION OF DB: 4949 PG: :. CT SIX CAMERON RUSTY EAKER, JR. & CAMERON RUSTY EAKER, SR. PIN'. 2690-79-8664 DB. 4949 PG'. 1803 (TRACT FIVE) CAMERON RUSTY EAKER, JR. & CAMERON RUSTY EAKER, SR. PIN'. 2690-79-9620 DB. 4949 PG 1803 (TRACT FOUR) CE` CE �\ CE CAMERON RUSTY EAKER, SR. PIN 2690-89-1706 DB. 3262 PG'. 477 N ICOLE L. MASSEV PIN 2690-09-05/ DB. 4782 PG'. 590 VA CAROLYN B. TURNEK(LIFE E) VA� ROBERTF TURNER& \ \ \ PIN 4999 PG 501 DB. 4999 PG'. 501 WETLAND 2 (SEE SHEET 2.3) C EXISTING POND CAMERON RUSTY EAKER, JR. & CAMERON RUSTY EAKER, SR. PIN: 2691-90-0340 DB: 4949 PG: 1803 (TRACT ONE) ALSO DB: 4949 PG: 1803 (TRACT #B OF TRACT EIGHT) TERRY A. RIDDLEY & WIFE LORIE B. RIDDLEY PIN'. 2690-09-8022 DB. 4483 PG'. 1040 C/\ 4 0 T RO o � q *010 !/ // / I I STA: 122+49 OUTLET CHANNEL STABILIZED FOR ADDED SUPPORT TO ROADSIDE CULVERT !/ // /) (./T3 HAROLD R. LINEBERGER & WIFE V� PATSY E. LINEBERGER ' PIN 3601-00-0464 \ DB. 1898 PG'. 658 \ \ ESTATE FILE 14E//80 ;Qa `aJi 0 100' 200' l 300' (HORIZONTAL) X \ Shared \ Proiects \ 005-02182 Oak H111 Daffy \ M omtormg \ Basehne M omtormg - 20 WETLAND RE-ESTABLISHMENT PROPOSED AT A 1:1 CREDIT RATIO - • • • WETLAND REHABILITATION . „ . . PROPOSED AT A 1:1 CREDIT RATIO + WETLAND REHABILITATION + PROPOSED AT A 1.5:1 CREDIT RATIO WETLAND CREATION PROPOSED AT A 3:1 CREDIT RATIO 0. 2040' 60' 0. (HORIZONTAL) 2' 4' 6' (VERTICAL) 795 790 • 4 PRECONSTRUCTION GRADE • I 1 I vv enana uracung ffoss-section 41 1 I Section View VJ I I I I ..----- _ I I I TIED TO EXISTING WETLAND CRED TING I TIED TO EXISTING GROUND — BOUNDARY(TYP) CONSERVATION EASEMENT BOUNDARY (TYP) DESIGN GRADE ASBUILT GRADE 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 795 790 3+70 795 790 788 WETLAND BOUNDARY Wetland Grading Cross -Section #2 CREDITING (TYP) Section View I CONSERVATION BOUNDARY EASEMENT (TYP) i\ / I I ASBUILT GRADE 1 I N \ I I I I I- -I 1 1 I I I I I \ / / I 1 1 I I DESIGN GRADE i• I I , \ / / / 1 I i I I---,. I ° / --- I 1 1 PRECONSTRUCTION GRADE 1 1 1 1+30 1+50 2+00 2+50 3+00 3+50 795 790 788 4+00 795 790 785 v v e Licu LLI _31. awl L6 ._,I u ssmie L um L It ..) Section View WETLAND BOUNDARY CREDITING ( YP) ASBUILT GRADE I I 1 I I I I I I I I I I / I I — — — — — — — — _ I _ _ I \ I— I Lu I I PRECONSTRUCTION GRADE 1 I I \ \ I I I I I I I I \ I Lu I --, °°.---- DESIGN GRADE CONSERVATION BOUNDARY EASEMENT (TYP) 0+50 1+00 1+50 2+00 2+50 3+00 795 790 785 3+30 STA: 122+49 -OUTLET CHANNEL STABILIZED FOR ADDED SUPPORT TO ROADSIDE CULVERT i o' 20' 40' 60' 0' (HORIZONTAL) 2' 4' 6' 810 (VERTICAL) WETLAND RE-ESTABLISHMENT PROPOSED AT A 1:1 CREDIT RATIO WETLAND REHABILITATION PROPOSED AT A 1:1 CREDIT RATIO I d T - + + + I WETLAND REHABILITATION PROPOSED AT A 1.5:1 CREDIT RATIO WETLAND CREATION I PROPOSED AT A 3:1 CREDIT RATIO 805 800 795 Wetland Grading Cross -Section #4 Section View WETLAND BOUNDARY CREDITING (TYP) DESIGN GRADE 1 U ASBUILT GRADE 1 1 1 u 1 1 1 1 1 1 1 1 1 u 1 1 1 1 / 1 1 1 1 1 — 1 —1 1 1 I 1 1 \ 1 1 1 11:\ 1 1 TIED INTO _ TIED INTO EXISTING 1 EXISTING GROUND GROUND CONSERVATION EASEMENT BOUNDARY (TYP) 0+00 0+50 1+00 1+50 810 805 800 810 805 800 795 797 2+00 Wetland Grading Cross -Section #5 Section View WETLAND BOUNDARY CREDITING (TYP) DESIGN GRADE TIED INTO EXISTING GROUND 1 1 1 1 1 — TIED INTO EXISTING GROUND � ASBUILT GRADE 1 1 1 1 , ___ __ 1 1 1 W , 1 1 ......\— v ' r 1 1 1 1 1 � 1 1 1 1 CONSERVATION EASEMENT BOUNDARY (TYP) 0+00 0+50 1+00 1+50 2+00 810 805 800 797 2+30 cn 3 V—Jctl � O O r , Cn 0 oz U 0 �� 73 0 N N ct ft • z Wetland Grading Cross -Section #6 Section View 805 Wetland Grading Cross -Section #7 Section View 805 805 800 795 TIED INTO GROUNDLu EXISTING DESIGN CREDITING (TYP) WETLAND BOUNDARY i I u 1 Lu V -- , 11 TIED rGROUND INTO EXIST NG Lu V 1 1 IL 1 1 1 \ / J } DESIGN GRADE 1 �� 1 ASBUILT GRADE DESIGN EASEMENT CONSERVATION BOUNDARY (TYP) 0+00 0+50 1+00 1+50 805 800 800 795 795 794 1+88 0 CONSERVATION EASEMENT BOUNDARY (TYP) T ED INTO EXISTING GROUND 0+00 20' 40' 60' 0 (HORIZONTAL) 2' 4' 6' (VERTICAL) 0+50 TIED INTO EXISTING GROUND - ASBUILT GRADE WETLAND CRED TING BOUNDARY (TYP) L _ T _ 1+00 DESIGN GRADE — 800 795 794 1+50 2+00 2+50 2+89 WETLAND RE-ESTABLISHMENT PROPOSED AT A 1:1 CREDIT RATIO /LITATION PROPOSED ATAWETLAND 61I1CREDIT RATIO /R + + + + WETLAND REHABILITATION + + + PROPOSED AT A 1.5:1 CREDIT RATIO -- J WETLAND CREATION PROPOSED AT A 3:1 CREDIT RATIO Plan View Wetland #3 and #4 OA- K - HILL CREEK DESIGN ALIGNMENT SEE WETLAND 2 (SHEET 2.3) U7 Q taY HLT, T 0 50' 100' 150' (HORIZONTAL) z i Open Area Buffer Planting Open Buffer Planting Zone Trees Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum Wetland Indicator # of Stems Acer negundo Boxelder 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 10% Platanus occidentalis Sycamore 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 15% Betula nigra River Birch 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 15% Liriodendron tulipifera Tulip Poplar 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 2% Quercus phellos Willow Oak 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 10% Oxydendrum arboreum Sourwood 12 ft. 6-12 ft. 0.25"-1.0" Canopy UPL 5% Diospyros virginiana Persimmon 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 6% Populus deltoides Eastern Cottonwood 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 10% Carya cordiformis Bitternut Hickory 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 5% Quercus alba White Oak 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 5% Quercus rubra NortOak Red 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 5% Ulmus rubra Slippery Elm 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 1% Total 89% Open Buffer Planting Zone Small Trees / Shrubs Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum Wetland Indicator # of Stems Alnu., Tag Alder 12 ft. 6 12 ft. 0.25" 1.0" Sub Canopy OBL 2% serrulata Hamamelis virginiana Witch Hazel 12 ft. 6-12 ft. 0.25"-1.0" Shrub FACU 2% Cornus florida Flowering Dogwood 12 ft. 6-12 ft. 0.25"-1.0" Sub -Canopy FACU 2% Lindera benzoin Spicebush 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 2% Amelanchier arborea Serviceberry 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 2% Calycanthus floridus Sweet Shrub 12 ft. 6-12 ft. 0.25"-1.0" Shrub FACW 1% Sambucus canadensis Elderberry 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 2% Total 11% Notes: (1) Substitute species: Sweetshrub, northern red oak, slippery elm. (2) Transplants from on -site to be used at Designer's discretion for streambank and floodplain planting. (3) Percentages of each species may be varied at Designer's discretion but shall not exceed 20% per each species. (4) Designer may substitute container plantings or other plantings for bare roots. TEMPORARY SEEDING APPROVED DATE TYPE PLANTING RATE (Ibs/acre) Jan 1— May 1 Rye Grain (Secale Cereale) 120 Ladino clover (Trifolium Repens) 5 Crimson Clover (Trifolium incarnatum) 5 Straw Mulch 4,000 May 1— Aug 15 German Millet (Setaria italica) 40 Ladino clover (Trifolium Repens) 5 Crimson Clover (Trifolium incarnatum) 5 Straw Mulch 4,000 Aug 15 — Dec 31 Rye Grain (Secale Cereale) 120 Ladino clover (Trifolium Repens) 5 Crimson Clover (Trifolium incarnatum) 5 Straw Mulch 4,000 Note: Rates of fertilizer and lime if necessary can be found in the site preparation plan included in the specification documents. Wetland Planting Wetland Planting Zone Trees Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum Wetland Indicator # of Stems Platanus occidentalis Sycamore 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 15% Betula nigra River Birch 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 15% Quercus phellos Willow Oak 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 10% Ulmus americana American Elm 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 10% Nyssa sylvatica Black Gum 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 5% Quercus michauxii Swamp Chestnut Oak 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 8% Acer negundo Boxelder 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 5% Quercus nigra Water Oak 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 7% Celtis laevigata Sugarberry 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACW 5% Total 80% Wetland Planting Zone Small Trees/Shrubs Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum Wetland Indicator # of Stems Alnus serrulata Tag Alder 12 ft. 6-12 ft. 0.25"-1.0" Sub -Canopy OBL 1% Lindera benzoin Spicebush 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 5% Cephalanthus occidentalis Buttonbush 12 ft. 6-12 ft. 0.25"-1.0" Shrub OBL 5% Sambucus canadensis Elderberry 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 5% Cornus am om um Silky Dogwood 12 ft. 6-12 ft. 0.25"-1.0" Shrub FACW 1% Salix sericea Silky Willow 12 ft. 6-12 ft. 0.25"-1.0" Shrub OBL 2% Livestakes Salix nigra Black Willow 8 ft 6-8 ft. 0.5"-1.5" Shrub OBL 1% Total 20% Notes: 1) Substitute species: Silky willow, silky dogwood. 2) Tag Alder shall be limited to Wetland 1 or other wetter areas of the site as designated by Designer. 3) Transplants from on -site to be used at Designer's discretion for streambank and floodplain planting. 4) Percentages of each species may be varied at Designer's discretion but shall not exceed 20% per each species. 5) Designer may substitute container plantings or other plantings for bare roots. Partially Vegetated Buffer Area Planting Open Buffer Planting Zone Trees Bare Root Species Common Name Max Spacing Indiv. Spacing Min. Caliper Size Stratum Wetland Indicator # of Stems Carpinus caroliniana American Hornbeam 12 ft. 6-12 ft. 0.25"-1.0" Sub -Canopy FAC 14% Euonymus americana Strawberry Bush 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 14% Lindera benzoin Spicebush 12 ft. 6-12 ft. 0.25"-1.0" Shrub FAC 8% Fagus grandifolia American Beech 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 14% Ulmus rubra Slippery Elm 12 ft. 6-12 ft. 0.25"-1.0" Canopy FAC 7% Hamamelis virginiana Witchhazel 12 ft. 6-12 ft. 0.25"-1.0" Shrub FACU 7% Calycanthus floridus Sweetshrub 12 ft. 6-12 ft. 0.25"-1.0" Shrub FACU 7% Cornus florida Flowering Dogwood 12 ft. 6-12 ft. 0.25"-1.0" Sub -Canopy FACU 7% Asimina triloba Pawpaw 12 ft. 6-12 ft. 0.25"-1.0" Sub -Canopy FAC 14% Quercus rubra NortOak Red 12 ft. 6-12 ft. 0.25"-1.0" Canopy FACU 8% Total 100% Riparian Corridor and Inundated Wetland Planting Streambank Planting Zone Live Stakes Species Common Name Max Spacing Indiv. Spacing Min. Size Stratum Wetland Indicator % of Stems Salix nigra Black Willow 8 ft. 6-8 ft. 0.5"-1.5" cal. Shrub OBL 25% Corpus amomum Silky Dogwood 8 ft. 6-8 ft. 0.5"-1.5" cal. Shrub FACW 20% Salix sericea Silky Willow 8 ft. 6-8 ft. 0.5"-1.5" cal. Shrub OBL 25% Cephalanthus occidentalis Buttonbush 8 ft. 6-8 ft. 0.5"-1.5" cal. Shrub OBL 15% Sambucus canadensis Elderberry 8 ft. 6-8 ft. 0.5"-1.5" cal. Shrub FAC 15% Total 100% Herbaceous Plugs Juncos effusus Common Rush 5 ft. 3-5 ft. 1.0"- 2.0" plug Herb FACW 40% Carex crinita Fringed Sedge 5 ft. 3-5 ft. 1.0"- 2.0" plug Herb OBL 10% Carex lurida Lurid Sedge 5 ft. 3-5 ft. 1.0"- 2.0" plug Herb OBL 20% Carex lupulina Hop Sedge 5 ft. 3-5 ft. 1.0"-2.0" plug Herb OBL 15% Scirpus cyperinus Woolgrass 5 ft 3-5 ft. 1.0"-2.0" plug Herb FACW 15% Total 100% Note: See live staking and herbaceous plugs detail. Permanent Seeding Riparian Seeding - Open Canopy Pure Live Seed (21 Ibs/ acre) Approved Date Species Name Common Name Stratum Wetland Indicator Density (Ibs/acre) All Year Schizachyrium scoparium Little Bluestem Herb FACU 4.0 All Year Panicum virgatum Switchgrass Herb FAC 2.0 All Year Panicum rigidulum Redtop Panicgrass Herb FACW 1.0 All Year Rudbeckia hirta Blackeyed Susan Herb FACU 1.0 All Year Coreopsis lanceolata Lanceleaf Coreopsis Herb FACU 1.0 All Year Echinacea purpurea Purple coneflower Herb UPL 1.0 All Year Panicum clandestinum Deertongue Herb FAC 2.0 All Year Elymus virginicus Virginia Wild Rye Herb FACW 2.0 All Year Sorghastrum nutans Indiangrass Herb FACU 3.0 All Year Bidens aristosa Bur -Marigold Herb FACW 1.0 All Year Helianthus angustifolia Narrowleaf Sunflower Herb FACW 1.0 All Year Coreopsis tinctoria Plains corepsis Herb FAC 1.0 All Year Achillea millefolium Common yarrow Herb FACU 1.0 Wetland Seeding - Open Canopy Pure Live Seed (19 Ibs/ acre) Approved Date Species Name Common Name Stratum Wetland Indicator Density (Ibs/acre) All Year Coleataenia anceps Beaked Panicgrass Herb FAC 3.0 All Year Carex vulpinoidea Fox Sedge Herb OBL 2.0 All Year Elymus virginicus Virginia Wild Rye Herb FACW 4.0 All Year Bidens aristosa Bur -Marigold Herb FACW 3.0 All Year Panicum cirgatum Switchgrass Herb FAC 2.0 All Year Polygonum pensylvanicum Smartweed Herb FACW 0.5 All Year Juncos effusus Common Rush Herb OBL 1.5 All Year Panicum dichotomiflorum Panicgrass Herb FACW 2.0 All Year Helianthus augustifolia Narrowleaf sunflower Herb FACW 1.0 Notes: (1) Apply Permanent Riparian seeding in all disturbed areas within Conservation Easement. (2) Apply Permanent seeding in all other disturbed areas outside of Easement per specification. O 0 0 0 7 V V V O 0 0 0 Best Management Practice (BMP) Planting Notes: (1) Apply "Wetland Seeding - Open Canopy" seed mix to all disturbed areas of BMP including bottom of basin. (2) Apply "Riparian Corridor Planting - Herbaceous Plugs and Livestakes" species in areas shown in detail. Stabilization Seeding Stabilization Seeding Pure Live Seed (321bs/ac) Species Name Common Name Ibs/acre Festuca arundinacea Fescue (KY 31) 20 Doctylis glomerate Orchard Grass 12 Notes: (1) Apply Pasture Seeding for grading outside Conservation Easement, utility easements, and stream crossings. (2) Install temporary seed and mulch with all permanent seed. m Q ▪ w • .y M� z i OPEN BUFFER PLANTING RIPARIAN CORRIDOR AND INUNDATED WETLAND PLANTING WETLAND PLANTING PARTIALLY VEGETATED BUFFER PLANTING aaaaaaa ROY 0 v0v0 ]-7 # BMP PLANTING SHEET 3.3 / CE Uri CE CE / / h / / / SHEET 3.4 / / / / / / / / / / yr 1120,p0� /// / / / RT� s2s//;`)4<' / �F O U I AF CE/ r \ �s1 ( I wow. � �� - .. I 0 I / c fi Lol I 1 /2/ m Q ta,41 Q� Planting Overview MN i 7 NO BARE ROOTS WERE PLANTED DUE TO DEPTH OF STANDING WATER CE CE NO BARE ROOTS WERE PLANTED DUE TO DEPTH OF STANDING WATER CE CE OPEN BUFFER PLANTING RIPARIAN CORRIDOR AND INUNDATED WETLAND PLANTING WETLAND PLANTING PARTIALLY VEGETATED BUFFER PLANTING BMP PLANTING CONSISTS OF WETLAND SEEDING, PLUGS (10'X10') AND LIVES STAKES (10'X10') c CE NO PLANTING /A _) _) - O�O�C • v • CE CE pr14'- BMP PLANTING CE - CE 0 0 0 7 7 7 7 7 a 0 50' 100' 150' (HORIZONTAL) z i OPEN BUFFER PLANTING RIPARIAN CORRIDOR AND INUNDATED WETLAND PLANTING WETLAND PLANTING PARTIALLY VEGETATED BUFFER PLANTING VOVOS OOC SSE SS SSE BMP PLANTING SSE SS SSE V V V V V n n n n 1 SSE / SSE SSE SSE SSE SS SS SS SS SSE SSE SSE SSE SE NO BARE ROOTS WERE PLANTED DUE TO DEPTH OF STANDING WATER SS SS SSE SS SSE SS SSE SS SSE SS CE ce � cF cF cE o ON N�`� CREEK cF ce CROSSING PLANTED WITH STABILIZATION SEEDING CE CE ./ NO PLANTING se V \SS sF Js,\\ C 47f EFIESIEFF j 0 50' 100' 150' (HORIZONTAL) z i OPEN BUFFER PLANTING RIPARIAN CORRIDOR AND INUNDATED WETLAND PLANTING WETLAND PLANTING PARTIALLY VEGETATED BUFFER PLANTING SE SS SSE SSE SSE SSE SS SSE SS SSE SSE S SSE SSE BMP PLANTING v0v0 ]-7 # NO BARE ROOTS WERE PLANTED DUE TO DEPTH OF STANDING WATER SSE SS SSE SSE Ss SSE SSE SS = SSE SSE SSE SSE SSE SSE SSE SSE - SSE SS SS SS SS SS Ss SS SSE_ SSE SSE SSE SSE SSE / gS SSE V V V V V n n n n 1 BMP PLANTING CONSISTS OF WETLAND SEEDING, PLUGS (10X10) AND LIVESTAKES (10X10) SSE- 55 - SSE NO BARE ROOTS WERE PLANTED DUE TO DEPTH OF STANDING WATER 55E- - 55E 5S SSE SSE _ 5S SSE SS SSE 55 55E SSE SSE SSE 55 SSE 55 55E 5S SSE SSEi of 0 0 124+00 59 tiD 0 50' 100' 150' (HORIZONTAL) z - - •',- ,/,); //,z )', , ' ' '/; ; r -", = ,c;r2 , j) ,';)1) )", ) , ," / • • ' - • ,-_ ) „ )) ) f / I / _--- ONE 12GATE AT NON —CROSSING , LOCATIONS (TYP) MOVEDTO TOPOFSLOPE ) 303Y // •;• )7'.) — ); • , , ) • ; ) ' s • , ' ' _ ,• „ , - - - 7-, 2 lI o 2 z Project Engmeer DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D CERTIFICATE OF SURVEY AND ACCURACY I, PHILLIP B. KEE CERTIFY THAT THE GROUND TOPOGRAPHIC SURVEY PORTION OF THIS PROJECT WAS COMPLETED UNDER MY DIRECT SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY DIRECT SUPERVISION; THAT THIS SURVEY WAS PERFORMED AT THE 95% CONFIDENCE LEVEL TO MEET THE FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO THE CLASS A HORIZONTAL AND CLASS C VERTICAL WHERE APPLICABLE; THAT THE ORIGINAL DATA WAS OBTAINED BETWEEN THE DATES OF _2116/22=43/18/22___; THAT THE CONTOURS SHOWN AS BROKEN LINES MAY NOT MEET THE STATED STANDARD AND ALL COORDINATES ARE BASED ON NAD 83 (NSRS 2011) AND ALL ELEVATIONS ARE BASED ON NAVD 88; THAT THE GPS PORTION OF THIS PROJECT WAS TO PERFORM A GRID TIE TO THE NC STATE PLANE COORDINATE SYSTEM AND THE INFORMATION USED IS SHOWN & NOTED HEREON; THAT THIS MAP MEETS THE SPECIFICATIONS FOR TOPOGRAPHIC SURVEYS AS STATED IN TITLE 21, CHAPTER 56, SECTION .1606; THAT THIS MAP WAS NOT PREPARED IN ACCORDANCE WITH G.S. 47-30, AS AMENDED AND DOES NOT REPRESENT AN OFFICIAL BOUNDARY SURVEY. GPS METADATA SEE SURVEY CONTROL WILDLANDS ENGINEERING, INC. BY KEE MAPPING & SURVEYING, PA (LICENSE # C-3039); SIGNED, SEALED AND DATED ON DECEMBER 17, 2019 BY PHILLIP B. KEE, NC PLS (LICENSE #4647). WITNESS MY ORIGINAL SIGNATURE, LICENSE NUMBER, AND SE150cB' ecp199; OF APRIL 2022, A.D. r.1 D965004A7692407 PHILLIP B. KEE, PLS L-4647 SURVEYOR'S NOTES: 1. ALL DISTANCES AND COORDINATES ARE GROUND MEASUREMENTS IN US SURVEY FEET UNLESS OTHERWISE NOTED. 2. PROPERTY SUBJECT TO ALL EASEMENTS, RIGHT OF WAYS AND RESTRICTIONS THAT ARE RECORDED, UNRECORDED, WRITTEN AND UNWRITTEN. 3. CONSERVATION EASEMENT BOUNDARIES SHOWN HEREON WERE TAKEN FROM PLATS OF SURVEY ENTITLED: "A CONSERVATION EASEMENT SURVEY FOR THE STATE OF NORTH CAROLINA, DIVISION OF MITIGATION SERVICES, OAK HILL DAIRY SITE" AND RECORDED IN PB: 93 PGS:53-56 DATED MARCH 23, 2021, RECORDED IN THE GASTON COUNTY REGISTRY. 4. GASTON COUNTY GIS WEBSITE USED TO IDENTIFY ADJOINING PROPERTY OWNERS. 5. BY GRAPHIC DETERMINATION, A PORTION OF THE SUBJECT PROPERTY APPEARS TO LIE WITHIN A SPECIAL FLOOD HAZARD AREA (SFHA) AS DETERMINED BY THE FIRM. MAP# 3710269100K, 3710360100K, & 3710269000J DATED 09/28/2007. 6. STATE PLANE COORDINATES AND ELEVATIONS WERE DERIVED FROM THE CONTROL SURVEY PREPARED BY KEE MAPPING & SURVEYING. THE HORIZONTAL DATUM IS NAD 83 (2011) AND THE VERTICAL DATUM IS NAVD 88. ALL COORDINATES SHOWN HEREON ARE GROUND MEASUREMENTS IN US SURVEY FEET. 7. UTILITIES WERE LOCATED BASED ON VISIBLE ABOVE GROUND STRUCTURES, THEREFORE THE LOCATION OF UNDERGROUND UTILITIES ARE APPROXIMATE OR MAY BE PRESENT AND NOT SHOWN HEREON. CALL 1-800-632-4949 BEFORE DIGGING. 8. STATIONING AND STREAM LABELS FOR PLAN AND PROFILES ARE BASED OFF OF FINAL PLANS AND DESIGN CENTERLINES PROVIDED BY WILDLANDS ENGINEERING, INC. 9. CONTOUR INTERVAL: 1 FOOT VERTICAL DATUM: NAVD 88 10. AREA OF LIMITS OF DISTURBANCE: 17.48 ACRES 11. WETLANDS SHOWN HEREON WERE PROVIDED BY WILDLANDS ENGINEERING, INC. (SHEET 7/2�------I V r 4. P � 40 CONTROL POINT RBCC "KEE" (312) GROUND COORDINATES N: 61.87.39' E: 1297865.44 ELEV: 832.73' CONTROL POINT RBCC "KEE" (311) GROUND COORDINATES N: 610116.93' E: 1297759.67' ELEV: 817.41' 003 4�� AN AS -BUILT SURVEY FOR • • WILDLANDS ENGINEERING, INC. THE STATE OF NORTH CAROLINA, NCDEQ: DEPARTMENT OF MITIGATION SERVICES "OAK HILL DAIRY MITIGATION SITE" GASTON COUNTY, NORTH CAROLINA CONTROL POINT RBCC "KEE" (500) GROUND COORDINATES N: 611209.03' E: 1298.9.38' ELEV: 853.38' CONTROL POINT RBCC "KEE" (501) GROUND COORDINATES N: 610798.22' E: 1297791.18' ELEV: 837.61' CONTROL POINT RBCC "KEE" (310) GROUND COORDINATES N: 610218.65' E: 1298114.62' ELEV: 820.84' IX c07 m. 407 �X _ V1 �SHEET8 X \DE \$ aft 00 SHEET 10 E LHEET-.�.�.�.�.�._ SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 CONTROL POINT RBCC "KEE" (309) GROUND COORDINATES N: 610137.38' E: 1298363.97' ELEV: 822.01' CONTROL POINT RBCC "KEE" (308) GROUND COORDINATES N: 610115.05' E: 1298698.65' ELEV: 813.97' CONTROL POINT RBCC "KEE" (307) GROUND COORDINATES N: 610071.38' E: 1299.0.05' ELEV: 808.67' SHEET # SHEET TITLE 1 "PROJECT OVERVIEW" 2 "BEGIN OAK HILL CREEK" 3 "OAK HILL CREEK" 4 "OAK HILL CREEK" 5 "OAK HILL CREEK" 6 "END OAK HILL CREEK" 7 "BEGIN UT1" 8 "UT1" 9 "UT1" 10 "END UT1" 11 "BEGIN UT1A" 12 "ENDUTIA&UT1B" 13 "UT2" 14 "UT3" 15 "CROSS -SECTIONS # 1-8" 16 "CROSS -SECTIONS # 9-14" 17 "LONGITUDINAL PROFILE: 18 "LONGITUDINAL PROFILE: 19 "LONGITUDINAL PROFILE: 20 "LONGITUDINAL PROFILE: 21 "LONGITUDINAL PROFILE: 22 "LONGITUDINAL PROFILE: 23 "LONGITUDINAL PROFILE: CONTROL POINT RBCC "KEE" (400) GROUND COORDINATES N: 609780.16' E: 1299127.60' ELEV: 800.83' OAK HILL CREEK STA: 100+00-108+00" OAK HILL CREEK STA: 108+00-116+00" OAK HILL CREEK STA: 116+00-124+00" UT1 STA: 200+00-212+00" UT1 STA: 212+00-221+00" UT1A STA: 300+00-305+00" UT2 STA: 2+30-4+90 & UT3 STA: 300+40-302+80" CONTROL POINT RBCC "KEE" (401) GROUND COORDINATES N: 609529.75' E: 1299266.95' ELEV: 800.32' R0116OA0 CONTROL POINT RBCC 'KEE'(3.) GROUND COORDINATES N: 610949.68' E: 1299579.61' ELEV: 795.46' CONTROL POINT RBCC "KEE" (305) GROUND COORDINATES N: 6106..12' E: 1299468.06' ELEV: 802.20' CONTROL POINT RBCC "KEE" (306) GROUND COORDINATES N: 610346.17' E: 1299232.63' ELEV: 810.30' SHEET 3 CONTROL POINT RBCC "KEE" (402) GROUND COORDINATES N: 609797.97' E: 1299388.66' ELEV: 807.01' CONTROL POINT RBCC "KEE" (403) GROUND COORDINATES N: 609361.92' E: 1299261.94' ELEV: 8..98' GRID NORTH NAD 83 (2011) CONTROL POINT RBC "KEE" (302) GROUND COORDINATES N: 611235.06' E: 1299706.36' ELEV: 796.28' O� SHEET 113 13 O 0 D m z 0 m A 0 SURVEY AREA e- uge" ST VICINITY MAP a\ (NOT TO SCALE) LEGEND 0 94/ c'A0 o STRUCTURE NUMBER • 1/2" RBCC (CROSS-SECTION REBAR) 5/8" RBC W/ "KEE" CONTROL CAP (AS NOTED) • GAUGE (AS NOTED) 6 PHOTO POINT �( UTILITY POLE SEWER MANHOLE • DECIDUOUS TREE LOG SILL ROCK SILL LOG J-HOOK MOBILE VEG PLOT ® BRUSH TOE imsyt FLOOD PLAIN ROUGHENING ® BANK ROUGHENING ® BRUSH TOE W/ GEO LIFT 1 ((((,1 BOULDER TOE ®11 LOD TB --- DW - CE - CE-XS - SS- RBCC RBC INV ELEV NAVD NAD NSRS CMP CPP PVC VP STA RIFFLE GRAVEL RIP RAP SOIL ROADBED ASPHALT MINOR CONTOUR MAJOR CONTOUR LIMITS OF DISTURBANCE THALWEG TOP OF BANK DESIGN CENTERLINE OVERHEAD WIRE CONSERVATION EASEMENT INTERNAL EASEMENT CROSSING SEWER LINE SEWER EASEMENT REBAR W/ CAP SET IN CONCRETE REBAR W/ CAP INVERT ELEVATION NORTH AMERICAN VERTICAL DATUM NORTH AMERICAN DATUM NATIONAL SPATIAL REFERENCE SYSTEM CORRUGATED METAL PIPE CORRUGATED PLASTIC PIPE POLYVINYL CHLORIDE PIPE VEGETATED PLOT STATION SEAL: \\0111111////// :'7' _� o.S ALbv �_ " J-1/ -4647 ° 5004A769 fib,:. ///��7�Q"""Of \\ /// /////BBII\\4s.tee NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: PROJECT OVERVIEW TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013-AB # DATE COUNTY: GASTON CHECKED BY: PBK SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP REVISIONS SHEET: 1 OF 23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D CONTROL POINT RBCC "KEE" (401) GROUND COORDINATES N: 609529.75' E: 1299266.95' ELEV: 800.32' CONTROL POINT RBCC "KEE" (nn3) vim) GROUND COORDINATES N: 609361.92' E: 1299261.94' ELEV: 804.98' m g �/ °O, X / O00°' t7 m I PIN: 6/2" RBCC f N: 609566.56' N: E: 1299306.88' \ Z: 800.97' 0 1 o0 i 0, O 0' 40' 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) 00 0 O VP8 U CROSS-SECTION #9 I OQ PO co, CE C 8n7 7 � ` E07 GROUNDWATER GAUGE #4 tRo BOLT ELEV: 803.83' ° 00 U R-PIN: 1/2" RBCC N: 609579.77' E: 1299378.10' Z: 800.26' z00 BEGIN OAK HILL CREEK STA: 100+10 SHEET 3 SHEET 2 GRID NORTH NAD 83 (2011) STRUCTURE TABLE -OAK HILL CREEK # DESCRIPTION ELEVATION 1 ROCK SILL 798.24 2 LOG SILL 797.71 O l o° �o cE � cE cE SEAL: eI C AR ®ie � s�B� ocre ocuSigned b o :a. 1" L9 SEAL �e °I464/ y 65004A769 °:.. — °®3�9h�� ��7� 1110� B \\\ NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: BEGIN OAK HILL CREEK TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013-AB SHEET SIZE: 11" X 17° (HALF SIZE) DATE REVISIONS SHEET: 2 � 23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 2i8+0oz0 L-PIN: 1/2" RBCC IN: bU`J`JbU.64' E: 1299216.91' Z: 798.28' V v GROUNDWATER GAUGE #6 BOLT ELEV: 799.84' ° v -417 0.6\'' m 0 ° IIm / I 4 x a BUI mI oRBCC "KEE" (400) GROUND COORDI NATES LJNTrOL POINT m N: 609780.16' E: 1299127.60' ELEV: 800.83' R-PIN: 1/2" RBCC N:610011.26' E: 1299201.26' Z: 798.52' L-PIN: 1/2" RBCC N: 609893.24' E: 1299218.17' Z: 798.67' CROSS-SECTION #11 R-PIN: 1/2" RBCC N: 609923.66' E: 1299305.87' Z: 798.36' R-PIN: 1/2" RBCC / N: 609908.33' E: 1299300.55' Z: 798.48' (;KU55-t(; I ION 141U INTERNAL EASEMENT CROSSING STA: 105+53 GROUNDWATER GAUGE #5 BOLT ELEV: 800.51' a CONTROL POINT RBCC "KEE" (402) GROUND COORDINATES N: 609797.97' E: 1299388.66' ELEV: 807.01' INTERNAL EASEMENT CROSSING STA: 104+99 SHEET 4/13 SHEET 3 GRID NORTH NAD 83 (2011) STRUCTURE TABLE -OAK HILL CREEK # DESCRIPTION ELEVATION 3 LOG J-HOOK 797.35 4 LOG J-HOOK 796.52 5 LOG SILL 7g6.12 0' 40' 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) SHEET 3 SHEET 2 NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: OAK HILL CREEK TOWNSHIP: COUNTY: CHERRYVILLE GASTON NORTH CAROLINA DRAWN BY: CHECKED BY: NH PBK SCALE: SURVEY DATE: AS SHOWN 04/22/22 SURVEY BY: KP, AC, JR, CB, DP JOB: SHEET SIZE: #2201013—AB 11" X 17" (HALF SIZE) SHEET: REVISIONS P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D SHEET 5/14 SHEET 4/13 GRID NORTH NAD 83 (2011) CONTROL POINT RBCC "KEE" (306) GROUND COORDINATES N: 610346.17' E: 1299232.63' ELEV: 810.30' S I RUC I URE I ABLE -OAK HILL CREEK # DESCRIPTION ELEVATION 6 LOG J-HOOK 794.58 7 LOG J-HOOK 793.76 8 LOG J-HOOK 792.20 9 LOG SILL 791.49 / GROUNDWATER GAUGE #7 BOLT ELEV: 798.95' moo MVP5 L-PIN: 1/2" RBCC N: 610083.26' E: 1299210.85' Z: 798.16' 27 \+\ \, 7 / /, / / / / 0' i o' I CROSS-SECTION L-PIN: 1/2" RBCC N: 610389.81' E: 1299505.01' Z: 794.82' L-PIN: 1/2" RBCC— L - N: 610384.13' E: 1299500.20' Z: 794.875' CO 11 -81-- 81- _ INTERSECTION OAK HILL CREEK STA: 110+23 END UT1 STA: 221+11 40' GROUNDWATER GAUGE #8 BOLT ELEV: 796.84' MVP4 / / / / 80' 120' po' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) / c`P / R-PIN: 1/2" RBCC N: 610417.96' E: 1299603.58' Z: 794.41' R-PIN: 1/2" RBCC N: 610333.72' E: 1299616.91' Z: 794.67' p0 oso SHEET 4/13 SHEET 3 SEAL: EBI \e\\\��VIR() / es 'eS S j tr'; foff,°oct l,gwEby.��e I��1�4L���47 �o 004A76• -:^.. ,:,i2i,A7� 1� B I 1 \ \ \\\\e NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: OAK HILL CREEK TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013—AB DATE SHEET: COUNTY: GASTON CHECKED BY: PBK SURVEY DATE: 04/22/22 STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS oF 23 MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D GRID NORTH A NAD 83 (2011) SHEET 6 SHEET 5/14 STRUCTURE TABLE -OAK HILL CREEK # DESCRIPTION ELEVATION 10 LOG J-HOOK 790.38 11 LOG SILL 789.96 12 LOG J-HOOK 789.49 13 ROCK SILL 789.00 CONTROL POINT I RBCC "KEE" (305) GROUND COORDINATES N: 610644.12' E: 1299468.06' ELEV: 802.20' 0p' o \ oo SHEET 5/14 ,X SHEET 4/13 < xi 0 d-,)7 / �OO� 7ST INTERSECTION OAK HILL CREEK A:115+24 END UT2 STA: 4+89 i 1- 1 INTERSECTION OAK HILL CREEK STA: 118+99 END U T 3 STA: 302+85 0 I O R-PIN: 1/2" RBCC N: 610817.43' E: 1299742.90' Z: 791.42' moo IINn\HATER (,AI I(,P #10 BOLT ELEV: 793.14' o I 7 ,d � 1 GROUNDWATER GAUGE #9 / BOLT ELEV: 794.31' / 1001 W � / 00 W / / UO 0' 40' 80' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) 0 48" CPP INV IN: 790.97' INV OUT: 790.45' 120' NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: OAK HILL CREEK TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013—AB SHEET: COUNTY: GASTON CHECKED BY: PBK STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D okx\ GRID NORTH NAD 83 (2011) \ ow x 30 3 / `op OW ow I 30 \ 00 0° 0 0 x x x m lx� I // x/ / k/ CONTROL POINT RBCC "KEE" (304) /m GROUND COORDINATES i`Vc/N:610949.68'E: 1299579.61' x ELEV:795.46' // ° � 0 m 471 o / °� o0 a0 // k/ /m /m /m m a01 JJ a07 7 0 ow GROUNDWATER GAUGE #11 BOLT ELEV: 79 I.78' ( LCROSS-SECTION #14 CREST GAUGE #3 BOLT ELEV: 791.17' VP13 L-PIN: 1/2" RBCC N: 610911.03' ,� / E: 1299731.15' / " Z: 791.02' r i R-PIN: 1/2" RBCC N: 610817.43' E: 1299742.90' Z: 791.42' RpgRRT RoqD ,v36.) 30 30 6" PVC INV IN: 790.45' INV OUT: 788.88' � / ®9v / 13' X 8' BOX CULVERT t/INV T7.09' INV OUT:: O 784.67' END OAK HILL CREEK I STA: 123+96 �w\ �w\ Ow\ Ow 6" PVC INV IN: 790.53' INV OUT: 788.91' 0 STRUCTURE TABLE -OAK HILL CREEK # DESCRIPTION ELEVATION 14 LOG SILL 788.48 15 LOG SILL 787.72 18" CPP INV IN: 789.35' / s/ 1/ INV OUT: 787.67' 0' 40' 0 / 0 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) 0 SHEET 6 SHEET 5/14 SEAL: \01e��� �0ARo ",,/ . ��S30®e+ �. Do�u�Sigr1ed bye e k647 7. �a 6wo4A °� 3Pn> NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: END OAK HILL CREEK TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013—AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 0, 23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 0111 GRID NORTH A NAD 83 (2011) 0 0 0 STRUCTURE TABLE-UT1 # DESCRIPTION ELEVATION 16 LOG J-HOOK 807.34 0 0 0 0 CONTROL POINT RBCC "KEE" (311) GROUND COORDINATES N: 610116.93' E: 1297759.67' ELEV: 817.41' 30 0 SO L-PIN: 1/L' RBCC N: 610096.90' E: 1297756.69' Z: 814.95' 0 0 - o • '4 ago 3o o° m\co) ` 007 0 I I m BEGIN UT1B I STA: 00+00 d CEX XCE R-PIN: 1/2" RBCC N: 610202.47' E: 1297869.94' Z: 816.20' R-PIN: 1/2" RBCC N: 610198.37' E: 1297871.61' Z: 815.92' CREST GAUGE #1 BOLT ELEV: 812.24' 3o 30 — 30 3o INTERSECTION I UT1 STA: 202+23 END UT1A STA: 304+91 UT1 °° LOD I FLOW L•7.,o5 �� o? f oo� � -Eo-- � �- f1f ��Jy'� i i pO1 R-PIN: 1/2" RBCC N: 610026.11' E: 1297787.32' Z: 81 1.43' 00 0o i / + CE CE CE+/ X X X vvvvvv vv vvvvvvvvvvvv vvvvvvvvvvvv �vvv - 0 SHEET 11 SHEET 7/12 L-PIN: 1/2' RBCC N: 610222.31' E: 1297912.11' Z: 814.74' i CROSS-SECTION #2 1 2 2 1 0 ,c7 L^ \\ L-PIN: 1/2" RBCC\ N: 610193.04' E: 13.30' T �\ Z: 813.30' 44, \ \ \\\ \\\\ INTERSECTION UT1 STA: 203+56 END UT1B STA: 3+10 N 007 vi �.�]Ol / Co o 00 7So 4: + �C ° 870 o_Go, CY ro 0' 40' 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) S - TB 1 1 1 1 SEAL: �0,. iL ''' C AR®‘�%,B/ o� SEAL �r-e = c IIPI'PY: e. e NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT 007 — THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013-AB DATE SHEET TITLE: BEGIN UT1 COUNTY: GASTON STATE: NORTH CAROLINA CHECKED BY: SURVEY BY: PBK KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS SHEET: 7 OF 23 ee MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D X o30 X GRID NORTH NAD 83 (2011) 3 X 3D fix_ (OD 30 LOD 1 L-PIN:: 1/2" RBCC N: 610047.51' E: 1298044.27' Z: 808.49' 1 x 30 X /J LOD 1,OD ` / r 810 L-PIN: 1/2" RBCC N: 610068.43' CROSS-SECTION #4 I 30 x 30x E: 1298115.30' Z: 810.29' CROSS-SECTION #5 3o�x_ O r_ \ \ AGO / VP3 \\805 —%0 �� ° r� LOD V CONTROL POINT RBCC "KEE" (309) GROUND COORDINATES N: 610137.38' E' 1298363 97' ELEV: 822.01' <O LOD Lo�9000 815 O� LOD '�i GROUND WATER GAUGE #1 .i�lii�` .04 BOLT ELEV: 808.89' ll'ali! ��ilL� �Ir,ll�!ii�!I ( 40l CO/ OOl — — DOl — DOl _ °07 r\JR-PIN: 1/2" RBCC _ ° CO/ Doi Dot / °O1 Doi Doi CE N: 609971.99' E: 1298109.83' x� --X N: CEZ: 807.60'CE x x rF PIN: 1/2" N 0�996�n 2Q RBCC --CE_���E X�E. UT1 FLOW STRUCTURE TABLE-UT1 # UtJC:KIV II ION ELEVATION 17 LOG SILL 806.20 18 LOG SILL 805.64 19 LOG SILL 803.61 LOD 1 LOD OD 0 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) °•G= 0 0 uSi r r /L-- 4 6 4 % s ° . ' 4A76924P l° \ �i-i,,_,t t1oB .1. \\\..- NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013—AB SHEET: SHEET TITLE: UT1 COUNTY: GASTON CHECKED BY: PBK STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D GRID NORTH NAD 83 (2011) co I 6) I— w w w w U) 1 U) 1 o� ors LOD 3s LOD l 400 CONTROL POINT RBCC "KEE" (308) GROUND COORDINATES N: 610115.05' E: 1298698.65' ELEV: 813.97' BAROTROLL —� 3D�D GAUGE GROUND WATER GAUGE #2 BOLT ELEV: 805.13' CROSS-SECTION #6 CE — CE _ CE L-PIN: 1/2" RBCC N: 610007.72' E: 1298746.97' Z: 803.13' R-PIN: 1/2" RBCC N: 609911.07' E: 1298737.30' Z: 803.31' STRUCTURE TABLE-UT1 # DESCRIPTION ELEVATION 20 LOG SILL 802.20 21 LOG SILL 801.51 22 LOG SILL 800.52 23 LOG SILL 799.26 vvv vvvv vvv vv R-PIN: 1/2" RBCC N N: 609903.80' E: 1298751.44' Z: 803.30' L-PIN: 1/2" RBCC N: 609966.06' E: 1298815.94' Z: 802.61' CROSS-SECTION #7 CREST GAUGE #2 BOLT ELEV: 802.96' vvvv vvv v v 5iv 0' 40' 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) 1 SEAL: e�'¢� 10��®%�B/ - cu ,jg Acey: "o irk 1it.-4647 £ ST.A769.:a ° NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013—AB SHEET: SHEET TITLE: UT1 COUNTY: GASTON CHECKED BY: PBK STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS 0, 23 MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 1 GOT GOT I 1 GE GRID NORTH A NAD 83 (2011) CONTROL POINT RBCC "KEE" (307) GROUND COORDINATES N: 610071.38' E: 1299040.05' ELEV: 808.67' INTERNAL EASEMENT CROSSING STA: 216+88 BRIDGE LOW CHORD: 801.39' 00- i o07 00-1 Oo� °o> GROUNDWATER GAUGE #3 BOLT ELEV: 802.46' GE ) GE 0 GE GE GE X 00 vv v v. v v • GROUNDWATER GAUGE #7 " BOLT ELEV: 798.95' SOD STRUCTURE TABLE-UT1 # DESCRIPTION ELEVATION 24 ROCK SILL 798.43 25 LOG SILL 796.85 26 LOG SILL 795.92 •1 0 MVPS LY IIV: I/L RBi. N: 610083.26' E: 1299210.85' Z: 798.16' /70 26 1 R-PIN: 1/2" RBCC _„,,,,-----e______ N: 610011.26' E: 1299201.26' Z: 798.52' L-PIN: 1/2" RBCC N: 609960.84' E: 1299216.91' Z: 798.28' GROUNDWATER GAUGE #6 BOLT ELEV: 799.84' l)�Y INTERNAL EASEMENT CROSSING / L-PIN: 1/2" RBCC STA: 217+18 N:609893.24' E: 1299218.17' X �1 / Z: 798.67' op 007 X/ 0 / I I 4J� x m 1 1 220+ 4i / 109+50 61 SHEET 4/13 SHEET 3 / co CROSS-SECTION #11 / / / / \ 00 �� / R-PIN: 1/2" RBCC / / N:609923.66' & & E: 1299305.87' / o Z: 798.36' ' R-PIN: 1/2" RBCC // °o E: 1299300.55' /) N 609908 33' CROSS -SECT ION #10 / 1 / o •/ �� 0' 40' INTERSECTION OAK HILL CREEK STA: 110+23 END UT1 STA: 221+11 80' / ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) 120' NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013-AB # DATE SHEET: SHEET TITLE: END UT1 COUNTY: STATE: GASTON NORTH CAROLINA CHECKED BY: SURVEY BY: PBK KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D GRID NORTH NAD 83 (2011) L1\ \Z\ \ \ 1 \ POINT \ \ E" (312) \ \ \ ` 39' \ b 73' \ COORDINATES .44' CONTROL RBCC "KE GROUND N: 610487. E:1297865 ELEV: 832. 0 0' 40' 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) HOUSE (AS DRAFTED FROM AERIAL) / .6- / STRUCTURE TABLE-UT1A # DESCRIPTION ELEVATION 27 ROCK SILL 821.90 28 LOG SILL 821.41 29 ROCK SILL 820.66 30 LOG SILL 820.18 31 ROCK SILL 819.50 32 LOG SILL 818.82 00 33 ROCK .ILL ROCK/ SILL 818.22 34 LOG SILL 817.63 35 ROCK SILL 816.71 36 LOG SILL 815.57 37 ROCK SILL 814.64 38 ROCK SILL 813.91 39 LOG SILL 812.91 SHEET 11 SHEET 7/12 1 SEAL: �\ 10A®‘o",, �°'CreSSQ®°� „bj: �r•_ 0 is 1 NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: BEGIN UT1A TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013-AB # DATE COUNTY: STATE: GASTON NORTH CAROLINA CHECKED BY: SURVEY BY: PBK KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS SHEET: 11 OF 23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D GRID NORTH A NAD 83 (2011) . —0111— 0 0 0 STRUCTURE TABLE-UT1A # DESCRIPTION ELEVATION 40 � LOG SILL 811.86 41 LOG SILL 810.66 42 ROCK SILL 809.85 43 ROCK SILL 809.03 44 ROCK SILL 808.85 45 LOG SILL 808.23 0 0 0 0 I I BEGIN UT1 STA: 200+05 0 — — — CONTROL POINT RBCC "KEE" (311) GROUND COORDINATES N: 610116.93' E: 1297759.67' ELEV: 817.41' So 30 0 0 0 L-PIN: 1/L' RBCC N: 610096.90' E: 1297756.69' Z: 814.95' 0 N o I I� O N D /� 0 0 00 m 0 I I m BEGIN UT1B I STA:00+00 , 6 0 CEX — — R-PIN: 1/2" RBCC N: 610202.47' E: 1297869.94' Z: 816.20' R-PIN: 1/2" RBCC N: 610198.37' E: 1297871.61' Z: 815.92' 30/ / 30 30 SO CREST GAUGE #1 BOLT ELEV: 812.24' 3o a INTERSECTION UT1 STA: 202+23 END UT1A STA: 304+91 UTi 00 LOD FLOW L`104, iib0__ i t ram_ r Ct imisigo R-PIN: 1/2" RBCC N: 610026.11' E: 1297787.32' Z: 81 1.43' CE CE X X X 061 V V V V V Vvvvvv vv vvvvvvvvvvvv vvvvvvvvvvvv vvv 0 00, o / Co1 ` 00^ co, 0 SHEET 11 SHEET 7/12 L-PIN: 1/2' RBCC N: 610222.31' E: 1297912.11' \ \ Z: 814.74' CROSS-SECTION #2 v\,c \ o L-PIN: 1/2" RBCC N: 610193.04' E: 1297923 57' -f- Z: 813.30' 44 INTERSECTION UT1 STA: 203+56 END UT1B STA: 3+10 870 /\� 07 \ ao , 1 SHEET 7/1:2 7B I 1 1 NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT COT — CY' CE CE �+ X 0' 40' 80' 120' ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) 1 1 THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013-AB DATE SHEET TITLE: END UT1A UT1B oi COUNTY: GASTON STATE: NORTH CAROLINA CHECKED BY: SURVEY BY: PBK KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS SHEET: 120F23 ee MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D / SHEET 5/14 SHEET 4/13 L00 L-PIN: 1/2" RBCC N: 610389.81' 5.0 12 Z: 794.82' ° L-PIN: 1/2" RBCC N: 610384.13' E: 1299500.20' Z: 794.875' CROSS-SECTION #12 INTERSECTION OAK HILL CREEK STA: 115+24 END UT2 STA: 4+89 VVV:� v v vvv v v vv R-PIN: 1/2" RBCC N: 610417.96' E: 1299603.58' Z: 794.41' R-PIN: 1/2" RBCC N: 610333.72' E: 1299616.91' GROUNDWATER GAUGE #9 BOLT ELEV: 794.31' BEGIN UT2 STA: 2+66 42" CPP INV IN: 792.63' INV OUT: 792.51' ° O O / / IQ° / GROUNDWATER GAUGE #8 BOLT ELEV: 796.84' 0' 40' 80' 120' os GRID NORTH A NAD 83 (2011) STRUCTURE TABLE-UT2 # Ut5UKIP T ION ELEVATION 46 ROCK SILL 792.76 ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013-AB SHEET: SHEET TITLE: UT2 COUNTY: GASTON CHECKED BY: PBK STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS MAPPING & SURVEYING P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D GRID NORTH NAD 83 (2011) SHEET V SHEET 5/14 CONTROL POINT RBCC "KEE" (305) GROUND COORDINATES N: 610644.12' E: 1299468.06' ELEV: 802.20' A SHEET 5/14 SHEET 4/13 6 0 \\ S //77'1' AID Aaf II Algir AlOr i2f_'` gat i INTERSECTION OAK HILL CREEK STA: 118+99 END UT3 STA: 302+85 INTERSECTION OAK HILL CREEK STA: 115+24 END UT2 STA: 4+89 27 - �L v vvv \ A R-PIN: 1/2" RBCC / N: 610817.43' E: 1299742.90' Z: 791.42' MVP6 • GROUNDWATER GAUGE #9 BOLT ELEV: 794.31' \ U °O GROUNDWATER GAUGE #10 BOLT ELEV: 793.14' 0' 190' o cuSigned by:Cmoo fr4:(j*Y4Pn 111° �®®®//IalBll\\4��\ NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE TOWNSHIP: CHERRYVILLE DRAWN BY: NH SCALE: AS SHOWN JOB: #2201013—AB SHEET: ° 0 1 a Lj h 0 48" CPP INV IN: 790.97' INV OUT: 790.45' 6- BEGIN UT3 I IA: 300+31 STRUCTURE TABLE-UT3 # DESCRIPTION ELEVATION 47 ROCK SILL 791.00 40' 80' 0 O ONE INCH = TWENTY FEET (FULL SIZE) ONE INCH = FORTY FEET (HALF SIZE) SHEET TITLE: UT3 COUNTY: GASTON CHECKED BY: PBK STATE: NORTH CAROLINA SURVEY BY: KP, AC, JR, CB, DP SURVEY DATE: 04/22/22 SHEET SIZE: 11" X 17" (HALF SIZE) REVISIONS P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 816 815 814 813 812 811 810 809 816 815 814 813 812 811 810 809 808 o ON o o� o + + + + + 0 0 0 0 0 0 808 CROSS-SECTION #1 -UT1A HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 809 809 808 807 806 v 808 807 806 00 O O O OV i0 (9 O 00 00) 00 O N COO O O O O O O O O O CROSS-SECTION #4 -UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 804 818 818 817 816 815 814 813 812 811 810 0 0 O O oCO � o N ▪ + + + 0 0 0 0 O 0 817 816 815 814 813 812 811 810 CROSS-SECTION #2 -UT1A HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 812 812 311 811 810 810 309 809 Sob 808 307 807 806 806 305 805 804J 804 00 O O O ON CO V i0 , O + + + + + + + + O O O O O O O O CO rn o + + + + O O CROSS-SECTION #5 -UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 804 803 802 801 800 803 802 801 800 00 O O O O0 , O 0 N CO V i0 0 0 0 0 0 0 0 0 0 + CROSS-SECTION #7 -UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 800 816 816 315 815 814 814 313 813 812 812 311 811 810 810 309 809 808 808 0 o O O oo LO O O N CO ' ro 0 0 0 0 0 0 0 0 0 CROSS-SECTION #3 -UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 804 804 803 802 801 800 799 798 00 o O O oN COv o , O Oro rn + + + + + + + + + + O O O O O O O O O O 803 802 801 800 799 798 CROSS-SECTION #6 -UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 800 799 799 798 797 796 • 798 797 796 O O O O V i0 , O 0N CO 0 0 0 0 0 0 0 0 0 0 CROSS-SECTION #8 -UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE SEAL: eo"� 1CA®�o",, SQ®°+ _� SEAL 7�e fl",eirrki 0. °650z4Hd 91 0 NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: CROSS-SECTION # 1-8 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013-AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 150F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 802 802 301 801 300 80C r99 799 r98 798 r97 1 797 r96 796 0 0 N o v coo N- c0 O O O O O O O O o CROSS-SECTION #9 -OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 796 796 r95 795 794 794 r93 793 792 792 r91 791 790 790 r89 789 788 788 O O O O O O O O O O O O O 0 N ('7 'Cr B') + I+ 0 0) O N + + + + + + + + + + + + + + O O O O O O O r O O 0 CROSS-SECTION #12 -OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 800 800 r99 799 r98 798 r97 797 r96 796 r95 795 r94 794 0 0 N o v coo N- CO rn + + + + + + + + + + O O O O O O O O O o CROSS-SECTION #10 -OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 796 796 r95 795 r94 � �. 794 �93 793 �92 792 r91 791 r90 790 00 O N O OV i0 CO O 00 0')) 00 O + + + + + + + + + + + + O O O O O O O O O O r r CROSS-SECTION #13 -OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 800 800 r99 799 r98 798 797 \\ 797 r96 796 795 I 795 r94 794 793 793 r92 792 00 O N O V coo N- CO 00) O + + + + + + + + + + + O O O O O O O O O o r CROSS-SECTION #11 -OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE 792 792 791 Ai_ 790 790 789 789 788 788 0O O 'Cr L OC) COCOO - CO 00O ) 0 N + + + + + + + + + + + O O O O O O O O O O CROSS-SECTION #14 -OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE SEAL: e��\ ICAR° /, 0.'CAS30®e* /. oa. SEAL r LAfill7y. ;\'; ��IIaIBII\\:�� NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: CROSS-SECTION # 9-14 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013-AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 160F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 800 800 799 799 797 795 793 z 0 H 0 uJ 0) co co 0 797 795 793 792 O O 799 O O O o 07 O O O o co O O O 0 O 0 O + 0 o co 0 O CO 0 O O co O O CO O 0 O co O 792 o o 07 O O 799 r97 797 I r95 ::"1---------- 795 z / r93 AEN ICROISSINI I I I 1 EM ENT IROSI 0 z 793 0 0 r91 in 0 (%)co 7 791 W co ¢ 0 ROSS-SECTIOI r89 W J Q INTERNA 0 789 NTERN I 1 1 r88 v 788 O O O o co O O O Lc) O O 0 O + 0 o co 0 O CO O O O CO O o co CO O LONGITUDINAL PROFILE- OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG o co O O O o co O O O 07 O SEAL: 0(\e0AR0/ o��� 1%�B/ SiO ° _� SEAL fir: ▪ �o6!i?n7bY. _ / 9b5004A76 �ipBII\\4���\\\ce NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: OAK HILL CREEK STA: 100+00-108+00 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013—AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 170F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 798 798 797 795 793 791 HI3 z O H 0 W 0) W H z 789 COCO 797 Q) CO m 797 795 793 791 789 o o + O O O 797 r95 co 795 N z 0 r93 t z 0 H uJ W 793 0 °co?I co SR EE TIOFI r91 co 05 co CC 0 791 O U inH ? r89 789 J r87 787 LONGITUDINAL PROFILE- OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG LC) SEAL: `\A 10A19 ..0. oceak ed byr o-4647 s� ,e "4o. 447._ u'r tip /,77��/IalBll\\��\\ NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: OAK HILL CREEK STA: 108+00-116+00 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013—AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 180F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D SEAL: e��° 10AR®)/%�B/ 795 795 793 791 3 z H U 789 787 793 791 785 CO 793 m co m 789 787 785 793 791 789 z 0 H U 791 789 787 787 785 LONGITUDINAL PROFILE- OAK HILL CREEK HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG 785 /'//ia5iit P \\\ NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: OAK HILL CREEK STA: 116+00-124+00 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013—AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 190F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 810 810 309 80S 807 807 co z 305 0 / o Lu � co 0 CC ION W/ UT' co 803 7 80? 0 2 z 301 TERE 0 801 uJ co II 800 H z 80C 00 NN ,r coo 0 0 + + + + + + O O O O O O N N N N N N 809 0 0 0 + O 0 O 0 O CO 0 0 0 0 0 0 0 + 0 0 (.0 0 O CO 0 0 0 CO O 0 CO 0 0 + 0 0 O CO O CO CO 0 0 O 809 807 807 805 803 801 4 z O H U 799 0 0 O N O O N N uJ 0) 0) co 0 U z 0 H 0 uJ 0) 0) co i 805 803 801 805 0 + 0 O 799 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co co 0 N V co co 0 N V co co 0 N V co co 0 + + + + + + + + + + + + + + + + + + V V Lc) Lc) Lc) Lc) Lc) O O O O O r r r r r O O O O O O O O O O O O O O O O 0 N N N N N N N N N N N N N N N N N CO O 805 803 803 801 799 0 0 + + CO CO O O N N v coo co 0 NN v coo co 0 NN + + + + + + + + + + CO CO co Q) Q) Q) Q) Q) O_ O_ O O O O O O O 0 N N N N N N N N N N LONGITUDINAL PROFILE- UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG 0 0 + N 0 r N 0 + ✓ N 0 r N 801 799 0 co 0 N _ N NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: UT1 STA: 200+00-212+00 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013-AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 200F 23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www. keemap. com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 805 805 303 z 80? 0 H 0 801 OSS-SECTION i -S b I hl in co co 801 0 U r99 799 797 1 797 I 806 806 305 ENT CROSSING iING 80E 803 80? co II 301 0 H in 801 uJ co uJ in 799 uJ _1 in J 799 Q z w INTERNAI r97 H 797 r95 ` 795 \ 794 794 + co N 798 798 797 797 795 793 791 0 0 CO + N 7 CO z 0 H 0 uJ 0) 0 N N + co N 0 co 0 m N 795 793 791 0o oN v coo o 0 N N N N N LONGITUDINAL PROFILE- UT1 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG SEAL: �0�\\�`\ 10AR() i ,O,, � cAssi �. ' Doali4r6d byr ° ° LL-4647 = /i,, Ip B I I. 1 \\\� NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: UT1 STA: 212+00-221+00 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013—AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 21 OF 23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 823 823 821 I ^ 821 V 819 I 819 817 /\ 817 815 815 813 811 z 0 H U uJ 0) 0) co 0 0 z 0 H 0 uJ 0) 0) co 0 0 813 811 809 809 807 O � 0 co CO 0 co CO CO LONGITUDINAL PROFILE- UT1A HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG CO M 807 O 00 +j SEAL: `c, 1CAP %B/ occtel 6 bY' ° 1:12:1:1\ NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: UT1A STA: 300+00-305+00 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013—AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 220F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 DocuSign Envelope ID: B2BD400E-10BD-4052-8946-793A438C0C6D 797 796 795 794 793 792 791 790 42' CPP INV IN: 792.63' INV OUT: 792.51' 0 0 + 71- + + N N 796 795 797 796 795 794 793 792 co CO + co co CO CO LONGITUDINAL PROFILE- UT2 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG 0 0 0 0 co co + + V V V V 796 795 794 794 793 793 792 792 791 790 789 + coo + 0 0 0 0 0 0 co co co 48" CPP INV IN: 790.97' INV OUT: 790.45' o � 0 0 CO CO + 0 co 0 co 0 0 co 791 790 789 o o N v coo om + + + + + 0 0 0 0 000 CO CO CO CO LONGITUDINAL PROFILE- UT3 HORIZONTAL SCALE: 1" = 20' FULL SIZE, 1" = 40' HALF SIZE VERTICAL SCALE: 1" = 2' FULL SIZE, 1" = 4' HALF SIZE LEGEND THALWEG 791 790 SEAL: 0,\eo��� ICAR®%�B/ 7 r: L-4 4 7 NOTE: SEE SHEET 1 FOR SURVEYOR'S NOTES, LEGEND & STATEMENT OF CERTIFICATION ELEVATION DATUM: NAVD 88 CONTOUR INTERVAL: 1 FOOT THIS IS A TOPOGRAPHIC SURVEY FOR INFORMATIONAL AND DESIGN PURPOSES ONLY. IT SHOULD NOT BE USED FOR CONVEYANCE OR LEGAL PURPOSES. AN AS -BUILT SURVEY FOR: WILDLANDS ENGINEERING, INC SPO FILE NOS. 36-CR & 36-CS DMS SITE ID NO. 100120 PROJECT: OAK HILL DAIRY MITIGATION SITE SHEET TITLE: LONGITUDINAL PROFILE: UT2 STA: 2+30-4+90 UT3 STA: 300+40-302+80 TOWNSHIP: CHERRYVILLE COUNTY: GASTON STATE: NORTH CAROLINA DRAWN BY: NH CHECKED BY: PBK SURVEY BY: KP, AC, JR, CB, DP SCALE: AS SHOWN SURVEY DATE: 04/22/22 JOB: #2201013-AB SHEET SIZE: 11" X 17" (HALF SIZE) DATE REVISIONS SHEET: 230F23 P.O. Box 2566 Asheville, NC 28802 (828) 575-9021 www.keemap.com License # C-3039 Appendix F Correspondence Environmental Quality To: DMS Technical Workgroup, DMS operations staff From: Periann Russell, Division of Mitigation Services (DMS) RE: Pebble count data requirements Date: October 19, 2021 The DMS Technical Work Group met September 29, 2021 to discuss Interagency Review Team (IRT) and DMS requirements for collecting pebble count data as part of monitoring (MYO-MYx). Agreement was reached between all attending parties that pebble count data will not be required during the monitoring period for all future projects. Sediment data and particle distribution will still be required for the mitigation plan as part of the proposed design explanation and justification. Pebble counts and/or particle distributions currently being conducted by providers for annual monitoring may be discontinued at the discretion of the DMS project manager. If particle distribution was listed as a performance standard in the project mitigation plan, the provider is required to communicate the intent to cease data collection with the DMS project manager. The absence of pebble count data in future monitoring reports where pebble count data was listed as part of monitoring in the mitigation plan must be documented in the monitoring report. The September 29, 2021 Technical Work Group meeting may be cited as the source of the new policy. The IRT reserves the right to request pebble count data/particle distributions if deemed necessary during the monitoring period. Kristi Suggs From: Reid, Matthew <matthew.reid@ncdenr.gov> Sent: Wednesday, October 27, 2021 1:26 PM To: Kristi Suggs Cc: Mimi Caddell Subject: RE: [External] FW: Pebble Count Data Requirements I am absolutely OK with not doing pebble counts anymore! As stated in the memo, please add a statement in the monitoring reports citing the policy. Thanks! Matthew Reid Project Manager — Western Region North Carolina Department of Environmental Quality Division of Mitigation Services 828-231-7912 Mobile matthew.reid@ncdenr.gov Western DMS Field Office 5 Ravenscroft Dr Suite 102 Asheville, NC 28801 %' lMthlrq Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kristi Suggs [mailto:ksuggs@wildlandseng.com] Sent: Wednesday, October 27, 2021 1:24 PM To: Reid, Matthew <matthew.reid@ncdenr.gov> Cc: Mimi Caddell <mcaddell@wildlandseng.com> Subject: [External] FW: Pebble Count Data Requirements CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Matthew, Jason Lorch in our Raleigh Office forwarded this meeting memo to me. It says that conducting pebble counts for DMS monitoring (MYO — MY7) projects is no longer needed as long as it has been okayed by the DMS PM. Moving forward, are you going to allow us to stop doing them on your projects? If so, will DBB projects be treated the same? Please let me know. Thank you! Kristi 1 Kristi Suggs I Senior Environmental Scientist 0: 704.332.7754 x110 M: 704.579.4828 Wildlands Engineering, Inc. 1430 S. Mint St, Suite 104 Charlotte, NC 28203 From: Jason Lorch <jlorch@wildlandseng.com> Sent: Monday, October 25, 2021 9:05 AM To: Kristi Suggs <ksuggs@wildlandseng.com> Subject: FW: Pebble Count Data Requirements FYI! Jason Lorch, GISP 1 Senior Environmental Scientist 0: 919.851.9986 x107 M: 919.413.1214 Wildlands Engineering, Inc. 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 From: Russell, Periann <periann.russell@ncdenr.gov> Sent: Thursday, October 21, 2021 10:05 AM To: King, Scott <Scott.King@mbakerintl.com>; Catherine Manner <catherine@waterlandsolutions.com>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; adam.spiller@kci.com; Brad Breslow <bbreslow@res.us>; Davis, Erin B <erin.davis@ncdenr.gov>; gginn@wolfcreekeng.com; grant lewis<glewis@axiomenvironmental.org>; Jeff Keaton <ikeaton@wildlandseng.com>; katie mckeithan <Katie.McKeithan@mbakerintl.com>; Kayne Van Stell <kayne@waterlandsolutions.com>; Kevin Tweedy <ktweedy@eprusa.net>; Reid, Matthew <matthew.reid@ncdenr.gov>; Ryan Smith <rsmith@lmgroup.net>; Melia, Gregory <gregory.melia@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov>; Famularo, Joseph T <Joseph.Famularo@ncdenr.gov>; Rich@mogmit.com; Bryan Dick <Bryan.Dick@freese.com>; Ryan Medric <rmedric@res.us>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Kayne Van Stell <kayne@waterlandsolutions.com>; Worth Creech <worth@restorationsystems.com>; Jason Lorch <jlorch@wildlandseng.com> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Tsomides, Harry <harry.tsomides@ncdenr.gov>; Reid, Matthew <matthew.reid@ncdenr.gov>; Dow, Jeremiah J <ieremiah.dow@ncdenr.gov>; Horton, Jeffrey <ieffrey.horton@ncdenr.gov>; Ullman, Kirsten J <Kirsten.Ullman@NCDENR.gov>; Ackerman, Anjie <aniie.ackerman@ncdenr.gov>; Blackwell, Jamie D <iames.blackwell@ncdenr.gov>; Xu, Lin <lin.xu@ncdenr.gov>; Mir, Danielle <Danielle.Mir@ncdenr.gov>; Corson, Kristie <kristie.corson@ncdenr.gov>; Russell, Periann <periann.russell@ncdenr.gov>; Sparks, Kimberly L <Kim.sparks@ncdenr.gov> Subject: Pebble Count Data Requirements Please review the attached memo documenting the agreed upon policy for pebble count data requirements. Please reply (me only) to this email if accept that this memo represents (or misrepresents) our discussion on Sept 29. Thank you. Periann Russell Geomorphologist Division of Mitigation Services, Science and Analysis NC Department of Environmental Quality 2 919 707 8306 office 919 208 1426 mobile beriann.russell@ncdenr.gov Mailing: 1652 Mail Service Center Raleigh, NC 27699-1652 Physical: 217 West Jones Street Raleigh, NC 27603 `Nothlrq COMM Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 3