Loading...
HomeMy WebLinkAbout20220467 Ver 1_Impact Bulletin Details 2022-5-18 Fig 5 10_20220524Dewatering Device (or dirt/sediment bag) Discharge Pump Into Velocity Dissipater Discharge Hose Dewatering Pump (as needed) Discharge Hose Work Area Length Not To Exceed That Which Can Be Completed In One Day Flow Intake Hose Sump —hole Or Pool 12" Min Depth 2' Min Diamet Diversion Pump Base Flow + 1 Foot (2 Foot Minimum) Cross Section Of Sandbag/Stone Diversion SECTION A —A D 0 PUMP AROUND / DEWATERING PLAN VIEW DETAIL NOT TO SCALE C Civil 'Q V oesi3n Concerts, PA NCBELSA C-2184 RESLCPE EXISTING STREAM BANK TO ORIGINAL CONTOURS AND STABIUZE WITH NATIVE PLANT SEED MIX PER EROSION CONTROL NOTES INSTALL HEAVY COCONUT FIBER MATTING W/ NATURAL FIBER NETS ON DISTURBED SLOPE AREAS. SECURE W/ 12' WOODEN STAKES O 36' O.C. NORMAL STREAM LEVEL VARIES 6' — 12" ANCHOR MATTING 6' INTO EARTH FILL 1l NCTE. NO FERTILIZER TO BE USED WITHIN 10' OF BANK STREAM BANK PROTECTION NOT TO SCALE 12" OR 20% OF PIPE DIA BELOW STREAM BED — FLOODPLAIN BENCH/ BACKFILL ELEVATION STREAM CHANNEL DUAL CULVERT STREAM CROSSING CROSS SECTION NOT TO SCALE PINNERS COVE IMPACT BULLETIN DETAILS MAY 2022 Figure 5.10