Loading...
HomeMy WebLinkAboutGW1-2022-05788_Well Construction - GW1_20220615 WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.WQII Contractor Information: 14.WATER ZONES Welj Contractor Name l ► FROM TO DESCRIPTION ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells)OR LINER(if a 1'icable) Barnette Well Drilling, Inc. FROM TO DIAMETER THICKNESS I MATERIAL ft. ft Company Name in. s �Q 1 )� 16.,INNER,CASING.OR.T.UBIYCn(aeothermal•closed-loo ) 2.Well Construction Permit#: FROM TO EIMMETER THICKNESS MATERIAL List all applicable well construction permits ri.e.UIC,County,State,Variance,etc.) ft. ft in. 3.Well Use(check well use): ft. ft in. Water Supply Well: FROMREE TO DL41IETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) nfresidential Water Supply(single) ft. ft. in. ❑hidustrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irri ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft. ft. GemeWSaii4 Poured ❑Monitoring ❑Recovery ft 6 ft. b �� Injection Well: ft. ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK-(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEME`1T METHOD ❑Aquifer Test ❑StormwaterDrainage ft. ft. ❑Experimental Technology [--]Subsidence Control ft. ft ❑Geothermal(Closed Loop) ❑Tracer 20;DRILLING LOG attach additional sheets ifnecessaryl ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness,soil/rock type,grain size,etc.) c ft. ft. It (`- Z L za t� 4.Date Well(s)Completed: 2'Z3 2�Well ID#�U)Z 1 --tOtL q ft. ft. 5a.Well Location: ft. -3 ft. Lb } J ft. �Z 6 P Facility/Owner Name p Facility ID#(if applicable) it. ft. F 7— ,h At "t,a ft. it �'"a.S""� r��T,p `?�'i;_... Physical Address,City and Zip it. ft. I 1 21.REMARKS County Parcel Identification No.(PIN) q�1 r ��,,, ,J pp,0 3vS c J IN 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat(long is sufficient) 22.Certification: 6.IS(are)the Well(s)' rmanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or SN-0 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: /A (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if dierent(example-3@200'and 2@100) 24a. For All Wells: Original form to.Division of Water Resources (DWR), 10.Static water level below top of casing: (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ifwater level is above casing,use"+" 11.Borehole diameter: (in.) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) 1� Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method:Air Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (Le.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gpm) ��U-J Permit Program,1611 MSC,Raleigh,NC 27699-1611 �. � Method of test: 11 13b.Disinfection type: HTH Amount: Cu Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018