HomeMy WebLinkAbout20220753 Ver 1_Riparian Buffer Form_20220620Strickland, Bev
From: office@capotebuilders.com
Sent: Monday, June 20, 2022 2:48 PM
To: Perez, Douglas J
Subject: [External] Re: Signed Catawba Riparian Buffer Form
Attachments: Catawba Buffer Form.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to Report Spam.<mailto:report.spam@nc.gov>
Signed form returned as per your request.
Thank you,
Lynn Hogenson
Office Manager
Capote Builders
704 578 8509
NEW EMAIL: office@capotebuilders.com
On 2022-06-20 13:22, Perez, Douglas J wrote:
> If you could fill this form out and return it back to me, that would
> be most appreciated.
>
> Thanks,
>
> Doug
>
> Doug Perez - Environmental Specialist
>
> NC Dept. of Environmental Quality (NCDEQ)
>
> Division of Water Resources - Water Quality Regional Operations
>
> 610 East Center Ave., Suite 301, Mooresville, NC 28115
>
> Phone: (704) 235-2162 Fax: (704) 663-6040
>
> _E-mail correspondence to and from this address may be subject to the
> North Carolina Public Records Law and may be disclosed to third
> parties unless the content is exempt by statute or other regulation._
1
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Af
l � �1'1( ` I "�/ 2-J County:Project Name/address• Uj'i y
�n ` f
Owner: (I)11 0 aple--
�
Print4100 il:41-
Contractor/agent: 0 N
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule.Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B.0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer(within 30 ft of the full pond elevation), unless
approved. Exception,those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B.0243
(6)]
Beaches,impervious patios,impervious walkways,etc.are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4)and(6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described.The approved access corridor shall be restored.Staging,spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4),(6), (8)1
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non-erosive velocities to the lake. [15A NCAC 02B.0243(5),(6)]
Ackno led ement of No '!cation
I, v �D � l!T ,hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any wofk conducted in the buffer,not specifically stated in the application and approved
by the Division of Water Resources(DWR),is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules,the approved plan(s)and specification(s), and other supporting
materials.
i(:e .1 qogg&-----
Signature(owner): Date: L/PD/g t •