Loading...
HomeMy WebLinkAbout20140557 Ver 1_More Info Received_201406130 20'4055~ 2 ®'4®557 Office Use Only- Corps action ID no. DWQ project no Form Version 13 Dec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version D� 4 ITY Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps ®Section 404 Permit ❑Section 10 Permit 1b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a Name of project- Sewer System Improvements Project 2b County Gaston 2c Nearest municipality / town, City of Bessemer City 2d Subdivision name NIA 2e NCDOT only, T I P or state project no NIA 3. Owner Information 3a Name(s) on Recorded Deed. City of Bessemer City 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable): James Inman, City Manager, Bessemer City JOIN .1 3d Street address 132 W. Virginia Avenue 3e City, state, zip. Bessemer City, North Carolina 28016 3f Telephone no 704 - 629 -5542 3g Fax no 3h. Email address jinman @bessemercity.com Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version D� 4 ITY f Ic" etDkkc c 4 n •.n „n e... �•.vu •eA`�+C : 02 4. Applicant Information (if different from owner) 4a Applicant is. ® Agent ❑ Other, specify 4b. Name, 4c Business name (if applicable). 4d Street address. 4e. City, state, zip 4f Telephone no.. 4g. Fax no 4h. Email address - 5. Agent/Consultant Information (if applicable) 5a. Name: Douglas G. Chapman, PE 5b. Business name (if applicable) McGill Associates 5c Street address 1240 19th Street Lane NW 5d. City, state, zip Hickory, NC 28601 5e. Telephone no - 828 - 328 -2024 5f. Fax no. 828 - 328 -3870 5g Email address- doug .chapman @mcgiliengineers.com Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no. (tax PIN or parcel ID)* 1 b Site coordinates (in decimal degrees). See Attached List and Design Plans w/ Location Map 1c Property size - 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Unnamed Tributary to Long Creek proposed project- 2b Water Quality Classification of nearest receiving water. C 2c. River basin map is available at Catawba http• / /h2o enr state nc us /adman /maps/ 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing sewer alignment through wooded areas within established residential regions of City. 3b List the total estimated acreage of all existing wetlands on the property: 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 1,025 3d Explain the purpose of the proposed project- The proposed project will replace segments of sanitary sewers and manholes which are aged and currently expose the surrounding areas to Increased risk of sanitary sewer overflows. All proposed sewers will follow all federal, state, and local standards for such systems and their construction. 3e Describe the overall project in detail, including the type of equipment to be used The project generally involves the construction of approximately 7,730 linear feet of gravity sewer pipelines and manholes. All proposed sewers will be 8 -inch diameter sewer lines. The project also includes approximately 637 linear feet of sewer upgrade by pipe- bursting methods. The new sewer lines will connect to adjacent existing segments of the sewer system which are not in need of replacement. All creek crossing disturbances will be temporary in nature. Upon completion of the sewer line installation across each stream, stream banks will be restored with biodegradable matting and native plant species. Equipment proposed for construction activities will Include track -hoes, back -hoes, tractors, other small power equipment, and hand tools as necessary. Page 3of11 PCN Form —Version 1 3 December 10, 2008 Version 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments ❑ Yes ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known)- N/A Agency /Consultant Company Other: 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a. Is this a phased project? ❑Yes ® No 6b. If yes, explain Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply). ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b. 2c. 2d. 2e 2f Wetland impact number — Type of impact Type of wetland Forested Type of jurisdiction (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T ❑ Yes ❑ Corps W1 El P ❑ T ❑ No ❑ DWQ El Yes El Corps W2 El P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P r-1 T ❑ No ❑ DWQ El Yes Yes ❑ W5 ❑ P ❑ T ❑ No ❑ DWQ El Corps W6 ❑ P ❑ T El No El ❑ DWQ 2g. Total wetland impacts 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact length number - (PER) or (Corps - 404, 10 stream width (linear Permanent (P) or intermittent DWQ — non -404, (INT)? (feet) feet) Temporary (T) other) S1 ❑ P ®T Temp Stream Crossing UT to Long Creek ® PER ❑ INT ® Corps ❑ DWQ 10 40 ® PER ® Corps S2 ❑ P F1 T ❑ INT ❑ DWQ ® PER ® Corps S3 ED] P ❑ T ❑ INT ❑ DWQ ® PER ® Corps S4 El ❑ T ❑ INT ❑ DWQ ❑ PER F1 Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ El PER El Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h Total stream and tributary impacts 40 31 Comments Page 5 of 11 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a. 4b 4c 4d 4e. Open water impact number — Name of waterbody (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments* 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number pond P1 P2 5f. Total 5g. Comments* 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 51 Expected pond surface area (acres), 5j Size of pond watershed (acres) 5k Method of construction, 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then ou MUST fill out Section D of this form 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other Project is in which protected basin? N/A ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary T required? ❑Yes B1 ❑ P ❑ T ❑ No El Yes B2 ❑P ❑T ❑ No ❑Yes B3 ❑P ❑T ❑ No 6h Total buffer Impacts 6i Comments Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The most viable and feasible alternative for crossing the streams Is to do so temporarily, with as little impact to surrounding stream beds, stream banks, and vegetation as possible. b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Disturbed areas affecting the stream banks will be graded at a 2:1 maximum slope, tying into the existing ground, planted with temporary and native grass seed and stabilized with a biodegradable erosion control matting. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U.S or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply). ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c Comments- 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b. Stream mitigation requested. linear feet 4c If using stream mitigation, stream temperature. ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested. acres 4h Comments Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If you will have to fill out this entire form — please contact the State for more information El Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required. Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments* Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments, 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? NIA % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why All existing topographic features will be restored to their original condition and the proposed construction activities will not require tying to existing storm water drainage structures 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Cabarrus County ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs El USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other. 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes No ❑ attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land'? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑ Yes El No letter ) Comments: 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) NIA 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility No wastewater is generated from this sewer replacement project but all sewer conveyed by the project is ultimately treated at the City of Gastonia's Crowder's Creek WWTP Page 10 of 11 PCN Form —Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http:// www .fws.gov /nc- es /es /countyfr.htmi 6. Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://www.ncdenr.org/web/wq 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a WIII this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant In North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http: /lwww hpo.ncdcr.ciov /, http: / /www.ncnhp.org B. Flood Zone Designation (Corps Requirement) 8a. WIII this project occur in a FEMA- designated 100 -year floodplain? ❑Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? FEMA Firm maps Douglas G. Chapman, PE 5/30/2014 Applicant/Agent's Printed Name Date Appli a t/Agent's gftature (Agent's signature is valid nl if an autho ation letter from the applicant s provided Page 11 of 11 U JUN 13 2014 LEM PUMP STATION ` LEGEND (D FMC CITY LIMITS — (2 ) VANTINE _, EXISTING GRAVITY SEWER Q WINFIELD '� EXISTING FORCE MAIN - -- - - -7 ® NINTH STREET PROPOSED PUMP STATION SCADA Q SHOPPING CENTER r k= ; _ PROPOSED PUMP STATION SCADA AND GENERATOR 6 COSTNER SCHOOL ROAD I . PROPOSED GRAVITY SEWER IMPROVEMENTS Q) SOUTHEAST ' ` =f�C /" J ✓ 1 ,`Z•e,_ t� ,; !a , . Q CROWDERS MOU NTAIN ROAD ,,�� t � Vie,• ) � i � _ � � _ r.�y�F 9 PINCHBACK (\ t11 mom X�Ir � 11\ fj'�`l{ -�.}`? `ice . -1• :i �� 4 ./�'~� `�fi' , , y l- Y-`A'• vnv- ih AK t(( \ �� PRC3POSED S1 STREAM IMPACT ^t f ^ e t ,'rrnk... �1 tt ,.- J t±^ 1 'T.n flr«l 1.3 9 �� "� _- °t ��.• tl ltt z�� �'` _ I- /rte i. t. ��; �. Al fe'ij� rkw�' ,.,.' ./ r DISCHARGE POINT #2 l' TO CITY OFGASTONIA COLLECTION SYSTEM .k SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. STREET ADDRESS PLAN N0. PARCEL ID: 132 W. Virginia Avenue Please print: �► Property Owner: ` �fy c��� y.�PsSL�/�L-.0 a� Property Owner: J 4oy ����► � �� ���y�� The undersigned, registered property owners of the above noted property, do hereby authorize CC* , of /'(% �� �SSn PiQl � 4 i (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: �%�` (A2F''55'Zfo2 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. thorized Signature Authorized Signature Date: 572 Yjll Date: